ABB Brazil JCM A-1 Power Products Division Power Transformers © ABB Group 14 de abril de 2015 | Slide 1 ABB Brasil Power Products Division Dr. José Carlos Mendes Gte Tecnologia Transmissão e Produtos de Potência Gte Desenvolvimento & Engenharia Engenheiro Corporativo Executivo Global ABB Asea Brown Boveri Divisão de Produtos de Potência Transformadores de Potência São Paulo, SP - Brasil email: [email protected] tel: + 55 11 2464 8410 cel: + 55 11 9 8354 5358 + 55 11 9 8112 7575 SANTIAGO CL Jornadas Técnicas 2015 2015Abr14&15 Power Transformers: Life Cycle and Operational Cost Optimization – From Purchase to Minimum Maintenance

Upload: others

Post on 06-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-1Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 1

ABB BrasilPower Products Division

Dr. José Carlos MendesGte Tecnologia Transmissão e Produtos de PotênciaGte Desenvolvimento & EngenhariaEngenheiro Corporativo Executivo Global

ABB Asea Brown BoveriDivisão de Produtos de PotênciaTransformadores de PotênciaSão Paulo, SP - Brasil

email: [email protected]: + 55 11 2464 8410cel: + 55 11 9 8354 5358

+ 55 11 9 8112 7575

SANTIAGO CLJornadas Técnicas 2015

2015Abr14&15

Power Transformers:Life Cycle and Operational Cost Optimization –

From Purchase to Minimum Maintenance

Page 2: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-2Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 2

ContentContent

Content

q introduction§ buying by performance to a long life§ useful life and maintenance

q transformers and useful life aspects§ life cycle§ end of life

q from purchse to minimum maintenance§ transport§ installation§ knowledge based§ condition based§ event based§ minimum periodic inspection

q advanced asset managment

ContextRenewables Energy

Page 3: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-3Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 3

Power TransformersLife Cycle Optimization

Transformer Life CycleTransformer Life Cycle

Page 4: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-4Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 4

Power TransformersUseful Life and Reliability

Specification, Design, Manufacturing, Tests, Transportation, Receiving,Storage, Installation, Operation, Monitoring, Maintenance, End of Life

Transformer Life CycleTransformer Life Cycle

Page 5: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-5Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 5

USD$kVA x Useful Life x Overloading Factor

Capital Cost:n purchasen transportn installation

Operation Cost:n losses (noLoad,

Load, Auxiliar)n maintenancen insurance premiumn repairsn performance

End of Life Cost:n replacementn transfern refurbishment

NPV, Total Cost / Life Cycle $ = $1+$2+$3

$1

$2

$3

Warranty of Useful Life Garantida, year

Life Cycle, years

Power TransformersLife Cycle and Global Evaluation of Alternatives

Transformer Life CycleTransformer Life Cycle

Page 6: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-6Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 6

cellulosemoleculecellulosemolecule

O2 chemical bond

Power TransformersLife Cycle and Global Evaluation of Alternatives

Transformer End of LifeTransformer End of Life

Page 7: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-7Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 7

Insulation PaperPolymerization Degree DP

Insulation PaperPolymerization Degree DP

n New Paper - DP 1050 ... 1300tensile strength of a new paper

n Half Life Paper - DP 380 ... 450residual tensile strength of a half-life paperis about 50% of the one of a new paper

n End of Life Paper - DP 150 ... 200residual tensile strength of a end-of-life paperis about 25% of the one of a new paper

n New Paper - DP 1050 ... 1300tensile strength of a new paper

n Half Life Paper - DP 380 ... 450residual tensile strength of a half-life paperis about 50% of the one of a new paper

n End of Life Paper - DP 150 ... 200residual tensile strength of a end-of-life paperis about 25% of the one of a new paper

Dielectric Strength at end-of-life is reduced justabout ~ 10% of its original new paper value

Dielectric Strength at end-of-life is reduced justabout ~ 10% of its original new paper value

Power TransformersLife Cycle and Global Evaluation of Alternatives

Transformer End of LifeTransformer End of Life

Page 8: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-8Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 8

Power Transformers Applications and Operation OptmizationFrom Purchase to Minimum Maintenance - Conclusions

Power TransformersLife Cycle and Operation Optimization

Page 9: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-9Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 9

Transport Factory-to-SiteTransport Factory-to-Site

Transportation Process

At Site1. Retrieve, collect and review impact recorder registers:

• at arrival at final destination installation site• after truck unloading• verify for abnormal transport accelerations• together ABB define actions as needed

Long Time Storage – critical process1. In case of long time storage – follows specific procedures

depending on storage time period:• up to 6 months• up to 12 months• above 12 months – assembly oil conservator and oil filled

2. To learn more please see:• IEEE Std C57.93-2007 Guide for Installation and Maintenance• ABB Installation, Operation and Maintenance Manual

Power TransformersLife Cycle and Operation Optimization

Page 10: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-10Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 10

InstallationInstallation

Installation Process

Key Aspects1. Substation pad conditions:

• high importance to minimum external stresses• properly levelled and plan

2. ABB Installation, Operation and Maintenance Manual

3. Right and Qualified Equipment – per ABB requirements:• lifting equipment• dry-air machine or dry-air bottles• vacuum pumps• thermo vacuum oil processing system

4. Right and Qualified Personal:• following and safety CUSTOMER and ABB requirements• experience with references in similar power equipment• full ABB supervision

Power TransformersLife Cycle and Operation Optimization

Page 11: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-11Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 11

Installation Process

Main Steps1. Overall external inspection:

• main tank• accessories

2. Open main tank

3. Internal overall inspection

4. Assembly:• radiators• conservator• bushings (C1 and tanδ tests before assembly)• all accessories• electrical connections• replace by new gaskets in all opened man-holes etc

InstallationInstallation

Power TransformersLife Cycle and Operation Optimization

Page 12: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-12Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 12

Installation Process

Final Processing1. URSI Insulation Surface Moisture:

• pull vacuum and check for tightness• pressurize with super dry-air and check for tightness• dew-point readings (12h, 18h, 24h after pressurization)

2. Oil Filling and Processing:• pull final vacuum• complete (main tank, radiators, conservator) oil filling under

vacuum• oil circulation• oil sampling (2 syringes for DGA and 1000ml bottle for Oil

Properties tests)

3. Commissioning Tests:• routine tests• FRA tests

InstallationInstallation

Power TransformersLife Cycle and Operation Optimization

Page 13: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-13Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 13

Operation StrategyExtended Useful Life andMinimum Maintenance

1. Knowledge• update and develop technical knowledge about the equipment

• electrical, thermal, mechanical technical limits• according to purchase technical specification• system operation monitoring to limit over-stressing on

equipment's

• advanced monitoring of few and key operating parameters• advanced trend analysis• diagnostic of on-line and off-line monitored results

• condition assessment• risk of failure• reliability indicators

OperationOperation

Power TransformersLife Cycle and Operation Optimization

Page 14: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-14Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 14

Minimum MaintenanceCondition BasedMinimum Invasive

Operation and Performance Data

• chronology• data, time, number of maneuvers (in and off)• data, time, lightning strikes

• date, time, current, voltage, power, reactive power• date, time, temperatures – ambient, oil, winding• date, time, oil – key dissolved gas and moisture• date, time, OIP bushing – C1 and tanδ variations

• periodic external inspection – oil level, leaking, vibration, rubber bag, silica gel, etc• periodic infrared scanning – radiators, tank and bushings• periodic in lab oil tests – Properties, DGA, 2Fal

MaintenanceMaintenance

Advanced MonitoringCondition Based Maintenance

on-line

on-line

periodic

monitoring and data analysis

Power TransformersLife Cycle and Operation Optimization

Page 15: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-15Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 15

Minimum MaintenanceCondition BasedMinimum Invasive

4. Maintenance Electrical Tests• HV OIP condensive bushings C1 & tand testü on-line monitoring of HV OIP condensive bushings C1 & tandü consider to install PCORE® TEST TERMINAL to C1& tand testsü eliminate periodic condensive bushings C1 & tand tests

• FRA Frequency Response Doble M5400 testü base line before energizationü perform just after a major system event or a major earthquake

• Core and Winding testsü commissioning tests at siteü eliminate periodic core and winding tests

MaintenanceMaintenance

Advanced MonitoringCondition Based Maintenance

1. before2. after a major

system event3. after a relevant

change in themonitored pattern

event & condition based

1. before2. after a major

system event

1. before2. after a major

system event3. after a relevant

change in themonitored pattern

PCORE® Test Terminal HUBBEL Power Systems

Power TransformersLife Cycle and Operation Optimization

Page 16: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-16Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 16

q Overall1.Available Technology allows utilization of a Minimum Invasive

Condition Based Maintenance Strategy2.Combined efforts from High Quality Shunt Reactors, Knowledge

Based Operation, Monitoring Data Analysis and Asset Managment!

q power transformers purchasing process§ to evaluate overall performance§ global economic evaluation aligned with Transmission Project ROI§ regulation requires minimum invasive condition based maintenance

q steps to minimum maintenance§ high quality power transformers from a well known technology§ knowledge on the power transformers design limits to reliable operation§ detailed care of all process steps: from purchasing to energization

q condition based maintenance§ time based periodic inspections§ on-line monitoring of minimum key parameters§ off-line tests/maintenance supported by on-line monitoring data analysis

q advanced asset managment

ConclusionsConclusions

Power TransformersLife Cycle and Operation Optimization

Page 17: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-17Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 17

Monitoring

On-Line Monitoring and Sensors:

n load – current & voltagen ambient temperaturen top-oil temperaturen winding hotspot temperaturen moisture in oil/solid insulationn gas in oil H2, CO, C2H4, C2H2 (Hydran)n HV OIP cond bushings C1 & tand

ABB TECüs

üs

üs

üs

üs

? s? s

ISAreactors

Power TransformersLife Cycle and Operation Optimization

Page 18: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-18Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 18

Advanced Asset Management

ActionAnalysisData1 2 3

EAM Mobile ERP

Sensors SCADA Historiador

§ Strategic Decisions§ Maintenance Plan§ Later Maintenance§ Replacement

§ Centralized Information§ Data Storage§ Data Management§ Data Protection

ALGORITHMS

§ ABB Methods§ Data Mining§ Condition Assessment ModelsØ failure riskØ asset condition

Power TransformersLife Cycle and Operation Optimization

Page 19: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-19Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 19

Advanced Operational BI

Data Processing andAnalytics

Subject Matter Workbench

Enterprise Asset and WorkManagement

Engineering Workbench

Complete InformationFleet to Equipment HealthActionable NotificationsBusiness Process WorkflowOptimization &Planning

Enterprise DataSources

Advanced Asset Management

Power TransformersLife Cycle and Operation Optimization

Page 20: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-20Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 20

Advanced Asset Management - Potential Benefits

Power TransformersLife Cycle and Operation Optimization

Page 21: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-21Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 21

Advanced Asset Management - Monitor

Power TransformersLife Cycle and Operation Optimization

Page 22: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-22Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 22

Advanced Asset Management - Monitor

Power TransformersLife Cycle and Operation Optimization

Page 23: 2015Abr14&15 Dr. José Carlos Mendes ABB Brasil

ABB Brazil JCM A-23Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 23

Advanced Asset Management – Maintenance Planning

Power TransformersLife Cycle and Operation Optimization