tunel kloštar, hr - geobrugg · pdf fileengenharia geotehnički studio zagreb...
TRANSCRIPT
Estabilizao de taludes
TUNEL KLOTAR, HR
Estabilizao de taludes | Tunel Klotar, HR 2/6
TUNEL KLOTAREstabilizao de taludes
Projecto Tunel KlotarNmero do projecto 130527-HRLugar VrbovskoPas / Regio Crocia
Ano de instalao 2015
Cliente Hrvatske eljezniceEngenharia Geotehniki studio ZagrebContratante Octopus Rijeka
Situao Rockfalls on a speed up railway line near tunnel Klotar.
Descrio Active slope protection and tunnel portal with nailed DELTAX mesh and TECCO
SYSTEM3.
Objecto protegido Caminho de ferroSistemas TECCO G65/3, DELTAX G80/2
Proteco contra a corroso GEOBRUGG SUPERCOATING , GEOBRUGG ULTRACOATING
Geologia Limestone.
rea estabilizada 3 m
Altura do talude 10 mInclinao do talude 60 - 75
Medida de proteco Estabilizao activa do talude
Exposio Sudeste
Estabilizao de taludes | Tunel Klotar, HR 3/6
Tunnel Klostar portal and slopes around in the final stateafter stabilization.
Drilling works on the slope directly next to the tunnelportal.
Drilling works and installation of nails on the tunnelportal.
Estabilizao de taludes | Tunel Klotar, HR 4/6
Tunnel portal protected with TECCO SYSTEM3.
TECCO SYSTEM3 on the slope.
Estabilizao de taludes | Tunel Klotar, HR 5/6
Estabilizao de taludes | Tunel Klotar, HR 6/6
Tunnel portal after completion of all installation works.
Em caso de dvidas por favor contacte com nosso especialista Geobrugg na sua rea
Head office and production
Telefone+1 505 771 4080
Geobrugg North America, LLC22 Centro Algodones | Algodones NM 87001 | Estados Unidos| www.geobrugg.comA company of the BRUGG Group | Certified to ISO 9001