iii workshop pmu coppe2 - kth · centro de pesquisas de energia elétrica - cepel título do...
TRANSCRIPT
Centro de Pesquisas de Energia Elétrica -CEPEL
Título do trabalho
Centro de Pesquisas de Energia Elétrica - CEPEL
III International Workshop
on PMU Applications:
Perspectives for ONS and Transmission
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Autor/apresentador
Área
Título do trabalho
Raul B Sollero
Systems Automation Department - DAS
Perspectives for ONS and Transmission
Owners in Brazil
COPPE/UFRJ
Outline:
Motivation - the Brazilian regulatory framework
Applications considered by Brazilian Transmission Owners –
the Eletrobras Workshop
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
the Eletrobras Workshop
Applications selected by ONS – the RFI
Ongoing initiatives at Cepel
Present situation in Brazil
MEDFASEE
Partnership UFSC/Reason/FinepPMUs in the system today
Individual initiatives from some
companies
� Chesf
� Furnas
� Eletronorte
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Eletrosul, …
Universities - Medfasee
ONS - SMS (Aneel Resolution 170/2005)
� ONS RFI for Phasor Data Concentrators
and applications for the Synchrophasor
Data Network project
ONS Responsibilities
Define and specify the architecture of the
Phasor Measurement System and
telecommunication requirements �
Reassess requirements, quantities and
location of the Phasor Measurement Units -
Motivation
ANEEL Resolution -170/2005
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
location of the Phasor Measurement Units -
PMUs to be installed by the agents �
Coordinate the PMU Certification process,
through independent laboratory tests (in a
first phase no PMU was certified) �
Specify, acquire and install the ONS' Phasor Concentrators
Define PMU placement
Define the schedule and coordinate the PMU installation by TOs
Motivation
ANEEL Resolution -170/2005
Transmission Companies responsibilities
To purchase, install, operate and maintain the PMUs placed in their substations
To supply the communication links to ONS’ PDCs, complying with technical
requirements, specifications and schedules coordinated by ONS.
(ONS letter 1468/100/2013, December 02/2013)
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Counterpart
Operation and maintenance costs considered after ANEEL audit, at the periodic
revisions on the permitted annual revenue, on the tariffs or costs
Access to the measurements data
How can Transmission Companies benefit from ONS’s infrastructure?
Model of the Brazilian Electric SectorApplications of interest for ONS
ONS is a not-for-profit organization whose mission is to operate the Brazilian
Interconnected Power System in an integrated manner, seeking security, continuity and
economicity of electricity supply in the country
So: phasor applications of interest to ONS should aim at:
Reduction of the risks of power outages
� Enhance the system observability and situational awareness
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Enhance the system observability and situational awareness
� Monitor and alarm at potentially unsafe states or events (oscillations, suden changes,..)
� Prevent cascading events
� Wide area monitoring and control: protect the power system grid as an entity
Increase the quality and efficiency of electricity service
� Support tools to minimize restoration and reconfiguration times
� Disturbance detection and location tools
Model of the Brazilian Electric SectorApplications of interest for the Transmission Owners
Transmission companies are remunerated by the full availability of their assets,
regardless of the amount of energy transmitted through their lines
So: Phasor applications of interest to the transmission companies should aim at:
Maximization of the availability of their assets
� To reduce the risk of equipment failure or minimize its impact
� To increase the reliability and performance of their protection systems (equipment and systems)
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� To increase the reliability and performance of their protection systems (equipment and systems)
� To reduce restoration times after a disturbance…
More efficiency and reduction of operational costs
� Better disturbance analysis tools - higher efficiency in fulfilling regulatory requirements and to
avoid undue penalties
� Monitoring of conditions that can lead to overvoltages, overloads and other stressful situations in
their equipment, with an impact on the degradation on their life cycle…
• Disturbance Analysis
Operational efficiency
Mapping the key phasor applications to TOs: Eletrobras
Companies Workshop
Agenda
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
• Disturbance Analysis
• Fault Location
• Line parameters calculation and validation of network simulation tools
• Out-of-step detection
• Differential protection – lines, busbars
• Wide area backup protection
Availability of assets
Disturbance analysis and protection
performance analysis
Objectives� To reconstruct the sequence of events post disturbance� Considered one of the most useful applications for a
synchrophasor infrastructure
Benefits� Less time and effort for the analysis� Avoids undue penalties� Enhances reliability
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Enhances reliability
Tecnology� Sufficient number of PMUs for the function� Archiving of local data� Perspective for evolution to a Smart Analyzer, capable
to process data from multiple sources (fault recorders, relays, PMUs, ..)
Gap� No product such as a Smart Analyzer
Source: MedFasee
Fault location
Objectives� To improve accuracy on the establishment of the point of incidence of faults –
permanent or transient
Benefits� More accuracy on fault location translates to shorter restoration times� Fault location can be sent to the maintenance teams within milliseconds from the
event.
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Technology� Voltage and current phasors at both terminals of
the transmission line� Communication links with permanent
availability� Available algorithms (Johns & Jamalis, ..)
Challenges� Extraction of information from a small
window
Line impedance calculations
Objectives� Dynamically calculate positive and zero sequence line impedances from measured
quantities at line terminals
Benefits� Inaccurate values for calculations derived from line constants (mainly for zero
sequence): influence on distance relays operation� A study of the zero sequence impedance variation based on the season of the year
could be made (use of different setting groups)
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Challenges� Positive sequence impedance: can be obtained at any time with positive sequence
measurements at both ends of the line� Zero sequence impedance: can only be obtained when a fault occurs on the line
Validation of network simulation tools
Objectives� To validate network simulation tools using data obtained during power system
disturbances
Benefits� More reliability and confidence on protection settings; better use of available
capacities; more confidence on off-line simulation tools
Tecnology
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Tecnology� PMUs distributed at the network
Challenges� Basic technology already available
Comparison between calculated
and measured currents during a
disturbance in India
Out-of-Step detection logic enhances distance
relays stability
Objectives� Improve the ability to detect power swings, to separate the system under
unstable power swings and to avoid undue zone 3 protection operations
Benefits� More robustness of the system under disturbances:
o Avoids spurious tripping of zone 3 during oscillationso Avoids refusals of operation for three-phase faults
during oscillations
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
during oscillationso Controlled separation under unstable power swings
Technology� Continuous monitoring, through PMUs, of the variation of:
o Angles of the busbars positive seq. voltageso Apparent Power (S) absorbed by the transmission lines
Challenges� To demonstrate reliability� Operating times limit
application to zone 3
Equipment: line differential protection
Distributed generation: complex configurations
Backup for GPS signaling: local atomic clocks?
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Ref: Alex Apostolov
Equipment protection: Busbars
Possible architecture for busbar differential protection
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Wide area backup protection using
synchrophasors
Function� Differential backup covering multiple zones, dynamically redefinable
Benefits� Selectivity and faster operating times
� Stability under oscillations and heavy loads
� Unnecessary coordination settings
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Unnecessary coordination settings
� Fewer hidden faults: auto monitoring for
communication, equipment and measurements
Gap� Availability and latency of communication systems
� Cyber security
� Traditional challenges: CT saturation, complex busbar arrangements, shunt reactances. ..
• Plot charts for every measurement made by the SMS
• Spectral Analysis
• Modal Analysis
Network Analysis Applications – Situational Awareness
ONS Request for Information – RFI
Agenda
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
• Modal Analysis
• Event Analysis
• Monitoring of frequency, voltage, angle, power
• Oscillatory Stability Monitoring
• Restoration Support
• Disturbance Detection and Location
Network Real-Time Applications - Security
ONS Synchrophasor Measurement System(Source: ONS)
31 Substations, 181 Line Terminals
543 phase voltage and 724 phase current
synchrophasors
1 second total latency time
Dedicated telecommunication channels to
guarantee bandwidth and system security
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
guarantee bandwidth and system security
Phasors in real time using multicast
addressing and C37.118 format
ONS to hire telecom provider to the RDS
point of presence
All accesses are redundant
Power System Monitoring:
Better situational awareness of the network
Function� Real time display of current profile, maximum & minimum values and deviations
from expected for:� Frequency
� Voltage
� Angle
� Power flow (active and reactive)
Benefits
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Benefits� Faster and more effective situational
awareness
� Each unexpected variation can be
correlated with EMS alarms
Gap� Selection, establishment of limits and form of presentation of the most significant quantities
Ref: CAISO
Detection of poorly damped local and inter area oscillations
Functions and Objectives� To alarm the occurrence, to identify the vectors representing the amplitude and
phase (mode shape) for local and inter-area oscillations
� Display mode damping, mode amplitude and mode phase for each mode
� Display the group of measurements which are oscillating in phase or out of phase.
Benefits� Unstable oscillatory modes can rise and result in system breakup and blackouts
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� To identify flaws in control systems
Tecnology� High rate PMUs (Nyquist)
� Phase angles at generator voltage terminals
and positive sequence voltages
� Frequency analysis (Prony or Wavelets, per ex.)
Gap� Discriminating oscillations from noise is
challenging
Detection of poorly damped local and inter area oscillations
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Compass plot
� Vectors indicating the amplitude
and phase of signal oscillation
Bar plot
� Bars indicating the amplitude
and frequency of signal
oscillation
Source: Siemens
Power System restoration support
Function� To support the Operator for faster and safer restoration
� Real time identification and alarm of an islanding condition
� Display of voltages, frequencies and angular differences in different islands
Benefits
� Time efficiency
� The Operator knows whether it is feasible to
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� The Operator knows whether it is feasible to
command the tie breaker
� Close monitoring of the state of the system
during the restoration process
� Valuable resource to alleviate the Operator
stress during a restoration
Gap
� Operator’s simulator training is advisable
� Simulators need to offer information that emulates direct measurements
Black-start training at WECC
Disturbance Detection and Location
Function� Detect and display in real time a
disturbance occurrence
� Suggest the type of disturbance :� generation trip
� load shedding
� transmission line tripping
� Cascading failure
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Based on all available signals,
pinpoint the most likely geographical
disturbance location
Benefits� Situational awareness enables fast countermeasure actions
Gaps� Large scale events are, typically, very complex
Roles and responsibilities of CEPEL
Some ongoing initiatives
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Some ongoing initiatives
Cepel’s SAGE is the most prevalent SCADA/EMS
system in the Brazilian transmission network
Sage provides the real-time solution to REGER – the
set of 4 integrated SSC’s that support ONS
operation of the whole Brazilian Interconnected
Power System
Cepel as a provider of tools for the Operation of the Brazilian Electrical Network
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
The Reger contract includes Control Center phasor
applications, to be driven by the planned ONS
Synchrophasor Network
SAGE/EMS:
• +100 clients
• + 700 installations in Brazil
Cepel’s SAGE is the most prevalent SCADA/EMS
system in the Brazilian transmission network
Sage provides the real-time solution to REGER – the
set of 4 integrated SSC’s that support ONS
operation of the whole Brazilian Interconnected
Power System
Cepel as a provider of tools for the Operation of the Brazilian Electrical Network
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
The Reger contract includes Control Center phasor
applications, to be driven by the planned ONS
Synchrophasor Network
Personnel and hardware infrastructure for
engineering, communication, cybersecurity,
maintenance, updates and so on, for Sage, is fully
operational and reaches hundreds of installations
Transmission companies are now seeking the best alternative to make use of the phasor data
obtained from their substations to be sent to ONS
SAGE EMS applications included in the ONS
REGER system
Real Time Network Analysis Tools
Equipment Outage
scheduling
Topology Processor
Parameter Adaptation
State Estimator
SimulationStudy Mode
Operator
Powerflow
Optimal
Powerflow
Contingency
Analysis
Network
GenerationControl
Automatic Gen
Control
Reserve
Monitoring
Deviation
Monitoring
Generation
Rescheduling
SynchrophasorApplications
Stress
Monitor
Sync Assist
Loop Assist
Damp Mon
3rd Party
Integration
Siemens
PowerCC IMM
Historian
OSISoft PI
Epri
OTS
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Topology Estimator
Contingency Analysis
Remedial Action
Automatic Voltage
Control
Constrained Dispatch
Network
EquivalentsRescheduling
Production Production
Schedulling
AGC Monitoring
Economic Dispatch
Production Costs
Load Forecast
Damp Mon
Innovative approach: enable SAGE for PDC capability,
eliminating the need for another local infrastructure!
SAGE Phasor Applications
Sage/EMS as a local Phasor Data Concentrator (PDC)
• Full support do IEEE C37-118 protocol for direct communication with PMUs and distribution to external PDCs, at native rates (say, 60 samples/s)
• SCADA phasor data distribution through ICCP
• Platform for processing local applications
SOM – Monitoring Power System Oscillations
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
• DampMon – Evaluation of mode shapes of system oscillations
VPAM – Monitoring of Voltage Phase Angles
• StressMon – Monitoring of system stress
• SynchAssist – Resynchronizing electrical islands
• LoopAssist – Closing a transmission system loop
EMS – Including synchrohasors into the Power System State Estimator
• SE – Merge direct phasor measurements to enhance state estimation
SAGE as a substation PDC
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
SAGE as a substation PDC
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Small signal instability is one of the major threats to grid reliability in some systems
� An unstable oscillatory mode can cause large-amplitude oscillations and may result in system
breakup and large scale blackouts
An oscillation may be triggered by:
Phasor Measurements Applications
DampMon
� Small disturbances during heavy
power transfers between areas
Bad behavior of control systems
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Bad behavior of control systems
� Application input: the complete set
of samples (60 s/sec)
StressMon - Monitoring Transmission Loading
Monitors angle difference between pairs of locations or
regions in the power system
Alerts on sudden angle-pair changes for critical corridors
Phasor Measurements Applications -StressMon
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Barra X Barra Y
VX
VY
PX-Y
QX-Y
Área AÁrea B
-170-160-150-140-130-120-110-100-90-80-70-60-50-40-30-20-10
0
15:05:0015:32:0015:44:0015:51:0016:05:0016:06:0116:09:0516:10:38Time (EDT)
Rel
ativ
e P
hase
Ang
le
Cleveland West Michigan
Normal Phase Angle is approx. -25º
Phase
Angles
Diverg
ed
Prior
To
Blacko
ut
August 14, 2003 Blackout
Phasor Measurements Applications -StressMon
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
f=59.95 Hz
Phasor Measurements Applications -SyncAssist
Phasor
Time curve frequency
differences
Ref: main system f
SyncAssist - Assistance on Reconnecting Islands
Monitors voltage magnitude difference, angle difference and frequency deviation across transmission
equipment involved in reconnecting electrical islands
To guide the operator on conditioning the power system for a valid reconnection situation
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
BarraY
Bus B
(PMU)Main system Island
Bus A
(PMU)BarraX
VA
VX
VB
VX
VY
VA
VB
VAB
Phasor
Diagram
Ref: main system f
Time curve with voltage
differences VAB
Time curve with angle
differences
Phasor Measurements Applications -SyncAssist
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Assistance on Closing Transmission Loops
Monitors voltage magnitude and angle difference across circuits involved in closing
transmissions loops in the power system
Means to guide the operator on conditioning the power system for a valid reconnection
situation , minimizing impacts on existing equipment.
Phasor Measurements Applications -LoopAssist
Phasor
DiagramOpen Loop
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Bus A
(PMU)
Barra X
Bus B
(PMU)
Barra Y
VA
VB
VX
VY
Diagram
Time curve with angle
differences
Time curve with voltage
magnitude differences VAB
Open Loop
Phasor Measurements Applications -SyncAssist
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
SE uses SCADA data to determine (every few seconds) a ‘best estimate’ of the current
power system state:
Voltages, Angles, MW/MVAR flows, CB status, taps, etc
SE has become a critical, ‘must-run successfully’ control center function. Provides input
to:� Contingency Analysis
� Remedial Action
� Constrained dispatch, …
State Estimation (SE)
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
� Constrained dispatch, …
One of the key solution variables in SE is the:
bus voltage phase angle
PMUs can now provide the direct
measurement of voltage phase angle as well as
current phasors:� Better observability of the network� Enhanced accuracy� More robustness
Candidate approaches for SE in consideration
for SAGE
Candidate approaches
� Hybrid SEs: SCADA and PMU data processed simultaneously – internal change
� Multistage approaches: separate processing – parallel or sequential
� Evolutionary solution ( Multistage approach) was selected for SAGEo Preserves current implementation and installationso Strategy defined after a master thesis at Coppe – Prof. Djalma Falcãoo Yet under analysis: A Priori Information or State Estimate Fusion approaches
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
A priori information approach Fusion approach
Cepel’s Synchrophasor Measurements
Laboratory - LabPMU
Foreseen activities
Reference tests: accuracy, performance, compatibility, ..
Research: platform to test and validate synchrophasor applications (internal or
external)
Support to field installations: real life
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Support to field installations: real life
challenges (synchronization,
communication, latency, ..),
Exploring new possibilities: harmonics
Platform for testing and validating
synchrophasor applications
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Output files from ANATEM
Comments?
Contributions?
Thanks!
Centro de Pesquisas de Energia Elétrica - CEPEL III WORKSHOP on the Use of Synchrophasors | 11 2014
Raul B Sollero
Centro de Pesquisas de Energia Elétrica - CEPEL