TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
SERVICOS PRELIMINARES01
LIMPEZA DO TERRENO01.01
RETIRANDO A VEGETACAO, TRONCOS ATE 5CM DE DIAMETRO E RASPAGEM01.01.01
0,88000SERVENTE10.146 0,25000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,88000 1,07360 0,00000 0,44933 2,40 1,95360
CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>5153060CM01.01.13
31,95000AJUDANTE10.101 9,00000 3,55H
19,26000OPERADOR10.155 3,00000 6,42H
175,80000RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP80.108 3,00000 58,60H
33,33000MOTOSSERRA80.187 3,00000 11,11H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 51,21000 62,47620 209,13000 74,24773 397,06 113,68620
LIMPEZAS DO TERRENO01.01.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
MOVIMENTO DE TERRA MANUAL01.02
CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO01.02.01
8,80000SERVENTE10.146 2,50000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,80000 10,73600 0,00000 4,49328 24,02 19,53600
CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M01.02.02
2,11200SERVENTE10.146 0,60000 3,52H
7,87500CAMINHAO BASCULANTE 6M380.310 0,15000 52,50H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,11200 2,57664 7,87500 2,88964 15,45 4,68864
ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M01.02.03
2,11200SERVENTE10.146 0,60000 3,52H
7,87500CAMINHAO BASCULANTE 6M380.310 0,15000 52,50H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,11200 2,57664 7,87500 2,88964 15,45 4,68864
TRANSPORTE POR CAMINHAO M3X01.02.04
0,43575CAMINHAO BASCULANTE 6M380.310 0,00830 52,50H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 0,43575 0,10022 0,53 0,00000
MOVIMENTOS DE TERRA MANUAL01.02.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Pgina 1 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
MOVIMENTO DE TERRA MECANIZADO01.03
CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO01.03.01
0,12840OPERADOR10.155 0,02000 6,42H
0,82000ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV80.115 0,02000 41,00H
3,80200TRATOR DE ESTEIRAS C/LAMINA POT 80HP80.305 0,04000 95,05H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,12840 0,15665 4,62200 1,12862 6,03 0,28505
CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M01.03.02
1,90500PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M380.104 0,02000 95,25H
1,90100TRATOR DE ESTEIRAS C/LAMINA POT 80HP80.305 0,02000 95,05H
3,15000CAMINHAO BASCULANTE 6M380.310 0,06000 52,50H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 6,95600 1,59988 8,55 0,00000
ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M01.03.04
0,12840OPERADOR10.155 0,02000 6,42H
1,90500PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M380.104 0,02000 95,25H
0,82000ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV80.115 0,02000 41,00H
1,90100TRATOR DE ESTEIRAS C/LAMINA POT 80HP80.305 0,02000 95,05H
3,15000CAMINHAO BASCULANTE 6M380.310 0,06000 52,50H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,12840 0,15665 7,77600 1,85404 9,91 0,28505
TRANSPORTE POR CAMINHAO M3X01.03.05
0,06899SERVENTE10.146 0,01960 3,52H
0,51450CAMINHAO BASCULANTE 6M380.310 0,00980 52,50H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,06899 0,08417 0,51450 0,15356 0,82 0,15316
MOVIMENTOS DE TERRA MECANIZADOS01.03.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
ESCORAMENTO DE TERRA01.04
PONTALETADO01.04.06
1,26000CARPINTEIRO10.111 0,30000 4,20H
1,06800AJUDANTE DE CARPINTEIRO10.112 0,30000 3,56H
38,70735MADEIRA PEROBA21.005 0,01500 2.580,49M3
0,25825ESTRONCAS DE EUCALIPTO - DIAM DE 15CM21.052 0,02500 10,33M
0,51200PREGO26.760 0,10000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,32800 2,84016 39,47760 10,26852 54,91 5,16816
ESCORAMENTO DE VALAS CONTINUO AT 2,00M01.04.10
2,81820CARPINTEIRO10.111 0,67100 4,20H
4,72384SERVENTE10.146 1,34200 3,52H
2,62408VIGAS PEROBA DE 6X16 CM21.027 0,10530 24,92M
0,72517ESTRONCAS DE EUCALIPTO - DIAM DE 15CM21.052 0,07020 10,33M
16,63351PRANCHAS PEROBA DE 3 CM21.054 0,23160 71,82M2
3,58400PREGO26.760 0,70000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,54204 9,20129 23,56675 9,27132 49,58 16,74333
ESCORAMENTO DE VALAS CONTINUO AT 4,00M01.04.11
2,15460CARPINTEIRO10.111 0,51300 4,20H
3,61152SERVENTE10.146 1,02600 3,52H
33,54730VIGAS PEROBA DE 6X16 CM21.027 1,34620 24,92M
1,86219VIGA DE PEROBA 8X18CM21.066 0,10260 18,15M
1,41930ESTRONCA DE EUCALIPTO DN 20CM21.088 0,06840 20,75M
3,58400PREGO26.760 0,70000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,76612 7,03467 40,41279 12,23912 65,45 12,80079
Pgina 2 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
ESCORAMENTO DE VALAS DESCONTINUO AT 2,00M01.04.15
2,25540CARPINTEIRO10.111 0,53700 4,20H
3,78048SERVENTE10.146 1,07400 3,52H
2,62408VIGAS PEROBA DE 6X16 CM21.027 0,10530 24,92M
0,72517ESTRONCAS DE EUCALIPTO - DIAM DE 15CM21.052 0,07020 10,33M
8,33112PRANCHAS PEROBA DE 3 CM21.054 0,11600 71,82M2
2,86720PREGO26.760 0,56000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,03588 7,36377 14,54756 6,42786 34,37 13,39965
ESCORAMENTO DE VALAS DESCONTINUO AT 4,00M01.04.16
1,76400CARPINTEIRO10.111 0,42000 4,20H
2,92160SERVENTE10.146 0,83000 3,52H
16,94560VIGAS PEROBA DE 6X16 CM21.027 0,68000 24,92M
1,86219VIGA DE PEROBA 8X18CM21.066 0,10260 18,15M
1,41930ESTRONCA DE EUCALIPTO DN 20CM21.088 0,06840 20,75M
2,86720PREGO26.760 0,56000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 4,68560 5,71643 23,09429 7,70415 41,20 10,40203
ESCORAMENTOS DE TERRA01.04.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
ESCAVACAO MANUAL EM TERRA01.05
ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M01.05.01
8,09600SERVENTE10.146 2,30000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,09600 9,87712 0,00000 4,13382 22,10 17,97312
ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M01.05.02
10,56000SERVENTE10.146 3,00000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 10,56000 12,88320 0,00000 5,39194 28,83 23,44320
ESCAVACOES MANUAIS EM TERRA01.05.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
APILOAMENTO E ATERRO DE CAVAS01.06
PARA SIMPLES REGULARIZACAO01.06.01
1,40800SERVENTE10.146 0,40000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,40800 1,71776 0,00000 0,71892 3,84 3,12576
REATERRO INTERNO APILOADO01.06.05
12,32000SERVENTE10.146 3,50000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 12,32000 15,03040 0,00000 6,29059 33,64 27,35040
APILOAMENTO E ATERRO DE CAVAS01.06.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
LASTRO DE PEDRA BRITADA OU DE CONCRETO SIMPLES01.07
LASTRO DE PEDRA BRITADA - 5CM01.07.02
0,52800SERVENTE10.146 0,15000 3,52H
3,07010PEDRA BRITADA 220.518 0,05500 55,82M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,52800 0,64416 3,07010 0,97572 5,21 1,17216
LASTRO DE CONCRETO - 5 CM01.07.10
1,26900PEDREIRO10.139 0,30000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
1,88880AREIA20.503 0,03000 62,96M3
Pgina 3 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
3,40000CIMENTO20.508 10,00000 0,34KG
2,23280PEDRA BRITADA 220.518 0,04000 55,82M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 4,08500 4,98370 7,52160 3,81577 20,40 9,06870
LASTROS01.07.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
DRENAGEM DO TERRENO01.08
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") CLASSE A INCL CONEX01.08.16
4,68000ENCANADOR10.118 1,00000 4,68H
3,51000AJUDANTE DE ENCANADOR10.119 1,00000 3,51H
6,30300TUBO PVC P/ESGOTO 100MM62.533 1,10000 5,73M
1,06000ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM62.673 1,00000 1,06UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,19000 9,99180 7,36300 5,87530 31,42 18,18180
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") CLASSE A INCL CONEX01.08.17
5,61600ENCANADOR10.118 1,20000 4,68H
4,21200AJUDANTE DE ENCANADOR10.119 1,20000 3,51H
14,74000TUBO PVC P/ESGOTO 150MM62.534 1,10000 13,40M
3,66000ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM62.674 1,00000 3,66UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 9,82800 11,99016 18,40000 9,25018 49,46 21,81816
TUBO DE CONCRETO - CLASSE C1 - DN 300MM01.08.20
1,26900PEDREIRO10.139 0,30000 4,23H
4,25920SERVENTE10.146 1,21000 3,52H
0,06296AREIA20.503 0,00100 62,96M3
0,15300CIMENTO20.508 0,45000 0,34KG
35,40600TUBO CONCRETO DE 30CM DIAM C-160.101 1,05000 33,72M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,52820 6,74440 35,62196 11,01575 58,91 12,27260
TUBO DE CONCRETO - CLASSE C1 - DN 400MM01.08.21
1,69200PEDREIRO10.139 0,40000 4,23H
5,35040SERVENTE10.146 1,52000 3,52H
0,14481AREIA20.503 0,00230 62,96M3
0,30940CIMENTO20.508 0,91000 0,34KG
45,92700TUBO CONCRETO DE 40CM DIAM C-160.102 1,05000 43,74M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,04240 8,59173 46,38121 14,26353 76,27 15,63413
TUBO DE CONCRETO - CLASSE C1 - DN 500MM01.08.22
2,11500PEDREIRO10.139 0,50000 4,23H
7,14560SERVENTE10.146 2,03000 3,52H
0,19518AREIA20.503 0,00310 62,96M3
0,46240CIMENTO20.508 1,36000 0,34KG
65,29950TUBO CONCRETO DE 50CM DIAM C-160.103 1,05000 62,19M
6,91400GUINDASTE SOBRE PNEUS 5T80.190 0,10000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 9,26060 11,29793 72,87108 21,48881 114,91 20,55853
TUBO DE CONCRETO - CLASSE C1 - DN 600MM01.08.23
2,96100PEDREIRO10.139 0,70000 4,23H
8,94080SERVENTE10.146 2,54000 3,52H
0,26443AREIA20.503 0,00420 62,96M3
0,61540CIMENTO20.508 1,81000 0,34KG
85,81650TUBO CONCRETO DE 60CM DIAM C-160.104 1,05000 81,73M
6,91400GUINDASTE SOBRE PNEUS 5T80.190 0,10000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 11,90180 14,52020 93,61033 27,60744 147,63 26,42200
TUBO DE CONCRETO - CLASSE CA1 - DN 700MM01.08.24
3,38400PEDREIRO10.139 0,80000 4,23H
10,77120SERVENTE10.146 3,06000 3,52H
Pgina 4 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
0,39665AREIA20.503 0,00630 62,96M3
0,92480CIMENTO20.508 2,72000 0,34KG
120,18300TUBO DE CONCRETO DE 70CM-CA-160.133 1,05000 114,46M
7,60540GUINDASTE SOBRE PNEUS 5T80.190 0,11000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 14,15520 17,26934 129,10985 36,92291 197,45 31,42454
TUBO DE CONCRETO - CLASSE CA1 - DN 800MM01.08.25
4,23000PEDREIRO10.139 1,00000 4,23H
12,95360SERVENTE10.146 3,68000 3,52H
0,52886AREIA20.503 0,00840 62,96M3
1,23080CIMENTO20.508 3,62000 0,34KG
187,00500TUBO CONCRETO DE 80CM DIAM CA-160.141 1,05000 178,10M
8,29680GUINDASTE SOBRE PNEUS 5T80.190 0,12000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 17,18360 20,96399 197,06146 54,09808 289,30 38,14759
TUBO DE CONCRETO - CLASSE CA1 - DN 900MM01.08.26
5,07600PEDREIRO10.139 1,20000 4,23H
16,19200SERVENTE10.146 4,60000 3,52H
0,66108AREIA20.503 0,01050 62,96M3
1,54020CIMENTO20.508 4,53000 0,34KG
183,33000TUBO DE CONCRETO DE 90CM-CA-160.135 1,05000 174,60M
8,98820GUINDASTE SOBRE PNEUS 5T80.190 0,13000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 21,26800 25,94696 194,51948 55,59892 297,33 47,21496
TUBO DE CONCRETO - CLASSE CA1 - DN 1000MM01.08.27
6,34500PEDREIRO10.139 1,50000 4,23H
23,23200SERVENTE10.146 6,60000 3,52H
0,98847AREIA20.503 0,01570 62,96M3
2,31200CIMENTO20.508 6,80000 0,34KG
255,15000TUBO CONCRETO DE 1,M DIAM CA-160.204 1,05000 243,00M
10,37100GUINDASTE SOBRE PNEUS 5T80.190 0,15000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 29,57700 36,08394 268,82147 76,93095 411,41 65,66094
TUBO DE CONCRETO - CLASSE CA1 - DN 1100MM01.08.28
8,46000PEDREIRO10.139 2,00000 4,23H
25,34400SERVENTE10.146 7,20000 3,52H
1,31586AREIA20.503 0,02090 62,96M3
3,08040CIMENTO20.508 9,06000 0,34KG
196,94850TUBO DE CONCRETO DE 110CM-CA-160.205 1,05000 187,57M
11,75380GUINDASTE SOBRE PNEUS 5T80.190 0,17000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 33,80400 41,24088 213,09856 66,27299 354,41 75,04488
TUBO DE CONCRETO - CLASSE CA1 - DN 1200MM01.08.29
12,69000PEDREIRO10.139 3,00000 4,23H
28,86400SERVENTE10.146 8,20000 3,52H
1,64326AREIA20.503 0,02610 62,96M3
3,85220CIMENTO20.508 11,33000 0,34KG
372,99150TUBO DE CONCRETO DE 120CM-CA-160.206 1,05000 355,23M
13,82800GUINDASTE SOBRE PNEUS 5T80.190 0,20000 69,14H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 41,55400 50,69588 392,31496 111,44991 596,01 92,24988
TUBO DRENO PLASTICO CORRUGADO PERFURADO DE 100MM EM BARRAS01.08.32
4,68000ENCANADOR10.118 1,00000 4,68H
3,51000AJUDANTE DE ENCANADOR10.119 1,00000 3,51H
0,07320LIXA D"AGUA38.040 0,12000 0,61UN
11,93500TUBO PVC RIG CORRUG PERF P/ DRENAG 100MM68.103 1,10000 10,85M
5,31090ADESIVO PARA TUBOS PVC69.513 0,21000 25,29L
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,19000 9,99180 17,31910 8,16521 43,66 18,18180
TUBO DRENO PLASTICO CORRUGADO PERFURADO DE 150MM EM BARRAS01.08.33
Pgina 5 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
5,61600ENCANADOR10.118 1,20000 4,68H
4,21200AJUDANTE DE ENCANADOR10.119 1,20000 3,51H
0,08540LIXA D"AGUA38.040 0,14000 0,61UN
23,69400TUBO PVC RIG CORRUG PERF P/ DRENAGEM 150MM68.104 1,10000 21,54M
6,06960ADESIVO PARA TUBOS PVC69.513 0,24000 25,29L
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 9,82800 11,99016 29,84900 11,88345 63,55 21,81816
MANTA GEOTEXTIL DE 200 GR/M201.08.34
1,26900PEDREIRO10.139 0,30000 4,23H
1,05600SERVENTE10.146 0,30000 3,52H
2,99000BIDIM OP-20 (200 GR/M2)24.080 1,00000 2,99M2
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,32500 2,83650 2,99000 1,87484 10,02 5,16150
MANTA GEOTEXTIL DE 300 GR/M201.08.35
1,26900PEDREIRO10.139 0,30000 4,23H
1,05600SERVENTE10.146 0,30000 3,52H
4,47000BIDIM OP-30 (300 GR/M2)24.049 1,00000 4,47M2
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,32500 2,83650 4,47000 2,21524 11,84 5,16150
MANTA GEOTEXTIL DE 600 GR/M201.08.36
1,26900PEDREIRO10.139 0,30000 4,23H
1,05600SERVENTE10.146 0,30000 3,52H
8,86000BIDIM OP-60 (600 GR/M2)24.029 1,00000 8,86M2
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,32500 2,83650 8,86000 3,22495 17,24 5,16150
ENVOLVIMENTO DE DRENOS COM PEDRA BRITADA01.08.40
8,80000SERVENTE10.146 2,50000 3,52H
61,40200PEDRA BRITADA 220.518 1,10000 55,82M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,80000 10,73600 61,40200 18,61574 99,55 19,53600
ENVOLVIMENTO DE DRENOS COM AREIA GROSSA01.08.41
7,04000SERVENTE10.146 2,00000 3,52H
69,25600AREIA20.503 1,10000 62,96M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,04000 8,58880 69,25600 19,52350 104,40 15,62880
FORNEC E INST DE DHP EM FUROS DE 100MM C/TUBO PVC 1 1/2" INCL TXS INST01.08.44
54,90000FORN IN DHP FUROS 100MM TUBO PVC 1 1/2" C/TXS INST21.556 1,00000 54,90M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 54,90000 12,62700 67,52 0,00000
FORNEC E INST DE DHP EM FUROS DE 100MM C/TUBO PVC 2" INCL TXS INST01.08.45
64,90000FORN INST DHP FUROS 100MM C/TUBO PVC 2" C/TXS INST21.555 1,00000 64,90M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 64,90000 14,92700 79,82 0,00000
CAIXA DE LIGACAO OU INSPECAO - ALVENARIA DE 1/2 TIJOLO REVESTIDA01.08.50
17,04690PEDREIRO10.139 4,03000 4,23H
12,81280SERVENTE10.146 3,64000 3,52H
3,96648AREIA20.503 0,06300 62,96M3
1,54560CAL HIDRATADA20.505 4,83000 0,32KG
5,97380CIMENTO20.508 17,57000 0,34KG
15,12000TIJOLO COMUM MACICO22.515 84,00000 0,18UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 29,85970 36,42883 26,60588 21,36572 114,26 66,28853
CAIXA DE LIGACAO OU INSPECAO - ALVENARIA DE 1 TIJOLO REVESTIDA01.08.51
18,99270PEDREIRO10.139 4,49000 4,23H
20,06400SERVENTE10.146 5,70000 3,52H
7,61816AREIA20.503 0,12100 62,96M3
4,46720CAL HIDRATADA20.505 13,96000 0,32KG
8,13960CIMENTO20.508 23,94000 0,34KG
35,28000TIJOLO COMUM MACICO22.515 196,00000 0,18UN
Pgina 6 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 39,05670 47,64917 55,50496 32,70849 174,91 86,70587
CAIXA DE LIGACAO OU INSPECAO - TAMPA DE CONCRETO ARMADO01.08.52
10,16400CARPINTEIRO10.111 2,42000 4,20H
8,61520AJUDANTE DE CARPINTEIRO10.112 2,42000 3,56H
1,95040FERREIRO10.121 0,46000 4,24H
1,61000AJUDANTE DE FERREIRO10.122 0,46000 3,50H
1,26900PEDREIRO10.139 0,30000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
2,07768AREIA20.503 0,03300 62,96M3
5,50800CIMENTO20.508 16,20000 0,34KG
2,25320PEDRA BRITADA 120.517 0,04000 56,33M3
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
4,09200CHAPA COMPENSADA RESINADA E=12MM21.032 0,40000 10,23M2
17,12750ACO CA-60-B $MD BITOLAS21.538 5,27000 3,25KG
0,46710ARAME RECOZIDO N.1827.010 0,09000 5,19KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 26,42460 32,23801 33,58708 21,21743 113,46 58,66261
TUBO DRENO PEAD CORRUG PERF DN 65MM EM ROLOS01.08.60
1,87200ENCANADOR10.118 0,40000 4,68H
1,40400AJUDANTE DE ENCANADOR10.119 0,40000 3,51H
2,11200SERVENTE10.146 0,60000 3,52H
7,81480PEDRA BRITADA 220.518 0,14000 55,82M3
7,28610BIDIM OP-30 (300 GR/M2)24.049 1,63000 4,47M2
7,16100TUBO DRENO PEAD CORRUG PERF DN 65MM EM ROLO68.110 1,05000 6,82M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,38800 6,57336 22,26190 7,87135 42,09 11,96136
TUBO DRENO PEAD CORRUG PERF DN 80MM EM ROLO01.08.61
2,10600ENCANADOR10.118 0,45000 4,68H
1,57950AJUDANTE DE ENCANADOR10.119 0,45000 3,51H
2,28800SERVENTE10.146 0,65000 3,52H
8,93120PEDRA BRITADA 220.518 0,16000 55,82M3
7,82250BIDIM OP-30 (300 GR/M2)24.049 1,75000 4,47M2
8,26350TUBO DRENO PEAD CORRUG PERF DN 80MM EM ROLO68.111 1,05000 7,87M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,97350 7,28767 25,01720 8,80403 47,08 13,26117
TUBO DRENO PEAD CORRUG PERF DN 100MM EM ROLO01.08.62
2,34000ENCANADOR10.118 0,50000 4,68H
1,75500AJUDANTE DE ENCANADOR10.119 0,50000 3,51H
2,46400SERVENTE10.146 0,70000 3,52H
10,04760PEDRA BRITADA 220.518 0,18000 55,82M3
8,18010BIDIM OP-30 (300 GR/M2)24.049 1,83000 4,47M2
10,53150TUBO DRENO PEAD CORRUG PERF DN 100MM EM ROLO68.112 1,05000 10,03M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,55900 8,00198 28,75920 9,96364 53,28 14,56098
TUBO DRENO PEAD CORRUG PERF DN 170MM EM ROLO01.08.63
2,80800ENCANADOR10.118 0,60000 4,68H
2,10600AJUDANTE DE ENCANADOR10.119 0,60000 3,51H
2,81600SERVENTE10.146 0,80000 3,52H
13,95500PEDRA BRITADA 220.518 0,25000 55,82M3
9,61050BIDIM OP-30 (300 GR/M2)24.049 2,15000 4,47M2
23,02650TUBO DRENO PEAD CORRUG PERF DN 170MM EM ROLO68.113 1,05000 21,93M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,73000 9,43060 46,59200 14,66310 78,41 17,16060
TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 65MM EM ROLO01.08.64
1,87200ENCANADOR10.118 0,40000 4,68H
1,40400AJUDANTE DE ENCANADOR10.119 0,40000 3,51H
2,11200SERVENTE10.146 0,60000 3,52H
7,81480PEDRA BRITADA 220.518 0,14000 55,82M3
7,28610BIDIM OP-30 (300 GR/M2)24.049 1,63000 4,47M2
2,92950TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 65MM68.120 1,05000 2,79M
Pgina 7 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,38800 6,57336 18,03040 6,89810 36,88 11,96136
TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 110MM EM ROLO01.08.65
2,34000ENCANADOR10.118 0,50000 4,68H
1,75500AJUDANTE DE ENCANADOR10.119 0,50000 3,51H
2,46400SERVENTE10.146 0,70000 3,52H
10,04760PEDRA BRITADA 220.518 0,18000 55,82M3
8,18010BIDIM OP-30 (300 GR/M2)24.049 1,83000 4,47M2
3,57000TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 110MM68.121 1,05000 3,40M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,55900 8,00198 21,79770 8,36250 44,72 14,56098
SERVICOS EM DRENAGEM DO TERRENO01.08.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
DEMOLICOES01.50
DEMOLICOES01.50.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
RETIRADAS01.60
RETIRADAS01.60.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
RECOLOCACOES01.70
RECOLOCACOES01.70.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
CONSERVACAO - SERVICOS PRELIMINARES01.80
SERVICOS PARCIAIS01.80.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
INFRA ESTRUTURA02
ESCAVACAO02.01
ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M02.01.01
8,09600SERVENTE10.146 2,30000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,09600 9,87712 0,00000 4,13382 22,10 17,97312
ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M02.01.02
10,56000SERVENTE10.146 3,00000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 10,56000 12,88320 0,00000 5,39194 28,83 23,44320
ESCORAMENTO DE TERRA CONTINUO02.01.05
2,94000CARPINTEIRO10.111 0,70000 4,20H
2,49200AJUDANTE DE CARPINTEIRO10.112 0,70000 3,56H
29,90400VIGAS PEROBA DE 6X16 CM21.027 1,20000 24,92M
28,72800PRANCHAS PEROBA DE 3 CM21.054 0,40000 71,82M2
4,09600PREGO26.760 0,80000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,43200 6,62704 62,72800 17,20102 91,98 12,05904
ESCORAMENTO DE TERRA DESCONTINUO02.01.06
1,68000CARPINTEIRO10.111 0,40000 4,20H
1,42400AJUDANTE DE CARPINTEIRO10.112 0,40000 3,56H
14,95200VIGAS PEROBA DE 6X16 CM21.027 0,60000 24,92M
14,36400PRANCHAS PEROBA DE 3 CM21.054 0,20000 71,82M2
Pgina 8 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
2,04800PREGO26.760 0,40000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 3,10400 3,78688 31,36400 8,79862 47,05 6,89088
APILOAMENTO PARA SIMPLES REGULARIZACAO02.01.10
1,40800SERVENTE10.146 0,40000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,40800 1,71776 0,00000 0,71892 3,84 3,12576
LASTRO DE PEDRA BRITADA - 5CM02.01.12
0,52800SERVENTE10.146 0,15000 3,52H
3,07010PEDRA BRITADA 220.518 0,05500 55,82M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,52800 0,64416 3,07010 0,97572 5,21 1,17216
LASTRO DE CONCRETO - 5 CM02.01.15
1,26900PEDREIRO10.139 0,30000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
1,88880AREIA20.503 0,03000 62,96M3
3,40000CIMENTO20.508 10,00000 0,34KG
2,23280PEDRA BRITADA 220.518 0,04000 55,82M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 4,08500 4,98370 7,52160 3,81577 20,40 9,06870
REATERRO INTERNO APILOADO02.01.25
12,32000SERVENTE10.146 3,50000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 12,32000 15,03040 0,00000 6,29059 33,64 27,35040
REATERRO COM ADICAO DE 2% DE CIMENTO02.01.27
29,92000SERVENTE10.146 8,50000 3,52H
9,65600CIMENTO20.508 28,40000 0,34KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 29,92000 36,50240 9,65600 17,49803 93,57 66,42240
ESCAVACOES02.01.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
FUNDACAO PROFUNDA02.02
TUBULOES: ESCAVACAO MANUAL - DIAMETRO DE 70CM02.02.01
41,70000POCEIRO10.142 10,00000 4,17H
36,40000AJUDANTE DE POCEIRO10.190 10,00000 3,64H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 78,10000 95,28200 0,00000 39,87786 213,25 173,38200
TUBULOES: ESCAVACAO MECANICA - DIAMETRO DE 50CM02.02.02
20,51000ESCAVACAO MECANICA DIAM 50 CM20.143 1,00000 20,51M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 20,51000 4,71730 25,22 0,00000
TUBULOES: ESCAVACAO MECANICA - DIAMETRO DE 60CM02.02.03
24,90000ESCAVACAO MECANICA DIAM 60 CM20.144 1,00000 24,90M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 24,90000 5,72700 30,62 0,00000
TUBULES : CONCRETO FCK 20 MPA PARA BASE E FUSTE02.02.17
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
237,19000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA20.535 1,00000 237,19M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 237,19000 78,29660 418,71 103,23000
ACO CA-50 (A OU B) FYK = 500 MPA02.02.21
0,42400FERREIRO10.121 0,10000 4,24H
0,35000AJUDANTE DE FERREIRO10.122 0,10000 3,50H
3,88700ACO CA-50-A $MD BITOLAS21.525 1,15000 3,38KG
0,10380ARAME RECOZIDO N.1827.010 0,02000 5,19KG
Pgina 9 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,77400 0,94428 3,99080 1,31309 7,02 1,71828
BROCA DE CONCRETO DE DIAMETRO 20CM - INCL ARRANQUES02.02.25
0,88830PEDREIRO10.139 0,21000 4,23H
4,57600SERVENTE10.146 1,30000 3,52H
1,32216AREIA20.503 0,02100 62,96M3
3,57000CIMENTO20.508 10,50000 0,34KG
1,56296PEDRA BRITADA 220.518 0,02800 55,82M3
4,73200ACO CA-50-A $MD BITOLAS21.525 1,40000 3,38KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 5,46430 6,66645 11,18712 5,36311 28,68 12,13075
BROCA DE CONCRETO DE DIAMETRO 25CM - INCL ARRANQUES02.02.26
1,31130PEDREIRO10.139 0,31000 4,23H
6,47680SERVENTE10.146 1,84000 3,52H
2,01472AREIA20.503 0,03200 62,96M3
5,40600CIMENTO20.508 15,90000 0,34KG
2,40026PEDRA BRITADA 220.518 0,04300 55,82M3
7,77400ACO CA-50-A $MD BITOLAS21.525 2,30000 3,38KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,78810 9,50148 17,59498 8,02345 42,90 17,28958
BROCA DE CONCRETO DE DIAMETRO 30CM - INCL ARRANQUES02.02.27
1,90350PEDREIRO10.139 0,45000 4,23H
8,76480SERVENTE10.146 2,49000 3,52H
3,02208AREIA20.503 0,04800 62,96M3
8,05800CIMENTO20.508 23,70000 0,34KG
3,57248PEDRA BRITADA 220.518 0,06400 55,82M3
13,52000ACO CA-50-A $MD BITOLAS21.525 4,00000 3,38KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 10,66830 13,01533 28,17256 11,92692 63,78 23,68363
ESTACAS TIPO STRAUSS DIAM 25CM CAPACIDADE ATE 20 TF02.02.35
0,35200SERVENTE10.146 0,10000 3,52H
25,59000M.OBRA EQUIPAMENTO P/ESTACA ATE 20T20.117 1,00000 25,59M
2,01472AREIA20.503 0,03200 62,96M3
5,10000CIMENTO20.508 15,00000 0,34KG
2,40026PEDRA BRITADA 220.518 0,04300 55,82M3
1,02900ACO CA-25 $MD BITOLAS21.510 0,30000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,35200 0,42944 36,13398 8,49055 45,40 0,78144
ESTACAS TIPO STRAUSS DIAM 32CM CAPACIDADE ATE 30 TF02.02.36
0,35200SERVENTE10.146 0,10000 3,52H
29,16000M.OBRA EQUIPAMENTO P/ESTACA ATE 30T20.118 1,00000 29,16M
3,02208AREIA20.503 0,04800 62,96M3
8,16000CIMENTO20.508 24,00000 0,34KG
3,57248PEDRA BRITADA 220.518 0,06400 55,82M3
1,02900ACO CA-25 $MD BITOLAS21.510 0,30000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,35200 0,42944 44,94356 10,51675 56,24 0,78144
ESTACAS TIPO STRAUSS DIAM 38CM CAPACIDADE ATE 40 TF02.02.37
0,35200SERVENTE10.146 0,10000 3,52H
35,34000M.OBRA EQUIPAMENTO P/ESTACA ATE 40T20.119 1,00000 35,34M
4,72200AREIA20.503 0,07500 62,96M3
12,75000CIMENTO20.508 37,50000 0,34KG
5,58200PEDRA BRITADA 220.518 0,10000 55,82M3
1,02900ACO CA-25 $MD BITOLAS21.510 0,30000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,35200 0,42944 59,42300 13,84702 74,05 0,78144
ESTACAS TIPO STRAUSS DIAM 45CM CAPACIDADE ATE 60 TF02.02.38
0,52800SERVENTE10.146 0,15000 3,52H
50,70000M.OBRA EQUIPAMENTO P/ESTACA ATE 60T20.122 1,00000 50,70M
6,04416AREIA20.503 0,09600 62,96M3
Pgina 10 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
16,21800CIMENTO20.508 47,70000 0,34KG
7,20078PEDRA BRITADA 220.518 0,12900 55,82M3
1,02900ACO CA-25 $MD BITOLAS21.510 0,30000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,52800 0,64416 81,19194 18,94374 101,30 1,17216
ESTACAS TIPO STRAUSS DIAM 55CM CAPACIDADE ATE 90 TF02.02.39
0,70400SERVENTE10.146 0,20000 3,52H
58,02000M.OBRA EQUIPAMENTO P/ESTACA ATE 90T20.121 1,00000 58,02M
10,07360AREIA20.503 0,16000 62,96M3
27,03000CIMENTO20.508 79,50000 0,34KG
12,00130PEDRA BRITADA 220.518 0,21500 55,82M3
1,02900ACO CA-25 $MD BITOLAS21.510 0,30000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,70400 0,85888 108,15390 25,23486 134,95 1,56288
ESTACA ESCAVADA MECANICAMENTE DIAM 25CM CAPACIDADE ATE 20 TF02.02.45
0,35200SERVENTE10.146 0,10000 3,52H
11,32000ESCAVACAO MECANICA DIAN 25 CM20.140 1,00000 11,32M
2,20360AREIA20.503 0,03500 62,96M3
6,70140CIMENTO20.508 19,71000 0,34KG
2,79100PEDRA BRITADA 220.518 0,05000 55,82M3
1,02900ACO CA-25 $MD BITOLAS21.510 0,30000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,35200 0,42944 24,04500 5,71008 30,53 0,78144
ESTACA ESCAVADA MECANICAMENTE DIAM 30CM CAPACIDADE ATE 30 TF02.02.46
0,38720SERVENTE10.146 0,11000 3,52H
12,48000ESCAVACAO MECANICA DIAM 30 CM20.141 1,00000 12,48M
4,02944AREIA20.503 0,06400 62,96M3
12,39640CIMENTO20.508 36,46000 0,34KG
5,19126PEDRA BRITADA 220.518 0,09300 55,82M3
1,16620ACO CA-25 $MD BITOLAS21.510 0,34000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,38720 0,47238 35,26330 8,30826 44,43 0,85958
ESTACA ESCAVADA MECANICAMENTE DIAM 35CM CAPACIDADE ATE 40 TF02.02.47
0,42240SERVENTE10.146 0,12000 3,52H
14,31000ESCAVACAO MECANICA DIAM 35 CM20.142 1,00000 14,31M
5,91824AREIA20.503 0,09400 62,96M3
17,65960CIMENTO20.508 51,94000 0,34KG
7,64734PEDRA BRITADA 220.518 0,13700 55,82M3
1,20050ACO CA-25 $MD BITOLAS21.510 0,35000 3,43KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,42240 0,51533 46,73568 10,96488 58,63 0,93773
ESTACA PRE-MOLD CONC SECAO MIN 225 CM2 P/ATE 15 TF02.02.51
72,96520ESTACA CONC PM CRAV SECAO MIN 225 CM2 P/ATE 15TF20.189 1,03000 70,84M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 72,96520 16,78200 89,74 0,00000
ESTACA PRE-MOLD CONC SECAO MIN 289 CM2 P/ATE 20 TF02.02.52
80,21640ESTACA CONC PM CRAV SECAO MIN 289 CM2 P/ATE 20TF20.198 1,03000 77,88M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 80,21640 18,44977 98,66 0,00000
ESTACA PRE-MOLD CONC SECAO MIN 314 CM2 P/ATE 25 TF02.02.53
82,48240ESTACA CONC PM CRAV SECAO MIN 314 CM2 P/ATE 25TF20.201 1,03000 80,08M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 82,48240 18,97095 101,45 0,00000
ESTACA PRE-MOLD CONC SECAO MIN 415 CM2 P/ATE 30 TF02.02.54
87,71480ESTACA CONC PM CRAV SECAO MIN 415 CM2 P/ATE 30TF20.203 1,03000 85,16M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 87,71480 20,17440 107,88 0,00000
ESTACA PRE-MOLD CONC SECAO MIN 531 CM2 P/ATE 40 TF02.02.55
116,99770ESTACA DE CONCR PM CRAV SECAO MIN 531CM2 P/ATE 40T20.204 1,03000 113,59M
Pgina 11 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 116,99770 26,90947 143,90 0,00000
ESTACA PRE-MOLD CONC SECAO MIN 616 CM2 P/ATE 50 TF02.02.56
133,04510ESTACA DE CONCR PM CRAV SECAO MIN 616CM2 P/ATE 50T20.205 1,03000 129,17M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 133,04510 30,60037 163,64 0,00000
ESTACA PRE-MOLD CONC SECAO MIN 855 CM2 P/ATE 70 TF02.02.57
185,63690ESTACA DE CONCR PM CRAV SECAO MIN 885CM2 P/ATE 70T20.206 1,03000 180,23M
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 185,63690 42,69649 228,33 0,00000
ESTACA RAIZ DN 150MM - CAPACIDADE ATE 25 TF02.02.60
1,10240FERREIRO10.121 0,26000 4,24H
0,91520SERVENTE10.146 0,26000 3,52H
128,92000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=150MM ATE 25 TF20.271 1,00000 128,92M
2,83320AREIA20.503 0,04500 62,96M3
9,18000CIMENTO20.508 27,00000 0,34KG
34,50000ACO CA-50 DE 5/8" - 15,9MM21.520 9,20000 3,75KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,01760 2,46147 175,43320 41,37982 221,29 4,47907
ESTACA RAIZ DN 160MM - CAPACIDADE ATE 30 TF02.02.61
1,10240FERREIRO10.121 0,26000 4,24H
0,91520SERVENTE10.146 0,26000 3,52H
137,12000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=160MM ATE 30 TF20.272 1,00000 137,12M
3,21096AREIA20.503 0,05100 62,96M3
10,54000CIMENTO20.508 31,00000 0,34KG
34,50000ACO CA-50 DE 5/8" - 15,9MM21.520 9,20000 3,75KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,01760 2,46147 185,37096 43,66551 233,51 4,47907
ESTACA RAIZ DN 200MM - CAPACIDADE ATE 50 TF02.02.62
1,27200FERREIRO10.121 0,30000 4,24H
1,05600SERVENTE10.146 0,30000 3,52H
146,79000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=200MM ATE 50 TF20.273 1,00000 146,79M
4,09240AREIA20.503 0,06500 62,96M3
13,60000CIMENTO20.508 40,00000 0,34KG
38,25000ACO CA-50 DE 5/8" - 15,9MM21.520 10,20000 3,75KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,32800 2,84016 202,73240 47,81713 255,71 5,16816
ESTACA RAIZ DN 250MM - CAPACIDADE ATE 70 TF02.02.63
1,27200FERREIRO10.121 0,30000 4,24H
1,05600SERVENTE10.146 0,30000 3,52H
160,43000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=250MM ATE 70 TF20.274 1,00000 160,43M
6,39674AREIA20.503 0,10160 62,96M3
21,08000CIMENTO20.508 62,00000 0,34KG
56,25000ACO CA-50 DE 5/8" - 15,9MM21.520 15,00000 3,75KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,32800 2,84016 244,15674 57,34473 306,66 5,16816
ESTACA RAIZ DN 310MM - CAPACIDADE ATE 100 TF02.02.64
1,44160FERREIRO10.121 0,34000 4,24H
1,19680SERVENTE10.146 0,34000 3,52H
183,80000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=310MM ATE 100TF20.275 1,00000 183,80M
9,83435AREIA20.503 0,15620 62,96M3
32,64000CIMENTO20.508 96,00000 0,34KG
90,00000ACO CA-50 DE 5/8" - 15,9MM21.520 24,00000 3,75KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 2,63840 3,21885 316,27435 74,09027 396,22 5,85725
ESTACA RAIZ DN 410MM - CAPACIDADE ATE 140 TF02.02.65
1,69600FERREIRO10.121 0,40000 4,24H
1,40800SERVENTE10.146 0,40000 3,52H
242,61000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=410MM ATE 140TF20.276 1,00000 242,61M
17,21326AREIA20.503 0,27340 62,96M3
Pgina 12 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
57,12000CIMENTO20.508 168,00000 0,34KG
157,50000ACO CA-50 DE 5/8" - 15,9MM21.520 42,00000 3,75KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 3,10400 3,78688 474,44326 110,70685 592,04 6,89088
ESTACA TIPO HELICE DN 25CM PARA CARGAS ATE 25 TF02.02.70
33,77000EXEC DE ESTACA TIPO HELICE DN 25CM P/ATE 25 TF20.220 1,00000 33,77M
12,23867CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,04910 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 46,00867 10,58199 56,59 0,00000
ESTACA TIPO HELICE DN 30CM PARA CARGAS ATE 35 TF02.02.71
42,75000EXEC DE ESTACA TIPO HELICE DN 30CM P/ATE 35 TF20.221 1,00000 42,75M
17,62268CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,07070 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 60,37268 13,88572 74,25 0,00000
ESTACA TIPO HELICE DN 35CM PARA CARGAS ATE 50 TF02.02.72
51,03000EXEC DE ESTACA TIPO HELICE DN 35CM P/ATE 50 TF20.222 1,00000 51,03M
23,97881CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,09620 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 75,00881 17,25203 92,26 0,00000
ESTACA TIPO HELICE DN 40CM PARA CARGAS ATE 60 TF02.02.73
57,42000EXEC DE ESTACA TIPO HELICE DN 40CM P/ATE 60 TF20.223 1,00000 57,42M
31,33198CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,12570 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 88,75198 20,41296 109,16 0,00000
ESTACA TIPO HELICE DN 50CM PARA CARGAS ATE 100 TF02.02.74
66,87000EXEC DE ESTACA TIPO HELICE DN 50CM P/ATE 100 TF20.224 1,00000 66,87M
48,95466CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,19640 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 115,82466 26,63967 142,46 0,00000
ESTACA TIPO HELICE DN 60CM PARA CARGAS ATE 150 TF02.02.75
82,07000EXEC DE ESTACA TIPO HELICE DN 60CM P/ATE 150 TF20.226 1,00000 82,07M
70,46580CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,28270 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 152,53580 35,08323 187,61 0,00000
ESTACA TIPO HELICE DN 70CM PARA CARGAS ATE 200 TF02.02.76
84,91000EXEC DE ESTACA TIPO HELICE DN 70CM P/ATE 200 TF20.227 1,00000 84,91M
95,91525CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,38480 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 180,82525 41,58981 222,41 0,00000
ESTACA TIPO HELICE DN 80CM PARA CARGAS ATE 250 TF02.02.77
98,81000EXEC DE ESTACA TIPO HELICE DN 80CM P/ATE 250 TF20.228 1,00000 98,81M
125,30300CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,50270 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 224,11300 51,54599 275,65 0,00000
ESTACA TIPO HELICE DN 90CM PARA CARGAS ATE 300 TF02.02.78
110,25000EXEC DE ESTACA TIPO HELICE DN 90CM P/ATE 300 TF20.229 1,00000 110,25M
158,57921CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO20.560 0,63620 249,26M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 268,82921 61,83072 330,65 0,00000
TAXA DE MOBILIZACAO DE EQUIPAMENTO PARA ESTACA TIPO HELICE02.02.94
19.442,50000TAXA DE MOBILIZACAO DE EQUIPAMENTO - ESTACA HELICE20.318 1,00000 19.442,50UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 19.442,50000 4.471,77500 23.914,27 0,00000
EMENDA COM ANEIS SOLDADOS PARA ESTACA02.02.95
158,25000FORN E APLIC EMENDA SOLDADA20.180 1,00000 158,25UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 158,25000 36,39750 194,64 0,00000
TAXA DE MOBILIZACAO DE EQUIPAMENTO - ESCATAS PRE-MOLDADAS02.02.97
7.333,00000TAXA DE MOBILIZACAO EQUIPAMENTOS-ESTACAS PRE-MOLD20.160 1,00000 7.333,00UN
Pgina 13 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 7.333,00000 1.686,59000 9.019,59 0,00000
TAXA DE MOBILIZACAO DE EQUIPAMENTOS - ESCATAS STRAUSS02.02.98
1.000,00000TAXA DE MOBILIZACAO EQUIPAMENTOS-ESTACAS STRAUSS20.317 1,00000 1.000,00UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 1.000,00000 230,00000 1.230,00 0,00000
FUNDACOES PROFUNDAS02.02.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
FORMA02.03
FORMA DE MADEIRA MACICA02.03.01
4,62000CARPINTEIRO10.111 1,10000 4,20H
3,91600AJUDANTE DE CARPINTEIRO10.112 1,10000 3,56H
4,40000SARRAFO PINHO APARELHADO 5X2,5 CM21.014 2,00000 2,20M
8,59000TABUAS PINHO DE 1"X12" DE 3A.21.021 0,50000 17,18M2
1,02400PREGO26.760 0,20000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,53600 10,41392 14,01400 7,58170 40,54 18,94992
FORMAS02.03.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
ARMADURA02.04
ACO CA 50 (A OU B) FYK= 500 M PA02.04.02
0,42400FERREIRO10.121 0,10000 4,24H
0,35000AJUDANTE DE FERREIRO10.122 0,10000 3,50H
3,88700ACO CA-50-A $MD BITOLAS21.525 1,15000 3,38KG
0,10380ARAME RECOZIDO N.1827.010 0,02000 5,19KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,77400 0,94428 3,99080 1,31309 7,02 1,71828
ACO CA 60 (A OU B) FYK= 600 M PA02.04.03
0,42400FERREIRO10.121 0,10000 4,24H
0,35000AJUDANTE DE FERREIRO10.122 0,10000 3,50H
3,73750ACO CA-60-B $MD BITOLAS21.538 1,15000 3,25KG
0,10380ARAME RECOZIDO N.1827.010 0,02000 5,19KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,77400 0,94428 3,84130 1,27870 6,83 1,71828
TELA ARMADURA (MALHA ACO CA 60 FYK= 600 M PA)02.04.05
0,12720FERREIRO10.121 0,03000 4,24H
0,10500AJUDANTE DE FERREIRO10.122 0,03000 3,50H
6,06100TELA ARMADURA (MALHA AO CA-60)21.560 1,10000 5,51KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,23220 0,28328 6,06100 1,51259 8,08 0,51548
ARMADURAS02.04.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
CONCRETO02.05
CONCRETO DOSADO E LANCADO FCK= 20 M PA02.05.14
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
241,93380CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA20.535 1,02000 237,19M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 241,93380 79,38767 424,55 103,23000
CONCRETO DOSADO E LANCADO FCK=25MPA02.05.18
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
254,40840CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 1,02000 249,42M3
Pgina 14 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 254,40840 82,25683 439,89 103,23000
CONCRETO DOSADO E LANCADO FCK=30MPA02.05.19
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
264,88380CONCRETO DOSADO (CONDICAO A) FCK=30MPA20.538 1,02000 259,69M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 264,88380 84,66617 452,77 103,23000
CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA02.05.24
12,69000PEDREIRO10.139 3,00000 4,23H
10,56000SERVENTE10.146 3,00000 3,52H
279,37800CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA20.553 1,02000 273,90M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 23,25000 28,36500 279,37800 76,12839 407,12 51,61500
CONCRETO DOSADO,BOMBEADO E LANCADO FCK=25MPA02.05.28
12,69000PEDREIRO10.139 3,00000 4,23H
10,56000SERVENTE10.146 3,00000 3,52H
293,19900CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA20.537 1,02000 287,45M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 23,25000 28,36500 293,19900 79,30722 424,12 51,61500
CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA02.05.29
12,69000PEDREIRO10.139 3,00000 4,23H
10,56000SERVENTE10.146 3,00000 3,52H
304,77600CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA20.539 1,02000 298,80M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 23,25000 28,36500 304,77600 81,96993 438,36 51,61500
CONCRETO GROUT02.05.50
25,38000PEDREIRO10.139 6,00000 4,23H
56,32000SERVENTE10.146 16,00000 3,52H
45,33120AREIA20.503 0,72000 62,96M3
6,40000CAL HIDRATADA20.505 20,00000 0,32KG
96,22000CIMENTO20.508 283,00000 0,34KG
16,66000PEDRISCO20.522 0,28000 59,50M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 81,70000 99,67400 164,61120 79,57660 425,56 181,37400
FORNECIMENTO E MONTAGEM DE ESTRUTURA PRE-MOLDADA DE CONCRETO02.05.98
2.378,73000ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT22.055 1,00000 2.378,73M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 2.378,73000 547,10790 2.925,83 0,00000
CONCRETOS02.05.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
EMBASAMENTO02.06
ALVENARIA DE FUNDACAO E EMBASAMENTO COM TIJ MACICOS COMUNS02.06.01
27,07200PEDREIRO10.139 6,40000 4,23H
33,22880SERVENTE10.146 9,44000 3,52H
20,39904AREIA20.503 0,32400 62,96M3
18,15680CAL HIDRATADA20.505 56,74000 0,32KG
10,21020CIMENTO20.508 30,03000 0,34KG
100,80000TIJOLO COMUM MACICO22.515 560,00000 0,18UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 60,30080 73,56698 149,56604 65,18978 348,62 133,86778
ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS DE CONCRETO02.06.14
27,79787PEDREIRO10.139 6,57160 4,23H
27,65770SERVENTE10.146 7,85730 3,52H
10,34433AREIA20.503 0,16430 62,96M3
9,46304CAL HIDRATADA20.505 29,57200 0,32KG
7,86872CIMENTO20.508 23,14330 0,34KG
159,71748BLOCO CONCRETO DE 14X39X19CM22.504 92,85900 1,72UN
Pgina 15 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 55,45556 67,65579 187,39357 71,41613 381,92 123,11135
ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS DE CONCRETO ESTRUTURAL02.06.15
21,81707PEDREIRO10.139 5,15770 4,23H
21,30480SERVENTE10.146 6,05250 3,52H
5,30123AREIA20.503 0,08420 62,96M3
4,27776CAL HIDRATADA20.505 13,36800 0,32KG
4,76000CIMENTO20.508 14,00000 0,34KG
218,94080BLOCO DE CONCRETO 19X19X19 CM - ESTRUTURAL22.509 136,83800 1,60UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 43,12187 52,60868 233,27979 75,67238 404,68 95,73055
ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS CERAMICOS PORTANTE02.06.16
27,79787PEDREIRO10.139 6,57160 4,23H
27,65770SERVENTE10.146 7,85730 3,52H
5,39567AREIA20.503 0,08570 62,96M3
2,72006CAL HIDRATADA20.505 8,50020 0,32KG
9,35020CIMENTO20.508 27,50060 0,34KG
152,28876BLOCO CERAMICO ESTRUTURAL 14X19X39 CM22.531 92,85900 1,64UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 55,45556 67,65579 169,75470 67,35919 360,22 123,11135
ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS CERAMICOS DE VEDACAO02.06.17
27,79787PEDREIRO10.139 6,57160 4,23H
27,65770SERVENTE10.146 7,85730 3,52H
5,39567AREIA20.503 0,08570 62,96M3
2,72006CAL HIDRATADA20.505 8,50020 0,32KG
9,35020CIMENTO20.508 27,50060 0,34KG
186,64659BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM22.521 92,85900 2,01UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 55,45556 67,65579 204,11253 75,26149 402,48 123,11135
ALVENARIA DE FUNDACAO E EMBASAMENTO C/ TIJOLO CERAMICO FURADO (BAIANO)02.06.18
48,34382PEDREIRO10.139 11,42880 4,23H
47,52106SERVENTE10.146 13,50030 3,52H
10,38840AREIA20.503 0,16500 62,96M3
9,33917CAL HIDRATADA20.505 29,18490 0,32KG
5,25796CIMENTO20.508 15,46460 0,34KG
102,85920TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM22.529 228,57600 0,45UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 95,86488 116,95515 127,84473 78,35290 419,01 212,82003
ALVENARIA DE FUNDACAO E EMBASAMENTO COM TIJOLOS LAMINADOS02.06.19
103,21200PEDREIRO10.139 24,40000 4,23H
64,06400SERVENTE10.146 18,20000 3,52H
20,14720AREIA20.503 0,32000 62,96M3
18,14400CAL HIDRATADA20.505 56,70000 0,32KG
10,20000CIMENTO20.508 30,00000 0,34KG
434,00000TIJOLO LAMINADO FURADO22.536 700,00000 0,62UN
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 167,27600 204,07672 482,49120 196,38410 1.050,22 371,35272
EMBASAMENTOS02.06.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
IMPERMEABILIZACOES02.07
IMPERM RESP ALV EMBAS COM ARGAM CIM-AREIA 1:3 CONTENDO HIDROFUGO02.07.01
4,23000PEDREIRO10.139 1,00000 4,23H
4,22400SERVENTE10.146 1,20000 3,52H
1,32216AREIA20.503 0,02100 62,96M3
3,15520CIMENTO20.508 9,28000 0,34KG
0,69600IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO24.069 0,30000 2,32KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,45400 10,31388 5,17336 5,50649 29,44 18,76788
Pgina 16 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
IMPERM RESP ALV EMBAS C/ CIM-AREIA 1-3 HIDROFUGO/TINTA BETUMINUSA02.07.02
4,23000PEDREIRO10.139 1,00000 4,23H
4,22400SERVENTE10.146 1,20000 3,52H
1,32216AREIA20.503 0,02100 62,96M3
3,15520CIMENTO20.508 9,28000 0,34KG
6,18000TINTA BETUMINOSA24.056 1,00000 6,18L
0,69600IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO24.069 0,30000 2,32KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,45400 10,31388 11,35336 6,92789 37,04 18,76788
IMPERMEABILIZACAO POR CRISTALIZACAO - SUB SOLOS02.07.03
0,42300PEDREIRO10.139 0,10000 4,23H
4,83000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO24.009 3,00000 1,61KG
1,56600EMULSAO ADESIVA PVA24.010 0,15000 10,44KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,42300 0,51606 6,39600 1,68706 9,02 0,93906
IMPERMEABILIZACOES02.07.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
DEMOLICOES02.50
DE CONCRETO SIMPLES (MANUAL)02.50.01
38,72000SERVENTE10.146 11,00000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 38,72000 47,23840 0,00000 19,77043 105,72 85,95840
LASTRO DE CONCRETO SIMPLES (MANUAL)02.50.02
45,76000SERVENTE10.146 13,00000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 45,76000 55,82720 0,00000 23,36506 124,95 101,58720
DE ALVENARIA DE FUNDACAO (MANUAL)02.50.03
21,12000SERVENTE10.146 6,00000 3,52H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 21,12000 25,76640 0,00000 10,78387 57,67 46,88640
DEMOLICOES02.50.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
RETIRADAS02.60
RETIRADAS02.60.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
RECOLOCACOES02.70
RECOLOCACOES02.70.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
CONSERVACAO - INFRA ESTRUTURA02.80
SERVICOS DE INFRA ESTRUTURA02.80.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
SUPER ESTRUTURA03
FORMA03.01
FORMAS DE MADEIRA MACICA03.01.01
5,46000CARPINTEIRO10.111 1,30000 4,20H
4,62800AJUDANTE DE CARPINTEIRO10.112 1,30000 3,56H
11,34000PONTALETE PINHO DE 3"X3"21.009 3,00000 3,78M
Pgina 17 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
8,59000TABUAS PINHO DE 1"X12" DE 3A.21.021 0,50000 17,18M2
1,02400PREGO26.760 0,20000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 10,08800 12,30736 20,95400 9,97035 53,31 22,39536
FORMAS PLANAS PLASTIFICADA PARA CONCRETO APARENTE03.01.02
8,40000CARPINTEIRO10.111 2,00000 4,20H
7,12000AJUDANTE DE CARPINTEIRO10.112 2,00000 3,56H
11,34000PONTALETE PINHO DE 3"X3"21.009 3,00000 3,78M
1,71800TABUAS PINHO DE 1"X12" DE 3A.21.021 0,10000 17,18M2
5,90040CHAPA COMPENSADA PLASTIFICADA E=12MM21.034 0,33000 17,88M2
1,02400PREGO26.760 0,20000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 15,52000 18,93440 19,98240 12,52046 66,95 34,45440
FORMAS CURVAS PLASTIFICADA PARA CONCRETO APARENTE03.01.03
11,76000CARPINTEIRO10.111 2,80000 4,20H
9,96800AJUDANTE DE CARPINTEIRO10.112 2,80000 3,56H
11,34000PONTALETE PINHO DE 3"X3"21.009 3,00000 3,78M
4,29500TABUAS PINHO DE 1"X12" DE 3A.21.021 0,25000 17,18M2
5,17110CHAPA COMPENSADA PLASTIFICADA E=10MM21.033 0,33000 15,67M2
1,02400PREGO26.760 0,20000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 21,72800 26,50816 21,83010 16,11524 86,18 48,23616
CIMBRAMENTO DE MADEIRA03.01.05
2,10000CARPINTEIRO10.111 0,50000 4,20H
1,78000AJUDANTE DE CARPINTEIRO10.112 0,50000 3,56H
5,67000PONTALETE PINHO DE 3"X3"21.009 1,50000 3,78M
0,76800PREGO26.760 0,15000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 3,88000 4,73360 6,43800 3,46187 18,51 8,61360
FORMA DE TUBO DE PAPELAO DIAM. 15 CM03.01.11
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
35,34000FORMA DE TUBO DE PAPELAO DIAM. 15CM21.231 1,00000 35,34M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 37,45280 9,31571 49,81 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 20 CM03.01.12
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
47,89000FORMA DE TUBO DE PAPELAO DIAM.20 CM21.228 1,00000 47,89M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 50,00280 12,20221 65,25 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 25 CM03.01.13
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
58,81000FORMA DE TUBO DE PAPELAO DIAM. 25CM21.232 1,00000 58,81M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 60,92280 14,71381 78,68 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 30 CM03.01.14
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
71,71000FORMA DE TUBO DE PAPELAO DIAM.30 CM21.229 1,00000 71,71M
0,05120PREGO26.760 0,01000 5,12KG
Pgina 18 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 73,82280 17,68081 94,55 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 35 CM03.01.15
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
84,52000FORMA DE TUBO DE PAPELAO DIAM. 35CM21.233 1,00000 84,52M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 86,63280 20,62711 110,31 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 40 CM03.01.16
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
105,19000FORMA DE TUBO DE PAPELAO DIAM. 40CM21.234 1,00000 105,19M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 107,30280 25,38121 135,73 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 45 CM03.01.17
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
118,39000FORMA DE TUBO DE PAPELAO DIAM. 45CM21.235 1,00000 118,39M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 120,50280 28,41721 151,97 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 50 CM03.01.18
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
140,45000FORMA DE TUBO DE PAPELAO DIAM. 50CM21.236 1,00000 140,45M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 142,56280 33,49101 179,10 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 55 CM03.01.19
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
153,58000FORMA DE TUBO DE PAPELAO DIAM. 55CM21.237 1,00000 153,58M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 155,69280 36,51091 195,25 3,05028
FORMA DE TUBO DE PAPELAO DIAM. 60 CM03.01.20
0,84000CARPINTEIRO10.111 0,20000 4,20H
0,53400AJUDANTE DE CARPINTEIRO10.112 0,15000 3,56H
2,06160TABUAS PINHO DE 1"X12" DE 3A.21.021 0,12000 17,18M2
187,24000FORMA DE TUBO DE PAPELAO DIAM. 60CM21.238 1,00000 187,24M
0,05120PREGO26.760 0,01000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,37400 1,67628 189,35280 44,25271 236,65 3,05028
FORMA METALICA TREPANTE PARA RESERVATORIO - INCLUSIVE COMPLEMENTOS03.01.30
17,00000FORMA METALICA TREPANTE FORNECIDA/APLICADA21.211 1,00000 17,00M2
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 17,00000 3,91000 20,91 0,00000
FORMAS03.01.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
ARMADURA03.02
ACO CA 50 (A OU B) FYK= 500 M PA03.02.02
Pgina 19 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
0,42400FERREIRO10.121 0,10000 4,24H
0,35000AJUDANTE DE FERREIRO10.122 0,10000 3,50H
3,88700ACO CA-50-A $MD BITOLAS21.525 1,15000 3,38KG
0,10380ARAME RECOZIDO N.1827.010 0,02000 5,19KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,77400 0,94428 3,99080 1,31309 7,02 1,71828
ACO CA 60 (A OU B) FYK= 600 M PA03.02.03
0,42400FERREIRO10.121 0,10000 4,24H
0,35000AJUDANTE DE FERREIRO10.122 0,10000 3,50H
3,73750ACO CA-60-B $MD BITOLAS21.538 1,15000 3,25KG
0,10380ARAME RECOZIDO N.1827.010 0,02000 5,19KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,77400 0,94428 3,84130 1,27870 6,83 1,71828
TELA ARMADURA (MALHA ACO CA 60 FYK= 600 M PA)03.02.05
0,12720FERREIRO10.121 0,03000 4,24H
0,10500AJUDANTE DE FERREIRO10.122 0,03000 3,50H
6,06100TELA ARMADURA (MALHA AO CA-60)21.560 1,10000 5,51KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,23220 0,28328 6,06100 1,51259 8,08 0,51548
ARMADURAS03.02.99
229,74000MODULO DE VERBA69.602 1,00000 229,74MV
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 0,00000 0,00000 229,74000 52,84020 282,58 0,00000
CONCRETO03.03
LAJE PRE-FABRICADA UNID C/VIGOTAS PROTENDIDAS LP12-100KGF/M203.03.03
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,48050PEDREIRO10.139 0,35000 4,23H
2,46400SERVENTE10.146 0,70000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
47,09000LAJE PRE-FABR UNIDIR VIGOTA PROT LP12-100KGF/M222.101 1,00000 47,09M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,03970 7,36843 68,01368 18,72702 100,14 13,40813
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP12-300KGF/M203.03.05
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,48050PEDREIRO10.139 0,35000 4,23H
2,46400SERVENTE10.146 0,70000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
47,09000LAJE PRE-FABR UNIDIR VIGOTA PROT LP12-300KGF/M222.102 1,00000 47,09M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,03970 7,36843 68,01368 18,72702 100,14 13,40813
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP16-100KGF/M203.03.06
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,56510PEDREIRO10.139 0,37000 4,23H
2,60480SERVENTE10.146 0,74000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
50,90000LAJE PRE-FABR UNIDIR VIGOTA PROT LP16-100KGF/M222.104 1,00000 50,90M2
Pgina 20 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,26510 7,64342 71,82368 19,71841 105,45 13,90852
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP16-300KGF/M203.03.07
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,56510PEDREIRO10.139 0,37000 4,23H
2,60480SERVENTE10.146 0,74000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
53,84000LAJE PRE-FABR UNIDIR VIGOTA PROT LP16-300KGF/M222.105 1,00000 53,84M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,26510 7,64342 74,76368 20,39461 109,06 13,90852
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-100KGF/M203.03.08
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,69200PEDREIRO10.139 0,40000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
54,81000LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-100KGF/M222.107 1,00000 54,81M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,60320 8,05590 75,73368 20,79034 111,18 14,65910
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-300KGF/M203.03.09
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,69200PEDREIRO10.139 0,40000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
61,52000LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-300KGF/M222.108 1,00000 61,52M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,60320 8,05590 82,44368 22,33364 119,43 14,65910
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-500KGF/M203.03.10
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,69200PEDREIRO10.139 0,40000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
61,52000LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-500KGF/M222.109 1,00000 61,52M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,60320 8,05590 82,44368 22,33364 119,43 14,65910
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-100KGF/M203.03.12
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,56510PEDREIRO10.139 0,37000 4,23H
2,60480SERVENTE10.146 0,74000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
Pgina 21 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
61,95000LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-100KGF/M222.110 1,00000 61,95M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,26510 7,64342 82,87368 22,25991 119,04 13,90852
CONCRETO DOSADO E LANCADO FCK= 20 M PA03.03.14
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
241,93380CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA20.535 1,02000 237,19M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 241,93380 79,38767 424,55 103,23000
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-300KGF/M203.03.15
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,56510PEDREIRO10.139 0,37000 4,23H
2,60480SERVENTE10.146 0,74000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
64,68000LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-300KGF/M222.111 1,00000 64,68M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,26510 7,64342 85,60368 22,88781 122,40 13,90852
CONCRETO DOSADO E LANCADO FCK=25 MPA03.03.16
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
254,40840CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 1,02000 249,42M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 254,40840 82,25683 439,89 103,23000
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-500KGF/M203.03.17
1,13400CARPINTEIRO10.111 0,27000 4,20H
0,96120AJUDANTE DE CARPINTEIRO10.112 0,27000 3,56H
1,56510PEDREIRO10.139 0,37000 4,23H
2,60480SERVENTE10.146 0,74000 3,52H
10,97448CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04400 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
67,65000LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-500KGF/M222.112 1,00000 67,65M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,26510 7,64342 88,57368 23,57091 126,05 13,90852
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT12-100KGF/M203.03.18
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,22670PEDREIRO10.139 0,29000 4,23H
2,64000SERVENTE10.146 0,75000 3,52H
12,22158CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04900 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
22,58000LAJE PRE-FABR VIGOTA TREL UNIDIR LT12-100KGF/M222.121 1,00000 22,58M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,11710 7,46286 43,57136 13,14480 70,29 13,57996
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT16-100KGF/M203.03.19
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
Pgina 22 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
1,48050PEDREIRO10.139 0,35000 4,23H
3,34400SERVENTE10.146 0,95000 3,52H
15,63863CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,06270 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
29,66000LAJE PRE-FABR VIGOTA TREL UNIDIR LT16-100KGF/M222.124 1,00000 29,66M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,07490 8,63138 54,06841 16,04818 85,82 15,70628
CONCRETO DOSADO E LANCADO FCK=30MPA03.03.20
25,38000PEDREIRO10.139 6,00000 4,23H
21,12000SERVENTE10.146 6,00000 3,52H
264,88380CONCRETO DOSADO (CONDICAO A) FCK=30MPA20.538 1,02000 259,69M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 46,50000 56,73000 264,88380 84,66617 452,77 103,23000
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT16-300KGF/M203.03.22
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,48050PEDREIRO10.139 0,35000 4,23H
3,34400SERVENTE10.146 0,95000 3,52H
15,63863CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,06270 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
29,66000LAJE PRE-FABR VIGOTA TREL UNIDIR LT16-300KGF/M222.125 1,00000 29,66M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,07490 8,63138 54,06841 16,04818 85,82 15,70628
CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA03.03.24
12,69000PEDREIRO10.139 3,00000 4,23H
10,56000SERVENTE10.146 3,00000 3,52H
279,37800CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA20.553 1,02000 273,90M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 23,25000 28,36500 279,37800 76,12839 407,12 51,61500
CONCRETO DOSADO,BOMBEADO E LANCADO FCK 25 MPA03.03.26
12,69000PEDREIRO10.139 3,00000 4,23H
10,56000SERVENTE10.146 3,00000 3,52H
293,19900CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA20.537 1,02000 287,45M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 23,25000 28,36500 293,19900 79,30722 424,12 51,61500
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-100KGF/M203.03.27
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,69200PEDREIRO10.139 0,40000 4,23H
3,73120SERVENTE10.146 1,06000 3,52H
18,50696CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,07420 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
37,18000LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-100KGF/M222.127 1,00000 37,18M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,67360 9,36179 64,45674 18,74319 100,23 17,03539
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-300KGF/M203.03.28
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,69200PEDREIRO10.139 0,40000 4,23H
3,73120SERVENTE10.146 1,06000 3,52H
18,50696CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,07420 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
Pgina 23 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
37,18000LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-300KGF/M222.128 1,00000 37,18M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,67360 9,36179 64,45674 18,74319 100,23 17,03539
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-500KGF/M203.03.29
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,69200PEDREIRO10.139 0,40000 4,23H
3,73120SERVENTE10.146 1,06000 3,52H
18,50696CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,07420 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
37,18000LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-500KGF/M222.129 1,00000 37,18M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,67360 9,36179 64,45674 18,74319 100,23 17,03539
CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA03.03.30
12,69000PEDREIRO10.139 3,00000 4,23H
10,56000SERVENTE10.146 3,00000 3,52H
304,77600CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA20.539 1,02000 298,80M3
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 23,25000 28,36500 304,77600 81,96993 438,36 51,61500
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT25-300KGF/M203.03.31
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,98810PEDREIRO10.139 0,47000 4,23H
4,36480SERVENTE10.146 1,24000 3,52H
19,87877CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,07970 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
43,45000LAJE PRE-FABR VIGOTA TREL UNIDIR LT25-300KGF/M222.130 1,00000 43,45M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,60330 10,49603 72,09855 20,97551 112,17 19,09933
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT25-500KGF/M203.03.32
1,21800CARPINTEIRO10.111 0,29000 4,20H
1,03240AJUDANTE DE CARPINTEIRO10.112 0,29000 3,56H
1,98810PEDREIRO10.139 0,47000 4,23H
4,36480SERVENTE10.146 1,24000 3,52H
19,87877CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,07970 249,42M3
4,34700PONTALETE PINHO DE 3"X3"21.009 1,15000 3,78M
0,81600SARRAFO DE PINHO DE 1X4" DE 3A CONSTR21.016 0,60000 1,36M
3,45318TABUAS PINHO DE 1"X12" DE 3A.21.021 0,20100 17,18M2
43,45000LAJE PRE-FABR VIGOTA TREL UNIDIR LT25-500KGF/M222.131 1,00000 43,45M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 8,60330 10,49603 72,09855 20,97551 112,17 19,09933
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H10-100KGF/M203.03.33
0,67680PEDREIRO10.139 0,16000 4,23H
0,84480SERVENTE10.146 0,24000 3,52H
0,13851AREIA20.503 0,00220 62,96M3
0,46787CIMENTO20.508 1,37610 0,34KG
0,18445PEDRISCO20.522 0,00310 59,50M3
13,71810CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05500 249,42M3
84,44000LAJE PRE-FABR PAINEL ALVEOLAR PROT H10-100KGF/M222.141 1,00000 84,44M2
0,07028ADITIVO EXPANSOR28.040 0,01400 5,02KG
7,25096GUINDASTE SOBRE PNEUS 13 T80.328 0,06670 108,71H
Pgina 24 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,52160 1,85635 106,27017 25,21907 134,86 3,37795
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-100KGF/M203.03.34
0,67680PEDREIRO10.139 0,16000 4,23H
0,84480SERVENTE10.146 0,24000 3,52H
0,23925AREIA20.503 0,00380 62,96M3
0,79975CIMENTO20.508 2,35220 0,34KG
0,30940PEDRISCO20.522 0,00520 59,50M3
13,71810CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05500 249,42M3
107,38000LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-100KGF/M222.144 1,00000 107,38M2
0,12048ADITIVO EXPANSOR28.040 0,02400 5,02KG
7,25096GUINDASTE SOBRE PNEUS 13 T80.328 0,06670 108,71H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,52160 1,85635 129,81793 30,63505 163,83 3,37795
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-300KGF/M203.03.36
0,67680PEDREIRO10.139 0,16000 4,23H
0,84480SERVENTE10.146 0,24000 3,52H
0,23925AREIA20.503 0,00380 62,96M3
0,79975CIMENTO20.508 2,35220 0,34KG
0,30940PEDRISCO20.522 0,00520 59,50M3
13,71810CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05500 249,42M3
109,20000LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-300KGF/M222.145 1,00000 109,20M2
0,12048ADITIVO EXPANSOR28.040 0,02400 5,02KG
7,25096GUINDASTE SOBRE PNEUS 13 T80.328 0,06670 108,71H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,52160 1,85635 131,63793 31,05365 166,06 3,37795
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-500KGF/M203.03.37
0,67680PEDREIRO10.139 0,16000 4,23H
0,84480SERVENTE10.146 0,24000 3,52H
0,23925AREIA20.503 0,00380 62,96M3
0,79975CIMENTO20.508 2,35220 0,34KG
0,30940PEDRISCO20.522 0,00520 59,50M3
13,71810CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05500 249,42M3
112,49000LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-500KGF/M222.146 1,00000 112,49M2
0,12048ADITIVO EXPANSOR28.040 0,02400 5,02KG
7,25096GUINDASTE SOBRE PNEUS 13 T80.328 0,06670 108,71H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,52160 1,85635 134,92793 31,81035 170,11 3,37795
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H20-300KGF/M203.03.38
0,67680PEDREIRO10.139 0,16000 4,23H
0,84480SERVENTE10.146 0,24000 3,52H
0,41554AREIA20.503 0,00660 62,96M3
1,36711CIMENTO20.508 4,02090 0,34KG
0,52360PEDRISCO20.522 0,00880 59,50M3
13,71810CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05500 249,42M3
136,65000LAJE PRE-FABR PAINEL ALVEOLAR PROT H20-300KGF/M222.147 1,00000 136,65M2
0,20682ADITIVO EXPANSOR28.040 0,04120 5,02KG
7,25096GUINDASTE SOBRE PNEUS 13 T80.328 0,06670 108,71H
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,52160 1,85635 160,13212 37,60732 201,11 3,37795
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H20-500KGF/M203.03.39
0,67680PEDREIRO10.139 0,16000 4,23H
0,84480SERVENTE10.146 0,24000 3,52H
0,41554AREIA20.503 0,00660 62,96M3
1,36711CIMENTO20.508 4,02090 0,34KG
0,52360PEDRISCO20.522 0,00880 59,50M3
13,71810CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05500 249,42M3
137,63000LAJE PRE-FABR PAINEL ALVEOLAR PROT H20-500KGF/M222.148 1,00000 137,63M2
0,20682ADITIVO EXPANSOR28.040 0,04120 5,02KG
7,25096GUINDASTE SOBRE PNEUS 13 T80.328 0,06670 108,71H
Pgina 25 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 1,52160 1,85635 161,11212 37,83272 202,32 3,37795
LAJE MISTA B-11 SOBRECARGA 100 KG03.03.40
1,62646FERREIRO10.121 0,38360 4,24H
1,34260AJUDANTE DE FERREIRO10.122 0,38360 3,50H
1,48050PEDREIRO10.139 0,35000 4,23H
2,46400SERVENTE10.146 0,70000 3,52H
11,19896CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04490 249,42M3
4,00680PONTALETE PINHO DE 3"X3"21.009 1,06000 3,78M
2,69640SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,63000 4,28M
3,09240TABUAS PINHO DE 1"X12" DE 3A.21.021 0,18000 17,18M2
12,94540ACO CA-50-A $MD BITOLAS21.525 3,83000 3,38KG
15,34000LAJE PRE-FABR B-11 41-1-10022.035 1,00000 15,34M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 6,91356 8,43455 49,43356 14,89978 79,68 15,34811
LAJE MISTA B-16 SOBRECARGA 500 KG03.03.42
1,62646FERREIRO10.121 0,38360 4,24H
1,34260AJUDANTE DE FERREIRO10.122 0,38360 3,50H
1,69200PEDREIRO10.139 0,40000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
11,19896CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04490 249,42M3
4,27140PONTALETE PINHO DE 3"X3"21.009 1,13000 3,78M
2,86760SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,67000 4,28M
3,26420TABUAS PINHO DE 1"X12" DE 3A.21.021 0,19000 17,18M2
12,94540ACO CA-50-A $MD BITOLAS21.525 3,83000 3,38KG
22,65000LAJE PRE-FABR B-1641-2-50022.037 1,00000 22,65M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,47706 9,12202 57,35116 17,00856 90,95 16,59908
LAJE MISTA B-16 SOBRECARGA 300 KG03.03.43
1,62646FERREIRO10.121 0,38360 4,24H
1,34260AJUDANTE DE FERREIRO10.122 0,38360 3,50H
1,69200PEDREIRO10.139 0,40000 4,23H
2,81600SERVENTE10.146 0,80000 3,52H
14,61601CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,05860 249,42M3
4,27140PONTALETE PINHO DE 3"X3"21.009 1,13000 3,78M
2,86760SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,67000 4,28M
3,26420TABUAS PINHO DE 1"X12" DE 3A.21.021 0,19000 17,18M2
12,94540ACO CA-50-A $MD BITOLAS21.525 3,83000 3,38KG
17,06000LAJE PRE-FABR B-16 41-2-30022.038 1,00000 17,06M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,47706 9,12202 55,17821 16,50878 88,28 16,59908
LAJE MISTA B-20 SOBRECARGA 300 KG03.03.44
1,62646FERREIRO10.121 0,38360 4,24H
1,34260AJUDANTE DE FERREIRO10.122 0,38360 3,50H
1,81890PEDREIRO10.139 0,43000 4,23H
3,06240SERVENTE10.146 0,87000 3,52H
16,21230CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,06500 249,42M3
4,27140PONTALETE PINHO DE 3"X3"21.009 1,13000 3,78M
2,86760SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,67000 4,28M
3,26420TABUAS PINHO DE 1"X12" DE 3A.21.021 0,19000 17,18M2
12,94540ACO CA-50-A $MD BITOLAS21.525 3,83000 3,38KG
29,71000LAJE PRE-FABR B20-41-2-30022.039 1,00000 29,71M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,85036 9,57744 69,42450 19,97603 106,82 17,42781
LAJE MISTA B-12 SOBRECARGA 100 KG03.03.45
1,62646FERREIRO10.121 0,38360 4,24H
1,34260AJUDANTE DE FERREIRO10.122 0,38360 3,50H
Pgina 26 de 464
-
TABELA DE COMPOSIO DE INSUMOS
A tabela oficial a que se encontra disponvel no site: www.fde.sp.gov.br
Tab. Ref. Setembro/2009
1,56510PEDREIRO10.139 0,37000 4,23H
2,60480SERVENTE10.146 0,74000 3,52H
11,02436CONCRETO DOSADO (CONDICAO A) FCK 25 MPA20.536 0,04420 249,42M3
4,27140PONTALETE PINHO DE 3"X3"21.009 1,13000 3,78M
2,86760SARRAFO PINHO APARELHADO 10X2,5 CM21.017 0,67000 4,28M
3,26420TABUAS PINHO DE 1"X12" DE 3A.21.021 0,19000 17,18M2
12,94540ACO CA-50-A $MD BITOLAS21.525 3,83000 3,38KG
21,33000LAJE PRE-FABRICADA B-12-41-1-10022.056 1,00000 21,33M2
0,15360PREGO26.760 0,03000 5,12KG
Mo Obra: Materiais:LS: BDI:SubMO: TOTAL: 7,13896 8,70954 55,85656 16,49216 88,19 15,84850
LAJE MISTA B-12 SOBRECARGA 300 KG03.03.46
1,62646FERREIRO10.121 0,38360 4,24H