    1/27

    235

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    2 AGRICULTURE AND ALLIED SECTORS

    Agriculture

    1. Seasonal conditions and crop prospects in

    2008-09

    a. Kharif

    Anticipating favourable pre-monsoon and

    well distributed southwest monsoon, it was

    programmed to cover about 74.73 lakh hectares

    under various agricultural crops during the current

    kharif season. Targeted area under cereals, pulses,

    oilseeds, cotton, sugarcane & tobacco is in the order

    of 36.70, 14.37, 17.33, 2.32, 2.96, & 1.05 lakh

    hectares respectively.

    Pre-monsoon rainfall

    Pre-monsoon rainfall during April and May

    was deficit in major parts of the State. Isolated

    rainfall occurred in South Interior parts from 18th to

    21st May. A low pressure area over southeast

    Arabian Sea from 23rd May resulted in fairly

    widespread rainfall in parts of coastal and south

    interior districts.

    South-west monsoon rainfall

    The southwest monsoon advanced into most parts

    of coastal & south interior Karnataka on 1st June

    and by 9th June it covered the entire State. Initially

    it was active over coastal, malnad and some parts

    of south interior districts and weak over north interior

    and major parts of south interior districts. The

    monsoon activity was subdued over interior peninsula

    region. The monsoon was weak from the second

    fortnight of June to the first fortnight of July in major

    parts of northern & southern districts hindering

    normal progress of kharif sowing. The monsoon

    became active from the last week of July. From

    6th August to 19th August, major parts of the State

    experienced excess rainfall leading to flash floods

    in some parts. During first fortnight of September,

    major parts of the State experienced widespread

    rainfall. Southwest monsoon has withdrawn from

    some parts of north interior Karnataka by 14th and

    from entire the State by 15th October.

    Total coverage under Kharif crops was

    65.58 lakh hectares against the set target of 74.73lakh hectare, accounting for 88% coverage, while

    corresponding coverage of previous year was 74.41

    lakh hectares.

    Impact of Dry spell

    Rainfed kharif crops like jowar, maize, bajra,

    greengram, blackgram, soyabean, sesamum,

    sunflower etc. in about 7.71 lakh hectares in parts

    of Bidar, Gulbarga, Belgaum, Bellary, Koppal,

    Bagalkote, Dharwad, Chitradurga, Mysore,

    Chamarajanagar, Davanagere, Hassan, Ramanagarand Tumkur districts were affected by severe

    moisture stress due to consecutive dry spell of about

    5-6 weeks from 2nd fortnight of June to 3rd week

    of July. The widespread rainfall during the last week

    of July and 1st fortnight of August had helped in

    recovery of rainfed crops to some extent; however

    substantial decline is observed in the yield of short

    duration crops like Blackgram, Greengram,

    Soyabean and Sesamum.

    Impact of Excess rainfall /Flash floods

    The State also experienced heavy rainfall

    in first fortnight of August leading to flash floods in

    some parts of northern and malnad districts. Crops

    in an extent of about 0.89 lakh hectares were

    affected by submergence/water logging in parts of

    Belgaum, Bagalkote, Haveri, Shimoga, Koppal,

    Gulbarga, Davanagere and Dakshina Kannada

    district.

  • 8/8/2019 Chapter2 Eng

    2/27

  • 8/8/2019 Chapter2 Eng

    3/27

    237

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    The crop wise target and achievement in area sowing of Kharif are as below.Unit: Area in lakh hectares

    Crop Target Area Kharif 2008

    Area sown

    Normal Area Previous Year

    Coverage

    Cereals 36.70 33.58 34.54 36.73

    Pulses 14.37 11.18 13.85 15.32

    Total

    Food grains

    51.07 44.76 48.39 52.05

    Oilseeds 17.33 13.94 15.99 15.48

    Cotton 2.32 2.85 2.36 2.34

    Sugarcane 2.96 2.97 3.61 3.59

    Tobacco 1.05 1.05 0.98 0.94

    Total 74.73 65.58 71.34 74.41

    b. RabiIn order to bring unsown kharif area under

    rabi sowings, the Rabi target was revised to 37.75

    lakh hectares by programming an additional area

    of about 3.44 lakh hectares from Kharif unsown

    area.

    Fairly wide-spread rainfall occurred over

    major parts of south interior Karnataka, and

    scattered / isolated over North Interior Karnataka

    during 2nd fortnight of October, thereafter dry

    weather prevailed in major parts of the State up to16th November. Under the influence of Cyclonic

    storm Khaimuk over West central Bay of Bengal

    widespread rainfall occurred over Bagalkote, Bijapur,

    Dharwad, Gadag, Gulbarga, Koppal, Raichur, Bellary

    and Belgaum on 17th & 18th November. Again,widespread rainfall occurred under the influence of

    Cyclonic storm NISHA over southern and

    southeastern districts on 28th and entire State on

    29th November. The cummulative rainfall from 1st

    October to 31st December was 143 mm as against

    the normal rainfall of 193 mm. The total area covered

    under various rabi crops is 35.11 lakh hectares against

    the revised target of 37.75 lakh hectares, accounting

    for 93% coverage.

    c. Summer

    During summer, it is programmed to cover

    an area of about 6.90 lakh hectares under paddy,

    groundnut, sunflower, maize, etc. in irrigated areas

    of major/minor reservoirs. Sowing of summer crops

    is in progress in irrigated parts.

    The Crop-wise Targets and achievements in area sowing of Rabi are as below:Unit: Area in lakh hectares

    Crop Target Area * Rabi 2008

    Area sown

    Normal Area Previous Year

    Coverage

    Cereals 18.42 16.69 16.14 15.74

    Pulses 9.77 10.28 8.95 8.97

    Total Foodgrains 28.19 26.97 25.09 24.71

    Oilseeds 7.42 6.34 6.66 5.53

    Cotton 1.90 1.37 1.67 1.55

    Sugarcane 0.23 0.40 0.42 0.31

    Tobacco 0.02 0.03 0.07 0.18

    Total 37.75 35.11 33.92 32.29

    * Revised target.

  • 8/8/2019 Chapter2 Eng

    4/27

    238

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Crop-wise area target and anticipated achievement during summer is as follows:Unit: Area in lakh hectares

    Crop Target Area Anticipated

    Achievement

    Previous year coverage

    Cereals 3.35 3.35 3.58

    Pulses 0.30 0.30 0.25

    Total Foodgrains 3.65 3.65 3.83

    Oilseeds 2.91 2.91 2.38

    Cotton 0.01 0.01 Neg.

    Sugarcane 0.33 0.33 0.30

    Total 6.90 6.90 6.51

    Source: Agriculture Department

    2. ProductionIn view of the above stated seasonal

    conditions and area coverage under various crops it

    is anticipated that the total food grain production

    Table 2.1

    Production of important agricultural crops in Karnataka(Lakh M.Tonne)

    2006-07 2007-08 2008-09Crop/ Crop Group

    Target Achvt. Target Achvt. Target Achvt. *

    1. Cereals 104.04 84.90 108.20 109.21 112.71 99.71

    2. Pulses 10.53 8.39 11.50 12.65 12.54 9.06

    Total Food grains 114.56 93.29 119.70 121.86 125.24 108.77

    3. Oilseeds 18.06 9.45 18.86 15.49 20.83 10.15

    4. Cotton(1) 8.89 5.36 6.76 7.78 7.75 6.54

    5. Sugarcane 187.20 236.42 200.00 262.40 211.75 221.26

    6. Tobacco 0.77 0.46 0.68 0.46 0.76 0.35

    (1) lakh bales of 170 Kgs.Source: Directorate of Economics and Statistics, Government of Karnataka

    would be about 109 lakh tonnes as against the settarget of 125.25 lakh tonnes. The details are given

    below:

    Changes in cropping pattern

    As seen in the previous year, this year too

    area diversion was observed from Cotton and oilseed

    crops to Maize and pulses like Red gram and Bengal

    gram.

    3. Agricultural inputs

    a. Production and distribution of seeds

    The seed replacement norms fixed by the

    State for different crops in 2008 -09 are as follows.

    Cereals - 20 to 30 percent

    Pulses - 20.5 to 23.5 percent

    Oilseeds - 13.5 to 30 percent

    Cotton - 15.5 percent

    All Hybrids - 100 percent

    Source: Agriculture Department

    57

  • 8/8/2019 Chapter2 Eng

    5/27

  • 8/8/2019 Chapter2 Eng

    6/27

    240

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    The area under Maize and corresponding

    production from 2006-07 to 2008-09 are given below.

    Year Area (Lakh Ha.) Production (Lakh Tonnes)

    Target Ach. Target Ach.

    2006-07 8.80 9.61 27.68 26.42

    2007-08 8.95 11.13 28.97 32.54

    2008-09 9.10 10.50 29.93* 30.42*

    * anticipated

    c) Pulses

    To augment pulses production, an action

    plan for the year 2008-09 to cover 20.95 lakh

    hectares and a production target of 12.54 lakh tonnes

    was formulated by Technology Mission with the

    assistance of University of Agriculture Sciences,

    Bangalore and Dharwad, seed producing agencieslike the KSSC Ltd. and NSC.

    The area under pulses and corresponding

    production from 2006-07 to 2008-09 are given below

    in table 2.6.

    Table 2.6

    Area and production of pulses

    Area (Lakh Hectares) Production

    (Lakh Tonnes)Year

    Target Ach. Target Ach.

    2006-2007 20.00 23.16 10.53 8.392007-2008 20.45 23.83 11.50 12.65

    2008-2009 20.95 21.25* 12.54 9.06*

    d. Oilseeds

    The oilseeds production programme is being

    implemented in all the districts except Kodagu since

    1990-91 with central assistance, cost share being

    75:25 between the Center and State.

    The area under oilseeds and their production

    as targeted and the achievement from 2006-07 to

    2008-09 are as follows.

    The use of certified seeds, application of

    gypsum and Phosphorus Solubling Bacteria accounts

    for 30-40% increase in the yield. Availability of

    certified/quality seeds is a big constraint; hence the

    seed supplied was below 50% of the total

    requirements.

    e) National Food Security Mission (NFSM)

    A Centrally Sponsored Scheme, National

    Food Security Mission was launched from 2007-

    08. It has three components (i) National Food

    Security Mission Rice (NFSM-Rice); (ii) National

    Food Security Mission Wheat (NFSM-Wheat);

    and (iii) National Food Security Mission Pulses

    (NFSM Pulses).

    The Objectives of the Mission are: 1)Increasing production of rice, wheat and pulses

    through area expansion and productivity

    enhancement in a sustainable manner in the identified

    districts of the country; 2) Restoring soil fertility and

    productivity at the individual farm level; 3) Creation

    of employment opportunities; and 4) Enhancing farm

    level economy (i.e. farm profits) to restore

    confidence amongst the farmers.

    Table 2.7

    Area and production of oilseeds

    Area (Lakh Ha.) Production(LakhTonnes)

    Year

    Target Ach. Target Ach.

    2006-2007 27.50 23.55 18.06 9.45

    2007-2008 27.82 22.76 18.86 15.49

    2008-2009 28.62 21.28 20.83 10.15

    (Rs. Lakh)

    ItemBudget

    Provision

    Grants

    Released

    Unspent

    Balance

    Total Grants

    available

    for 2008-09

    Expenditure

    as on

    October 08

    NFSM-Rice 1464.54 701.97 165.35 867.32 737.10

    NFSM-Pulses 1118.40 316.85 400.40 717.25 937.80

    Publicity 174.00 50.00 0.00 50.00 17.71

    Local Initiatives 948.00 474.00 0.00 474.00 0.00

    Total 3704.94 1542.81 565.75 2108.57 1692.61

    * anticipated

    Budget Allocation and expenditure for 2008-09

    upto end of

  • 8/8/2019 Chapter2 Eng

    7/27

    241

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Under NFSM- 7 districts for Rice and 13

    districts for Pulses have been selected in Karnataka.

    NFSM Programme and Progress during

    2008-09

    The State has a vision to achieve theaverage productivity target of 45 quintals of Paddy

    per hectare and 7 quintals of Pulses per hectare in

    the NFSM implementing districts during 2008-09 with

    the budget support of Rs.25.82 crore (NFSM Rice

    - Rs.1464.55 lakh and NFSM Pulses - Rs.1118.14

    lakh) under NFSM programme.

    f) Rashtriya Krishi Vikas Yojana (RKVY)

    The Government of India has launched a

    Special Additional Central Assistance Scheme called

    Rashtriya Krishi Vikas Yojana from 2007-08 in

    order to reorient the agriculture development

    strategies for rejuvenation of agriculture. It

    encourages the states to increase public investment

    in agriculture and allied sectors. It aims at achieving

    the goal of reducing the yield gaps in important crops

    and in maximising returns to the farmers in

    agriculture and allied sectors.

    During 2008-09 an amount of Rs.314.13

    crore has been provided for implementation of the

    schemes related to Agriculture, Horticulture, Animal

    Husbandry, Fisheries and Agricultural marketing

    departments and Schemes implementation is under

    progress.

    An amount of Rs.207.78 crore has been

    provided to the Department of Agriculture for

    implementation of the following schemes and

    implementation is under progress.

    Sl.

    No.

    Scheme Amount

    (Rs. Crore)

    1 Revitalizing Agriculture Extension System and for accelerating

    Agricultural Growth in Karnataka and Karnataka Farmers'

    Participatory Extension Programme

    66.17

    2 Karnataka Seed Mission 81.61

    3 Karnataka Farm Mechanization Mission

    60.00Total 207.78

    g. Centrally sponsored Macro Management

    mode scheme for Agriculture:

    The Centrally sponsored Macro

    Management mode scheme for agriculture is being

    implemented in the state since 2000-2001. This novel

    approach has been formulated amalgamating 17

    Centrally Sponsored Schemes. Under this scheme,

    the State has the flexibility to choose region/crop

    specific interventions based on the States needs and

    problems. The Government of Indias assistance to

    the programme is 90% and the remaining 10% by

    the State.

    The outlay for the year 2008-09 (both under

    state and District sector) is Rs. 1694.43 lakh, of

    which Rs. 402.65 lakh has been spent up to end of

    October 2008 and the targeted areas are Integrated

    Nutrient and Pest Management Programme, State

    Land Board, Sugarcane Development Scheme,

    Human Resources Development and Farm

    Mechanisation Programme.

    5. a) Watershed Development Programme

    Watershed Development Department was

    established during 2000-01 to give a new impetus towatershed management in the arid zones of the

    State, which has the second largest area in the

    country after Rajasthan. All the watershed

    development programmes have been brought under

    one umbrella.

    The area covered by soil conservation

    measures from 2003-04 to 2008-09 is depicted in

    the following table.

  • 8/8/2019 Chapter2 Eng

    8/27

    242

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    b) Centrally Sponsored Macro Management

    Mode Scheme for Watershed Development:Under the Centrally Sponsored Macro

    Management Mode Scheme, three different

    programmes i.e. National Watershed Development

    Programme for Rainfed Areas, River Valley Project

    and Reclamation of saline and Alkaline water logged

    areas have been taken up. Government of Indias

    share in the programmes is 90% and the State has

    to contribute remaining 10% of the outlay. For the

    year 2008-09 the financial target is Rs.5534.90 lakh

    to develop 46123 hectares. Up to end of November

    2008, Rs.2594.41 lakh has been spent and 39803

    hectares of area have been developed.

    From 2005-06 onwards the district sector

    schemes viz. Drought Prone Area Programme,

    Integrated Wasted Land Development Programme

    and Desert Area Development Area programmes

    have been transferred to Watershed Development

    Department from RD & PR. For the year 2008-09,

    financial target is Rs.24021.22 lakh to develop 4.00

    lakh hectares of land. Rs.7238.97 lakh has been

    spent including the unspent balance of 2007-08 upto

    end of November 2008 and 1.39 lakh hectares ofland have been developed.

    Prime Ministers package programme is

    being implemented in 6 districts viz., Chikamagalur,

    Hassan, Kodagu, Shimoga, Belgaum and

    Chitradurga districts with an Annual allocation of

    Rs. 3000.00 lakh and a sum of Rs.129.64 lakh has

    been spent upto the end of Nov08 as against the

    released amount of Rs.240.00 lakh and 343 hectares

    of area have been developed.

    Fish culture activities in farm ponds have

    been developed by the Department and a sum of

    Rs.8.99 lakh has been spent as against the target of

    Rs.35.00 lakh during 2008-09.

    For monitoring and evaluation of plan

    schemes of the Department a provision of Rs.100.00

    lakh has been provided in the current year.

    6. Externally aided projects

    The Sujala Watershed Development

    Programme with the assistance of World Bank has

    been sanctioned at a revised total cost of Rs.557.01

    crore covering 5 districts in the State namely, Kolar,

    Tumkur, Chitradurga, Haveri, Chikkaballapur and

    Dharwad. The scheme is being implemented on a

    participatory approach. Under this scheme, 742 sub

    watersheds have been selected. For the year 2008-09 an allocation of Rs.10835.47 lakh is provided to

    treat about 0.65 lakh hectares. Upto the end of

    November 2008, Rs.6585.22 lakh has been spent

    and 0.34 lakh hectares have been treated. The

    scheme will be closed in March-2009.

    On the similar lines of Sujala Watershed

    Project, the Department proposes to extend the

    programme for another 5 districts with an estimated

    project cost of Rs.495.00 crore over a period of 6

    years.

    Watershed programme with the assistance

    of NABARD-WDF is also being implemented in

    Karnataka with a project cost of Rs.50.00 crore.

    For the year 2008-09 Rs.513.24 lakh has been

    allocated to develop 5500 hectares of land. Upto

    the end of October 2008, Rs 55.47 lakh has been

    spent and 860 hectares of area have been developed.

    NABARD-RIDF: Under this programme

    ground water harvesting structures are being

    constructed in drinking water problematic villages.

    For the year 2008-09 Rs.1000.00 lakh has been

    provided to implement the programme.

    7. Minimum Floor Price Scheme

    Government of Karnataka has implemented

    Minimum Floor Price scheme for perishable

    Agricultural Commodities like Onion, Potato,

    Tomato, and Green Chillies, and also crops like

    Maize, Jowar, and Copra etc.

    Table 2.8

    Area covered under soil conservation

    (Lakh hectare)

    Year Area Covered Cumulative

    2003-2004 3.12 32.22

    2004-2005 3.20 35.42

    2005-2006 3.78 39.20

    2006-2007 3.45 42.65

    2007-2008 3.22 45.87

    2008-2009(A) 3.47 49.34

    Source: Watershed Development Dept.

    A: Anticipated

  • 8/8/2019 Chapter2 Eng

    9/27

    243

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    8. Agricultural prices

    Minimum Support price for different Kharif

    crops for the year 2008-09 are fixed as follows:

    9. Implementation of Crop Insurance Scheme

    a. Rastriya Krishi Bima Yojana

    Rastriya Krishi Bima Yojana (RKBY) is

    being implemented in the State since Kharif 2000.

    Under this scheme, all farmers irrespective of the

    size of their holdings, both loanee and non-loanee

    will be insured against any loss of yield due to natural

    calamities. The scheme is compulsory for loanee

    farmers and optional for non-loanee farmers. The

    Premium paid by small and marginal farmers is

    subsidised to the extent of 10%. Claims will be paid

    based on indemnity level, Sum assured and shortfall

    in the assessed yield against the Threshold yield.

    During 2008-09, 30, 19 and 5 crops were

    notified at hobli level for Kharif, Rabi and Summer

    seasons respectively.

    To compensate the crop losses on individual

    basis to the farmers in the event of crop failure dueto localized calamities like flood, hailstorm, cyclone

    and landslide, all the districts were covered under

    notified crops during Kharif , Rabi and summer 2008.

    The financial allocation for the year

    2008-09 is Rs.10000.00 lakh. Crops notified during

    Kharif, Rabi and summer 2008-09 are as follows:

    Kharif 2008-09

    Paddy (Irrigated) Sunflower (Rainfed)Paddy (Rainfed) Sesamum (Rainfed)

    Maize (Irrigated) Groundnut (Irrigated)

    Maize (Rainfed) Groundnut (Rainfed)

    Jowar (Irrigated) Cotton (Irrigated)

    Jowar (Rainfed) Potato (Irrigated)

    Ragi (Irrigated) Potato (Rainfed)

    Ragi (Rainfed) Onion (Irrigated)

    Bajra (Irrigated) Chilly (Irrigated)

    Bajra (Rainfed) Castor (Rainfed)

    Tur (Irrigated) Horsegram (Rainfed)

    Tur (Rainfed) Greengram (Rainfed)

    Soyabean (Irrigated) Blackgram (Rainfed)

    Soyabean (Rainfed) Save (Rainfed)

    Sunflower (Irrigated) Navane (Rainfed)

    CropMinimum Support

    Price/Quintal in Rupees

    Paddy (Common) 850

    Paddy (Grade 1) 880

    Jowar (Hybrid) 840

    Jowar (Maldandi) 860

    Bajra 840

    Maize 840

    Ragi 915

    Tur (Arhar) 2000

    Green Gram 2520

    Black Gram 2520

    Cotton (F-414)

    Cotton (H-777/J-34)

    Cotton (H-4)

    Cotton (Jayadhar)

    Cotton (PCO-2)

    Cotton (DCH-32)

    Cotton (LRA)

    Cotton (Banni)

    Cotton (NHH-44)

    Rs.2500 & Rs.3000 per

    quintal depending upon

    staple length

    Ground nut -in shell 2100

    Sunflower 2215

    Soybean (Black) 1350Soybean (Yellow) 1390

    Sesamum 2750

    Niger Seed 2400

    Cotton (Brahma) 2100

    Rabi - 2008-09

    Paddy (Irrigated) Bengalgram (Rainfed)

    Maize (Irrigated) Sunflower (Irrigated)

    Maize (Rainfed) Sunflower (Rainfed)

    Jowar (Irrigated) Blackgram (Rainfed)

    Jowar (Rainfed) Horsegram (Rainfed)

    Ragi (Irrigated) Greengram (Rainfed)

    Ragi (Rainfed) Safflower (Rainfed)

    Wheat (Irrigated) Linseed (Rainfed)

    Wheat (Rainfed)

    Bengalgram (Irrigated)

    Groundnut (Rainfed)

  • 8/8/2019 Chapter2 Eng

    10/27

    244

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Summer 2008-09

    Paddy (Irrigated)

    Groundnut (Irrigated)

    Groundnut (Rainfed)

    Ragi (Irrigated)

    Sunflower (Irrigated)

    Table 2.9

    Progress made under Rastriya Krishi Bima Yojana since inception of the scheme

    up to 2007-08Season / Year No. of

    farmersEnrolled

    (lakh)

    Premium

    collected(Rs. in lakh)

    Area covered

    (lakhHectares)

    Sum insured

    (Rs. in lakh)

    No. of

    farmersBenefitted

    (lakh)

    Claims settled

    (Rs. in lakh)

    Kharif 2000 3.27 953.67 6.13 34861.32 0.22 213.03Rabi 2000-01 0.24 94.73 0.73 4598.44 0.01 34.71

    Summer 2000-01 0.16 70.36 0.30 3348.68 0.01 79.21

    TOTAL 2000-01 3.67 1118.76 7.16 42808.44 0.24 326.95

    Kharif 2001 6.11 1417.89 9.83 51907.35 3.12 11990.08

    Rabi 2001-02 0.53 96.60 0.78 3230.53 0.36 1411.35

    Summer 2001-02 0.12 61.23 0.24 3014.24 0.04 211.35

    TOTAL 2001-02 6.76 1575.72 10.85 58152.12 3.52 13612.78

    Kharif 2002 8.89 3891.79 12.88 116343.40 5.07 28096.53

    Rabi 2002-03 1.35 270.90 1.97 8848.01 0.89 2168.63

    Summer 2002-03 0.06 29.10 0.13 1426.82 0.03 125.65

    TOTAL 2002-03 10.30 4191.79 14.98 126618.23 5.99 30390.81

    Kharif 2003 7.04 3042.31 10.09 94566.66 3.81 28742.00

    Rabi 2003-04 11.52 1320.12 19.50 58962.63 8.59 22063.57Summer 2003-04 0.08 43.13 0.14 1885.86 0.02 102.72

    TOTAL 2003-04 18.64 4405.56 29.73 155415.15 12.42 50908.29

    Kharif 2004 7.89 3687.97 11.40 97197.00 1.25 2648.18

    Rabi 2004-05 1.65 243.71 2.45 11204.32 0.26 369.22Summer 2004-05 0.09 57.76 0.21 2887.84 0.01 33.02

    TOTAL 2004-05 9.63 3989.44 14.06 111289.16 1.52 3050.42

    Kharif 2005 8.54 4646.67 14.72 117866.05 1.16 4387.70

    Rabi 2005-06 1.09 151.51 1.90 7647.93 0.15 125.89

    Summer 2005-06 0.08 54.63 0.17 2731.26 0.01 23.00

    TOTAL 2005-06 9.71 4852.81 16.79 128245.24 1.32 4536.59

    Kharif 2006 7.92 3987.82 16.37 115736.71 3.13 15028.10

    Rabi 2006-07 5.39 686.24 10.30 34512.85 2.96 5196.95

    Summer 2006-07 0.08 62.94 0.55 3118.38 0.06 442.65TOTAL 2006-07 13.39 4735.67 27.12 153367.94 6.15 20667.70

    Kharif 2007 5.72 3545.06 15.06 102209.63 0.65 2801.04

    Rabi 2007-08 0.57 100.21 0.82 5059.80 0.01* 42.18*

    Summer 2007-08 0.08 53.15 0.17 2657.47 0.01* 28.77*

    TOTAL 2007-08 6.37 3698.42 16.05 109926.90 0.67 2871.99

    GRAND TOTAL 78.47 28568.17 120.69 885823.18 31.83 126365.53

    * Claims will be settled to the farmers shortly by Agriculture Insurance Company of India Ltd.

    Source: Agriculture. Department

    .

  • 8/8/2019 Chapter2 Eng

    11/27

    245

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    b. Weather Based Crop Insurance Scheme:

    This is an alternative scheme for Rashtriya

    Krishi Bima Yojana framed by Government of India

    and was launched in the country during Kharif 2007.

    The scheme compensates the insured farmers

    against the likelihood of financial loss in the event of

    loss in crop yield resulting from incidence of adverse

    weather conditions and will cover the risk of deficit

    and excess rainfall. The scheme is compulsory for

    loanee farmers and voluntary for non-loanee

    farmers. Payment of all claims shall be the

    responsibility of the Agriculture Insurance Company

    of India Limited.

    The scheme was implemented in the State

    on Pilot basis from Kharif 2007 and it was continuedduring Kharif 2008 covering 12 rainfed crops viz.,

    Jowar, Maize, Ragi, Greengram, Blackgram, Tur,

    Groundnut, Soyabean, Sunflower, Cotton, Onion and

    Chilly in 77 reference unit areas (hoblis) of 15

    Districts viz., Bangalore (Rural), Bellary, Bidar,

    Bijapur, Chitradurga, Chikkaballapur, Gadag,

    Gulbarga, Hassan, Haveri, Kolar, Koppal,

    Ramanagar, Shimoga and Tumkur. The actuarial

    premium rates are charged under the scheme.

    Anyhow, farmers have to pay concessional rates of

    premium i.e., 2.5% to 3.5% for Food and Oil seedcrops and maximum 6% for Horticulture crops, and

    the remaining portion of the premium are shared

    equally by State and Central Governments.

    During Rabi 2008-09, 7 crops viz., Jowar

    (Irrigated), Jowar (Rainfed), Bengalgram (Irrigated),

    Bengalgram (Rainfed), Potato (Irrigated), Grapes

    and Mango were notified in 88 reference unit areas

    (hoblis) of 16 Districts viz., Bangalore (Rural),

    Bagalkot, Belgaum, Bellary, Bidar, Bijapur,

    Chitradurga, Chikkaballapur, Davangere, Dharwad,

    Gulbarga, Haveri, Kolar, Koppal, Raichur and

    Tumkur.

    The financial allocation provided under

    Rashtriya Krishi Bima Yojana for the year 2008-09

    i.e., is Rs.10000.00 lakh will be used to pay State

    Government share towards premium subsidy.

    About 43790 farmers have participatedunder the scheme by paying a premium of Rs.1.59

    crore. The State Governments 50 % share towards

    premium subsidy of Rs.6.31 crore has been paid to

    Agriculture Insurance Company of India Limited.

    An amount of Rs.5.24 crore has been claimed by

    35275 beneficiaries under Weather Based Crop

    Insurance Scheme.

    10. Raitha Samparka Kendra- Farm Clinics

    To provide extension service to farmers and

    encourage them for adopt modern technologies, 745

    RSKs are established, one in each hobli of the State.

    Providing updated crop production related

    know-how, critical agricultural inputs, primary seed

    and soil testing facilities and arranging interface with

    public and private sector technologies are the

    responsibilities of these centers.

    The farmers can visit them and avail

    required farm information, inputs and other supportingservices and benefits. Arrangement has also been

    made to seek information over phone. The technical

    staff of RSKs visits all the villages of the hobli as

    per the fixed visit schedule and arrange farmers meet

    and provide necessary suggestions. Field visits are

    also arranged to facilitate adoption of new

    technologies. During 2008-09, an allocation of

    Rs.186.17 lakh is provided upto the end of

    November 2008 an expenditure of Rs.43.21 lakh is

    incurred.

    The details of expenditure incurred during

    the last three years under this programme are as

    follows:

    (Rs. lakh)

    Scheme 2005-06 2006-07 2007-08 2008-09

    Raitha Samparka Kendra

    (Farm Clinics)

    172.15 173.83 151.14 43.21

    (upto November 2008)

  • 8/8/2019 Chapter2 Eng

    12/27

    246

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    11. ATMA-Reformed Agricultural Extension

    System- CSS

    The main objective is to bring co-ordination

    among all stakeholders of agricultural extension viz.,

    agriculture and allied departments working under

    Panchayat Raj System, State AgriculturalUniversities, Private Entrepreneurs, input dealers and

    farmers.

    The extension activities are implemented

    through Taluka level ATMA Implementation

    Committees, under monitoring by District Level

    ATMA Steering Committee.Earlier, the scheme was

    implemented in nine districts viz., Bidar, Gulbarga,

    Koppal, Bijapur, Haveri, Shimoga, Hassan,

    Chamarajanagar and Kolar. During 2006-07 this

    scheme was extended to four other districts viz.,Belgaum, Chitradurga, Chikkamagalur and Kodagu,

    under Honble PMs Special Package Programme.

    During 2007-08, the scheme was extended to all

    the remaining 15 districts of the state.

    At State level Inter Departmental Working

    Group under the Chairmanship of the Development

    Commissioner and State Level Project

    Implementation Committee under the chairmanship

    of Commissioner for Agriculture, are constituted to

    monitor and guide the implementation of ATMA

    Model of Agricultural Extension System in the State

    to provide improved training programmes to the

    extension staff Southern and Northern Regional

    Centers of State Agriculture Management Extention

    Training Institute at UAS, Bangalore and Dharwad

    are functioning. During 2008-09, Government of

    India has given Administrative sanction of

    Rs.1865.55 lakh and the expenditure incurred upto

    the end of Nov08 is of Rs.142.78 lakh as against

    the released amount of Rs.452.00 lakh.

    12. Micro Irrigation

    The Centrally sponsored Micro Irrigation

    Programme is implemented to provide 75 per cent

    subsidy to the farmers for adoption of Micro

    Irrigation systems. The main objective is to achieve

    economic and Judicious use of water. Under this

    scheme drip, sprinkler and Rain gun units are

    provided at 75% subsidy so as to facilitate more

    farmers to adopt Micro Irrigation System. As per

    the announcement in the State budget for 2006-07,

    the rate of subsidy was increased to 75 per centwith the State Subsidy of 25 per cent in addition to

    the Central Subsidy of 50 percent. An allocation of

    Rs. 2336.12 lakh was provided by the State

    Government in addition to Rs. 640.44 lakh under

    District sector and Government of India provided

    Rs.1397.51 lakh and Rs. 781.16 lakh respectively

    for General and Special Package Districts during

    the year 2007-08.

    Under this scheme, drip, sprinkler and rain

    gun units are provided to the farmers. The main

    objective is to achieve economy in use of water.

    The details of expenditure incurred during

    the last three years under this programme are as

    follows:(Rs.lakh)

    Scheme 2005-06 2006-07 2007-08 2008-09

    Micro Irrigation 612.95 1994.11 4547.60 3409.48 (upto

    November2008)

    13. Farm Mechanization

    The centrally sponsored scheme of Farm

    Mechanisation Programme is being implemented

    under Macro Management Mode of Agriculture

    (Work Plan) since 2001-02. Under this scheme, 25

    per cent subsidy is provided as per assistance norms

    indicated by Government of India. From 2003-04 as

    per the State Government announcement the rate

    of subsidy was increased to 50 per cent with the

    State Subsidy of 25 per cent in addition to the Central

    subsidy of 25 per cent. From 2008-09 Central Fund

    under Macro Management mode of Agriculture

    (Work Plan) is used as matching grant to state fund.

    After exhausting the Central Fund the entire 50%

    subsidy for farm machinaries is borne by the State

    fund.

    The main objective of the scheme is to

    popularize mechanized farming in order to reduce

    drudgery in farm operations, labour use, to save time

    and to cover more area in short span of time.

    Mechanized farming helps to increase efficiency in

    farming operations and ultimately results in higher

    production and productivity.

  • 8/8/2019 Chapter2 Eng

    13/27

    247

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    (Rs.lakh)

    Scheme 2005-06 2006-07 2007-08 2008-09

    Farm Mechanisation 4388.48 5763.61 5141.54 3876.52(upto

    November2008)

    14. Organic Fertilizers

    The main objective of the scheme is to

    encourage farmers in use of organic manure instead

    of chemical fertilizers. The scheme mainly

    emphasizes in situ production of organic manures.

    An amount of Rs.115.32 lakh has been

    spent up to end of Nov 2008, out of the budget

    provision of Rs.183.91 lakh provided during

    2008-09.

    15. Organic Farming

    To encourage Organic Farming in the State

    Government of Karnataka has brought a policy on

    Organic Farming during 2004. Following are the

    promotional programmes initiated in the State since

    2004-05.

    1. Organic village / site programme under which

    an area of 100 ha being converted to organic

    cultivation in all the taluks of the State2. Conversion of State Government and SAUs

    farms into organic cultivation

    3. Documentation of existing Organic Farming

    practices to develop package of practices in

    Organic Farming

    4. Training in Organic Farming to departmental

    officers, NGOs and farmers

    5. Publicity and consumer awareness

    programme

    6. Workshops, symposium, seminars, exhibitionsand trade fairs in Organic Farming

    During 2008-09 Government has given

    much emphasis for Organic Farming promotional

    programmes in the State and has made budget

    provision of Rs. 100.00 crore. State Level Organic

    Mission Empowered Committee has been

    constituted to plan, implement and oversee the

    Organic Farming promotional programmes.

    Department has taken steps to bring area under

    Organic cultivation to group certification and internal

    controlling system. All the Organic village / site are

    being brought under the group certification and

    internal controlling system for which an amount of

    Rs.5.28 crore has been released to NGOs

    implementing Organic village / site programme and

    Rs.2.20 crore has been spent upto the end of

    Nov08.

    16. Scheme to provide relief to the deceased

    farmer families who have committed suicide

    This scheme was launched during 2003-04

    to provide Rs. One lakh as a relief to families of

    farmers committing suicide on account of the heavy

    burden of loans borrowed from the institutional

    agencies. A budget provision of Rs.103.00 lakh has

    been made and an additional grant of Rs. 102.00

    lakh was provided during 2008-09 and Rs.165.00

    lakh has been spent up to end of November 2008.

    Prime Minister Rehabilitation Programme

    The Prime Minister Package was launched

    during 2006-07 to 2008-09 for six distressed districts

    (Belgaum, Chitradurga, Chikkamagalur, Shimoga,

    Hassan and Kodagu) where the very high incidences

    of farmers suicides were reported in the state of

    Karnataka. The departments involved in organizing

    the package are Agricultural Department, Major and

    Medium irrigation, Water Resource Department

    (Minor Irrigation), Department of Watershed

    Development, Horticulture Department and Animalhusbandry and Fisheries Department. The budget

    provision of Rs. 2689.64 crore has been allocated

    for three years viz., 2006 -07 to 2008-09 and Rs.

    2001.79 crore has been spent up to end of October

    2008. The package has been extended up to 30th

    September 2011. Considering the reports submitted

    by different departments up to end of October 2008,

    the Central Government has released only Rs.

    1070.09 crore.

    The details of expenditure during the last three years under this programme are as follows:

  • 8/8/2019 Chapter2 Eng

    14/27

    248

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    17. Relief to small and marginal farmers

    i) Subsidized Seeds Distribution:

    During Kharif 2008, it was programmed to

    distribute 14 crop seeds viz., Paddy, Ragi, Jowar,

    Maize, Bajra, Cowpea, Greengram, Blackgram,

    Redgram, Groundnut, Sunflower, Soybean, Castor

    and Cotton crops at 75 percent subsidized rates to

    Small and Marginal Farmers. Totally 2.96 lakh quintal

    seeds have been distributed and Rs.3755.68 lakh

    subsidy amount is utilized for this purpose. In this

    scheme 14.57 lakh farmers have been benefited.

    During Rabi 2008-09, it was programmed

    to distribute six crops seeds viz., Jowar, Wheat,

    Maize, Bengalgram, Safflower and Sunflower to

    Small and Marginal farmers at 50% subsidized rates.

    Totally 0.56 lakh quintal seeds have been distributed

    and Rs.686.41 lakh subsidy amount is utilized for

    this purpose. In this scheme 1.48 lakh farmers

    have been benefited.

    ii) Drought Relief to Small & Marginal Dry Land

    Farmers:

    The Government has decided to provide

    Rs.1,000 for every family of small and marginal dry

    land farmers as a special measure on account of

    failure of southwest monsoon during Kharif 2008

    for purchasing seeds, fertilizers and agricultural

    implements. For this purposed an amount of

    Rs.500.00 crore has been provided in the budget

    during 2008-09 and the Department has spent

    Rs.29.00 crore upto the end of Nov08.

    Agriculture Mission:

    For the comprehensive development of

    agriculture and allied activities, a Karnataka

    Agriculture Mission has been set up. As part of its

    commitments in Budget 2008-09, the Government

    of Karnataka has, under the Karnataka Agriculture

    Mission, announced seven new schemes with a total

    allocation of Rs.101.90 crore. The new schemes

    are listed below.

    1. Strengthening Raitha Samparka Kendras with

    Multi-Disciplinary Team

    2. Raitha Shakthi Groups Empowering small

    and marginal farmers through group approach.

    3. Training and orientation programmes for

    NGOs, extension staff and farmers

    4. Farmer Fellowships

    5. Up gradation of District Agriculture Training

    Centres

    6. Organizing Hasiru Habba (Krishi Mela)

    7. Study tours for farmers.

    Horticulture

    Horticulture covers an area of 17.25 lakh

    hectares in the State with a production of about

    130.26 lakh tonnes. The focus of horticulture policy

    is on area expansion, dissemination of new

    technology, production and supply of planting

    materials, credit, effective plant protection, post-

    harvest management and hi-tech horticulture. Areaunder horticultural crops from 2006-07 to 2008-09

    is given in table 2.10.

    Table-2.10

    Area under horticultural crops in Karnataka(lakh hectares)

    Crops 2006-07 2007-08(P) 2008-09(A)

    1 Fruits

    2 Coconut

    3 Spices

    4 Vegetables5 Cashew

    6 Flowers

    7 Others

    2.78

    4.68

    2.45

    4.120.69

    0.23

    2.30

    2.79

    4.96

    2.75

    4.020.80

    0.23

    2.24

    2.93

    4.77

    2.53

    4.320.72

    0.24

    2.34

    Source: Directorate of Horticulture

    P: Provisional A: Anticipated

    a. Production and supply of planting material

    A lot of impetus is provided for mass

    multiplication of all kinds of planting materials in all

    the 411 horticultural farms and nurseries of the

    department and to supply the same to farmers ataffordable rates. As for vegetables, efforts are

    limited only to the production of foundation and

    certified seeds. In the current year to implement

    the new scheme viz., Karnataka State Horticulture

    Development Agency has been registered for the

    effective maintenance and development of

    Horticultural farms in the State. Distribution of

    important horticultural grafts/seedlings to the farmers

    from 2006-07 to 2008-09 is given in table 2.11.

  • 8/8/2019 Chapter2 Eng

    15/27

    249

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Table - 2.11

    Distribution of seedlings

    Unit 2006-07 2007-08 2008-09(A)

    1.Fruits

    2.Coconut

    3.Spice Crops*

    4.Veg.Seeds

    5.Cashew

    6.Flowers

    7.Oil palm

    Lakh

    000kgs

    lakh

    50.00

    3.84

    17.87

    -

    9.37

    -

    5.31

    110.94

    4.00

    15.56

    235

    9.89

    0.05

    6.17

    6.55

    -

    0.50

    -

    0.13

    0.08

    2.72

    Source: Directorate of Horticulture A: Anticipated. *Pepper only

    b. Plant protection

    The department subsidies the supply of

    plant protection chemicals and plant protection

    equipments to farmers, and also provides literature

    to create awareness and educate them in differentplant protection measures, in the control of pests

    and diseases such as Eriophyid Mite, Black Headed

    Caterpillar, Stem Bleeding, Tomato Leaf Curl Virus,

    Whirling Whitefly and also Bacterial Blight and

    koleroga at Arecanut.

    The department is encouraging the biological

    method of control as one of the Integrated Pest

    Management Programme, Emphasis is given to use

    bio-pesticides, pheromone traps and lures in the

    control of pests and diseases of horticultural crops.During 2006-07 and 2007-08, Rs.74.40 and

    Rs.209.44 lakh has been spent for demonstrations

    in the farmers field using bio-pesticides and

    pheromone traps, pest surveillance, workshops and

    seminars on Integrated Pest Management

    Programme (IPM). During the current year

    Rs.83.90 lakh has been spent up to the end of

    November 08 against Rs.157.65 lakh.

    There are 21 major and 36 mini laboratories

    in the Department, which had produced and released

    491 and 358 lakh parasites during 2006-07 and 2007-

    08 respectively. During 2008-09, 197 lakh parasites

    were produced and released (up to end of November

    2008). The Yellow Leaf and Koleroga diseases have

    been a limiting factor for cultivation of areca nut.

    In this context, department has taken initiative to

    establish Areca Research Station at Sringeri with

    an allocation of Rs.100.00 lakh during 2008-09.

    c. Credit

    Credit facilities provided through various

    commercial and land development banks to the

    horticulture sector by NABARD during the last

    three years are given below:

    The Horticultural Producers Co-operative

    Marketing and Processing Society Ltd

    (HOPCOMS) is organizing marketing of fruits and

    vegetables grown in the State. There are about 326

    retail outlets working in Bangalore Urban, Rural andKolar handling about 80-100 M.T. everyday. There

    are also 16 district level co-operative societies

    working on lines of HOPCOMS in other areas. The

    Department has taken initiative to take up a Pilot

    Project for strengthening of Bijapur, Sirisi, Shimoga,

    Mysore and Mandya District Hopcoms through

    Karnataka Horticulture Federation with an allocation

    of Rs.8.50 crore under RKVY during 2008-09.

    The Karnataka State Agricultural Produce

    Processing and Export Corporation (KAPPEC)established to promote export of the horticultural

    produce, is undertaking export business as a joint

    venture with other companies. Since inception, up

    to the end of November 2008, KAPPEC has handled

    3.34 lakh Metric Tonnes of various Agricultural and

    Horticultural produce and its turnover was

    Rs.525.25 crore and net profit Rs.8.50 crore.

    In all, there are 68 Cold Storages functioning

    in the State (public, private, as well as co-operative

    sectors). To make the existing cold storages moreeconomical and to encourage the establishment of

    new ones in private/co-operative sector, a subsidy

    of Re.1/- per unit consumption of electricity is being

    given. During 2007-08 Rs.125.16 lakh has been

    given to 42 Cold Storages. During the current year,

    up to the end of November 08 an amount of Rs.17.55

    lakh has been released to 13 Cold Storages.

    Year Financial (Rs. in crore)

    2005-06 340.95

    2006-07 440.00

    2007-08 576.17

  • 8/8/2019 Chapter2 Eng

    16/27

    250

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    d. Training

    Farmers, both women and men, are given

    training in the preservation of fruits, vegetables and

    in mushroom cultivation. The progress under the

    Farmers Training Scheme for the last two years is

    given below:

    Physical

    (No. Of persons trained)

    Year

    Total Women

    Financial

    (Rs.in lakh)

    2006-07

    2007-08

    2008-09

    (Target)

    Achievement

    (Upto Nov.08)

    4832

    9223

    11354

    785

    1907

    4779

    6161

    204

    17.98

    19.70

    12.15

    2.85

    e. Bio-Technology

    The Biotechnology Center of the

    Department of Horticulture is taking up activities

    like germplasm conservation, tissue culture,

    mushroom development, production of Bio-

    fertilisers/pesticides, soil and water analysis, water

    and leaf samples, DNA finger printing and so on.

    During 2006-07 and 2007-08, about 22.00 lakh tissue

    culture plants were produced. During 2008-09, the

    target is to produce 5.00 lakh plants and the

    achievement up to the end of Nov.08, is 3.30 lakh

    plants. The cost-effective Green-House technologyis suitable for achieving mass production.

    During 2006-07 & 2007-08, 95.00 tonnes

    of Biofertilisers and Biocontrol agents were

    produced. In the current year up to end of Nov. 08,

    28 tonnes of Biofertilisers and Bio control agents

    were produced.

    During 2006-07 and 2007-08, 60 Training

    programmes and demonstrations were arranged to

    promote cultivation and consumption of mushrooms

    at this center. In the current Year 442 trainees have

    been trained and 5500 Spawn bottles were produced

    at the end of Nov 2008. Quality control laboratory

    is set up for testing and analysis of Bio-fertilisers at

    this center. During 2006-07 and 2007-08, 6750 water,

    soil and leaf samples were analyzed. During 2008-

    09, 1261 water, soil and plants samples, 126 samples

    of organic manure, 51 residue analysis were analyzed

    up to the end of Nov 2008.

    In order to promote cultivation of medicinal,

    aromatic and dye plants, the department promotes

    area expansion and also provides fianancial

    assistance for establishment of herbal gardens,

    nursery development and processing units. During

    2006-07, 10 nurseries and 5 processing units andduring 2007-08, 5 nurseries and 2 processing units

    were established.

    The use of plastics (drip irrigation) in

    horticulture has gained much popularity and

    importance in the farming community. The adoption

    of drip-irrigation /micro irrigation promotes efficient

    use of water, fertilizers and other resources, and

    reduces weed growth. During 2007-08, under

    RIDF assistance drip irrigation systems for

    horticulture crops, an amount of Rs.99.61 lakh has

    been spent as against the allocation of Rs.100.00

    lakh covering 765 hectare of area. Under the

    Centrally Sponsored Micro Irrigation Scheme during

    2007-08, Rs.59.14 crore has been spent covering

    an area of 29860 hectares and in the current year,

    Rs.47.50 crore has been spent upto the end of Nov

    2008 by covering 10,671 hectares of area.

    f. Oil Palm Development:

    The oil palm development programmecovers area expansion, maintenance of oil palm seed

    gardens and frontline demonstration plots, apart from

    a leaf analysis laboratory. Since inception of the

    project in the state during 1990, till the end of March

    2008, an area of 20,425 hectares has been developed

    under oil palm in different oil palm growing regions

    of Karnataka. The farmers are given on-farm-

    investment for the first 4 years of pre-bearing period,

    @ Rs.15,500 per hectare.,50% of the actual cost of

    cultivation released in the form of fertilizers &

    chemicals. The oil palm seedlings are distributed tothe farmers at subsidized rates at the cost of Rs.7500

    per hectare.

    In order to facilitate area expansion and

    planting in the next year, oil palm seedlings are raised

    during the Current year. In order to produce

    indigenous oil palm sprout, required for future area

    expansion programme, a seed garden in an area of

    12 hectares has been established at Taraka, in

  • 8/8/2019 Chapter2 Eng

    17/27

    251

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    H.D.Kote Taluk. During the current year, Rs.257.78

    lakh has been spent as against the target of Rs.991.94

    lakh up to end of Nov.2008, covering 1901 hectares

    of new area against the target of 4,600 hectares.

    g. Coconut:The Coconut Development Board,

    Government of India, in co-ordination with the

    Department of Horticulture, Government of

    Karnataka has been implementing the programmes,

    for improvement in production and productivity of

    coconut. During 2006-07 & 2007-08 a sum of Rs.

    3.30 crore and Rs.1.77 crore has been spent under

    this programme respectively. During 2008-09,

    Rs.1.14 crore has been spent as against the target

    of Rs.5.68 crore upto the end of Nov 2008.

    h. National Horticulture Mission

    Government of India has launched the

    National Horticulture Mission (NHM) during the

    10th plan, with effect from 2005-06. The thrust of

    the Mission will be on area-based, regionally

    differentiated cluster approach for development of

    Horticulture Crops, having comparative advantage.

    This is a Centrally Sponsored Scheme in which

    Government of India shall provide 100% assistance

    to the State Missions during Tenth Plan. During theXI Plan, the assistance will be 85% with 15%

    contribution by the State Government.

    During 2006-07, Rs.84.48 crore have been

    approved by Government of India. The action plan

    includes Special Prime Ministers Package

    Programme for suicide prone districts of Kodagu,

    Belgaum, Hassan, Chikkamagalur, Chitradurga and

    Shimoga. Shimoga and Chikkamagalur have been

    included as additional districts also Sapota and Sweet

    Orange as additional crops. An amount of Rs. 65.08

    crore has been spent under NHM. Under Prime

    Ministers special package Rs.36.87 crore is

    earmarked, out of which Rs.29.82 crore has been

    spent by implementing different activities.

    For the year 2007-08, GOI has sanctioned

    the action plan for Rs.177.55 crore, which includes

    the programmes under Prime Ministers special

    package for suicide prone districts for an allocation

    of Rs.52.41 crore and also a special package for

    Good Management Practices (GMP) in bacterial

    blight affected for pomegranate orchards with an

    allocation of Rs.15.87 crore is being implemented

    under the National Horticultural Mission and

    Rs.144.74 crore has been spent for implementingthe above programmes. For the Pomegranate

    orchards which are severely affected by bacterial

    blight, a subsidy of 50% of the cost for Good

    Management Practices is provided with a maximum

    of Rs.25,000 per hectare limited to 4 hectares per

    beneficiary. During 2007-08, 4 more districts namely

    Chamarajnagar, Dharwad, Bellary and Bidar besides

    3 more crops namely Lime, Fig and Chilli were

    included under NHM.

    During 2008-09, Government of India has

    approved action plan for Rs.256.00 crore which

    includes Rs.95.00 crore under PMs Special

    Package for 6 suicide prone districts and Rs.100.00

    crore for establishing 4 modern private wholesale

    markets at Mysore, Hassan, Kolar and Belagum

    Districts. Inclusion of Chikkaballapura and

    Ramanagar Districts in the current year. NHM

    programme is implemented in all 23 districts. The

    Department has spent Rs.73.37 crore including an

    amount of Rs.20.63 crore in PMs Special Package

    upto the end of Nov 2008.

    The programmes of establishing the

    Horticultural University at Bagalkot with allocation

    of Rs.10.00 crore and Horticulture College at Bidar

    with allocation of Rs.4.00 crore are being

    implemented by the Department under Special

    Development Plan

    i. Post Harvest Linkages:

    Karnataka State Government hasintroduced Processing in Horticulture Scheme

    during 2006-07 for processing horticultural produces.

    Considering the importance of post harvest handling

    and marketing, during 2008-09, the State Government

    has given sanction to provide 25% subsidy to all other

    Post Harvest Management activities viz. Functional

    Infrastructure for Collection and Grading,

    Construction of Pack House, Onion Storage

    Structures, Cold Storage, Reefer Van, Rural

  • 8/8/2019 Chapter2 Eng

    18/27

    252

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Markets. In addition to this, sanction has also been

    given to provide 50% subsidy to improved fruit and

    vegetable mobile kiosk for the sale of Horticulture

    produce. In the current year Rs.200.00 lakh is

    provided in the Budget for the implementation of

    the programme.

    j. New Interventions of Horticulture in

    Karnataka:

    For the effective implementations of the

    programmes by the Horticulture Department, many

    policies have been adopted and are being

    implemented by the Department in the Current Year.

    i) Wine Policy and Establishment of Karnataka

    Grape wine Board

    To promote wine varieties of grapes in the

    state and to encourage wine industries, Wine Policy

    has been enforced in the state since the year 2007-

    08. The Karnataka Grape Wine Board has been

    set up for implementing the programmes of the Wine

    Policy. An allocation of Rs.300.00 lakh has been

    provided in the Budget as share capital to the Wine

    Board during the year 2008-09.

    ii) Advanced Research on Bacterial Blight

    Disease in PomegranateThe University of Agricultural Sciences,

    Dharwad is conducting Advanced Research on

    Bacterial Blight Disease in Pomegranate with the

    financial assistance from the Department of

    Horticulture since 2007-08.

    iii) Rashtriya Krishi Vikas Yojana

    With a view to give impetus to the

    comprehensive development of Mango in the State,

    approval has been accorded for the implementation

    of the project on Establishment of Mango

    Development Centre at Kolar and Chickaballapur

    districts at a total cost of Rs.19 crore, and a project

    on Establishment of Flower Auction Centres in

    Tumkur, Davanagere, Udupi, Uttara Kananda,

    Kodagu and Belgaum districts, at a total cost of

    Rs.15.00 crore under RKVY over a period of four

    years i.e., from 2008-09 to 2011-12.

    Forestry

    In the total geographical area of the State

    of 1,91,791 sq.kms., of which the actual recorded

    forest area is 35,259 sq.km, (18.38%). 1.32% is

    very dense forest, 61.37% is moderately dense, and

    remaining 37.32% is open forest as per State ofForests Report 2005. During 2007-08, an extent of

    79,474 hectares of area has been covered and 0.71

    crore seedlings were planted. Under farm forestry

    programme, 3.01 crore seedlings were distributed

    to farmers and general Public for planting is private

    lands. In 2008-09, 74,445 hectares of area has been

    covered and 0.60 crore seedlings were planted upto

    the end of December 2008.

    1. Externally Aided Project

    a) JBIC Assisted Karnataka Sustainable Forest

    Management and Bio diversity Conservation

    Project (KSFMBC) (JBIC Phase-II):-

    The Karnataka Forest Department is

    implementing KSFMBC project which is an

    extension of the JBIC Phase I, from the year

    2005-06 with an outlay of Rs.745.00 crore for a

    period of 8 years upto 2012-13. The project covers

    176 taluks in 29 districts of the State. During 2006-

    07 & 2007-08, a sum of Rs. 226.50 crore has been

    spent for raising 62117 hectares of plantations andfor other development works. For the year 2008-09

    Rs. 139.69 crore has been earmarked for carrying

    out the proposed works and Rs.54.95 crore have

    been spent up to end of December 2008 for raising

    41204 hectares of plantations and for other

    developmental works.

    2. State sector plan schemes

    a) Development of Degraded Forests:

    During the year 2007-08, as against thetarget of Rs.205.94 lakh, a sum of Rs.199.96

    lakh has been spent for raising 572 hectares of

    plantations and for other development works.

    During the year 2008-09 an amount of Rs. 109.35

    lakh has been spent for raising 610 hectares of

    plantations and for other development works as

    against the target of Rs. 327.50 lakh.

  • 8/8/2019 Chapter2 Eng

    19/27

    253

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    b) Greening of Urban areas:

    During 2007-08 as against the target of

    Rs.150.00 lakh, a sum of Rs.147.81 lakh has been

    spent for raising 520 hectares of plantations and for

    other development works. During 2008-09 as against

    the target of Rs.265.12 lakh, a sum of Rs.82.22 lakhhas been spent up to December 2008 for raising

    360 hectares of plantations and for other

    developmental works.

    c) Raising of seedlings for Public Distribution

    Scheme:

    During 2007-08, as against the target of

    Rs. 247.87 lakh, a sum of Rs.239.27 lakh has been

    spent for raising of 44.17 lakh seedlings 117.85 lakh

    seedlings have also been maintained for selling the

    same to the farmers and public. During the currentyear as against the target of Rs. 166.50 lakh, Rs.

    38.36 lakh has been spent up to end of December

    2008 for maintaining of 53.34 lakh seedlings, of which

    40.79 lakh seedlings have been sold to the farmers

    and public. Action has also been initiated for raising

    fresh seedlings for distribution during 2009 rains.

    3. Centrally Sponsored Schemes & Central Plan

    schemes:

    The CSS-Area Oriented Fuel wood &

    Fodder Project, Conservation and Development of

    Non-Timber Forest Produce including Medicinal

    Plants, Integrated Afforestation & Eco-

    Development Project, Association of ST and Rural

    Poor in Regeneration of Degraded Forests on benefit

    sharing basis which were under implementation in

    the 9th Five Year Plan have been merged under

    CSSNational Afforestation Programme through

    Forest Development Agency (FDA-NAP) in the

    10th Five year Plan. The plantations created under

    the above schemes have been maintained during

    10th Plan. During 2007-08, Rs. 8.35 crore has been

    spent against the target of Rs. 45.64 crore for raising

    of 18843 hectares of plantations and other

    developmental works. During the current year

    Rs.12.49 crore has been earmarked and Rs. 3.26

    crore has been spent up to end of December 2008

    for raising of 6622 hectares of plantations and for

    other developmental works.

    a) Conservation and management of Mangroves:

    During 2007-08 Rs. 100.00 lakh has been

    earmarked, of which Rs.65.43 lakh has been spent

    for raising of 120 hectares of plantations and for

    other developmental works. During the current year

    Rs.150.00 lakh has been earmarked and Governmentof India has released Rs. 54.93 lakh and the entire

    amount has been released to the implementing

    officers for maintaining 268 hectares of plantations

    and to take up other developmental works.

    b) Novod sponsored tree-borne oilseeds:

    During 2007-08 a sum of Rs.29.00 lakh has

    been spent for raising of 200 hectares of plantations

    and in the current year action is being taken for

    maintaining these plantations.

    4a) CSS- Integrated Forest Protection Scheme:

    Under Integrated Forest Protection scheme,

    6078 Kms of new fire lines have been created and

    9030 Kms of old fire lines have been maintained

    and 1009 Km of survey and demarcation by spending

    Rs. 208.43 lakh against the target of Rs. 212.80 lakh

    during 2007-08. During the current year Rs.250.00

    lakh has been earmarked and released for the

    implementation of the programme.

    b) Revenue & Expenditure:-

    The following table (2.12) presents the

    details of revenue realized by sale of forest produce

    like timber, minor forest produce and fees charged

    for wildlife sanctuaries etc. The expenditure

    component includes the establishment cost.

    Table-2.12

    Revenue realised and expenditure on forestry

    (Rs.crore)

    Year Revenue Expenditure

    2000-2001 107.48 315.60

    2001-2002 100.00 330.68

    2002-2003 100.88 231.01

    2003-2004 182.27 231.70

    2004-2005 168.70 289.80

    2005-2006 114.79 253.28

    2006-2007 127.07 326.71

    2007-2008 130.51 377.14

    2008-2009(A) 127.78 472.12

    A: Anticipated Source: Forest department.

  • 8/8/2019 Chapter2 Eng

    20/27

    254

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Table-2.13

    Additional area brought under forestry

    (Hectares)

    2004-05 2005-06 2006-07 2007-08 2008-09 (A)

    Eucalyptus 328 496 3371 1667.50 1834.25

    Teak plantations 388.66 195 1009 2014.87 2216.357

    Miscellaneous plantations 35855.69 39386 11209 35958.68 39554.55

    Canal and avenue

    Plantations (kms.) 3032.10 2331 2652 1804.27 1984.697

    Trees Planted (lakh) 264.00 542.19 1068.18 1011.062 962.361

    A: Anticipated. Source: Forest department.

    Wildlife Sanctuaries and National parks

    Karnataka has a net work of well connected

    and well protected Wildlife Sanctuaries and National

    Parks. The State has 5 National Parks and 21Wildlife sanctuaries covering an area of 6446 sq.kms,

    which constitute 15% of the total forest area. These

    are spread across several forest types ranging from

    the evergreen to scrub type of forests, thus forming

    a network of areas representing different eco-

    systems containing rare and endangered species of

    plants as well as animals and birds. With around

    5500 wild Elephants and nearly 290 tigers, the State

    is home for about 20% of wild elephants and 20%

    of the tigers in the country. During 2008-09,

    Rs.875.00 lakh have been allocated and Rs. 73.10lakh has been spent up to end of December 2008

    for maintenance of Wildlife Sanctuaries and National

    Parks.

    During the Current Year Honble Chief

    Minster has announced to implement the following

    programmes and these programmes are being

    implemented by the Department during 2008-09.

    1. Village Forest Committees will be revived and

    it is proposed to extend these committees

    to1000 villages.

    2. Cultivation of Sandalwood Trees with an

    allocation of 200 lakh has been provided in

    the budget.

    3. Samrudha Hasiru Grama Yojane.

    Ecology and Environment

    National Lake Conservation Programmes

    Government of India is financing the

    conservation of lakes under National Lake

    Conservation programmes. The conservation of

    lakes is proposed to be undertaken through de-silting,

    de-weeding, strengthening of bunds, interception and

    diversion of sewage entering the tanks, fencing and

    such other works. The detailed project reports will

    be approved by Government of India which provides

    a grant of 70% of the project cost for these works

    and the remaining 30% has to be borne by the State

    Government. Under this programme, development

    of lakes were sanctioned from the year 2002-03 and

    upto end of December 2008, 16lakes have been

    sanctioned and 4 lakes have been completed.

    Under this scheme, during the current year

    an amount of Rs.667.00 lakh is provided in the

    Budget, of which Rs.200.00 lakh as State Share and

    the remaining Rs.467.00 lakh as Central Share.

    National River Conservation Programme

    National River Conservation Programme is

    a centrally sponsored scheme, which has been in

    operation since 1992-93, 8 towns were approved by

    Government of India and 6 towns have been

    completed, 2 towns are in final stages of completion.

    During the current year, an amount of Rs.467.00lakh provided in the Budget, of which Rs.140.00 lakh

    as State Share and the remaining Rs.327.00 lakh as

    Central Share.

    Environment Action Plan (EAP) for

    Bangalore City which is being implemented by

    Bangalore Water Supply and Sewerage Board

    (BWSSB) for which 70% of the project cost is

    Central Share, where as the State Government has

    to provide 30%. The estimated cost of the project

  • 8/8/2019 Chapter2 Eng

    21/27

    255

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    was Rs.46.27 crore. During the current year

    Government of India has released Rs.31.43 crore

    and Government of Karnataka has released

    Rs.13.88 crore.

    Centrally Sponsored Schemes: National Mangrove Conservation and

    Management Scheme

    Karnataka State covers a geographical area

    of about 1,91,791 Sq.Kms. The Coastline of

    Dakshina Kannada, Udupi and Uttar Kannada

    District is about 329 Kms long. Mangrove in

    Karnataka are fringed type, found in the intertidal

    regions along the estuaries, backwaters, islands and

    other protected areas. About 14 species of

    mangroves belonging to 9 genera under 7 families

    are found along the estuaries of Karnataka coast, in

    coastal Karnataka, mangroves are found growing

    along the rivers. Considering the ecological and

    economic significance of the coastal systems,

    Government of India launched a programme on

    conservation and management of mangroves and

    coral reels.

    In the year 2004-05, Government of

    Karnataka submitted management action plan on

    Conservation and mangroves to the ministry of

    Environment and Forests. The Government of India

    assisting these project with 100% grant. These

    projects have a span for 3-5 years, the following 4

    projects have been sanctioned;

    Table-2.14

    Projects sanctioned under National Mangrove Conservation

    and Management Scheme

    (Rs. in lakh)

    Sl.

    NoPlaces Project Cost

    Amount

    Released

    1. Karwar 38.00 38.00

    2. Honnavar 62.08 37.432

    3. Mangalore 92.75 64.925

    4. Kundapur 53.00 30.00

    National Wetland Conservation Programme

    Karnataka State is having 682 wetlands

    covering an area of about 27.18 lakh hectares.

    Wetlands in Karnataka State includes Manmade and

    Natural water bodies, inland natural water, natural

    wetland includes lakes also. Considering ecological

    and economic significance of the Wetlands,

    Government of India launched a programme on

    conservation and development of Wetland under

    National Wetland Conservation Programme. These

    projects are phased for 3 to 5 years. The Government

    of India is assisting these projects with 100% grant.

    Various ongoing wetland projects taken up from

    2005-06 to 2008-09 are given below;

    Table-2.15

    Projects under National Wetland Conservation Programme

    (Rs. in lakh)

    Sl.

    NoPlaces

    Project

    Cost

    Amount

    Released

    1. Bonal Wetland 36.222 19.275

    2. Guduvi Wetland 60.80 60.80

    3. Magadi Wetland 33.175 33.100

    4. Ghataprabha Wetland 8.77 7.720

    5. Hidkal Wetland 12.910 -

    Fisheries

    Karnataka has rich fisheries resources with

    a continental shelf of 27,000 sq.kms. with 300 kms

    of coastline and 5.20 lakh hectares of inland water

    spread area. This offers immense scope for fisheries

    development. In addition, 8,000 hectares of brackish

    water area provides good scope for shrimp farming.

    The total fisherfolk population of the State is 8.61

    lakh comprising 2.33 lakh marine and 6.28 lakh inland

    area. Anticipated annual revenue from the disposal

    of fishery rights of water bodies, sale of fish seed,

    fish and other receipts is Rs.8.00 crore.

    The objective of the department is to utilize

    the available resources to augment fish production,

    to improve the nutritional standard of the people,

    alleviate poverty and provide employment

    opportunities to the rural poor.

    Fish seed production and rearing centers are

    being set up in private sector to meet the fish seed

    requirement of the State. Reservoir fisheries

    development and fish culture in water logged and

    saline areas are also given thrust. The total

    production of marine and inland fish for the last 2

    years is 3.43 and 2.46 lakh tonnes respectively.

  • 8/8/2019 Chapter2 Eng

    22/27

    256

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    During current year it is expected to achieve 1.90

    lakh tonnes under marine and 1.30 lakh tonnes under

    Inland.

    The programmes under marine fisheries

    include construction of fishing harbours and fishlanding centres in selected places of the coastal

    districts in order to provide safe landing and berthing

    facilities for mechanized fishing boats, construction

    and improvement of fishery link roads, remission of

    central excise duty on HSD used by mechanized

    fishing boats, etc. Besides, State Government has

    sanctioned 75,000 kilo litres of sales tax exempted

    diesel during the year to mechanized fishing boats

    so as to reduce the fishing costs.

    There are six minor fishing harbours in theState. They are located at Karwar, Honnavar, Tadri,

    Malpe, Gangolli and Mangalore, besides 25 fish

    landing centres at intervening centres. Besides

    harbour development, upgradation of the existing

    harbours with central assistance also has been

    initiated. Export of marine products for the last three

    years is 53,037 metric tonnes with a foreign

    exchange earning of Rs.329.68 crore.

    The construction of Malpe-II stage fishing

    harbour at an estimated cost of Rs.1900.00 lakh hasbeen completed with 50% assistance of the

    Government of India. Works with respect to

    Mangalore Fishing Harbour-II stage at an estimated

    cost of Rs.144.67 lakh has been completed.

    Construction of fish landing center at Belikeri in Uttar

    Kannada district at an estimated cost of Rs.67.40

    lakh has been completed. Construction of fishing

    harbour at Gangolli in Udupi District is taken up at

    an estimated cost of Rs.832.00 lakh and Rs. 864.10

    lakh has been spent so far. Fish landing center at

    Aleve Kodi at an estimated cost of Rs.229.00 lakhis nearing completion.

    Financial assistance is being given to

    fishermen and fisherwomen to market fish under

    hygienic conditions through subsidies for the

    purchase of insulated boxes, cycles, mopeds and

    tempo. Under Mathsya Mahila Swavalambana

    Yojane Rs 10.00 lakh has been sanctioned to

    100 Fisher women group for fish marketing during

    2007-08. Other programs taken up during 2008-09

    for the socio-economic upliftment of fishermen

    include group insurance, housing, support to

    fishermen co-operatives, assistance for

    mechanization of traditional fishing boats, assistance

    for fish processing and marketing, etc. The total

    budget for implementation of various fisheriesdevelopment and management schemes for the year

    2008-09 is Rs.11575.93 lakh, of which Rs.9886.18

    lakh under plan and 1689.75 lakh under non-plan.

    Under Fish Farmers Development

    Agencies, 4997 hectares of inland water spread area

    has been brought under fish culture by stocking

    283.14 lakh fish fingerlings and imparted training to

    785 farmers. Under Mathsyashraya-I and II

    schemes, 5000 houses each have been completed.

    Under Mathsyashraya Phase-III scheme, 5000houses have been sanctioned from 2005-06 of which

    2095 have been completed.

    Assistance is being provided for purchase

    of modern fishing and navigational aids such as fish

    finders, radio-telephone equipment etc. for off-shore

    fishing vessels for easy navigation and identification

    of fish in deeper waters. Application of remote

    sensing technology is also being used to identify

    potential fishing zones along the coast.

    Government of India is funding various

    schemes such as constructing of fishing harbours,

    landing centers, development of inland fisheries etc.,

    under centrally sponsored schemes. The total

    expenditure of Rs.1214.96 lakh was incurred as

    against the total allocation of Rs. 1859.42 lakh

    including the Central Share of Rs.1266.19 lakh during

    2008-09.

    Under RIDF-VII, Administrative approval

    has been accorded for construction of 16 roads and2 bridges at a cost of Rs.370.12 lakh with

    NABARD assistance, of which works of 16 roads

    and 2 bridges have been completed by spending

    Rs.347.81 lakh. During 2005-06 administrative

    approval has been accorded for construction of 5

    bridges and 24 roads at a cost of Rs. 1056.83 lakh

    under RIDF-VIII with NABARD assistance and

    out of these, 16 roads and 4 bridges have been

    completed and an expenditure of Rs. 827.66 lakh

    has been incurred during 2008-09. Under RIDF-

  • 8/8/2019 Chapter2 Eng

    23/27

    257

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    XIV, a sum of Rs.1053.90 lakh is estimated for

    construction of two fish landing centers, one wharf,

    one bridge and five roads in Dakshina Kannada,

    Udupi and Uttara Kannada District.

    Table 2.16

    Development of Fisheries

    (Numbers)

    2006-07 2007-08 2008-09(A)

    1.Mechanised boats

    i. Purse Seines

    ii Gill Netters

    iii. Shrimp Trawlers

    iv. Others

    2.Purse Seine nets

    3.Capacity of Ice

    Plants per day (MTs.)

    4. Storage Capacity

    (MT.)

    338

    5127

    2777

    50

    629

    2725

    3315

    291

    5819

    2734

    55

    636

    2721

    2365.5

    350

    5350

    2800

    60

    630

    3200

    3350

    A: Anticipated

    Source: Directorate of Fisheries.

    Animal Husbandry & Veterinary Services

    The livestock and poultry population of the

    State is 5.29 crore as per the results of the 17th

    Livestock Census, 2003. Free health care facilities

    are provided for the animals. Government of India

    have declared the State as a disease free zone from

    rinderpest. The same type of eradication programme

    has been taken up for Foot and Mouth disease.

    During the Current Financial Year an amount of Rs.

    369.05 crore has been allocated and Rs.100.35 crore

    has been spent including Central share till the end

    of November 2008.

    a. Animal health and veterinary services

    The health of livestock and poultry are

    rendered through a network of 4110 Veterinary

    Institutions, comprising of 347 Veterinary Hospitals,

    1914 Veterinary Dispensaries, 1209 Primary

    Veterinary Centres, 401 artificial insemination

    centres and 174 mobile veterinary clinics and 65other Veterinary Institutions. In 2006-07 and 2007-

    08, 104.15 lakh & 103.06 lakh cases were treated

    for various diseases respectively. During 2008-09,

    69.89 lakh cases were treated for various diseases

    upto end of November 2008. During 2006-07 & 2007-

    08, 356.04 lakh and 369.47 lakh vaccinations were

    given for various diseases respectively. In 2008-09,

    222.76 lakh vaccinations were given for various

    diseases as precautionary measure up to end of

    November 2008.

    b. Cattle development

    Cattle breeding programme for milch animal

    production and conservation of indigenous breeds

    i.e. Hallikar, Amrutmahal, Khilar and Deoni for

    draught purposes is carried out through artificial

    insemination and embryo transfer technology.Indigenous breeds are developed by selective

    breeding in the livestock farms located at

    Kunikenahalli, Ajjampura and Bankapura. Frozen

    semen from the centers at Hessaraghatta and

    Dharwad is supplied for breeding purposes. In 2006-

    07 and 2007-08, 26.17 lakh and 25.92 lakh artificial

    inseminations were done, from there 6.13 lakh, 6.32

    lakh calves were born and 6.13 lakh, 6.00 lakh

    castrations were performed respectively. During

    2008-09, 17.73 lakh artificial inseminations were

    done, from there 4.30 lakh calves were born and3.33 lakh castrations were performed up to end of

    November 2008.

    c. Karnataka Sheep and wool development

    corporation

    This corporation is registered in December

    2001. Six Sheep breeding farms are functioning

    under this corporation. Mini wool scouring plant

    (MWSP) sponsored by Central Wool Development

    Board, Jodhpur is being installed at Ranebennur and

    is under process to install machineries sponsored byCentral Wool Development Board, Jodhpur for

    better returns to the producers of Decanni Wool.

    During the year 2006-07 and 2007-08, 279 & 278

    cross bred rams have been distributed to the farmers

    at subsidized rates. In the current year up to end of

    November 2008, 89 cross-bred rams have been

    distributed to the farmers at subsidized rates.

    From the year 2003-04, Rs.35.00 lakh has

    been released by Government to sponsor 777

    beneficiaries to (10+1) sheep units under 25% loancomponent at 4% interest. An amount of Rs.16.96

    lakh has been released to 325 beneficiaries who are

    below poverty line up to end of December 2007.

    Under Karnataka Janashree Vima Yojane, 5.42 lakh

    sheeps have been insured at a cost of Rs.2.93 crore

    to farmers belonging to below poverty line (BPL),

    of which Rs.470.00 lakh have been released by

    Government of Karnataka during 2006-07. The

    programme will be continued in the current year

    also.

  • 8/8/2019 Chapter2 Eng

    24/27

    258

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    During 2007-08, under Sheep and Wool

    Improvement Scheme (SWIS) sponsored by Central

    Wool Development Board, Jodhpur, 250 each cross

    breed Rambouillet rams were distributed to the

    farmers at free of cost in the project areas-Belgaum

    Taluk and Chitradurga Taluks by procuring the rams

    from Central Sheep Breeding farm, Hissar.

    During 2008-09, 300 automatic drenching

    guns for sheep at a cost of Rs.15.00 lakh will be

    purchased and distributed to the Districts. Revival

    of sheep and Wool Development programme has

    been taken up at the cost of Rs.2.85 lakh during

    2007-08 and Rs.3.00 lakh is allocated during current

    year. Under health coverage for sheep and goats in

    the State Deworming drugs at a cost of Rs.200.00

    lakh during 2006-07 and Rs.35.00 lakh during current

    year have been distributed to sheep and goats.

    Training programme scientific in sheep rearing is

    conducted at a cost of Rs.2.00 lakh for 1281 sheep

    farmers during 2006-07 and 2044 sheep farmers

    upto the end of November 2008.

    During 2006-07, Under Integrated Wool

    Improvement Programme, 600 sheep farmers have

    been trained in scientific sheep rearing at the cost

    of Rs.3.00 lakh in the project areas of Chitradurga,

    Belgaum and Mundargi and 500 cross breed rams

    have been distributed to sheep rearers in project

    areas of chitradurga and Belgaum.

    Mini Wool Scouring Plant was established

    at Ranebennur with the financial assistance from

    Central Wool Development Board, Jodhpur and

    purchase of machineries under scheme for Value

    addition to Deccani Wool is under process.

    Centrally Sponsored Scheme of

    Conservation of Bandur Breed Sheep at sheep

    breeding farm, Dhanagur has been taken up at the

    cost of Rs.63.80 lakh for preservation of world

    famous Bandur Breed Sheep and the Department

    has spent Rs.36.99 lakh and Rs.49.76 lakh during

    2006-07 and 2007-08 respectively under the scheme.

    During the Current year, Rs.54.76 lakh has been

    spent upto end of November 2008.

    During 2008-09, totally 7693 shepherds have

    been insured under Kendria Bhed Palak Bhima

    Yojane. Life Insurance Corporation of India has

    released Rs.0.60 lakh towards compensation for the

    death of one shepherd.

    d. Poultry development

    The Poultry Feed Act has come into force,

    to maintain the quality of poultry feed. 24 poultry

    farms are functioning under the technical guidance

    of the department. The major developmental

    activities are breeding and rearing of Giriraja parent

    stock and supplying chicks to the farmers and rearing

    centers of the department. In 2006-07 and 2007-

    08, 1732 and 1480 persons were trained in poultry

    rearing and 1.09 lakh and 1.07 lakh Giriraja chicks

    were produced respectively. During the current year

    0.67 lakh chicks were reared and 628 persons were

    trained up to end of October 2008.

    Progress 2006-07 2007-08 2008-09(upto Nov08)

    Activity T A P T A P T A P

    Training to

    Farmers(No)

    1250 945 76 1250 1099 88 750 838 112

    Giriraja

    chick

    rearing

    (no.)

    8000 12851 161 8000 12548 157 6000 10892 182

    Formation

    of poultry

    co-

    operative

    societies

    5 4 80 5 1 20 3 0 0

    T: Target A: Achievement P: Percent

  • 8/8/2019 Chapter2 Eng

    25/27

  • 8/8/2019 Chapter2 Eng

    26/27

    260

    ECONOMIC SURVEY OF KARNATAKA 2008-09

    Table 2.18Dairy development

    Sl.

    No.Items Unit 2006-07 2007-08

    2008-09

    (A)

    1 DCS registered No. 554 482 494

    2 DCS made functional No. 588 542 576

    3 Members enrolled No. 70195 62253 60804

    4 Milk procured Lakh

    Tonnes

    10.68 11.07 11.86

    5 Animals treated Lakh 1.48 1.22 1.22

    6 Animals inseminated Lakh 15.01 16.41 18.43

    7 Animals examined for pregnancy Lakh 8.24 8.79 11.21

    A : Anticipated

    Source: Karnataka Milk Federation

    During 2008-09, under Special Development

    Plan (SDP) as recommended by Dr. D.M.

    Nanjundappas Report, Rs.66.00 crore has been

    allotted to implement various programmes in Animal

    Husbandry and Dairy Development. The

    programmes are being implemented during thecurrent year.

    i) Rastriya Krishi Vikasa Yojane (RKVY)

    During 2008-09 an amount of Rs.39.60

    crore has been allocated for providing incentives to

    the Animal Husbandry Activities to enhance the

    agricultural production for genetic improvement,

    Development of Sheep and Piggery Development,

    Diary Development and health programmes to

    livestock under Rastriya Krishi Vikasa Yojane. The

    programmes are being implemented by the

    Department.

    Dairy development

    The Karnataka Milk Federation is a state

    level co-operative organization implementing dairy

    development activities in the state under operation

    flood. This organization has the responsibility of

    providing remunerative price and market to the rural

    milk producers of the state and of supplying pure

    milk and milk products to the consumers. The

    progress for the three years is given in the Table

    2.18

    The Federation has 21 dairy processing

    plants with a capacity of 26.65 lakh litres a day and

    42 chilling centers having 14.60 lakh litres of chillingcapacity and 4 product dairies equipped to produce

    62 MTs of milk powder per day. ISO 9001/2000

    Certification in respect of 4 cattle feed plants is

    renewed and the quality is being maintained with

    production and supply of goods. During the current

    year 9,668 dairy co-operative societies are

    functioning and 19.80 lakh farmers were enrolled.

    Dairy Programme for Women namely,

    Amrutha Yojane has been announced in the budget,

    with an allocation of Rs.5000.00 lakh during 2007-

    08 for providing milch animals to the Devadasis,

    Widows, SC and ST Women in order to improve

    their Economic and Social Status, with a cost of

    Rs.20,000 each of which the subsidy component is

    Rs.10,000 for Devadasis and Widows, Rs.12,000 for

    SC women and Rs.15,000 for ST women and the

  • 8/8/2019 Chapter2 Eng

    27/27

    261

    For Redressal of Regional Imbalances,

    Government has taken a decision to strengthen the

    Dairy activities in the backward taluks of Bellary

    and Gulbarga Milk Unions, an amount of Rs.600.00

    lakh has been earmarked and the Department has

    utilised the entire amount to strengthen forward and

    backward linkage to the milk producers of

    Bellary, Raichur, Gulbarga and Bidar Dairies during

    2007-08.

    To take up the developmental activities in

    backward taluks of Dharwad, Haveri, Gadag, Uttar

    Kannada, Belgaum, Bijapur and Bagalkote Districts,

    an amount of Rs.600.00 lakh is provided during

    2008-09.

    Ministry of Women and Children

    Development, Government of India has sanctioned

    the programme of Support to Training andEmployment Programme (STEP) with an objective

    of socio-economic up liftment of women. Exclusive

    women dairy co-operative societies are organized

    and women members are trained in Dairy Animal

    Management and Awareness Programme on Health

    & Nutrition, Legal Literacy Gender Sensitization at

    Village level.

    The proposal to meet the increasing demand

    for cattle feed it is envisaged to establish new cattle

    field plant with a capacity of 300 MT at Hassan and

    500 MT capacity plant at Shallghatta Village, near

    Bangalore i