8/12/2019 1 - Tutorial Criação Goose ABB http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 1/13  SA.T. Training Product Integration REC670 2007-01-15 Page 1 ABB Power Technologies AB Västerås - Sweden REC670 Product Integration Training Substation Automation & Protection Training  Start CCT tool and create a new project:  Give a “Project name” and browse for the folder  Import into CCT the exported SCL-file from PCM

Upload: rafael-gondim

Post on 03-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 1/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 1

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Start CCT tool and create a new project:

•  Give a “Project name” and browse for the folder

•  Import into CCT the exported SCL-file from PCM

Page 2: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 2/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 2

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  The structure of your project shown by CCT should look like this

Page 3: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 3/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 3

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

Data Set Engineering

•  Navigate your “REC670” object down to LD0/LLN0 level:

•  Add a new data set into LLN0 and rename it to “GOOSE”. 

Page 4: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 4/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 4

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Click/select on ”GOOSE” dataset. Under “IED Data Model” browse and select thesignals you want to add :

-reservation request:

-acknow. the reservation request

Page 5: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 5/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 5

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

-apparatus position

QB1+QB2

QB2

QB1

Page 6: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 6/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 6

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  The complete GOOSE dataset for Line bay should look like this: 

•  Create GOOSE dataset for Bus Coupler bay. 

•  Add resp. signals from ”IED Data Model” :

Page 7: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 7/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 7

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

GOOSE Control Engineering

•  Define a GOOSE control block and insert your dataset.(have remain on the same level in the project structure)

•  Click on Goose Control Engineering and then on GSE Control

•  Associate your GOOSE dataset to this NewGSEControl:

Page 8: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 8/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 8

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Click on  and then define the MAC Address of your GOOSE message:

•  Save 

•  Do the same procedure for BusCouplers IED.:

•  Define a new MAC Address of your GOOSE message:

•  Save

•  Drag and drop the REC670 (client-IED) to REC670_BC (sending-IED) Goose ControlEngineerings window .

Page 9: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 9/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 9

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  You can now see the REC670 (client-IED) in the structure

•  Update the data flow you just created and Save.

•  You can now see the “Inputs” for REC670 (client-IED):

•  Do the same procedure for Line Bay IED. Drag and drop the REC670_BC (client-IED)to REC670 Goose Control Engineerings window .

Page 10: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 10/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 10

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Update the data flow. Save

•  Verify that you can see the “Inputs” under REC670_BC

•  Export SCD file from CCT, now containing the GOOSE part.

•  Import SCD file to PCM600.

Page 11: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 11/13

 

SA.T. Training Product Integration REC670 2007-01-15 Page 11

ABB Power Technologies AB

Västerås - Sweden  REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Start SMT, do the connection both Line bay REC670………

…….and BusCoupler REC670_BC:

•  Save.

•  Close SMT.

Page 12: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 12/13

 

SA.T. REC670 Product Integration Training Course

2007-01-16 Page 12

ABB Power Technologies AB

Västerås - Sweden REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Start PST. You need to activate IEC61850 communication and GOOSE messaging.

Settings for REC670:

Settings for REC670_BC:

Page 13: 1 - Tutorial Criação Goose ABB

8/12/2019 1 - Tutorial Criação Goose ABB

http://slidepdf.com/reader/full/1-tutorial-criacao-goose-abb 13/13

 

SA.T. REC670 Product Integration Training Course

2007-01-16 Page 13

ABB Power Technologies AB

Västerås - Sweden REC670 Product Integration Training

Substation Automation & ProtectionTraining

•  Save and close PST.

•  Download to IEDs1. CAP-configuration2. PST (settings)3. SMT4. GDE (If necessary)

•  Verify that horizontal communication (GOOSE) is working.