Page 1: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

14 December 2011 Fabio Lobo

Ferrostaal do BrasilPresentation

Ferrostaal do Brasil

Page 2: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 2Introduction to Ferrostaal

Year of Foundation :

Head Office :

Branch Offices :

Total Personnel :

Business Volume:

Areas of Activity :

Certifications:

1953

São Paulo

Belo Horizonte, Rio de Janeiro, Vitória

65 (including Industrial Projects and Services)

Euros 100 Million (Average) - Annual

• Industrial projects, with focus on oil and gas,

petrochemical, power and marine business.

• Further activities through subsidiary Ferrostaal

Equipamentos e Soluções: equipment for printing

industry and industrial manufacturing (SERVICES);

• ISO 9001

Head Office, São Paulo

Brazil

Ferrostaal do Brasil

SERVICES

Ferrostaal Equip e Soluções Ltda.

INDUSTRIAL PROJECTS

Ferrostaal do Brasil Com e Ind Ltda.

Managing Director: Fabio Lobo

Oil & Gas /

PetrochemicalPower

São Paulo Belo Horizonte

PrintingPackaging /

Others

São Paulo

Page 3: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 3Introduction to Ferrostaal

Brazil

Ferrostaal do Brasil – What we do (Industrial Projects)

EPC Contracts and

Project Development

• Oil and Gas

Industry (On and

Offshore

• Power Industry

(Gas Based and

Biomass based)

• Petrochemical

Industry

Page 4: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 4Introduction to Ferrostaal

Main References – Brazil

Ferrostaal do Brasil (Industrial Projects)

Page 5: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 5Introduction to Ferrostaal

Project: TKCSA Gas System

Order: Turnkey Plant Construction without Civil Works

Client: ThyssenKrupp CSA Siderúrgica do Atlântico

Ltda.

Plant Concept: 2 x 100.000m³ Gasholders, 2 Flares

and Gas Mix Station, incl. 2 Gas Boosters and

Substitute Gas Station

Location: Santa Cruz / Rio de Janeiro / Brasil

Scope MF: BE, DE, Supplies, Erection and

Commissioning

Special Features: Improvement of the overall plant

environmental emission

Main References – Brazil

Ferrostaal do Brasil (Industrial Projects)

Page 6: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 6Introduction to Ferrostaal

Customer: Companhía Siderúrgica de Tubarão, CST / Brazil

Nominal Production Capacity:1.2 Mio mt/a

Hearth Diameter: 8.0 m

Start Production: 1998

Consortium Ferrostaal / MAN GHH / DME

Nominal Production Capacity:3.0 Mio mt/a

Hearth Diameter: 12.5 m

Start Production: 2007

Consortium Ferrostaal / VAI / Paul Wurth

Blast Furnace No. 2

Blast Furnace No. 3

Main References – Turn Key Contracts

Ferrostaal do Brasil (Industrial Projects)

Page 7: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 7Introduction to Ferrostaal

Customer: Alunorte

Barcarena, Brazil

26,5 MW co-generation system with

HP steam turbine

Turnkey contract

Turbine by MAN Turbo

Main References – Turn Key Contracts

Ferrostaal do Brasil (Industrial Projects)

Page 8: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 8Introduction to Ferrostaal

Main References – Turn Key Contracts

FPSO Petrobrás

Guara B.V. ("Guara") and Tupi B.V. ("Tupi") issued a tender with 4 lots of oil & gas processing,

compression and power generation modules for 6 identical Floating Production, Storage and Off-loading

(FPSO) vessels. Guara and Tupi have been recently founded in 2010 and established to organize the

construction of the FPSOs. Guara shall be owner of 1 FPSO, Tupi shall be owner of 5 FPSOs. Total

contract value: USD 860 Mio

There will be an option for 2 further FPSOs to be placed by Petrobras within 18 months from contract

signature.

Consortium Ferrostaal/Tomé (Brazilian construction company): won the bid for lot 4 in July/2012.

A FPSO unit is a floating vessel used by the offshore industry for the processing of hydrocarbons and for

storage of oil. The FPSO vessels for this project are designed to process hydrocarbons produced from

deep subsea templates in the Tupi and Guara field, process them and to store the oil, so that it can be off-

loaded onto a tanker. FPSOs are preferred in frontier offshore regions as they are easy to install, and do

not require a local pipeline infrastructure to export oil.

The overall project includes more lots than mentioned herein, but those are not part of the tender issued.

The Project

Page 9: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 9Introduction to Ferrostaal

Main References – Turn Key Contracts

Ferrostaal do Brasil – FPSO Petrobrás

The Clients

TUPI BV

Rotterdam, The Netherlands.Guara BV

Rotterdam, The Netherlands.

Page 10: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 10Introduction to Ferrostaal

Main References – Turn Key Contracts

Ferrostaal do Brasil – FPSO Petrobrás

The Consortium

Internal Structure: a horizontal

consortium;

Partners will execute the consortium

company-like;

No split of responsabilities;

Page 11: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 11Introduction to Ferrostaal

Main References – Turn Key Contracts

Ferrostaal do Brasil – FPSO Petrobrás

Project Highlights

Page 12: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 12Introduction to Ferrostaal

Main References – Turn Key Contracts

Ferrostaal do Brasil – FPSO Petrobrás

Project Timetable

Page 13: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 13Introduction to Ferrostaal

Main References – Turn Key Contracts

Ferrostaal do Brasil – FPSO Petrobrás

The Shipyard

Page 14: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 14Introduction to Ferrostaal

Main References – Brazil

Ferrostaal do Brasil – Other References (Industrial Projects)

Page 15: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

May 2012Ferrostaal GmbH 15Introduction to Ferrostaal

Main References – Turn Key Contracts

Ferrostaal do Brasil –

Some Local Challenges

Challenges

- Local content: All upstream projects

performed in Brazil (in the oil & gas

are must have a high local content;

- Complex local regulations (labor,

environmental, tax);

- High local competition – skilled and

experienced companies;

- Aggressive EPC contract conditions

(high penalties); and

- Good previous relationship with

customer required.

Best alternatives:

- Selection of

strong and

reliable local

partner

(engineering and

construction);

- Qualified local FS

set-up

- Selection of

qualified local

support from third

parties

Page 16: Ferrostaal do Brasil - Lateinamerika Verein...Ferrostaal GmbH Introduction to Ferrostaal May 2012 5 Project: TKCSA Gas System Order: Turnkey Plant Construction without Civil WorksClient:

16Introduction to Ferrostaal May 2012Ferrostaal GmbH

Turning Ideas Into Reality