RELATÓRIO ANALÍTICO DE SERVIÇOS Referência Custo Unit. Coeficiente Descrição UN Custo Total A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br Tab. Ref. janeiro/2011 LS: 122% BDI: 23% 01.01.001 RETIRANDO A VEGETACAO, TRONCOS ATE 5CM DE DIAMETRO E RASPAGEM. M2 2,60 1.01.46 0,25000 SERVENTE H 0,95250 3,81 LS 1,16205 BDI 0,48635 Mão-de-Obra 0,95250 Material 0,00000 SubMO 2,11455 01.01.010 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>5<15CM UN 137,05 1.01.01 6,00000 AJUDANTE H 23,40000 3,90 1.01.55 2,00000 OPERADOR H 13,90000 6,95 8.01.87 2,00000 MOTOSSERRA H 28,62000 14,31 LS 45,50600 BDI 25,62798 Mão-de-Obra 37,30000 Material 28,62000 SubMO 82,80600 01.01.011 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>15<30CM UN 281,20 1.01.01 6,00000 AJUDANTE H 23,40000 3,90 1.01.55 2,00000 OPERADOR H 13,90000 6,95 8.01.08 2,00000 RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 117,20000 58,60 8.01.87 2,00000 MOTOSSERRA H 28,62000 14,31 LS 45,50600 BDI 52,58398 Mão-de-Obra 37,30000 Material 145,82000 SubMO 82,80600 01.01.012 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>30<60CM UN 351,51 1.01.01 7,50000 AJUDANTE H 29,25000 3,90 1.01.55 2,50000 OPERADOR H 17,37500 6,95 8.01.08 2,50000 RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 146,50000 58,60 8.01.87 2,50000 MOTOSSERRA H 35,77500 14,31 LS 56,88250 BDI 65,72998 Mão-de-Obra 46,62500 Material 182,27500 SubMO 103,50750 01.01.013 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>60CM UN 421,81 1.01.01 9,00000 AJUDANTE H 35,10000 3,90 1.01.55 3,00000 OPERADOR H 20,85000 6,95 8.01.08 3,00000 RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 175,80000 58,60 8.01.87 3,00000 MOTOSSERRA H 42,93000 14,31 LS 68,25900 BDI 78,87597 Mão-de-Obra 55,95000 Material 218,73000 SubMO 124,20900 01.01.099 LIMPEZAS DO TERRENO MV 298,09 6.96.02 1,00000 MODULO DE VERBA MV 242,35000 242,35 LS 0,00000 BDI 55,74050 Mão-de-Obra 0,00000 Material 242,35000 SubMO 0,00000 01.02.001 CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO M3 26,00 1.01.46 2,50000 SERVENTE H 9,52500 3,81 LS 11,62050 BDI 4,86347 Mão-de-Obra 9,52500 Material 0,00000 SubMO 21,14550 01.02.002 CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M M3 17,67 1.01.46 0,60000 SERVENTE H 2,28600 3,81 8.03.10 0,15000 CAMINHAO BASCULANTE 6M3 H 9,29100 61,94 LS 2,78892 BDI 3,30416 Mão-de-Obra 2,28600 Material 9,29100 SubMO 5,07492 01.02.003 ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M M3 17,67 1.01.46 0,60000 SERVENTE H 2,28600 3,81 8.03.10 0,15000 CAMINHAO BASCULANTE 6M3 H 9,29100 61,94 LS 2,78892 BDI 3,30416 Mão-de-Obra 2,28600 Material 9,29100 SubMO 5,07492 01.02.004 TRANSPORTE POR CAMINHAO M3X KM 0,63 8.03.10 0,00830 CAMINHAO BASCULANTE 6M3 H 0,51410 61,94 LS 0,00000 BDI 0,11824 Mão-de-Obra 0,00000 Material 0,51410 SubMO 0,00000 01.02.099 MOVIMENTOS DE TERRA MANUAL MV 298,09 6.96.02 1,00000 MODULO DE VERBA MV 242,35000 242,35 LS 0,00000 BDI 55,74050 Mão-de-Obra 0,00000 Material 242,35000 SubMO 0,00000 01.03.001 CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO M3 6,16 1.01.55 0,02000 OPERADOR H 0,13900 6,95 8.01.15 0,02000 ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV H 0,82000 41,00 8.03.05 0,04000 TRATOR DE ESTEIRAS C/LAMINA POT 80HP H 3,88240 97,06 LS 0,16958 BDI 1,15253 Mão-de-Obra 0,13900 Material 4,70240 SubMO 0,30858 01.03.002 CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M M3 9,59 8.01.04 0,02000 PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M3 H 2,14000 107,00 8.03.05 0,02000 TRATOR DE ESTEIRAS C/LAMINA POT 80HP H 1,94120 97,06 8.03.10 0,06000 CAMINHAO BASCULANTE 6M3 H 3,71640 61,94 LS 0,00000 BDI 1,79345 Mão-de-Obra 0,00000 Material 7,79760 SubMO 0,00000 01.03.004 ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M M3 10,97 1.01.55 0,02000 OPERADOR H 0,13900 6,95 8.01.04 0,02000 PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M3 H 2,14000 107,00 8.01.15 0,02000 ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV H 0,82000 41,00 8.03.05 0,02000 TRATOR DE ESTEIRAS C/LAMINA POT 80HP H 1,94120 97,06 8.03.10 0,06000 CAMINHAO BASCULANTE 6M3 H 3,71640 61,94 09/02/2011 11:38:40 Página: 1 de 0

Upload: wesley-machado

Post on 11-Dec-2015

284 views

Category:

Documents


8 download

DESCRIPTION

Tabela de composições de custo para obras civis.

TRANSCRIPT

Page 1: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

01.01.001 RETIRANDO A VEGETACAO, TRONCOS ATE 5CM DE DIAMETRO E RASPAGEM. M2 2,60

1.01.46 0,25000SERVENTE H 0,952503,81

LS 1,16205 BDI 0,48635Mão-de-Obra 0,95250 Material 0,00000SubMO 2,11455

01.01.010 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>5<15CM UN 137,05

1.01.01 6,00000AJUDANTE H 23,400003,901.01.55 2,00000OPERADOR H 13,900006,958.01.87 2,00000MOTOSSERRA H 28,6200014,31

LS 45,50600 BDI 25,62798Mão-de-Obra 37,30000 Material 28,62000SubMO 82,80600

01.01.011 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>15<30CM UN 281,20

1.01.01 6,00000AJUDANTE H 23,400003,901.01.55 2,00000OPERADOR H 13,900006,958.01.08 2,00000RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 117,2000058,608.01.87 2,00000MOTOSSERRA H 28,6200014,31

LS 45,50600 BDI 52,58398Mão-de-Obra 37,30000 Material 145,82000SubMO 82,80600

01.01.012 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>30<60CM UN 351,51

1.01.01 7,50000AJUDANTE H 29,250003,901.01.55 2,50000OPERADOR H 17,375006,958.01.08 2,50000RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 146,5000058,608.01.87 2,50000MOTOSSERRA H 35,7750014,31

LS 56,88250 BDI 65,72998Mão-de-Obra 46,62500 Material 182,27500SubMO 103,50750

01.01.013 CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>60CM UN 421,81

1.01.01 9,00000AJUDANTE H 35,100003,901.01.55 3,00000OPERADOR H 20,850006,958.01.08 3,00000RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 175,8000058,608.01.87 3,00000MOTOSSERRA H 42,9300014,31

LS 68,25900 BDI 78,87597Mão-de-Obra 55,95000 Material 218,73000SubMO 124,20900

01.01.099 LIMPEZAS DO TERRENO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.02.001 CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO M3 26,00

1.01.46 2,50000SERVENTE H 9,525003,81

LS 11,62050 BDI 4,86347Mão-de-Obra 9,52500 Material 0,00000SubMO 21,14550

01.02.002 CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M M3 17,67

1.01.46 0,60000SERVENTE H 2,286003,818.03.10 0,15000CAMINHAO BASCULANTE 6M3 H 9,2910061,94

LS 2,78892 BDI 3,30416Mão-de-Obra 2,28600 Material 9,29100SubMO 5,07492

01.02.003 ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M M3 17,67

1.01.46 0,60000SERVENTE H 2,286003,818.03.10 0,15000CAMINHAO BASCULANTE 6M3 H 9,2910061,94

LS 2,78892 BDI 3,30416Mão-de-Obra 2,28600 Material 9,29100SubMO 5,07492

01.02.004 TRANSPORTE POR CAMINHAO M3X KM 0,63

8.03.10 0,00830CAMINHAO BASCULANTE 6M3 H 0,5141061,94

LS 0,00000 BDI 0,11824Mão-de-Obra 0,00000 Material 0,51410SubMO 0,00000

01.02.099 MOVIMENTOS DE TERRA MANUAL MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.03.001 CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO M3 6,16

1.01.55 0,02000OPERADOR H 0,139006,958.01.15 0,02000ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV H 0,8200041,008.03.05 0,04000TRATOR DE ESTEIRAS C/LAMINA POT 80HP H 3,8824097,06

LS 0,16958 BDI 1,15253Mão-de-Obra 0,13900 Material 4,70240SubMO 0,30858

01.03.002 CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M M3 9,59

8.01.04 0,02000PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M3 H 2,14000107,008.03.05 0,02000TRATOR DE ESTEIRAS C/LAMINA POT 80HP H 1,9412097,068.03.10 0,06000CAMINHAO BASCULANTE 6M3 H 3,7164061,94

LS 0,00000 BDI 1,79345Mão-de-Obra 0,00000 Material 7,79760SubMO 0,00000

01.03.004 ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M M3 10,97

1.01.55 0,02000OPERADOR H 0,139006,958.01.04 0,02000PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M3 H 2,14000107,008.01.15 0,02000ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV H 0,8200041,008.03.05 0,02000TRATOR DE ESTEIRAS C/LAMINA POT 80HP H 1,9412097,068.03.10 0,06000CAMINHAO BASCULANTE 6M3 H 3,7164061,94

09/02/2011 11:38:40 Página: 1 de 0

Page 2: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,16958 BDI 2,05302Mão-de-Obra 0,13900 Material 8,61760SubMO 0,30858

01.03.005 TRANSPORTE POR CAMINHAO M3X KM 0,95

1.01.46 0,01960SERVENTE H 0,074683,818.03.10 0,00980CAMINHAO BASCULANTE 6M3 H 0,6070161,94

LS 0,09111 BDI 0,17774Mão-de-Obra 0,07468 Material 0,60701SubMO 0,16578

01.03.099 MOVIMENTOS DE TERRA MECANIZADOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.04.006 PONTALETADO M2 33,54

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.10.05 0,01500MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 20,935351.395,692.10.52 0,02500ESTRONCAS DE EUCALIPTO - DIAM DE 15CM M 0,208508,342.67.60 0,10000PREGO KG 0,457004,57

LS 3,11466 BDI 6,27176Mão-de-Obra 2,55300 Material 21,60085SubMO 5,66766

01.04.010 ESCORAMENTO DE VALAS CONTINUO ATé 2,00M M2 47,95

1.01.11 0,67100CARPINTEIRO H 3,053054,551.01.46 1,34200SERVENTE H 5,113023,812.10.27 0,10530VIGAS PEROBA DE 6X16 CM M 1,3689013,002.10.52 0,07020ESTRONCAS DE EUCALIPTO - DIAM DE 15CM M 0,585478,342.10.54 0,23160PRANCHAS PEROBA DE 3 CM M2 15,7094367,832.67.60 0,70000PREGO KG 3,199004,57

LS 9,96261 BDI 8,96804Mão-de-Obra 8,16607 Material 20,86280SubMO 18,12868

01.04.011 ESCORAMENTO DE VALAS CONTINUO ATé 4,00M M2 45,89

1.01.11 0,51300CARPINTEIRO H 2,334154,551.01.46 1,02600SERVENTE H 3,909063,812.10.27 1,34620VIGAS PEROBA DE 6X16 CM M 17,5006013,002.10.66 0,10260VIGA DE PEROBA 8X18CM M 1,8621918,152.10.88 0,06840ESTRONCA DE EUCALIPTO DN 20CM M 0,8898813,012.67.60 0,70000PREGO KG 3,199004,57

LS 7,61672 BDI 8,58167Mão-de-Obra 6,24321 Material 23,45167SubMO 13,85993

01.04.015 ESCORAMENTO DE VALAS DESCONTINUO ATé 2,00M M2 33,07

1.01.11 0,53700CARPINTEIRO H 2,443354,551.01.46 1,07400SERVENTE H 4,091943,812.10.27 0,10530VIGAS PEROBA DE 6X16 CM M 1,3689013,002.10.52 0,07020ESTRONCAS DE EUCALIPTO - DIAM DE 15CM M 0,585478,342.10.54 0,11600PRANCHAS PEROBA DE 3 CM M2 7,8682867,832.67.60 0,56000PREGO KG 2,559204,57

LS 7,97305 BDI 6,18474Mão-de-Obra 6,53529 Material 12,38185SubMO 14,50834

01.04.016 ESCORAMENTO DE VALAS DESCONTINUO ATé 4,00M M2 31,25

1.01.11 0,42000CARPINTEIRO H 1,911004,551.01.46 0,83000SERVENTE H 3,162303,812.10.27 0,68000VIGAS PEROBA DE 6X16 CM M 8,8400013,002.10.66 0,10260VIGA DE PEROBA 8X18CM M 1,8621918,152.10.88 0,06840ESTRONCA DE EUCALIPTO DN 20CM M 0,8898813,012.67.60 0,56000PREGO KG 2,559204,57

LS 6,18943 BDI 5,84522Mão-de-Obra 5,07330 Material 14,15127SubMO 11,26273

01.04.099 ESCORAMENTOS DE TERRA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.05.001 ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M M3 23,92

1.01.46 2,30000SERVENTE H 8,763003,81

LS 10,69086 BDI 4,47439Mão-de-Obra 8,76300 Material 0,00000SubMO 19,45386

01.05.002 ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M M3 31,21

1.01.46 3,00000SERVENTE H 11,430003,81

LS 13,94460 BDI 5,83616Mão-de-Obra 11,43000 Material 0,00000SubMO 25,37460

01.05.099 ESCAVACOES MANUAIS EM TERRA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.06.001 PARA SIMPLES REGULARIZACAO M2 4,16

1.01.46 0,40000SERVENTE H 1,524003,81

LS 1,85928 BDI 0,77815Mão-de-Obra 1,52400 Material 0,00000SubMO 3,38328

09/02/2011 11:38:40 Página: 2 de 0

Page 3: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

01.06.005 REATERRO INTERNO APILOADO M3 36,41

1.01.46 3,50000SERVENTE H 13,335003,81

LS 16,26870 BDI 6,80885Mão-de-Obra 13,33500 Material 0,00000SubMO 29,60370

01.06.099 APILOAMENTO E ATERRO DE CAVAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.07.002 LASTRO DE PEDRA BRITADA - 5CM M2 5,69

1.01.46 0,15000SERVENTE H 0,571503,812.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,09

LS 0,69723 BDI 1,06460Mão-de-Obra 0,57150 Material 3,35995SubMO 1,26873

01.07.010 LASTRO DE CONCRETO - 5 CM M2 22,61

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,03000AREIA M3 2,3760079,202.05.08 10,00000CIMENTO KG 3,700000,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,09

LS 5,42046 BDI 4,22810Mão-de-Obra 4,44300 Material 8,51960SubMO 9,86346

01.07.099 LASTROS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.08.016 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") CLASSE A INCL CONEX M 34,44

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.25.33 1,10000TUBO PVC P/ESGOTO 100MM M 6,600006,006.26.73 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM UN 1,180001,18

LS 11,11420 BDI 6,44097Mão-de-Obra 9,11000 Material 7,78000SubMO 20,22420

01.08.017 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") CLASSE A INCL CONEX M 53,62

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.25.34 1,10000TUBO PVC P/ESGOTO 150MM M 15,5100014,106.26.74 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM UN 3,820003,82

LS 13,33704 BDI 10,02778Mão-de-Obra 10,93200 Material 19,33000SubMO 24,26904

01.08.020 TUBO DE CONCRETO - CLASSE C1 - DN 300MM M 63,59

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 1,21000SERVENTE H 4,610103,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 0,45000CIMENTO KG 0,166500,376.01.01 1,05000TUBO CONCRETO DE 30CM DIAM C-1 M 38,1255036,31

LS 7,32622 BDI 11,89158Mão-de-Obra 6,00510 Material 38,37120SubMO 13,33132

01.08.021 TUBO DE CONCRETO - CLASSE C1 - DN 400MM M 81,17

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 1,52000SERVENTE H 5,791203,812.05.03 0,00230AREIA M3 0,1821679,202.05.08 0,91000CIMENTO KG 0,336700,376.01.02 1,05000TUBO CONCRETO DE 40CM DIAM C-1 M 48,4890046,18

LS 9,33446 BDI 15,17851Mão-de-Obra 7,65120 Material 49,00786SubMO 16,98566

01.08.022 TUBO DE CONCRETO - CLASSE C1 - DN 500MM M 120,80

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 2,03000SERVENTE H 7,734303,812.05.03 0,00310AREIA M3 0,2455279,202.05.08 1,36000CIMENTO KG 0,503200,376.01.03 1,05000TUBO CONCRETO DE 50CM DIAM C-1 M 68,2185064,978.01.90 0,10000GUINDASTE SOBRE PNEUS 5T H 6,9140069,14

LS 12,27235 BDI 22,58896Mão-de-Obra 10,05930 Material 75,88122SubMO 22,33165

01.08.023 TUBO DE CONCRETO - CLASSE C1 - DN 600MM M 150,54

1.01.39 0,70000PEDREIRO H 3,255004,651.01.46 2,54000SERVENTE H 9,677403,812.05.03 0,00420AREIA M3 0,3326479,202.05.08 1,81000CIMENTO KG 0,669700,376.01.04 1,05000TUBO CONCRETO DE 60CM DIAM C-1 M 85,7640081,688.01.90 0,10000GUINDASTE SOBRE PNEUS 5T H 6,9140069,14

LS 15,77753 BDI 28,14976Mão-de-Obra 12,93240 Material 93,68034SubMO 28,70993

01.08.024 TUBO DE CONCRETO - CLASSE CA1 - DN 700MM M 205,59

1.01.39 0,80000PEDREIRO H 3,720004,65

09/02/2011 11:38:40 Página: 3 de 0

Page 4: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 3,06000SERVENTE H 11,658603,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 2,72000CIMENTO KG 1,006400,376.01.33 1,05000TUBO DE CONCRETO DE 70CM-CA-1 M 123,90000118,008.01.90 0,11000GUINDASTE SOBRE PNEUS 5T H 7,6054069,14

LS 18,76189 BDI 38,44479Mão-de-Obra 15,37860 Material 133,01076SubMO 34,14049

01.08.025 TUBO DE CONCRETO - CLASSE CA1 - DN 800MM M 308,00

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 3,68000SERVENTE H 14,020803,812.05.03 0,00840AREIA M3 0,6652879,202.05.08 3,62000CIMENTO KG 1,339400,376.01.41 1,05000TUBO CONCRETO DE 80CM DIAM CA-1 M 198,66000189,208.01.90 0,12000GUINDASTE SOBRE PNEUS 5T H 8,2968069,14

LS 22,77838 BDI 57,59445Mão-de-Obra 18,67080 Material 208,96148SubMO 41,44918

01.08.026 TUBO DE CONCRETO - CLASSE CA1 - DN 900MM M 304,53

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 4,60000SERVENTE H 17,526003,812.05.03 0,01050AREIA M3 0,8316079,202.05.08 4,53000CIMENTO KG 1,676100,376.01.35 1,05000TUBO DE CONCRETO DE 90CM-CA-1 M 184,80000176,008.01.90 0,13000GUINDASTE SOBRE PNEUS 5T H 8,9882069,14

LS 28,18932 BDI 56,94598Mão-de-Obra 23,10600 Material 196,29590SubMO 51,29532

01.08.027 TUBO DE CONCRETO - CLASSE CA1 - DN 1000MM M 436,99

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 6,60000SERVENTE H 25,146003,812.05.03 0,01570AREIA M3 1,2434479,202.05.08 6,80000CIMENTO KG 2,516000,376.02.04 1,05000TUBO CONCRETO DE 1,M DIAM CA-1 M 269,83950256,998.01.90 0,15000GUINDASTE SOBRE PNEUS 5T H 10,3710069,14

LS 39,18762 BDI 81,71407Mão-de-Obra 32,12100 Material 283,96994SubMO 71,30862

01.08.028 TUBO DE CONCRETO - CLASSE CA1 - DN 1100MM M 363,16

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 7,20000SERVENTE H 27,432003,812.05.03 0,02090AREIA M3 1,6552879,202.05.08 9,06000CIMENTO KG 3,352200,376.02.05 1,05000TUBO DE CONCRETO DE 110CM-CA-1 M 196,94850187,578.01.90 0,17000GUINDASTE SOBRE PNEUS 5T H 11,7538069,14

LS 44,81304 BDI 67,90861Mão-de-Obra 36,73200 Material 213,70978SubMO 81,54504

01.08.029 TUBO DE CONCRETO - CLASSE CA1 - DN 1200MM M 626,91

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 8,20000SERVENTE H 31,242003,812.05.03 0,02610AREIA M3 2,0671279,202.05.08 11,33000CIMENTO KG 4,192100,376.02.06 1,05000TUBO DE CONCRETO DE 120CM-CA-1 M 389,27700370,748.01.90 0,20000GUINDASTE SOBRE PNEUS 5T H 13,8280069,14

LS 55,13424 BDI 117,22881Mão-de-Obra 45,19200 Material 409,36422SubMO 100,32624

01.08.032 TUBO DRENO PLASTICO CORRUGADO PERFURADO DE 100MM EM BARRAS M 49,56

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,093.80.40 0,12000LIXA D"AGUA UN 0,078000,656.81.03 1,10000TUBO PVC RIG CORRUG PERF P/ DRENAG 100MM M 14,2670012,976.95.13 0,21000ADESIVO PARA TUBOS PVC L 5,7309027,29

LS 11,11420 BDI 9,26902Mão-de-Obra 9,11000 Material 20,07590SubMO 20,22420

01.08.033 TUBO DRENO PLASTICO CORRUGADO PERFURADO DE 150MM EM BARRAS M 72,95

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,093.80.40 0,14000LIXA D"AGUA UN 0,091000,656.81.04 1,10000TUBO PVC RIG CORRUG PERF P/ DRENAGEM 150MM M 28,4020025,826.95.13 0,24000ADESIVO PARA TUBOS PVC L 6,5496027,29

LS 13,33704 BDI 13,64168Mão-de-Obra 10,93200 Material 35,04260SubMO 24,26904

01.08.034 MANTA GEOTEXTIL DE 200 GR/M2 M2 10,79

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.40.80 1,00000BIDIM OP-20 (200 GR/M2) M2 3,140003,14

LS 3,09636 BDI 2,01810Mão-de-Obra 2,53800 Material 3,14000SubMO 5,63436

01.08.035 MANTA GEOTEXTIL DE 300 GR/M2 M2 12,34

1.01.39 0,30000PEDREIRO H 1,395004,65

09/02/2011 11:38:40 Página: 4 de 0

Page 5: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 0,30000SERVENTE H 1,143003,812.40.49 1,00000BIDIM OP-30 (300 GR/M2) M2 4,400004,40

LS 3,09636 BDI 2,30790Mão-de-Obra 2,53800 Material 4,40000SubMO 5,63436

01.08.036 MANTA GEOTEXTIL DE 600 GR/M2 M2 17,65

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.40.29 1,00000BIDIM OP-60 (600 GR/M2) M2 8,720008,72

LS 3,09636 BDI 3,30150Mão-de-Obra 2,53800 Material 8,72000SubMO 5,63436

01.08.040 ENVOLVIMENTO DE DRENOS COM PEDRA BRITADA M3 108,66

1.01.46 2,50000SERVENTE H 9,525003,812.05.18 1,10000PEDRA BRITADA 2 M3 67,1990061,09

LS 11,62050 BDI 20,31924Mão-de-Obra 9,52500 Material 67,19900SubMO 21,14550

01.08.041 ENVOLVIMENTO DE DRENOS COM AREIA GROSSA M3 127,96

1.01.46 2,00000SERVENTE H 7,620003,812.05.03 1,10000AREIA M3 87,1200079,20

LS 9,29640 BDI 23,92837Mão-de-Obra 7,62000 Material 87,12000SubMO 16,91640

01.08.044 FORNEC E INST DE DHP EM FUROS DE 100MM C/TUBO PVC 1 1/2" INCL TXS INST M 67,52

2.15.56 1,00000FORN IN DHP FUROS 100MM TUBO PVC 1 1/2" C/TXS INST M 54,9000054,90

LS 0,00000 BDI 12,62700Mão-de-Obra 0,00000 Material 54,90000SubMO 0,00000

01.08.045 FORNEC E INST DE DHP EM FUROS DE 100MM C/TUBO PVC 2" INCL TXS INST M 79,82

2.15.55 1,00000FORN INST DHP FUROS 100MM C/TUBO PVC 2" C/TXS INST M 64,9000064,90

LS 0,00000 BDI 14,92700Mão-de-Obra 0,00000 Material 64,90000SubMO 0,00000

01.08.050 CAIXA DE LIGACAO OU INSPECAO - ALVENARIA DE 1/2 TIJOLO REVESTIDA M2 127,92

1.01.39 4,03000PEDREIRO H 18,739504,651.01.46 3,64000SERVENTE H 13,868403,812.05.03 0,06300AREIA M3 4,9896079,202.05.05 4,83000CAL HIDRATADA KG 1,642200,342.05.08 17,57000CIMENTO KG 6,500900,372.25.15 84,00000TIJOLO COMUM MACICO UN 18,480000,22

LS 39,78164 BDI 23,92052Mão-de-Obra 32,60790 Material 31,61270SubMO 72,38954

01.08.051 CAIXA DE LIGACAO OU INSPECAO - ALVENARIA DE 1 TIJOLO REVESTIDA M2 197,86

1.01.39 4,49000PEDREIRO H 20,878504,651.01.46 5,70000SERVENTE H 21,717003,812.05.03 0,12100AREIA M3 9,5832079,202.05.05 13,96000CAL HIDRATADA KG 4,746400,342.05.08 23,94000CIMENTO KG 8,857800,372.25.15 196,00000TIJOLO COMUM MACICO UN 43,120000,22

LS 51,96651 BDI 36,99996Mão-de-Obra 42,59550 Material 66,30740SubMO 94,56201

01.08.052 CAIXA DE LIGACAO OU INSPECAO - TAMPA DE CONCRETO ARMADO M2 118,96

1.01.11 2,42000CARPINTEIRO H 11,011004,551.01.12 2,42000AJUDANTE DE CARPINTEIRO H 9,583203,961.01.21 0,46000FERREIRO H 2,194204,771.01.22 0,46000AJUDANTE DE FERREIRO H 1,757203,821.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,03300AREIA M3 2,6136079,202.05.08 16,20000CIMENTO KG 5,994000,372.05.17 0,04000PEDRA BRITADA 1 M3 2,4772061,932.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.10.32 0,40000CHAPA COMPENSADA RESINADA E=12MM M2 4,8400012,102.15.38 5,27000ACO CA-60-B $MD BITOLAS KG 13,965502,652.70.10 0,09000ARAME RECOZIDO N.18 KG 0,416704,63

LS 35,36609 BDI 22,24636Mão-de-Obra 28,98860 Material 32,36860SubMO 64,35469

01.08.060 TUBO DRENO PEAD CORRUG PERF DN 65MM EM ROLOS M 44,16

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,091.01.46 0,60000SERVENTE H 2,286003,812.05.18 0,14000PEDRA BRITADA 2 M3 8,5526061,092.40.49 1,63000BIDIM OP-30 (300 GR/M2) M2 7,172004,406.81.10 1,05000TUBO DRENO PEAD CORRUG PERF DN 65MM EM ROLO M 7,014006,68

LS 7,23460 BDI 8,25774Mão-de-Obra 5,93000 Material 22,73860SubMO 13,16460

01.08.061 TUBO DRENO PEAD CORRUG PERF DN 80MM EM ROLO M 49,74

1.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,091.01.46 0,65000SERVENTE H 2,476503,812.05.18 0,16000PEDRA BRITADA 2 M3 9,7744061,09

09/02/2011 11:38:40 Página: 5 de 0

Page 6: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.40.49 1,75000BIDIM OP-30 (300 GR/M2) M2 7,700004,406.81.11 1,05000TUBO DRENO PEAD CORRUG PERF DN 80MM EM ROLO M 8,368507,97

LS 8,02272 BDI 9,30157Mão-de-Obra 6,57600 Material 25,84290SubMO 14,59872

01.08.062 TUBO DRENO PEAD CORRUG PERF DN 100MM EM ROLO M 55,88

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,091.01.46 0,70000SERVENTE H 2,667003,812.05.18 0,18000PEDRA BRITADA 2 M3 10,9962061,092.40.49 1,83000BIDIM OP-30 (300 GR/M2) M2 8,052004,406.81.12 1,05000TUBO DRENO PEAD CORRUG PERF DN 100MM EM ROLO M 10,353009,86

LS 8,81084 BDI 10,44983Mão-de-Obra 7,22200 Material 29,40120SubMO 16,03284

01.08.063 TUBO DRENO PEAD CORRUG PERF DN 170MM EM ROLO M 83,81

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,091.01.46 0,80000SERVENTE H 3,048003,812.05.18 0,25000PEDRA BRITADA 2 M3 15,2725061,092.40.49 2,15000BIDIM OP-30 (300 GR/M2) M2 9,460004,406.81.13 1,05000TUBO DRENO PEAD CORRUG PERF DN 170MM EM ROLO M 24,5070023,34

LS 10,38708 BDI 15,67233Mão-de-Obra 8,51400 Material 49,23950SubMO 18,90108

01.08.064 TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 65MM EM ROLO M 38,77

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,091.01.46 0,60000SERVENTE H 2,286003,812.05.18 0,14000PEDRA BRITADA 2 M3 8,5526061,092.40.49 1,63000BIDIM OP-30 (300 GR/M2) M2 7,172004,406.81.20 1,05000TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 65MM M 2,635502,51

LS 7,23460 BDI 7,25068Mão-de-Obra 5,93000 Material 18,36010SubMO 13,16460

01.08.065 TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 110MM EM ROLO M 47,08

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,091.01.46 0,70000SERVENTE H 2,667003,812.05.18 0,18000PEDRA BRITADA 2 M3 10,9962061,092.40.49 1,83000BIDIM OP-30 (300 GR/M2) M2 8,052004,406.81.21 1,05000TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 110MM M 3,202503,05

LS 8,81084 BDI 8,80521Mão-de-Obra 7,22200 Material 22,25070SubMO 16,03284

01.08.099 SERVICOS EM DRENAGEM DO TERRENO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.70.099 RECOLOCACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

01.80.099 SERVICOS PARCIAIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.01.001 ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M M3 23,92

1.01.46 2,30000SERVENTE H 8,763003,81

LS 10,69086 BDI 4,47439Mão-de-Obra 8,76300 Material 0,00000SubMO 19,45386

02.01.002 ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M M3 31,21

1.01.46 3,00000SERVENTE H 11,430003,81

LS 13,94460 BDI 5,83616Mão-de-Obra 11,43000 Material 0,00000SubMO 25,37460

02.01.005 ESCORAMENTO DE TERRA CONTINUO M2 73,32

1.01.11 0,70000CARPINTEIRO H 3,185004,551.01.12 0,70000AJUDANTE DE CARPINTEIRO H 2,772003,962.10.27 1,20000VIGAS PEROBA DE 6X16 CM M 15,6000013,002.10.54 0,40000PRANCHAS PEROBA DE 3 CM M2 27,1320067,832.67.60 0,80000PREGO KG 3,656004,57

LS 7,26754 BDI 13,71088Mão-de-Obra 5,95700 Material 46,38800SubMO 13,22454

09/02/2011 11:38:40 Página: 6 de 0

Page 7: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

02.01.006 ESCORAMENTO DE TERRA DESCONTINUO M2 37,82

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.10.27 0,60000VIGAS PEROBA DE 6X16 CM M 7,8000013,002.10.54 0,20000PRANCHAS PEROBA DE 3 CM M2 13,5660067,832.67.60 0,40000PREGO KG 1,828004,57

LS 4,15288 BDI 7,07270Mão-de-Obra 3,40400 Material 23,19400SubMO 7,55688

02.01.010 APILOAMENTO PARA SIMPLES REGULARIZACAO M2 4,16

1.01.46 0,40000SERVENTE H 1,524003,81

LS 1,85928 BDI 0,77815Mão-de-Obra 1,52400 Material 0,00000SubMO 3,38328

02.01.012 LASTRO DE PEDRA BRITADA - 5CM M2 5,69

1.01.46 0,15000SERVENTE H 0,571503,812.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,09

LS 0,69723 BDI 1,06460Mão-de-Obra 0,57150 Material 3,35995SubMO 1,26873

02.01.015 LASTRO DE CONCRETO - 5 CM M2 22,61

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,03000AREIA M3 2,3760079,202.05.08 10,00000CIMENTO KG 3,700000,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,09

LS 5,42046 BDI 4,22810Mão-de-Obra 4,44300 Material 8,51960SubMO 9,86346

02.01.025 REATERRO INTERNO APILOADO M3 36,41

1.01.46 3,50000SERVENTE H 13,335003,81

LS 16,26870 BDI 6,80885Mão-de-Obra 13,33500 Material 0,00000SubMO 29,60370

02.01.027 REATERRO COM ADICAO DE 2% DE CIMENTO M3 101,35

1.01.46 8,50000SERVENTE H 32,385003,812.05.08 28,40000CIMENTO KG 10,508000,37

LS 39,50970 BDI 18,95262Mão-de-Obra 32,38500 Material 10,50800SubMO 71,89470

02.01.099 ESCAVACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.02.001 TUBULOES: ESCAVACAO MANUAL - DIAMETRO DE 70CM M3 225,82

1.01.42 10,00000POCEIRO H 45,000004,501.01.90 10,00000AJUDANTE DE POCEIRO H 37,700003,77

LS 100,89400 BDI 42,22662Mão-de-Obra 82,70000 Material 0,00000SubMO 183,59400

02.02.002 TUBULOES: ESCAVACAO MECANICA - DIAMETRO DE 50CM M 24,39

2.01.43 1,00000ESCAVACAO MECANICA DIAM 50 CM M 19,8300019,83

LS 0,00000 BDI 4,56090Mão-de-Obra 0,00000 Material 19,83000SubMO 0,00000

02.02.003 TUBULOES: ESCAVACAO MECANICA - DIAMETRO DE 60CM M 30,71

2.01.44 1,00000ESCAVACAO MECANICA DIAM 60 CM M 24,9700024,97

LS 0,00000 BDI 5,74310Mão-de-Obra 0,00000 Material 24,97000SubMO 0,00000

02.02.017 TUBULÕES : CONCRETO FCK 20 MPA PARA BASE E FUSTE M3 437,63

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.35 1,00000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 243,11000243,11

LS 61,92720 BDI 81,83336Mão-de-Obra 50,76000 Material 243,11000SubMO 112,68720

02.02.021 ACO CA-50 (A OU B) FYK = 500 MPA KG 6,27

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.25 1,15000ACO CA-50-A $MD BITOLAS KG 3,105002,702.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,17405Mão-de-Obra 0,85900 Material 3,19760SubMO 1,90698

02.02.025 BROCA DE CONCRETO DE DIAMETRO 20CM - INCL ARRANQUES M 29,76

1.01.39 0,21000PEDREIRO H 0,976504,651.01.46 1,30000SERVENTE H 4,953003,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 10,50000CIMENTO KG 3,885000,372.05.18 0,02800PEDRA BRITADA 2 M3 1,7105261,092.15.25 1,40000ACO CA-50-A $MD BITOLAS KG 3,780002,70

LS 7,23399 BDI 5,56651Mão-de-Obra 5,92950 Material 11,03872SubMO 13,16349

02.02.026 BROCA DE CONCRETO DE DIAMETRO 25CM - INCL ARRANQUES M 44,30

1.01.39 0,31000PEDREIRO H 1,441504,65

09/02/2011 11:38:40 Página: 7 de 0

Page 8: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 1,84000SERVENTE H 7,010403,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 15,90000CIMENTO KG 5,883000,372.05.18 0,04300PEDRA BRITADA 2 M3 2,6268761,092.15.25 2,30000ACO CA-50-A $MD BITOLAS KG 6,210002,70

LS 10,31132 BDI 8,28402Mão-de-Obra 8,45190 Material 17,25427SubMO 18,76322

02.02.027 BROCA DE CONCRETO DE DIAMETRO 30CM - INCL ARRANQUES M 65,17

1.01.39 0,45000PEDREIRO H 2,092504,651.01.46 2,49000SERVENTE H 9,486903,812.05.03 0,04800AREIA M3 3,8016079,202.05.08 23,70000CIMENTO KG 8,769000,372.05.18 0,06400PEDRA BRITADA 2 M3 3,9097661,092.15.25 4,00000ACO CA-50-A $MD BITOLAS KG 10,800002,70

LS 14,12687 BDI 12,18692Mão-de-Obra 11,57940 Material 27,28036SubMO 25,70627

02.02.035 ESTACAS TIPO STRAUSS DIAM 25CM CAPACIDADE ATE 20 TF M 49,98

1.01.46 0,10000SERVENTE H 0,381003,812.01.17 1,00000M.OBRA EQUIPAMENTO P/ESTACA ATE 20T M 28,2600028,262.05.03 0,03200AREIA M3 2,5344079,202.05.08 15,00000CIMENTO KG 5,550000,372.05.18 0,04300PEDRA BRITADA 2 M3 2,6268761,092.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,73

LS 0,46482 BDI 9,34630Mão-de-Obra 0,38100 Material 39,79027SubMO 0,84582

02.02.036 ESTACAS TIPO STRAUSS DIAM 32CM CAPACIDADE ATE 30 TF M 61,72

1.01.46 0,10000SERVENTE H 0,381003,812.01.18 1,00000M.OBRA EQUIPAMENTO P/ESTACA ATE 30T M 31,9300031,932.05.03 0,04800AREIA M3 3,8016079,202.05.08 24,00000CIMENTO KG 8,880000,372.05.18 0,06400PEDRA BRITADA 2 M3 3,9097661,092.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,73

LS 0,46482 BDI 11,54282Mão-de-Obra 0,38100 Material 49,34036SubMO 0,84582

02.02.037 ESTACAS TIPO STRAUSS DIAM 38CM CAPACIDADE ATE 40 TF M 81,47

1.01.46 0,10000SERVENTE H 0,381003,812.01.19 1,00000M.OBRA EQUIPAMENTO P/ESTACA ATE 40T M 38,6500038,652.05.03 0,07500AREIA M3 5,9400079,202.05.08 37,50000CIMENTO KG 13,875000,372.05.18 0,10000PEDRA BRITADA 2 M3 6,1090061,092.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,73

LS 0,46482 BDI 15,23493Mão-de-Obra 0,38100 Material 65,39300SubMO 0,84582

02.02.038 ESTACAS TIPO STRAUSS DIAM 45CM CAPACIDADE ATE 60 TF M 112,29

1.01.46 0,15000SERVENTE H 0,571503,812.01.22 1,00000M.OBRA EQUIPAMENTO P/ESTACA ATE 60T M 56,0800056,082.05.03 0,09600AREIA M3 7,6032079,202.05.08 47,70000CIMENTO KG 17,649000,372.05.18 0,12900PEDRA BRITADA 2 M3 7,8806161,092.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,73

LS 0,69723 BDI 20,99912Mão-de-Obra 0,57150 Material 90,03181SubMO 1,26873

02.02.039 ESTACAS TIPO STRAUSS DIAM 55CM CAPACIDADE ATE 90 TF M 142,37

1.01.46 0,20000SERVENTE H 0,762003,812.01.21 1,00000M.OBRA EQUIPAMENTO P/ESTACA ATE 90T M 58,0200058,022.05.03 0,16000AREIA M3 12,6720079,202.05.08 79,50000CIMENTO KG 29,415000,372.05.18 0,21500PEDRA BRITADA 2 M3 13,1343561,092.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,73

LS 0,92964 BDI 26,62296Mão-de-Obra 0,76200 Material 114,06035SubMO 1,69164

02.02.045 ESTACA ESCAVADA MECANICAMENTE DIAM 25CM CAPACIDADE ATE 20 TF M 33,30

1.01.46 0,10000SERVENTE H 0,381003,812.01.40 1,00000ESCAVACAO MECANICA DIAN 25 CM M 12,2900012,292.05.03 0,03500AREIA M3 2,7720079,202.05.08 19,71000CIMENTO KG 7,292700,372.05.18 0,05000PEDRA BRITADA 2 M3 3,0545061,092.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,73

LS 0,46482 BDI 6,22703Mão-de-Obra 0,38100 Material 26,22820SubMO 0,84582

02.02.046 ESTACA ESCAVADA MECANICAMENTE DIAM 30CM CAPACIDADE ATE 30 TF M 48,79

1.01.46 0,11000SERVENTE H 0,419103,812.01.41 1,00000ESCAVACAO MECANICA DIAM 30 CM M 13,5700013,572.05.03 0,06400AREIA M3 5,0688079,202.05.08 36,46000CIMENTO KG 13,490200,372.05.18 0,09300PEDRA BRITADA 2 M3 5,6813761,09

09/02/2011 11:38:40 Página: 8 de 0

Page 9: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.15.10 0,34000ACO CA-25 $MD BITOLAS KG 0,928202,73

LS 0,51130 BDI 9,12386Mão-de-Obra 0,41910 Material 38,73857SubMO 0,93040

02.02.047 ESTACA ESCAVADA MECANICAMENTE DIAM 35CM CAPACIDADE ATE 40 TF M 63,85

1.01.46 0,12000SERVENTE H 0,457203,812.01.42 1,00000ESCAVACAO MECANICA DIAM 35 CM M 14,9100014,912.05.03 0,09400AREIA M3 7,4448079,202.05.08 51,94000CIMENTO KG 19,217800,372.05.18 0,13700PEDRA BRITADA 2 M3 8,3693361,092.15.10 0,35000ACO CA-25 $MD BITOLAS KG 0,955502,73

LS 0,55778 BDI 11,93986Mão-de-Obra 0,45720 Material 50,89743SubMO 1,01498

02.02.051 ESTACA PRE-MOLD CONC SECAO MIN 225 CM2 P/ATE 15 TF M 93,04

2.01.89 1,03000ESTACA CONC PM CRAV SECAO MIN 225 CM2 P/ATE 15TF M 75,6432073,44

LS 0,00000 BDI 17,39794Mão-de-Obra 0,00000 Material 75,64320SubMO 0,00000

02.02.052 ESTACA PRE-MOLD CONC SECAO MIN 289 CM2 P/ATE 20 TF M 108,53

2.01.98 1,03000ESTACA CONC PM CRAV SECAO MIN 289 CM2 P/ATE 20TF M 88,2401085,67

LS 0,00000 BDI 20,29522Mão-de-Obra 0,00000 Material 88,24010SubMO 0,00000

02.02.053 ESTACA PRE-MOLD CONC SECAO MIN 314 CM2 P/ATE 25 TF M 111,00

2.02.01 1,03000ESTACA CONC PM CRAV SECAO MIN 314 CM2 P/ATE 25TF M 90,2486087,62

LS 0,00000 BDI 20,75718Mão-de-Obra 0,00000 Material 90,24860SubMO 0,00000

02.02.054 ESTACA PRE-MOLD CONC SECAO MIN 415 CM2 P/ATE 30 TF M 109,96

2.02.03 1,03000ESTACA CONC PM CRAV SECAO MIN 415 CM2 P/ATE 30TF M 89,4040086,80

LS 0,00000 BDI 20,56292Mão-de-Obra 0,00000 Material 89,40400SubMO 0,00000

02.02.055 ESTACA PRE-MOLD CONC SECAO MIN 531 CM2 P/ATE 40 TF M 153,37

2.02.04 1,03000ESTACA DE CONCR PM CRAV SECAO MIN 531CM2 P/ATE 40T M 124,69180121,06

LS 0,00000 BDI 28,67911Mão-de-Obra 0,00000 Material 124,69180SubMO 0,00000

02.02.056 ESTACA PRE-MOLD CONC SECAO MIN 616 CM2 P/ATE 50 TF M 213,71

2.02.05 1,03000ESTACA DE CONCR PM CRAV SECAO MIN 616CM2 P/ATE 50T M 173,75070168,69

LS 0,00000 BDI 39,96266Mão-de-Obra 0,00000 Material 173,75070SubMO 0,00000

02.02.057 ESTACA PRE-MOLD CONC SECAO MIN 855 CM2 P/ATE 70 TF M 235,87

2.02.06 1,03000ESTACA DE CONCR PM CRAV SECAO MIN 885CM2 P/ATE 70T M 191,76540186,18

LS 0,00000 BDI 44,10604Mão-de-Obra 0,00000 Material 191,76540SubMO 0,00000

02.02.060 ESTACA RAIZ DN 150MM - CAPACIDADE ATE 25 TF M 224,46

1.01.21 0,26000FERREIRO H 1,240204,771.01.46 0,26000SERVENTE H 0,990603,812.02.71 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=150MM ATE 25 TF M 140,34000140,342.05.03 0,04500AREIA M3 3,5640079,202.05.08 27,00000CIMENTO KG 9,990000,372.15.20 9,20000ACO CA-50 DE 5/8" - 15,9MM KG 23,644002,57

LS 2,72158 BDI 41,97279Mão-de-Obra 2,23080 Material 177,53800SubMO 4,95238

02.02.061 ESTACA RAIZ DN 160MM - CAPACIDADE ATE 30 TF M 236,21

1.01.21 0,26000FERREIRO H 1,240204,771.01.46 0,26000SERVENTE H 0,990603,812.02.72 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=160MM ATE 30 TF M 147,94000147,942.05.03 0,05100AREIA M3 4,0392079,202.05.08 31,00000CIMENTO KG 11,470000,372.15.20 9,20000ACO CA-50 DE 5/8" - 15,9MM KG 23,644002,57

LS 2,72158 BDI 44,17048Mão-de-Obra 2,23080 Material 187,09320SubMO 4,95238

02.02.062 ESTACA RAIZ DN 200MM - CAPACIDADE ATE 50 TF M 258,73

1.01.21 0,30000FERREIRO H 1,431004,771.01.46 0,30000SERVENTE H 1,143003,812.02.73 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=200MM ATE 50 TF M 158,48000158,482.05.03 0,06500AREIA M3 5,1480079,202.05.08 40,00000CIMENTO KG 14,800000,372.15.20 10,20000ACO CA-50 DE 5/8" - 15,9MM KG 26,214002,57

LS 3,14028 BDI 48,38194Mão-de-Obra 2,57400 Material 204,64200SubMO 5,71428

02.02.063 ESTACA RAIZ DN 250MM - CAPACIDADE ATE 70 TF M 305,16

1.01.21 0,30000FERREIRO H 1,431004,771.01.46 0,30000SERVENTE H 1,143003,812.02.74 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=250MM ATE 70 TF M 172,85000172,852.05.03 0,10160AREIA M3 8,0467279,202.05.08 62,00000CIMENTO KG 22,940000,372.15.20 15,00000ACO CA-50 DE 5/8" - 15,9MM KG 38,550002,57

LS 3,14028 BDI 57,06323Mão-de-Obra 2,57400 Material 242,38672SubMO 5,71428

09/02/2011 11:38:40 Página: 9 de 0

Page 10: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

02.02.064 ESTACA RAIZ DN 310MM - CAPACIDADE ATE 100 TF M 385,99

1.01.21 0,34000FERREIRO H 1,621804,771.01.46 0,34000SERVENTE H 1,295403,812.02.75 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=310MM ATE 100TF M 197,77000197,772.05.03 0,15620AREIA M3 12,3710479,202.05.08 96,00000CIMENTO KG 35,520000,372.15.20 24,00000ACO CA-50 DE 5/8" - 15,9MM KG 61,680002,57

LS 3,55898 BDI 72,17796Mão-de-Obra 2,91720 Material 307,34104SubMO 6,47618

02.02.065 ESTACA RAIZ DN 410MM - CAPACIDADE ATE 140 TF M 547,88

1.01.21 0,40000FERREIRO H 1,908004,771.01.46 0,40000SERVENTE H 1,524003,812.02.76 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=410MM ATE 140TF M 246,06000246,062.05.03 0,27340AREIA M3 21,6532879,202.05.08 168,00000CIMENTO KG 62,160000,372.15.20 42,00000ACO CA-50 DE 5/8" - 15,9MM KG 107,940002,57

LS 4,18704 BDI 102,44943Mão-de-Obra 3,43200 Material 437,81328SubMO 7,61904

02.02.070 ESTACA TIPO HELICE DN 25CM PARA CARGAS ATE 25 TF M 57,40

2.02.20 1,00000EXEC DE ESTACA TIPO HELICE DN 25CM P/ATE 25 TF M 33,7700033,772.05.60 0,04910CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 12,90004262,73

LS 0,00000 BDI 10,73411Mão-de-Obra 0,00000 Material 46,67004SubMO 0,00000

02.02.071 ESTACA TIPO HELICE DN 30CM PARA CARGAS ATE 35 TF M 68,59

2.02.21 1,00000EXEC DE ESTACA TIPO HELICE DN 30CM P/ATE 35 TF M 37,1900037,192.05.60 0,07070CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 18,57501262,73

LS 0,00000 BDI 12,82595Mão-de-Obra 0,00000 Material 55,76501SubMO 0,00000

02.02.072 ESTACA TIPO HELICE DN 35CM PARA CARGAS ATE 50 TF M 83,39

2.02.22 1,00000EXEC DE ESTACA TIPO HELICE DN 35CM P/ATE 50 TF M 42,5300042,532.05.60 0,09620CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 25,27463262,73

LS 0,00000 BDI 15,59506Mão-de-Obra 0,00000 Material 67,80463SubMO 0,00000

02.02.073 ESTACA TIPO HELICE DN 40CM PARA CARGAS ATE 60 TF M 101,22

2.02.23 1,00000EXEC DE ESTACA TIPO HELICE DN 40CM P/ATE 60 TF M 49,2700049,272.05.60 0,12570CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 33,02516262,73

LS 0,00000 BDI 18,92789Mão-de-Obra 0,00000 Material 82,29516SubMO 0,00000

02.02.074 ESTACA TIPO HELICE DN 50CM PARA CARGAS ATE 100 TF M 137,07

2.02.24 1,00000EXEC DE ESTACA TIPO HELICE DN 50CM P/ATE 100 TF M 59,8400059,842.05.60 0,19640CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 51,60017262,73

LS 0,00000 BDI 25,63124Mão-de-Obra 0,00000 Material 111,44017SubMO 0,00000

02.02.075 ESTACA TIPO HELICE DN 60CM PARA CARGAS ATE 150 TF M 180,86

2.02.26 1,00000EXEC DE ESTACA TIPO HELICE DN 60CM P/ATE 150 TF M 72,7700072,772.05.60 0,28270CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 74,27377262,73

LS 0,00000 BDI 33,82007Mão-de-Obra 0,00000 Material 147,04377SubMO 0,00000

02.02.076 ESTACA TIPO HELICE DN 70CM PARA CARGAS ATE 200 TF M 230,94

2.02.27 1,00000EXEC DE ESTACA TIPO HELICE DN 70CM P/ATE 200 TF M 86,6600086,662.05.60 0,38480CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 101,09850262,73

LS 0,00000 BDI 43,18446Mão-de-Obra 0,00000 Material 187,75850SubMO 0,00000

02.02.077 ESTACA TIPO HELICE DN 80CM PARA CARGAS ATE 250 TF M 286,14

2.02.28 1,00000EXEC DE ESTACA TIPO HELICE DN 80CM P/ATE 250 TF M 100,56000100,562.05.60 0,50270CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 132,07437262,73

LS 0,00000 BDI 53,50591Mão-de-Obra 0,00000 Material 232,63437SubMO 0,00000

02.02.078 ESTACA TIPO HELICE DN 90CM PARA CARGAS ATE 300 TF M 347,65

2.02.29 1,00000EXEC DE ESTACA TIPO HELICE DN 90CM P/ATE 300 TF M 115,50000115,502.05.60 0,63620CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO M3 167,14883262,73

LS 0,00000 BDI 65,00923Mão-de-Obra 0,00000 Material 282,64883SubMO 0,00000

02.02.094 TAXA DE MOBILIZACAO DE EQUIPAMENTO PARA ESTACA TIPO HELICE UN 24.775,27

2.03.18 1,00000TAXA DE MOBILIZACAO DE EQUIPAMENTO - ESTACA HELICE UN 20.142,5000020.142,50

LS 0,00000 BDI 4.632,77500Mão-de-Obra 0,00000 Material 20.142,50000SubMO 0,00000

02.02.095 EMENDA COM ANEIS SOLDADOS PARA ESTACA UN 204,41

2.01.80 1,00000FORN E APLIC EMENDA SOLDADA UN 166,19000166,19

LS 0,00000 BDI 38,22370Mão-de-Obra 0,00000 Material 166,19000SubMO 0,00000

02.02.097 TAXA DE MOBILIZACAO DE EQUIPAMENTO - ESCATAS PRE-MOLDADAS UN 8.558,34

2.01.60 1,00000TAXA DE MOBILIZACAO EQUIPAMENTOS-ESTACAS PRE-MOLD UN 6.958,000006.958,00

LS 0,00000 BDI 1.600,34000Mão-de-Obra 0,00000 Material 6.958,00000SubMO 0,00000

09/02/2011 11:38:40 Página: 10 de 0

Page 11: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

02.02.098 TAXA DE MOBILIZACAO DE EQUIPAMENTOS - ESCATAS STRAUSS UN 1.243,53

2.03.17 1,00000TAXA DE MOBILIZACAO EQUIPAMENTOS-ESTACAS STRAUSS UN 1.011,000001.011,00

LS 0,00000 BDI 232,53000Mão-de-Obra 0,00000 Material 1.011,00000SubMO 0,00000

02.02.099 FUNDACOES PROFUNDAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.03.001 FORMA DE MADEIRA MACICA M2 42,39

1.01.11 1,10000CARPINTEIRO H 5,005004,551.01.12 1,10000AJUDANTE DE CARPINTEIRO H 4,356003,962.10.14 2,00000SARRAFO PINHO APARELHADO 5X2,5 CM M 4,180002,092.10.21 0,50000TABUAS PINHO DE 1"X12" DE 3A. M2 8,5900017,182.67.60 0,20000PREGO KG 0,914004,57

LS 11,42042 BDI 7,92705Mão-de-Obra 9,36100 Material 13,68400SubMO 20,78142

02.03.099 FORMAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.04.002 ACO CA 50 (A OU B) FYK= 500 M PA KG 6,27

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.25 1,15000ACO CA-50-A $MD BITOLAS KG 3,105002,702.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,17405Mão-de-Obra 0,85900 Material 3,19760SubMO 1,90698

02.04.003 ACO CA 60 (A OU B) FYK= 600 M PA KG 6,20

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.38 1,15000ACO CA-60-B $MD BITOLAS KG 3,047502,652.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,16083Mão-de-Obra 0,85900 Material 3,14010SubMO 1,90698

02.04.005 TELA ARMADURA (MALHA ACO CA 60 FYK= 600 M PA) KG 6,49

1.01.21 0,03000FERREIRO H 0,143104,771.01.22 0,03000AJUDANTE DE FERREIRO H 0,114603,822.15.60 1,10000TELA ARMADURA (MALHA AÇO CA-60) KG 4,708004,28

LS 0,31439 BDI 1,21442Mão-de-Obra 0,25770 Material 4,70800SubMO 0,57209

02.04.099 ARMADURAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.05.014 CONCRETO DOSADO E LANCADO FCK= 20 M PA M3 443,61

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.35 1,02000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 247,97220243,11

LS 61,92720 BDI 82,95166Mão-de-Obra 50,76000 Material 247,97220SubMO 112,68720

02.05.018 CONCRETO DOSADO E LANCADO FCK=25MPA M3 456,63

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.36 1,02000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 258,55980253,49

LS 61,92720 BDI 85,38681Mão-de-Obra 50,76000 Material 258,55980SubMO 112,68720

02.05.019 CONCRETO DOSADO E LANCADO FCK=30MPA M3 471,92

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.38 1,02000CONCRETO DOSADO (CONDICAO A) FCK=30MPA M3 270,99360265,68

LS 61,92720 BDI 88,24658Mão-de-Obra 50,76000 Material 270,99360SubMO 112,68720

02.05.024 CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA M3 420,35

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.53 1,02000CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA M3 285,40620279,81

LS 30,96360 BDI 78,60245Mão-de-Obra 25,38000 Material 285,40620SubMO 56,34360

02.05.028 CONCRETO DOSADO,BOMBEADO E LANCADO FCK=25MPA M3 439,43

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.37 1,02000CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA M3 300,92040295,02

LS 30,96360 BDI 82,17072Mão-de-Obra 25,38000 Material 300,92040SubMO 56,34360

02.05.029 CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA M3 453,08

09/02/2011 11:38:40 Página: 11 de 0

Page 12: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.39 1,02000CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA M3 312,01800305,90

LS 30,96360 BDI 84,72317Mão-de-Obra 25,38000 Material 312,01800SubMO 56,34360

02.05.050 CONCRETO GROUT M3 472,70

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 16,00000SERVENTE H 60,960003,812.05.03 0,72000AREIA M3 57,0240079,202.05.05 20,00000CAL HIDRATADA KG 6,800000,342.05.08 283,00000CIMENTO KG 104,710000,372.05.22 0,28000PEDRISCO M3 18,5080066,10

LS 108,40920 BDI 88,39158Mão-de-Obra 88,86000 Material 187,04200SubMO 197,26920

02.05.098 FORNECIMENTO E MONTAGEM DE ESTRUTURA PRE-MOLDADA DE CONCRETO M3 3.112,09

2.20.55 1,00000ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT M3 2.530,160002.530,16

LS 0,00000 BDI 581,93680Mão-de-Obra 0,00000 Material 2.530,16000SubMO 0,00000

02.05.099 CONCRETOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.06.001 ALVENARIA DE FUNDACAO E EMBASAMENTO COM TIJ MACICOS COMUNS M3 399,96

1.01.39 6,40000PEDREIRO H 29,760004,651.01.46 9,44000SERVENTE H 35,966403,812.05.03 0,32400AREIA M3 25,6608079,202.05.05 56,74000CAL HIDRATADA KG 19,291600,342.05.08 30,03000CIMENTO KG 11,111100,372.25.15 560,00000TIJOLO COMUM MACICO UN 123,200000,22

LS 80,18621 BDI 74,79051Mão-de-Obra 65,72640 Material 179,26350SubMO 145,91261

02.06.014 ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS DE CONCRETO M3 423,38

1.01.39 6,57160PEDREIRO H 30,557944,651.01.46 7,85730SERVENTE H 29,936313,812.05.03 0,16430AREIA M3 13,0125679,202.05.05 29,57200CAL HIDRATADA KG 10,054480,342.05.08 23,14330CIMENTO KG 8,563020,372.25.04 92,85900BLOCO CONCRETO DE 14X39X19CM UN 178,289281,92

LS 73,80299 BDI 79,16981Mão-de-Obra 60,49425 Material 209,91934SubMO 134,29724

02.06.015ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS DE CONCRETOESTRUTURAL

M3 448,21

1.01.39 5,15770PEDREIRO H 23,983314,651.01.46 6,05250SERVENTE H 23,060033,812.05.03 0,08420AREIA M3 6,6686479,202.05.05 13,36800CAL HIDRATADA KG 4,545120,342.05.08 14,00000CIMENTO KG 5,180000,372.25.09 136,83800BLOCO DE CONCRETO 19X19X19 CM - ESTRUTURAL UN 243,571641,78

LS 57,39286 BDI 83,81237Mão-de-Obra 47,04333 Material 259,96540SubMO 104,43619

02.06.016 ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS CERAMICOS PORTANTE M3 398,62

1.01.39 6,57160PEDREIRO H 30,557944,651.01.46 7,85730SERVENTE H 29,936313,812.05.03 0,08570AREIA M3 6,7874479,202.05.05 8,50020CAL HIDRATADA KG 2,890070,342.05.08 27,50060CIMENTO KG 10,175220,372.25.31 92,85900BLOCO CERAMICO ESTRUTURAL 14X19X39 CM UN 169,931971,83

LS 73,80299 BDI 74,53885Mão-de-Obra 60,49425 Material 189,78470SubMO 134,29724

02.06.017ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS CERAMICOS DEVEDACAO

M3 359,78

1.01.39 6,57160PEDREIRO H 30,557944,651.01.46 7,85730SERVENTE H 29,936313,812.05.03 0,08570AREIA M3 6,7874479,202.05.05 8,50020CAL HIDRATADA KG 2,890070,342.05.08 27,50060CIMENTO KG 10,175220,372.25.21 92,85900BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM UN 138,359911,49

LS 73,80299 BDI 67,27727Mão-de-Obra 60,49425 Material 158,21264SubMO 134,29724

02.06.018ALVENARIA DE FUNDACAO E EMBASAMENTO C/ TIJOLO CERAMICO FURADO(BAIANO)

M3 478,32

1.01.39 11,42880PEDREIRO H 53,143924,651.01.46 13,50030SERVENTE H 51,436143,812.05.03 0,16500AREIA M3 13,0680079,202.05.05 29,18490CAL HIDRATADA KG 9,922870,342.05.08 15,46460CIMENTO KG 5,721900,372.25.29 228,57600TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM UN 128,002560,56

09/02/2011 11:38:40 Página: 12 de 0

Page 13: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 127,58768 BDI 89,44311Mão-de-Obra 104,58006 Material 156,71533SubMO 232,16774

02.06.019 ALVENARIA DE FUNDACAO E EMBASAMENTO COM TIJOLOS LAMINADOS M3 1.144,56

1.01.39 24,40000PEDREIRO H 113,460004,651.01.46 18,20000SERVENTE H 69,342003,812.05.03 0,32000AREIA M3 25,3440079,202.05.05 56,70000CAL HIDRATADA KG 19,278000,342.05.08 30,00000CIMENTO KG 11,100000,372.25.36 700,00000TIJOLO LAMINADO FURADO UN 469,000000,67

LS 223,01844 BDI 214,02476Mão-de-Obra 182,80200 Material 524,72200SubMO 405,82044

02.06.099 EMBASAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.07.001 IMPERM RESP ALV EMBAS COM ARGAM CIM-AREIA 1:3 CONTENDO HIDROFUGO M2 32,37

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,20000SERVENTE H 4,572003,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 9,28000CIMENTO KG 3,433600,372.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 11,25084 BDI 6,05421Mão-de-Obra 9,22200 Material 5,84980SubMO 20,47284

02.07.002 IMPERM RESP ALV EMBAS C/ CIM-AREIA 1-3 HIDROFUGO/TINTA BETUMINUSA M2 40,23

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,20000SERVENTE H 4,572003,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 9,28000CIMENTO KG 3,433600,372.40.56 1,00000TINTA BETUMINOSA L 6,390006,392.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 11,25084 BDI 7,52391Mão-de-Obra 9,22200 Material 12,23980SubMO 20,47284

02.07.003 IMPERMEABILIZACAO POR CRISTALIZACAO - SUB SOLOS M2 8,49

1.01.39 0,10000PEDREIRO H 0,465004,652.40.09 3,00000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 4,290001,432.40.10 0,15000EMULSAO ADESIVA PVA KG 1,5855010,57

LS 0,56730 BDI 1,58879Mão-de-Obra 0,46500 Material 5,87550SubMO 1,03230

02.07.099 IMPERMEABILIZACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.50.001 DE CONCRETO SIMPLES (MANUAL) M3 114,43

1.01.46 11,00000SERVENTE H 41,910003,81

LS 51,13020 BDI 21,39925Mão-de-Obra 41,91000 Material 0,00000SubMO 93,04020

02.50.002 LASTRO DE CONCRETO SIMPLES (MANUAL) M3 135,24

1.01.46 13,00000SERVENTE H 49,530003,81

LS 60,42660 BDI 25,29002Mão-de-Obra 49,53000 Material 0,00000SubMO 109,95660

02.50.003 DE ALVENARIA DE FUNDACAO (MANUAL) M3 62,42

1.01.46 6,00000SERVENTE H 22,860003,81

LS 27,88920 BDI 11,67232Mão-de-Obra 22,86000 Material 0,00000SubMO 50,74920

02.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.70.099 RECOLOCACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

02.80.099 SERVICOS DE INFRA ESTRUTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.01.001 FORMAS DE MADEIRA MACICA M2 55,84

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,962.10.09 3,00000PONTALETE PINHO DE 3"X3" M 11,340003,782.10.21 0,50000TABUAS PINHO DE 1"X12" DE 3A. M2 8,5900017,18

09/02/2011 11:38:40 Página: 13 de 0

Page 14: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.60 0,20000PREGO KG 0,914004,57

LS 13,49686 BDI 10,44289Mão-de-Obra 11,06300 Material 20,84400SubMO 24,55986

03.01.002 FORMAS PLANAS PLASTIFICADA PARA CONCRETO APARENTE M2 71,76

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,962.10.09 3,00000PONTALETE PINHO DE 3"X3" M 11,340003,782.10.21 0,10000TABUAS PINHO DE 1"X12" DE 3A. M2 1,7180017,182.10.34 0,33000CHAPA COMPENSADA PLASTIFICADA E=12MM M2 6,5868019,962.67.60 0,20000PREGO KG 0,914004,57

LS 20,76440 BDI 13,41894Mão-de-Obra 17,02000 Material 20,55880SubMO 37,78440

03.01.003 FORMAS CURVAS PLASTIFICADA PARA CONCRETO APARENTE M2 92,85

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,962.10.09 3,00000PONTALETE PINHO DE 3"X3" M 11,340003,782.10.21 0,25000TABUAS PINHO DE 1"X12" DE 3A. M2 4,2950017,182.10.33 0,33000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 6,0423018,312.67.60 0,20000PREGO KG 0,914004,57

LS 29,07016 BDI 17,36258Mão-de-Obra 23,82800 Material 22,59130SubMO 52,89816

03.01.005 CIMBRAMENTO DE MADEIRA M3 19,43

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,50000AJUDANTE DE CARPINTEIRO H 1,980003,962.10.09 1,50000PONTALETE PINHO DE 3"X3" M 5,670003,782.67.60 0,15000PREGO KG 0,685504,57

LS 5,19110 BDI 3,63437Mão-de-Obra 4,25500 Material 6,35550SubMO 9,44610

03.01.011 FORMA DE TUBO DE PAPELAO DIAM. 15 CM M 51,61

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.31 1,00000FORMA DE TUBO DE PAPELAO DIAM. 15CM M 36,5200036,522.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 9,65222Mão-de-Obra 1,50400 Material 38,62730SubMO 3,33888

03.01.012 FORMA DE TUBO DE PAPELAO DIAM. 20 CM M 65,03

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.28 1,00000FORMA DE TUBO DE PAPELAO DIAM.20 CM M 47,4300047,432.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 12,16152Mão-de-Obra 1,50400 Material 49,53730SubMO 3,33888

03.01.013 FORMA DE TUBO DE PAPELAO DIAM. 25 CM M 82,33

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.32 1,00000FORMA DE TUBO DE PAPELAO DIAM. 25CM M 61,4900061,492.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 15,39532Mão-de-Obra 1,50400 Material 63,59730SubMO 3,33888

03.01.014 FORMA DE TUBO DE PAPELAO DIAM. 30 CM M 94,00

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.29 1,00000FORMA DE TUBO DE PAPELAO DIAM.30 CM M 70,9800070,982.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 17,57802Mão-de-Obra 1,50400 Material 73,08730SubMO 3,33888

03.01.015 FORMA DE TUBO DE PAPELAO DIAM. 35 CM M 108,82

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.33 1,00000FORMA DE TUBO DE PAPELAO DIAM. 35CM M 83,0300083,032.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 20,34952Mão-de-Obra 1,50400 Material 85,13730SubMO 3,33888

03.01.016 FORMA DE TUBO DE PAPELAO DIAM. 40 CM M 137,79

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.34 1,00000FORMA DE TUBO DE PAPELAO DIAM. 40CM M 106,58000106,582.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 25,76602Mão-de-Obra 1,50400 Material 108,68730SubMO 3,33888

09/02/2011 11:38:40 Página: 14 de 0

Page 15: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

03.01.017 FORMA DE TUBO DE PAPELAO DIAM. 45 CM M 151,77

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.35 1,00000FORMA DE TUBO DE PAPELAO DIAM. 45CM M 117,95000117,952.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 28,38112Mão-de-Obra 1,50400 Material 120,05730SubMO 3,33888

03.01.018 FORMA DE TUBO DE PAPELAO DIAM. 50 CM M 181,34

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.36 1,00000FORMA DE TUBO DE PAPELAO DIAM. 50CM M 141,99000141,992.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 33,91032Mão-de-Obra 1,50400 Material 144,09730SubMO 3,33888

03.01.019 FORMA DE TUBO DE PAPELAO DIAM. 55 CM M 195,60

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.37 1,00000FORMA DE TUBO DE PAPELAO DIAM. 55CM M 153,58000153,582.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 36,57602Mão-de-Obra 1,50400 Material 155,68730SubMO 3,33888

03.01.020 FORMA DE TUBO DE PAPELAO DIAM. 60 CM M 236,08

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,962.10.21 0,12000TABUAS PINHO DE 1"X12" DE 3A. M2 2,0616017,182.12.38 1,00000FORMA DE TUBO DE PAPELAO DIAM. 60CM M 186,49000186,492.67.60 0,01000PREGO KG 0,045704,57

LS 1,83488 BDI 44,14532Mão-de-Obra 1,50400 Material 188,59730SubMO 3,33888

03.01.099 FORMAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.02.002 ACO CA 50 (A OU B) FYK= 500 M PA KG 6,27

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.25 1,15000ACO CA-50-A $MD BITOLAS KG 3,105002,702.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,17405Mão-de-Obra 0,85900 Material 3,19760SubMO 1,90698

03.02.003 ACO CA 60 (A OU B) FYK= 600 M PA KG 6,20

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.38 1,15000ACO CA-60-B $MD BITOLAS KG 3,047502,652.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,16083Mão-de-Obra 0,85900 Material 3,14010SubMO 1,90698

03.02.005 TELA ARMADURA (MALHA ACO CA 60 FYK= 600 M PA) KG 6,49

1.01.21 0,03000FERREIRO H 0,143104,771.01.22 0,03000AJUDANTE DE FERREIRO H 0,114603,822.15.60 1,10000TELA ARMADURA (MALHA AÇO CA-60) KG 4,708004,28

LS 0,31439 BDI 1,21442Mão-de-Obra 0,25770 Material 4,70800SubMO 0,57209

03.02.099 ARMADURAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.03.003 LAJE PRE-FABRICADA UNID C/VIGOTAS PROTENDIDAS LP12-100KGF/M2 M2 100,42

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,70000SERVENTE H 2,667003,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.01 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP12-100KGF/M2 M2 45,7500045,752.67.60 0,03000PREGO KG 0,137104,57

LS 8,04248 BDI 18,77889Mão-de-Obra 6,59220 Material 67,01266SubMO 14,63468

03.03.005 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP12-300KGF/M2 M2 99,42

1.01.11 0,27000CARPINTEIRO H 1,228504,55

09/02/2011 11:38:40 Página: 15 de 0

Page 16: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,70000SERVENTE H 2,667003,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.02 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP12-300KGF/M2 M2 44,9400044,942.67.60 0,03000PREGO KG 0,137104,57

LS 8,04248 BDI 18,59259Mão-de-Obra 6,59220 Material 66,20266SubMO 14,63468

03.03.006 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP16-100KGF/M2 M2 105,31

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.04 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP16-100KGF/M2 M2 49,1800049,182.67.60 0,03000PREGO KG 0,137104,57

LS 8,34187 BDI 19,69309Mão-de-Obra 6,83760 Material 70,44266SubMO 15,17947

03.03.007 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP16-300KGF/M2 M2 109,06

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.05 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP16-300KGF/M2 M2 52,2300052,232.67.60 0,03000PREGO KG 0,137104,57

LS 8,34187 BDI 20,39459Mão-de-Obra 6,83760 Material 73,49266SubMO 15,17947

03.03.008 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-100KGF/M2 M2 111,70

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,80000SERVENTE H 3,048003,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.07 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-100KGF/M2 M2 53,5600053,562.67.60 0,03000PREGO KG 0,137104,57

LS 8,79095 BDI 20,88844Mão-de-Obra 7,20570 Material 74,82266SubMO 15,99665

03.03.009 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-300KGF/M2 M2 117,25

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,80000SERVENTE H 3,048003,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.08 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-300KGF/M2 M2 58,0700058,072.67.60 0,03000PREGO KG 0,137104,57

LS 8,79095 BDI 21,92574Mão-de-Obra 7,20570 Material 79,33266SubMO 15,99665

03.03.010 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-500KGF/M2 M2 117,25

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,80000SERVENTE H 3,048003,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.09 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-500KGF/M2 M2 58,0700058,072.67.60 0,03000PREGO KG 0,137104,57

LS 8,79095 BDI 21,92574Mão-de-Obra 7,20570 Material 79,33266SubMO 15,99665

03.03.012 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-100KGF/M2 M2 119,23

09/02/2011 11:38:40 Página: 16 de 0

Page 17: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.10 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-100KGF/M2 M2 60,5000060,502.67.60 0,03000PREGO KG 0,137104,57

LS 8,34187 BDI 22,29669Mão-de-Obra 6,83760 Material 81,76266SubMO 15,17947

03.03.014 CONCRETO DOSADO E LANCADO FCK= 20 M PA M3 443,61

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.35 1,02000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 247,97220243,11

LS 61,92720 BDI 82,95166Mão-de-Obra 50,76000 Material 247,97220SubMO 112,68720

03.03.015 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-300KGF/M2 M2 121,26

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.11 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-300KGF/M2 M2 62,1500062,152.67.60 0,03000PREGO KG 0,137104,57

LS 8,34187 BDI 22,67619Mão-de-Obra 6,83760 Material 83,41266SubMO 15,17947

03.03.016 CONCRETO DOSADO E LANCADO FCK=25 MPA M3 456,63

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.36 1,02000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 258,55980253,49

LS 61,92720 BDI 85,38681Mão-de-Obra 50,76000 Material 258,55980SubMO 112,68720

03.03.017 LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-500KGF/M2 M2 124,09

1.01.11 0,27000CARPINTEIRO H 1,228504,551.01.12 0,27000AJUDANTE DE CARPINTEIRO H 1,069203,961.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,15356253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.21.12 1,00000LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-500KGF/M2 M2 64,4500064,452.67.60 0,03000PREGO KG 0,137104,57

LS 8,34187 BDI 23,20519Mão-de-Obra 6,83760 Material 85,71266SubMO 15,17947

03.03.018 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT12-100KGF/M2 M2 74,55

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,29000PEDREIRO H 1,348504,651.01.46 0,75000SERVENTE H 2,857503,812.05.36 0,04900CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,42101253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.21 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT12-100KGF/M2 M2 24,6200024,622.67.60 0,03000PREGO KG 0,137104,57

LS 8,14216 BDI 13,94038Mão-de-Obra 6,67390 Material 45,79429SubMO 14,81606

03.03.019 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT16-100KGF/M2 M2 91,62

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,95000SERVENTE H 3,619503,812.05.36 0,06270CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,89382253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.24 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT16-100KGF/M2 M2 32,7200032,722.67.60 0,03000PREGO KG 0,137104,57

LS 9,41218 BDI 17,13366Mão-de-Obra 7,71490 Material 57,36710SubMO 17,12708

09/02/2011 11:38:40 Página: 17 de 0

Page 18: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

03.03.020 CONCRETO DOSADO E LANCADO FCK=30MPA M3 471,92

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.38 1,02000CONCRETO DOSADO (CONDICAO A) FCK=30MPA M3 270,99360265,68

LS 61,92720 BDI 88,24658Mão-de-Obra 50,76000 Material 270,99360SubMO 112,68720

03.03.022 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT16-300KGF/M2 M2 91,62

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,95000SERVENTE H 3,619503,812.05.36 0,06270CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,89382253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.25 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT16-300KGF/M2 M2 32,7200032,722.67.60 0,03000PREGO KG 0,137104,57

LS 9,41218 BDI 17,13366Mão-de-Obra 7,71490 Material 57,36710SubMO 17,12708

03.03.024 CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA M3 420,35

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.53 1,02000CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA M3 285,40620279,81

LS 30,96360 BDI 78,60245Mão-de-Obra 25,38000 Material 285,40620SubMO 56,34360

03.03.026 CONCRETO DOSADO,BOMBEADO E LANCADO FCK 25 MPA M3 439,43

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.37 1,02000CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA M3 300,92040295,02

LS 30,96360 BDI 82,17072Mão-de-Obra 25,38000 Material 300,92040SubMO 56,34360

03.03.027 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-100KGF/M2 M2 107,46

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,40000PEDREIRO H 1,860004,651.01.46 1,06000SERVENTE H 4,038603,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.27 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-100KGF/M2 M2 41,2300041,232.67.60 0,03000PREGO KG 0,137104,57

LS 10,20713 BDI 20,09415Mão-de-Obra 8,36650 Material 68,79224SubMO 18,57363

03.03.028 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-300KGF/M2 M2 107,46

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,40000PEDREIRO H 1,860004,651.01.46 1,06000SERVENTE H 4,038603,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.28 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-300KGF/M2 M2 41,2300041,232.67.60 0,03000PREGO KG 0,137104,57

LS 10,20713 BDI 20,09415Mão-de-Obra 8,36650 Material 68,79224SubMO 18,57363

03.03.029 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-500KGF/M2 M2 107,46

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,40000PEDREIRO H 1,860004,651.01.46 1,06000SERVENTE H 4,038603,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.29 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-500KGF/M2 M2 41,2300041,232.67.60 0,03000PREGO KG 0,137104,57

LS 10,20713 BDI 20,09415Mão-de-Obra 8,36650 Material 68,79224SubMO 18,57363

03.03.030 CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA M3 453,08

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.39 1,02000CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA M3 312,01800305,90

LS 30,96360 BDI 84,72317Mão-de-Obra 25,38000 Material 312,01800SubMO 56,34360

09/02/2011 11:38:40 Página: 18 de 0

Page 19: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

03.03.031 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT25-300KGF/M2 M2 120,16

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,47000PEDREIRO H 2,185504,651.01.46 1,24000SERVENTE H 4,724403,812.05.36 0,07970CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,20315253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.30 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT25-300KGF/M2 M2 47,9200047,922.67.60 0,03000PREGO KG 0,137104,57

LS 11,44092 BDI 22,46988Mão-de-Obra 9,37780 Material 76,87643SubMO 20,81872

03.03.032 LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT25-500KGF/M2 M2 120,16

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,47000PEDREIRO H 2,185504,651.01.46 1,24000SERVENTE H 4,724403,812.05.36 0,07970CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,20315253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,60000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,816001,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.31 1,00000LAJE PRE-FABR VIGOTA TREL UNIDIR LT25-500KGF/M2 M2 47,9200047,922.67.60 0,03000PREGO KG 0,137104,57

LS 11,44092 BDI 22,46988Mão-de-Obra 9,37780 Material 76,87643SubMO 20,81872

03.03.033 LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H10-100KGF/M2 M2 135,63

1.01.39 0,16000PEDREIRO H 0,744004,651.01.46 0,24000SERVENTE H 0,914403,812.05.03 0,00220AREIA M3 0,1742479,202.05.08 1,37610CIMENTO KG 0,509160,372.05.22 0,00310PEDRISCO M3 0,2049166,102.05.36 0,05500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,94195253,492.21.41 1,00000LAJE PRE-FABR PAINEL ALVEOLAR PROT H10-100KGF/M2 M2 84,4400084,442.80.40 0,01400ADITIVO EXPANSOR KG 0,071265,098.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 2,02325 BDI 25,36305Mão-de-Obra 1,65840 Material 106,59247SubMO 3,68165

03.03.034 LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-100KGF/M2 M2 161,32

1.01.39 0,16000PEDREIRO H 0,744004,651.01.46 0,24000SERVENTE H 0,914403,812.05.03 0,00380AREIA M3 0,3009679,202.05.08 2,35220CIMENTO KG 0,870310,372.05.22 0,00520PEDRISCO M3 0,3437266,102.05.36 0,05500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,94195253,492.21.44 1,00000LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-100KGF/M2 M2 104,65000104,652.80.40 0,02400ADITIVO EXPANSOR KG 0,122165,098.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 2,02325 BDI 30,16719Mão-de-Obra 1,65840 Material 127,48006SubMO 3,68165

03.03.036 LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-300KGF/M2 M2 164,30

1.01.39 0,16000PEDREIRO H 0,744004,651.01.46 0,24000SERVENTE H 0,914403,812.05.03 0,00380AREIA M3 0,3009679,202.05.08 2,35220CIMENTO KG 0,870310,372.05.22 0,00520PEDRISCO M3 0,3437266,102.05.36 0,05500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,94195253,492.21.45 1,00000LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-300KGF/M2 M2 107,07000107,072.80.40 0,02400ADITIVO EXPANSOR KG 0,122165,098.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 2,02325 BDI 30,72379Mão-de-Obra 1,65840 Material 129,90006SubMO 3,68165

03.03.037 LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-500KGF/M2 M2 169,76

1.01.39 0,16000PEDREIRO H 0,744004,651.01.46 0,24000SERVENTE H 0,914403,812.05.03 0,00380AREIA M3 0,3009679,202.05.08 2,35220CIMENTO KG 0,870310,372.05.22 0,00520PEDRISCO M3 0,3437266,102.05.36 0,05500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,94195253,492.21.46 1,00000LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-500KGF/M2 M2 111,51000111,512.80.40 0,02400ADITIVO EXPANSOR KG 0,122165,098.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 2,02325 BDI 31,74499Mão-de-Obra 1,65840 Material 134,34006SubMO 3,68165

03.03.038 LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H20-300KGF/M2 M2 185,59

1.01.39 0,16000PEDREIRO H 0,744004,65

09/02/2011 11:38:40 Página: 19 de 0

Page 20: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 0,24000SERVENTE H 0,914403,812.05.03 0,00660AREIA M3 0,5227279,202.05.08 4,02090CIMENTO KG 1,487730,372.05.22 0,00880PEDRISCO M3 0,5816866,102.05.36 0,05500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,94195253,492.21.47 1,00000LAJE PRE-FABR PAINEL ALVEOLAR PROT H20-300KGF/M2 M2 123,21000123,212.80.40 0,04120ADITIVO EXPANSOR KG 0,209715,098.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 2,02325 BDI 34,70387Mão-de-Obra 1,65840 Material 147,20475SubMO 3,68165

03.03.039 LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H20-500KGF/M2 M2 199,35

1.01.39 0,16000PEDREIRO H 0,744004,651.01.46 0,24000SERVENTE H 0,914403,812.05.03 0,00660AREIA M3 0,5227279,202.05.08 4,02090CIMENTO KG 1,487730,372.05.22 0,00880PEDRISCO M3 0,5816866,102.05.36 0,05500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,94195253,492.21.48 1,00000LAJE PRE-FABR PAINEL ALVEOLAR PROT H20-500KGF/M2 M2 134,40000134,402.80.40 0,04120ADITIVO EXPANSOR KG 0,209715,098.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 2,02325 BDI 37,27757Mão-de-Obra 1,65840 Material 158,39475SubMO 3,68165

03.03.040 LAJE MISTA B-11 SOBRECARGA 100 KG M2 78,74

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,70000SERVENTE H 2,667003,812.05.36 0,04490CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,38170253,492.10.09 1,06000PONTALETE PINHO DE 3"X3" M 4,006803,782.10.17 0,63000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,872804,562.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.35 1,00000LAJE PRE-FABR B-11 41-1-100 M2 15,3400015,342.67.60 0,03000PREGO KG 0,137104,57

LS 9,25934 BDI 14,72478Mão-de-Obra 7,58962 Material 47,17180SubMO 16,84897

03.03.042 LAJE MISTA B-16 SOBRECARGA 500 KG M2 90,17

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,80000SERVENTE H 3,048003,812.05.36 0,04490CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,38170253,492.10.09 1,13000PONTALETE PINHO DE 3"X3" M 4,271403,782.10.17 0,67000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,055204,562.10.21 0,19000TABUAS PINHO DE 1"X12" DE 3A. M2 3,2642017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.37 1,00000LAJE PRE-FABR B-1641-2-500 M2 22,6500022,652.67.60 0,03000PREGO KG 0,137104,57

LS 10,00781 BDI 16,86165Mão-de-Obra 8,20312 Material 55,10060SubMO 18,21094

03.03.043 LAJE MISTA B-16 SOBRECARGA 300 KG M2 87,56

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,80000SERVENTE H 3,048003,812.05.36 0,05860CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 14,85451253,492.10.09 1,13000PONTALETE PINHO DE 3"X3" M 4,271403,782.10.17 0,67000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,055204,562.10.21 0,19000TABUAS PINHO DE 1"X12" DE 3A. M2 3,2642017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.38 1,00000LAJE PRE-FABR B-16 41-2-300 M2 17,0600017,062.67.60 0,03000PREGO KG 0,137104,57

LS 10,00781 BDI 16,37470Mão-de-Obra 8,20312 Material 52,98341SubMO 18,21094

03.03.044 LAJE MISTA B-20 SOBRECARGA 300 KG M2 106,23

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,43000PEDREIRO H 1,999504,651.01.46 0,87000SERVENTE H 3,314703,812.05.36 0,06500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 16,47685253,492.10.09 1,13000PONTALETE PINHO DE 3"X3" M 4,271403,782.10.17 0,67000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,055204,562.10.21 0,19000TABUAS PINHO DE 1"X12" DE 3A. M2 3,2642017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.39 1,00000LAJE PRE-FABR B20-41-2-300 M2 29,7100029,712.67.60 0,03000PREGO KG 0,137104,57

09/02/2011 11:38:40 Página: 20 de 0

Page 21: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 10,50338 BDI 19,86474Mão-de-Obra 8,60932 Material 67,25575SubMO 19,11270

03.03.045 LAJE MISTA B-12 SOBRECARGA 100 KG M2 91,69

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,20426253,492.10.09 1,13000PONTALETE PINHO DE 3"X3" M 4,271403,782.10.17 0,67000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,055204,562.10.21 0,19000TABUAS PINHO DE 1"X12" DE 3A. M2 3,2642017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.56 1,00000LAJE PRE-FABRICADA B-12-41-1-100 M2 24,8800024,882.67.60 0,03000PREGO KG 0,137104,57

LS 9,55873 BDI 17,14579Mão-de-Obra 7,83502 Material 57,15316SubMO 17,39375

03.03.046 LAJE MISTA B-12 SOBRECARGA 300 KG M2 95,71

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,37000PEDREIRO H 1,720504,651.01.46 0,74000SERVENTE H 2,819403,812.05.36 0,04420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 11,20426253,492.10.09 1,13000PONTALETE PINHO DE 3"X3" M 4,271403,782.10.17 0,67000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,055204,562.10.21 0,19000TABUAS PINHO DE 1"X12" DE 3A. M2 3,2642017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.57 1,00000LAJE PRE-FABRICADA B-12-41-2-300 M2 28,1500028,152.67.60 0,03000PREGO KG 0,137104,57

LS 9,55873 BDI 17,89789Mão-de-Obra 7,83502 Material 60,42316SubMO 17,39375

03.03.047 LAJE MISTA B-16 SOBRECARGA 100 KG M2 85,91

1.01.21 0,38360FERREIRO H 1,829774,771.01.22 0,38360AJUDANTE DE FERREIRO H 1,465353,821.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,80000SERVENTE H 3,048003,812.05.36 0,05330CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,51102253,492.10.09 1,13000PONTALETE PINHO DE 3"X3" M 4,271403,782.10.17 0,67000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,055204,562.10.21 0,19000TABUAS PINHO DE 1"X12" DE 3A. M2 3,2642017,182.15.25 3,83000ACO CA-50-A $MD BITOLAS KG 10,341002,702.20.58 1,00000LAJE PRE-FABRICADA B-16-41-1-100 M2 17,0600017,062.67.60 0,03000PREGO KG 0,137104,57

LS 10,00781 BDI 16,06570Mão-de-Obra 8,20312 Material 51,63992SubMO 18,21094

03.03.048 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT12-100KGF/M2 M2 109,00

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,52000PEDREIRO H 2,418004,651.01.46 1,12000SERVENTE H 4,267203,812.05.36 0,04900CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,42101253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.61 1,00000PRE-LAJE TREL BIDIR C/EPS PLT12-100KGF/M2 M2 39,7800039,782.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,16678 BDI 20,38268Mão-de-Obra 9,15310 Material 68,30045SubMO 20,31988

03.03.049 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT16-100KGF/M2 M2 120,19

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,52000PEDREIRO H 2,418004,651.01.46 1,12000SERVENTE H 4,267203,812.05.36 0,06270CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,89382253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.62 1,00000PRE-LAJE TREL BIDIR C/EPS PLT16-100KGF/M2 M2 45,4100045,412.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,16678 BDI 22,47632Mão-de-Obra 9,15310 Material 77,40326SubMO 20,31988

03.03.050 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT-16 300KGF/M2 M2 120,19

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,52000PEDREIRO H 2,418004,651.01.46 1,12000SERVENTE H 4,267203,81

09/02/2011 11:38:40 Página: 21 de 0

Page 22: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.36 0,06270CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,89382253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.63 1,00000PRE-LAJE TREL BIDIR C/EPS PLT16-300KGF/M2 M2 45,4100045,412.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,16678 BDI 22,47632Mão-de-Obra 9,15310 Material 77,40326SubMO 20,31988

03.03.051 PAINEIS/LAJES PISO EM CONCRETO CELULAR AUTOCLAVADO E=7,50CM M2 148,15

1.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,70000SERVENTE H 2,667003,812.05.03 0,00300AREIA M3 0,2376079,202.05.05 0,60000CAL HIDRATADA KG 0,204000,342.05.08 0,50000CIMENTO KG 0,185000,372.05.35 0,03000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 7,29330243,112.20.11 1,00000PAINEL/LAJE FORRO CONCR. CEL. AUTOCLAVADO E=7,5CM M2 103,00000103,00

LS 5,23929 BDI 27,70435Mão-de-Obra 4,29450 Material 110,91990SubMO 9,53379

03.03.053 PAINEIS/LAJES FORRO EM CONCRETO CELULAR AUTOCLAVADO E=7,50CM M2 135,83

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,00300AREIA M3 0,2376079,202.05.05 0,60000CAL HIDRATADA KG 0,204000,342.05.08 0,50000CIMENTO KG 0,185000,372.20.11 1,00000PAINEL/LAJE FORRO CONCR. CEL. AUTOCLAVADO E=7,5CM M2 103,00000103,00

LS 3,74235 BDI 25,40038Mão-de-Obra 3,06750 Material 103,62660SubMO 6,80985

03.03.054 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT20-100KGF/M2 M2 135,62

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,57000PEDREIRO H 2,650504,651.01.46 1,23000SERVENTE H 4,686303,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.64 1,00000PRE-LAJE TREL BIDIR C/EPS PLT20-100KGF/M2 M2 53,5900053,592.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,96173 BDI 25,36091Mão-de-Obra 9,80470 Material 88,49840SubMO 21,76643

03.03.055 TIJOLO FURADO CERAMICO P/ENCHIMENTO DE REBAIXO DE LAJE M3 223,14

1.01.46 5,00000SERVENTE H 19,050003,812.25.16 262,50000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 139,125000,53

LS 23,24100 BDI 41,72568Mão-de-Obra 19,05000 Material 139,12500SubMO 42,29100

03.03.056 CONCRETO PREPARADO NO LOCAL C/AGREGADO LEVE P/ENCHIMENTO M3 652,80

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 16,00000SERVENTE H 60,960003,812.05.03 0,60000AREIA M3 47,5200079,202.05.08 300,00000CIMENTO KG 111,000000,372.45.02 0,80000ARGILA EXPANDIDA M3 174,94400218,68

LS 108,40920 BDI 122,06864Mão-de-Obra 88,86000 Material 333,46400SubMO 197,26920

03.03.058 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT20-300KGF/M2 M2 135,62

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,57000PEDREIRO H 2,650504,651.01.46 1,23000SERVENTE H 4,686303,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.65 1,00000PRE-LAJE TREL BIDIR C/EPS PLT20-300KGF/M2 M2 53,5900053,592.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,96173 BDI 25,36091Mão-de-Obra 9,80470 Material 88,49840SubMO 21,76643

03.03.059 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT20-500KGF/M2 M2 135,62

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,57000PEDREIRO H 2,650504,651.01.46 1,23000SERVENTE H 4,686303,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,78

09/02/2011 11:38:40 Página: 22 de 0

Page 23: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.66 1,00000PRE-LAJE TREL BIDIR C/EPS PLT20-500KGF/M2 M2 53,5900053,592.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,96173 BDI 25,36091Mão-de-Obra 9,80470 Material 88,49840SubMO 21,76643

03.03.063 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT25-300KGF/M2 M2 147,01

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,64000PEDREIRO H 2,976004,651.01.46 1,41000SERVENTE H 5,372103,812.05.36 0,07970CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,20315253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.67 1,00000PRE-LAJE TREL BIDIR C/EPS PLT25-300KGF/M2 M2 59,2100059,212.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 13,19552 BDI 27,49055Mão-de-Obra 10,81600 Material 95,51259SubMO 24,01152

03.03.064 LAJE STEEL DECK E=0,95MM PARA PISO E=15CM C/ CAPA CONCRETO FCK=25 M2 133,35

1.01.39 0,68000PEDREIRO H 3,162004,651.01.44 0,19000SERRALHEIRO H 1,535208,081.01.45 0,19000AJUDANTE SERRALHEIRO H 0,824604,341.01.46 0,68000SERVENTE H 2,590803,812.05.36 0,11250CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,51763253,492.15.46 1,05000TELA TELCON Q-75 M2 4,872004,642.20.01 1,00000LAJE METALICA COMPOSTA TIPO STEEL DECK E=0.95MM M2 57,0200057,02

LS 9,89737 BDI 24,93651Mão-de-Obra 8,11260 Material 90,40963SubMO 18,00997

03.03.065 LAJE STEEL DECK E=0,80MM PARA FORRO E=15CM C/ CAPA CONCRETO FCK=25 M2 124,59

1.01.39 0,68000PEDREIRO H 3,162004,651.01.44 0,19000SERRALHEIRO H 1,535208,081.01.45 0,19000AJUDANTE SERRALHEIRO H 0,824604,341.01.46 0,68000SERVENTE H 2,590803,812.05.36 0,11250CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,51763253,492.15.46 1,05000TELA TELCON Q-75 M2 4,872004,642.20.05 1,00000LAJE METALICA COMPOSTA TIPO STEEL DECK E=0,80MM M2 49,9000049,90

LS 9,89737 BDI 23,29891Mão-de-Obra 8,11260 Material 83,28963SubMO 18,00997

03.03.067 LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT25-500KGF/M2 M2 147,01

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,64000PEDREIRO H 2,976004,651.01.46 1,41000SERVENTE H 5,372103,812.05.36 0,07970CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,20315253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.68 1,00000PRE-LAJE TREL BIDIR C/EPS PLT25-500KGF/M2 M2 59,2100059,212.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 13,19552 BDI 27,49055Mão-de-Obra 10,81600 Material 95,51259SubMO 24,01152

03.03.080 REFORCO PARA LAJE MISTA M 32,81

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,40000SERVENTE H 1,524003,812.05.03 0,01800AREIA M3 1,4256079,202.05.08 11,00000CIMENTO KG 4,070000,372.05.17 0,02100PEDRA BRITADA 1 M3 1,3005361,932.10.09 0,56500PONTALETE PINHO DE 3"X3" M 2,135703,782.10.17 0,33500SARRAFO PINHO APARELHADO 10X2,5 CM M 1,527604,562.10.21 0,09500TABUAS PINHO DE 1"X12" DE 3A. M2 1,6321017,182.15.25 0,20000ACO CA-50-A $MD BITOLAS KG 0,540002,702.20.38 0,50000LAJE PRE-FABR B-16 41-2-300 M2 8,5300017,062.67.60 0,01500PREGO KG 0,068554,57

LS 2,99388 BDI 6,13593Mão-de-Obra 2,45400 Material 21,23008SubMO 5,44788

03.03.082 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT12-100KGF/M2 M2 109,06

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,52000PEDREIRO H 2,418004,651.01.46 1,12000SERVENTE H 4,267203,812.05.36 0,04900CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,42101253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,36

09/02/2011 11:38:40 Página: 23 de 0

Page 24: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.51 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT12-100KGF/M2 M2 39,8300039,832.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,16678 BDI 20,39418Mão-de-Obra 9,15310 Material 68,35045SubMO 20,31988

03.03.083 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT16-100KGF/M2 M2 120,23

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,52000PEDREIRO H 2,418004,651.01.46 1,12000SERVENTE H 4,267203,812.05.36 0,06270CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,89382253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.52 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT16-100KGF/M2 M2 45,4400045,442.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,16678 BDI 22,48322Mão-de-Obra 9,15310 Material 77,43326SubMO 20,31988

03.03.084 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT16-300KGF/M2 M2 120,23

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,52000PEDREIRO H 2,418004,651.01.46 1,12000SERVENTE H 4,267203,812.05.36 0,06270CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,89382253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.53 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT16-300KGF/M2 M2 45,4400045,442.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,16678 BDI 22,48322Mão-de-Obra 9,15310 Material 77,43326SubMO 20,31988

03.03.085 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT20-100KGF/M2 M2 135,60

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,57000PEDREIRO H 2,650504,651.01.46 1,23000SERVENTE H 4,686303,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.54 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT20-100KGF/M2 M2 53,5700053,572.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,96173 BDI 25,35631Mão-de-Obra 9,80470 Material 88,47840SubMO 21,76643

03.03.086 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT20-300KGF/M2 M2 135,67

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,57000PEDREIRO H 2,650504,651.01.46 1,23000SERVENTE H 4,686303,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.55 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT20-300KGF/M2 M2 53,6300053,632.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,96173 BDI 25,37011Mão-de-Obra 9,80470 Material 88,53840SubMO 21,76643

03.03.087 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT20-500KGF/M2 M2 135,67

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,57000PEDREIRO H 2,650504,651.01.46 1,23000SERVENTE H 4,686303,812.05.36 0,07420CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,80896253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.56 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT20-500KGF/M2 M2 53,6300053,632.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 11,96173 BDI 25,37011Mão-de-Obra 9,80470 Material 88,53840SubMO 21,76643

03.03.088 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT25-300KGF/M2 M2 148,15

09/02/2011 11:38:40 Página: 24 de 0

Page 25: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,64000PEDREIRO H 2,976004,651.01.46 1,41000SERVENTE H 5,372103,812.05.36 0,07970CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,20315253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.57 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT25-300KGF/M2 M2 60,1400060,142.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 13,19552 BDI 27,70445Mão-de-Obra 10,81600 Material 96,44259SubMO 24,01152

03.03.089 LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT25-500KGF/M2 M2 148,26

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.39 0,64000PEDREIRO H 2,976004,651.01.46 1,41000SERVENTE H 5,372103,812.05.36 0,07970CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,20315253,492.10.09 1,15000PONTALETE PINHO DE 3"X3" M 4,347003,782.10.16 0,67000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 0,911201,362.10.21 0,20100TABUAS PINHO DE 1"X12" DE 3A. M2 3,4531817,182.21.58 1,00000PRE-LAJE TREL UNIDIR C/EPS PLT25-500KGF/M2 M2 60,2300060,232.67.60 0,03000PREGO KG 0,137104,578.03.28 0,06670GUINDASTE SOBRE PNEUS 13 T H 7,25096108,71

LS 13,19552 BDI 27,72515Mão-de-Obra 10,81600 Material 96,53259SubMO 24,01152

03.03.098 FORNECIMENTO E MONTAGEM DE ESTRUTURA PRE-MOLDADA DE CONCRETO M3 3.112,09

2.20.55 1,00000ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT M3 2.530,160002.530,16

LS 0,00000 BDI 581,93680Mão-de-Obra 0,00000 Material 2.530,16000SubMO 0,00000

03.03.099 CONCRETOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.04.001 FORNECIMENTO DE EST MET - ACO ESTRUTURAL ASTM OU ABNT - NAO PATINAVEL KG 12,26

2.50.17 1,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 9,970009,97

LS 0,00000 BDI 2,29310Mão-de-Obra 0,00000 Material 9,97000SubMO 0,00000

03.04.003 FORNEC DE ESTR METALICA ACO ASTM A709/A588 (RESIST A CORROSAO) KG 12,57

2.50.16 1,00000ESTR MET ACO RESIST A CORROSAO (ASTM A709/A588) KG 10,2200010,22

LS 0,00000 BDI 2,35060Mão-de-Obra 0,00000 Material 10,22000SubMO 0,00000

03.04.005 MONTAGEM DE ESTRUTURA METALICA KG 2,66

2.50.20 1,00000MONTAGEM DE ESTRUTURA METALICA KG 2,170002,17

LS 0,00000 BDI 0,49910Mão-de-Obra 0,00000 Material 2,17000SubMO 0,00000

03.04.030 DESMONTAGEM DE ESTRUTURA METALICA KG 2,30

2.50.40 1,00000DESMONTAGEM DE ESTRUTURA METALICA KG 1,870001,87

LS 0,00000 BDI 0,43010Mão-de-Obra 0,00000 Material 1,87000SubMO 0,00000

03.04.099 ESTRUTURAS METALICAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.05.010 PILAR DE MADEIRA (PASSAGEM COBERTA) UN 300,27

1.01.11 2,98000CARPINTEIRO H 13,559004,551.01.12 2,98000AJUDANTE DE CARPINTEIRO H 11,800803,961.01.21 1,07200FERREIRO H 5,113444,771.01.22 1,07200AJUDANTE DE FERREIRO H 4,095043,821.01.39 0,84000PEDREIRO H 3,906004,651.01.46 1,68000SERVENTE H 6,400803,812.05.35 0,13400CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 32,57674243,112.10.14 0,38000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,794202,092.10.21 0,38000TABUAS PINHO DE 1"X12" DE 3A. M2 6,5284017,182.10.27 5,00000VIGAS PEROBA DE 6X16 CM M 65,0000013,002.15.25 7,72000ACO CA-50-A $MD BITOLAS KG 20,844002,702.15.38 3,00000ACO CA-60-B $MD BITOLAS KG 7,950002,652.67.32 8,00000PARAFUSO FRANCES 3/8"X8" C/ PORCA E ARRUELA CJ 9,200001,152.67.60 0,15000PREGO KG 0,685504,572.70.10 0,20000ARAME RECOZIDO N.18 KG 0,926004,63

LS 54,74760 BDI 56,14933Mão-de-Obra 44,87508 Material 144,50484SubMO 99,62268

03.05.011 VIGA DE MADEIRA 6X12 CM (PASSAGEM COBERTA) M 20,28

1.01.11 0,32000CARPINTEIRO H 1,456004,551.01.12 0,32000AJUDANTE DE CARPINTEIRO H 1,267203,96

09/02/2011 11:38:40 Página: 25 de 0

Page 26: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.26 1,05000VIGAS PEROBA DE 6X12 CM M 10,353009,862.67.60 0,02000PREGO KG 0,091404,57

LS 3,32230 BDI 3,79268Mão-de-Obra 2,72320 Material 10,44440SubMO 6,04550

03.05.012 VIGA DE MADEIRA 6X16 CM (PASSAGEM COBERTA) M 26,94

1.01.11 0,43000CARPINTEIRO H 1,956504,551.01.12 0,43000AJUDANTE DE CARPINTEIRO H 1,702803,962.10.27 1,05000VIGAS PEROBA DE 6X16 CM M 13,6500013,002.67.60 0,02900PREGO KG 0,132534,57

LS 4,46435 BDI 5,03842Mão-de-Obra 3,65930 Material 13,78253SubMO 8,12365

03.05.099 ESTRUTURAS DE MADEIRA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.50.001 DE CONCRETO INCLUINDO REVESTIMENTOS (MANUAL) M3 208,07

1.01.46 20,00000SERVENTE H 76,200003,81

LS 92,96400 BDI 38,90772Mão-de-Obra 76,20000 Material 0,00000SubMO 169,16400

03.50.005 DE LAJES MISTAS OU PRE-MOLDADAS INCLUINDO REVESTIMENTOS (MANUAL) M2 15,60

1.01.46 1,50000SERVENTE H 5,715003,81

LS 6,97230 BDI 2,91808Mão-de-Obra 5,71500 Material 0,00000SubMO 12,68730

03.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.70.099 RECOLOCACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

03.80.099 SERVICOS PARCIAIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.01.001 ALVENARIA DE TIJOLO DE BARRO MACICO E=1/4 TIJOLO M2 37,06

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,01700AREIA M3 1,3464079,202.05.05 3,00000CAL HIDRATADA KG 1,020000,342.05.08 1,20000CIMENTO KG 0,444000,372.25.15 35,00000TIJOLO COMUM MACICO UN 7,700000,22

LS 10,78602 BDI 6,93161Mão-de-Obra 8,84100 Material 10,51040SubMO 19,62702

04.01.002 ALVENARIA DE TIJOLO DE BARRO MACICO E=1/2 TIJOLO M2 63,34

1.01.39 1,44000PEDREIRO H 6,696004,651.01.46 1,82000SERVENTE H 6,934203,812.05.03 0,03400AREIA M3 2,6928079,202.05.05 6,00000CAL HIDRATADA KG 2,040000,342.05.08 3,00000CIMENTO KG 1,110000,372.25.15 70,00000TIJOLO COMUM MACICO UN 15,400000,22

LS 16,62884 BDI 11,84542Mão-de-Obra 13,63020 Material 21,24280SubMO 30,25904

04.01.003 ALVENARIA DE TIJOLO DE BARRO MACICO E=1 TIJOLO M2 116,51

1.01.39 2,40000PEDREIRO H 11,160004,651.01.46 3,02000SERVENTE H 11,506203,812.05.03 0,07900AREIA M3 6,2568079,202.05.05 14,00000CAL HIDRATADA KG 4,760000,342.05.08 7,00000CIMENTO KG 2,590000,372.25.15 140,00000TIJOLO COMUM MACICO UN 30,800000,22

LS 27,65276 BDI 21,78693Mão-de-Obra 22,66620 Material 44,40680SubMO 50,31896

04.01.012 ALVENARIA DE TIJOLO DE BARRO A VISTA E=1/4 TIJOLO M2 54,42

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,01700AREIA M3 1,3464079,202.05.05 3,00000CAL HIDRATADA KG 1,020000,342.05.08 1,50000CIMENTO KG 0,555000,372.25.14 35,00000TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA UN 21,700000,62

LS 10,78602 BDI 10,17714Mão-de-Obra 8,84100 Material 24,62140SubMO 19,62702

09/02/2011 11:38:40 Página: 26 de 0

Page 27: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

04.01.013 REVESTIMENTO DE TIJOLO DE BARRO A VISTA E=1/2 TIJOLO/DISP ALTERNADA M2 82,53

1.01.39 2,44000PEDREIRO H 11,346004,651.01.46 1,82000SERVENTE H 6,934203,812.05.03 0,01000AREIA M3 0,7920079,202.05.05 1,74000CAL HIDRATADA KG 0,591600,342.05.08 0,90000CIMENTO KG 0,333000,372.25.14 40,00000TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA UN 24,800000,62

LS 22,30184 BDI 15,43269Mão-de-Obra 18,28020 Material 26,51660SubMO 40,58204

04.01.014 ALVENARIA DE TIJOLO DE BARRO A VISTA E=1/2 TIJOLO M2 110,48

1.01.39 2,44000PEDREIRO H 11,346004,651.01.46 1,82000SERVENTE H 6,934203,812.05.03 0,03400AREIA M3 2,6928079,202.05.05 6,00000CAL HIDRATADA KG 2,040000,342.05.08 3,00000CIMENTO KG 1,110000,372.25.14 70,00000TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA UN 43,400000,62

LS 22,30184 BDI 20,65971Mão-de-Obra 18,28020 Material 49,24280SubMO 40,58204

04.01.015 ALVENARIA DE TIJOLO DE BARRO A VISTA E=1 TIJOLO M2 185,39

1.01.39 2,40000PEDREIRO H 11,160004,651.01.46 3,02000SERVENTE H 11,506203,812.05.03 0,07900AREIA M3 6,2568079,202.05.05 14,00000CAL HIDRATADA KG 4,760000,342.05.08 7,00000CIMENTO KG 2,590000,372.25.14 140,00000TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA UN 86,800000,62

LS 27,65276 BDI 34,66693Mão-de-Obra 22,66620 Material 100,40680SubMO 50,31896

04.01.017 ALVENARIA DE TIJOLO LAMINADO A VISTA E=1/2 TIJOLO/DISP ALTERNADO M2 84,99

1.01.39 2,44000PEDREIRO H 11,346004,651.01.46 1,82000SERVENTE H 6,934203,812.05.03 0,01000AREIA M3 0,7920079,202.05.05 1,74000CAL HIDRATADA KG 0,591600,342.05.08 0,90000CIMENTO KG 0,333000,372.25.36 40,00000TIJOLO LAMINADO FURADO UN 26,800000,67

LS 22,30184 BDI 15,89269Mão-de-Obra 18,28020 Material 28,51660SubMO 40,58204

04.01.018 ALVENARIA DE TIJOLO LAMINADO A VISTA E=1/4 TIJOLO M2 67,34

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,00800AREIA M3 0,6336079,202.05.05 1,35000CAL HIDRATADA KG 0,459000,342.05.08 0,70000CIMENTO KG 0,259000,372.25.36 35,00000TIJOLO LAMINADO FURADO UN 23,450000,67

LS 16,45902 BDI 12,59287Mão-de-Obra 13,49100 Material 24,80160SubMO 29,95002

04.01.019 ALVENARIA DE TIJOLO LAMINADO A VISTA E=1/2 TIJOLO M2 114,45

1.01.39 2,44000PEDREIRO H 11,346004,651.01.46 1,82000SERVENTE H 6,934203,812.05.03 0,03200AREIA M3 2,5344079,202.05.05 5,67000CAL HIDRATADA KG 1,927800,342.05.08 3,00000CIMENTO KG 1,110000,372.25.36 70,00000TIJOLO LAMINADO FURADO UN 46,900000,67

LS 22,30184 BDI 21,40248Mão-de-Obra 18,28020 Material 52,47220SubMO 40,58204

04.01.020 ALVENARIA DE TIJOLO LAMINADO A VISTA E=1 TIJOLO M2 205,99

1.01.39 3,40000PEDREIRO H 15,810004,651.01.46 3,02000SERVENTE H 11,506203,812.05.03 0,07500AREIA M3 5,9400079,202.05.05 13,24000CAL HIDRATADA KG 4,501600,342.05.08 7,00000CIMENTO KG 2,590000,372.25.36 140,00000TIJOLO LAMINADO FURADO UN 93,800000,67

LS 33,32576 BDI 38,51892Mão-de-Obra 27,31620 Material 106,83160SubMO 60,64196

04.01.030 ALVENARIA DE BLOCOS DE CONCRETO E=9CM M2 49,52

1.01.39 0,88000PEDREIRO H 4,092004,651.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,01500AREIA M3 1,1880079,202.05.05 2,76000CAL HIDRATADA KG 0,938400,342.05.08 2,16000CIMENTO KG 0,799200,372.25.02 13,00000BLOCO CONCRETO DE 9X39X19CM UN 19,370001,49

LS 9,87285 BDI 9,26002Mão-de-Obra 8,09250 Material 22,29560SubMO 17,96535

04.01.031 ALVENARIA DE BLOCOS DE CONCRETO E=14CM M2 59,27

1.01.39 0,92000PEDREIRO H 4,278004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,02300AREIA M3 1,8216079,20

09/02/2011 11:38:40 Página: 27 de 0

Page 28: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.05 4,14000CAL HIDRATADA KG 1,407600,342.05.08 3,24000CIMENTO KG 1,198800,372.25.04 13,00000BLOCO CONCRETO DE 14X39X19CM UN 24,960001,92

LS 10,33218 BDI 11,08351Mão-de-Obra 8,46900 Material 29,38800SubMO 18,80118

04.01.032 ALVENARIA DE BLOCOS DE CONCRETO E=19CM M2 71,27

1.01.39 0,98000PEDREIRO H 4,557004,651.01.46 1,15000SERVENTE H 4,381503,812.05.03 0,03100AREIA M3 2,4552079,202.05.05 5,31000CAL HIDRATADA KG 1,805400,342.05.08 4,33000CIMENTO KG 1,602100,372.25.05 13,00000BLOCO CONCRETO DE 19X39X19CM UN 32,240002,48

LS 10,90497 BDI 13,32762Mão-de-Obra 8,93850 Material 38,10270SubMO 19,84347

04.01.042 ALVENARIA DE BLOCO CERAMICO PORTANTE E=14CM M2 55,80

1.01.39 0,92000PEDREIRO H 4,278004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,01200AREIA M3 0,9504079,202.05.05 1,19000CAL HIDRATADA KG 0,404600,342.05.08 3,85000CIMENTO KG 1,424500,372.25.31 13,00000BLOCO CERAMICO ESTRUTURAL 14X19X39 CM UN 23,790001,83

LS 10,33218 BDI 10,43526Mão-de-Obra 8,46900 Material 26,56950SubMO 18,80118

04.01.043 ALVENARIA DE BLOCO CERAMICO PORTANTE E=19CM M2 64,94

1.01.39 0,98000PEDREIRO H 4,557004,651.01.46 1,15000SERVENTE H 4,381503,812.05.03 0,01700AREIA M3 1,3464079,202.05.05 1,62000CAL HIDRATADA KG 0,550800,342.05.08 5,25000CIMENTO KG 1,942500,372.25.32 13,00000BLOCO CERAMICO ESTRUTURAL 19X19X39 CM UN 29,120002,24

LS 10,90497 BDI 12,14473Mão-de-Obra 8,93850 Material 32,95970SubMO 19,84347

04.01.045 CONCRETO GROUT PARA PAREDE AUTO PORTANTE M3 472,70

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 16,00000SERVENTE H 60,960003,812.05.03 0,72000AREIA M3 57,0240079,202.05.05 20,00000CAL HIDRATADA KG 6,800000,342.05.08 283,00000CIMENTO KG 104,710000,372.05.22 0,28000PEDRISCO M3 18,5080066,10

LS 108,40920 BDI 88,39158Mão-de-Obra 88,86000 Material 187,04200SubMO 197,26920

04.01.046 ARMADURA CA 50 PARA PAREDE AUTO-PORTANTE KG 6,27

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.25 1,15000ACO CA-50-A $MD BITOLAS KG 3,105002,702.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,17405Mão-de-Obra 0,85900 Material 3,19760SubMO 1,90698

04.01.047 ARMADURA CA 60 PARA PAREDE AUTO-PORTANTE KG 6,20

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.38 1,15000ACO CA-60-B $MD BITOLAS KG 3,047502,652.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,16083Mão-de-Obra 0,85900 Material 3,14010SubMO 1,90698

04.01.049 ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 19X19X19CM M2 85,16

1.01.39 0,98000PEDREIRO H 4,557004,651.01.46 1,15000SERVENTE H 4,381503,812.05.03 0,01600AREIA M3 1,2672079,202.05.05 2,54000CAL HIDRATADA KG 0,863600,342.05.08 2,66000CIMENTO KG 0,984200,372.25.09 26,00000BLOCO DE CONCRETO 19X19X19 CM - ESTRUTURAL UN 46,280001,78

LS 10,90497 BDI 15,92485Mão-de-Obra 8,93850 Material 49,39500SubMO 19,84347

04.01.050 ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 14X19X39CM M2 62,57

1.01.39 0,92000PEDREIRO H 4,278004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,01200AREIA M3 0,9504079,202.05.05 1,86000CAL HIDRATADA KG 0,632400,342.05.08 1,95000CIMENTO KG 0,721500,372.25.75 13,00000BLOCO CONCR ESTRUTURAL 14X19X39CM UN 29,770002,29

LS 10,33218 BDI 11,70136Mão-de-Obra 8,46900 Material 32,07430SubMO 18,80118

04.01.051 ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 19X19X39CM M2 77,00

1.01.39 0,98000PEDREIRO H 4,557004,651.01.46 1,15000SERVENTE H 4,381503,81

09/02/2011 11:38:40 Página: 28 de 0

Page 29: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,01600AREIA M3 1,2672079,202.05.05 2,54000CAL HIDRATADA KG 0,863600,342.05.08 2,66000CIMENTO KG 0,984200,372.25.76 13,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 39,650003,05

LS 10,90497 BDI 14,39995Mão-de-Obra 8,93850 Material 42,76500SubMO 19,84347

04.01.057 VERGA/CINTA EM BLOCO DE CONCRETO CANALETA - 11,5X19X39CM M 18,78

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,40000SERVENTE H 1,524003,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 2,00500CIMENTO KG 0,741850,372.05.18 0,00500PEDRA BRITADA 2 M3 0,3054561,092.15.25 0,50000ACO CA-50-A $MD BITOLAS KG 1,350002,702.26.01 2,50000BLOCO DE CONCRETO CANALETA 11,5X19X39CM UN 6,075002,43

LS 3,56118 BDI 3,51193Mão-de-Obra 2,91900 Material 8,78910SubMO 6,48018

04.01.058 VERGA/CINTA EM BLOCO DE CONCRETO CANALETA - 14 CM M 23,49

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,00900AREIA M3 0,7128079,202.05.08 4,36500CIMENTO KG 1,615050,372.05.18 0,01300PEDRA BRITADA 2 M3 0,7941761,092.15.25 0,50000ACO CA-50-A $MD BITOLAS KG 1,350002,702.25.96 2,50000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,275002,51

LS 4,59330 BDI 4,39422Mão-de-Obra 3,76500 Material 10,74702SubMO 8,35830

04.01.059 VERGA/CINTA EM BLOCO DE CONCRETO CANALETA - 19 CM M 28,02

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,01400AREIA M3 1,1088079,202.05.08 6,62900CIMENTO KG 2,452730,372.05.18 0,01900PEDRA BRITADA 2 M3 1,1607161,092.15.25 0,50000ACO CA-50-A $MD BITOLAS KG 1,350002,702.25.97 2,50000BLOCO DE CONCRETO CANALETA 19X19X39CM UN 8,350003,34

LS 4,59330 BDI 5,23952Mão-de-Obra 3,76500 Material 14,42224SubMO 8,35830

04.01.060 ALVENARIA DE CONCR CELULAR - CHAPAS ARMADAS SIMPLES ESPESS 7,5 CM M2 99,82

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 1,35000CAL HIDRATADA KG 0,459000,342.05.08 1,95000CIMENTO KG 0,721500,372.35.37 1,02000CHAPA ARM SIMP CONCRETO CELUL ESP 7,5CM M2 70,3800069,00

LS 5,05812 BDI 18,66694Mão-de-Obra 4,14600 Material 71,95650SubMO 9,20412

04.01.061 ALVENARIA DE CONCR CELULAR - CHAPAS ARMADAS SIMPLES ESPESS 10 CM M2 166,80

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,70000SERVENTE H 2,667003,812.05.03 0,00700AREIA M3 0,5544079,202.05.05 1,80000CAL HIDRATADA KG 0,612000,342.05.08 2,60000CIMENTO KG 0,962000,372.35.38 1,02000CHAPA ARM SIMP CONCRETO CELUL ESP 10CM M2 122,40000120,00

LS 6,09024 BDI 31,19045Mão-de-Obra 4,99200 Material 124,52840SubMO 11,08224

04.01.063 ALVENARIA DE CONCRETO CELULAR - BLOCOS E=7CM M2 57,60

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00900AREIA M3 0,7128079,202.05.05 1,65600CAL HIDRATADA KG 0,563040,342.05.08 1,30000CIMENTO KG 0,481000,372.45.66 1,02000CONCRETO CELULAR ESP 7,5CM P/ PROT TERM-MEC M2 28,3560027,80

LS 9,18660 BDI 10,77077Mão-de-Obra 7,53000 Material 30,11284SubMO 16,71660

04.01.064 ALVENARIA DE CONCRETO CELULAR - BLOCOS E=11CM M2 72,11

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,20000SERVENTE H 4,572003,812.05.03 0,01800AREIA M3 1,4256079,202.05.05 3,30000CAL HIDRATADA KG 1,122000,342.05.08 2,60000CIMENTO KG 0,962000,372.45.67 1,02000CONCRETO CELULAR ESP 10CM P/ PROT TERM-MEC M2 34,6494033,97

LS 11,25084 BDI 13,48532Mão-de-Obra 9,22200 Material 38,15900SubMO 20,47284

04.01.065 ALVENARIA DE CONCRETO CELULAR BLOCOS E=14CM M2 91,27

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,20000SERVENTE H 4,572003,812.05.03 0,01800AREIA M3 1,4256079,20

09/02/2011 11:38:40 Página: 29 de 0

Page 30: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.05 3,30000CAL HIDRATADA KG 1,122000,342.05.08 2,60000CIMENTO KG 0,962000,372.45.68 1,02000CONCRETO CELULAR ESP=15CM P/ PROT TERM-MEC M2 50,2248049,24

LS 11,25084 BDI 17,06767Mão-de-Obra 9,22200 Material 53,73440SubMO 20,47284

04.01.070 ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM. 10 CM M2 43,77

1.01.39 0,96000PEDREIRO H 4,464004,651.01.46 1,14000SERVENTE H 4,343403,812.05.03 0,01600AREIA M3 1,2672079,202.05.05 2,83000CAL HIDRATADA KG 0,962200,342.05.08 1,50000CIMENTO KG 0,555000,372.25.16 25,00000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 13,250000,53

LS 10,74503 BDI 8,18497Mão-de-Obra 8,80740 Material 16,03440SubMO 19,55243

04.01.071 ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM. 12.5 CM M2 49,39

1.01.39 1,04000PEDREIRO H 4,836004,651.01.46 1,23000SERVENTE H 4,686303,812.05.03 0,01920AREIA M3 1,5206479,202.05.05 3,39600CAL HIDRATADA KG 1,154640,342.05.08 1,80000CIMENTO KG 0,666000,372.25.29 28,00000TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM UN 15,680000,56

LS 11,61721 BDI 9,23698Mão-de-Obra 9,52230 Material 19,02128SubMO 21,13951

04.01.072 ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM 15 CM M2 66,96

1.01.39 1,60000PEDREIRO H 7,440004,651.01.46 1,89000SERVENTE H 7,200903,812.05.03 0,02310AREIA M3 1,8295279,202.05.05 4,08580CAL HIDRATADA KG 1,389170,342.05.08 2,16500CIMENTO KG 0,801050,372.25.29 32,00000TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM UN 17,920000,56

LS 17,86190 BDI 12,52178Mão-de-Obra 14,64090 Material 21,93974SubMO 32,50280

04.01.073 ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM. 20 CM M2 82,96

1.01.39 1,60000PEDREIRO H 7,440004,651.01.46 1,90000SERVENTE H 7,239003,812.05.03 0,04800AREIA M3 3,8016079,202.05.05 8,51000CAL HIDRATADA KG 2,893400,342.05.08 4,50000CIMENTO KG 1,665000,372.25.16 50,00000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 26,500000,53

LS 17,90838 BDI 15,51290Mão-de-Obra 14,67900 Material 34,86000SubMO 32,58738

04.01.099 ALVENARIAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.02.012ELEMENTO VAZADO DE CONCRETO QUADRICULADO REF NEO-REX 18 / REF UNICA4D

M2 102,42

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 0,92000SERVENTE H 3,505203,812.05.03 0,01100AREIA M3 0,8712079,202.05.05 1,24000CAL HIDRATADA KG 0,421600,342.05.08 1,43000CIMENTO KG 0,529100,372.15.10 0,30000ACO CA-25 $MD BITOLAS KG 0,819002,732.30.21 4,20000ELEMENTO VAZ DE CONCR 50X50X7 CM QUADRIC UN 52,2060012,43

LS 15,62234 BDI 19,15312Mão-de-Obra 12,80520 Material 54,84690SubMO 28,42754

04.02.013 ELEMENTO VAZADO DE CONCRETO TIPO VENEZIANA REF UNICA 11A M2 171,73

1.01.39 4,00000PEDREIRO H 18,600004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,01600AREIA M3 1,2672079,202.05.05 5,24000CAL HIDRATADA KG 1,781600,342.05.08 3,24000CIMENTO KG 1,198800,372.15.10 0,60000ACO CA-25 $MD BITOLAS KG 1,638002,732.30.20 36,20000ELEMENTO VAZADO DE CONCRETO REF UNICA N.11 UN 83,984002,32

LS 27,34020 BDI 32,11255Mão-de-Obra 22,41000 Material 89,86960SubMO 49,75020

04.02.018 ELEMENTO VAZADO DE BLOCO DE CONCRETO M2 52,72

1.01.39 0,90000PEDREIRO H 4,185004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,02000AREIA M3 1,5840079,202.05.05 1,94000CAL HIDRATADA KG 0,659600,342.05.08 6,30000CIMENTO KG 2,331000,372.25.80 10,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 19,700001,97

LS 10,21872 BDI 9,85994Mão-de-Obra 8,37600 Material 24,27460SubMO 18,59472

04.02.020 ELEMENTO VAZADO DE BLOCOS CERAMICOS DE VEDACAO M2 81,27

09/02/2011 11:38:40 Página: 30 de 0

Page 31: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 1,92000PEDREIRO H 8,928004,651.01.46 2,28000SERVENTE H 8,686803,812.05.03 0,03400AREIA M3 2,6928079,202.05.05 5,79000CAL HIDRATADA KG 1,968600,342.05.08 3,00000CIMENTO KG 1,110000,372.25.16 40,00000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 21,200000,53

LS 21,49006 BDI 15,19754Mão-de-Obra 17,61480 Material 26,97140SubMO 39,10486

04.02.029 ELEMENTO VAZADO REF NEO REX 4A / REF UNICA 2C M2 107,06

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00740AREIA M3 0,5860879,202.05.08 3,12000CIMENTO KG 1,154400,372.30.28 11,60000ELEMENTO VAZADO "NEO-REX" N.4A (20X40X10CM) UN 51,040004,40

LS 18,83070 BDI 20,02062Mão-de-Obra 15,43500 Material 52,78048SubMO 34,26570

04.02.030 ELEMENTO VAZADO REF NEO REX 16 / REF UNICA 1 I M2 133,30

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 1,50000SERVENTE H 5,715003,812.05.03 0,01000AREIA M3 0,7920079,202.05.08 4,25000CIMENTO KG 1,572500,372.30.10 23,80000ELEMENTO VAZADO "NEO-REX" N.16 (19X19X10)CM UN 62,356002,62

LS 23,99130 BDI 24,92666Mão-de-Obra 19,66500 Material 64,72050SubMO 43,65630

04.02.032 ELEMENTO VAZADO REF NEO REX 16DS/16DC M2 210,47

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 1,50000SERVENTE H 5,715003,812.05.03 0,02000AREIA M3 1,5840079,202.05.08 8,29000CIMENTO KG 3,067300,372.30.12 22,70000ELEMENTO VAZADO "NEO-REX" N.16D (19X19X20)CM UN 122,807005,41

LS 23,99130 BDI 39,35636Mão-de-Obra 19,66500 Material 127,45830SubMO 43,65630

04.02.033 ELEMENTO VAZADO REF NEO REX 17A M2 113,44

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,06500AREIA M3 5,1480079,202.05.08 2,77000CIMENTO KG 1,024900,372.30.29 10,40000ELEMENTO VAZADO "NEO-REX" N.17A (30X30X10CM) UN 51,792004,98

LS 18,83070 BDI 21,21304Mão-de-Obra 15,43500 Material 57,96490SubMO 34,26570

04.02.035 ELEMENTO VAZADO REF NEO REX 19B/19C / REF UNICA 5/5B M2 93,87

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,81000CIMENTO KG 0,669700,372.30.22 6,30000ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM UN 47,502007,54

LS 15,29697 BDI 17,55451Mão-de-Obra 12,53850 Material 48,48850SubMO 27,83547

04.02.036 ELEMENTO VAZADO REF NEO REX 22B / REF UNICA 4B M2 145,82

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,75000CIMENTO KG 0,647500,372.30.09 11,20000ELEMENTO VAZADO "NEO-REX" N.22B (33X33X10)CM UN 83,328007,44

LS 18,83070 BDI 27,26834Mão-de-Obra 15,43500 Material 84,29230SubMO 34,26570

04.02.037 ELEMENTO VAZADO REF NEO REX 22C / REF UNICA 4A M2 101,60

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,75000CIMENTO KG 0,647500,372.30.01 11,20000ELEMENTO VAZADO "NEO-REX" N.22C (29X29X6)CM UN 47,376004,23

LS 18,83070 BDI 18,99938Mão-de-Obra 15,43500 Material 48,34030SubMO 34,26570

04.02.039 ELEMENTO VAZADO REF NEO REX 23A / REF UNICA 3A M2 94,84

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 2,18000CIMENTO KG 0,806600,372.30.13 6,10000ELEMENTO VAZADO "NEO-REX" N.23A (39X39X10)CM UN 48,068007,88

LS 15,29697 BDI 17,73440Mão-de-Obra 12,53850 Material 49,27060SubMO 27,83547

04.02.044 ELEMENTO VAZADO REF NEO REX 41 / REF UNICA 4 M2 108,18

1.01.39 2,01600PEDREIRO H 9,374404,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,01000AREIA M3 0,7920079,20

09/02/2011 11:38:40 Página: 31 de 0

Page 32: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.08 4,25000CIMENTO KG 1,572500,372.30.03 16,00000ELEMENTO VAZADO "NEO REX" N.0 41 UN 56,320003,52

LS 16,08497 BDI 20,22939Mão-de-Obra 13,18440 Material 58,68450SubMO 29,26937

04.02.047 ELEMENTO VAZADO REF NEO REX 59 / REF UNICA 11 M2 139,47

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,52000CIMENTO KG 0,562400,372.30.17 25,00000ELEMENTO VAZADO "NEO-REX" N.59 B / UNICA N.11 UN 78,250003,13

LS 18,83070 BDI 26,08083Mão-de-Obra 15,43500 Material 79,12920SubMO 34,26570

04.02.058 ELEMENTO VAZADO REF NEO REX 90 M2 89,10

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,54000CIMENTO KG 0,569800,372.30.19 6,30000ELEMENTO VAZADO "NEO-REX" N.90 (39X39X7)CM UN 43,722006,94

LS 15,29697 BDI 16,66214Mão-de-Obra 12,53850 Material 44,60860SubMO 27,83547

04.02.060 ELEMENTO VAZADO REF NEO REX 95 / REF UNICA 23A M2 139,83

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,54000CIMENTO KG 0,569800,372.30.08 8,33000ELEMENTO VAZADO "NEO-REX" N.95 A (39X39X10CM) UN 84,9660010,20

LS 15,29697 BDI 26,14826Mão-de-Obra 12,53850 Material 85,85260SubMO 27,83547

04.02.061 ELEMENTO VAZADO REF NEO REX 97 / REF UNICA 1H M2 201,42

1.01.39 3,50000PEDREIRO H 16,275004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,01730AREIA M3 1,3701679,202.05.08 7,36000CIMENTO KG 2,723200,372.30.30 82,65000ELEMENTO VAZADO "NEO-REX" N.97 (10X10X10CM) UN 106,618501,29

LS 29,15190 BDI 37,66452Mão-de-Obra 23,89500 Material 110,71186SubMO 53,04690

04.02.062 ELEMENTO VAZADO CERAMICO 18X18X7CM M2 217,28

1.01.39 3,50000PEDREIRO H 16,275004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,02010AREIA M3 1,5919279,202.05.05 2,01670CAL HIDRATADA KG 0,685680,342.05.08 4,01680CIMENTO KG 1,486220,372.30.50 82,65000ELEMENTO VAZADO CERAMICO 18X18X7CM UN 119,842501,45

LS 29,15190 BDI 40,63024Mão-de-Obra 23,89500 Material 123,60631SubMO 53,04690

04.02.099 ELEMENTOS VAZADOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.03.001 DV-01 DIVISORIA DE GRANILITE - LATERAL ABERTA M 293,95

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 3,00000SERVENTE H 11,430003,812.35.27 1,95000DIVISORIA SANITARIA DE GRANILITE E=3CM M2 186,9270095,863.80.47 0,10260CERA VIRGEM KG 0,878268,56

LS 28,12710 BDI 54,96709Mão-de-Obra 23,05500 Material 187,80526SubMO 51,18210

04.03.002 DV-02 DIVISORIA DE GRANILITE - LATERAL FECHADA M 293,95

1.01.39 2,50000PEDREIRO H 11,625004,651.01.46 3,00000SERVENTE H 11,430003,812.35.27 1,95000DIVISORIA SANITARIA DE GRANILITE E=3CM M2 186,9270095,863.80.47 0,10260CERA VIRGEM KG 0,878268,56

LS 28,12710 BDI 54,96709Mão-de-Obra 23,05500 Material 187,80526SubMO 51,18210

04.03.003 DV-03 DIVISORIA DE GRANILITE - FRONTAL M 1.030,95

1.01.39 2,80000PEDREIRO H 13,020004,651.01.46 3,30000SERVENTE H 12,573003,812.35.23 1,95000DIVISORIA SANITARIA DE GRANILITE E=4CM M2 186,9270095,862.67.19 22,00000PARAFUSO SEXTAVADO 3/8"X3" C/ PORCA E ARRUELA UN 12,100000,552.67.45 24,00000PARAFUSO AUTO-ATARRACHANTE (3,5X25MM)-CABEÇA CHATA UN 0,720000,032.67.79 0,24000BUCHA TIPO S-5 (CENTO) UN 0,854403,563.10.54 17,90000BATENTE DE ALUMINIO P/ DIVISORIA GRANILITE M 425,6620023,783.10.55 3,70000FIXACAO (FERRO TRABALHADO) KG 154,2160041,683.80.47 0,10260CERA VIRGEM KG 0,878268,56

LS 31,22346 BDI 192,78005Mão-de-Obra 25,59300 Material 781,35766SubMO 56,81646

04.03.004 DV-04 DIVISORIA DE GRANILITE - ANTEPARO M 320,44

09/02/2011 11:38:40 Página: 32 de 0

Page 33: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 3,10000SERVENTE H 11,811003,812.35.27 1,95000DIVISORIA SANITARIA DE GRANILITE E=3CM M2 186,9270095,862.67.45 2,00000PARAFUSO AUTO-ATARRACHANTE (3,5X25MM)-CABEÇA CHATA UN 0,060000,032.67.79 0,02000BUCHA TIPO S-5 (CENTO) UN 0,071203,563.11.91 0,56000CAIXILHARIA EM ALUMINIO KG 19,5272034,873.80.47 0,10260CERA VIRGEM KG 0,878268,56

LS 29,15922 BDI 59,92049Mão-de-Obra 23,90100 Material 207,46366SubMO 53,06022

04.03.020 PLACAS DE CONCRETO - ESPESSURA 5 CM M2 172,19

1.01.11 3,63000CARPINTEIRO H 16,516504,551.01.12 3,63000AJUDANTE DE CARPINTEIRO H 14,374803,961.01.21 0,44000FERREIRO H 2,098804,771.01.22 0,44000AJUDANTE DE FERREIRO H 1,680803,821.01.39 1,49000PEDREIRO H 6,928504,651.01.46 1,99000SERVENTE H 7,581903,812.05.03 0,03300AREIA M3 2,6136079,202.05.08 16,20000CIMENTO KG 5,994000,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,092.10.21 0,11000TABUAS PINHO DE 1"X12" DE 3A. M2 1,8898017,182.10.32 0,38000CHAPA COMPENSADA RESINADA E=12MM M2 4,5980012,102.15.38 5,01000ACO CA-60-B $MD BITOLAS KG 13,276502,65

LS 60,00119 BDI 32,19954Mão-de-Obra 49,18130 Material 30,81550SubMO 109,18249

04.03.022 DIVISORIA CHAPA FIBRA MAD PRENS BP/PAINEL/VIDRO/VENTIL PERM E=35MM M2 120,24

2.35.31 1,00000DIVIS PAINEL/VIDRO/VENT PERMAN-COL M2 97,7600097,76

LS 0,00000 BDI 22,48480Mão-de-Obra 0,00000 Material 97,76000SubMO 0,00000

04.03.023 DIVISORIA CHAPA FIBRA MAD PRENS BP/PAINEL CEGO 1,20X2,11M E=35MM M2 78,91

2.35.32 0,33100DIVISORIA PAINEL CEGO 1,20X2,52M COLOCADA UN 64,15773193,83

LS 0,00000 BDI 14,75628Mão-de-Obra 0,00000 Material 64,15773SubMO 0,00000

04.03.025 DIVISORIA CHAPA FIBRA MAD PRENS BP/PAINEL VENT PERM 1,20X2,11M E=35MM M2 91,69

2.35.34 0,28200DIVISORIA VENT PERMANENTE 1,20X2,96M COLOCADA UN 74,55234264,37

LS 0,00000 BDI 17,14704Mão-de-Obra 0,00000 Material 74,55234SubMO 0,00000

04.03.026 DV-05 DIVISORIA PARA SALA DE INFORMÁTICA M2 84,94

2.35.29 1,00000FORN INST DIV BP-PLUS PERFIL AÇO GALV H=1,055M M2 69,0600069,06

LS 0,00000 BDI 15,88380Mão-de-Obra 0,00000 Material 69,06000SubMO 0,00000

04.03.030 DIVISORIAS DE GESSO ACARTONADO M2 78,44

2.35.36 1,00000DIVISORIA DE GESSO ACARTONADA FORN E INST M2 63,7800063,78

LS 0,00000 BDI 14,66940Mão-de-Obra 0,00000 Material 63,78000SubMO 0,00000

04.03.099 PLACAS DIVISORIAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.50.001 DE ALVENARIAS EM GERAL E ELEMENTOS VAZADOS,INCL REVESTIMENTOS M3 48,18

1.01.39 0,41500PEDREIRO H 1,929754,651.01.46 4,12500SERVENTE H 15,716253,81

LS 21,52812 BDI 9,01005Mão-de-Obra 17,64600 Material 0,00000SubMO 39,17412

04.50.010 DIVISORIAS DE MADEIRA INCLUINDO ENTARUGAMENTO M2 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

04.50.011 DE DIVISORIAS EM PLACAS PARA SANITARIOS M2 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

04.50.012 DE PLACAS DE FIBRO CIMENTO M2 3,72

1.01.11 0,30000CARPINTEIRO H 1,365004,55

LS 1,66530 BDI 0,69697Mão-de-Obra 1,36500 Material 0,00000SubMO 3,03030

04.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.60.010 DE DIVISORIAS EM CHAPAS DE MADEIRA, INCLUSIVE ENTARUGAMENTO M2 7,45

1.01.11 0,60000CARPINTEIRO H 2,730004,55

LS 3,33060 BDI 1,39394Mão-de-Obra 2,73000 Material 0,00000SubMO 6,06060

04.60.011 DE DIVISORIAS EM CHAPA DE MADEIRA,EXCLUSIVE ENTARUGAMENTO M2 2,48

1.01.11 0,20000CARPINTEIRO H 0,910004,55

09/02/2011 11:38:40 Página: 33 de 0

Page 34: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 1,11020 BDI 0,46465Mão-de-Obra 0,91000 Material 0,00000SubMO 2,02020

04.60.012 DE PAINEIS DIVISORIAS COM MONTANTES METALICAS M2 3,56

1.01.12 0,33000AJUDANTE DE CARPINTEIRO H 1,306803,96

LS 1,59430 BDI 0,66725Mão-de-Obra 1,30680 Material 0,00000SubMO 2,90110

04.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.70.010 DE DIVISORIAS EM CHAPAS DE MADEIRA INCLUSIVE ENTARUGAMENTO M2 29,00

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.67.60 0,20000PREGO KG 0,914004,57

LS 12,45864 BDI 5,42447Mão-de-Obra 10,21200 Material 0,91400SubMO 22,67064

04.70.011 DE DIVISORIAS EM CHAPAS DE MADEIRA EXCLUSIVE ENTARUGAMENTO M2 9,29

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,96

LS 4,15288 BDI 1,73808Mão-de-Obra 3,40400 Material 0,00000SubMO 7,55688

04.70.012 DE PAINEIS DIVISORIOS COM MONTANTES METALICAS M2 23,00

1.01.11 0,99000CARPINTEIRO H 4,504504,551.01.12 0,99000AJUDANTE DE CARPINTEIRO H 3,920403,96

LS 10,27838 BDI 4,30175Mão-de-Obra 8,42490 Material 0,00000SubMO 18,70328

04.70.099 RECOLOCACOES DE ALVENARIA E OUTROS ELEMENTOS DIVISORIOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

04.80.001 ALVENARIA DE CHAPAS DE CONCRETO CELULAR SIMPLES E=10 CM M2 165,45

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,70000SERVENTE H 2,667003,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 1,12000CAL HIDRATADA KG 0,380800,342.05.08 0,70000CIMENTO KG 0,259000,372.75.17 1,02000CHAPA CONCRETO CELULAR SIMPLES E=10CM M2 122,40000120,00

LS 6,09024 BDI 30,93915Mão-de-Obra 4,99200 Material 123,43580SubMO 11,08224

04.80.010 DIVISORIA DE CHAPA COMPENSADO PINHO E=4MM AMBAS FACES,INCL ENTARUG M2 81,71

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.17 4,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 20,520004,562.10.42 2,20000CHAPA COMPENSADA PINHO E=4MM M2 22,3300010,152.67.60 0,20000PREGO KG 0,914004,57

LS 12,45864 BDI 15,27997Mão-de-Obra 10,21200 Material 43,76400SubMO 22,67064

04.80.011 DIVISORIA CHAPA COMPENSADO CEDRO DE E=4MM AMBAS FACES INCL ENTARUG M2 95,62

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.17 4,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 20,520004,562.10.40 2,20000CHAPA COMPENSADA CEDRO E=4MM M2 33,6380015,292.67.60 0,20000PREGO KG 0,914004,57

LS 12,45864 BDI 17,88081Mão-de-Obra 10,21200 Material 55,07200SubMO 22,67064

04.80.015 DIVISORIAS DE CHAPAS DURATEX OU SIMILAR,INCL ENTARUGAMENTO M2 103,95

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.17 4,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 20,520004,562.35.26 2,20000CHAPA DURATEX 4,5MM M2 40,4140018,372.67.60 0,20000PREGO KG 0,914004,57

LS 12,45864 BDI 19,43929Mão-de-Obra 10,21200 Material 61,84800SubMO 22,67064

04.80.016 CHAPA DURATEX OU SIMILAR M2 34,14

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.35.26 1,10000CHAPA DURATEX 4,5MM M2 20,2070018,37

LS 4,15288 BDI 6,38569Mão-de-Obra 3,40400 Material 20,20700SubMO 7,55688

04.80.017 DIVISORIAS DE CHAPAS DIVILUX OU SIMILAR M2 94,15

2.35.30 1,00000DIVISORIA DIVILUX-FORN E COLOCADA M2 76,5500076,55

LS 0,00000 BDI 17,60650Mão-de-Obra 0,00000 Material 76,55000SubMO 0,00000

04.80.099 SERVICOS DE ALVENARIA E OUTROS ELEMENTOS DIVISORIOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

09/02/2011 11:38:40 Página: 34 de 0

Page 35: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.01.001 PM-67 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=82CM UN 893,70

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,813.01.69 1,00000PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1 FL 274,50000274,503.13.12 5,00000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 175,0500035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 167,11564Mão-de-Obra 70,72900 Material 569,57136SubMO 157,01838

05.01.002 PM-68 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=92CM UN 890,25

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,813.01.68 1,00000PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1 FL 268,19000268,193.13.12 5,10000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 178,5510035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 166,46957Mão-de-Obra 70,72900 Material 566,76236SubMO 157,01838

05.01.004 PM-04 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=82CM UN 494,21

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,20000PREGO KG 0,914004,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.02.23 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1 UN 77,7300077,733.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 92,41344Mão-de-Obra 45,88900 Material 299,92400SubMO 101,87358

05.01.005 PM-05 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=92CM UN 502,85

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,20000PREGO KG 0,914004,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.02.24 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1 UN 84,7600084,763.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 94,03034Mão-de-Obra 45,88900 Material 306,95400SubMO 101,87358

05.01.006 PM-69 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=124CM UN 1.264,88

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 2,00000SERVENTE H 7,620003,813.01.71 2,00000PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1 UN 469,18000234,593.13.12 5,40000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 189,0540035,013.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 108,04930 BDI 236,52272Mão-de-Obra 88,56500 Material 831,74536SubMO 196,61430

09/02/2011 11:38:40 Página: 35 de 0

Page 36: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

05.01.007 PM-08 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=124CM UN 771,88

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,30000PREGO KG 1,371004,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.37 1,00000BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1 UN 106,02000106,023.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.64 2,00000PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1 FL 166,1000083,053.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 77,74450 BDI 144,33662Mão-de-Obra 63,72500 Material 486,08100SubMO 141,46950

05.01.009 PM-19 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=62CM UN 653,33

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,20000PREGO KG 0,914004,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.71 1,00000PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1 UN 234,59000234,593.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 122,16854Mão-de-Obra 45,88900 Material 429,29400SubMO 101,87358

05.01.010 PM-20 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=82CM UN 702,42

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,20000PREGO KG 0,914004,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.69 1,00000PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1 FL 274,50000274,503.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 131,34784Mão-de-Obra 45,88900 Material 469,20400SubMO 101,87358

05.01.011 PM-21 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=92CM UN 694,66

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,20000PREGO KG 0,914004,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.68 1,00000PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1 FL 268,19000268,193.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 129,89654Mão-de-Obra 45,88900 Material 462,89400SubMO 101,87358

05.01.012 PM-22 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=124CM UN 1.110,86

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.67.60 0,30000PREGO KG 1,371004,573.01.37 1,00000BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1 UN 106,02000106,023.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.71 2,00000PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1 UN 469,18000234,593.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 77,74450 BDI 207,72232Mão-de-Obra 63,72500 Material 761,67100SubMO 141,46950

05.01.013 PM-23 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=72CM UN 702,42

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,20000PREGO KG 0,914004,57

09/02/2011 11:38:40 Página: 36 de 0

Page 37: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.67 1,00000PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1 FL 274,50000274,503.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 131,34784Mão-de-Obra 45,88900 Material 469,20400SubMO 101,87358

05.01.014 PM-24 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=72CM UN 494,21

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,20000PREGO KG 0,914004,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.02.22 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1 UN 77,7300077,733.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 92,41344Mão-de-Obra 45,88900 Material 299,92400SubMO 101,87358

05.01.024 PM-34 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=72CM UN 958,02

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,813.01.67 1,00000PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1 FL 274,50000274,503.03.09 0,35000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 55,79350159,413.13.12 4,90000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 171,5490035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 179,14292Mão-de-Obra 70,72900 Material 621,86386SubMO 157,01838

05.01.025 PM-35 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=82CM UN 972,13

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,813.01.69 1,00000PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1 FL 274,50000274,503.03.09 0,40000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 63,76400159,413.13.12 5,00000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 175,0500035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 181,78136Mão-de-Obra 70,72900 Material 633,33536SubMO 157,01838

05.01.026 PM-36 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=92CM UN 978,48

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,813.01.68 1,00000PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1 FL 268,19000268,193.03.09 0,45000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 71,73450159,413.13.12 5,10000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 178,5510035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 182,96851Mão-de-Obra 70,72900 Material 638,49686SubMO 157,01838

05.01.027 PM-37 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=124CM UN 1.382,52

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 2,00000SERVENTE H 7,620003,813.01.71 2,00000PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1 UN 469,18000234,593.03.09 0,60000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 95,64600159,41

09/02/2011 11:38:40 Página: 37 de 0

Page 38: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.13.12 5,40000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 189,0540035,013.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 108,04930 BDI 258,52130Mão-de-Obra 88,56500 Material 927,39136SubMO 196,61430

05.01.028 PORTAS PARA DIVISORIAS CHAPA FIBRA MAD PRENS BP COM FERRAGENS UN 170,99

2.35.35 1,00000DIVISORIA PORTA 0,82X2,10M COLOCADA UN 84,6000084,603.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.16.71 1,00000FECHADURA TIPO TUBULAR COMPLETA - 90 MM DIST. UN 32,9100032,91

LS 0,00000 BDI 31,97460Mão-de-Obra 0,00000 Material 139,02000SubMO 0,00000

05.01.029 PM-74 PORTA DE SARRAFEADO MACIÇO P/BOXES L=62CM-COMPLETA UN 403,26

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,963.02.06 1,00000PORTA SARRAFEADA MACIÇA P/ BOX 62X150CM G1-C1 UN 192,93000192,933.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.16.35 2,00000CABIDE SIMPLES GANCHO GRANDE - ZAMACK UN 2,780001,393.17.15 1,00000TARGETA DE SOBREPOR LIVRE-OCUP UN 33,1800033,18

LS 42,56702 BDI 75,40735Mão-de-Obra 34,89100 Material 250,40000SubMO 77,45802

05.01.036 PM-38 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=72CM UN 771,33

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,25000PREGO KG 1,142504,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.67 1,00000PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1 FL 274,50000274,503.03.09 0,35000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 55,79350159,413.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 144,23290Mão-de-Obra 45,88900 Material 525,22600SubMO 101,87358

05.01.037 PM-39 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=82CM UN 781,13

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,25000PREGO KG 1,142504,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.69 1,00000PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1 FL 274,50000274,503.03.09 0,40000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 63,76400159,413.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 146,06612Mão-de-Obra 45,88900 Material 533,19650SubMO 101,87358

05.01.044 PM-40 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=92CM UN 783,17

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,25000PREGO KG 1,142504,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.68 1,00000PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1 FL 268,19000268,193.03.09 0,45000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 71,73450159,413.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 146,44803Mão-de-Obra 45,88900 Material 534,85700SubMO 101,87358

05.01.045 PM-41 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=124CM UN 1.228,78

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.67.60 0,35000PREGO KG 1,599504,573.01.37 1,00000BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1 UN 106,02000106,023.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.71 2,00000PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1 UN 469,18000234,593.03.09 0,60000BANDEIRA P/ PORTA MACHO-FEMEA G1-C1 M2 95,64600159,413.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

09/02/2011 11:38:40 Página: 38 de 0

Page 39: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 77,74450 BDI 229,77345Mão-de-Obra 63,72500 Material 857,54550SubMO 141,46950

05.01.046 PM-70 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=72CM UN 681,18

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.02.22 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1 UN 77,7300077,733.13.12 4,90000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 171,5490035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 127,37601Mão-de-Obra 70,72900 Material 396,79036SubMO 157,01838

05.01.047 PM-71 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=82CM UN 685,49

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.02.23 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1 UN 77,7300077,733.13.12 5,00000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 175,0500035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 128,18124Mão-de-Obra 70,72900 Material 400,29136SubMO 157,01838

05.01.048 PM-72 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=92CM UN 698,44

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.02.24 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1 UN 84,7600084,763.13.12 5,10000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 178,5510035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 130,60337Mão-de-Obra 70,72900 Material 410,82236SubMO 157,01838

05.01.049 PM-73 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=124CM UN 925,90

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 2,00000SERVENTE H 7,620003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.64 2,00000PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1 FL 166,1000083,053.13.12 5,40000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 189,0540035,013.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 108,04930 BDI 173,13702Mão-de-Obra 88,56500 Material 556,15536SubMO 196,61430

05.01.050 PM-81 PORTA DE SARRAFEADO MACIÇO P/BOXE ACESSIVEL-COMPLETA UN 834,02

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,962.67.48 12,00000PARAFUSO INOX AUTO-ATARR CABECA PANELA 6X25MM UN 3,720000,313.02.07 1,00000PORTA SARRAFEADA MACIÇA P/ BOX 92X150CM G1-C1 UN 216,82000216,823.13.40 2,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 297,54000148,77

09/02/2011 11:38:40 Página: 39 de 0

Page 40: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.16.35 1,00000CABIDE SIMPLES GANCHO GRANDE - ZAMACK UN 1,390001,393.17.15 1,00000TARGETA DE SOBREPOR LIVRE-OCUP UN 33,1800033,18

LS 57,10210 BDI 155,95543Mão-de-Obra 46,80500 Material 574,16000SubMO 103,90710

05.01.051 PM-75 PORTA SARRAFEADO MACICO SANIT. ACESSIVEL BAT. MET. UN 971,91

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.66.40 0,37000CHAPA DE ACO INOX P/ PROTECAO E=0,79MM M2 39,50860106,782.67.46 8,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,480000,063.02.10 1,00000PORTA LISA SARRAFEADA MACIÇA 92X210CM P/PINTURA G1-C1 UN 119,38000119,383.13.12 5,10000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 178,5510035,013.13.40 1,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 148,77000148,773.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 100,82446 BDI 181,74104Mão-de-Obra 82,64300 Material 606,71096SubMO 183,46746

05.01.062 PM-76 PORTA SARRAFEADO MACICO SANIT. ACESSIVEL BAT. MAD. UN 782,88

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,30000PEDREIRO H 10,695004,651.01.46 2,30000SERVENTE H 8,763003,812.66.40 0,37000CHAPA DE ACO INOX P/ PROTECAO E=0,79MM M2 39,50860106,782.67.46 8,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,480000,063.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.02.10 1,00000PORTA LISA SARRAFEADA MACIÇA 92X210CM P/PINTURA G1-C1 UN 119,38000119,383.13.40 1,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 148,77000148,773.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 80,84086 BDI 146,39327Mão-de-Obra 66,26300 Material 489,38860SubMO 147,10386

05.01.067 PM-79 PORTA PARA HALL DO ELEVADOR BAT. MET. UN 1.092,63

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,50000SERRALHEIRO H 20,200008,081.01.45 2,50000AJUDANTE SERRALHEIRO H 10,850004,341.01.46 1,30000SERVENTE H 4,953003,812.66.40 0,37000CHAPA DE ACO INOX P/ PROTECAO E=0,79MM M2 39,50860106,782.67.46 8,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,480000,063.02.10 1,00000PORTA LISA SARRAFEADA MACIÇA 92X210CM P/PINTURA G1-C1 UN 119,38000119,383.13.12 5,10000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 178,5510035,013.13.40 1,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 148,77000148,773.15.10 1,00000MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2) UN 111,27000111,273.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.16.67 1,00000FECHADURA YALE S/ MACANETA (PAPAIZ 341) UN 70,6500070,653.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 108,40066 BDI 204,31466Mão-de-Obra 88,85300 Material 691,07096SubMO 197,25366

05.01.068 PM-80 PORTA PARA HALL DO ELEVADOR BAT. MAD. UN 898,26

1.01.11 6,00000CARPINTEIRO H 27,300004,551.01.12 6,00000AJUDANTE DE CARPINTEIRO H 23,760003,961.01.39 2,30000PEDREIRO H 10,695004,651.01.46 2,30000SERVENTE H 8,763003,812.66.40 0,37000CHAPA DE ACO INOX P/ PROTECAO E=0,79MM M2 39,50860106,782.67.46 8,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,480000,063.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.02.10 1,00000PORTA LISA SARRAFEADA MACIÇA 92X210CM P/PINTURA G1-C1 UN 119,38000119,383.13.40 1,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 148,77000148,773.15.10 1,00000MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2) UN 111,27000111,273.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.16.67 1,00000FECHADURA YALE S/ MACANETA (PAPAIZ 341) UN 70,6500070,65

LS 86,03196 BDI 167,96867Mão-de-Obra 70,51800 Material 573,74860SubMO 156,54996

05.01.069 PM-82 PORTA DE CORRER ACESSIVEL SARRAF.MACIÇA P/PINTURA(L=111CM) UN 1.493,98

1.01.11 6,64000CARPINTEIRO H 30,212004,551.01.12 6,64000AJUDANTE DE CARPINTEIRO H 26,294403,961.01.39 1,57000PEDREIRO H 7,300504,651.01.44 2,42000SERRALHEIRO H 19,553608,081.01.45 2,42000AJUDANTE SERRALHEIRO H 10,502804,341.01.46 1,57000SERVENTE H 5,981703,812.66.40 0,45000CHAPA DE ACO INOX P/ PROTECAO E=0,79MM M2 48,05100106,78

09/02/2011 11:38:40 Página: 40 de 0

Page 41: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.66.79 2,08000FERRO CANTONEIRA 2 1/2"X2 1/2"X1/8" GALV. M 45,4064021,832.66.89 4,00000PARAFUSO AUTO ATARRACHANTE 8,0X50MM UN 0,720000,182.67.39 10,00000PARAFUSO AUTOATARRACHANTE 9,5X2,9MM UN 0,200000,022.67.46 16,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,960000,062.68.10 0,04000BUCHA PLASTICA TIPO S-10 (CENTO) UN 0,099202,483.02.05 1,00000PORTA SARRAFEADA MACIÇA 111X211CM DE CORRER G1-C1 UN 338,96000338,963.13.12 2,11000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 73,8711035,013.13.40 2,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 297,54000148,773.15.36 1,15000TRILHO CANALETA DE ALUMINIO "U" DE 1/2" M 3,990503,473.15.37 1,00000PIVOT RETO DE LATAO DE 1/2" UN 7,940007,943.15.41 2,08000TRILHO CHAPA 50X60X1,9MM GALV.P/PORTA CORRER M 62,4000030,003.15.97 2,00000RODIZIO DE AÇO DUPLO DN 1 1/2" (JOCEC REF.71203) UN 14,320007,163.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 121,81090 BDI 279,36386Mão-de-Obra 99,84500 Material 992,96956SubMO 221,65590

05.01.075 PORTA ARMARIO EMBUTIDO EM COMPENSADO 3 CM -BAT MADEIRA 1,5X7CM M2 313,26

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,961.01.39 0,70000PEDREIRO H 3,255004,651.01.46 0,70000SERVENTE H 2,667003,813.03.25 1,00000PORTA ARMARIO EMBUT C/BATENTE E GUARNIÇ. G1-C1 M2 218,87000218,87

LS 19,68348 BDI 58,57812Mão-de-Obra 16,13400 Material 218,87000SubMO 35,81748

05.01.090 PM-58 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=72CM UN 700,61

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.02.22 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1 UN 77,7300077,733.03.08 0,35000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 15,7990045,143.13.12 4,90000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 171,5490035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 131,00978Mão-de-Obra 70,72900 Material 412,58936SubMO 157,01838

05.01.091 PM-59 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=82CM UN 707,69

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.02.23 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1 UN 77,7300077,733.03.08 0,40000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 18,0560045,143.13.12 5,00000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 175,0500035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 132,33412Mão-de-Obra 70,72900 Material 418,34736SubMO 157,01838

05.01.092 PM-60 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=92CM UN 723,42

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.02.24 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1 UN 84,7600084,763.03.08 0,45000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 20,3130045,143.13.12 5,10000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 178,5510035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

09/02/2011 11:38:40 Página: 41 de 0

Page 42: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 86,28938 BDI 135,27536Mão-de-Obra 70,72900 Material 431,13536SubMO 157,01838

05.01.093 PM-61 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=124CM UN 959,22

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 2,00000SERVENTE H 7,620003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.64 2,00000PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1 FL 166,1000083,053.03.08 0,60000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 27,0840045,143.13.12 5,40000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 189,0540035,013.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 108,04930 BDI 179,36634Mão-de-Obra 88,56500 Material 583,23936SubMO 196,61430

05.01.094 PM-62 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=72CM UN 513,92

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,25000PREGO KG 1,142504,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.02.22 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1 UN 77,7300077,733.03.08 0,35000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 15,7990045,143.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 96,09977Mão-de-Obra 45,88900 Material 315,95150SubMO 101,87358

05.01.095 PM-63 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=82CM UN 516,70

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,25000PREGO KG 1,142504,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.02.23 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1 UN 77,7300077,733.03.08 0,40000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 18,0560045,143.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 96,61888Mão-de-Obra 45,88900 Material 318,20850SubMO 101,87358

05.01.096 PM-64 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=92CM UN 528,12

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,25000PREGO KG 1,142504,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,183.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.02.24 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1 UN 84,7600084,763.03.08 0,45000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 20,3130045,143.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 55,98458 BDI 98,75489Mão-de-Obra 45,88900 Material 327,49550SubMO 101,87358

05.01.097 PM-65 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=124CM UN 805,48

1.01.11 5,50000CARPINTEIRO H 25,025004,551.01.12 5,50000AJUDANTE DE CARPINTEIRO H 21,780003,961.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,81

09/02/2011 11:38:40 Página: 42 de 0

Page 43: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.67.60 0,35000PREGO KG 1,599504,572.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.01.37 1,00000BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1 UN 106,02000106,023.01.50 1,00000GUARNICAO 5CM - CEDRINHO UN 12,5400012,543.01.64 2,00000PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1 FL 166,1000083,053.03.08 0,60000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 27,0840045,143.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,133.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 77,74450 BDI 150,61849Mão-de-Obra 63,72500 Material 513,39350SubMO 141,46950

05.01.098 PM-66 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=72CM UN 889,39

1.01.11 4,10000CARPINTEIRO H 18,655004,551.01.12 4,10000AJUDANTE DE CARPINTEIRO H 16,236003,961.01.39 1,30000PEDREIRO H 6,045004,651.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 1,30000SERVENTE H 4,953003,813.01.67 1,00000PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1 FL 274,50000274,503.13.12 4,90000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 171,5490035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 86,28938 BDI 166,31041Mão-de-Obra 70,72900 Material 566,07036SubMO 157,01838

05.01.099 ELEMENTOS DE MADEIRA COM ACESSORIO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.02.001 JM-01 JANELA VENEZIANA UN 491,43

1.01.11 0,46000CARPINTEIRO H 2,093004,551.01.39 1,44000PEDREIRO H 6,696004,651.01.46 1,44000SERVENTE H 5,486403,812.05.03 0,00700AREIA M3 0,5544079,202.05.05 1,14000CAL HIDRATADA KG 0,387600,342.05.08 0,86000CIMENTO KG 0,318200,372.67.10 2,00000JM-01 GRAPA PARA FIXACAO UN 4,600002,303.01.07 1,00000JANELA MADEIRA GUILHOTINA C/VENEZ 120X120CM (JM-01) G1-C1 CJ 304,13000304,133.01.57 1,00000GUARNICAO IMBUIA P/ JANELA 120X120CM (JM-01) CJ 16,7400016,743.17.22 2,00000CARRANCA EM LATAO FUNDIDO UN 41,1200020,56

LS 17,41599 BDI 91,89457Mão-de-Obra 14,27540 Material 367,85020SubMO 31,69139

05.02.099 ELEMENTOS DE MADEIRA COM ACESSORIO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.03.099 FERRAGENS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.04.099 QUADRO NEGRO / QUADROS DE AVISO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.05.034 BS-05 BANCADA PARA COZINHA - GRANITO M 339,05

1.01.06 0,31000AZULEJISTA H 1,639905,291.01.39 2,90000PEDREIRO H 13,485004,651.01.46 5,03000SERVENTE H 19,164303,812.05.03 0,10500AREIA M3 8,3160079,202.05.05 9,32000CAL HIDRATADA KG 3,168800,342.05.08 14,78000CIMENTO KG 5,468600,372.05.09 0,28000CIMENTO BRANCO KG 0,294001,052.25.15 27,00000TIJOLO COMUM MACICO UN 5,940000,223.20.01 0,45000AZULEJO LISO BRANCO BRILHANTE M2 10,2375022,753.50.39 0,65000GRANITO CINZA ANDORINHA E=2CM M2 166,10750255,55

LS 41,83282 BDI 63,40052Mão-de-Obra 34,28920 Material 199,53240SubMO 76,12202

05.05.046 BE-02 BANCADA LABORATORIO / EDUC.ART. / AULA PRATICA - L=10,80M UN 6.048,75

1.01.06 9,30000AZULEJISTA H 49,197005,291.01.11 21,20000CARPINTEIRO H 96,460004,551.01.12 21,20000AJUDANTE DE CARPINTEIRO H 83,952003,961.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,091.01.21 4,68000FERREIRO H 22,323604,77

09/02/2011 11:38:40 Página: 43 de 0

Page 44: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.22 4,68000AJUDANTE DE FERREIRO H 17,877603,821.01.39 13,56000PEDREIRO H 63,054004,651.01.40 4,16000PINTOR H 19,593604,711.01.41 4,00000AJUDANTE DE PINTOR H 15,280003,821.01.46 47,30000SERVENTE H 180,213003,812.05.03 1,04570AREIA M3 82,8194479,202.05.05 73,03000CAL HIDRATADA KG 24,830200,342.05.08 340,09000CIMENTO KG 125,833300,372.05.09 3,40000CIMENTO BRANCO KG 3,570001,052.05.17 0,47900PEDRA BRITADA 1 M3 29,6644761,932.10.09 7,62000PONTALETE PINHO DE 3"X3" M 28,803603,782.10.17 12,80000SARRAFO PINHO APARELHADO 10X2,5 CM M 58,368004,562.10.31 7,56000CHAPA COMPENSADA RESINADA E=10MM M2 71,744409,492.15.38 53,77000ACO CA-60-B $MD BITOLAS KG 142,490502,652.25.21 29,00000BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM UN 43,210001,492.41.60 11,00000FORNECIMENTO E APLICACAO DE RESINA ACRILICA M2 110,8800010,082.66.90 12,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 1,920000,162.67.77 0,12000BUCHA TIPO S-8 (CENTO) UN 1,3332011,112.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.10.55 31,04000FIXACAO (FERRO TRABALHADO) KG 1.293,7472041,683.20.01 14,61000AZULEJO LISO BRANCO BRILHANTE M2 332,3775022,753.50.36 0,24000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 115,79280482,473.75.02 0,32000TINTA ESMALTE L 3,187209,963.80.16 1,44000MASSA PARA MADEIRA L 12,556808,726.40.45 2,00000VALVULA AMERICANA P/PIA 3 1/2' UN 42,2600021,136.45.13 2,00000SIFAO METALICO TIPO COPO DN 1 1/2X2" UN 130,9800065,496.55.16 2,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 24,3800012,196.56.13 1,00000CUBA DUPLA ACO INOX 304 CH.20 1020X400X250MM UN 489,68000489,686.60.13 2,00000TUBO LIGACAO CROMADO C/CANOPLA UN 35,8800017,946.60.74 2,00000TORNEIRA MEC/CER 1/4 VOLTA TIPO MESA CROMADO 1/2" UN 423,30000211,65

LS 707,39968 BDI 1.131,06734Mão-de-Obra 579,83580 Material 3.630,44861SubMO 1.287,23548

05.05.048 BE-03 BANCADA LABORATORIO / EDUCACAO ARTISTICA / AULA PRATICA L=7,20M UN 5.237,01

1.01.06 6,90000AZULEJISTA H 36,501005,291.01.11 14,10000CARPINTEIRO H 64,155004,551.01.12 14,10000AJUDANTE DE CARPINTEIRO H 55,836003,961.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,091.01.21 2,88000FERREIRO H 13,737604,771.01.22 2,88000AJUDANTE DE FERREIRO H 11,001603,821.01.39 10,06000PEDREIRO H 46,779004,651.01.40 4,16000PINTOR H 19,593604,711.01.41 4,00000AJUDANTE DE PINTOR H 15,280003,821.01.46 29,95000SERVENTE H 114,109503,812.05.03 0,69000AREIA M3 54,6480079,202.05.05 31,62000CAL HIDRATADA KG 10,750800,342.05.08 243,75000CIMENTO KG 90,187500,372.05.09 2,55000CIMENTO BRANCO KG 2,677501,052.05.17 0,30900PEDRA BRITADA 1 M3 19,1363761,932.10.09 5,53000PONTALETE PINHO DE 3"X3" M 20,903403,782.10.17 12,80000SARRAFO PINHO APARELHADO 10X2,5 CM M 58,368004,562.10.31 5,04000CHAPA COMPENSADA RESINADA E=10MM M2 47,829609,492.15.38 33,07000ACO CA-60-B $MD BITOLAS KG 87,635502,652.25.21 18,00000BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM UN 26,820001,492.41.60 11,00000FORNECIMENTO E APLICACAO DE RESINA ACRILICA M2 110,8800010,082.66.90 12,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 1,920000,162.67.77 0,12000BUCHA TIPO S-8 (CENTO) UN 1,3332011,112.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.10.55 31,04000FIXACAO (FERRO TRABALHADO) KG 1.293,7472041,683.20.01 10,74000AZULEJO LISO BRANCO BRILHANTE M2 244,3350022,753.50.36 0,24000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 115,79280482,473.75.02 0,32000TINTA ESMALTE L 3,187209,963.80.16 1,44000MASSA PARA MADEIRA L 12,556808,726.40.45 2,00000VALVULA AMERICANA P/PIA 3 1/2' UN 42,2600021,136.45.13 2,00000SIFAO METALICO TIPO COPO DN 1 1/2X2" UN 130,9800065,496.55.16 2,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 24,3800012,196.56.13 1,00000CUBA DUPLA ACO INOX 304 CH.20 1020X400X250MM UN 489,68000489,686.60.13 2,00000TUBO LIGACAO CROMADO C/CANOPLA UN 35,8800017,946.60.74 2,00000TORNEIRA MEC/CER 1/4 VOLTA TIPO MESA CROMADO 1/2" UN 423,30000211,65

LS 498,83153 BDI 979,27990Mão-de-Obra 408,87830 Material 3.350,02887SubMO 907,70983

05.05.064 PR-08 PRATELEIRA DE GRANITO M 134,04

1.01.39 0,26000PEDREIRO H 1,209004,651.01.46 0,26000SERVENTE H 0,990603,812.05.03 0,02000AREIA M3 1,5840079,202.05.08 0,80000CIMENTO KG 0,296000,373.50.39 0,40000GRANITO CINZA ANDORINHA E=2CM M2 102,22000255,55

09/02/2011 11:38:40 Página: 44 de 0

Page 45: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 2,68351 BDI 25,06612Mão-de-Obra 2,19960 Material 104,10000SubMO 4,88311

05.05.067 PR-03 PRATELEIRA DE GRANILITE - L=30CM M 411,26

1.01.39 4,20000PEDREIRO H 19,530004,651.01.40 0,97500PINTOR H 4,592254,711.01.41 0,75000AJUDANTE DE PINTOR H 2,865003,821.01.46 9,00000SERVENTE H 34,290003,812.05.03 0,00600AREIA M3 0,4752079,202.05.08 2,97000CIMENTO KG 1,098900,372.67.31 33,33330PARAFUSO AUTO-ATARRACHANTE CABECA OVAL 4,8 X 75MM UN 4,666660,142.67.77 0,33330BUCHA TIPO S-8 (CENTO) UN 3,7029611,112.68.65 3,75000PERFIL DE FERRO "T" 1 1/4X1 1/4X1/8" M 19,200005,122.80.56 0,05000GRAFITE L 0,6460012,923.55.31 1,75000PLACA GRANILITE 3CM M2 167,7550095,863.80.47 0,09100CERA VIRGEM KG 0,778968,56

LS 74,75825 BDI 76,90261Mão-de-Obra 61,27725 Material 198,32369SubMO 136,03550

05.05.075 PR-09 PRATELEIRA EM GRANILITE - L=55CM M 499,16

1.01.39 4,33070PEDREIRO H 20,137764,651.01.40 1,28500PINTOR H 6,052354,711.01.41 0,99200AJUDANTE DE PINTOR H 3,789443,821.01.46 9,68140SERVENTE H 36,886133,812.05.03 0,00620AREIA M3 0,4910479,202.05.08 3,06250CIMENTO KG 1,133130,372.67.26 26,67000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 3,467100,132.67.77 0,26670BUCHA TIPO S-8 (CENTO) UN 2,9630411,112.68.66 4,33000PERFIL DE FERRO BRUTO “T” 1 1/4X1 1/4X1/8” M 23,901605,522.80.56 0,08000GRAFITE L 1,0336012,923.55.31 2,33000PLACA GRANILITE 3CM M2 223,3538095,863.80.47 0,12120CERA VIRGEM KG 1,037478,56

LS 81,57613 BDI 93,33919Mão-de-Obra 66,86568 Material 257,38077SubMO 148,44181

05.05.078 GS-03 GUICHE DE SECRETARIA/JANELA DE 2 FOLHAS UN 1.802,79

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,961.01.24 2,50000GRANITEIRO H 14,075005,631.01.39 2,50000PEDREIRO H 11,625004,651.01.46 4,18000SERVENTE H 15,925803,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,80000CIMENTO KG 0,666000,372.05.81 1,60000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,560000,353.01.09 1,00000GS-03 JANELA SARRAF.MACIÇA (60X130CM E=25MM) X 2 (G1-C1) UN 711,90000711,903.13.12 3,80000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 133,0380035,013.16.44 4,00000DOBRADICA DE ACO CROMADO C/ PINOS BOLAS 3"X2 1/2" UN 25,160006,293.16.86 4,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 63,9600015,993.50.38 1,34000GRANITO CINZA ANDORINHA E=3CM M2 399,32000298,003.75.91 0,00460GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,72938158,56

LS 71,54788 BDI 337,10765Mão-de-Obra 58,64580 Material 1.335,49178SubMO 130,19368

05.05.079 PR-10 PRATELEIRA EM GRANILITE L=70CM M 614,87

1.01.39 4,53270PEDREIRO H 21,077064,651.01.40 1,28500PINTOR H 6,052354,711.01.41 0,99200AJUDANTE DE PINTOR H 3,789443,821.01.46 9,92340SERVENTE H 37,808153,812.05.03 0,01120AREIA M3 0,8870479,202.05.05 0,91100CAL HIDRATADA KG 0,309740,342.05.08 3,77550CIMENTO KG 1,396940,372.25.04 2,86000BLOCO CONCRETO DE 14X39X19CM UN 5,491201,922.66.93 15,00000CHUMBADOR BOLT 1/4" X 3" UN 13,650000,912.68.66 6,50000PERFIL DE FERRO BRUTO “T” 1 1/4X1 1/4X1/8” M 35,880005,523.55.31 3,00000PLACA GRANILITE 3CM M2 287,5800095,863.75.02 0,08000TINTA ESMALTE L 0,796809,963.80.47 0,15600CERA VIRGEM KG 1,335368,56

LS 83,84694 BDI 114,97723Mão-de-Obra 68,72700 Material 347,32708SubMO 152,57394

05.05.080 ET-05 ESTRADO DE POLIPROPILENO M 39,80

1.01.46 0,06660SERVENTE H 0,253753,813.91.20 4,00000ESTRADO DE POLIPROPILENO (25X50X2,5CM) UN 31,800007,95

LS 0,30957 BDI 7,44356Mão-de-Obra 0,25375 Material 31,80000SubMO 0,56332

05.05.083 BA-07 BALCAO DE DISTRIBUICAO 1,50X0,50M(GRANITO) UN 1.344,82

1.01.06 2,64000AZULEJISTA H 13,965605,291.01.11 1,21000CARPINTEIRO H 5,505504,551.01.12 1,21000AJUDANTE DE CARPINTEIRO H 4,791603,961.01.21 0,89000FERREIRO H 4,245304,771.01.22 0,89000AJUDANTE DE FERREIRO H 3,399803,821.01.39 3,05000PEDREIRO H 14,182504,65

09/02/2011 11:38:40 Página: 45 de 0

Page 46: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.40 0,95000PINTOR H 4,474504,711.01.41 0,81000AJUDANTE DE PINTOR H 3,094203,821.01.46 4,42000SERVENTE H 16,840203,812.05.03 0,09500AREIA M3 7,5240079,202.05.05 6,73000CAL HIDRATADA KG 2,288200,342.05.08 45,01000CIMENTO KG 16,653700,372.05.18 0,08500PEDRA BRITADA 2 M3 5,1926561,092.05.81 2,79000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,976500,352.10.09 2,79000PONTALETE PINHO DE 3"X3" M 10,546203,782.10.21 0,23000TABUAS PINHO DE 1"X12" DE 3A. M2 3,9514017,182.10.32 0,93000CHAPA COMPENSADA RESINADA E=12MM M2 11,2530012,102.15.38 10,28000ACO CA-60-B $MD BITOLAS KG 27,242002,652.30.10 4,00000ELEMENTO VAZADO "NEO-REX" N.16 (19X19X10)CM UN 10,480002,622.67.60 0,46000PREGO KG 2,102204,572.70.10 0,18000ARAME RECOZIDO N.18 KG 0,833404,632.75.30 0,16000TELA DE ACO INOX (MALHA 14 FIO 30) M2 7,6336047,713.10.72 1,00000BA-07 PORTA DE ACO DE ENROLAR DE 1,50X1,35M UN 514,97000514,973.12.15 6,65000GRADIL DE FERRO (TIPO PMSP) KG 76,9405011,573.50.39 0,93000GRANITO CINZA ANDORINHA E=2CM M2 237,66150255,553.75.02 0,06000TINTA ESMALTE L 0,597609,96

LS 86,00902 BDI 251,47158Mão-de-Obra 70,49920 Material 936,84645SubMO 156,50822

05.05.085 BA-12 BALCÃO DE ATENDIMENTO DE GRANITO (210X60CM) UN 3.612,49

1.01.11 4,04000CARPINTEIRO H 18,382004,551.01.12 4,04000AJUDANTE DE CARPINTEIRO H 15,998403,961.01.21 1,01300FERREIRO H 4,832014,771.01.22 1,01300AJUDANTE DE FERREIRO H 3,869663,821.01.39 4,44300PEDREIRO H 20,659954,651.01.40 7,18200PINTOR H 33,827224,711.01.41 6,23700AJUDANTE DE PINTOR H 23,825343,821.01.46 4,81500SERVENTE H 18,345153,812.05.38 0,11400CONCRETO DOSADO (CONDICAO A) FCK=30MPA M3 30,28752265,682.05.81 5,54000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,939000,352.10.09 6,06000PONTALETE PINHO DE 3"X3" M 22,906803,782.10.21 0,20200TABUAS PINHO DE 1"X12" DE 3A. M2 3,4703617,182.10.32 0,66700CHAPA COMPENSADA RESINADA E=12MM M2 8,0707012,102.15.25 2,68000ACO CA-50-A $MD BITOLAS KG 7,236002,702.15.38 8,97000ACO CA-60-B $MD BITOLAS KG 23,770502,652.67.60 0,40400PREGO KG 1,846284,572.70.10 0,20300ARAME RECOZIDO N.18 KG 0,939894,633.10.73 1,00000BA-12 PORTA FERRO BASC.ACION.MANUAL (2,10X1,50) UN 2.094,750002.094,753.50.39 1,49000GRANITO CINZA ANDORINHA E=2CM M2 380,76950255,553.75.02 2,36300TINTA ESMALTE L 23,535489,963.75.50 1,41800FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 27,2397819,21

LS 170,48247 BDI 675,50632Mão-de-Obra 139,73973 Material 2.626,76181SubMO 310,22220

05.05.087 GS-04 GUICHE DE SECRETARIA/JANELA DE CORRER UN 1.886,34

1.01.11 3,00000CARPINTEIRO H 13,650004,551.01.12 3,00000AJUDANTE DE CARPINTEIRO H 11,880003,961.01.24 2,50000GRANITEIRO H 14,075005,631.01.39 2,50000PEDREIRO H 11,625004,651.01.46 2,50000SERVENTE H 9,525003,812.05.81 1,60000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,560000,352.66.83 1,80000PERFIL CANTONEIRA DE FERRO DE 1/2" X 1/2" X 1/8" M 3,816002,122.66.84 0,45000PERFIL "T" DE FERRO 1/2" X 1/2" X 1/8" M 0,954002,122.66.90 5,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 0,800000,162.67.77 0,05000BUCHA TIPO S-8 (CENTO) UN 0,5555011,113.01.10 1,00000GS-04 JANELA SARRAF MACIÇA (130X125CM) C/BATENTE E GUARNICOES (G1-C1) UN 908,29000908,293.15.20 1,00000FECHADURA LATAO CROMADO P/PORTA DE CORRER UN 23,6900023,693.15.21 1,00000CONCHA LATAO CROMADO C/FURO P/CHAVE UN 3,540003,543.15.34 2,54000TRILHO PARA JANELA DE CORRER M 33,4010013,153.15.35 2,00000ROLDANA DUPLA DE FERRO RINCADO P/JANELA DE CORRER UN 11,360005,683.15.36 1,30000TRILHO CANALETA DE ALUMINIO "U" DE 1/2" M 4,511003,473.15.37 1,00000PIVOT RETO DE LATAO DE 1/2" UN 7,940007,943.50.38 1,34000GRANITO CINZA ANDORINHA E=3CM M2 399,32000298,00

LS 74,12110 BDI 352,73113Mão-de-Obra 60,75500 Material 1.398,73750SubMO 134,87610

05.05.088 BA-09 BALCAO DE ADENDIMENTO 2,10X0,50M (GRANITO) UN 1.886,46

1.01.06 3,92000AZULEJISTA H 20,736805,291.01.11 3,39000CARPINTEIRO H 15,424504,551.01.12 3,39000AJUDANTE DE CARPINTEIRO H 13,424403,961.01.21 1,24600FERREIRO H 5,943424,771.01.22 1,24600AJUDANTE DE FERREIRO H 4,759723,821.01.39 4,27000PEDREIRO H 19,855504,651.01.40 1,28400PINTOR H 6,047644,711.01.41 1,28400AJUDANTE DE PINTOR H 4,904883,821.01.46 7,47000SERVENTE H 28,460703,81

09/02/2011 11:38:40 Página: 46 de 0

Page 47: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,13300AREIA M3 10,5336079,202.05.05 9,42200CAL HIDRATADA KG 3,203480,342.05.08 63,01400CIMENTO KG 23,315180,372.05.18 0,11900PEDRA BRITADA 2 M3 7,2697161,092.05.81 3,90600ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,367100,352.10.09 3,91000PONTALETE PINHO DE 3"X3" M 14,779803,782.10.21 0,32200TABUAS PINHO DE 1"X12" DE 3A. M2 5,5319617,182.10.32 1,30200CHAPA COMPENSADA RESINADA E=12MM M2 15,7542012,102.15.38 14,39200ACO CA-60-B $MD BITOLAS KG 38,138802,652.30.10 4,00000ELEMENTO VAZADO "NEO-REX" N.16 (19X19X10)CM UN 10,480002,622.67.60 0,64400PREGO KG 2,943084,572.70.10 0,25200ARAME RECOZIDO N.18 KG 1,166764,632.75.30 0,16000TELA DE ACO INOX (MALHA 14 FIO 30) M2 7,6336047,713.11.75 1,00000PORTA DE ACO DE ENROLAR 2,10X1,35M (BA-09) UN 715,91000715,913.12.15 6,65000GRADIL DE FERRO (TIPO PMSP) KG 76,9405011,573.50.39 1,30200GRANITO CINZA ANDORINHA E=2CM M2 332,72610255,553.75.02 0,06000TINTA ESMALTE L 0,597609,96

LS 145,86022 BDI 352,75313Mão-de-Obra 119,55756 Material 1.268,29147SubMO 265,41778

05.05.089 BA-10 BALCÃO DE DISTRIB.DE GRANITO (L=350CM) UN 5.869,39

1.01.06 0,73100AZULEJISTA H 3,866995,291.01.11 6,42000CARPINTEIRO H 29,211004,551.01.12 6,42000AJUDANTE DE CARPINTEIRO H 25,423203,961.01.21 2,00000FERREIRO H 9,540004,771.01.22 2,00000AJUDANTE DE FERREIRO H 7,640003,821.01.39 2,85100PEDREIRO H 13,257154,651.01.40 11,97000PINTOR H 56,378704,711.01.41 10,39500AJUDANTE DE PINTOR H 39,708903,821.01.46 5,23500SERVENTE H 19,945353,812.05.03 0,06400AREIA M3 5,0688079,202.05.05 4,28100CAL HIDRATADA KG 1,455540,342.05.08 20,72800CIMENTO KG 7,669360,372.05.22 0,01800PEDRISCO M3 1,1898066,102.05.36 0,16400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 41,57236253,492.05.81 14,34000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 5,019000,352.05.96 0,60700ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,971201,602.10.09 9,63000PONTALETE PINHO DE 3"X3" M 36,401403,782.10.21 0,32100TABUAS PINHO DE 1"X12" DE 3A. M2 5,5147817,182.10.32 1,05900CHAPA COMPENSADA RESINADA E=12MM M2 12,8139012,102.15.25 23,00000ACO CA-50-A $MD BITOLAS KG 62,100002,702.25.75 10,00000BLOCO CONCR ESTRUTURAL 14X19X39CM UN 22,900002,292.67.60 0,64200PREGO KG 2,933944,572.70.10 0,40000ARAME RECOZIDO N.18 KG 1,852004,633.10.75 1,00000BA-10 PORTA BASCULANTE ACION.MANUAL (3,50X1,50) UN 3.491,250003.491,253.20.01 1,44900AZULEJO LISO BRANCO BRILHANTE M2 32,9647522,753.50.39 2,00000GRANITO CINZA ANDORINHA E=2CM M2 511,10000255,553.75.02 3,93800TINTA ESMALTE L 39,222489,963.80.66 2,36300FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 34,8306214,74

LS 250,06497 BDI 1.097,52923Mão-de-Obra 204,97129 Material 4.316,82993SubMO 455,03626

05.05.090 BA-11 BALCÃO DE DEVOLUÇÃO DE GRANITO (L=70CM) UN 811,38

1.01.11 0,49600CARPINTEIRO H 2,256804,551.01.12 0,49600AJUDANTE DE CARPINTEIRO H 1,964163,961.01.21 0,07200FERREIRO H 0,343444,771.01.22 0,07200AJUDANTE DE FERREIRO H 0,275043,821.01.39 1,20400PEDREIRO H 5,598604,651.01.40 2,39400PINTOR H 11,275744,711.01.41 2,07900AJUDANTE DE PINTOR H 7,941783,821.01.46 1,26400SERVENTE H 4,815843,812.05.35 0,00920CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 2,23661243,112.05.81 0,89400ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,312900,352.10.09 0,74400PONTALETE PINHO DE 3"X3" M 2,812323,782.10.21 0,02480TABUAS PINHO DE 1"X12" DE 3A. M2 0,4260617,182.10.32 0,24800CHAPA COMPENSADA RESINADA E=12MM M2 3,0008012,102.15.38 0,83000ACO CA-60-B $MD BITOLAS KG 2,199502,652.67.60 0,04960PREGO KG 0,226674,572.70.10 0,01500ARAME RECOZIDO N.18 KG 0,069454,633.10.76 1,00000BA-11 PORTA DE FERRO (0,70X1,50) UN 493,60000493,603.50.39 0,24000GRANITO CINZA ANDORINHA E=2CM M2 61,33200255,553.75.02 0,78750TINTA ESMALTE L 7,843509,963.75.50 0,47250FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 9,0767319,21

LS 42,05511 BDI 151,72250Mão-de-Obra 34,47140 Material 583,13654SubMO 76,52651

05.05.091 CC-01 CUBA INOX (60X50X30 CM) INCL VALV. AMERICANA - GRANITO UN 2.661,38

1.01.06 0,85000AZULEJISTA H 4,496505,291.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,09

09/02/2011 11:38:40 Página: 47 de 0

Page 48: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.21 0,23000FERREIRO H 1,097104,771.01.22 0,23000AJUDANTE DE FERREIRO H 0,878603,821.01.39 5,74000PEDREIRO H 26,691004,651.01.46 6,23000SERVENTE H 23,736303,812.05.03 0,22400AREIA M3 17,7408079,202.05.05 22,61000CAL HIDRATADA KG 7,687400,342.05.08 38,03000CIMENTO KG 14,071100,372.05.09 0,63000CIMENTO BRANCO KG 0,661501,052.05.18 0,02400PEDRA BRITADA 2 M3 1,4661661,092.25.15 78,00000TIJOLO COMUM MACICO UN 17,160000,222.66.90 6,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 0,960000,162.67.77 0,06000BUCHA TIPO S-8 (CENTO) UN 0,6666011,112.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.10.55 15,52000FIXACAO (FERRO TRABALHADO) KG 646,8736041,683.20.01 1,61000AZULEJO LISO BRANCO BRILHANTE M2 36,6275022,753.50.36 1,08000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 521,06760482,476.40.45 1,00000VALVULA AMERICANA P/PIA 3 1/2' UN 21,1300021,136.45.13 1,00000SIFAO METALICO TIPO COPO DN 1 1/2X2" UN 65,4900065,496.55.16 1,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 12,1900012,196.56.12 1,00000CUBA SIMPLES ACO INOX 304 CH 20 600X500X300MM UN 458,57000458,576.60.73 1,00000TORNEIRA MEC/CER 1/4 VOLTA TIPO PARED CROMADO 1/2" UN 183,87000183,87

LS 86,08869 BDI 497,65685Mão-de-Obra 70,56450 Material 2.007,07226SubMO 156,65319

05.05.093 CC-O3 CUBA INOX 50X40X25CM - TORNEIRA PAREDE UN 1.781,18

1.01.06 0,85000AZULEJISTA H 4,496505,291.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,091.01.21 0,23000FERREIRO H 1,097104,771.01.22 0,23000AJUDANTE DE FERREIRO H 0,878603,821.01.39 5,74000PEDREIRO H 26,691004,651.01.46 6,23000SERVENTE H 23,736303,812.05.03 0,20600AREIA M3 16,3152079,202.05.05 22,61000CAL HIDRATADA KG 7,687400,342.05.08 38,03000CIMENTO KG 14,071100,372.05.09 0,63000CIMENTO BRANCO KG 0,661501,052.05.18 0,02400PEDRA BRITADA 2 M3 1,4661661,092.25.15 78,00000TIJOLO COMUM MACICO UN 17,160000,222.66.90 6,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 0,960000,162.67.77 0,06000BUCHA TIPO S-8 (CENTO) UN 0,6666011,112.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.10.55 3,92000FIXACAO (FERRO TRABALHADO) KG 163,3856041,683.20.01 1,61000AZULEJO LISO BRANCO BRILHANTE M2 36,6275022,753.50.36 1,08000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 521,06760482,476.40.45 1,00000VALVULA AMERICANA P/PIA 3 1/2' UN 21,1300021,136.45.13 1,00000SIFAO METALICO TIPO COPO DN 1 1/2X2" UN 65,4900065,496.55.16 1,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 12,1900012,196.56.20 1,00000CUBA SIMPLES ACO INOX 304 CH.20 500X400X250MM UN 227,88000227,886.60.73 1,00000TORNEIRA MEC/CER 1/4 VOLTA TIPO PARED CROMADO 1/2" UN 183,87000183,87

LS 86,08869 BDI 333,06803Mão-de-Obra 70,56450 Material 1.291,46866SubMO 156,65319

05.05.094 CC-04 CUBA DUPLA INOX (102X40X25 CM) INCL VALV. AMERICANA - GRANITO UN 3.605,83

1.01.06 1,00000AZULEJISTA H 5,290005,291.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,091.01.21 0,27000FERREIRO H 1,287904,771.01.22 0,27000AJUDANTE DE FERREIRO H 1,031403,821.01.39 7,01000PEDREIRO H 32,596504,651.01.46 6,76000SERVENTE H 25,755603,812.05.03 0,28000AREIA M3 22,1760079,202.05.05 27,45000CAL HIDRATADA KG 9,333000,342.05.08 42,50000CIMENTO KG 15,725000,372.05.09 0,74000CIMENTO BRANCO KG 0,777001,052.05.18 0,02900PEDRA BRITADA 2 M3 1,7716161,092.25.15 78,00000TIJOLO COMUM MACICO UN 17,160000,222.66.90 6,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 0,960000,162.67.77 0,06000BUCHA TIPO S-8 (CENTO) UN 0,6666011,112.80.70 1,50000TRAVA QUIMICA GR 2,520001,683.10.55 15,52000FIXACAO (FERRO TRABALHADO) KG 646,8736041,683.20.01 1,94000AZULEJO LISO BRANCO BRILHANTE M2 44,1350022,753.50.36 1,47000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 709,23090482,476.40.45 2,00000VALVULA AMERICANA P/PIA 3 1/2' UN 42,2600021,136.45.13 2,00000SIFAO METALICO TIPO COPO DN 1 1/2X2" UN 130,9800065,496.55.16 1,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 12,1900012,196.56.13 1,00000CUBA DUPLA ACO INOX 304 CH.20 1020X400X250MM UN 489,68000489,686.60.71 1,00000MISTURADOR P/PIA 1/4 VOLTA TIPO PARED CROMADO 1/2" UN 394,16000394,166.60.73 1,00000TORNEIRA MEC/CER 1/4 VOLTA TIPO PARED CROMADO 1/2" UN 183,87000183,87

09/02/2011 11:38:40 Página: 48 de 0

Page 49: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 113,81551 BDI 674,26239Mão-de-Obra 93,29140 Material 2.724,46871SubMO 207,10691

05.05.095 CC-05 CUBA INOX (50X40X25CM) TORNEIRA DE MESA UN 2.410,04

1.01.06 0,85000AZULEJISTA H 4,496505,291.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,091.01.21 0,23000FERREIRO H 1,097104,771.01.22 0,23000AJUDANTE DE FERREIRO H 0,878603,821.01.39 5,74000PEDREIRO H 26,691004,651.01.46 6,23000SERVENTE H 23,736303,812.05.03 0,20600AREIA M3 16,3152079,202.05.05 22,61000CAL HIDRATADA KG 7,687400,342.05.08 38,03000CIMENTO KG 14,071100,372.05.09 0,63000CIMENTO BRANCO KG 0,661501,052.05.18 0,02400PEDRA BRITADA 2 M3 1,4661661,092.25.15 78,00000TIJOLO COMUM MACICO UN 17,160000,222.66.90 6,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 0,960000,162.67.77 0,06000BUCHA TIPO S-8 (CENTO) UN 0,6666011,112.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.10.55 15,52000FIXACAO (FERRO TRABALHADO) KG 646,8736041,683.20.01 1,61000AZULEJO LISO BRANCO BRILHANTE M2 36,6275022,753.50.36 1,08000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 521,06760482,476.40.45 1,00000VALVULA AMERICANA P/PIA 3 1/2' UN 21,1300021,136.45.13 1,00000SIFAO METALICO TIPO COPO DN 1 1/2X2" UN 65,4900065,496.55.16 1,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 12,1900012,196.56.20 1,00000CUBA SIMPLES ACO INOX 304 CH.20 500X400X250MM UN 227,88000227,886.60.74 1,00000TORNEIRA MEC/CER 1/4 VOLTA TIPO MESA CROMADO 1/2" UN 211,65000211,65

LS 86,08869 BDI 450,65967Mão-de-Obra 70,56450 Material 1.802,73666SubMO 156,65319

05.05.099 COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.06.010 BI-02 BRISE EM ALETAS DE CHAPA METALICA L=0,40M M 198,35

1.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,15000SERVENTE H 0,571503,812.66.90 1,11110PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 0,177780,162.68.10 0,01110BUCHA PLASTICA TIPO S-10 (CENTO) UN 0,027532,483.05.10 0,13890BRISE METALICO-VAO 1,80M-4 ALETAS MET CH 14-L=40CM UN 158,243211.139,26

LS 1,54818 BDI 37,09111Mão-de-Obra 1,26900 Material 158,44852SubMO 2,81718

05.06.022 REVESTIM INT DE ARMARIOS EMBUT-C/COMPENSADO CEDRO DE E=6MM M2 57,89

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,962.10.14 2,00000SARRAFO PINHO APARELHADO 5X2,5 CM M 4,180002,092.35.43 1,10000CHAPA COMPENSADA CEDRO E=6MM M2 23,5400021,402.67.60 0,10000PREGO KG 0,457004,57

LS 10,38220 BDI 10,82592Mão-de-Obra 8,51000 Material 28,17700SubMO 18,89220

05.06.051 CHAPA DE POLICARBONATO (LEXAN/POLYHARD) ESP=3MM M2 591,74

3.30.35 1,10000CHAPA POLICARBONATO E=3MM (LEXAN/POLYHARD) C/FIX M2 481,09600437,36

LS 0,00000 BDI 110,65208Mão-de-Obra 0,00000 Material 481,09600SubMO 0,00000

05.06.052 CHAPA DE POLICARBONATO COMPACTA E=4MM M2 239,42

1.01.44 1,97000SERRALHEIRO H 15,917608,081.01.45 1,97000AJUDANTE SERRALHEIRO H 8,549804,343.30.36 1,10000CHAPA DE POLICARBONATO COMPACTA E=4MM M2 140,33800127,58

LS 29,85023 BDI 44,77079Mão-de-Obra 24,46740 Material 140,33800SubMO 54,31763

05.06.053 CHAPA DE POLICARBONATO ALVEOLAR E=6MM M2 115,77

1.01.44 1,97000SERRALHEIRO H 15,917608,081.01.45 1,97000AJUDANTE SERRALHEIRO H 8,549804,343.30.37 1,10000CHAPA DE POLICARBONATO ALVEOLAR E=6MM M2 39,8090036,19

LS 29,85023 BDI 21,64912Mão-de-Obra 24,46740 Material 39,80900SubMO 54,31763

05.06.061 RP-02 REFORCO DE FECHADURAS PARA PORTAS (RP-02) UN 39,62

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,962.67.46 2,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,120000,062.68.41 4,00000PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES CJ 1,240000,313.15.60 1,00000REFORCO DE FECHADURA PARA PORTA (RP-02) UN 26,1300026,13

LS 2,59555 BDI 7,40900Mão-de-Obra 2,12750 Material 27,49000SubMO 4,72305

05.06.099 COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

09/02/2011 11:38:40 Página: 49 de 0

Page 50: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.50.015 DE QUADRO NEGRO TIPO GREEMBOARD INCLUINDO ENTARUGAMENTO M2 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

05.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.60.001 DE FOLHAS DE PORTAS OU JANELAS UN 6,21

1.01.11 0,50000CARPINTEIRO H 2,275004,55

LS 2,77550 BDI 1,16162Mão-de-Obra 2,27500 Material 0,00000SubMO 5,05050

05.60.005 DE BATENTES DE ESQUADRIAS DE MADEIRA UN 27,72

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 1,20000SERVENTE H 4,572003,81

LS 12,38544 BDI 5,18361Mão-de-Obra 10,15200 Material 0,00000SubMO 22,53744

05.60.010 DE GUARNICAO OU MOLDURAS M 0,86

1.01.11 0,07000CARPINTEIRO H 0,318504,55

LS 0,38857 BDI 0,16263Mão-de-Obra 0,31850 Material 0,00000SubMO 0,70707

05.60.017 DE PORTA GIZ, INCLUSIVE SUPORTES M 4,96

1.01.11 0,40000CARPINTEIRO H 1,820004,55

LS 2,22040 BDI 0,92929Mão-de-Obra 1,82000 Material 0,00000SubMO 4,04040

05.60.050 DE FECHADURAS DE EMBUTIR UN 6,21

1.01.11 0,50000CARPINTEIRO H 2,275004,55

LS 2,77550 BDI 1,16162Mão-de-Obra 2,27500 Material 0,00000SubMO 5,05050

05.60.055 DE CREMONA FECHO DE ALAVANCA DE EMBUTIR,TARJETAS E FECHAD SOBREPOR UN 2,48

1.01.11 0,20000CARPINTEIRO H 0,910004,55

LS 1,11020 BDI 0,46465Mão-de-Obra 0,91000 Material 0,00000SubMO 2,02020

05.60.060 DE DOBRADICAS UN 2,48

1.01.11 0,20000CARPINTEIRO H 0,910004,55

LS 1,11020 BDI 0,46465Mão-de-Obra 0,91000 Material 0,00000SubMO 2,02020

05.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.70.001 DE FOLHAS DE PORTA OU JANELA UN 51,12

1.01.11 2,20000CARPINTEIRO H 10,010004,551.01.12 2,20000AJUDANTE DE CARPINTEIRO H 8,712003,96

LS 22,84084 BDI 9,55945Mão-de-Obra 18,72200 Material 0,00000SubMO 41,56284

05.70.005 DE BATENTES DE ESQUADRIAS DE MADEIRA UN 31,15

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,20000PREGO KG 0,914004,57

LS 13,41756 BDI 5,82580Mão-de-Obra 10,99800 Material 0,91400SubMO 24,41556

05.70.010 DE GUARNICAO OU MOLDURAS M 1,16

1.01.11 0,05000CARPINTEIRO H 0,227504,551.01.12 0,05000AJUDANTE DE CARPINTEIRO H 0,198003,96

LS 0,51911 BDI 0,21726Mão-de-Obra 0,42550 Material 0,00000SubMO 0,94461

05.70.013 DE PORTA-GIZ, INCLUINDO SUPORTES M 12,33

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,50000AJUDANTE DE CARPINTEIRO H 1,980003,962.67.26 2,40000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,312000,132.67.77 0,02400BUCHA TIPO S-8 (CENTO) UN 0,2666411,11

LS 5,19110 BDI 2,30569Mão-de-Obra 4,25500 Material 0,57864SubMO 9,44610

05.70.015 DE FECHADURAS DE EMBUTIR UN 36,94

1.01.11 1,59000CARPINTEIRO H 7,234504,551.01.12 1,59000AJUDANTE DE CARPINTEIRO H 6,296403,96

LS 16,50770 BDI 6,90888Mão-de-Obra 13,53090 Material 0,00000SubMO 30,03860

05.70.016DE CREMONA,FECHOS DE ALAVANCA EMBUTIR,TARJETAS E FECHADURASSOBREPOR

UN 29,97

1.01.11 1,29000CARPINTEIRO H 5,869504,551.01.12 1,29000AJUDANTE DE CARPINTEIRO H 5,108403,96

09/02/2011 11:38:40 Página: 50 de 0

Page 51: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 13,39304 BDI 5,60532Mão-de-Obra 10,97790 Material 0,00000SubMO 24,37094

05.70.017 DE DOBRADICAS UN 3,95

1.01.11 0,17000CARPINTEIRO H 0,773504,551.01.12 0,17000AJUDANTE DE CARPINTEIRO H 0,673203,96

LS 1,76497 BDI 0,73869Mão-de-Obra 1,44670 Material 0,00000SubMO 3,21167

05.70.099 RECOLOCACAO DE ELEM DE MADEIRA/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.80.001 PORTA MADEIRA COMPENS LISA P/ PINTURA M2 87,57

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,963.02.23 0,60000PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1 UN 46,6380077,73

LS 13,49686 BDI 16,37551Mão-de-Obra 11,06300 Material 46,63800SubMO 24,55986

05.80.002 PORTA MADEIRA COMPENS LISA COM VISOR M2 258,06

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,963.01.72 0,60000PORTA MADEIRA COMPENS LISA P/PINT C/VISOR 82X210CM G1-C1 UN 185,25000308,75

LS 13,49686 BDI 48,25627Mão-de-Obra 11,06300 Material 185,25000SubMO 24,55986

05.80.003 PORTA MADEIRA ALMOFADADA M2 181,98

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,963.01.73 0,60000PORTA MADEIRA ALMOFADADA 82X210CM G1-C1 UN 123,39600205,66

LS 13,49686 BDI 34,02985Mão-de-Obra 11,06300 Material 123,39600SubMO 24,55986

05.80.004 PORTA MADEIRA MACHO-FEMEA M2 232,78

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,963.01.69 0,60000PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1 FL 164,70000274,50

LS 13,49686 BDI 43,52977Mão-de-Obra 11,06300 Material 164,70000SubMO 24,55986

05.80.005 PORTA TIPO VENEZIANA M2 374,05

1.01.11 0,77000CARPINTEIRO H 3,503504,551.01.12 0,77000AJUDANTE DE CARPINTEIRO H 3,049203,963.01.79 1,00000PORTA VENEZIANA MADEIRA 82X210CM G1-C1 UN 289,56000289,56

LS 7,99429 BDI 69,94461Mão-de-Obra 6,55270 Material 289,56000SubMO 14,54699

05.80.006 FOLHA DE PORTA LISA DE 22 MM PARA ARMARIOS M2 249,59

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,963.01.80 1,00000FOLHA PORTA MADEIRA LISA P/ARMARIO 22MM G1-C1 UN 184,03000184,03

LS 10,38220 BDI 46,67211Mão-de-Obra 8,51000 Material 184,03000SubMO 18,89220

05.80.011 JANELA MADEIRA GUILHOTINA: FOLHA M2 144,71

1.01.11 0,64000CARPINTEIRO H 2,912004,551.01.12 0,64000AJUDANTE DE CARPINTEIRO H 2,534403,963.01.06 1,00000JANELA MADEIRA GUILHOTINA: FOLHA G1-C1 M2 105,56000105,56

LS 6,64461 BDI 27,05973Mão-de-Obra 5,44640 Material 105,56000SubMO 12,09101

05.80.015 BANDEIRA P/ PORTA MADEIRA COMPENS LISA P/ PINTURA M2 78,75

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,963.03.08 1,00000BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1 M2 45,1400045,14

LS 10,38220 BDI 14,72741Mão-de-Obra 8,51000 Material 45,14000SubMO 18,89220

05.80.020 BATENTE DE MADEIRA PARA PORTAS DE 1 FL SEM BANDEIRA CJ 107,63

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,20000PREGO KG 0,914004,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,18

LS 13,41756 BDI 20,12720Mão-de-Obra 10,99800 Material 63,09400SubMO 24,41556

05.80.021 BATENTE DE MADEIRA PARA PORTAS DE 1 FOLHA COM BANDEIRA CJ 108,03

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,812.67.60 0,27000PREGO KG 1,233904,573.01.35 1,00000BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1 UN 62,1800062,18

LS 13,41756 BDI 20,20078Mão-de-Obra 10,99800 Material 63,41390SubMO 24,41556

05.80.022 BATENTE DE MADEIRA PARA PORTA DE 2 FLS SEM BANDEIRA CJ 178,29

1.01.39 2,00000PEDREIRO H 9,300004,65

09/02/2011 11:38:40 Página: 51 de 0

Page 52: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 2,00000SERVENTE H 7,620003,812.67.60 0,30000PREGO KG 1,371004,573.01.37 1,00000BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1 UN 106,02000106,02

LS 20,64240 BDI 33,33928Mão-de-Obra 16,92000 Material 107,39100SubMO 37,56240

05.80.023 BATENTE DE MADEIRA PARA PORTAS DE 2 FLS COM BANDEIRA CJ 178,79

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.67.60 0,39000PREGO KG 1,782304,573.01.37 1,00000BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1 UN 106,02000106,02

LS 20,64240 BDI 33,43388Mão-de-Obra 16,92000 Material 107,80230SubMO 37,56240

05.80.025 BATENTE DE MADEIRA PARA PORTAS DE BOX SANITARIO CJ 111,23

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,813.01.36 1,00000BATENTE MADEIRA 3,5X3,5CM VAO 60X210CM G1-C1 UN 66,0200066,02

LS 13,41756 BDI 20,80018Mão-de-Obra 10,99800 Material 66,02000SubMO 24,41556

05.80.026 BATENTE DE MADEIRA PARA ARMARIO M 43,94

1.01.39 0,70000PEDREIRO H 3,255004,651.01.46 0,70000SERVENTE H 2,667003,813.01.33 1,00000BATENTE MADEIRA 3,5X3,5CM P/ARMARIO G1-C1 M 22,5800022,58

LS 7,22484 BDI 8,21717Mão-de-Obra 5,92200 Material 22,58000SubMO 13,14684

05.80.028 BATENTE DE MADEIRA PARA JANELAS M 26,12

1.01.39 0,42000PEDREIRO H 1,953004,651.01.46 0,42000SERVENTE H 1,600203,812.67.60 0,04000PREGO KG 0,182804,573.01.39 1,00000BATENTE MADEIRA PARA JANELA G1-C1 M 13,1700013,17

LS 4,33490 BDI 4,88541Mão-de-Obra 3,55320 Material 13,35280SubMO 7,88810

05.80.030 BATENTE METALICO - PERFIL CHAPA 14 DOBRADA 57X30X42 MM M 44,22

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,813.13.08 1,00000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 30,3200030,32

LS 3,09636 BDI 8,26950Mão-de-Obra 2,53800 Material 30,32000SubMO 5,63436

05.80.033 BATENTE METALICO EM PERFIL CHAPA 16 ZINC DOBRADA 57X30X42 MM M 44,22

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,813.13.08 1,00000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 30,3200030,32

LS 3,09636 BDI 8,26950Mão-de-Obra 2,53800 Material 30,32000SubMO 5,63436

05.80.034 BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 49,99

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,813.13.12 1,00000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 35,0100035,01

LS 3,09636 BDI 9,34820Mão-de-Obra 2,53800 Material 35,01000SubMO 5,63436

05.80.035 GUARNICAO DE 5 CM PARA PORTA DE 1 FOLHA CJ 14,68

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,963.01.50 0,50000GUARNICAO 5CM - CEDRINHO UN 6,2700012,54

LS 3,11466 BDI 2,74566Mão-de-Obra 2,55300 Material 6,27000SubMO 5,66766

05.80.036 GUARNICAO DE 5 CM PARA PORTA DE 2 FOLHAS CJ 20,95

1.01.11 0,57000CARPINTEIRO H 2,593504,551.01.12 0,57000AJUDANTE DE CARPINTEIRO H 2,257203,963.01.50 0,50000GUARNICAO 5CM - CEDRINHO UN 6,2700012,54

LS 5,91785 BDI 3,91887Mão-de-Obra 4,85070 Material 6,27000SubMO 10,76855

05.80.037 GUARNICAO MADEIRA DE 5,0CM M 5,78

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,963.01.52 1,10000GUARNICAO PEROBA 5CM M 2,816002,56

LS 1,03822 BDI 1,08220Mão-de-Obra 0,85100 Material 2,81600SubMO 1,88922

05.80.038 GUARNICAO MADEIRA DE 7,0CM M 6,86

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,963.01.55 1,10000GUARNICAO PEROBA 7,0CM M 3,696003,36

LS 1,03822 BDI 1,28460Mão-de-Obra 0,85100 Material 3,69600SubMO 1,88922

05.80.039 GUARNICAO MADEIRA DE 10,0CM M 10,71

1.01.11 0,10000CARPINTEIRO H 0,455004,55

09/02/2011 11:38:40 Página: 52 de 0

Page 53: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,963.01.53 1,10000GUARNICAO PEROBA 10CM M 6,820006,20

LS 1,03822 BDI 2,00312Mão-de-Obra 0,85100 Material 6,82000SubMO 1,88922

05.80.040 GUARNICAO MADEIRA DE 15,0CM M 15,89

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,963.01.54 1,10000GUARNICAO PEROBA 15CM M 11,0330010,03

LS 1,03822 BDI 2,97211Mão-de-Obra 0,85100 Material 11,03300SubMO 1,88922

05.80.041 PORTA GIZ, INCLUSIVE SUPORTES M 98,55

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,50000AJUDANTE DE CARPINTEIRO H 1,980003,962.66.78 0,35800FERRO CANTONEIRA 1X1X1/8' KG 0,952282,662.67.26 2,40000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,312000,132.67.77 0,02400BUCHA TIPO S-8 (CENTO) UN 0,2666411,113.12.72 1,00000PORTA GIZ EM CEDRINHO ENCERADO M 69,1500069,15

LS 5,19110 BDI 18,42922Mão-de-Obra 4,25500 Material 70,68092SubMO 9,44610

05.80.042 LG-01 LOUSA QUADRICULADA L=4.61M UN 1.022,40

1.01.11 7,50000CARPINTEIRO H 34,125004,551.01.12 7,50000AJUDANTE DE CARPINTEIRO H 29,700003,962.10.29 5,50000CHAPA COMPENSADA VIROLINHA E=10MM M2 82,1150014,932.11.22 20,00000SARRAFO CEDRINHO APARELHADO 5X2,5CM M 56,200002,812.11.24 7,10000SARRAFO EM CEDRINHO APAR. 2X5CM - ABAULADO M 16,259002,292.66.78 6,00000FERRO CANTONEIRA 1X1X1/8' KG 15,960002,662.67.20 52,00000PARAFUSO P/ MADEIRA 3,2X40MM UN 1,560000,032.67.24 31,00000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 8,680000,282.67.60 1,10000PREGO KG 5,027004,572.67.77 0,31000BUCHA TIPO S-8 (CENTO) UN 3,4441011,113.12.72 4,61000PORTA GIZ EM CEDRINHO ENCERADO M 318,7815069,153.40.51 5,50000CHAPA LAMINADO GREENBOARD QUADRIC (5X5CM) E=1MM M2 168,5200030,643.90.75 0,78300COLA PARA CHAPAS MELAMINICAS KG 12,9821416,58

LS 77,86650 BDI 191,18066Mão-de-Obra 63,82500 Material 689,52874SubMO 141,69150

05.80.043 CHAPA GREENBOARD DE 1,3 MM DE ESPESSURA M2 72,38

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,963.40.50 1,00000CHAPA LAMINADO GREENBOARD E=1,3MM M2 28,8100028,813.90.75 0,90000COLA PARA CHAPAS MELAMINICAS KG 14,9220016,58

LS 8,30576 BDI 13,53453Mão-de-Obra 6,80800 Material 43,73200SubMO 15,11376

05.80.044 LG-02 LOUSA QUADRICULADA L=2.55M UN 535,77

1.01.11 2,92000CARPINTEIRO H 13,286004,551.01.12 2,92000AJUDANTE DE CARPINTEIRO H 11,563203,962.10.29 3,17000CHAPA COMPENSADA VIROLINHA E=10MM M2 47,3281014,932.11.22 8,80000SARRAFO CEDRINHO APARELHADO 5X2,5CM M 24,728002,812.11.24 5,03000SARRAFO EM CEDRINHO APAR. 2X5CM - ABAULADO M 11,518702,292.66.78 3,60000FERRO CANTONEIRA 1X1X1/8' KG 9,576002,662.67.20 30,00000PARAFUSO P/ MADEIRA 3,2X40MM UN 0,900000,032.67.24 15,00000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 4,200000,282.67.60 0,63000PREGO KG 2,879104,572.67.77 0,15000BUCHA TIPO S-8 (CENTO) UN 1,6665011,113.12.72 2,50000PORTA GIZ EM CEDRINHO ENCERADO M 172,8750069,153.40.51 3,17000CHAPA LAMINADO GREENBOARD QUADRIC (5X5CM) E=1MM M2 97,1288030,643.90.75 0,46000COLA PARA CHAPAS MELAMINICAS KG 7,6268016,58

LS 30,31602 BDI 100,18621Mão-de-Obra 24,84920 Material 380,42700SubMO 55,16522

05.80.045 LG-03 LOUSA EM ARGAMASSA L=4.61M UN 857,13

1.01.39 7,32000PEDREIRO H 34,038004,651.01.40 3,66000PINTOR H 17,238604,711.01.41 3,10000AJUDANTE DE PINTOR H 11,842003,821.01.46 9,29000SERVENTE H 35,394903,812.05.03 0,13510AREIA M3 10,6999279,202.05.05 26,91000CAL HIDRATADA KG 9,149400,342.05.08 25,90000CIMENTO KG 9,583000,372.10.14 11,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 24,662002,092.11.24 11,80000SARRAFO EM CEDRINHO APAR. 2X5CM - ABAULADO M 27,022002,292.65.97 12,00000PARAFUSO P/ MADEIRA 3,2X20MM - CABECA REDONDA UN 0,240000,022.66.78 6,00000FERRO CANTONEIRA 1X1X1/8' KG 15,960002,662.67.20 12,00000PARAFUSO P/ MADEIRA 3,2X40MM UN 0,360000,032.67.24 10,00000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 2,800000,282.67.77 0,12000BUCHA TIPO S-8 (CENTO) UN 1,3332011,113.12.72 4,61000PORTA GIZ EM CEDRINHO ENCERADO M 318,7815069,153.75.30 1,13000TINTA ESMALTE SINTETICO VERDE ESCOLAR L 14,6448012,963.80.16 3,38000MASSA PARA MADEIRA L 29,473608,723.80.39 2,82000LIXA PARA MADEIRA UN 0,930600,33

09/02/2011 11:38:40 Página: 53 de 0

Page 54: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.80.57 1,13000PREPERADOR LIQUIDO BASE DE OLEO L 12,5204011,08

LS 120,18647 BDI 160,27789Mão-de-Obra 98,51350 Material 478,16042SubMO 218,69997

05.80.046 ALCAPAO DE MADEIRA M2 190,15

1.01.39 2,78000PEDREIRO H 12,927004,651.01.46 2,78000SERVENTE H 10,591803,813.12.90 2,78000ALCAPAO MADEIRA,REQUADRO 60X60CM UN 102,3874036,83

LS 28,69294 BDI 35,55780Mão-de-Obra 23,51880 Material 102,38740SubMO 52,21174

05.80.047 QUADRO NEGRO EM MASSA - COMPLETO M2 152,17

1.01.11 0,75000CARPINTEIRO H 3,412504,551.01.12 0,75000AJUDANTE DE CARPINTEIRO H 2,970003,961.01.39 0,90000PEDREIRO H 4,185004,651.01.40 1,00000PINTOR H 4,710004,711.01.41 0,55000AJUDANTE DE PINTOR H 2,101003,821.01.46 1,12000SERVENTE H 4,267203,812.05.03 0,02000AREIA M3 1,5840079,202.05.05 5,11000CAL HIDRATADA KG 1,737400,342.05.08 3,39000CIMENTO KG 1,254300,372.65.97 2,00000PARAFUSO P/ MADEIRA 3,2X20MM - CABECA REDONDA UN 0,040000,022.66.78 1,00000FERRO CANTONEIRA 1X1X1/8' KG 2,660002,662.67.20 2,00000PARAFUSO P/ MADEIRA 3,2X40MM UN 0,060000,032.67.77 0,02000BUCHA TIPO S-8 (CENTO) UN 0,2222011,113.12.72 0,80000PORTA GIZ EM CEDRINHO ENCERADO M 55,3200069,153.61.06 1,20000CORDAO MEIA CANA 1X1 CM M 4,224003,523.80.16 0,50000MASSA PARA MADEIRA L 4,360008,723.80.34 0,20000TINTA A OLEO L 1,826009,133.80.40 0,25000LIXA D"AGUA UN 0,162500,653.80.57 0,20000PREPERADOR LIQUIDO BASE DE OLEO L 2,2160011,08

LS 26,40775 BDI 28,45557Mão-de-Obra 21,64570 Material 75,66640SubMO 48,05345

05.80.048 FP-01 FAIXA DE PROTEÇÃO EM MDF M 56,64

1.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,20000PINTOR H 0,942004,711.01.46 0,20000SERVENTE H 0,762003,812.67.35 3,70000PARAFUSO P/ MADEIRA 6,1 X 65 MM UN 0,370000,102.67.78 0,03700BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,027380,743.01.58 1,00000FP-01 TABUA MDF REV LAMINADO,CANTO ARRED(290X15MM) M 39,0000039,003.80.39 0,20000LIXA PARA MADEIRA UN 0,066000,333.80.51 0,05000SELADORA PARA MADEIRA L 0,7420014,84

LS 3,21348 BDI 10,59216Mão-de-Obra 2,63400 Material 40,20538SubMO 5,84748

05.80.049 FP-02 FAIXA DE EXPOSIÇÃO EM MDF M 82,88

1.01.39 0,30000PEDREIRO H 1,395004,651.01.40 0,40000PINTOR H 1,884004,711.01.46 0,30000SERVENTE H 1,143003,812.10.50 2,00000SARRAFO DE PINHO APARELHADO 2,5 X 7,5 CM M 8,000004,002.67.35 3,70000PARAFUSO P/ MADEIRA 6,1 X 65 MM UN 0,370000,102.67.78 0,03700BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,027380,743.01.59 2,00000FP-02 TABUA MDF REV LAMINADO,CANTOS ARRED(90X15MM) M 44,2600022,133.80.39 0,50000LIXA PARA MADEIRA UN 0,165000,333.80.50 0,30000VERNIZ SINTETICO BRILHANTE L 3,2610010,873.80.51 0,10000SELADORA PARA MADEIRA L 1,4840014,84

LS 5,39484 BDI 15,49837Mão-de-Obra 4,42200 Material 57,56738SubMO 9,81684

05.80.070 FECHADURA COMPLETA, CILINDRICA DE EMBUTIR JG 156,94

1.01.11 1,59000CARPINTEIRO H 7,234504,551.01.12 1,59000AJUDANTE DE CARPINTEIRO H 6,296403,963.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 16,50770 BDI 29,34768Mão-de-Obra 13,53090 Material 97,56000SubMO 30,03860

05.80.071 FECHADURA COMPLETA, TIPO GORGE DE EMBUTIR JG 89,57

1.01.11 1,59000CARPINTEIRO H 7,234504,551.01.12 1,59000AJUDANTE DE CARPINTEIRO H 6,296403,963.16.72 1,00000FECHAD GORGES COMPL (FECHAD.ROSETA ENTRADA MACAN) UN 42,7900042,79

LS 16,50770 BDI 16,75058Mão-de-Obra 13,53090 Material 42,79000SubMO 30,03860

05.80.072 FECHADURA COMPL TIPO TARGETA DE SOBREPOR C/VISOR "LIVRE-OCUPADO" JG 70,78

1.01.11 1,29000CARPINTEIRO H 5,869504,551.01.12 1,29000AJUDANTE DE CARPINTEIRO H 5,108403,963.17.15 1,00000TARGETA DE SOBREPOR LIVRE-OCUP UN 33,1800033,18

LS 13,39304 BDI 13,23672Mão-de-Obra 10,97790 Material 33,18000SubMO 24,37094

05.80.073 FECHADURA DE SOBREPOR CILINDRICA PARA PORTOES UN 107,82

1.01.44 1,30000SERRALHEIRO H 10,504008,081.01.45 1,30000AJUDANTE SERRALHEIRO H 5,642004,34

09/02/2011 11:38:40 Página: 54 de 0

Page 55: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.15.88 1,00000FECHADURA DE SOBREPOR CILINDRICA PARA PORTOES UN 51,8200051,82

LS 19,69812 BDI 20,16275Mão-de-Obra 16,14600 Material 51,82000SubMO 35,84412

05.80.080 DOBRADICA DE 3 1/2" X 3" CROMADO, COM EIXO E BOLA DE LATAO UN 14,62

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,963.15.33 1,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 7,170007,17

LS 2,59555 BDI 2,73540Mão-de-Obra 2,12750 Material 7,17000SubMO 4,72305

05.80.081 DOBRADICA DE 3 1/2" X 3" EM ACO LAMINADO UN 9,33

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,963.16.52 1,00000DOBRADICA DE FERRO POL PINO E BOLAS FERRO 3 1/2X3" UN 2,870002,87

LS 2,59555 BDI 1,74640Mão-de-Obra 2,12750 Material 2,87000SubMO 4,72305

05.80.082 DOBRADICA FERRO CROMADO COM PINO E BOLAS DE FERRO 3" X 2 1/2" UN 13,54

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,963.16.44 1,00000DOBRADICA DE ACO CROMADO C/ PINOS BOLAS 3"X2 1/2" UN 6,290006,29

LS 2,59555 BDI 2,53300Mão-de-Obra 2,12750 Material 6,29000SubMO 4,72305

05.80.083 DOBRADICA DE 3" X 2 1/2" EM ACO LAMINADO UN 13,54

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,963.16.44 1,00000DOBRADICA DE ACO CROMADO C/ PINOS BOLAS 3"X2 1/2" UN 6,290006,29

LS 2,59555 BDI 2,53300Mão-de-Obra 2,12750 Material 6,29000SubMO 4,72305

05.80.086 CREMONA COMPLETO JG 116,56

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,963.16.30 1,00000CREMONA C/VARETA DE FERRO P/PINTURA UN 87,2100087,21

LS 4,15288 BDI 21,79638Mão-de-Obra 3,40400 Material 87,21000SubMO 7,55688

05.80.087 VARETA PARA CREMONA M 22,36

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,963.16.94 1,00000VARETA P/CREMONA M 10,6300010,63

LS 4,15288 BDI 4,18298Mão-de-Obra 3,40400 Material 10,63000SubMO 7,55688

05.80.090 BORBOLETA PARA JANELAS PR 11,04

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,963.16.10 1,00000BORBOLETA DE ZAMACK P/ JANELA UN 4,260004,26

LS 2,59555 BDI 2,06610Mão-de-Obra 2,12750 Material 4,26000SubMO 4,72305

05.80.091 FECHO TIPO UNHO DE EMBUTIR DE 10 CM UN 13,87

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,963.16.88 1,00000FECHO UNHO 10 CM DE EMBUTIR - ACO CROMADO UN 5,610005,61

LS 3,11466 BDI 2,59386Mão-de-Obra 2,55300 Material 5,61000SubMO 5,66766

05.80.092 FECHO TIPO UNHO DE EMBUTIR DE 22 CM UN 49,55

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,963.16.89 1,00000FECHO UNHO 22CM DE EMBUTIR - LATAO CROMADO UN 34,6200034,62

LS 3,11466 BDI 9,26616Mão-de-Obra 2,55300 Material 34,62000SubMO 5,66766

05.80.093 FECHO TIPO UNHO DE EMBUTIR DE 40 CM UN 109,38

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,963.16.90 1,00000FECHO UNHO 40 CM DE EMBUTIR - LATAO CROMADO UN 83,2600083,26

LS 3,11466 BDI 20,45336Mão-de-Obra 2,55300 Material 83,26000SubMO 5,66766

05.80.094 DOBRADICA FERRO CROM C/ PINO BOLAS ANEIS FERRO 3 1/2"X3" UN 12,76

1.01.11 0,17000CARPINTEIRO H 0,773504,551.01.12 0,17000AJUDANTE DE CARPINTEIRO H 0,673203,963.15.33 1,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 7,170007,17

LS 1,76497 BDI 2,38779Mão-de-Obra 1,44670 Material 7,17000SubMO 3,21167

05.80.095 FECHADURA CILINDRICA COMPLETO (FECHAD ROSETA MACAN) UN 156,94

1.01.11 1,59000CARPINTEIRO H 7,234504,551.01.12 1,59000AJUDANTE DE CARPINTEIRO H 6,296403,963.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 16,50770 BDI 29,34768Mão-de-Obra 13,53090 Material 97,56000SubMO 30,03860

09/02/2011 11:38:40 Página: 55 de 0

Page 56: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

05.80.099 SERVICOS DE ELEMENTOS DE MADEIRA/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.81.001 PORTA MADEIRA COMPENS LISA P/ VERNIZ 72X210CM UN 149,14

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.02.19 1,00000PORTA MADEIRA COMPENS LISA P/ VERNIZ 72X210CM G1-C1 UN 77,8000077,80

LS 23,87906 BDI 27,88797Mão-de-Obra 19,57300 Material 77,80000SubMO 43,45206

05.81.002 PORTA MADEIRA COMPENS LISA P/ VERNIZ 82X210CM UN 149,14

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.02.17 1,00000PORTA MADEIRA COMPENS LISA P/ VERNIZ 82X210CM G1-C1 UN 77,8000077,80

LS 23,87906 BDI 27,88797Mão-de-Obra 19,57300 Material 77,80000SubMO 43,45206

05.81.003 PORTA MADEIRA COMPENS LISA P/ VERNIZ 92X210CM UN 157,73

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.02.18 1,00000PORTA MADEIRA COMPENS LISA P/ VERNIZ 92X210CM G1-C1 UN 84,7900084,79

LS 23,87906 BDI 29,49567Mão-de-Obra 19,57300 Material 84,79000SubMO 43,45206

05.81.005 PORTA MADEIRA COMPENS LISA P/ PINTURA 72X210CM UN 149,05

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.02.22 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1 UN 77,7300077,73

LS 23,87906 BDI 27,87187Mão-de-Obra 19,57300 Material 77,73000SubMO 43,45206

05.81.006 PORTA MADEIRA COMPENS LISA P/ PINTURA 82X210CM UN 149,05

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.02.23 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1 UN 77,7300077,73

LS 23,87906 BDI 27,87187Mão-de-Obra 19,57300 Material 77,73000SubMO 43,45206

05.81.007 PORTA COMPENS LISA MADEIRA P/ PINTURA 92X210CM UN 157,70

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.02.24 1,00000PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1 UN 84,7600084,76

LS 23,87906 BDI 29,48877Mão-de-Obra 19,57300 Material 84,76000SubMO 43,45206

05.81.025 PORTA MADEIRA MACHO-FEMEA 72X210CM UN 391,08

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.01.67 1,00000PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1 FL 274,50000274,50

LS 23,87906 BDI 73,12897Mão-de-Obra 19,57300 Material 274,50000SubMO 43,45206

05.81.026 PORTA MADEIRA MACHO-FEMEA 82X210CM UN 391,08

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.01.69 1,00000PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1 FL 274,50000274,50

LS 23,87906 BDI 73,12897Mão-de-Obra 19,57300 Material 274,50000SubMO 43,45206

05.81.027 PORTA MADEIRA MACHO-FEMEA 92X210CM UN 383,31

1.01.11 2,30000CARPINTEIRO H 10,465004,551.01.12 2,30000AJUDANTE DE CARPINTEIRO H 9,108003,963.01.68 1,00000PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1 FL 268,19000268,19

LS 23,87906 BDI 71,67767Mão-de-Obra 19,57300 Material 268,19000SubMO 43,45206

05.81.032 PORTA DE ARMARIO SOB PIA TIPO VENEZIANA - DE ABRIR M2 505,14

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,963.03.38 1,00000PORTA VENEZIANA MADEIRA P/ PIA G1-C1 M2 320,24000320,243.16.47 4,00000DOBRADICA 2 1/2' X 2' LATAO CROMADO UN 42,8000010,703.17.45 2,00000PUXADOR TIPO BOTAO CONVEXO 30 MM - ZAMACK UN 1,020000,513.17.58 4,00000FECHO DE PRESSAO ESFERA LATAO CROMADO 12 MM UN 8,840002,21

LS 20,76440 BDI 94,45741Mão-de-Obra 17,02000 Material 372,90000SubMO 37,78440

05.81.033 PORTA DE ARMARIO SOB PIA TIPO VENEZIANA - DE CORRER M2 480,81

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,963.03.38 1,00000PORTA VENEZIANA MADEIRA P/ PIA G1-C1 M2 320,24000320,243.15.98 2,00000ROLDANA EM ZAMACK E NYLON (RODIZIO NAPOLEAO) 6 MM UN 15,140007,573.17.18 1,00000TRILHO ALUMUMINIO - 6 MM M 2,640002,643.17.47 2,00000PUXADOR TIPO CONCHA 40 X 100 MM - LATAO LAMINADO UN 15,100007,55

09/02/2011 11:38:40 Página: 56 de 0

Page 57: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 20,76440 BDI 89,90801Mão-de-Obra 17,02000 Material 353,12000SubMO 37,78440

05.81.034 PORTA DE ARMARIO SOB PIA REVEST LAMINADO FENOL-MELAMINICO - DE ABRIR M2 419,55

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,963.03.36 1,00000PORTA P/ PIA REVEST LAM FENOL-MEL M2 250,66000250,663.16.47 4,00000DOBRADICA 2 1/2' X 2' LATAO CROMADO UN 42,8000010,703.17.45 2,00000PUXADOR TIPO BOTAO CONVEXO 30 MM - ZAMACK UN 1,020000,513.17.58 4,00000FECHO DE PRESSAO ESFERA LATAO CROMADO 12 MM UN 8,840002,21

LS 20,76440 BDI 78,45401Mão-de-Obra 17,02000 Material 303,32000SubMO 37,78440

05.81.035 PORTA DE ARMARIO SOB PIA REVEST LAMINADO FENOL-MELAMINICO - DE CORRER M2 395,22

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,963.03.36 1,00000PORTA P/ PIA REVEST LAM FENOL-MEL M2 250,66000250,663.15.98 2,00000ROLDANA EM ZAMACK E NYLON (RODIZIO NAPOLEAO) 6 MM UN 15,140007,573.17.18 1,00000TRILHO ALUMUMINIO - 6 MM M 2,640002,643.17.47 2,00000PUXADOR TIPO CONCHA 40 X 100 MM - LATAO LAMINADO UN 15,100007,55

LS 20,76440 BDI 73,90461Mão-de-Obra 17,02000 Material 283,54000SubMO 37,78440

05.81.047 FECHADURAS E FECHOS PARA PORTAS INT WC - TARGETA LATAO LIVRE-OCUPADO CJ 61,72

1.01.11 0,90000CARPINTEIRO H 4,095004,551.01.12 0,90000AJUDANTE DE CARPINTEIRO H 3,564003,963.17.15 1,00000TARGETA DE SOBREPOR LIVRE-OCUP UN 33,1800033,18

LS 9,34398 BDI 11,54209Mão-de-Obra 7,65900 Material 33,18000SubMO 17,00298

05.81.048 ESPELHOS RET 200 X 50 MM PESO MINIMO 170 G PR 42,57

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,966.57.22 1,00000ESPELHO RET 200X50MM PESO MINIMO 170G PR 29,8900029,89

LS 2,59555 BDI 7,96100Mão-de-Obra 2,12750 Material 29,89000SubMO 4,72305

05.81.053 FECHOS DE EMBUTIR DE ALAVANCA DE 22 CM UN 51,87

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,963.16.89 1,00000FECHO UNHO 22CM DE EMBUTIR - LATAO CROMADO UN 34,6200034,62

LS 4,15288 BDI 9,70068Mão-de-Obra 3,40400 Material 34,62000SubMO 7,55688

05.81.055 JM-01 JANELA VENEZIANA UN 491,43

1.01.11 0,46000CARPINTEIRO H 2,093004,551.01.39 1,44000PEDREIRO H 6,696004,651.01.46 1,44000SERVENTE H 5,486403,812.05.03 0,00700AREIA M3 0,5544079,202.05.05 1,14000CAL HIDRATADA KG 0,387600,342.05.08 0,86000CIMENTO KG 0,318200,372.67.10 2,00000JM-01 GRAPA PARA FIXACAO UN 4,600002,303.01.07 1,00000JANELA MADEIRA GUILHOTINA C/VENEZ 120X120CM (JM-01) G1-C1 CJ 304,13000304,133.01.57 1,00000GUARNICAO IMBUIA P/ JANELA 120X120CM (JM-01) CJ 16,7400016,743.17.22 2,00000CARRANCA EM LATAO FUNDIDO UN 41,1200020,56

LS 17,41599 BDI 91,89457Mão-de-Obra 14,27540 Material 367,85020SubMO 31,69139

05.81.056 CHAPA LAMINADO MELAMINICO ACAB TEXTURIZADO E=1MM M2 52,64

1.01.48 0,80000MARCENEIRO H 5,664007,081.01.59 0,80000AJUDANTE MARCENEIRO H 3,320004,153.55.80 1,00000CHAPA LAMINADO MELAMINICO ACAB TEXTURIZADO E=1MM M2 17,8800017,883.90.75 0,30000COLA PARA CHAPAS MELAMINICAS KG 4,9740016,58

LS 10,96048 BDI 9,84365Mão-de-Obra 8,98400 Material 22,85400SubMO 19,94448

05.81.057 JANELAS DE MADEIRA TIPO GUILHOTINA - COM VENEZIANAS M2 389,36

1.01.11 2,88000CARPINTEIRO H 13,104004,551.01.12 2,88000AJUDANTE DE CARPINTEIRO H 11,404803,961.01.39 1,28000PEDREIRO H 5,952004,651.01.46 1,28000SERVENTE H 4,876803,812.67.60 0,13000PREGO KG 0,594104,573.02.30 1,00000JANELA MADEIRA GUILHOTINA C/ VENEZIANA G1-C1 M2 211,20000211,203.17.22 1,28000CARRANCA EM LATAO FUNDIDO UN 26,3168020,56

LS 43,11187 BDI 72,80889Mão-de-Obra 35,33760 Material 238,11090SubMO 78,44947

05.81.060 FERRAGEM PORTAS EXTERNAS 1 FOLHA - COM DOBRAD DE FERRO POLIDO CJ 245,22

1.01.11 2,10000CARPINTEIRO H 9,555004,551.01.12 2,10000AJUDANTE DE CARPINTEIRO H 8,316003,963.15.16 1,00000MACANETA ALAVANCA MACICA CROMADA BORDAS ARREDOND PR 15,5400015,543.16.52 3,00000DOBRADICA DE FERRO POL PINO E BOLAS FERRO 3 1/2X3" UN 8,610002,873.17.51 1,00000FECHADURA EMBUTIR CIL. DIAM. 3 CM UN 105,66000105,666.57.22 1,00000ESPELHO RET 200X50MM PESO MINIMO 170G PR 29,8900029,89

09/02/2011 11:38:40 Página: 57 de 0

Page 58: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 21,80262 BDI 45,85593Mão-de-Obra 17,87100 Material 159,70000SubMO 39,67362

05.81.065 FERRAGEM PORTINHOLAS ARMARIO SOB PIA - COM 2 FOLHAS DE CORRER CJ 75,29

1.01.11 1,50000CARPINTEIRO H 6,825004,551.01.12 1,50000AJUDANTE DE CARPINTEIRO H 5,940003,963.15.98 2,00000ROLDANA EM ZAMACK E NYLON (RODIZIO NAPOLEAO) 6 MM UN 15,140007,573.17.18 1,00000TRILHO ALUMUMINIO - 6 MM M 2,640002,643.17.47 2,00000PUXADOR TIPO CONCHA 40 X 100 MM - LATAO LAMINADO UN 15,100007,55

LS 15,57330 BDI 14,08021Mão-de-Obra 12,76500 Material 32,88000SubMO 28,33830

05.81.070 CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 25 MM UN 12,61

1.01.11 0,05000CARPINTEIRO H 0,227504,553.17.23 1,00000CADEADO LATAO CIL. TRAVA DUPLA 25 MM UN 9,750009,75

LS 0,27755 BDI 2,35866Mão-de-Obra 0,22750 Material 9,75000SubMO 0,50505

05.81.071 CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 35 MM UN 18,59

1.01.11 0,05000CARPINTEIRO H 0,227504,553.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,61

LS 0,27755 BDI 3,47646Mão-de-Obra 0,22750 Material 14,61000SubMO 0,50505

05.81.072 CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 45 MM UN 24,38

1.01.11 0,05000CARPINTEIRO H 0,227504,553.17.27 1,00000CADEADO LATAO CIL. TRAVA DUPLA 45 MM UN 19,3200019,32

LS 0,27755 BDI 4,55976Mão-de-Obra 0,22750 Material 19,32000SubMO 0,50505

05.81.073 CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 50 MM UN 29,23

1.01.11 0,05000CARPINTEIRO H 0,227504,553.17.28 1,00000CADEADO LATAO CIL. TRAVA DUPLA 50 MM UN 23,2600023,26

LS 0,27755 BDI 5,46596Mão-de-Obra 0,22750 Material 23,26000SubMO 0,50505

05.81.076 CADEADO DE LATAO C/ CILINDRO-TRAVA DUPLA DE 30MM - PESO MIN 110G UN 14,39

1.01.11 0,05000CARPINTEIRO H 0,227504,553.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,20

LS 0,27755 BDI 2,69216Mão-de-Obra 0,22750 Material 11,20000SubMO 0,50505

05.81.080 PORTA CADEADO EM FERRO PINTADO - DE 60MM - PESO MIN 25G UN 5,47

1.01.11 0,30000CARPINTEIRO H 1,365004,553.16.12 1,00000PORTA CADEADO 63 MM - ACO ZINCADO UN 1,420001,42

LS 1,66530 BDI 1,02357Mão-de-Obra 1,36500 Material 1,42000SubMO 3,03030

05.81.081 PORTA CADEADO EM FERRO PINTADO - DE 90MM - PESO MIN 115G UN 8,81

1.01.11 0,30000CARPINTEIRO H 1,365004,553.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,14

LS 1,66530 BDI 1,64917Mão-de-Obra 1,36500 Material 4,14000SubMO 3,03030

05.81.082 PORTA CADEADO EM FERRO PINTADO - DE 110MM - PESO MIN 135G UN 8,10

1.01.11 0,30000CARPINTEIRO H 1,365004,553.16.15 1,00000PORTA CADEADO 114 MM - ACO ZINCADO UN 3,560003,56

LS 1,66530 BDI 1,51577Mão-de-Obra 1,36500 Material 3,56000SubMO 3,03030

05.81.099 RECOLOCACOES DE ELEM DE MADEIRA/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

05.82.001 BL-01 BANCADA LATERAL PARA LABORATORIO (PARTE CIVIL) M 244,41

1.01.06 1,27000AZULEJISTA H 6,718305,291.01.11 1,43000CARPINTEIRO H 6,506504,551.01.12 1,43000AJUDANTE DE CARPINTEIRO H 5,662803,961.01.21 0,25000FERREIRO H 1,192504,771.01.22 0,25000AJUDANTE DE FERREIRO H 0,955003,821.01.28 1,05000LADRILHISTA H 5,302505,051.01.39 1,82000PEDREIRO H 8,463004,651.01.46 4,16000SERVENTE H 15,849603,812.05.03 0,05700AREIA M3 4,5144079,202.05.05 5,56000CAL HIDRATADA KG 1,890400,342.05.08 20,63000CIMENTO KG 7,633100,372.05.09 1,87000CIMENTO BRANCO KG 1,963501,052.05.17 0,03000PEDRA BRITADA 1 M3 1,8579061,932.10.21 0,07000TABUAS PINHO DE 1"X12" DE 3A. M2 1,2026017,182.10.32 0,24000CHAPA COMPENSADA RESINADA E=12MM M2 2,9040012,102.15.38 2,89000ACO CA-60-B $MD BITOLAS KG 7,658502,652.25.15 49,00000TIJOLO COMUM MACICO UN 10,780000,223.20.01 0,70000AZULEJO LISO BRANCO BRILHANTE M2 15,9250022,753.45.30 1,03000LADRILHO CERAMICO 7.5X15CM VERMELHO M2 29,1387028,293.60.35 0,31000RODAPE CERAMICO VERMELHO 7.5X1 5CM M 0,802902,59

09/02/2011 11:38:40 Página: 58 de 0

Page 59: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 61,79324 BDI 45,70432Mão-de-Obra 50,65020 Material 86,27100SubMO 112,44344

05.82.002 BL-02 BANCADA LATERAL PARA LABORATORIO (PARTE CIVIL EXCETO PORTAS) M 269,56

1.01.06 1,05000AZULEJISTA H 5,554505,291.01.11 1,80000CARPINTEIRO H 8,190004,551.01.12 1,80000AJUDANTE DE CARPINTEIRO H 7,128003,961.01.21 0,34000FERREIRO H 1,621804,771.01.22 0,34000AJUDANTE DE FERREIRO H 1,298803,821.01.28 1,38000LADRILHISTA H 6,969005,051.01.39 1,91000PEDREIRO H 8,881504,651.01.46 4,01000SERVENTE H 15,278103,812.05.03 0,10400AREIA M3 8,2368079,202.05.05 7,56000CAL HIDRATADA KG 2,570400,342.05.08 25,10000CIMENTO KG 9,287000,372.05.09 0,15000CIMENTO BRANCO KG 0,157501,052.05.17 0,04000PEDRA BRITADA 1 M3 2,4772061,932.10.21 0,30000TABUAS PINHO DE 1"X12" DE 3A. M2 5,1540017,182.10.32 0,09000CHAPA COMPENSADA RESINADA E=12MM M2 1,0890012,102.15.38 0,18000ACO CA-60-B $MD BITOLAS KG 0,477002,652.25.15 61,00000TIJOLO COMUM MACICO UN 13,420000,222.67.60 0,68000PREGO KG 3,107604,572.70.10 3,89000ARAME RECOZIDO N.18 KG 18,010704,633.20.01 0,66000AZULEJO LISO BRANCO BRILHANTE M2 15,0150022,753.45.30 0,55000LADRILHO CERAMICO 7.5X15CM VERMELHO M2 15,5595028,293.60.35 1,03000RODAPE CERAMICO VERMELHO 7.5X1 5CM M 2,667702,59

LS 67,00447 BDI 50,40578Mão-de-Obra 54,92170 Material 97,22940SubMO 121,92617

05.82.008 BS-03 BANCADA LIVRE COZINHA - GRANITO (PARTE CIVIL EXCETO PORTAS) M 626,04

1.01.06 2,34000AZULEJISTA H 12,378605,291.01.28 1,13000LADRILHISTA H 5,706505,051.01.39 2,51000PEDREIRO H 11,671504,651.01.46 4,78000SERVENTE H 18,211803,812.05.03 0,08400AREIA M3 6,6528079,202.05.05 10,86000CAL HIDRATADA KG 3,692400,342.05.08 11,68000CIMENTO KG 4,321600,372.05.09 0,29000CIMENTO BRANCO KG 0,304501,052.25.15 70,00000TIJOLO COMUM MACICO UN 15,400000,223.20.01 1,28000AZULEJO LISO BRANCO BRILHANTE M2 29,1200022,753.45.30 1,03000LADRILHO CERAMICO 7.5X15CM VERMELHO M2 29,1387028,293.50.38 1,05000GRANITO CINZA ANDORINHA E=3CM M2 312,90000298,003.60.35 0,37000RODAPE CERAMICO VERMELHO 7.5X1 5CM M 0,958302,59

LS 58,52145 BDI 117,06497Mão-de-Obra 47,96840 Material 402,48830SubMO 106,48985

05.82.010 TAMPO DE PIA EM GRANITO E=2CM M 213,55

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.05.03 0,02000AREIA M3 1,5840079,202.05.08 0,80000CIMENTO KG 0,296000,373.50.39 0,65000GRANITO CINZA ANDORINHA E=2CM M2 166,10750255,55

LS 3,09636 BDI 39,93303Mão-de-Obra 2,53800 Material 167,98750SubMO 5,63436

05.82.099 SERVICOS DE ELEMENTOS DE MADEIRA/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.01.001 EF-01 ESQUADRIA DE FERRO 90X60CM UN 242,77

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,813.12.18 1,00000EF-01 ESQUADRIA DE FERRO 90X60CM UN 187,99000187,99

LS 5,16060 BDI 45,39754Mão-de-Obra 4,23000 Material 187,99000SubMO 9,39060

06.01.002 EF-02 ESQUADRIA DE FERRO 90X120CM UN 474,32

1.01.39 0,95000PEDREIRO H 4,417504,651.01.46 0,95000SERVENTE H 3,619503,813.12.19 1,00000EF-02 ESQUADRIA DE FERRO 90X120CM UN 367,79000367,79

LS 9,80514 BDI 88,69539Mão-de-Obra 8,03700 Material 367,79000SubMO 17,84214

06.01.003 EF-03 ESQUADRIA DE FERRO 90X150CM UN 590,71

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 1,20000SERVENTE H 4,572003,813.13.55 1,00000EF-03 ESQUADRIA DE FERRO 90X150CM UN 457,72000457,72

LS 12,38544 BDI 110,45921Mão-de-Obra 10,15200 Material 457,72000SubMO 22,53744

06.01.004 EF-04 ESQUADRIA DE FERRO 180X60CM UN 451,97

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,81

09/02/2011 11:38:40 Página: 59 de 0

Page 60: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.12.11 1,00000EF-04 ESQUADRIA DE FERRO 180X60CM UN 346,80000346,80

LS 11,35332 BDI 84,51564Mão-de-Obra 9,30600 Material 346,80000SubMO 20,65932

06.01.005 EF-05 ESQUADRIA DE FERRO 180X120CM UN 978,14

1.01.39 2,10000PEDREIRO H 9,765004,651.01.46 2,10000SERVENTE H 8,001003,813.12.12 1,00000EF-05 ESQUADRIA DE FERRO 180X120CM UN 755,80000755,80

LS 21,67452 BDI 182,90532Mão-de-Obra 17,76600 Material 755,80000SubMO 39,44052

06.01.006 EF-06 ESQUADRIA DE FERRO 180X150CM UN 1.109,33

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 2,60000SERVENTE H 9,906003,813.12.13 1,00000EF-06 ESQUADRIA DE FERRO180X150CM UN 853,07000853,07

LS 26,83512 BDI 207,43726Mão-de-Obra 21,99600 Material 853,07000SubMO 48,83112

06.01.013 EF-13 ESQUADRIA DE FERRO 90X90CM UN 374,85

1.01.39 0,81000PEDREIRO H 3,766504,651.01.46 0,81000SERVENTE H 3,086103,813.10.71 1,00000EF-13 ESQUADRIA DE FERRO 90X90CM UN 289,55000289,55

LS 8,36017 BDI 70,09544Mão-de-Obra 6,85260 Material 289,55000SubMO 15,21277

06.01.014 EF-14 ESQUADRIA DE FERRO 180X90CM UN 769,08

1.01.39 1,62000PEDREIRO H 7,533004,651.01.46 1,62000SERVENTE H 6,172203,813.10.70 1,00000EF-14 ESQUADRIA DE FERRO 180X90CM UN 594,85000594,85

LS 16,72034 BDI 143,81338Mão-de-Obra 13,70520 Material 594,85000SubMO 30,42554

06.01.015 EF-15 ESQUADRIA DE FERRO / VENTILACAO CRUZADA H=30 A 45CM M2 319,30

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.13.60 1,00000EF-15 ESQUADRIA DE FERRO / VENT. CRUZ. L=180CM M2 240,82000240,82

LS 10,32120 BDI 59,70828Mão-de-Obra 8,46000 Material 240,82000SubMO 18,78120

06.01.016 EF-16 ESQUADRIA DE FERRO FIXA L=90CM UN 1.098,97

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.10.88 1,00000EF-16 ESQUADRIA DE FERRO FIXA L=90CM UN 799,57000799,57

LS 51,60600 BDI 205,49948Mão-de-Obra 42,30000 Material 799,57000SubMO 93,90600

06.01.017 EF-17 ESQUADRIA DE FERRO FIXA L=180CM UN 1.868,25

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.10.89 1,00000EF-17 ESQUADRIA DE FERRO FIXA L=180CM UN 1.425,000001.425,00

LS 51,60600 BDI 349,34838Mão-de-Obra 42,30000 Material 1.425,00000SubMO 93,90600

06.01.019 EF-18 ESQUADRIA DE FERRO / VENTILACAO PERMANENTE L=90X60CM UN 227,13

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,813.13.67 1,00000EF-18 ESQUADRIA DE FERRO / VENT. PERM. 90X60CM UN 175,27000175,27

LS 5,16060 BDI 42,47194Mão-de-Obra 4,23000 Material 175,27000SubMO 9,39060

06.01.020 EF-19 ESQUADRIA DE FERRO VENTILACAO PERMANENTE L=180X60CM UN 456,56

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,813.13.68 1,00000EF-19 ESQUADRIA DE FERRO / VENT. PERM. 180X60CM UN 350,53000350,53

LS 11,35332 BDI 85,37354Mão-de-Obra 9,30600 Material 350,53000SubMO 20,65932

06.01.022 EF-20 ESQUADRIA DE FERRO 180X180CM UN 1.388,57

1.01.39 3,10000PEDREIRO H 14,415004,651.01.46 3,10000SERVENTE H 11,811003,813.12.20 1,00000EF-20 ESQUADRIA DE FERRO 180X180CM UN 1.070,700001.070,70

LS 31,99572 BDI 259,65200Mão-de-Obra 26,22600 Material 1.070,70000SubMO 58,22172

06.01.023 EF-21 ESQUADRIA DE FERRO 180X210CM UN 1.632,25

1.01.39 3,85000PEDREIRO H 17,902504,651.01.46 3,85000SERVENTE H 14,668503,813.12.27 1,00000EF-21 ESQUADRIA DE FERRO 180X210CM UN 1.254,730001.254,73

LS 39,73662 BDI 305,21865Mão-de-Obra 32,57100 Material 1.254,73000SubMO 72,30762

06.01.024 EF-22 ESQUADRIA DE FERRO COM BASCULANTE L=90CM UN 1.186,74

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.10.83 1,00000EF-22 ESQUADRIA DE FERRO C/BASCULANTE L=90CM UN 870,93000870,93

LS 51,60600 BDI 221,91228Mão-de-Obra 42,30000 Material 870,93000SubMO 93,90600

09/02/2011 11:38:40 Página: 60 de 0

Page 61: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

06.01.025 CAIXILHOS DE FERRO -BASCULANTES M2 387,68

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.12.44 1,00000CAIXILHO DE FERRO BASCULANTE M2 296,41000296,41

LS 10,32120 BDI 72,49398Mão-de-Obra 8,46000 Material 296,41000SubMO 18,78120

06.01.026 CAIXILHOS DE FERRO -FIXOS M2 329,92

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.12.45 1,00000CAIXILHO DE FERRO FIXO M2 249,45000249,45

LS 10,32120 BDI 61,69318Mão-de-Obra 8,46000 Material 249,45000SubMO 18,78120

06.01.027 CAIXILHOS DE FERRO -FIXO COM VENTILACAO PERMANENTE M2 422,32

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.12.46 1,00000CAIXILHO DE FERRO FIXO C/VENT PERMANENTE M2 324,57000324,57

LS 10,32120 BDI 78,97078Mão-de-Obra 8,46000 Material 324,57000SubMO 18,78120

06.01.028 EF-23 ESQUADRIA DE FERRO COM BASCULANTE L=180CM UN 2.246,72

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.10.84 1,00000EF-23 ESQUADRIA DE FERRO C/BASCULANTE L=180CM UN 1.732,700001.732,70

LS 51,60600 BDI 420,11938Mão-de-Obra 42,30000 Material 1.732,70000SubMO 93,90600

06.01.040 EF-24 ESQ FERRO VENEZIANA DA CAIXA DO ELEVADOR (0.80X0.40M) UN 170,05

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,813.10.23 1,00000EF-24 ESQ. FERRO VENEZ. P/ ELEVADOR (0.80X0.40M) UN 117,60000117,60

LS 11,35332 BDI 31,79964Mão-de-Obra 9,30600 Material 117,60000SubMO 20,65932

06.01.041 EF-25 ESQ DE FERRO VENTILACAO CRUZADA (H=60 A 80CM) M2 272,29

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.12.61 1,00000EF-25 ESQ FERRO /VENTILACAO CRUZADA (H=60 A 80CM) M2 202,60000202,60

LS 10,32120 BDI 50,91768Mão-de-Obra 8,46000 Material 202,60000SubMO 18,78120

06.01.042 EF-26 ESQ DE FERRO VENTILACAO CRUZADA (180X65CM) UN 340,29

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,813.12.62 1,00000EF-26 ESQ FERRO / VENTILACAO CRUZADA (180X65CM) UN 256,00000256,00

LS 11,35332 BDI 63,63164Mão-de-Obra 9,30600 Material 256,00000SubMO 20,65932

06.01.043 EF-27 ESQ DE FERRO VENTILACAO CRUZADA (180X75CM) UN 355,05

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,813.12.63 1,00000EF-27 ESQ FERRO / VENTILACAO CRUZADA (180X75CM) UN 268,00000268,00

LS 11,35332 BDI 66,39164Mão-de-Obra 9,30600 Material 268,00000SubMO 20,65932

06.01.049 EV-01 ESQUADRIA VENEZIANA DE ACO (1,20X2,00 M) UN 774,54

1.01.39 2,10000PEDREIRO H 9,765004,651.01.46 2,10000SERVENTE H 8,001003,813.13.59 1,00000EV-01 / ESQUADRIA VENEZIANA DE ACO (1,20X2,00M) UN 590,27000590,27

LS 21,67452 BDI 144,83342Mão-de-Obra 17,76600 Material 590,27000SubMO 39,44052

06.01.062 EA-13 JANELA DE ALUMINIO - 1,80 X 1,50 M UN 1.449,97

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 2,60000SERVENTE H 9,906003,813.11.21 1,00000(EA-13) JANELA DE ALUMINIO UN 1.130,010001.130,01

LS 26,83512 BDI 271,13346Mão-de-Obra 21,99600 Material 1.130,01000SubMO 48,83112

06.01.063 EA-14 JANELA DE ALUMINIO - 1,80 X 1,20 M UN 1.139,81

1.01.39 2,10000PEDREIRO H 9,765004,651.01.46 2,10000SERVENTE H 8,001003,813.11.19 1,00000(EA-14) JANELA DE ALUMINIO UN 887,24000887,24

LS 21,67452 BDI 213,13652Mão-de-Obra 17,76600 Material 887,24000SubMO 39,44052

06.01.064 EA-15 JANELA DE ALUMINIO - 1,80 X 0,60 M UN 621,77

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,813.11.20 1,00000(EA-15) JANELA DE ALUMINIO UN 484,85000484,85

LS 11,35332 BDI 116,26714Mão-de-Obra 9,30600 Material 484,85000SubMO 20,65932

06.01.065 EA-16 JANELA DE ALUMINIO (0,90X0,90M) UN 444,32

1.01.39 0,81000PEDREIRO H 3,766504,651.01.46 0,81000SERVENTE H 3,086103,81

09/02/2011 11:38:40 Página: 61 de 0

Page 62: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.11.22 1,00000EA-16 JANELA DE ALUMINIO 0.90X0.90M UN 346,03000346,03

LS 8,36017 BDI 83,08584Mão-de-Obra 6,85260 Material 346,03000SubMO 15,21277

06.01.066 EA - 17 JANELA DE ALUMINIO (1,80 X0,90 M) UN 901,16

1.01.39 1,62000PEDREIRO H 7,533004,651.01.46 1,62000SERVENTE H 6,172203,813.11.23 1,00000EA-17 JANELA DE ALUMINIO 1.80X0.90M UN 702,23000702,23

LS 16,72034 BDI 168,51078Mão-de-Obra 13,70520 Material 702,23000SubMO 30,42554

06.01.067 EA-18 JANELA DE ALUMINIO (VENTILACAO CRUZADA) L= 180 CM M2 559,99

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 1,50000SERVENTE H 5,715003,813.13.34 1,00000EA-18 / JANELA DE ALUMINIO VENTILACAO CRUZADA M2 427,11000427,11

LS 15,48180 BDI 104,71481Mão-de-Obra 12,69000 Material 427,11000SubMO 28,17180

06.01.072 CAIXILHOS DE ALUMINIO -BASCULANTES M2 568,90

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 1,50000SERVENTE H 5,715003,813.11.53 1,00000CAIXILHO ALUMINIO BASCULANTES M2 434,35000434,35

LS 15,48180 BDI 106,38001Mão-de-Obra 12,69000 Material 434,35000SubMO 28,17180

06.01.075 CAIXILHOS DE ALUMINIO -FIXO M2 569,45

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 1,50000SERVENTE H 5,715003,813.11.55 1,00000CAIXILHO ALUMINIO FIXO M2 434,80000434,80

LS 15,48180 BDI 106,48351Mão-de-Obra 12,69000 Material 434,80000SubMO 28,17180

06.01.080 VENEZIANA INDUSTRIAL -ALETAS PVC MONTANTES ACO GALVANIZADO REF 100 M2 141,21

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.92 1,00000VENEZIANA IND.ALETAS PVC MONT ACO GALV (REF 100) M2 96,0300096,03

LS 10,32120 BDI 26,40658Mão-de-Obra 8,46000 Material 96,03000SubMO 18,78120

06.01.081 VENEZIANA INDUSTRIAL-ALETAS FIBRA DE VIDRO MONTANTES ACO GALV REF 100 M2 181,36

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.93 1,00000VENEZIANA IND.ALETAS FIBRA VIDRO MONT GALV REF 100 M2 128,67000128,67

LS 10,32120 BDI 33,91378Mão-de-Obra 8,46000 Material 128,67000SubMO 18,78120

06.01.082 VENEZIANA INDUSTRIAL-ALETAS PVC MONTANTES ACO PRE-PINTADO REF 100 M2 166,11

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.94 1,00000VENEZIANA IND.ALETAS PVC MONT ACO PRE-PINT REF 100 M2 116,27000116,27

LS 10,32120 BDI 31,06178Mão-de-Obra 8,46000 Material 116,27000SubMO 18,78120

06.01.083 VENEZIANA INDUSTRIAL-ALETAS FIBRA VIDRO MONTANTES ACO PRE-PINT REF 100 M2 215,76

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.95 1,00000VENEZIANA IND.ALETAS FIBRA VIDRO MONT ACO PRE R100 M2 156,64000156,64

LS 10,32120 BDI 40,34688Mão-de-Obra 8,46000 Material 156,64000SubMO 18,78120

06.01.084 VENEZIANA INDUSTRIAL-ALETAS PVC MONTANTE ALUMINIO ANODIZADO REF 100 M2 201,74

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.96 1,00000VENEZIANA IND.ALETAS PVC MONT ALUM ANOD (REF 100) M2 145,24000145,24

LS 10,32120 BDI 37,72488Mão-de-Obra 8,46000 Material 145,24000SubMO 18,78120

06.01.085 VENEZIANA INDUSTRIAL-ALETAS FIBRA VIDRO MONTANTES ALUM ANODIZ REF 100 M2 213,84

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.97 1,00000VENEZIANA IND.ALETAS FIBRA VIDRO MONT ALUM REF 100 M2 155,08000155,08

LS 10,32120 BDI 39,98808Mão-de-Obra 8,46000 Material 155,08000SubMO 18,78120

06.01.086 VENEZIANA INDUSTRIAL-ALETAS PVC/MONTANTES ACO GALVANIZADO/REF.50 M2 185,55

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.98 1,00000VENEZIANA IND.ALETAS PVC MONT ACO GALV(REF 50) M2 132,08000132,08

LS 10,32120 BDI 34,69808Mão-de-Obra 8,46000 Material 132,08000SubMO 18,78120

06.01.087 VENEZIANA INDUSTRIAL-ALETAS PVC/MONTANTES ALUM. ANODIZADO/REF.50 M2 227,82

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.10.99 1,00000VENEZIANA IND.ALETAS PVC MONT ALUM ANOD (REF 50) M2 166,44000166,44

LS 10,32120 BDI 42,60088Mão-de-Obra 8,46000 Material 166,44000SubMO 18,78120

09/02/2011 11:38:40 Página: 62 de 0

Page 63: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

06.01.099 SERVICOS EM ELEMENTOS METALICOS/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.02.001 PC-01 PORTA CORTA-FOGO P90 L=90CM COMPLETA UN 1.239,62

1.01.39 4,50000PEDREIRO H 20,925004,651.01.46 4,50000SERVENTE H 17,145003,812.05.03 0,01800AREIA M3 1,4256079,202.05.08 8,70000CIMENTO KG 3,219000,372.05.17 0,01940PEDRA BRITADA 1 M3 1,2014461,933.13.02 1,00000PORTA CORTA-FOGO CLASSE P90 L=90CM UN 434,83000434,833.15.45 1,00000BP-01 BARRA ANTIPANICO SIMPLES UN 476,18000476,183.87.40 1,00000ADESIVO PARA PORTA CORTA FOGO (APERTE E EMPURRE) UN 6,450006,45

LS 46,44540 BDI 231,79893Mão-de-Obra 38,07000 Material 923,30604SubMO 84,51540

06.02.010 PF-11 PORTA/JANELA DE FERRO 180X260CM UN 3.068,39

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,813.12.28 1,00000PF-11 PORTA/JANELA DE FERRO 180X260CM UN 1.988,480001.988,483.13.08 7,00000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 212,2400030,323.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.15.94 2,00000TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM UN 8,660004,333.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 61,92720 BDI 573,76426Mão-de-Obra 50,76000 Material 2.381,94000SubMO 112,68720

06.02.013 PF-20 PORTA DE FERRO COM BANDEIRA L=180CM UN 3.039,05

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,813.10.68 1,00000PF-20 PORTA DE FERRO COM BANDEIRA L=180CM UN 2.176,870002.176,873.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.15.94 2,00000TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM UN 8,660004,333.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 61,92720 BDI 568,27876Mão-de-Obra 50,76000 Material 2.358,09000SubMO 112,68720

06.02.015 PF-15 PORTA EM CHAPA DE FERRO (L=82 CM) UN 1.263,56

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.13.08 5,02000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 152,2064030,323.13.62 1,00000PF-15 / PORTA EM CHAPA DE FERRO - L=82 CM UN 662,11000662,113.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 236,27725Mão-de-Obra 42,30000 Material 933,38640SubMO 93,90600

06.02.016 PF-16 PORTA EM CHAPA DE FERRO (L=92 CM) UN 1.366,67

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.13.08 5,12000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 155,2384030,323.13.63 1,00000PF-16 / PORTA EM CHAPA DE FERRO - L=92 CM UN 742,90000742,903.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 255,55631Mão-de-Obra 42,30000 Material 1.017,20840SubMO 93,90600

06.02.017 PF-17 PORTA EM CHAPA DE FERRO L=102CM UN 1.488,33

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.13.08 5,22000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 158,2704030,323.13.64 1,00000PF-17 / PORTA EM CHAPA DE FERRO - L=102 CM UN 838,78000838,783.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 278,30607Mão-de-Obra 42,30000 Material 1.116,12040SubMO 93,90600

06.02.019 PF-19 PORTA DE FERRO P/ RESERVATORIO - GALVANIZADA 1.499,13

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.10.17 1,00000PF-19 PORTA DE FERRO P/ RESERVATORIO - GALVANIZADA UN 854,79000854,793.13.12 4,26000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 149,1426035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,56

LS 51,60600 BDI 280,32660Mão-de-Obra 42,30000 Material 1.124,90532SubMO 93,90600

06.02.020 PORTA DE FERRO M2 655,70

1.01.39 1,28210PEDREIRO H 5,961774,651.01.46 1,28210SERVENTE H 4,884803,81

09/02/2011 11:38:40 Página: 63 de 0

Page 64: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.12.28 0,21370PF-11 PORTA/JANELA DE FERRO 180X260CM UN 424,938181.988,483.13.08 1,49570BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 45,3496230,323.15.33 1,28210DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 9,192667,173.15.94 0,42740TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM UN 1,850644,333.16.86 0,42740FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 6,8341315,993.17.53 0,21370CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 20,8485797,56

LS 13,23281 BDI 122,61143Mão-de-Obra 10,84657 Material 509,01380SubMO 24,07938

06.02.024 PORTA EM CHAPA DE AÇO M2 1.187,20

1.01.39 2,90700PEDREIRO H 13,517554,651.01.46 2,90700SERVENTE H 11,075673,813.11.70 0,58140PF-24 PORTA EM CHAPA DE FERRO GALV. L=82CM UN 737,250081.268,063.13.12 2,92000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 102,2292035,013.15.33 1,74420DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 12,505917,173.17.53 0,58140CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 56,7213897,563.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,56

LS 30,00373 BDI 221,99744Mão-de-Obra 24,59322 Material 910,60930SubMO 54,59695

06.02.025 PAINEL FIXO EM CH.PERFURADA (E=1,5MM D=1/2" AA 45%) M2 380,37

1.01.39 0,86770PEDREIRO H 4,034814,651.01.46 0,86770SERVENTE H 3,305943,813.11.31 1,00000PAINEL CH.PERF. (E=1,5 1/2" AA 45%) COM REQUADRO M2 234,00000234,003.13.08 1,94440BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 58,9542130,32

LS 8,95571 BDI 71,12765Mão-de-Obra 7,34074 Material 292,95421SubMO 16,29645

06.02.026 PF-23 PORTA DE FERRO C/ BANDEIRA EM CHAPA PERFURADA L=140CM UN 2.083,23

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.11.74 1,00000PF-23 PORTA DE FERRO C/ BAND. CHAPA PERF. L=140CM UN 1.257,430001.257,433.13.08 5,60000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 169,7920030,323.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 389,54824Mão-de-Obra 42,30000 Material 1.599,78200SubMO 93,90600

06.02.028 PF-21 PORTA DE FERRO COM BANDEIRA EM CHAPA PERFURADA L=102CM UN 1.637,55

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.11.73 1,00000PF-21 PORTA DE FERRO C/ BAND. CHAPA PERF. L=102CM UN 960,10000960,103.13.08 5,22000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 158,2704030,323.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 306,20967Mão-de-Obra 42,30000 Material 1.237,44040SubMO 93,90600

06.02.029 PF-22 PORTA DE FERRO C/ BANDEIRA EM CHAPA PERFURADA L=82CM UN 1.371,71

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.11.72 1,00000PF-22 PORTA DE FERRO C/ BANDEIRA, CH PERF L=82CM UN 748,82000748,823.13.08 5,06000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 153,4192030,323.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 256,49950Mão-de-Obra 42,30000 Material 1.021,30920SubMO 93,90600

06.02.043 PF-24 PORTA EM CHAPA DE FERRO GALVANIZADO L=82CM UN 2.040,18

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.11.70 1,00000PF-24 PORTA EM CHAPA DE FERRO GALV. L=82CM UN 1.268,060001.268,063.13.12 5,02000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 175,7502035,013.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,56

LS 51,60600 BDI 381,49845Mão-de-Obra 42,30000 Material 1.564,78292SubMO 93,90600

06.02.044 PF-25 PORTA EM CHAPA DE FERRO GALVANIZADO L=140CM UN 2.893,74

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,813.11.71 1,00000PF-25 PORTA EM CHAPA DE FERRO GALV. L=140CM UN 1.758,160001.758,163.13.12 5,60000BATENTE METALICO EM PERFIL DE CHAPA ZINCADA M 196,0560035,013.15.10 1,00000MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2) UN 111,27000111,273.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,56

LS 61,92720 BDI 541,10626Mão-de-Obra 50,76000 Material 2.239,94872SubMO 112,68720

06.02.045 PF-26 PORTA DE FERRO PARA HALL ELEVADOR L=90CM UN 2.088,34

09/02/2011 11:38:40 Página: 64 de 0

Page 65: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,812.67.46 8,00000PARAFUSO AUTO-ATARRACHANTE 4,8X25MM UN 0,480000,063.10.66 1,00000PF-26 PORTA DE FERRO P/HALL ELEVADOR L=90CM UN 1.135,500001.135,503.13.08 6,60000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 200,1120030,323.13.40 1,00000BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1") UN 148,77000148,773.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 390,50274Mão-de-Obra 42,30000 Material 1.603,93200SubMO 93,90600

06.02.046 PF-27 PORTA DE FERRO 90X215CM UN 1.535,26

1.01.39 4,50000PEDREIRO H 20,925004,651.01.46 4,50000SERVENTE H 17,145003,813.12.01 1,00000PF-27 PORTA DE FERRO 90X215CM UN 886,93000886,933.13.08 5,20000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 157,6640030,323.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 46,44540 BDI 287,08126Mão-de-Obra 38,07000 Material 1.163,66400SubMO 84,51540

06.02.047 PF-28 PORTA DE FERRO COM BANDEIRA 90X260CM UN 1.744,56

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.12.02 1,00000PF-28 PORTA DE FERRO C/BANDEIRA 90X260CM UN 1.020,420001.020,423.13.08 6,10000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 184,9520030,323.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 326,22004Mão-de-Obra 42,30000 Material 1.324,44200SubMO 93,90600

06.02.048 PF-29 PORTA DE FERRO COM BANDEIRA EM CHAPA PERFURADA 90X260CM UN 1.890,50

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.12.03 1,00000PF-29 PORTA FERRO C/BANDEIRA CHAPA PERF 90X260CM UN 1.139,070001.139,073.13.08 6,10000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 184,9520030,323.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,56

LS 51,60600 BDI 353,50954Mão-de-Obra 42,30000 Material 1.443,09200SubMO 93,90600

06.02.049 PF-30 PORTA EM CHAPA DE AÇO C/VENT.PERM (L=140CM) UN 2.158,02

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,813.12.04 1,00000PF-30 PORTA EM CHAPA DE AÇO C/VENT.PERM.(L=140CM) - GALVANIZADA UN 1.173,830001.173,833.13.06 1,40000FRISO PARA VEDAÇÃO EM ALUMÍNIO E BORRACHA M 11,816008,443.13.08 5,60000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 169,7920030,323.15.10 1,00000MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2) UN 111,27000111,273.15.33 6,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 43,020007,173.16.86 2,00000FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO UN 31,9800015,993.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,01600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 2,53696158,56

LS 61,92720 BDI 403,53320Mão-de-Obra 50,76000 Material 1.641,80496SubMO 112,68720

06.02.050 PF-31 PORTA EM CH.DE AÇO COM VENT.PERM.(L=82CM) UN 1.182,44

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 5,00000SERVENTE H 19,050003,813.12.05 1,00000PF-31 PORTA EM CHAPA DE AÇO C/VENT.PERM.(L=82CM) - GALVANIZADA UN 586,70000586,703.13.06 0,82000FRISO PARA VEDAÇÃO EM ALUMÍNIO E BORRACHA M 6,920808,443.13.08 5,02000BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM M 152,2064030,323.15.33 3,00000DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3" UN 21,510007,173.17.53 1,00000CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA CJ 97,5600097,563.75.91 0,01600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 2,53696158,56

LS 51,60600 BDI 221,10824Mão-de-Obra 42,30000 Material 867,43416SubMO 93,90600

06.02.052 PORTA DE ENROLAR EM GRADES RETANGULARES M2 308,43

1.01.39 0,40000PEDREIRO H 1,860004,651.01.44 0,90000SERRALHEIRO H 7,272008,081.01.45 0,90000AJUDANTE SERRALHEIRO H 3,906004,341.01.46 0,40000SERVENTE H 1,524003,813.12.36 1,00000PORTA ENROLAR EM GRADES RETANGULARES M2 218,43000218,43

LS 17,76564 BDI 57,67426Mão-de-Obra 14,56200 Material 218,43000SubMO 32,32764

06.02.060 PT-38 PORTAO EM GRADIL ELETROFUNDIDO (345X230CM) UN 5.661,99

1.01.39 6,88500PEDREIRO H 32,015254,651.01.40 4,26700PINTOR H 20,097574,711.01.41 4,26700AJUDANTE DE PINTOR H 16,299943,821.01.44 2,30000SERRALHEIRO H 18,584008,081.01.45 2,30000AJUDANTE SERRALHEIRO H 9,982004,341.01.46 6,88500SERVENTE H 26,231853,81

09/02/2011 11:38:40 Página: 65 de 0

Page 66: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.13.07 4,60000BATENTE METALICO - PERFIL CH 14 GALV (44X35X20MM) M 171,6720037,323.13.76 1,00000PT-38 PORTAO EM GRADIL ELETROFUNDIDO (345X230CM) UN 4.090,000004.090,003.15.32 4,00000DOBRADICA 3 ESTAGIOS FERRO GALV DN 1"X4" UN 28,200007,053.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 1,18900TINTA ESMALTE L 11,842449,963.75.91 0,01800GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 2,85408158,563.80.66 0,71500FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 10,5391014,74

LS 150,31694 BDI 1.058,74639Mão-de-Obra 123,21061 Material 4.329,71762SubMO 273,52755

06.02.061 PT-39 PORTAO EM GRADIL ELETROFUNDIDO (165X230CM) UN 3.159,06

1.01.39 8,50000PEDREIRO H 39,525004,651.01.40 4,00000PINTOR H 18,840004,711.01.41 4,00000AJUDANTE DE PINTOR H 15,280003,821.01.44 2,30000SERRALHEIRO H 18,584008,081.01.45 2,30000AJUDANTE SERRALHEIRO H 9,982004,341.01.46 8,50000SERVENTE H 32,385003,813.13.07 4,60000BATENTE METALICO - PERFIL CH 14 GALV (44X35X20MM) M 171,6720037,323.13.77 1,00000PT-37 PORTAO EM GRADIL ELETROFUNDIDO (165X230CM) UN 2.050,000002.050,003.15.32 2,00000DOBRADICA 3 ESTAGIOS FERRO GALV DN 1"X4" UN 14,100007,053.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,88300TINTA ESMALTE L 8,794689,963.75.91 0,01600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 2,53696158,563.80.66 0,53100FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 7,8269414,74

LS 164,20712 BDI 590,71905Mão-de-Obra 134,59600 Material 2.269,54058SubMO 298,80312

06.02.062 PT-40 BANDEIRA EM GRADIL ELETROFUNDIDO M2 359,02

1.01.39 1,20000PEDREIRO H 5,580004,651.01.40 0,49000PINTOR H 2,307904,711.01.41 0,32000AJUDANTE DE PINTOR H 1,222403,821.01.46 1,20000SERVENTE H 4,572003,813.13.07 0,57970BATENTE METALICO - PERFIL CH 14 GALV (44X35X20MM) M 21,6344037,323.13.70 1,00000PT-40 BANDEIRA EM GRADIL ELETROFUNDIDO M2 235,00000235,003.75.07 0,16000TINTA ESMALTE SINTETICO - ALUMINIO L 2,2160013,853.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.12 0,17000LIXA PARA FERRO UN 0,243101,433.80.66 0,10000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,4740014,74

LS 16,69241 BDI 67,13552Mão-de-Obra 13,68230 Material 261,51886SubMO 30,37471

06.02.063 PORTÃO EM GRADIL ELETROFUNDIDO M2 714,15

1.01.39 0,86770PEDREIRO H 4,034814,651.01.40 0,53770PINTOR H 2,532574,711.01.41 0,53770AJUDANTE DE PINTOR H 2,054013,821.01.44 0,28990SERRALHEIRO H 2,342398,081.01.45 0,28990AJUDANTE SERRALHEIRO H 1,258174,341.01.46 0,86770SERVENTE H 3,305943,813.13.07 0,57970BATENTE METALICO - PERFIL CH 14 GALV (44X35X20MM) M 21,6344037,323.13.76 0,12600PT-38 PORTAO EM GRADIL ELETROFUNDIDO (345X230CM) UN 515,340004.090,003.15.32 0,50410DOBRADICA 3 ESTAGIOS FERRO GALV DN 1"X4" UN 3,553917,053.17.19 0,12600CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 1,8408614,613.75.02 0,14980TINTA ESMALTE L 1,492019,963.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.66 0,09010FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,3280714,74

LS 18,94402 BDI 133,54088Mão-de-Obra 15,52788 Material 546,14061SubMO 34,47190

06.02.064 PT-43 PORTAO DE CORRER EM GRADIL ELETROF (360X230CM) UN 5.476,89

1.01.39 2,95000PEDREIRO H 13,717504,651.01.40 4,06000PINTOR H 19,122604,711.01.41 2,65000AJUDANTE DE PINTOR H 10,123003,821.01.44 1,00000SERRALHEIRO H 8,080008,081.01.45 1,00000AJUDANTE SERRALHEIRO H 4,340004,341.01.46 2,95000SERVENTE H 11,239503,813.12.51 1,00000PT-43 PORTAO CORRER EM GRADIL ELETROF (360X230CM) UN 4.260,000004.260,003.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 1,32000TINTA ESMALTE L 13,147209,963.75.91 0,01800GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 2,85408158,563.80.12 1,41000LIXA PARA FERRO UN 2,016301,433.80.66 0,83000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 12,2342014,74

LS 81,27957 BDI 1.024,13571Mão-de-Obra 66,62260 Material 4.304,86178SubMO 147,90217

06.02.065 PT-44 PORTAO DE CORRER EM GRADIL ELETROF (720X230CM) UN 13.773,20

1.01.39 4,75000PEDREIRO H 22,087504,651.01.40 8,11000PINTOR H 38,198104,711.01.41 5,30000AJUDANTE DE PINTOR H 20,246003,821.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 4,75000SERVENTE H 18,097503,813.12.52 1,00000PT-44 PORTAO CORRER EM GRADIL ELETROF (720X230CM) UN 10.850,0000010.850,00

09/02/2011 11:38:40 Página: 66 de 0

Page 67: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 2,65000TINTA ESMALTE L 26,394009,963.75.91 0,02600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 4,12256158,563.80.12 2,82000LIXA PARA FERRO UN 4,032601,433.80.66 1,66000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 24,4684014,74

LS 150,63230 BDI 2.575,47766Mão-de-Obra 123,46910 Material 10.923,62756SubMO 274,10140

06.02.066 PT-45 PORTAO DE CORRER EM GRADIL ELETROF (372X230CM) UN 7.071,18

1.01.39 3,01000PEDREIRO H 13,996504,651.01.40 4,19000PINTOR H 19,734904,711.01.41 2,74000AJUDANTE DE PINTOR H 10,466803,821.01.44 1,00000SERRALHEIRO H 8,080008,081.01.45 1,00000AJUDANTE SERRALHEIRO H 4,340004,341.01.46 3,01000SERVENTE H 11,468103,813.12.53 1,00000PT-45 PORTAO CORRER EM GRADIL ELETROF (372X230CM) UN 5.555,000005.555,003.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.75.02 1,37000TINTA ESMALTE L 13,645209,963.75.91 0,02000GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 3,17120158,563.80.12 1,46000LIXA PARA FERRO UN 2,087801,433.80.66 0,86000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 12,6764014,74

LS 83,06529 BDI 1.322,25440Mão-de-Obra 68,08630 Material 5.597,78060SubMO 151,15159

06.02.067 PT-46 PORTAO DE CORRER EM GRADIL ELETROF (732X230CM) UN 13.651,06

1.01.39 4,81000PEDREIRO H 22,366504,651.01.40 8,25000PINTOR H 38,857504,711.01.41 5,39000AJUDANTE DE PINTOR H 20,589803,821.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,341.01.46 4,81000SERVENTE H 18,326103,813.12.54 1,00000PT-46 PORTAO CORRER EM GRADIL ELETROF (732X230CM) UN 10.750,0000010.750,003.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.75.02 2,69000TINTA ESMALTE L 26,792409,963.75.91 0,02600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 4,12256158,563.80.12 2,86000LIXA PARA FERRO UN 4,089801,433.80.66 1,68000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 24,7632014,74

LS 152,47548 BDI 2.552,63737Mão-de-Obra 124,97990 Material 10.820,96796SubMO 277,45538

06.02.073 PT-47 PORTÃO BASCULANTE-GRADIL ELETROFUND 705X230CM (USO INT) UN 8.342,55

1.01.39 2,92000PEDREIRO H 13,578004,651.01.40 7,94110PINTOR H 37,402584,711.01.41 5,18960AJUDANTE DE PINTOR H 19,824273,821.01.44 1,95000SERRALHEIRO H 15,756008,081.01.45 1,95000AJUDANTE SERRALHEIRO H 8,463004,341.01.46 2,92000SERVENTE H 11,125203,813.12.55 1,00000PT-47 PORTAO BASCULANTE-GRADIL ELETROF 705X230CM UN 6.467,600006.467,603.17.19 2,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 29,2200014,613.75.02 2,59480TINTA ESMALTE L 25,844219,963.80.66 1,64500FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 24,2473014,74

LS 129,50185 BDI 1.559,98935Mão-de-Obra 106,14905 Material 6.546,91151SubMO 235,65090

06.02.074 PT-48 PORTÃO BASCULANTE-GRADIL ELETROFUND 525X230CM (USO INT) UN 6.286,30

1.01.39 2,46000PEDREIRO H 11,439004,651.01.40 5,90000PINTOR H 27,789004,711.01.41 3,80000AJUDANTE DE PINTOR H 14,516003,821.01.44 1,40000SERRALHEIRO H 11,312008,081.01.45 1,40000AJUDANTE SERRALHEIRO H 6,076004,341.01.46 2,46000SERVENTE H 9,372603,813.12.56 1,00000PT-48 PORTAO BASCULANTE-GRADIL ELETROF 525X230CM UN 4.872,550004.872,553.16.21 2,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 22,4000011,203.75.02 1,93350TINTA ESMALTE L 19,257669,963.80.66 1,21380FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 17,8914114,74

LS 98,21561 BDI 1.175,48844Mão-de-Obra 80,50460 Material 4.932,09907SubMO 178,72021

06.02.075 PT-49 PORTÃO BASCULANTE-GRADIL ELETROFUND 345X230CM (USO INT) UN 4.180,81

1.01.39 2,00000PEDREIRO H 9,300004,651.01.40 4,26700PINTOR H 20,097574,711.01.41 4,26700AJUDANTE DE PINTOR H 16,299943,821.01.44 1,00000SERRALHEIRO H 8,080008,081.01.45 1,00000AJUDANTE SERRALHEIRO H 4,340004,341.01.46 2,00000SERVENTE H 7,620003,813.12.57 1,00000PT-49 PORTAO BASCULANTE-GRADIL ELETROF 345X230CM UN 3.201,500003.201,503.17.19 2,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 29,2200014,613.75.02 1,18900TINTA ESMALTE L 11,842449,963.80.66 0,71500FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 10,5391014,74

LS 80,19976 BDI 781,77893Mão-de-Obra 65,73751 Material 3.253,10154SubMO 145,93727

06.02.088 PORTÃO DE CORRER EM GRADIL ELETROFUNDIDO M2 662,34

09/02/2011 11:38:40 Página: 67 de 0

Page 68: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 0,35630PEDREIRO H 1,656804,651.01.40 0,49030PINTOR H 2,309314,711.01.41 0,32000AJUDANTE DE PINTOR H 1,222403,821.01.44 0,12080SERRALHEIRO H 0,976068,081.01.45 0,12080AJUDANTE SERRALHEIRO H 0,524274,341.01.46 0,35630SERVENTE H 1,357503,813.12.51 0,12080PT-43 PORTAO CORRER EM GRADIL ELETROF (360X230CM) UN 514,608004.260,003.17.19 0,12080CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 1,7648914,613.75.02 0,15940TINTA ESMALTE L 1,587629,963.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.12 0,17030LIXA PARA FERRO UN 0,243531,433.80.66 0,10020FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,4769514,74

LS 9,81654 BDI 123,85391Mão-de-Obra 8,04635 Material 520,63235SubMO 17,86289

06.02.089 PORTÃO BASCULANTE EM GRADIL ELETROFUNDIDO M2 514,72

1.01.39 0,18010PEDREIRO H 0,837474,651.01.40 0,48970PINTOR H 2,306494,711.01.41 0,32000AJUDANTE DE PINTOR H 1,222403,821.01.44 0,12030SERRALHEIRO H 0,972028,081.01.45 0,12030AJUDANTE SERRALHEIRO H 0,522104,341.01.46 0,18010SERVENTE H 0,686183,813.12.55 0,06170PT-47 PORTAO BASCULANTE-GRADIL ELETROF 705X230CM UN 399,050926.467,603.17.19 0,12330CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 1,8014114,613.75.02 0,16000TINTA ESMALTE L 1,593609,963.80.66 0,10140FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,4946414,74

LS 7,98692 BDI 96,24906Mão-de-Obra 6,54666 Material 403,94057SubMO 14,53358

06.02.092 ME-02 MONTANTE ESTRUTURAL VERTICAL P/ ESQUADRIAS EM VAO DE 7,20M M 88,36

1.01.39 0,75000PEDREIRO H 3,487504,651.01.44 0,36000SERRALHEIRO H 2,908808,081.01.45 0,36000AJUDANTE SERRALHEIRO H 1,562404,341.01.46 0,75000SERVENTE H 2,857503,813.10.55 0,28900FIXACAO (FERRO TRABALHADO) KG 12,0455241,683.11.97 1,05000TUBO DE ACO GALVANIZADO RETANGULAR 50X70X3MM M 35,7840034,08

LS 13,19576 BDI 16,52354Mão-de-Obra 10,81620 Material 47,82952SubMO 24,01196

06.02.093 ME-03 MONTANTE ESTRUTURAL HORIZONTAL P/ ESQUADRIAS M 88,36

1.01.39 0,75000PEDREIRO H 3,487504,651.01.44 0,36000SERRALHEIRO H 2,908808,081.01.45 0,36000AJUDANTE SERRALHEIRO H 1,562404,341.01.46 0,75000SERVENTE H 2,857503,813.10.55 0,28900FIXACAO (FERRO TRABALHADO) KG 12,0455241,683.11.97 1,05000TUBO DE ACO GALVANIZADO RETANGULAR 50X70X3MM M 35,7840034,08

LS 13,19576 BDI 16,52354Mão-de-Obra 10,81620 Material 47,82952SubMO 24,01196

06.02.099 SERVICOS EM ELEMENTOS METALICOS/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.03.001 TI-01 TAMPA DE INSPECAO - ACO UN 332,77

1.01.39 1,10000PEDREIRO H 5,115004,651.01.40 1,00000PINTOR H 4,710004,711.01.41 0,33000AJUDANTE DE PINTOR H 1,260603,821.01.46 1,10000SERVENTE H 4,191003,813.13.89 1,00000TI-01 TAMPA DE INSPECAO - GALVANIZADA UN 218,56000218,563.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.12 0,55000LIXA PARA FERRO UN 0,786501,433.80.28 0,17000ZARCAO L 2,7353016,093.80.34 0,28000TINTA A OLEO L 2,556409,13

LS 18,63745 BDI 62,22536Mão-de-Obra 15,27660 Material 236,63100SubMO 33,91405

06.03.003 AF-01 ALCAPAO PARA LAJE DE FORRO UN 346,66

1.01.39 2,00000PEDREIRO H 9,300004,651.01.40 0,80000PINTOR H 3,768004,711.01.41 0,80000AJUDANTE DE PINTOR H 3,056003,821.01.46 2,00000SERVENTE H 7,620003,813.11.90 14,50000CAIXILHARIA EM FERRO KG 198,9400013,723.15.91 1,00000FECHO COM PORTA CADEADO 4" UN 5,300005,303.16.52 2,00000DOBRADICA DE FERRO POL PINO E BOLAS FERRO 3 1/2X3" UN 5,740002,873.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,18000TINTA ESMALTE L 1,792809,963.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,14400ZARCAO L 2,3169616,09

LS 28,96768 BDI 64,82330Mão-de-Obra 23,74400 Material 229,12876SubMO 52,71168

09/02/2011 11:38:40 Página: 68 de 0

Page 69: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

06.03.009 CO-06 CORRIMAO TUBULAR M 111,64

1.01.39 0,60000PEDREIRO H 2,790004,651.01.40 0,05720PINTOR H 0,269414,711.01.41 0,02860AJUDANTE DE PINTOR H 0,109253,821.01.46 0,60000SERVENTE H 2,286003,813.13.14 1,00000CO-06 CORRIMAO EM TUBO DE ACO CARBONO GALV PINT M 77,4400077,443.75.02 0,02150TINTA ESMALTE L 0,214149,963.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.66 0,01430FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 0,2107814,74

LS 6,65469 BDI 20,87643Mão-de-Obra 5,45466 Material 78,65772SubMO 12,10935

06.03.012 CO-08 GUARDA CORPO TUBULAR SOBRE ALVENARIA M 221,70

1.01.39 0,60000PEDREIRO H 2,790004,651.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,821.01.46 0,60000SERVENTE H 2,286003,813.10.74 1,00000CO-08 CORRIMAO TUBULAR ACO CARBONO GALV PINT M 161,24000161,243.75.02 0,03000TINTA ESMALTE L 0,298809,963.75.91 0,00800GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,26848158,563.80.66 0,02000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 0,2948014,74

LS 9,42328 BDI 41,45735Mão-de-Obra 7,72400 Material 163,10208SubMO 17,14728

06.03.016 BP-01 BARRA ANTIPANICO SIMPLES UN 653,52

1.01.44 2,00000SERRALHEIRO H 16,160008,081.01.45 2,00000AJUDANTE SERRALHEIRO H 8,680004,343.15.45 1,00000BP-01 BARRA ANTIPANICO SIMPLES UN 476,18000476,18

LS 30,30480 BDI 122,20470Mão-de-Obra 24,84000 Material 476,18000SubMO 55,14480

06.03.017 BP-02 BARRA ANTIPANICO DUPLA UN 1.208,26

1.01.44 4,00000SERRALHEIRO H 32,320008,081.01.45 4,00000AJUDANTE SERRALHEIRO H 17,360004,343.15.46 1,00000BP-02 BARRA ANTIPANICO DUPLO UN 872,04000872,04

LS 60,60960 BDI 225,93581Mão-de-Obra 49,68000 Material 872,04000SubMO 110,28960

06.03.019 EM-05 ESCADA MARINHEIRO (GALVANIZADA) M 348,75

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,40000SERVENTE H 1,524003,812.66.91 4,00000CHUMBADOR URS 1/4" UN 8,040002,013.13.75 1,00000EM-05 ESCADA MARINHEIRO GALVANIZADA M 267,04000267,043.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 4,12848 BDI 65,21508Mão-de-Obra 3,38400 Material 276,03136SubMO 7,51248

06.03.020 EM-06 ESCADA DE MARINHEIRO C/GUARDA CORPO GALVANIZADA M 629,57

1.01.39 0,80000PEDREIRO H 3,720004,651.01.40 1,84000PINTOR H 8,666404,711.01.41 0,81000AJUDANTE DE PINTOR H 3,094203,821.01.46 0,80000SERVENTE H 3,048003,813.13.74 1,00000EM-06 ESCADA MARINHEIRO GALVANIZADO M 456,86000456,863.75.07 0,51000TINTA ESMALTE SINTETICO - ALUMINIO L 7,0635013,853.75.91 0,01400GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 2,21984158,563.80.66 0,31000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 4,5694014,74

LS 22,60489 BDI 117,72463Mão-de-Obra 18,52860 Material 470,71274SubMO 41,13349

06.03.021 CO-13 CORRIMAO TUBULAR INTERMEDIARIO M 269,53

1.01.39 0,60000PEDREIRO H 2,790004,651.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,821.01.46 0,60000SERVENTE H 2,286003,813.13.18 1,00000CO-13 CORRIMAO TUBULAR ACO CARBONO - GALVANIZADO M 189,83000189,833.75.02 0,12000TINTA ESMALTE L 1,195209,963.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.66 0,07000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,0318014,749.10.52 5,00000CHUMBADOR EXPANSIVEL D=3/8" UN 5,550001,11

LS 11,39602 BDI 50,40147Mão-de-Obra 9,34100 Material 198,39980SubMO 20,73702

06.03.023 CO-15 GUARDA CORPO TUBULAR H=1,10M (USO INTERNO) M 499,36

1.01.39 0,60000PEDREIRO H 2,790004,651.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,821.01.46 0,60000SERVENTE H 2,286003,813.13.19 1,00000CO-15 GUARDA CORPO TUBULAR ACO CARBONO H=1,10M INT M 341,97000341,973.75.02 0,12000TINTA ESMALTE L 1,195209,963.76.50 20,06000GALVANIZACAO A FOGO KG 35,506201,773.80.66 0,07000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,0318014,749.10.52 5,00000CHUMBADOR EXPANSIVEL D=3/8" UN 5,550001,11

09/02/2011 11:38:40 Página: 69 de 0

Page 70: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 11,39602 BDI 93,37775Mão-de-Obra 9,34100 Material 385,25320SubMO 20,73702

06.03.024 TP-12 TELA DE PROTECAO REMOVIVEL M2 393,32

1.01.39 0,33300PEDREIRO H 1,548454,651.01.46 0,33300SERVENTE H 1,268733,812.75.28 1,85000TP-12 TELA DE PROTECAO REMOVIVEL 90X60CM COMPLETA - GALVANIZADA UN 312,89050169,133.75.91 0,00400GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,63424158,56

LS 3,43696 BDI 73,54914Mão-de-Obra 2,81718 Material 313,52474SubMO 6,25414

06.03.025 CO-15 GUARDA CORPO TUBULAR H=1,30M (USO EXTERNO) M 538,70

1.01.39 0,60000PEDREIRO H 2,790004,651.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,821.01.46 0,60000SERVENTE H 2,286003,813.13.09 1,00000CO-15 GUARDA CORPO TUBULAR ACO CARBONO H=1,30M EXT M 365,10000365,103.75.02 0,12000TINTA ESMALTE L 1,195209,963.76.50 25,06000GALVANIZACAO A FOGO KG 44,356201,773.80.66 0,07000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,0318014,749.10.52 5,00000CHUMBADOR EXPANSIVEL D=3/8" UN 5,550001,11

LS 11,39602 BDI 100,73315Mão-de-Obra 9,34100 Material 417,23320SubMO 20,73702

06.03.027 TP-03 TELA DE PROTECAO ARAME GALVANIZADO ONDULADO-REQUADRO DE FERRO M2 267,46

1.01.44 3,80000SERRALHEIRO H 30,704008,081.01.45 3,80000AJUDANTE SERRALHEIRO H 16,492004,342.66.16 4,00000PERFIL "L" DE FERRO 1"X1"X1/8" GALV. M 21,280005,322.67.26 6,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,780000,132.67.31 6,00000PARAFUSO AUTO-ATARRACHANTE CABECA OVAL 4,8 X 75MM UN 0,840000,142.67.70 0,32000REBITE TIPO POP 440 (CENTO) UN 1,420804,442.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.68.18 3,00000PERFIL TUBULAR 30X30MM E=3MM GALVANIZADO M 47,2200015,742.68.24 4,00000FERRO CHATO 7/8``X1/8`` GALVANIZADO M 11,400002,852.75.34 1,00000TELA ARAME GALV. MALHA QUADRANGULA 1" FIO 12 M2 28,6600028,663.75.91 0,00400GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,63424158,56

LS 57,57912 BDI 50,01455Mão-de-Obra 47,19600 Material 112,67944SubMO 104,77512

06.03.030 GRADE DE PROTECAO DE FERRO PINTADO - COM TELA EMERG.83/84 M2 442,50

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,821.01.44 1,80000SERRALHEIRO H 14,544008,081.01.45 1,80000AJUDANTE SERRALHEIRO H 7,812004,342.75.26 1,00000TELA PROT 3/8' X 3/8' FIO 14 P/CAIXILHO M2 44,0500044,053.12.15 22,17000GRADIL DE FERRO (TIPO PMSP) KG 256,5069011,573.80.12 0,50000LIXA PARA FERRO UN 0,715001,433.80.28 0,10000ZARCAO L 1,6090016,093.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 30,50488 BDI 82,74463Mão-de-Obra 25,00400 Material 304,25040SubMO 55,50888

06.03.031 GRADE DE PROTECAO DE FERRO PINTADO - SEM TELA EMERG.83/84 M2 320,08

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,821.01.44 1,50000SERRALHEIRO H 12,120008,081.01.45 1,50000AJUDANTE SERRALHEIRO H 6,510004,343.12.15 18,09000GRADIL DE FERRO (TIPO PMSP) KG 209,3013011,573.80.12 0,50000LIXA PARA FERRO UN 0,715001,433.80.28 0,10000ZARCAO L 1,6090016,093.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 25,95916 BDI 59,85335Mão-de-Obra 21,27800 Material 212,99480SubMO 47,23716

06.03.033 GR-01 GRADE DE PROTECAO M2 317,05

1.01.39 0,50000PEDREIRO H 2,325004,651.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,821.01.46 0,50000SERVENTE H 1,905003,813.12.15 20,64000GRADIL DE FERRO (TIPO PMSP) KG 238,8048011,573.80.12 0,50000LIXA PARA FERRO UN 0,715001,433.80.28 0,10000ZARCAO L 1,6090016,093.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 8,39116 BDI 59,28652Mão-de-Obra 6,87800 Material 242,49830SubMO 15,26916

06.03.034 GR-02 GRADE DE PROTECAO / GUICHE (122X92 CM) UN 302,37

1.01.39 0,78000PEDREIRO H 3,627004,651.01.40 0,51000PINTOR H 2,402104,711.01.41 0,25000AJUDANTE DE PINTOR H 0,955003,821.01.46 0,78000SERVENTE H 2,971803,813.10.81 1,00000GR-02 GRADIL DE PROTECAO/GUICHE 122X105 CM UN 218,99000218,993.75.02 0,19000TINTA ESMALTE L 1,892409,96

09/02/2011 11:38:40 Página: 70 de 0

Page 71: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.80.12 0,64000LIXA PARA FERRO UN 0,915201,433.80.28 0,12000ZARCAO L 1,9308016,09

LS 12,14620 BDI 56,54102Mão-de-Obra 9,95590 Material 223,72840SubMO 22,10210

06.03.036CHAPA PERFURADA GALV 14(FUROS REDONDOS E ALTERNADOS 3/8")AREA PERF48%

M2 274,12

1.01.44 1,20000SERRALHEIRO H 9,696008,081.01.45 1,20000AJUDANTE SERRALHEIRO H 5,208004,346.80.18 1,00000CHAPA PERFUR GALV No 14 FUROS D=3/8" AREA PERF 48% M2 168,05000168,056.95.65 1,60000SOLDA ELETRICA KG 21,7280013,58

LS 18,18288 BDI 51,25892Mão-de-Obra 14,90400 Material 189,77800SubMO 33,08688

06.03.037 PERFIL METALICO TUBULAR SECCAO QUADRADA 8X8CM E=3MM M 69,94

1.01.44 0,60000SERRALHEIRO H 4,848008,081.01.45 0,60000AJUDANTE SERRALHEIRO H 2,604004,342.68.20 1,00000PERFIL METALICO TUBULAR SECAO QUADRADA 8X8CM E=3MM M 29,4600029,466.95.65 0,80000SOLDA ELETRICA KG 10,8640013,58

LS 9,09144 BDI 13,07951Mão-de-Obra 7,45200 Material 40,32400SubMO 16,54344

06.03.038 PERFIL L DE FERRO 1"X1"X1/8" M 37,61

1.01.44 0,60000SERRALHEIRO H 4,848008,081.01.45 0,60000AJUDANTE SERRALHEIRO H 2,604004,342.66.15 1,00000PERFIL L DE FERRO 1"X1"X1/8" M 3,170003,176.95.65 0,80000SOLDA ELETRICA KG 10,8640013,58

LS 9,09144 BDI 7,03281Mão-de-Obra 7,45200 Material 14,03400SubMO 16,54344

06.03.039 TELA DE PROTEÇÃO CONTRA NIDIFICACAO DE PASSAROS M2 30,85

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,962.12.21 0,13000ANDAIME TIPO TORRE - ALUGUEL MENSAL M 1,7264013,282.70.31 0,20000ARAME GALVANIZADO No. 16 KG 1,500007,502.75.31 1,10000TELA P/ VIVEIRO ARAME GALV MALHA 1/2 FIO 24 M2 6,743006,13

LS 8,30576 BDI 5,76913Mão-de-Obra 6,80800 Material 9,96940SubMO 15,11376

06.03.040 TELA DE ARAME CONTRA INSETOS DE ARAME GALV M2 254,41

1.01.39 0,33300PEDREIRO H 1,548454,651.01.46 0,33300SERVENTE H 1,268733,813.10.29 1,00000TELA MOSQUITEIRA ARAMA GALV C/REQUADRO M2 200,59000200,59

LS 3,43696 BDI 47,57415Mão-de-Obra 2,81718 Material 200,59000SubMO 6,25414

06.03.041 CO-16 CORRIMAO TUBULAR DUPLO M 268,17

1.01.39 0,80000PEDREIRO H 3,720004,651.01.40 0,11440PINTOR H 0,538824,711.01.41 0,05720AJUDANTE DE PINTOR H 0,218503,821.01.46 0,80000SERVENTE H 3,048003,813.13.78 1,00000CO-16 CORRIMAO EM TUBO DE ACO CARBONO GALV PINTADO M 199,84000199,843.75.02 0,04300TINTA ESMALTE L 0,428289,963.75.91 0,00400GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,63424158,563.80.66 0,02860FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 0,4215614,74

LS 9,18090 BDI 50,14697Mão-de-Obra 7,52533 Material 201,32408SubMO 16,70623

06.03.042 CO-17 CORRIMAO TUBULAR DUPLO LATERAL M 354,61

1.01.39 0,90000PEDREIRO H 4,185004,651.01.40 0,55720PINTOR H 2,624414,711.01.41 0,52860AJUDANTE DE PINTOR H 2,019253,821.01.46 0,90000SERVENTE H 3,429003,813.13.79 1,00000CO-17 CORRIMAO EM TUBO DE ACO CARBONO GALV PINTADO M 252,26000252,263.75.02 0,14150TINTA ESMALTE L 1,409349,963.75.91 0,00400GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,63424158,563.80.66 0,08430FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2425814,749.10.52 5,00000CHUMBADOR EXPANSIVEL D=3/8" UN 5,550001,11

LS 14,95435 BDI 66,31088Mão-de-Obra 12,25766 Material 261,09616SubMO 27,21201

06.03.043 CO-18 CORRIMÃO DUPLO M 213,06

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,813.13.88 1,00000CO-18 CORRIMÃO DUPLO C/PINTURA ELETROSTÁTICA M 158,20000158,20

LS 8,25696 BDI 39,84174Mão-de-Obra 6,76800 Material 158,20000SubMO 15,02496

06.03.044 CO-19 CORRIMÃO DUPLO COM MONTANTE VERTICAL M 371,46

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 1,20000SERVENTE H 4,572003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.94 1,00000CO-19 CORRIMÃO DUPLO C/MONT.VERT.C/PINT.ELETROST. M 269,42000269,42

LS 12,38544 BDI 69,46171Mão-de-Obra 10,15200 Material 279,47000SubMO 22,53744

09/02/2011 11:38:40 Página: 71 de 0

Page 72: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

06.03.045 CO-20 CORRIMÃO DUPLO INTERMEDIÁRIO M 368,62

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,60000SERVENTE H 2,286003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.96 1,00000CO-20 CORRIMÃO DUPLO INTERMED.C/PINT.ELETROST. M 278,38000278,38

LS 6,19272 BDI 68,93071Mão-de-Obra 5,07600 Material 288,43000SubMO 11,26872

06.03.046 CO-21 CORRIMÃO SIMPLES M 131,17

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,60000SERVENTE H 2,286003,813.13.98 1,00000CO-21 CORRIMÃO SIMPLES C/ PINTURA ELETROSTÁTICA M 95,3800095,38

LS 6,19272 BDI 24,52921Mão-de-Obra 5,07600 Material 95,38000SubMO 11,26872

06.03.047 CO-22 CORRIMÃO SIMPLES COM MONTANTE VERTICAL M 188,38

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,60000SERVENTE H 2,286003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.99 1,00000CO-22 CORRIMÃO SIMPLES C/MONT.VERT.C/PINT.ELETROST M 131,84000131,84

LS 6,19272 BDI 35,22651Mão-de-Obra 5,07600 Material 141,89000SubMO 11,26872

06.03.048 CO-23 CORRIMÃO SIMPLES INTERMEDIÁRIO M 235,59

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,60000SERVENTE H 2,286003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.73 1,00000CO-23 CORRIMÃO SIMPLES INTERMED. C/PINT. ELETROST. M 170,22000170,22

LS 6,19272 BDI 44,05391Mão-de-Obra 5,07600 Material 180,27000SubMO 11,26872

06.03.049 CO-24 GUARDA CORPO TUBULAR SOBRE ALVENARIA M 157,78

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,60000SERVENTE H 2,286003,812.66.91 1,00000CHUMBADOR URS 1/4" UN 2,010002,013.13.84 1,00000CO-24 GUARDA CORPO TUBULAR S/ALVEN.C/PINT.ELETROST M 115,00000115,00

LS 6,19272 BDI 29,50411Mão-de-Obra 5,07600 Material 117,01000SubMO 11,26872

06.03.056 CO-25 GUARDA CORPO METÁLICO C/CHAPA LISA (H=110CM) M 652,56

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.97 1,00000CO-25 GUARDA CORPO MET.CH.LISA H=110CM PINT.ELETRO M 499,83000499,83

LS 11,35332 BDI 122,02404Mão-de-Obra 9,30600 Material 509,88000SubMO 20,65932

06.03.057 CO-25 GUARDA CORPO METÁLICO C/CHAPA LISA (130CM) M 727,00

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.87 1,00000CO-25 GUARDA CORPO METAL CH.LISA H=130CM PINT.ELET M 560,35000560,35

LS 11,35332 BDI 135,94364Mão-de-Obra 9,30600 Material 570,40000SubMO 20,65932

06.03.058 CO-26 GUARDA CORPO METÁLICO C/CHAPA PERFURADA (H=110CM) M 660,68

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.85 1,00000CO-26 GUARDA CORPO METAL CH.PERF.H=110CM PINT.ELET M 506,43000506,43

LS 11,35332 BDI 123,54204Mão-de-Obra 9,30600 Material 516,48000SubMO 20,65932

06.03.059 CO-26 GUARDA CORPO METÁLICO C/CHAPA PERFURADA (H=130CM) M 653,16

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,10000SERVENTE H 4,191003,812.66.91 5,00000CHUMBADOR URS 1/4" UN 10,050002,013.13.86 1,00000CO-26 GUARDA CORPO METAL CH.PERF.H=130CM PINT.ELET M 500,32000500,32

LS 11,35332 BDI 122,13674Mão-de-Obra 9,30600 Material 510,37000SubMO 20,65932

06.03.060 BARRA DE APOIO P/DEFICIENTES EM LATAO CROMADO CJ 654,43

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,812.67.47 12,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 6,000000,502.67.78 0,12000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,088800,743.13.35 2,00000BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE UN 516,58000258,29

LS 5,16060 BDI 122,37366Mão-de-Obra 4,23000 Material 522,66880SubMO 9,39060

06.03.067 FQ-05 ALAMBRADO PARA QUADRA COBERTA TÉRREA (BROCA) M 590,31

1.01.11 0,78000CARPINTEIRO H 3,549004,551.01.12 0,78000AJUDANTE DE CARPINTEIRO H 3,088803,961.01.21 0,63000FERREIRO H 3,005104,771.01.22 0,63000AJUDANTE DE FERREIRO H 2,406603,82

09/02/2011 11:38:40 Página: 72 de 0

Page 73: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 3,12000PEDREIRO H 14,508004,651.01.40 1,37500PINTOR H 6,476254,711.01.41 1,37500AJUDANTE DE PINTOR H 5,252503,821.01.44 1,50000SERRALHEIRO H 12,120008,081.01.45 1,50000AJUDANTE SERRALHEIRO H 6,510004,341.01.46 6,87400SERVENTE H 26,189943,812.05.03 0,09900AREIA M3 7,8408079,202.05.05 12,80000CAL HIDRATADA KG 4,352000,342.05.08 35,61000CIMENTO KG 13,175700,372.05.18 0,04600PEDRA BRITADA 2 M3 2,8101461,092.05.22 0,00600PEDRISCO M3 0,3966066,102.05.36 0,05200CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 13,18148253,492.10.09 0,91000PONTALETE PINHO DE 3"X3" M 3,439803,782.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,35000TABUAS PINHO DE 1"X12" DE 3A. M2 6,0130017,182.15.25 7,25000ACO CA-50-A $MD BITOLAS KG 19,575002,702.15.38 1,87000ACO CA-60-B $MD BITOLAS KG 4,955502,652.25.77 13,00000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 24,960001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,08000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,834401,432.40.10 0,20000EMULSAO ADESIVA PVA KG 2,1140010,572.67.60 0,14000PREGO KG 0,639804,572.70.10 0,12000ARAME RECOZIDO N.18 KG 0,555604,632.70.31 0,70000ARAME GALVANIZADO No. 16 KG 5,250007,502.75.09 4,00000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 96,9200024,233.75.07 0,14170TINTA ESMALTE SINTETICO - ALUMINIO L 1,9625513,853.75.13 0,49000TINTA LATEX ECONOMICA L 2,116804,323.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.09 0,39000SELADOR P/PINTURA LATEX L 3,884409,963.80.12 0,28170LIXA PARA FERRO UN 0,402831,433.80.40 0,58000LIXA D"AGUA UN 0,377000,653.80.66 0,08540FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2588014,746.05.15 2,64000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 23,680808,976.05.16 2,46000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 40,5900016,50

LS 101,38955 BDI 110,38438Mão-de-Obra 83,10619 Material 295,43635SubMO 184,49574

06.03.068 FQ-06 ALAMBRADO PARA QUADRA COBERTA TERREA (SAPATA) M 556,36

1.01.11 0,58000CARPINTEIRO H 2,639004,551.01.12 0,58000AJUDANTE DE CARPINTEIRO H 2,296803,961.01.21 0,39100FERREIRO H 1,865074,771.01.22 0,39100AJUDANTE DE FERREIRO H 1,493623,821.01.39 3,08700PEDREIRO H 14,354554,651.01.40 1,37500PINTOR H 6,476254,711.01.41 1,37500AJUDANTE DE PINTOR H 5,252503,821.01.44 1,50000SERRALHEIRO H 12,120008,081.01.45 1,50000AJUDANTE SERRALHEIRO H 6,510004,341.01.46 6,33000SERVENTE H 24,117303,812.05.03 0,10100AREIA M3 7,9992079,202.05.05 12,80000CAL HIDRATADA KG 4,352000,342.05.08 25,43000CIMENTO KG 9,409100,372.05.18 0,02000PEDRA BRITADA 2 M3 1,2218061,092.05.22 0,00600PEDRISCO M3 0,3966066,102.05.36 0,07200CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,25128253,492.10.09 0,91000PONTALETE PINHO DE 3"X3" M 3,439803,782.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,25000TABUAS PINHO DE 1"X12" DE 3A. M2 4,2950017,182.15.25 2,46000ACO CA-50-A $MD BITOLAS KG 6,642002,702.15.38 2,04000ACO CA-60-B $MD BITOLAS KG 5,406002,652.25.77 13,00000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 24,960001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,10000PREGO KG 0,457004,572.70.10 0,07800ARAME RECOZIDO N.18 KG 0,361144,632.70.31 0,70000ARAME GALVANIZADO No. 16 KG 5,250007,502.75.09 4,00000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 96,9200024,233.75.07 0,14170TINTA ESMALTE SINTETICO - ALUMINIO L 1,9625513,853.75.13 0,49000TINTA LATEX ECONOMICA L 2,116804,323.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.09 0,39000SELADOR P/PINTURA LATEX L 3,884409,963.80.12 0,28170LIXA PARA FERRO UN 0,402831,433.80.40 0,58000LIXA D"AGUA UN 0,377000,653.80.66 0,08540FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2588014,746.05.15 2,64000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 23,680808,976.05.16 2,46000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 40,5900016,50

LS 94,09261 BDI 104,03611Mão-de-Obra 77,12509 Material 281,11323SubMO 171,21770

09/02/2011 11:38:40 Página: 73 de 0

Page 74: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

06.03.069 QE-36 REDE DE PROTECAO PARA QUADRAS DE ESPORTES M2 7,61

3.67.31 1,05000TELA POLIETILENO CRISTAL #10 F 4 COMPL FORN/INST M2 6,195005,90

LS 0,00000 BDI 1,42485Mão-de-Obra 0,00000 Material 6,19500SubMO 0,00000

06.03.070 QE-38 TABELA DE BASQUETE (FUNDACAO DIRETA) UN 5.596,12

1.01.11 4,46000CARPINTEIRO H 20,293004,551.01.12 5,97000AJUDANTE DE CARPINTEIRO H 23,641203,961.01.21 10,40000FERREIRO H 49,608004,771.01.22 10,40000AJUDANTE DE FERREIRO H 39,728003,821.01.39 9,11000PEDREIRO H 42,361504,651.01.46 35,02000SERVENTE H 133,426203,812.05.03 0,36300AREIA M3 28,7496079,202.05.08 173,40000CIMENTO KG 64,158000,372.05.18 0,49000PEDRA BRITADA 2 M3 29,9341061,092.05.36 6,95000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 1.761,75550253,492.10.14 4,32000SARRAFO PINHO APARELHADO 5X2,5 CM M 9,028802,092.10.21 1,55000TABUAS PINHO DE 1"X12" DE 3A. M2 26,6290017,182.12.29 3,90000FORMA DE TUBO DE PAPELAO DIAM.30 CM M 276,8220070,982.15.25 117,00000ACO CA-50-A $MD BITOLAS KG 315,900002,702.15.38 3,00000ACO CA-60-B $MD BITOLAS KG 7,950002,652.50.17 50,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 498,500009,972.50.20 50,00000MONTAGEM DE ESTRUTURA METALICA KG 108,500002,172.67.60 0,47000PREGO KG 2,147904,572.70.10 2,10000ARAME RECOZIDO N.18 KG 9,723004,633.67.09 1,00000TABELA DE BASQUETE COM ARO E CESTO UN 631,75000631,753.76.50 52,00000GALVANIZACAO A FOGO KG 92,040001,77

LS 377,05064 BDI 1.046,43018Mão-de-Obra 309,05790 Material 3.863,58790SubMO 686,10854

06.03.071 QE-39 TABELA DE BASQUETE (LAJE ALVEOLAR) UN 3.239,72

1.01.11 1,72000CARPINTEIRO H 7,826004,551.01.12 3,25500AJUDANTE DE CARPINTEIRO H 12,889803,961.01.21 0,15500FERREIRO H 0,739354,771.01.22 0,15500AJUDANTE DE FERREIRO H 0,592103,821.01.39 4,40200PEDREIRO H 20,469304,651.01.40 1,91000PINTOR H 8,996104,711.01.41 1,91000AJUDANTE DE PINTOR H 7,296203,821.01.46 7,27200SERVENTE H 27,706323,812.05.03 0,02660AREIA M3 2,1067279,202.05.05 0,74000CAL HIDRATADA KG 0,251600,342.05.08 10,50000CIMENTO KG 3,885000,372.05.22 0,01040PEDRISCO M3 0,6874466,102.05.36 0,28000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 70,97720253,492.10.21 0,20400TABUAS PINHO DE 1"X12" DE 3A. M2 3,5047217,182.12.34 0,60000FORMA DE TUBO DE PAPELAO DIAM. 40CM M 63,94800106,582.12.39 0,50000FORMA DE TUBO DE PAPELAO Ø70CM M 112,05500224,112.15.25 15,50000ACO CA-50-A $MD BITOLAS KG 41,850002,702.20.55 0,29000ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT M3 733,746402.530,162.50.17 50,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 498,500009,972.50.20 50,00000MONTAGEM DE ESTRUTURA METALICA KG 108,500002,172.67.17 2,00000BRACADEIRA DE ACO GALV 64X13MM DN 30CM UN 67,2000033,602.67.60 0,01700PREGO KG 0,077694,572.70.10 0,03100ARAME RECOZIDO N.18 KG 0,143534,633.67.09 1,00000TABELA DE BASQUETE COM ARO E CESTO UN 631,75000631,753.75.02 0,32000TINTA ESMALTE L 3,187209,963.75.50 0,32000FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 6,1472019,213.76.50 52,00000GALVANIZACAO A FOGO KG 92,040001,773.80.60 0,20000TINNER L 1,300006,50

LS 105,54851 BDI 605,80192Mão-de-Obra 86,51517 Material 2.441,85770SubMO 192,06368

06.03.072 QE-40 TABELA DE BASQUETE (PRE-LAJE TRELICADA) UN 3.382,73

1.01.11 1,72000CARPINTEIRO H 7,826004,551.01.12 3,25500AJUDANTE DE CARPINTEIRO H 12,889803,961.01.21 1,95000FERREIRO H 9,301504,771.01.22 1,95000AJUDANTE DE FERREIRO H 7,449003,821.01.39 5,54200PEDREIRO H 25,770304,651.01.40 1,91000PINTOR H 8,996104,711.01.41 1,91000AJUDANTE DE PINTOR H 7,296203,821.01.46 8,41200SERVENTE H 32,049723,812.05.03 0,02660AREIA M3 2,1067279,202.05.05 0,74000CAL HIDRATADA KG 0,251600,342.05.08 10,50000CIMENTO KG 3,885000,372.05.22 0,01040PEDRISCO M3 0,6874466,102.05.36 0,47000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 119,14030253,492.10.21 0,20400TABUAS PINHO DE 1"X12" DE 3A. M2 3,5047217,182.12.34 0,60000FORMA DE TUBO DE PAPELAO DIAM. 40CM M 63,94800106,582.12.39 0,50000FORMA DE TUBO DE PAPELAO Ø70CM M 112,05500224,112.15.25 19,50000ACO CA-50-A $MD BITOLAS KG 52,650002,70

09/02/2011 11:38:40 Página: 74 de 0

Page 75: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.20.55 0,29000ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT M3 733,746402.530,162.50.17 50,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 498,500009,972.50.20 50,00000MONTAGEM DE ESTRUTURA METALICA KG 108,500002,172.67.17 2,00000BRACADEIRA DE ACO GALV 64X13MM DN 30CM UN 67,2000033,602.67.60 0,01700PREGO KG 0,077694,572.70.10 0,39000ARAME RECOZIDO N.18 KG 1,805704,633.67.09 1,00000TABELA DE BASQUETE COM ARO E CESTO UN 631,75000631,753.75.02 0,32000TINTA ESMALTE L 3,187209,963.75.50 0,32000FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 6,1472019,213.76.50 52,00000GALVANIZACAO A FOGO KG 92,040001,773.80.60 0,20000TINNER L 1,300006,50

LS 136,12592 BDI 632,54313Mão-de-Obra 111,57862 Material 2.502,48297SubMO 247,70454

06.03.073 QE-41 TABELA DE BASQUETE (SOMENTE TRELICA - FIXACAO PAREDE/PILAR) UN 2.183,16

1.01.11 1,50000CARPINTEIRO H 6,825004,551.01.12 3,00000AJUDANTE DE CARPINTEIRO H 11,880003,961.01.39 2,50000PEDREIRO H 11,625004,651.01.40 2,56000PINTOR H 12,057604,711.01.41 2,56000AJUDANTE DE PINTOR H 9,779203,821.01.46 5,00000SERVENTE H 19,050003,812.50.17 67,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 667,990009,972.50.20 67,00000MONTAGEM DE ESTRUTURA METALICA KG 145,390002,172.66.92 4,00000CHUMBADOR KWIKBOLT - ACO CARBONO 3/4"X 51/2" UN 33,960008,493.67.09 1,00000TABELA DE BASQUETE COM ARO E CESTO UN 631,75000631,753.75.02 0,43000TINTA ESMALTE L 4,282809,963.75.50 0,43000FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 8,2603019,213.76.50 70,00000GALVANIZACAO A FOGO KG 123,900001,773.80.60 0,20000TINNER L 1,300006,50

LS 86,88450 BDI 408,23491Mão-de-Obra 71,21680 Material 1.616,83310SubMO 158,10130

06.03.074 QE-42 POSTE PARA REDE DE VOLEIBOL (FUNDACAO DIRETA) PR 836,46

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 2,00000SERVENTE H 7,620003,812.05.36 0,12300CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 31,17927253,493.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.17 1,00000QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR PR 490,02000490,023.67.20 1,00000REDE DE VOLEI C/ 4 FAIXAS UN 92,6300092,636.25.01 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM M 1,040001,306.25.08 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM M 16,5680020,71

LS 14,96940 BDI 156,41303Mão-de-Obra 12,27000 Material 652,81727SubMO 27,23940

06.03.075 QE-43 POSTE PARA REDE VOLEIBOL (LAJE ALVEOLAR) PR 848,69

1.01.39 1,62000PEDREIRO H 7,533004,651.01.46 3,32000SERVENTE H 12,649203,812.05.03 0,01440AREIA M3 1,1404879,202.05.05 0,40000CAL HIDRATADA KG 0,136000,342.05.08 5,66000CIMENTO KG 2,094200,372.05.22 0,00560PEDRISCO M3 0,3701666,103.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.17 1,00000QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR PR 490,02000490,023.67.20 1,00000REDE DE VOLEI C/ 4 FAIXAS UN 92,6300092,636.05.08 0,70000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 37,4220053,46

LS 24,62228 BDI 158,69939Mão-de-Obra 20,18220 Material 645,19284SubMO 44,80448

06.03.076 QE-44 POSTE PARA REDE VOLEIBOL (PRE-LAJE TRELICADA) PR 840,61

1.01.39 1,12000PEDREIRO H 5,208004,651.01.46 2,32000SERVENTE H 8,839203,812.05.03 0,01440AREIA M3 1,1404879,202.05.05 0,40000CAL HIDRATADA KG 0,136000,342.05.08 5,66000CIMENTO KG 2,094200,372.05.22 0,00560PEDRISCO M3 0,3701666,103.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.17 1,00000QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR PR 490,02000490,023.67.20 1,00000REDE DE VOLEI C/ 4 FAIXAS UN 92,6300092,636.05.08 0,70000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 37,4220053,466.25.34 0,50000TUBO PVC P/ESGOTO 150MM M 7,0500014,10

LS 17,13758 BDI 157,18835Mão-de-Obra 14,04720 Material 652,24284SubMO 31,18478

06.03.077 QE-45 TRAVE DE FUTEBOL DE SALAO (FUNDACAO DIRETA) UN 961,12

1.01.39 3,60000PEDREIRO H 16,740004,651.01.46 3,60000SERVENTE H 13,716003,812.05.36 0,12300CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 31,17927253,493.67.12 1,00000REDE PARA TRAVE DE GOL UN 36,8100036,813.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.18 1,00000QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE UN 606,81000606,816.25.01 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM M 1,040001,306.25.08 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM M 16,5680020,71

09/02/2011 11:38:40 Página: 75 de 0

Page 76: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 37,15632 BDI 179,72191Mão-de-Obra 30,45600 Material 713,78727SubMO 67,61232

06.03.078 QE-46 TRAVE DE FUTEBOL DE SALAO (LAJE ALVEOLAR) UN 923,68

1.01.39 1,62000PEDREIRO H 7,533004,651.01.46 3,32000SERVENTE H 12,649203,812.05.03 0,01440AREIA M3 1,1404879,202.05.05 0,40000CAL HIDRATADA KG 0,136000,342.05.08 5,66000CIMENTO KG 2,094200,372.05.22 0,00560PEDRISCO M3 0,3701666,103.67.12 1,00000REDE PARA TRAVE DE GOL UN 36,8100036,813.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.18 1,00000QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE UN 606,81000606,816.05.08 0,70000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 37,4220053,46

LS 24,62228 BDI 172,72249Mão-de-Obra 20,18220 Material 706,16284SubMO 44,80448

06.03.079 QE-47 TRAVE DE FUTEBOL DE SALAO (PRE-LAJE TRELICADA) UN 915,60

1.01.39 1,12000PEDREIRO H 5,208004,651.01.46 2,32000SERVENTE H 8,839203,812.05.03 0,01440AREIA M3 1,1404879,202.05.05 0,40000CAL HIDRATADA KG 0,136000,342.05.08 5,66000CIMENTO KG 2,094200,372.05.22 0,00560PEDRISCO M3 0,3701666,103.67.12 1,00000REDE PARA TRAVE DE GOL UN 36,8100036,813.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.18 1,00000QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE UN 606,81000606,816.05.08 0,70000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 37,4220053,466.25.34 0,50000TUBO PVC P/ESGOTO 150MM M 7,0500014,10

LS 17,13758 BDI 171,21145Mão-de-Obra 14,04720 Material 713,21284SubMO 31,18478

06.03.090 CAIXILHARIA EM ALUMINIO KG 52,13

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,40000SERVENTE H 1,524003,813.11.91 1,00000CAIXILHARIA EM ALUMINIO KG 34,8700034,87

LS 4,12848 BDI 9,74797Mão-de-Obra 3,38400 Material 34,87000SubMO 7,51248

06.03.091 CAIXILHARIA EM FERRO KG 16,87

3.11.90 1,00000CAIXILHARIA EM FERRO KG 13,7200013,72

LS 0,00000 BDI 3,15560Mão-de-Obra 0,00000 Material 13,72000SubMO 0,00000

06.03.099 SERVICOS EM ELEMENTOS METALICOS/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.50.030 DEGRAUS DE ESCADA DE MARINHEIRO EM GRAMPOS UN 2,08

1.01.46 0,20000SERVENTE H 0,762003,81

LS 0,92964 BDI 0,38908Mão-de-Obra 0,76200 Material 0,00000SubMO 1,69164

06.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.60.001 DE ESQUADRIAS METALICAS M2 16,17

1.01.39 0,70000PEDREIRO H 3,255004,651.01.46 0,70000SERVENTE H 2,667003,81

LS 7,22484 BDI 3,02377Mão-de-Obra 5,92200 Material 0,00000SubMO 13,14684

06.60.002 RETIRADA DE TELA M2 5,93

1.01.44 0,17500SERRALHEIRO H 1,414008,081.01.45 0,17500AJUDANTE SERRALHEIRO H 0,759504,34

LS 2,65167 BDI 1,10979Mão-de-Obra 2,17350 Material 0,00000SubMO 4,82517

06.60.005 DE BATENTES UN 27,72

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 1,20000SERVENTE H 4,572003,81

LS 12,38544 BDI 5,18361Mão-de-Obra 10,15200 Material 0,00000SubMO 22,53744

06.60.050 DE BRACO DE ALAVANCA UN 11,03

1.01.44 0,50000SERRALHEIRO H 4,040008,08

LS 4,92880 BDI 2,06282Mão-de-Obra 4,04000 Material 0,00000SubMO 8,96880

06.60.051 DE ALAVANCA UN 8,82

1.01.44 0,40000SERRALHEIRO H 3,232008,08

LS 3,94304 BDI 1,65026Mão-de-Obra 3,23200 Material 0,00000SubMO 7,17504

06.60.052 DE PUXADOR DE ENGATE PARA CAIXILHO DE CORRER UN 3,08

09/02/2011 11:38:40 Página: 76 de 0

Page 77: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.44 0,14000SERRALHEIRO H 1,131208,08

LS 1,38006 BDI 0,57759Mão-de-Obra 1,13120 Material 0,00000SubMO 2,51126

06.60.060 DE ESCADA DE MARINHEIRO COM GUARDA-CORPO M 18,48

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,81

LS 8,25696 BDI 3,45574Mão-de-Obra 6,76800 Material 0,00000SubMO 15,02496

06.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.70.001 DE ESQUADRIAS METALICAS M2 23,10

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,81

LS 10,32120 BDI 4,31968Mão-de-Obra 8,46000 Material 0,00000SubMO 18,78120

06.70.005 DE BATENTES UN 30,03

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,81

LS 13,41756 BDI 5,61558Mão-de-Obra 10,99800 Material 0,00000SubMO 24,41556

06.70.020 RECOLOCACAO DE TELA M2 7,80

1.01.44 0,23000SERRALHEIRO H 1,858408,081.01.45 0,23000AJUDANTE SERRALHEIRO H 0,998204,34

LS 3,48505 BDI 1,45858Mão-de-Obra 2,85660 Material 0,00000SubMO 6,34165

06.70.050 DE BRACO DE ALAVANCA M 26,47

1.01.44 1,20000SERRALHEIRO H 9,696008,08

LS 11,82912 BDI 4,95078Mão-de-Obra 9,69600 Material 0,00000SubMO 21,52512

06.70.051 DE ALAVANCA UN 24,26

1.01.44 1,10000SERRALHEIRO H 8,888008,08

LS 10,84336 BDI 4,53821Mão-de-Obra 8,88800 Material 0,00000SubMO 19,73136

06.70.052 DE PUXADOR DE ENGATE PARA CAIXILHO DE CORRER UN 4,41

1.01.44 0,20000SERRALHEIRO H 1,616008,08

LS 1,97152 BDI 0,82513Mão-de-Obra 1,61600 Material 0,00000SubMO 3,58752

06.70.060 DE ESCADA MARINHEIRO COM GUARDA CORPO M 18,48

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,81

LS 8,25696 BDI 3,45574Mão-de-Obra 6,76800 Material 0,00000SubMO 15,02496

06.70.099 RECOLOCACOES DE ELEMENTOS METALICOS/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

06.80.001 CAIXILHO BASCULANTE EM PERFIL DE FERRO M2 387,68

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.12.44 1,00000CAIXILHO DE FERRO BASCULANTE M2 296,41000296,41

LS 10,32120 BDI 72,49398Mão-de-Obra 8,46000 Material 296,41000SubMO 18,78120

06.80.003 CAIXILHO FIXO EM PERFIL DE FERRO M2 329,92

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.12.45 1,00000CAIXILHO DE FERRO FIXO M2 249,45000249,45

LS 10,32120 BDI 61,69318Mão-de-Obra 8,46000 Material 249,45000SubMO 18,78120

06.80.005 CAIXILHO DE CORRER EM PERFIL DE FERRO M2 97,71

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,813.12.49 0,18000CAIXILHO CORRER 068005 UN 55,02780305,71

LS 13,41756 BDI 18,27197Mão-de-Obra 10,99800 Material 55,02780SubMO 24,41556

06.80.007 FOLHA PARA CAIXILHO DE CORRER EM PERFIL DE FERRO M2 256,77

1.01.44 0,80000SERRALHEIRO H 6,464008,083.12.14 0,72000FOLHA P/CAIXILHO 068007 UN 194,40720270,01

LS 7,88608 BDI 48,01417Mão-de-Obra 6,46400 Material 194,40720SubMO 14,35008

06.80.009 CAIXILHO MAXIMAR DE FERRO M2 281,63

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,813.11.13 0,18000CAIXILHO MAXIMAR UN 204,555601.136,42

09/02/2011 11:38:40 Página: 77 de 0

Page 78: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 13,41756 BDI 52,66337Mão-de-Obra 10,99800 Material 204,55560SubMO 24,41556

06.80.015 PORTA DE ABRIR COM BATENTE EM CHAPA DE FERRO M2 681,23

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,813.12.22 1,00000PF-05 PORTA CHAPA N.14 C/BATENTE M2 516,29000516,29

LS 20,64240 BDI 127,38605Mão-de-Obra 16,92000 Material 516,29000SubMO 37,56240

06.80.019 PORTA PANTOGRAFICA M2 589,71

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,813.12.35 1,00000PORTA PANTOGRAFICA M2 464,42000464,42

LS 8,25696 BDI 110,27234Mão-de-Obra 6,76800 Material 464,42000SubMO 15,02496

06.80.020 PORTA DE ENROLAR EM TIRAS ARTICULADAS M2 268,69

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,813.12.37 1,00000BA-02PORTA DE ACO DE ENROLAR M2 203,43000203,43

LS 8,25696 BDI 50,24464Mão-de-Obra 6,76800 Material 203,43000SubMO 15,02496

06.80.021 PORTA DE ENROLAR EM GRADES RETANGULARES M2 287,14

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,813.12.36 1,00000PORTA ENROLAR EM GRADES RETANGULARES M2 218,43000218,43

LS 8,25696 BDI 53,69464Mão-de-Obra 6,76800 Material 218,43000SubMO 15,02496

06.80.023 PORTAO DE 1 FOLHA DE TUBOS E TELA GALVANIZADOS COM PORTA CADEADO M2 339,86

1.01.39 0,85000PEDREIRO H 3,952504,651.01.46 0,85000SERVENTE H 3,238503,813.12.25 0,27000PORTA DE TELA PT-06 UN 260,35020964,26

LS 8,77302 BDI 63,55227Mão-de-Obra 7,19100 Material 260,35020SubMO 15,96402

06.80.025 PORTAO DE 2 FOLHAS DE TUBO E TELA GALVANIZADOS COM PORTA CADEADO M2 353,71

1.01.39 0,55000PEDREIRO H 2,557504,651.01.46 0,55000SERVENTE H 2,095503,813.12.33 0,14000PORTA DE TELA PT-05 UN 277,242001.980,30

LS 5,67666 BDI 66,14148Mão-de-Obra 4,65300 Material 277,24200SubMO 10,32966

06.80.029 TELA DE PROTEC P/CAIXILHO C/REQ DE PERFIL DE FERRO E TELA ARAME GALV M2 140,12

1.01.44 1,80000SERRALHEIRO H 14,544008,081.01.45 1,80000AJUDANTE SERRALHEIRO H 7,812004,342.66.78 4,62000FERRO CANTONEIRA 1X1X1/8' KG 12,289202,662.75.29 1,00000TELA PROT. 1/2 X 1/2 FIO 15 PARA CAIXILHO M2 52,0000052,00

LS 27,27432 BDI 26,20149Mão-de-Obra 22,35600 Material 64,28920SubMO 49,63032

06.80.031 TELA MOSQUITEIRO COM REQUADRO DE PERFIL DE FERRO M2 79,55

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,812.75.23 2,27000TP-01 TELA/DISPENSA COMPLETA UN 45,8994020,22

LS 10,32120 BDI 14,87654Mão-de-Obra 8,46000 Material 45,89940SubMO 18,78120

06.80.033 CHAPA DE FERRO N 14, INCLUSIVE SOLDAGEM M2 143,89

1.01.44 1,80000SERRALHEIRO H 14,544008,081.01.45 1,80000AJUDANTE SERRALHEIRO H 7,812004,342.67.04 15,26000CHAPA DE FERRO N.14 KG 45,627402,996.95.65 1,60000SOLDA ELETRICA KG 21,7280013,58

LS 27,27432 BDI 26,90672Mão-de-Obra 22,35600 Material 67,35540SubMO 49,63032

06.80.035 ALCAPAO EM CHAPA DE FERRO COM PORTA CADEADO M2 196,23

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,813.13.90 1,73000PF-07TAMPA INSPECAO UN 121,9823070,51

LS 20,64240 BDI 36,69528Mão-de-Obra 16,92000 Material 121,98230SubMO 37,56240

06.80.042 COLUNA DE BATENTE MOVEL PARA PORTAS DE ENROLAR UN 173,01

1.01.44 2,00000SERRALHEIRO H 16,160008,083.13.65 1,00000COLUNA MOVEL P/PORTA ENROLAR UN 104,46000104,463.16.02 1,00000ALAVANCA P/COLUNA MOVEL UN 0,330000,33

LS 19,71520 BDI 32,35300Mão-de-Obra 16,16000 Material 104,79000SubMO 35,87520

06.80.043 BRACO DE ALAVANCA DE FERRO M 29,13

1.01.44 1,20000SERRALHEIRO H 9,696008,082.68.50 0,01040REBITE DE FERRO ZINCADO CABECA REDONDA 5/32"X1/2" KG 0,1400913,473.16.06 1,00000BRACO DE ALAVANCA - FERRO CHATO 5/8" X 3/16" M 2,020002,02

LS 11,82912 BDI 5,44760Mão-de-Obra 9,69600 Material 2,16009SubMO 21,52512

09/02/2011 11:38:40 Página: 78 de 0

Page 79: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

06.80.044 ALAVANCA PARA CAIXILHO BASCULANTE UN 27,64

1.01.44 1,10000SERRALHEIRO H 8,888008,082.65.51 0,00450REBITE DE FERRO ZINCADO CABECA REDONDA 5/32"X3/4" KG 0,0606213,473.16.01 1,00000ALAVANCA ACO CARBONO ZINCADO E=3MM COMP 140/145MM UN 2,680002,68

LS 10,84336 BDI 5,16855Mão-de-Obra 8,88800 Material 2,74062SubMO 19,73136

06.80.045 PUXADORES DE ENGATE EM LATAO CROMADO PARA CAIXILHO DE CORRER UN 60,93

1.01.44 0,50000SERRALHEIRO H 4,040008,083.17.49 1,00000PUCHADOR DE CENTRO PARA JANELAS UN 40,5700040,57

LS 4,92880 BDI 11,39392Mão-de-Obra 4,04000 Material 40,57000SubMO 8,96880

06.80.046 CADEADO E PORTA CADEADO UN 26,55

1.01.44 0,50000SERRALHEIRO H 4,040008,083.16.12 1,00000PORTA CADEADO 63 MM - ACO ZINCADO UN 1,420001,423.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,20

LS 4,92880 BDI 4,96542Mão-de-Obra 4,04000 Material 12,62000SubMO 8,96880

06.80.049 LUBRIFICACAO DE CAIXILHO E TROCA DE REBITES M2 5,97

1.01.44 0,24000SERRALHEIRO H 1,939208,082.68.50 0,01730REBITE DE FERRO ZINCADO CABECA REDONDA 5/32"X1/2" KG 0,2330313,473.12.99 0,05000OLEO LUBRIFICANTE L 0,320506,41

LS 2,36582 BDI 1,11747Mão-de-Obra 1,93920 Material 0,55353SubMO 4,30502

06.80.050 FERRO TRABALHADO (CAIXILHO) KG 24,39

3.12.17 1,00000ESQUADRIA DE FERRO (TIPO CONESP) KG 19,8300019,83

LS 0,00000 BDI 4,56090Mão-de-Obra 0,00000 Material 19,83000SubMO 0,00000

06.80.082 CAIXILHO FIXO EM ALUMINIO ANODIZADO M2 162,10

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,813.11.11 0,36000CAIXILHO FIXO 068082 UN 113,01480313,93

LS 10,32120 BDI 30,31308Mão-de-Obra 8,46000 Material 113,01480SubMO 18,78120

06.80.084 CAIXILHO DE CORRER EM ALUMINIO ANODIZADO M2 126,23

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,813.11.12 0,18000CAIXILHO CORRER 068084 UN 78,21360434,52

LS 13,41756 BDI 23,60471Mão-de-Obra 10,99800 Material 78,21360SubMO 24,41556

06.80.086 FOLHA PARA CAIXILHO DE CORRER EM ALUMINIO ANODIZADO M2 377,83

1.01.44 0,80000SERRALHEIRO H 6,464008,083.11.17 0,72000FOLHA P/CAIXILHO 068086 UN 292,83120406,71

LS 7,88608 BDI 70,65169Mão-de-Obra 6,46400 Material 292,83120SubMO 14,35008

06.80.088 CAIXILHO MAXIMAR EM ALUMINIO ANODIZADO M2 533,23

1.01.39 1,30000PEDREIRO H 6,045004,651.01.46 1,30000SERVENTE H 4,953003,813.11.56 1,00000CAIXILHO ALUMINIO TIPO MAXIMAR M2 409,11000409,11

LS 13,41756 BDI 99,71088Mão-de-Obra 10,99800 Material 409,11000SubMO 24,41556

06.80.094 BRACO DE ALAVANCA DE ALUMINIO M 30,16

1.01.44 1,20000SERRALHEIRO H 9,696008,082.68.55 0,01000REBITE DE ALUMINIO CABECA REDONDA 5/32"X3/4" KG 0,3865038,653.16.05 1,00000BRACO DE ALAVANCA ALUMINIO 3/4" X 1/4" M 2,610002,61

LS 11,82912 BDI 5,63997Mão-de-Obra 9,69600 Material 2,99650SubMO 21,52512

06.80.096 PUXADOR DE ENGATE DE ALUMINIO TIPO "BICO DE PAPAGAIO" UN 9,59

1.01.44 0,20000SERRALHEIRO H 1,616008,083.17.11 1,00000PUXADOR ENGATE ALUM 'BICO PAPAGAIO' UN 4,210004,21

LS 1,97152 BDI 1,79343Mão-de-Obra 1,61600 Material 4,21000SubMO 3,58752

06.80.099 SERVICOS EM ELEMENTOS METALICOS/COMPONENTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.01.001 EM TESOURAS PARA TELHAS CERAMICAS - VAOS ATE 7.00 M M2 79,60

1.01.11 1,25000CARPINTEIRO H 5,687504,551.01.12 1,25000AJUDANTE DE CARPINTEIRO H 4,950003,962.10.05 0,02700MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 37,683631.395,692.50.13 0,22000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 2,9172013,262.67.60 0,11000PREGO KG 0,502704,57

LS 12,97775 BDI 14,88532Mão-de-Obra 10,63750 Material 41,10353SubMO 23,61525

07.01.002 EM TESOURAS PARA TELHAS CERAMICAS - VAOS DE 7.01 A 10.00 M M2 84,41

1.01.11 1,30000CARPINTEIRO H 5,915004,55

09/02/2011 11:38:40 Página: 79 de 0

Page 80: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,962.10.05 0,02900MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 40,475011.395,692.50.13 0,23000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 3,0498013,262.67.60 0,12000PREGO KG 0,548404,57

LS 13,49686 BDI 15,78561Mão-de-Obra 11,06300 Material 44,07321SubMO 24,55986

07.01.003 EM TESOURAS PARA TELHAS CERAMICAS - VAOS DE 10.01 A 13.00 M M2 89,23

1.01.11 1,35000CARPINTEIRO H 6,142504,551.01.12 1,35000AJUDANTE DE CARPINTEIRO H 5,346003,962.10.05 0,03100MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 43,266391.395,692.50.13 0,24000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 3,1824013,262.67.60 0,13000PREGO KG 0,594104,57

LS 14,01597 BDI 16,68589Mão-de-Obra 11,48850 Material 47,04289SubMO 25,50447

07.01.004 EM TESOURAS PARA TELHAS CERAMICAS - VAOS DE 13.01 A 18.00 M M2 97,14

1.01.11 1,45000CARPINTEIRO H 6,597504,551.01.12 1,45000AJUDANTE DE CARPINTEIRO H 5,742003,962.10.05 0,03400MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 47,453461.395,692.50.13 0,26000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 3,4476013,262.67.60 0,15000PREGO KG 0,685504,57

LS 15,05419 BDI 18,16546Mão-de-Obra 12,33950 Material 51,58656SubMO 27,39369

07.01.010 EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS ATE 7,00 M M2 57,07

1.01.11 0,95000CARPINTEIRO H 4,322504,551.01.12 0,95000AJUDANTE DE CARPINTEIRO H 3,762003,962.10.05 0,01800MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 25,122421.395,692.50.13 0,22000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 2,9172013,262.67.60 0,09000PREGO KG 0,411304,57

LS 9,86309 BDI 10,67166Mão-de-Obra 8,08450 Material 28,45092SubMO 17,94759

07.01.011 EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS DE 7.01 A 10,00 M M2 61,88

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,962.10.05 0,02000MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 27,913801.395,692.50.13 0,23000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 3,0498013,262.67.60 0,10000PREGO KG 0,457004,57

LS 10,38220 BDI 11,57194Mão-de-Obra 8,51000 Material 31,42060SubMO 18,89220

07.01.012 EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS DE 10.01 A 13,00 M M2 66,69

1.01.11 1,05000CARPINTEIRO H 4,777504,551.01.12 1,05000AJUDANTE DE CARPINTEIRO H 4,158003,962.10.05 0,02200MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 30,705181.395,692.50.13 0,24000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 3,1824013,262.67.60 0,11000PREGO KG 0,502704,57

LS 10,90131 BDI 12,47223Mão-de-Obra 8,93550 Material 34,39028SubMO 19,83681

07.01.013 EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS DE 13,01 A 18,00 M M2 72,89

1.01.11 1,15000CARPINTEIRO H 5,232504,551.01.12 1,15000AJUDANTE DE CARPINTEIRO H 4,554003,962.10.05 0,02400MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 33,496561.395,692.50.13 0,26000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 3,4476013,262.67.60 0,13000PREGO KG 0,594104,57

LS 11,93953 BDI 13,63079Mão-de-Obra 9,78650 Material 37,53826SubMO 21,72603

07.01.025 EM TERCAS PARA TELHAS CERAMICAS M2 44,62

1.01.11 0,65000CARPINTEIRO H 2,957504,551.01.12 0,65000AJUDANTE DE CARPINTEIRO H 2,574003,962.10.05 0,01700MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 23,726731.395,692.67.60 0,06000PREGO KG 0,274204,57

LS 6,74843 BDI 8,34460Mão-de-Obra 5,53150 Material 24,00093SubMO 12,27993

07.01.026 EM TERCAS PARA TELHAS DE CIM-AM/AL/PLAST M2 13,52

1.01.11 0,15000CARPINTEIRO H 0,682504,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.10.05 0,00600MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 8,374141.395,692.67.60 0,05000PREGO KG 0,228504,57

LS 1,31577 BDI 2,52929Mão-de-Obra 1,07850 Material 8,60264SubMO 2,39427

07.01.027 EM TERCAS PARA TELHAS TRAPEZOIDAIS M2 9,57

1.01.11 0,15000CARPINTEIRO H 0,682504,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.10.05 0,00370MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 5,164051.395,692.67.60 0,05000PREGO KG 0,228504,57

LS 1,31577 BDI 1,79097Mão-de-Obra 1,07850 Material 5,39255SubMO 2,39427

07.01.035 EM TRELICAS PARA TELHAS ONDULADAS CIM-AM - PROJ.MOD.81 M2 59,41

09/02/2011 11:38:40 Página: 80 de 0

Page 81: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.11 0,79000CARPINTEIRO H 3,594504,551.01.12 0,79000AJUDANTE DE CARPINTEIRO H 3,128403,962.10.05 0,01900MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 26,518111.395,692.50.13 0,50000FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 6,6300013,262.67.60 0,05000PREGO KG 0,228504,57

LS 8,20194 BDI 11,10933Mão-de-Obra 6,72290 Material 33,37661SubMO 14,92484

07.01.098 PECAS DE MADEIRA MACICA M3 2.779,24

1.01.11 45,00000CARPINTEIRO H 204,750004,551.01.12 45,00000AJUDANTE DE CARPINTEIRO H 178,200003,962.10.05 1,00000MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 1.395,690001.395,692.67.60 3,00000PREGO KG 13,710004,57

LS 467,19900 BDI 519,69627Mão-de-Obra 382,95000 Material 1.409,40000SubMO 850,14900

07.01.099 ESTRUTURAS DE COBERTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.02.001 FORNECIMENTO DE EST MET - ACO ESTRUTURAL ASTM OU ABNT - NAO PATINAVEL KG 12,26

2.50.17 1,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 9,970009,97

LS 0,00000 BDI 2,29310Mão-de-Obra 0,00000 Material 9,97000SubMO 0,00000

07.02.003 FORNEC DE ESTR METALICA ACO ASTM A709/A588 (RESIST A CORROSAO) KG 12,57

2.50.16 1,00000ESTR MET ACO RESIST A CORROSAO (ASTM A709/A588) KG 10,2200010,22

LS 0,00000 BDI 2,35060Mão-de-Obra 0,00000 Material 10,22000SubMO 0,00000

07.02.006 FORNECIMENTO DE ESTRUTURA METALICA EM ALUMINIO (ESPACIAL) KG 38,67

2.50.21 1,00000ESTRUTURA ESPACIAL EM ALUMINIO - MATERIAL KG 31,4400031,44

LS 0,00000 BDI 7,23120Mão-de-Obra 0,00000 Material 31,44000SubMO 0,00000

07.02.010 MONTAGEM DE ESTRUTURA METALICA KG 2,66

2.50.20 1,00000MONTAGEM DE ESTRUTURA METALICA KG 2,170002,17

LS 0,00000 BDI 0,49910Mão-de-Obra 0,00000 Material 2,17000SubMO 0,00000

07.02.015 MONTAGEM DE ESTRUTURA METALICO EM ALUMINIO (ESPACIAL) KG 4,85

2.50.22 1,00000MONTAGEM ESTRUTURA ESPACIAL EM ALUMINIO KG 3,950003,95

LS 0,00000 BDI 0,90850Mão-de-Obra 0,00000 Material 3,95000SubMO 0,00000

07.02.020 FORNECIMENTO E MONTAGEM DE ESTRUTURA METALICA - MULTIVIGAS KG 4,66

2.50.30 1,00000FORNEC E MONTAGEM DE ESTRUTURA METALICA-MULTIVIGAS KG 3,790003,79

LS 0,00000 BDI 0,87170Mão-de-Obra 0,00000 Material 3,79000SubMO 0,00000

07.02.099 ESTRUTURAS DE COBERTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.03.001 TELHAS DE BARRO FRANCESA M2 43,77

1.01.46 1,00000SERVENTE H 3,810003,811.01.50 0,50000TELHADISTA H 2,275004,552.55.01 16,00000TELHA TIPO FRANCESA UN 22,080001,38

LS 7,42370 BDI 8,18540Mão-de-Obra 6,08500 Material 22,08000SubMO 13,50870

07.03.002 TELHAS DE BARRO PAULISTA M2 87,98

1.01.46 1,98000SERVENTE H 7,543803,811.01.50 1,04000TELHADISTA H 4,732004,552.05.03 0,00100AREIA M3 0,0792079,202.05.05 0,19000CAL HIDRATADA KG 0,064600,342.05.08 0,10000CIMENTO KG 0,037000,372.55.02 30,00000TELHA TIPO PAULISTA UN 44,100001,47

LS 14,97648 BDI 16,45261Mão-de-Obra 12,27580 Material 44,28080SubMO 27,25228

07.03.003 TELHAS DE BARRO PLAN M2 67,87

1.01.46 1,60000SERVENTE H 6,096003,811.01.50 0,85000TELHADISTA H 3,867504,552.05.03 0,00100AREIA M3 0,0792079,202.05.05 0,19000CAL HIDRATADA KG 0,064600,342.05.08 0,10000CIMENTO KG 0,037000,372.55.08 24,00000TELHA DE BARRO TIPO PLAN UN 32,880001,37

LS 12,15547 BDI 12,69135Mão-de-Obra 9,96350 Material 33,06080SubMO 22,11897

07.03.004 TELHA DE BARRO ROMANA M2 36,04

1.01.46 1,10000SERVENTE H 4,191003,811.01.50 0,60000TELHADISTA H 2,730004,552.05.03 0,00100AREIA M3 0,0792079,202.05.05 0,19000CAL HIDRATADA KG 0,064600,34

09/02/2011 11:38:40 Página: 81 de 0

Page 82: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.08 0,10000CIMENTO KG 0,037000,372.55.06 16,00000TELHA DE BARRO ROMANA UN 13,760000,86

LS 8,44362 BDI 6,74025Mão-de-Obra 6,92100 Material 13,94080SubMO 15,36462

07.03.005 TELHA DE BARRO PORTUGUESA M2 36,83

1.01.46 1,10000SERVENTE H 4,191003,811.01.50 0,60000TELHADISTA H 2,730004,552.05.03 0,00100AREIA M3 0,0792079,202.05.05 0,19000CAL HIDRATADA KG 0,064600,342.05.08 0,10000CIMENTO KG 0,037000,372.55.04 16,00000TELHA DE BARRO TIPO PORTUGUESA UN 14,400000,90

LS 8,44362 BDI 6,88745Mão-de-Obra 6,92100 Material 14,58080SubMO 15,36462

07.03.006 TELHA DE BARRO COLONIAL M2 74,07

1.01.46 1,60000SERVENTE H 6,096003,811.01.50 0,85000TELHADISTA H 3,867504,552.05.03 0,00100AREIA M3 0,0792079,202.05.05 0,19000CAL HIDRATADA KG 0,064600,342.05.08 0,10000CIMENTO KG 0,037000,372.55.05 24,00000TELHA DE BARRO TIPO COLONIAL UN 37,920001,58

LS 12,15547 BDI 13,85055Mão-de-Obra 9,96350 Material 38,10080SubMO 22,11897

07.03.010 TELHAS DE VIDRO PLAN M2 638,13

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,20000SERVENTE H 4,572003,812.55.50 24,00000TELHA DE VIDRO TIPO "PLAN" UN 500,4000020,85

LS 10,11624 BDI 119,32590Mão-de-Obra 8,29200 Material 500,40000SubMO 18,40824

07.03.011 TELHAS DE VIDRO PAULISTA M2 217,26

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 1,60000SERVENTE H 6,096003,812.55.62 16,00000TELHA DE VIDRO TIPO "PAULISTA" UN 150,720009,42

LS 14,24472 BDI 40,62737Mão-de-Obra 11,67600 Material 150,72000SubMO 25,92072

07.03.012 TELHAS DE VIDRO FRANCESA M2 462,78

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,80000SERVENTE H 3,048003,812.55.61 16,00000TELHA DE VIDRO TIPO "FRANCESA" UN 364,3200022,77

LS 6,55506 BDI 86,53705Mão-de-Obra 5,37300 Material 364,32000SubMO 11,92806

07.03.013 TELHAS DE VIDRO ROMANA M2 453,73

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,80000SERVENTE H 3,048003,812.55.60 16,00000TELHA DE VIDRO TIPO ROMANA UN 356,9600022,31

LS 6,55506 BDI 84,84425Mão-de-Obra 5,37300 Material 356,96000SubMO 11,92806

07.03.018 TELHAS DE VIDRO PORTUGUESA M2 525,17

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,80000SERVENTE H 3,048003,812.55.63 16,00000TELHA DE VIDRO TIPO PORTUGUESA UN 415,0400025,94

LS 6,55506 BDI 98,20265Mão-de-Obra 5,37300 Material 415,04000SubMO 11,92806

07.03.019 TELHA DE VIDRO COLONIAL M2 758,87

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,20000SERVENTE H 4,572003,812.55.64 24,00000TELHA DE VIDRO TIPO COLONIAL CAPA E CANAL UN 598,5600024,94

LS 10,11624 BDI 141,90270Mão-de-Obra 8,29200 Material 598,56000SubMO 18,40824

07.03.023 TELHA TECNOLOGIA CRFS MODULAR E=8MM M2 75,98

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,962.56.63 1,24000TELHA TECNOLOGIA CRFS MODULAR E=8MM M2 50,5424040,762.65.78 1,10000CALCO PLASTICO P/ FIXACAO TELHA MODULADA FIBROCIM UN 2,288002,082.65.91 1,10000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,099000,092.66.07 1,10000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,539000,49

LS 4,56402 BDI 14,20789Mão-de-Obra 3,74100 Material 53,46840SubMO 8,30502

07.03.024 TELHA TECNOLOGIA CRFS TRAPEZOIDAL 44CM E=8MM M2 68,21

1.01.11 0,26000CARPINTEIRO H 1,183004,551.01.12 0,52000AJUDANTE DE CARPINTEIRO H 2,059203,962.56.64 1,09000TELHA TECNOLOGIA CRFS TRAPEZOIDAL 44CM E=8MM M2 47,6439043,712.65.91 0,75000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,067500,092.66.12 0,75000PARAFUSO 8X65MM OU GANCHO FIX.TELHA TRAPEZOIDAL UN 0,322500,432.66.53 0,25000FIXADOR DE ABAS PARA TELHAS DE FIBRA UN 0,225000,90

LS 3,95548 BDI 12,75501Mão-de-Obra 3,24220 Material 48,25890SubMO 7,19768

09/02/2011 11:38:40 Página: 82 de 0

Page 83: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

07.03.027 TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM E=8MM M2 60,40

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,90000AJUDANTE DE CARPINTEIRO H 3,564003,962.56.66 1,09000TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM E=8MM M2 37,5396034,442.65.91 0,24000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,021600,092.66.13 0,24000PARAFUSO 8X110MM OU GANCHO FIX.TELHA TRAPEZOIDAL UN 0,117600,492.66.53 0,54000FIXADOR DE ABAS PARA TELHAS DE FIBRA UN 0,486000,90

LS 6,01338 BDI 11,29465Mão-de-Obra 4,92900 Material 38,16480SubMO 10,94238

07.03.028 TELHA DE ALUMINIO ONDULADA ACAB. NATURAL E=0,5MM M2 43,81

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.55.30 1,67000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 27,5216016,482.66.54 2,76000GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO UN 2,428800,88

LS 3,11466 BDI 8,19215Mão-de-Obra 2,55300 Material 29,95040SubMO 5,66766

07.03.029 TELHA DE ALUMINIO ONDULADA ACAB. NATURAL E=0,7MM M2 57,39

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.55.30 2,34000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 38,5632016,482.66.54 2,76000GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO UN 2,428800,88

LS 3,11466 BDI 10,73172Mão-de-Obra 2,55300 Material 40,99200SubMO 5,66766

07.03.030 TELHA DE ALUMINIO TRAPEZOIDAL ACAB. NATURAL E=0,5MM M2 41,35

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.55.30 1,60000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 26,3680016,482.66.51 1,80000GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO UN 1,584000,88

LS 3,11466 BDI 7,73252Mão-de-Obra 2,55300 Material 27,95200SubMO 5,66766

07.03.031 TELHA DE ALUMINIO TRAPEZOIDAL ACAB. NATURAL E=0,7MM M2 54,42

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.55.30 2,24500TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 36,9976016,482.66.51 1,80000GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO UN 1,584000,88

LS 3,11466 BDI 10,17733Mão-de-Obra 2,55300 Material 38,58160SubMO 5,66766

07.03.032 TELHA DE POLIESTER (PERFIL DA ONDULADA ALUMINIO) - E=1,2MM M2 51,21

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.56.75 1,15000TELHA DE POLIESTER (PERFIL OND. ALUM.) - E=1,2MM M2 33,5455029,172.66.54 2,76000GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO UN 2,428800,88

LS 3,11466 BDI 9,57765Mão-de-Obra 2,55300 Material 35,97430SubMO 5,66766

07.03.033 TELHA DE PVC RIGIDO TRANSLUCIDA - PERFIL FIBROCIMENTO ONDULADA M2 64,19

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.55.44 1,15000TELHA PVC RIGIDO TRANSLUCIDA - PERFIL OND FIBROCIM M2 47,2075041,052.65.91 1,42000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,127800,092.66.07 1,42000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,695800,49

LS 2,28408 BDI 12,00310Mão-de-Obra 1,87220 Material 48,03110SubMO 4,15628

07.03.035 TELHA DE POLIESTER (PERFIL DA TRAPEZOIDAL ALUMINIO) - E=1,2MM M2 51,01

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.55.59 1,15000TELHA DE POLIESTER (PERFIL TRAP. ALUM.) - E=1,2MM M2 34,2240029,762.66.51 1,80000GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO UN 1,584000,88

LS 3,11466 BDI 9,53940Mão-de-Obra 2,55300 Material 35,80800SubMO 5,66766

07.03.037 TELHA CALANDRADA ACO GALV NATURAL ONDULADA E=0,80MM M2 69,51

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.57 1,15000TELHA CALANDRADA DE ACO GALV NAT OND E=0,80MM M2 47,9205041,672.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 12,99900Mão-de-Obra 3,40400 Material 48,96050SubMO 7,55688

07.03.038 TELHA DE CONCRETO CINZA PEROLA / NATURAL M2 39,14

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 1,00000SERVENTE H 3,810003,812.55.65 10,50000TELHA DE CONCRETO TIPO TEGULA - COR PEROLA UN 20,790001,98

LS 6,06645 BDI 7,32066Mão-de-Obra 4,97250 Material 20,79000SubMO 11,03895

07.03.039 TELHA DE CONCRETO COLORIDA M2 43,66

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 1,00000SERVENTE H 3,810003,81

09/02/2011 11:38:40 Página: 83 de 0

Page 84: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.55.66 10,50000TELHA DE CONCRETO TIPO TEGULA - COR VERMELHA UN 24,465002,33

LS 6,06645 BDI 8,16591Mão-de-Obra 4,97250 Material 24,46500SubMO 11,03895

07.03.050 TELHA DE ACO GALV PINT 1 FACE PO OU COIL-COATING ONDULADA E=0,5 MM M2 45,17

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.80 1,15000TELHA ACO GALV PINT 1 FACE ONDULADA E=0.5MM M2 28,1290024,462.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 8,44695Mão-de-Obra 3,40400 Material 29,16900SubMO 7,55688

07.03.051 TELHA CALANDRADA ACO GALVANIZADA PINTADA 1 FACE OND E=0,80MM M2 88,49

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.81 1,15000TELHA CALANDRADA ACO GALV PINT 1 FACE OND E=0,80MM M2 63,3535055,092.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 16,54859Mão-de-Obra 3,40400 Material 64,39350SubMO 7,55688

07.03.052 TELHA DE ACO GALV PINT 1 FACE PO OU COIL-COATING ONDULADA E=0,65MM M2 54,26

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.84 1,15000TELHA ACO GALV PINT 1 FACE ONDULADA E=0.65MM M2 35,5235030,892.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 10,14769Mão-de-Obra 3,40400 Material 36,56350SubMO 7,55688

07.03.053 TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,5MM H ATE 40MM M2 45,14

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.85 1,15000TELHA ACO GALV PINT 1 FACE TRAP E=0,5MM H ATE 40MM M2 28,1060024,442.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 8,44166Mão-de-Obra 3,40400 Material 29,14600SubMO 7,55688

07.03.054 TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,65MM H ATE 40MM M2 53,46

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.86 1,15000TELHA ACO GALV PINT 1 FACE TRAPEZ E=0.65MM H=40MM M2 34,8680030,322.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 9,99692Mão-de-Obra 3,40400 Material 35,90800SubMO 7,55688

07.03.055 TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,5MM H=100MM M2 46,87

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.87 1,15000TELHA ACO GALV PINT 1 FACE TRAPEZ E=0,5MM H=100MM M2 29,5090025,662.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 8,76435Mão-de-Obra 3,40400 Material 30,54900SubMO 7,55688

07.03.056 TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,65MM H=100MM M2 63,66

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.88 1,15000TELHA ACO GALV PINT 1 FACE TRAPEZ E=0,65MM H=100M M2 43,1595037,532.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 11,90397Mão-de-Obra 3,40400 Material 44,19950SubMO 7,55688

07.03.057 TELHA DE ACO GALV PINT 1 FACE PO OU COIL-COATING ONDULADA E=0.8MM M2 66,63

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.21 1,15000TELHA ACO GALV PINT 1 FACE ONDULADA E=0,80MM M2 45,5745039,632.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 12,45942Mão-de-Obra 3,40400 Material 46,61450SubMO 7,55688

07.03.060 TELHA DE POLIESTER (PERFIL DA ONDULADA FIBROCIMENTO) M2 46,70

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.55.40 1,15000TELHA DE POLIESTER PERFIL ONDULADO FIBROCIMENTO M2 32,9935028,692.65.91 1,42000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,127800,092.66.07 1,42000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,695800,49

LS 2,28408 BDI 8,73388Mão-de-Obra 1,87220 Material 33,81710SubMO 4,15628

07.03.061 TELHA DE POLIESTER (PERFIL DA CANALETE 49/KALHETA) M2 46,16

1.01.11 0,21000CARPINTEIRO H 0,955504,551.01.12 0,63000AJUDANTE DE CARPINTEIRO H 2,494803,962.56.08 1,06000TELHA DE POLIESTER (PERFIL 49 OU KALHETA) M2 28,9910027,352.65.91 0,59000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,053100,092.66.05 0,59000PARAFUSO OU GANCHO FIX TELHA TRAPEZ 49CM UN 0,831901,41

LS 4,20937 BDI 8,63320Mão-de-Obra 3,45030 Material 29,87600SubMO 7,65967

07.03.062 TELHA DE POLIESTER (PERFIL DA CANALETA 90/KACHETAO) M2 71,32

09/02/2011 11:38:40 Página: 84 de 0

Page 85: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,90000AJUDANTE DE CARPINTEIRO H 3,564003,962.56.09 1,09000TELHA DE POLIESTER (PERFIL 90 OU KALHETAO) M2 46,4231042,592.65.91 0,24000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,021600,092.66.13 0,24000PARAFUSO 8X110MM OU GANCHO FIX.TELHA TRAPEZOIDAL UN 0,117600,492.66.53 0,54000FIXADOR DE ABAS PARA TELHAS DE FIBRA UN 0,486000,90

LS 6,01338 BDI 13,33786Mão-de-Obra 4,92900 Material 47,04830SubMO 10,94238

07.03.063 TELHA DE POLIESTER (PERFIL DA MAXIPLAC) M2 45,33

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.10 1,15000TELHA DE POLIESTER (PERFIL MAXIPLAC) M2 31,8780027,722.65.91 1,42000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,127800,092.66.07 1,42000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,695800,49

LS 2,28408 BDI 8,47731Mão-de-Obra 1,87220 Material 32,70160SubMO 4,15628

07.03.064 TELHA DE POLIESTER (PERFIL DA ONDULADA ACO) - E=1,2MM M2 44,93

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.11 1,15000TELHA DE POLIESTER (PERFIL OND. ACO) - E=1,2MM M2 31,3375027,252.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 2,28408 BDI 8,40277Mão-de-Obra 1,87220 Material 32,37750SubMO 4,15628

07.03.065 TELHA DE POLIESTER (PERFIL DA TRAPEZOIDAL ACO H ATE 40MM) - E=1,2MM M2 46,35

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.12 1,15000TELHA DE POLIESTER (PERF.TRAP.ACO H=40MM)- E=1,2MM M2 32,4875028,252.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 2,28408 BDI 8,66727Mão-de-Obra 1,87220 Material 33,52750SubMO 4,15628

07.03.066 TELHA DE POLIESTER (PERFIL DA TRAPEZOIDAL ACO H=100MM) - E=1,2MM M2 76,79

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.13 1,15000TELHA DE POLIESTER (PERF.TRAP.ACO H=100M)- E=1,2MM M2 57,2355049,772.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 2,28408 BDI 14,35931Mão-de-Obra 1,87220 Material 58,27550SubMO 4,15628

07.03.067 TELHA DE POLIESTER (PERFIL DA ONDULADA CRFS) - E=1,2MM M2 48,93

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.15 1,15000TELHA DE POLIESTER (PERFIL OND. CRFS) - E=1,2MM M2 34,5920030,082.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 2,28408 BDI 9,15131Mão-de-Obra 1,87220 Material 35,63200SubMO 4,15628

07.03.068 TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,8MM H=40MM M2 65,62

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.22 1,15000TELHA ACO GALV PINT 1 FACE TRAP E=0,8MM H=40MM M2 44,7580038,922.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 12,27162Mão-de-Obra 3,40400 Material 45,79800SubMO 7,55688

07.03.069 TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,8MM H=100MM M2 78,21

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.23 1,15000TELHA ACO GALV PINT 1 FACE TRAP E=0,8MM H=100MM M2 54,9930047,822.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 14,62567Mão-de-Obra 3,40400 Material 56,03300SubMO 7,55688

07.03.070 TELHA DE ACO GALV. ACAB. NATURAL OND. E=0,5MM M2 40,34

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.24 1,15000TELHA DE ACO GALV ACAB NATURAL ONDULADA E=0,5MM M2 24,2075021,052.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 7,54501Mão-de-Obra 3,40400 Material 25,24750SubMO 7,55688

07.03.071 TELHA DE ACO GALV.ACAB. NATURAL OND.E=0,65MM M2 48,96

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.25 1,15000TELHA DE ACO GALV ACAB NATURAL ONDULADA E=0,65MM M2 31,2110027,142.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 9,15581Mão-de-Obra 3,40400 Material 32,25100SubMO 7,55688

07.03.072 TELHA DE ACO GALV.ACAB. NATURAL OND.E=0,8MM M2 60,27

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.26 1,15000TELHA DE ACO GALV ACAB NATURAL ONDULADA E=0,8MM M2 40,4110035,14

09/02/2011 11:38:40 Página: 85 de 0

Page 86: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 11,27181Mão-de-Obra 3,40400 Material 41,45100SubMO 7,55688

07.03.073 TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ.E=0,5MM H= ATÉ 40,0MM M2 40,02

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.27 1,15000TELHA ACO GALV ACAB NAT TRAP E=0,5MM H= ATE 40MM M2 23,9430020,822.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 7,48417Mão-de-Obra 3,40400 Material 24,98300SubMO 7,55688

07.03.074 TELHA DE ACO GALV.ACAB. NATURAL TRAPEZ.E=0,5MM H=100,0MM M2 40,46

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.28 1,15000TELHA DE ACO GALV ACAB NAT TRAP E=0,5MM H=100MM M2 24,2995021,132.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 7,56617Mão-de-Obra 3,40400 Material 25,33950SubMO 7,55688

07.03.075 TELHA DE ACO GALV. ACAB.NATURAL TRAPEZ.E=0,65MM H= ATÉ40,0MM M2 48,53

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.29 1,15000TELHA ACO GALV ACAB NAT TRAP E=0,65MM H= ATE 40MM M2 30,8660026,842.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 9,07646Mão-de-Obra 3,40400 Material 31,90600SubMO 7,55688

07.03.076 TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ. E=0,65MM H=100,0MM M2 56,06

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.30 1,15000TELHA DE ACO GALV ACAB NAT TRAP E=0,65MM H=100MM M2 36,9840032,162.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 10,48360Mão-de-Obra 3,40400 Material 38,02400SubMO 7,55688

07.03.077 TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ. E=0,8MM H=40,0MM M2 59,71

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.31 1,15000TELHA DE ACO GALV ACAB NAT TRAP E=0,8MM H=40MM M2 39,9510034,742.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 11,16601Mão-de-Obra 3,40400 Material 40,99100SubMO 7,55688

07.03.078 TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ.E=0,8MM H=100,0MM M2 68,17

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.32 1,15000TELHA DE ACO GALV ACAB NAT TRAP E=0,8MM H=100MM M2 46,8280040,722.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 12,74772Mão-de-Obra 3,40400 Material 47,86800SubMO 7,55688

07.03.079 TELHA ACO GALV AUTO PORTANTE ACAB NATURAL E=0,8MM H=180MM M2 69,87

1.01.50 0,60000TELHADISTA H 2,730004,551.01.51 0,60000AJUDANTE DE TELHADISTA H 2,376003,962.56.38 1,15000TELHA ACO GALV AUTOPORTANTE NAT E=0,8MM H=180MM M2 43,4585037,792.65.02 3,66300CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE CJ 2,014650,55

LS 6,22932 BDI 13,06595Mão-de-Obra 5,10600 Material 45,47315SubMO 11,33532

07.03.080 TELHA CALANDRADA ACO GALV PINT 1 FACE PO/COIL-COATING OND E=0,65MM M2 90,49

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.33 1,15000TELHA CALANDRADA ACO GALV PINT 1 FACE OND E=0,65MM M2 64,9750056,502.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 16,92153Mão-de-Obra 3,40400 Material 66,01500SubMO 7,55688

07.03.081 TELHA MULTIDOBRA/CALANDRADA ACO GALV PINT 1 FACE TRAP E=0,8MM M2 89,29

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.16 1,15000TELHA MULT/CALAN ACO GALV PINT 1FACE TRAP E=0,80MM M2 63,9975055,652.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 16,69671Mão-de-Obra 3,40400 Material 65,03750SubMO 7,55688

07.03.082 TELHA MULTIDOBRA/CALANDRADA ACO GALV PINT 1 FACE TRAP E=0,65MM M2 77,72

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.17 1,15000TELHA MULT/CALAN ACO GALV PINT 1FACE TRAP E=0,65MM M2 54,5905047,472.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 14,53310Mão-de-Obra 3,40400 Material 55,63050SubMO 7,55688

07.03.083 TELHA CALANDRADA ACO GALV NATURAL OND E=0,65MM M2 62,58

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,96

09/02/2011 11:38:40 Página: 86 de 0

Page 87: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.56.18 1,15000TELHA CALANDRADA ACO GALV NAT OND E=0,65MM M2 42,2855036,772.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 11,70295Mão-de-Obra 3,40400 Material 43,32550SubMO 7,55688

07.03.084 TELHA MULTIDOBRA/CALANDRADA ACO GALVANIZADA NATURAL TRAP E=0,80MM M2 74,35

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.19 1,15000TELHA MULT/CALANDRADA ACO GALV NAT TRAP E=0,80MM M2 51,8535045,092.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 13,90359Mão-de-Obra 3,40400 Material 52,89350SubMO 7,55688

07.03.085 TELHA MULTIDOBRA/CALANDRADA ACO GALVANIZADA NATURAL TRAP E=0,65MM M2 64,07

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.56.20 1,15000TELHA MULT/CALAN ACO GALV NAT TRAP E=0,65MM M2 43,4930037,822.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 11,98067Mão-de-Obra 3,40400 Material 44,53300SubMO 7,55688

07.03.086 TELHA ACO GALV AUTO PORTANTE ACAB NATURAL E=0,8MM H=260MM M2 81,11

1.01.50 0,40000TELHADISTA H 1,820004,551.01.51 0,40000AJUDANTE DE TELHADISTA H 1,584003,962.56.34 1,15000TELHA ACO GALV AUTOPORT ACAB NAT E=0,80MM H=260MM M2 58,1440050,562.65.02 0,45450CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE CJ 0,249980,55

LS 4,15288 BDI 15,16870Mão-de-Obra 3,40400 Material 58,39398SubMO 7,55688

07.03.088 TELHA ACO GALV AUTOPORTANTE SAND LA DE ROCHA ACAB NAT E=0,8MM H=260MM M2 131,78

1.01.50 0,40000TELHADISTA H 1,820004,551.01.51 0,40000AJUDANTE DE TELHADISTA H 1,584003,962.56.36 1,15000TELHA ACO GAL AP/SAND LA ROCHA NAT E=0,8MM H=260MM M2 99,3370086,382.65.02 0,45450CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE CJ 0,249980,55

LS 4,15288 BDI 24,64309Mão-de-Obra 3,40400 Material 99,58698SubMO 7,55688

07.03.089 TELHA ACO GALV AUTOPORTANTE SAND LA DE ROCHA ACAB NAT E=0,8MM H=180MM M2 179,72

1.01.50 0,60000TELHADISTA H 2,730004,551.01.51 0,60000AJUDANTE DE TELHADISTA H 2,376003,962.56.37 1,15000TELHA ACO GAL AP/SAND LA ROCHA NAT E=0,8MM H=180MM M2 132,76750115,452.65.02 3,66300CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE CJ 2,014650,55

LS 6,22932 BDI 33,60702Mão-de-Obra 5,10600 Material 134,78215SubMO 11,33532

07.03.090 TELHA TECNOLOGIA CRFS ONDULADA E=6MM M2 24,66

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.61 1,15000TELHA TECNOLOGIA CRFS ONDULADA 6MM M2 15,0765013,112.65.91 1,42000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,127800,092.66.07 1,42000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,695800,49

LS 2,28408 BDI 4,61297Mão-de-Obra 1,87220 Material 15,90010SubMO 4,15628

07.03.091 TELHA TECNOLOGIA CRFS ONDULADA E=8MM M2 31,24

1.01.11 0,22000CARPINTEIRO H 1,001004,551.01.12 0,22000AJUDANTE DE CARPINTEIRO H 0,871203,962.56.62 1,15000TELHA TECNOLOGIA CRFS ONDULADA 8MM M2 20,4240017,762.65.91 1,42000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,127800,092.66.07 1,42000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,695800,49

LS 2,28408 BDI 5,84289Mão-de-Obra 1,87220 Material 21,24760SubMO 4,15628

07.03.097 TELHA ACO GALV TRAP SAND POLIURETANO PINT 1 FACE CHAPA 0,5MM E=30MM M2 105,06

1.01.50 0,40000TELHADISTA H 1,820004,551.01.51 0,40000AJUDANTE DE TELHADISTA H 1,584003,962.56.55 1,05000TELHA GALV SAND POLIURET CHAPA 0,5MM E=30MM C/ACAB M2 76,8180073,162.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 19,64542Mão-de-Obra 3,40400 Material 77,85800SubMO 7,55688

07.03.098 TELHA ACO GALV TRAP SAND POLIURETANO PINT 1 FACE CHAPA 0,5MM E=50MM M2 119,06

1.01.50 0,40000TELHADISTA H 1,820004,551.01.51 0,40000AJUDANTE DE TELHADISTA H 1,584003,962.56.56 1,05000TELHA GALV SAND POLIURET CHAPA 0,5MM E=50MM C/ACAB M2 88,2000084,002.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 4,15288 BDI 22,26328Mão-de-Obra 3,40400 Material 89,24000SubMO 7,55688

07.03.099 COBERTURAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.04.001 CUMEEIRA E ESPIGAO EMBOCADOS PARA TELHA DE BARRO FRANCESA M 17,50

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,40000SERVENTE H 1,524003,81

09/02/2011 11:38:40 Página: 87 de 0

Page 88: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,00700AREIA M3 0,5544079,202.05.05 1,13000CAL HIDRATADA KG 0,384200,342.05.08 0,60000CIMENTO KG 0,222000,372.60.77 4,00000CUMEEIRA P/TELHA TIPO FRANCES UN 5,560001,39

LS 4,12848 BDI 3,27361Mão-de-Obra 3,38400 Material 6,72060SubMO 7,51248

07.04.006 CUMEEIRA ACO GALV NATURAL P/ TELHA ZIPADA(PERFIL 305MM)FORNEC/MONT M 430,30

2.55.79 1,00000CUMEEIRA ACO GALV NAT P/TELHA ZIP(305MM)FORN MONT M 349,84000349,84

LS 0,00000 BDI 80,46320Mão-de-Obra 0,00000 Material 349,84000SubMO 0,00000

07.04.007 CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA M 28,78

1.01.11 0,12000CARPINTEIRO H 0,546004,551.01.12 0,12000AJUDANTE DE CARPINTEIRO H 0,475203,962.56.76 0,95000CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA UN 21,1375022,25

LS 1,24586 BDI 5,38305Mão-de-Obra 1,02120 Material 21,13750SubMO 2,26706

07.04.008 CUMEEIRA ARTICULADA P/ TELHA TECNOLOGIA CRFS ONDULADA M 37,87

1.01.11 0,12000CARPINTEIRO H 0,546004,551.01.12 0,12000AJUDANTE DE CARPINTEIRO H 0,475203,962.56.77 0,95000CUMEEIRA ARTICULADA P/ TELHA TECNOLOGIA CRFS ONDUL PR 28,5285030,03

LS 1,24586 BDI 7,08298Mão-de-Obra 1,02120 Material 28,52850SubMO 2,26706

07.04.009 CUMEEIRA SHED P/ TELHA TECNOLOGIA CRFS ONDULADA M 24,86

1.01.11 0,08000CARPINTEIRO H 0,364004,551.01.12 0,08000AJUDANTE DE CARPINTEIRO H 0,316803,962.56.78 0,95000CUMEEIRA SHED P/ TELHA TECNOLOGIA CRFS ONDULADA UN 18,7055019,69

LS 0,83058 BDI 4,64988Mão-de-Obra 0,68080 Material 18,70550SubMO 1,51138

07.04.014 CUMEEIRA ARTICULADA DE VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDULADA M 34,67

1.01.11 0,12000CARPINTEIRO H 0,546004,551.01.12 0,12000AJUDANTE DE CARPINTEIRO H 0,475203,962.56.79 0,95000CUMEEIRA ARTIC DE VENT P/ TELHA TECNOL. CRFS ONDUL PR 25,9255027,29

LS 1,24586 BDI 6,48429Mão-de-Obra 1,02120 Material 25,92550SubMO 2,26706

07.04.018 CUMEEIRA SHED PARA TELHA DE ALUMINIO TRAPEZOIDAL M 44,16

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.30 1,40000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 23,0720016,482.66.54 6,00000GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO UN 5,280000,88

LS 4,15288 BDI 8,25904Mão-de-Obra 3,40400 Material 28,35200SubMO 7,55688

07.04.019 ESPIGAO NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA M 25,06

1.01.11 0,12000CARPINTEIRO H 0,546004,551.01.12 0,12000AJUDANTE DE CARPINTEIRO H 0,475203,962.56.80 0,90000ESPIGAO NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA UN 17,0370018,932.65.91 0,90000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,081000,092.66.27 0,90000PARAFUSO P/ ESPIGAO NORMAL DE TELHA FIBRA ONDULADA UN 0,990001,10

LS 1,24586 BDI 4,68627Mão-de-Obra 1,02120 Material 18,10800SubMO 2,26706

07.04.026 TELHA DE VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDULADA UN 101,90

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.56.81 1,00000TELHA DE VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDUL UN 77,9100077,912.65.91 2,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,180000,092.66.07 2,00000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,980000,49

LS 2,07644 BDI 19,05514Mão-de-Obra 1,70200 Material 79,07000SubMO 3,77844

07.04.028 TELHA DE CLARABOIA P/ TELHA TECNOLOGIA CRFS ONDULADA UN 109,78

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,962.56.82 1,00000TELHA DE CLARABOIA P/ TELHADO TECNOL. CRFS ONDULAD UN 69,2000069,202.65.91 2,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,180000,092.66.07 2,00000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,980000,49

LS 10,38220 BDI 20,52801Mão-de-Obra 8,51000 Material 70,36000SubMO 18,89220

07.04.029 ARESTA P/ TELHA TECNOLOGIA CRFS ONDULADA M 26,09

1.01.11 0,09000CARPINTEIRO H 0,409504,551.01.12 0,09000AJUDANTE DE CARPINTEIRO H 0,356403,962.56.83 0,60000ARESTA P/ TELHA TECNOL. CRFS ONDULADA C=1,83M UN 19,5180032,53

LS 0,93440 BDI 4,88021Mão-de-Obra 0,76590 Material 19,51800SubMO 1,70030

07.04.031 CUMEEIRA SHED PARA TELHA DE ALUMINIO ONDULADA ACAB. NATURAL M 41,12

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.30 1,25000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 20,6000016,482.66.54 6,00000GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO UN 5,280000,88

09/02/2011 11:38:40 Página: 88 de 0

Page 89: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 4,15288 BDI 7,69048Mão-de-Obra 3,40400 Material 25,88000SubMO 7,55688

07.04.032 CUMEEIRA PARA TELHA DE ALUMINIO ONDULADA ACAB. NATURAL E=0,8MM M 48,22

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.30 1,60000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 26,3680016,482.66.54 6,00000GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO UN 5,280000,88

LS 4,15288 BDI 9,01712Mão-de-Obra 3,40400 Material 31,64800SubMO 7,55688

07.04.033 CUMEEIRA PARA TELHA DE ALUMINIO TRAPEZOIDAL ACAB. NATURAL E=0,8MM M 46,19

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,962.55.30 1,50000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 24,7200016,482.66.51 6,00000GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO UN 5,280000,88

LS 4,15288 BDI 8,63808Mão-de-Obra 3,40400 Material 30,00000SubMO 7,55688

07.04.034 CUMEEIRA ACO PINT PO/COIL-COATING PERFIL OND/TRAP E=0,65MM H ATE 40MM M 59,20

1.01.11 0,47000CARPINTEIRO H 2,138504,551.01.12 0,47000AJUDANTE DE CARPINTEIRO H 1,861203,962.55.68 1,20000CUMEEIRA ACO PINTADO SIMPLES E=0,65MM M 37,1760030,982.65.99 8,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 2,080000,26

LS 4,87963 BDI 11,07113Mão-de-Obra 3,99970 Material 39,25600SubMO 8,87933

07.04.035 CUMEEIRA DE ACO PINT PO OU COIL-COATING LISA OU LISA DENTADA E=0.5MM M2 40,38

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.55.82 1,10000CUMEEIRA ACO PRE-PINTADO SIMPLES 0,5MM M 26,9720024,522.65.99 8,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 2,080000,26

LS 2,07644 BDI 7,55100Mão-de-Obra 1,70200 Material 29,05200SubMO 3,77844

07.04.036 DOMOS P/ VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDULADA UN 175,10

1.01.11 0,26000CARPINTEIRO H 1,183004,551.01.12 0,26000AJUDANTE DE CARPINTEIRO H 1,029603,962.56.84 1,00000DOMO P/ TELHA TECNOLOGIA CRFS ONDULADA UN 13,8500013,852.66.43 4,00000SUPORTE METALICO P/ DOMO DE TELHA FIBRA ONDULADA UN 116,4000029,102.66.53 8,00000FIXADOR DE ABAS PARA TELHAS DE FIBRA UN 7,200000,90

LS 2,69937 BDI 32,74325Mão-de-Obra 2,21260 Material 137,45000SubMO 4,91197

07.04.037 CUMEEIRA ACO GALV PINT PO/COIL-COATING PERFIL TRAPEZ H=100MM E=0,65MM M 70,88

1.01.11 0,86000CARPINTEIRO H 3,913004,551.01.12 0,86000AJUDANTE DE CARPINTEIRO H 3,405603,962.55.90 1,20000CUMEEIRA ACO GALV PINT 1 FACE TRAP E=0.65MM H=100M M 39,3000032,752.65.99 8,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 2,080000,26

LS 8,92869 BDI 13,25428Mão-de-Obra 7,31860 Material 41,38000SubMO 16,24729

07.04.039 RUFO P/ TELHA TECNOLOGIA CRFS ONDULADA M 21,57

1.01.11 0,08000CARPINTEIRO H 0,364004,551.01.12 0,08000AJUDANTE DE CARPINTEIRO H 0,316803,962.56.85 0,95000RUFO P/ TELHA TECNOLOGIA CRFS ONDULADA UN 16,0265016,87

LS 0,83058 BDI 4,03371Mão-de-Obra 0,68080 Material 16,02650SubMO 1,51138

07.04.040 CUMEEIRA DE ACO NATURAL LISA OU LISA DENTADA E=0,5MM M 29,19

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.56.41 1,10000CUMEEIRA DE ACO NATURAL LISA / LISA DENT. E=0,5MM M 17,8750016,252.65.99 8,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 2,080000,26

LS 2,07644 BDI 5,45869Mão-de-Obra 1,70200 Material 19,95500SubMO 3,77844

07.04.041 CUMEEIRA DE ACO NATURAL PERFIL ONDUL OU TRAP E=0,65MM H ATE 40MM M 49,33

1.01.11 0,47000CARPINTEIRO H 2,138504,551.01.12 0,47000AJUDANTE DE CARPINTEIRO H 1,861203,962.56.42 1,20000CUMEEIRA ACO NAT. PERF. OND/TRAP E=065 H=ATE 40MM M 29,1480024,292.65.99 8,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 2,080000,26

LS 4,87963 BDI 9,22469Mão-de-Obra 3,99970 Material 31,22800SubMO 8,87933

07.04.042 CUMEEIRA DE ACO GALV NATURAL PERFIL TRAP E=0,5MM H=100MM M 54,33

1.01.11 0,86000CARPINTEIRO H 3,913004,551.01.12 0,86000AJUDANTE DE CARPINTEIRO H 3,405603,962.56.43 1,20000CUMEEIRA ACO GALV NAT PERFIL TRAP 0,5MM H=100MM M 25,8480021,542.65.99 8,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 2,080000,26

LS 8,92869 BDI 10,16032Mão-de-Obra 7,31860 Material 27,92800SubMO 16,24729

07.04.044 RUFO DE ACO NATURAL SIMPLES E=0,5MM M 14,81

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.56.44 1,10000RUFO DE ACO NATURAL SIMPLES E=0,5MM M 7,227006,57

09/02/2011 11:38:40 Página: 89 de 0

Page 90: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 2,07644 BDI 2,77045Mão-de-Obra 1,70200 Material 8,26700SubMO 3,77844

07.04.045 RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ATE 300MM M 28,82

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.56.45 1,05000RUFO LISO DE ACO GALV NAT E=0,65MM CORTE ATE 300MM M 10,8465010,332.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 5,39075Mão-de-Obra 5,46600 Material 11,30350SubMO 12,13452

07.04.047 RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ATE 400MM M 27,81

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,092.56.46 1,05000RUFO LISO DE ACO GALV NAT E=0,65MM CORTE ATE 400MM M 14,0700013,402.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 5,20184Mão-de-Obra 3,64400 Material 14,52700SubMO 8,08968

07.04.048 RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ATE 600MM M 35,78

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,092.56.47 1,05000RUFO LISO ACO GALV NAT E=0,65MM CORTE ATE 600MM M 20,5485019,572.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 6,69189Mão-de-Obra 3,64400 Material 21,00550SubMO 8,08968

07.04.049 RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ACIMA DE 600MM M 48,43

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,092.56.48 1,05000RUFO LISO ACO GALV NAT E=0,65MM CORTE ACIMA DE 600 M 30,8280029,362.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 9,05618Mão-de-Obra 3,64400 Material 31,28500SubMO 8,08968

07.04.051 RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,16M M 23,79

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.55.30 0,41000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 6,7568016,482.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 4,45011Mão-de-Obra 5,46600 Material 7,21380SubMO 12,13452

07.04.052 RUFO LISO DE ALUMINIO ACAB. NATURAL E=O,8MM CORTE 0,25M M 28,25

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.55.30 0,63000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 10,3824016,482.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 5,28400Mão-de-Obra 5,46600 Material 10,83940SubMO 12,13452

07.04.053 RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,33M M 36,24

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.55.30 0,84000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 13,8432016,482.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 6,77772Mão-de-Obra 6,83250 Material 14,30020SubMO 15,16815

07.04.054 RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,50M M 61,13

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.55.30 1,27000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 20,9296016,482.67.60 0,10000PREGO KG 0,457004,57

LS 15,55988 BDI 11,43111Mão-de-Obra 12,75400 Material 21,38660SubMO 28,31388

07.04.055 RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 1,00M M 102,36

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.55.30 2,54000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 41,8592016,482.67.60 0,20000PREGO KG 0,914004,57

LS 22,22840 BDI 19,14097Mão-de-Obra 18,22000 Material 42,77320SubMO 40,44840

07.04.057 RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ATE 300MM M 25,09

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,092.56.49 1,05000RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ATE 300MM M 11,8545011,292.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 4,69227Mão-de-Obra 3,64400 Material 12,31150SubMO 8,08968

07.04.058 RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ATE 400MM M 29,31

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,09

09/02/2011 11:38:40 Página: 90 de 0

Page 91: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.56.50 1,05000RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ATE 400MM M 15,2880014,562.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 5,48198Mão-de-Obra 3,64400 Material 15,74500SubMO 8,08968

07.04.059 RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ATE 600MM M 37,94

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,092.56.51 1,05000RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ATE 600MM M 22,3020021,242.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 7,09520Mão-de-Obra 3,64400 Material 22,75900SubMO 8,08968

07.04.061 DOMO DE ACRILICO COM CAIXILHO DE ALUMINIO M2 456,69

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.55.49 1,00000DOMO DE ACRILICO C CAIXILHO DE ALUMINIO M2 348,63000348,63

LS 12,45864 BDI 85,39915Mão-de-Obra 10,21200 Material 348,63000SubMO 22,67064

07.04.065 RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ACIMA DE 600MM M 52,49

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,092.56.52 1,05000RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ACIMA 600 M 34,1355032,512.67.60 0,10000PREGO KG 0,457004,57

LS 4,44568 BDI 9,81690Mão-de-Obra 3,64400 Material 34,59250SubMO 8,08968

07.04.077 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 300MM M 35,14

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.55.91 1,05000RUFO DENT ACO GALV PINT 1FACE E=0,65MM C ATE 300MM M 15,9810015,222.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 6,57168Mão-de-Obra 5,46600 Material 16,43800SubMO 12,13452

07.04.078 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 400MM M 44,28

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.55.92 1,05000RUFO DENT ACO GALV PINT 1FACE E=0,65MM C ATE 400MM M 20,3805019,412.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 8,28130Mão-de-Obra 6,83250 Material 20,83750SubMO 15,16815

07.04.079 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 300MM M 33,67

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.55.93 1,05000RUFO DENT.ACO GALV.PINT.E=0.50MM C=300MM M 14,7840014,082.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 6,29637Mão-de-Obra 5,46600 Material 15,24100SubMO 12,13452

07.04.080 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 400MM M 41,58

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.55.94 1,05000RUFO DENT.ACO GALV.PINT.E=0.50MM C=400MM M 18,1860017,322.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 7,77657Mão-de-Obra 6,83250 Material 18,64300SubMO 15,16815

07.04.081 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 600MM M 66,57

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.55.95 1,05000RUFO DENT.ACO GALV.PINT.E=0.50MM C=600MM M 25,3575024,152.67.60 0,10000PREGO KG 0,457004,57

LS 15,55988 BDI 12,44953Mão-de-Obra 12,75400 Material 25,81450SubMO 28,31388

07.04.082 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ACIMA 600MM M 97,22

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.55.96 1,05000RUFO DENT.ACO GALV.PINT.E=0.50MM C>600MM M 37,6845035,892.67.60 0,20000PREGO KG 0,914004,57

LS 22,22840 BDI 18,18079Mão-de-Obra 18,22000 Material 38,59850SubMO 40,44840

07.04.083 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 600MM M 72,31

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.55.97 1,05000RUFO DENT ACO GALV PINT 1FACE E=0,65MM C ATE 600MM M 30,0195028,592.67.60 0,10000PREGO KG 0,457004,57

LS 15,55988 BDI 13,52179Mão-de-Obra 12,75400 Material 30,47650SubMO 28,31388

07.04.085 RUFO DE ACO PINTADO PO OU COIL-COATING SIMPLES E=0,5MM M2 17,17

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,96

09/02/2011 11:38:40 Página: 91 de 0

Page 92: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.55.83 1,10000RUFO ACO PRE-PINTADO SIMPLES 0,5MM M 9,141008,312.65.99 4,00000PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO UN 1,040000,26

LS 2,07644 BDI 3,21067Mão-de-Obra 1,70200 Material 10,18100SubMO 3,77844

07.04.086 RUFO LISO ACO GALV PINT PO OU COIL-COATING E=0,65MM CORTE ATE 300MM M 33,72

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.55.98 1,05000RUFO LISO ACO GALV.PINT.E=0.65MM C=300MM M 14,8260014,122.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 6,30603Mão-de-Obra 5,46600 Material 15,28300SubMO 12,13452

07.04.087 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 400MM M 42,23

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.55.99 1,05000RUFO LISO ACO GALV.PINT.E=0.65MM C=400MM M 18,7110017,822.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 7,89732Mão-de-Obra 6,83250 Material 19,16800SubMO 15,16815

07.04.088 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 600MM M 67,95

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.56.01 1,05000RUFO LISO ACO GALV.PINT.E=0.65MM C=600MM M 26,4810025,222.67.60 0,10000PREGO KG 0,457004,57

LS 15,55988 BDI 12,70793Mão-de-Obra 12,75400 Material 26,93800SubMO 28,31388

07.04.089 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ACIMA 600MM M 98,06

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.56.02 1,05000RUFO LISO ACO GALV.PINT.E=0.65MM C>600MM M 38,3670036,542.67.60 0,20000PREGO KG 0,914004,57

LS 22,22840 BDI 18,33776Mão-de-Obra 18,22000 Material 39,28100SubMO 40,44840

07.04.090 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 300MM M 30,81

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.56.03 1,05000RUFO LISO ACO GALV.PINT.E=0.50MM C=300MM M 12,4635011,872.67.60 0,10000PREGO KG 0,457004,57

LS 6,66852 BDI 5,76265Mão-de-Obra 5,46600 Material 12,92050SubMO 12,13452

07.04.091 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 400MM M 38,41

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.56.04 1,05000RUFO LISO ACO GALV.PINT.E=0.50MM C=400MM M 15,6030014,862.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 7,18248Mão-de-Obra 6,83250 Material 16,06000SubMO 15,16815

07.04.092 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 600MM M 62,38

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.56.05 1,05000RUFO LISO ACO GALV.PINT.E=0.50MM C=600MM M 21,9450020,902.67.60 0,10000PREGO KG 0,457004,57

LS 15,55988 BDI 11,66465Mão-de-Obra 12,75400 Material 22,40200SubMO 28,31388

07.04.093 RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ACIMA 600MM M 89,86

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.56.06 1,05000RUFO LISO ACO GALV.PINT.E=0.50MM C>600MM M 31,6995030,192.67.60 0,20000PREGO KG 0,914004,57

LS 22,22840 BDI 16,80424Mão-de-Obra 18,22000 Material 32,61350SubMO 40,44840

07.04.094 RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ACIMA 600MM M 103,34

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.56.07 1,05000RUFO DENT ACO GALV PINT 1FACE E=0,65MM C > 600MM M 42,6615040,632.67.60 0,20000PREGO KG 0,914004,57

LS 22,22840 BDI 19,32550Mão-de-Obra 18,22000 Material 43,57550SubMO 40,44840

07.04.095 RUFOS ONDULADOS DE ALUMINIO ACAB. NATURAL ESP 0,8MM M 54,47

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,092.55.30 1,31000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 21,5888016,482.67.60 0,10000PREGO KG 0,457004,57

LS 12,22562 BDI 10,18726Mão-de-Obra 10,02100 Material 22,04580SubMO 22,24662

07.04.096 RUFO TRAPEZOIDAL DE ALUMINIO ACAB. NATURAL ESP 0,8MM M 57,72

1.01.18 1,10000ENCANADOR H 5,522005,02

09/02/2011 11:38:40 Página: 92 de 0

Page 93: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,092.55.30 1,47000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 24,2256016,482.67.60 0,10000PREGO KG 0,457004,57

LS 12,22562 BDI 10,79372Mão-de-Obra 10,02100 Material 24,68260SubMO 22,24662

07.04.097 CONTRA RUFO ONDULADO DE ALUMINIO ESP 0,8MM M 59,75

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.55.30 2,00000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 32,9600016,482.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 11,17459Mão-de-Obra 6,83250 Material 33,41700SubMO 15,16815

07.04.098 CONTRA RUFO TRAPEZOIDAL DE ALUMINIO ESP 0,8MM M 57,12

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.55.30 1,87000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 30,8176016,482.67.60 0,10000PREGO KG 0,457004,57

LS 8,33565 BDI 10,68183Mão-de-Obra 6,83250 Material 31,27460SubMO 15,16815

07.04.099 PECAS PARA COBERTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.05.002 FECHAMENTO DE OITAO C/ TELHA TECNOLOGIA CRFS ONDULADA E=8MM M2 31,23

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.12 0,28000AJUDANTE DE CARPINTEIRO H 1,108803,962.56.62 1,09000TELHA TECNOLOGIA CRFS ONDULADA 8MM M2 19,3584017,762.65.91 0,70000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,063000,092.66.07 1,40000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,686000,49

LS 2,90702 BDI 5,84136Mão-de-Obra 2,38280 Material 20,10740SubMO 5,28982

07.05.004 FECHAMENTO TELHA PERF GALV PINT PO 2 FACES TRAP E=0,95MM H=40MM M2 101,26

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.12 0,28000AJUDANTE DE CARPINTEIRO H 1,108803,962.56.39 1,09000TELHA PERFURADA GALV PINT 2 FACES E=0,95MM H=40MM M2 76,2891069,992.65.91 0,70000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,063000,092.66.07 1,40000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,686000,49

LS 2,90702 BDI 18,93542Mão-de-Obra 2,38280 Material 77,03810SubMO 5,28982

07.05.006 FECHAMENTO TELHA PERFURADA GALV PINT 2 FACES E=0,95MM H=35MM M2 108,26

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.12 0,28000AJUDANTE DE CARPINTEIRO H 1,108803,962.56.58 1,09000TELHA PERFURADA GALV TRAPEZOIDAL MOD L=35CM E=0,95 M2 81,9789075,212.65.91 0,70000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,063000,092.66.07 1,40000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,686000,49

LS 2,90702 BDI 20,24408Mão-de-Obra 2,38280 Material 82,72790SubMO 5,28982

07.05.010 VEDACAO LATERAL DE COBERTURA COM TELA DE NYLON M2 99,77

1.01.11 3,00000CARPINTEIRO H 13,650004,551.01.12 3,00000AJUDANTE DE CARPINTEIRO H 11,880003,962.10.01 4,39000CAIBRO PEROBA DE 5X6CM M 18,745304,272.67.60 0,05000PREGO KG 0,228504,572.75.24 1,00000TELA DE NYLON TIPO MOSQUITEIRO M2 5,470005,47

LS 31,14660 BDI 18,65769Mão-de-Obra 25,53000 Material 24,44380SubMO 56,67660

07.05.020 GRADE DE PROTECAO EM MADEIRA PINTADA (PROJ. EMERGENCIA) M 27,53

1.01.11 0,34000CARPINTEIRO H 1,547004,551.01.12 0,34000AJUDANTE DE CARPINTEIRO H 1,346403,961.01.40 0,14000PINTOR H 0,659404,711.01.41 0,12000AJUDANTE DE PINTOR H 0,458403,822.10.14 5,86000SARRAFO PINHO APARELHADO 5X2,5 CM M 12,247402,092.67.60 0,02300PREGO KG 0,105114,573.80.34 0,12000TINTA A OLEO L 1,095609,133.80.39 0,09000LIXA PARA MADEIRA UN 0,029700,33

LS 4,89366 BDI 5,14802Mão-de-Obra 4,01120 Material 13,47781SubMO 8,90486

07.05.040 CUMEEIRA P/ TELHA AUTOP ACO GALV ACAB NAT LISA/DENT H 180MM ATE 260MM M 67,28

1.01.50 0,86000TELHADISTA H 3,913004,551.01.51 0,86000AJUDANTE DE TELHADISTA H 3,405603,962.55.40 1,20000TELHA DE POLIESTER PERFIL ONDULADO FIBROCIMENTO M2 34,4280028,692.65.02 7,32600CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE CJ 4,029300,55

LS 8,92869 BDI 12,58206Mão-de-Obra 7,31860 Material 38,45730SubMO 16,24729

07.05.041 CUMEEIRA NORMAL PARA TELHA TECNOLOGIA CRFS MODULAR M 70,13

1.01.11 0,14000CARPINTEIRO H 0,637004,551.01.12 0,14000AJUDANTE DE CARPINTEIRO H 0,554403,96

09/02/2011 11:38:40 Página: 93 de 0

Page 94: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.61.03 1,97000CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS MODULAR UN 43,0642021,862.66.11 0,62000MASSA DE VEDACAO PARA TELHAS KG 11,3088018,24

LS 1,45351 BDI 13,11412Mão-de-Obra 1,19140 Material 54,37300SubMO 2,64491

07.05.042 CUMEEIRA ARTICULADA PARA TELHA TECNOLOGIA CRFS MODULAR M 82,07

1.01.11 0,14000CARPINTEIRO H 0,637004,551.01.12 0,14000AJUDANTE DE CARPINTEIRO H 0,554403,962.61.07 1,97000CUMEEIRA ARTICULADA P/ TELHA TECNOL CRFS MODULAR PR 52,7763026,792.66.11 0,62000MASSA DE VEDACAO PARA TELHAS KG 11,3088018,24

LS 1,45351 BDI 15,34790Mão-de-Obra 1,19140 Material 64,08510SubMO 2,64491

07.05.045 RUFO PARA TELHA TECNOLOGIA CRFS MODULAR M 44,15

1.01.11 0,12000CARPINTEIRO H 0,546004,551.01.12 0,12000AJUDANTE DE CARPINTEIRO H 0,475203,962.61.34 1,97000RUFO PARA TELHA TECNOLOGIA CRFS MODULAR UN 27,9740014,202.66.11 0,31000MASSA DE VEDACAO PARA TELHAS KG 5,6544018,24

LS 1,24586 BDI 8,25596Mão-de-Obra 1,02120 Material 33,62840SubMO 2,26706

07.05.046 CUMEEIRA NORMAL PARA TELHA TECNOLOGIA CRFS TRAPEZOIDAL 44CM M 54,07

1.01.11 0,14000CARPINTEIRO H 0,637004,551.01.12 0,14000AJUDANTE DE CARPINTEIRO H 0,554403,962.61.04 2,27000CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS TRAP 44CM UN 30,0094013,222.66.11 0,62000MASSA DE VEDACAO PARA TELHAS KG 11,3088018,24

LS 1,45351 BDI 10,11152Mão-de-Obra 1,19140 Material 41,31820SubMO 2,64491

07.05.068 CUMEEIRA NORMAL PARA TELMHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM M 66,87

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.61.06 1,09000CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS TRAP 90CM UN 35,6321032,692.66.11 0,82000MASSA DE VEDACAO PARA TELHAS KG 14,9568018,24

LS 2,07644 BDI 12,50449Mão-de-Obra 1,70200 Material 50,58890SubMO 3,77844

07.05.069 CUMEEIRA ARTICULADA PARA TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM M 85,06

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.61.10 1,09000CUMEEIRA ARTICULADA P/ TELHA TECNOL CRFS TRAP 90CM PR 50,4234046,262.66.11 0,82000MASSA DE VEDACAO PARA TELHAS KG 14,9568018,24

LS 2,07644 BDI 15,90649Mão-de-Obra 1,70200 Material 65,38020SubMO 3,77844

07.05.077 RUFO PARA TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM M 25,70

1.01.11 0,12000CARPINTEIRO H 0,546004,551.01.12 0,12000AJUDANTE DE CARPINTEIRO H 0,475203,962.61.37 1,09000RUFO P/ TELHA TECNOLOGIA CRFS TRAP 90CM UN 11,1507010,232.66.11 0,41000MASSA DE VEDACAO PARA TELHAS KG 7,4784018,24

LS 1,24586 BDI 4,80612Mão-de-Obra 1,02120 Material 18,62910SubMO 2,26706

07.05.080 SUB-COBERTURA COM MANTA ALUMINIZADA M2 10,27

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.40.40 1,15000MANTA ALUMINIZADA PARA SUB-COBERTURA M2 4,542503,952.67.61 0,00500PREGO ZINCADO 18X27 KG 0,034156,83

LS 2,07644 BDI 1,92167Mão-de-Obra 1,70200 Material 4,57665SubMO 3,77844

07.05.099 FECHAMENTOS E/OU VEDACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.50.001 DEMOLICAO DE TELHA FIBRO CIMENTO TRAPEZOIDAL M2 3,24

1.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,96

LS 1,44936 BDI 0,60659Mão-de-Obra 1,18800 Material 0,00000SubMO 2,63736

07.60.001 ESTRUT DE MADEIRA EM TESOURA,PONTAL OU MISTA P/TELHA BARRO SOBRE LAJE M2 13,94

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,96

LS 6,22932 BDI 2,60712Mão-de-Obra 5,10600 Material 0,00000SubMO 11,33532

07.60.002 ESTRUTURA DE MADEIRA EM TESOURA PARA TELHAS DE BARRO SOBRE VAO LIVRE M2 19,75

1.01.11 0,85000CARPINTEIRO H 3,867504,551.01.12 0,85000AJUDANTE DE CARPINTEIRO H 3,366003,96

LS 8,82487 BDI 3,69343Mão-de-Obra 7,23350 Material 0,00000SubMO 16,05837

07.60.005 ESTRUT DE MADEIRA EM TESOURA,PONTAL OU MISTA P/TELHA FIBRO-CIM SB LAJE M2 9,29

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,96

LS 4,15288 BDI 1,73808Mão-de-Obra 3,40400 Material 0,00000SubMO 7,55688

09/02/2011 11:38:40 Página: 94 de 0

Page 95: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

07.60.006 ESTRUT DE MADEIRA EM TESOURA,PARA TELHA DE FIBRO-CIM SOBRE VAO LIVRE M2 15,10

1.01.11 0,65000CARPINTEIRO H 2,957504,551.01.12 0,65000AJUDANTE DE CARPINTEIRO H 2,574003,96

LS 6,74843 BDI 2,82438Mão-de-Obra 5,53150 Material 0,00000SubMO 12,27993

07.60.010 VIGAMENTO DE APOIO P/TELHAS DE BARRO/FIBRO-CIM/AL/PLAST/PLANA PRE-FAB M 2,32

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,96

LS 1,03822 BDI 0,43452Mão-de-Obra 0,85100 Material 0,00000SubMO 1,88922

07.60.015 DE CAIBROS M 1,39

1.01.11 0,06000CARPINTEIRO H 0,273004,551.01.12 0,06000AJUDANTE DE CARPINTEIRO H 0,237603,96

LS 0,62293 BDI 0,26071Mão-de-Obra 0,51060 Material 0,00000SubMO 1,13353

07.60.016 DE RIPAS M 0,23

1.01.11 0,01000CARPINTEIRO H 0,045504,551.01.12 0,01000AJUDANTE DE CARPINTEIRO H 0,039603,96

LS 0,10382 BDI 0,04345Mão-de-Obra 0,08510 Material 0,00000SubMO 0,18892

07.60.020 DE FERRAGENS PARA ESTRUTURA DE MADEIRA UN 3,48

1.01.11 0,15000CARPINTEIRO H 0,682504,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,96

LS 1,55733 BDI 0,65178Mão-de-Obra 1,27650 Material 0,00000SubMO 2,83383

07.60.050 TELHAS DE BARRO M2 3,38

1.01.39 0,02900PEDREIRO H 0,134854,651.01.46 0,29000SERVENTE H 1,104903,81

LS 1,51250 BDI 0,63302Mão-de-Obra 1,23975 Material 0,00000SubMO 2,75224

07.60.051 TELHAS DE BARRO - S/REAPROV M2 2,33

1.01.39 0,02000PEDREIRO H 0,093004,651.01.46 0,20000SERVENTE H 0,762003,81

LS 1,04310 BDI 0,43656Mão-de-Obra 0,85500 Material 0,00000SubMO 1,89810

07.60.055 CUMEEIRAS E ESPIGOES DE BARRO M 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

07.60.056 CUMEEIRAS E ESPIGOES DE BARRO - S/REAPROV M 0,78

1.01.46 0,07500SERVENTE H 0,285753,81

LS 0,34862 BDI 0,14590Mão-de-Obra 0,28575 Material 0,00000SubMO 0,63437

07.60.060 TELHAS OND DE FIBRO-CIM/PLAST OU ALUM/PLANA PRE FAB M2 4,34

1.01.50 0,03600TELHADISTA H 0,163804,551.01.51 0,36000AJUDANTE DE TELHADISTA H 1,425603,96

LS 1,93907 BDI 0,81155Mão-de-Obra 1,58940 Material 0,00000SubMO 3,52847

07.60.061 TELHAS OND DE FIBRO-CIM/PLAST OU ALUM/PLANA PRE FAB - S/REAPROV M2 3,01

1.01.50 0,02500TELHADISTA H 0,113754,551.01.51 0,25000AJUDANTE DE TELHADISTA H 0,990003,96

LS 1,34658 BDI 0,56358Mão-de-Obra 1,10375 Material 0,00000SubMO 2,45033

07.60.065 CUMEEIRAS, ESPIGOES E RUFOS DE FIBRO-CIMENTO M 5,40

1.01.51 0,50000AJUDANTE DE TELHADISTA H 1,980003,96

LS 2,41560 BDI 1,01099Mão-de-Obra 1,98000 Material 0,00000SubMO 4,39560

07.60.066 CUMEEIRAS, ESPIGOES E RUFOS DE FIBRO-CIMENTO - S/REAPROV M 1,35

1.01.51 0,12500AJUDANTE DE TELHADISTA H 0,495003,96

LS 0,60390 BDI 0,25275Mão-de-Obra 0,49500 Material 0,00000SubMO 1,09890

07.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.70.001 DE RIPAS M 0,47

1.01.11 0,02000CARPINTEIRO H 0,091004,551.01.12 0,02000AJUDANTE DE CARPINTEIRO H 0,079203,962.67.60 0,00100PREGO KG 0,004574,57

LS 0,20764 BDI 0,08796Mão-de-Obra 0,17020 Material 0,00457SubMO 0,37784

07.70.002 DE CAIBROS M 3,30

1.01.11 0,14000CARPINTEIRO H 0,637004,551.01.12 0,14000AJUDANTE DE CARPINTEIRO H 0,554403,962.67.60 0,01000PREGO KG 0,045704,57

09/02/2011 11:38:40 Página: 95 de 0

Page 96: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 1,45351 BDI 0,61884Mão-de-Obra 1,19140 Material 0,04570SubMO 2,64491

07.70.003 DE VIGAS M 8,73

1.01.11 0,37000CARPINTEIRO H 1,683504,551.01.12 0,37000AJUDANTE DE CARPINTEIRO H 1,465203,962.67.60 0,02500PREGO KG 0,114254,57

LS 3,84141 BDI 1,63400Mão-de-Obra 3,14870 Material 0,11425SubMO 6,99011

07.70.010 DE FERRAGEM PARA ESTRUTURA DE MADEIRA UN 8,13

1.01.11 0,35000CARPINTEIRO H 1,592504,551.01.12 0,35000AJUDANTE DE CARPINTEIRO H 1,386003,96

LS 3,63377 BDI 1,52082Mão-de-Obra 2,97850 Material 0,00000SubMO 6,61227

07.70.050 DE TELHAS DE BARRO TIPO FRANCESA / ROMANA M2 14,67

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,80000SERVENTE H 3,048003,81

LS 6,55506 BDI 2,74345Mão-de-Obra 5,37300 Material 0,00000SubMO 11,92806

07.70.052 DE TELHA DE BARRO TIPO PLAN M2 12,84

1.01.39 0,11000PEDREIRO H 0,511504,651.01.46 1,10000SERVENTE H 4,191003,81

LS 5,73705 BDI 2,40110Mão-de-Obra 4,70250 Material 0,00000SubMO 10,43955

07.70.055 DE TELHA DE CIMENTO-AMIANTO, PLASTICO OU ALUMINIO M2 9,29

1.01.11 0,40000CARPINTEIRO H 1,820004,551.01.12 0,40000AJUDANTE DE CARPINTEIRO H 1,584003,96

LS 4,15288 BDI 1,73808Mão-de-Obra 3,40400 Material 0,00000SubMO 7,55688

07.70.080 DE CUMEEIRAS E ESPIGOES DE BARRO M 10,66

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,40000SERVENTE H 1,524003,812.05.03 0,00700AREIA M3 0,5544079,202.05.05 1,13000CAL HIDRATADA KG 0,384200,342.05.08 0,60000CIMENTO KG 0,222000,37

LS 4,12848 BDI 1,99481Mão-de-Obra 3,38400 Material 1,16060SubMO 7,51248

07.70.081 DE CUMEEIRAS, ESPIGOES E RUFOS DE CIMENTO-AMIANTO M 4,64

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,96

LS 2,07644 BDI 0,86904Mão-de-Obra 1,70200 Material 0,00000SubMO 3,77844

07.70.099 RECOLOCACOES DE COBERTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

07.80.001 RIPAS DE PEROBA DE 5 X 1,2 CM M 3,35

1.01.11 0,02000CARPINTEIRO H 0,091004,551.01.12 0,02000AJUDANTE DE CARPINTEIRO H 0,079203,962.10.60 1,05000RIPA DE PEROBA 1X5CM M 2,341502,232.67.60 0,00100PREGO KG 0,004574,57

LS 0,20764 BDI 0,62650Mão-de-Obra 0,17020 Material 2,34607SubMO 0,37784

07.80.002 CAIBRO DE PEROBA DE 5 X 6 CM M 8,82

1.01.11 0,14000CARPINTEIRO H 0,637004,551.01.12 0,14000AJUDANTE DE CARPINTEIRO H 0,554403,962.10.01 1,05000CAIBRO PEROBA DE 5X6CM M 4,483504,272.67.60 0,01000PREGO KG 0,045704,57

LS 1,45351 BDI 1,65005Mão-de-Obra 1,19140 Material 4,52920SubMO 2,64491

07.80.003 TABUA DE PEROBA DE 12 X 3 CM M 16,04

1.01.11 0,16000CARPINTEIRO H 0,728004,551.01.12 0,16000AJUDANTE DE CARPINTEIRO H 0,633603,962.10.65 1,05000TABUA PEROBA 12X3CM M 9,975009,502.67.60 0,01000PREGO KG 0,045704,57

LS 1,66115 BDI 2,99999Mão-de-Obra 1,36160 Material 10,02070SubMO 3,02275

07.80.004 VIGA DE PEROBA DE 6 X 12 CM M 20,28

1.01.11 0,32000CARPINTEIRO H 1,456004,551.01.12 0,32000AJUDANTE DE CARPINTEIRO H 1,267203,962.10.26 1,05000VIGAS PEROBA DE 6X12 CM M 10,353009,862.67.60 0,02000PREGO KG 0,091404,57

LS 3,32230 BDI 3,79268Mão-de-Obra 2,72320 Material 10,44440SubMO 6,04550

07.80.005 VIGA DE PEROBA DE 6 X 16 CM M 26,94

1.01.11 0,43000CARPINTEIRO H 1,956504,55

09/02/2011 11:38:40 Página: 96 de 0

Page 97: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.12 0,43000AJUDANTE DE CARPINTEIRO H 1,702803,962.10.27 1,05000VIGAS PEROBA DE 6X16 CM M 13,6500013,002.67.60 0,02900PREGO KG 0,132534,57

LS 4,46435 BDI 5,03842Mão-de-Obra 3,65930 Material 13,78253SubMO 8,12365

07.80.006 RIPA DE MADEIRA (GARAPERA) 5X2CM M 3,59

1.01.11 0,02000CARPINTEIRO H 0,091004,551.01.12 0,02000AJUDANTE DE CARPINTEIRO H 0,079203,962.10.67 1,05000RIPA DE GARAPERA 5X2CM M 2,541002,422.67.60 0,00100PREGO KG 0,004574,57

LS 0,20764 BDI 0,67239Mão-de-Obra 0,17020 Material 2,54557SubMO 0,37784

07.80.008 SARRAFO DE CEDRINHO 10X2,5CM (BRUTO) ML 4,51

1.01.11 0,02000CARPINTEIRO H 0,091004,551.01.12 0,02000AJUDANTE DE CARPINTEIRO H 0,079203,962.11.20 1,05000SARRAFO BRUTO DE CEDRINHO 10X2,5CM M 3,244503,092.67.60 0,01000PREGO KG 0,045704,57

LS 0,20764 BDI 0,84365Mão-de-Obra 0,17020 Material 3,29020SubMO 0,37784

07.80.009 PECAS ESPECIAIS DE PEROBA M3 2.779,24

1.01.11 45,00000CARPINTEIRO H 204,750004,551.01.12 45,00000AJUDANTE DE CARPINTEIRO H 178,200003,962.10.05 1,00000MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 1.395,690001.395,692.67.60 3,00000PREGO KG 13,710004,57

LS 467,19900 BDI 519,69627Mão-de-Obra 382,95000 Material 1.409,40000SubMO 850,14900

07.80.014 PARAFUSO P/ FIXACAO TELHA FIBROC OND/MOD/MAXIPLAC 5/16" X 110 MM GALV UN 4,84

1.01.11 0,17800CARPINTEIRO H 0,809904,551.01.12 0,17800AJUDANTE DE CARPINTEIRO H 0,704883,962.63.68 1,00000PARAFUSO FIXACAO TELHA FIBROC 5/16' X 110 MM UN 0,490000,492.65.91 1,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,090000,09

LS 1,84803 BDI 0,90685Mão-de-Obra 1,51478 Material 0,58000SubMO 3,36281

07.80.015 PARAFUSO TIPO FRANCES, COM PORCA E ARRUELA UN 3,08

1.01.11 0,20000CARPINTEIRO H 0,910004,552.67.38 1,00000PARAFUSO FRANCES C/PORCA E ARRUELA UN 0,490000,49

LS 1,11020 BDI 0,57735Mão-de-Obra 0,91000 Material 0,49000SubMO 2,02020

07.80.016 FERRO CHATO EM "U" DE 2"X 1.1/4" COM PARAFUSOS, PARA PENDURAL UN 9,85

1.01.11 0,35000CARPINTEIRO H 1,592504,551.01.12 0,35000AJUDANTE DE CARPINTEIRO H 1,386003,962.66.55 1,00000PENDURAL F.CHATO 2'X1/4' C/PARAF UN 1,400001,40

LS 3,63377 BDI 1,84282Mão-de-Obra 2,97850 Material 1,40000SubMO 6,61227

07.80.017 ESTRIBO DE FERRO REDONDO DE DIAM 1/2", PORCAS E CHAPA UN 12,06

1.01.11 0,35000CARPINTEIRO H 1,592504,551.01.12 0,35000AJUDANTE DE CARPINTEIRO H 1,386003,962.66.56 1,00000ESTRIBO F.REDONDO 1/2' PORCA E CHAPA UN 3,200003,20

LS 3,63377 BDI 2,25682Mão-de-Obra 2,97850 Material 3,20000SubMO 6,61227

07.80.018 CHAPA DE EMENDA DE 2" X 1.1/4" UN 11,76

1.01.11 0,35000CARPINTEIRO H 1,592504,551.01.12 0,35000AJUDANTE DE CARPINTEIRO H 1,386003,962.66.57 1,00000CHAPA DE EMENDA 2'X1/4' C/4 FUROS UN 2,950002,95

LS 3,63377 BDI 2,19932Mão-de-Obra 2,97850 Material 2,95000SubMO 6,61227

07.80.019 PARAFUSO PARA FIXACAO DE TELHA FIBROCIMENTO ONDULADA UN 3,03

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.65.91 1,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,090000,092.66.07 1,00000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,490000,49

LS 1,03822 BDI 0,56792Mão-de-Obra 0,85100 Material 0,58000SubMO 1,88922

07.80.020 PARAFUSO OU GANCHO P/ FIXACAO TELHA FIBROCIMENTO MAX E MODULADA UN 3,59

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.65.91 1,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,090000,092.66.08 1,00000PARAFUSO OU GANCHO P/ TELHAS FIBROCIM MAX/MODULADA UN 0,940000,94

LS 1,03822 BDI 0,67142Mão-de-Obra 0,85100 Material 1,03000SubMO 1,88922

07.80.030 TELHAS DE BARRO FRANCESA M2 43,77

1.01.46 1,00000SERVENTE H 3,810003,811.01.50 0,50000TELHADISTA H 2,275004,552.55.01 16,00000TELHA TIPO FRANCESA UN 22,080001,38

LS 7,42370 BDI 8,18540Mão-de-Obra 6,08500 Material 22,08000SubMO 13,50870

09/02/2011 11:38:40 Página: 97 de 0

Page 98: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

07.80.031 TELHAS DE VIDRO TIPO FANCESA PARA ILUMINACAO M2 462,78

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,80000SERVENTE H 3,048003,812.55.61 16,00000TELHA DE VIDRO TIPO "FRANCESA" UN 364,3200022,77

LS 6,55506 BDI 86,53705Mão-de-Obra 5,37300 Material 364,32000SubMO 11,92806

07.80.032 CUMEEIRAS E ESPIGOES DE BARRO EMBOCADAS PARA TELHAS FRANCESAS M 17,50

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,40000SERVENTE H 1,524003,812.05.03 0,00700AREIA M3 0,5544079,202.05.05 1,13000CAL HIDRATADA KG 0,384200,342.05.08 0,60000CIMENTO KG 0,222000,372.60.77 4,00000CUMEEIRA P/TELHA TIPO FRANCES UN 5,560001,39

LS 4,12848 BDI 3,27361Mão-de-Obra 3,38400 Material 6,72060SubMO 7,51248

07.80.033 DE OITAO EM TABUAS DE PINHO MACHO E FEMEA M2 59,13

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,962.67.60 0,25000PREGO KG 1,142504,573.40.41 1,10000TABUA PINHO MACHO-FEMEA 1X10CM-FORRO M2 35,5960032,36

LS 6,22932 BDI 11,05698Mão-de-Obra 5,10600 Material 36,73850SubMO 11,33532

07.80.087 PARAFUSO PARA FIXACAO TELHA FIBROCIMENTO TRAPEZOIDAL C/ 43CM UN 2,96

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.65.91 1,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,090000,092.66.12 1,00000PARAFUSO 8X65MM OU GANCHO FIX.TELHA TRAPEZOIDAL UN 0,430000,43

LS 1,03822 BDI 0,55412Mão-de-Obra 0,85100 Material 0,52000SubMO 1,88922

07.80.088 PARAFUSO PARA FIXACAO TELHA FIBROCIMENTO TRAPEZOIDAL C/ 90CM UN 3,03

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.65.91 1,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,090000,092.66.13 1,00000PARAFUSO 8X110MM OU GANCHO FIX.TELHA TRAPEZOIDAL UN 0,490000,49

LS 1,03822 BDI 0,56792Mão-de-Obra 0,85100 Material 0,58000SubMO 1,88922

07.80.089 PARAFUSO P/ FIXACAO TELHA FIBROCIMENTO TRAPEZOIDAL C/ 0,49 M UN 4,16

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 0,10000AJUDANTE DE CARPINTEIRO H 0,396003,962.65.91 1,00000VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC CJ 0,090000,092.66.05 1,00000PARAFUSO OU GANCHO FIX TELHA TRAPEZ 49CM UN 1,410001,41

LS 1,03822 BDI 0,77952Mão-de-Obra 0,85100 Material 1,50000SubMO 1,88922

07.80.090 AMARRACAO DE TELHAS DE BARRO COM ARAME DE COBRE M2 7,70

1.01.39 0,50000PEDREIRO H 2,325004,652.70.20 0,04000ARAME DE COBRE KG 1,1052027,63

LS 2,83650 BDI 1,44134Mão-de-Obra 2,32500 Material 1,10520SubMO 5,16150

07.80.091 EMBOCAMENTO DE BEIRAL EM TELHAS DE BARRO M 7,67

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,32000SERVENTE H 1,219203,812.05.03 0,00200AREIA M3 0,1584079,202.05.05 0,60000CAL HIDRATADA KG 0,204000,342.05.08 0,20000CIMENTO KG 0,074000,37

LS 3,18932 BDI 1,43518Mão-de-Obra 2,61420 Material 0,43640SubMO 5,80352

07.80.099 SERVICOS DE COBERTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.01.001 AC-04 ABRIGO E CAVALETE DE 3/4" COMPLETO 85X65X30CM UN 674,34

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,091.01.39 6,69000PEDREIRO H 31,108504,651.01.40 1,58000PINTOR H 7,441804,711.01.41 0,72000AJUDANTE DE PINTOR H 2,750403,821.01.46 9,25000SERVENTE H 35,242503,812.05.03 0,15300AREIA M3 12,1176079,202.05.05 14,71000CAL HIDRATADA KG 5,001400,342.05.08 37,24000CIMENTO KG 13,778800,372.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.14 1,38000SARRAFO PINHO APARELHADO 5X2,5 CM M 2,884202,092.10.21 0,35000TABUAS PINHO DE 1"X12" DE 3A. M2 6,0130017,182.15.38 2,60000ACO CA-60-B $MD BITOLAS KG 6,890002,652.25.02 16,00000BLOCO CONCRETO DE 9X39X19CM UN 23,840001,493.10.49 1,00000AC-04/05 PORTA DE TELA C/TRINCO P/CAVALETE 65X85CM UN 162,25000162,25

09/02/2011 11:38:40 Página: 98 de 0

Page 99: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.75.02 0,20000TINTA ESMALTE L 1,992009,963.75.13 0,93000TINTA LATEX ECONOMICA L 4,017604,323.80.09 0,75000SELADOR P/PINTURA LATEX L 7,470009,963.80.40 1,12000LIXA D"AGUA UN 0,728000,653.80.66 0,15000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 2,2110014,746.05.02 2,30000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 24,7020010,746.35.61 1,00000REGISTRO GAVETA AMARELO 3/4' UN 19,1300019,13

LS 137,83950 BDI 126,09676Mão-de-Obra 112,98320 Material 297,42408SubMO 250,82270

08.01.002 AC-05 ABRIGO E CAVALETE DE 1" COMPLETO 85X65X30CM UN 699,68

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,091.01.39 6,69000PEDREIRO H 31,108504,651.01.40 1,58000PINTOR H 7,441804,711.01.41 0,72000AJUDANTE DE PINTOR H 2,750403,821.01.46 9,25000SERVENTE H 35,242503,812.05.03 0,15000AREIA M3 11,8800079,202.05.05 14,71000CAL HIDRATADA KG 5,001400,342.05.08 37,24000CIMENTO KG 13,778800,372.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.14 1,38000SARRAFO PINHO APARELHADO 5X2,5 CM M 2,884202,092.10.21 0,35000TABUAS PINHO DE 1"X12" DE 3A. M2 6,0130017,182.15.38 2,60000ACO CA-60-B $MD BITOLAS KG 6,890002,652.25.02 16,00000BLOCO CONCRETO DE 9X39X19CM UN 23,840001,493.10.49 1,00000AC-04/05 PORTA DE TELA C/TRINCO P/CAVALETE 65X85CM UN 162,25000162,253.75.02 0,20000TINTA ESMALTE L 1,992009,963.75.13 0,93000TINTA LATEX ECONOMICA L 4,017604,323.80.09 0,75000SELADOR P/PINTURA LATEX L 7,470009,963.80.40 1,12000LIXA D"AGUA UN 0,728000,653.80.66 0,15000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 2,2110014,746.05.03 2,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 36,6160015,926.35.62 1,00000REGISTRO GAVETA AMARELO 1' UN 28,0600028,06

LS 137,83950 BDI 130,83623Mão-de-Obra 112,98320 Material 318,03048SubMO 250,82270

08.01.003 AC-06 ABRIGO E CAVALETE DE 1 1/4" COMPLETO 200X90X40CM UN 1.632,79

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,091.01.39 13,38000PEDREIRO H 62,217004,651.01.40 4,29000PINTOR H 20,205904,711.01.41 2,34000AJUDANTE DE PINTOR H 8,938803,821.01.46 18,63000SERVENTE H 70,980303,812.05.03 0,29800AREIA M3 23,6016079,202.05.05 25,14000CAL HIDRATADA KG 8,547600,342.05.08 84,39000CIMENTO KG 31,224300,372.05.18 0,17000PEDRA BRITADA 2 M3 10,3853061,092.10.14 3,12000SARRAFO PINHO APARELHADO 5X2,5 CM M 6,520802,092.10.21 0,78000TABUAS PINHO DE 1"X12" DE 3A. M2 13,4004017,182.15.38 7,00000ACO CA-60-B $MD BITOLAS KG 18,550002,652.25.15 196,00000TIJOLO COMUM MACICO UN 43,120000,222.80.56 0,90000GRAFITE L 11,6280012,923.10.42 1,00000AC-06PORTA C/TRINCO P/CAVALETE 1 1/4' UN 588,16000588,163.80.03 1,40000CAL PARA PINTURA KG 0,980000,703.80.12 1,80000LIXA PARA FERRO UN 2,574001,433.80.18 0,06000OLEO DE LINHACA L 0,390606,513.80.28 0,54000ZARCAO L 8,6886016,096.05.04 4,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4") M 81,9600020,496.35.63 1,00000REGISTRO GAVETA AMARELO 1 1/4' UN 36,4500036,45

LS 242,51404 BDI 305,31977Mão-de-Obra 198,78200 Material 886,18120SubMO 441,29604

08.01.004 AC-07 ABRIGO E CAVALETE DE 1 1/2" COMPLETO 200X90X40CM UN 1.660,48

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,091.01.39 13,38000PEDREIRO H 62,217004,651.01.40 4,29000PINTOR H 20,205904,711.01.41 2,34000AJUDANTE DE PINTOR H 8,938803,821.01.46 18,63000SERVENTE H 70,980303,812.05.03 0,29800AREIA M3 23,6016079,202.05.05 25,14000CAL HIDRATADA KG 8,547600,342.05.08 84,39000CIMENTO KG 31,224300,372.05.18 0,17000PEDRA BRITADA 2 M3 10,3853061,092.10.14 3,12000SARRAFO PINHO APARELHADO 5X2,5 CM M 6,520802,092.10.21 0,78000TABUAS PINHO DE 1"X12" DE 3A. M2 13,4004017,182.15.38 7,00000ACO CA-60-B $MD BITOLAS KG 18,550002,652.25.15 196,00000TIJOLO COMUM MACICO UN 43,120000,222.80.56 0,90000GRAFITE L 11,6280012,923.10.43 1,00000AC-07PORTA C/TRINCO P/CAVALETE 1 1/2' UN 588,16000588,163.80.03 1,40000CAL PARA PINTURA KG 0,980000,70

09/02/2011 11:38:40 Página: 99 de 0

Page 100: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.80.12 1,80000LIXA PARA FERRO UN 2,574001,433.80.18 0,06000OLEO DE LINHACA L 0,390606,513.80.28 0,54000ZARCAO L 8,6886016,096.05.05 4,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2") M 94,1600023,546.35.64 1,00000REGISTRO GAVETA AMARELO 1 1/2' UN 46,7600046,76

LS 242,51404 BDI 310,49707Mão-de-Obra 198,78200 Material 908,69120SubMO 441,29604

08.01.005 AC-08 ABRIGO E CAVALETE DE 2" COMPLETO 245X110X40CM UN 4.310,45

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,091.01.39 16,40000PEDREIRO H 76,260004,651.01.40 5,25000PINTOR H 24,727504,711.01.41 2,86000AJUDANTE DE PINTOR H 10,925203,821.01.46 22,82000SERVENTE H 86,944203,812.05.03 0,37000AREIA M3 29,3040079,202.05.05 30,80000CAL HIDRATADA KG 10,472000,342.05.08 103,40000CIMENTO KG 38,258000,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.14 3,85000SARRAFO PINHO APARELHADO 5X2,5 CM M 8,046502,092.10.21 0,95000TABUAS PINHO DE 1"X12" DE 3A. M2 16,3210017,182.15.38 8,60000ACO CA-60-B $MD BITOLAS KG 22,790002,652.25.02 47,00000BLOCO CONCRETO DE 9X39X19CM UN 70,030001,493.10.50 1,00000AC-08 PORTA DE TELA C/TRINCO P/CAVALETE 2" UN 681,42000681,423.75.02 0,90000TINTA ESMALTE L 8,964009,963.75.13 2,69000TINTA LATEX ECONOMICA L 11,620804,323.80.09 2,15000SELADOR P/PINTURA LATEX L 21,414009,963.80.40 3,23000LIXA D"AGUA UN 2,099500,653.80.66 0,67000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 9,8758014,746.05.65 1,00000KIT CAVALETE 2" FORNC/CERTIFICADO DE GARANTIA UN 2.103,960002.103,96

LS 251,49678 BDI 806,02011Mão-de-Obra 206,14490 Material 3.046,79360SubMO 457,64168

08.01.010 ABRIGO PARA CAVALETE COM PORTINHOLA DE CHAPA DE ACO UN 494,29

1.01.39 9,40000PEDREIRO H 43,710004,651.01.46 9,40000SERVENTE H 35,814003,812.05.03 0,13100AREIA M3 10,3752079,202.05.05 12,50000CAL HIDRATADA KG 4,250000,342.05.08 9,00000CIMENTO KG 3,330000,372.05.17 0,02400PEDRA BRITADA 1 M3 1,4863261,932.15.10 1,20000ACO CA-25 $MD BITOLAS KG 3,276002,732.25.15 140,00000TIJOLO COMUM MACICO UN 30,800000,223.10.52 1,00000PORTINHOLA CHAP ACO N18 80X60CM P/ABRIG UN 160,49000160,493.45.30 0,40000LADRILHO CERAMICO 7.5X15CM VERMELHO M2 11,3160028,29

LS 97,01928 BDI 92,42936Mão-de-Obra 79,52400 Material 225,32352SubMO 176,54328

08.01.015 CAVALETE DE 3/4" - (TUBO E CONEXOES DE FERRO GALVANIZADO) UN 180,02

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,096.05.02 2,30000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 24,7020010,746.35.53 1,00000REGISTRO DE PASSEIO DE 3/4" UN 19,1300019,136.35.61 1,00000REGISTRO GAVETA AMARELO 3/4' UN 19,1300019,136.50.22 1,00000CAIXA PASSEIO (ENTRADA D'AGUA) UN 2,500002,50

LS 44,45680 BDI 33,66252Mão-de-Obra 36,44000 Material 65,46200SubMO 80,89680

08.01.016 CAVALETE DE 1" - (TUBO E CONEXOES DE FERRO GALVANIZADO) UN 216,64

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,096.05.03 2,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 36,6160015,926.35.54 1,00000REGISTRO DE PASSEIO DE 1" UN 28,0600028,066.35.62 1,00000REGISTRO GAVETA AMARELO 1' UN 28,0600028,066.50.22 1,00000CAIXA PASSEIO (ENTRADA D'AGUA) UN 2,500002,50

LS 44,45680 BDI 40,51054Mão-de-Obra 36,44000 Material 95,23600SubMO 80,89680

08.01.017 CAVALETE DE 1.1/2" - (TUBO E CONEXOES DE FERRO GALVANIZADO) UN 296,14

1.01.18 4,50000ENCANADOR H 22,590005,021.01.19 4,50000AJUDANTE DE ENCANADOR H 18,405004,096.05.05 2,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2") M 54,1420023,546.35.55 1,00000REGISTRO DE PASSEIO DE 1.1/2" UN 46,3600046,366.35.64 1,00000REGISTRO GAVETA AMARELO 1 1/2' UN 46,7600046,766.50.22 1,00000CAIXA PASSEIO (ENTRADA D'AGUA) UN 2,500002,50

LS 50,01390 BDI 55,37731Mão-de-Obra 40,99500 Material 149,76200SubMO 91,00890

08.01.099 SERVICOS EM CAVALETE E ABRIGO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.02.001 AG-04 ABRIGO PARA GAS COM 2 CILINDROS DE 45 KG UN 3.941,80

09/02/2011 11:38:40 Página: 100 de 0

Page 101: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.11 5,18000CARPINTEIRO H 23,569004,551.01.12 5,18000AJUDANTE DE CARPINTEIRO H 20,512803,961.01.18 2,64000ENCANADOR H 13,252805,021.01.19 2,64000AJUDANTE DE ENCANADOR H 10,797604,091.01.21 0,93000FERREIRO H 4,436104,771.01.22 0,93000AJUDANTE DE FERREIRO H 3,552603,821.01.39 21,29000PEDREIRO H 98,998504,651.01.40 3,76000PINTOR H 17,709604,711.01.46 30,94000SERVENTE H 117,881403,812.05.03 0,57700AREIA M3 45,6984079,202.05.05 52,58000CAL HIDRATADA KG 17,877200,342.05.08 154,04000CIMENTO KG 56,994800,372.05.18 0,31300PEDRA BRITADA 2 M3 19,1211761,092.10.21 0,26000TABUAS PINHO DE 1"X12" DE 3A. M2 4,4668017,182.10.32 0,85000CHAPA COMPENSADA RESINADA E=12MM M2 10,2850012,102.15.25 3,05000ACO CA-50-A $MD BITOLAS KG 8,235002,702.15.38 7,62000ACO CA-60-B $MD BITOLAS KG 20,193002,652.25.02 70,72000BLOCO CONCRETO DE 9X39X19CM UN 105,372801,492.67.60 0,52000PREGO KG 2,376404,572.70.10 0,32000ARAME RECOZIDO N.18 KG 1,481604,633.11.42 1,00000AG-04PORTAO TELA 1.50X1.50 M UN 792,77000792,773.80.03 5,38000CAL PARA PINTURA KG 3,766000,703.80.18 0,11000OLEO DE LINHACA L 0,716106,516.07.51 2,40000TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4") M 75,4560031,446.85.01 2,00000CAP 3/4" NPT UN 15,860007,936.85.02 2,00000CILINDRO ACO 45 KG COM GAS UN 763,26000381,636.85.04 2,00000MEIA LUVA POL(VALV.RET)-GAS UN 10,460005,236.85.05 2,00000PIGTAIL POL MX7/16 NS(24) UN 35,4200017,716.85.09 2,00000VALVULA DE CILINDRO P/BOTIJAO 45KG (GAS) UN 61,7200030,866.85.10 2,00000VALVULA DE ESFERA METALICO 3/4" UN 30,9800015,496.85.18 1,00000TEE 3/4" NPT UN 14,5200014,526.85.23 1,00000REGULADOR PRESSAO PRIM EST SAIDA 150KPA VAZ 5G/H UN 327,91000327,916.85.30 1,00000VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL UN 90,0000090,00

LS 379,06669 BDI 737,08499Mão-de-Obra 310,71040 Material 2.514,94027SubMO 689,77709

08.02.002 AG-05 ABRIGO PARA GAS COM 4 CILINDROS DE 45 KG UN 5.799,73

1.01.11 7,12000CARPINTEIRO H 32,396004,551.01.12 7,12000AJUDANTE DE CARPINTEIRO H 28,195203,961.01.18 3,52000ENCANADOR H 17,670405,021.01.19 3,52000AJUDANTE DE ENCANADOR H 14,396804,091.01.21 1,21000FERREIRO H 5,771704,771.01.22 1,21000AJUDANTE DE FERREIRO H 4,622203,821.01.39 27,99000PEDREIRO H 130,153504,651.01.40 4,89000PINTOR H 23,031904,711.01.46 40,26000SERVENTE H 153,390603,812.05.03 0,75300AREIA M3 59,6376079,202.05.05 67,86000CAL HIDRATADA KG 23,072400,342.05.08 200,54000CIMENTO KG 74,199800,372.05.18 0,41600PEDRA BRITADA 2 M3 25,4134461,092.10.21 0,36000TABUAS PINHO DE 1"X12" DE 3A. M2 6,1848017,182.10.32 1,17000CHAPA COMPENSADA RESINADA E=12MM M2 14,1570012,102.15.25 2,65000ACO CA-50-A $MD BITOLAS KG 7,155002,702.15.38 10,83000ACO CA-60-B $MD BITOLAS KG 28,699502,652.25.02 88,40000BLOCO CONCRETO DE 9X39X19CM UN 131,716001,492.67.60 0,71000PREGO KG 3,244704,572.70.10 0,40000ARAME RECOZIDO N.18 KG 1,852004,633.11.43 1,00000AG-05PORTAO TELA 1.50X2.30 M UN 1.103,120001.103,123.80.03 6,99000CAL PARA PINTURA KG 4,893000,703.80.18 0,14000OLEO DE LINHACA L 0,911406,516.07.51 3,20000TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4") M 100,6080031,446.85.01 2,00000CAP 3/4" NPT UN 15,860007,936.85.02 4,00000CILINDRO ACO 45 KG COM GAS UN 1.526,52000381,636.85.04 4,00000MEIA LUVA POL(VALV.RET)-GAS UN 20,920005,236.85.05 4,00000PIGTAIL POL MX7/16 NS(24) UN 70,8400017,716.85.09 4,00000VALVULA DE CILINDRO P/BOTIJAO 45KG (GAS) UN 123,4400030,866.85.10 2,00000VALVULA DE ESFERA METALICO 3/4" UN 30,9800015,496.85.18 1,00000TEE 3/4" NPT UN 14,5200014,526.85.23 1,00000REGULADOR PRESSAO PRIM EST SAIDA 150KPA VAZ 5G/H UN 327,91000327,916.85.30 1,00000VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL UN 90,0000090,00

LS 499,74653 BDI 1.084,50278Mão-de-Obra 409,62830 Material 3.805,85464SubMO 909,37483

08.02.003 AG-06 ABRIGO PARA GAS COM 6 CILINDROS DE 45 KG UN 7.855,11

1.01.11 9,08000CARPINTEIRO H 41,314004,551.01.12 9,08000AJUDANTE DE CARPINTEIRO H 35,956803,961.01.18 4,40000ENCANADOR H 22,088005,021.01.19 4,40000AJUDANTE DE ENCANADOR H 17,996004,091.01.21 1,49000FERREIRO H 7,107304,77

09/02/2011 11:38:40 Página: 101 de 0

Page 102: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.22 1,49000AJUDANTE DE FERREIRO H 5,691803,821.01.39 33,07000PEDREIRO H 153,775504,651.01.40 5,85000PINTOR H 27,553504,711.01.46 48,61000SERVENTE H 185,204103,812.05.03 0,90700AREIA M3 71,8344079,202.05.05 81,14000CAL HIDRATADA KG 27,587600,342.05.08 241,70000CIMENTO KG 89,429000,372.05.18 0,51200PEDRA BRITADA 2 M3 31,2780861,092.10.21 0,45000TABUAS PINHO DE 1"X12" DE 3A. M2 7,7310017,182.10.32 1,50000CHAPA COMPENSADA RESINADA E=12MM M2 18,1500012,102.15.25 3,05000ACO CA-50-A $MD BITOLAS KG 8,235002,702.15.38 12,21000ACO CA-60-B $MD BITOLAS KG 32,356502,652.25.02 106,08000BLOCO CONCRETO DE 9X39X19CM UN 158,059201,492.67.60 0,91000PREGO KG 4,158704,572.70.10 0,48000ARAME RECOZIDO N.18 KG 2,222404,633.11.44 1,00000AG-06PORTAO TELA 1.50X3.10 M UN 1.608,020001.608,023.80.03 8,35000CAL PARA PINTURA KG 5,845000,703.80.18 0,17000OLEO DE LINHACA L 1,106706,516.07.51 4,00000TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4") M 125,7600031,446.85.01 2,00000CAP 3/4" NPT UN 15,860007,936.85.02 6,00000CILINDRO ACO 45 KG COM GAS UN 2.289,78000381,636.85.04 6,00000MEIA LUVA POL(VALV.RET)-GAS UN 31,380005,236.85.05 6,00000PIGTAIL POL MX7/16 NS(24) UN 106,2600017,716.85.09 6,00000VALVULA DE CILINDRO P/BOTIJAO 45KG (GAS) UN 185,1600030,866.85.10 2,00000VALVULA DE ESFERA METALICO 3/4" UN 30,9800015,496.85.18 1,00000TEE 3/4" NPT UN 14,5200014,526.85.23 1,00000REGULADOR PRESSAO PRIM EST SAIDA 150KPA VAZ 5G/H UN 327,91000327,916.85.30 1,00000VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL UN 90,0000090,00

LS 605,95814 BDI 1.468,84181Mão-de-Obra 496,68700 Material 5.283,62358SubMO 1.102,64514

08.02.004 AG-07 ABRIGO PARA MEDIDOR COMGAS 60X60X30CM UN 1.018,68

1.01.11 1,38000CARPINTEIRO H 6,279004,551.01.12 1,38000AJUDANTE DE CARPINTEIRO H 5,464803,961.01.18 2,73000ENCANADOR H 13,704605,021.01.19 2,73000AJUDANTE DE ENCANADOR H 11,165704,091.01.21 0,17000FERREIRO H 0,810904,771.01.22 0,17000AJUDANTE DE FERREIRO H 0,649403,821.01.39 7,50000PEDREIRO H 34,875004,651.01.40 1,57000PINTOR H 7,394704,711.01.41 0,65000AJUDANTE DE PINTOR H 2,483003,821.01.46 8,50000SERVENTE H 32,385003,812.05.03 0,23200AREIA M3 18,3744079,202.05.05 13,87000CAL HIDRATADA KG 4,715800,342.05.08 95,60000CIMENTO KG 35,372000,372.05.17 0,11800PEDRA BRITADA 1 M3 7,3077461,932.10.21 0,60000TABUAS PINHO DE 1"X12" DE 3A. M2 10,3080017,182.10.32 3,42700CHAPA COMPENSADA RESINADA E=12MM M2 41,4667012,102.15.38 16,00000ACO CA-60-B $MD BITOLAS KG 42,400002,652.25.15 61,00000TIJOLO COMUM MACICO UN 13,420000,222.67.60 0,13800PREGO KG 0,630664,572.70.10 0,03000ARAME RECOZIDO N.18 KG 0,138904,632.80.56 0,18000GRAFITE L 2,3256012,923.11.40 1,00000AG-07PORTA EM CHAPA N. 16 UN 277,00000277,003.80.03 1,32000CAL PARA PINTURA KG 0,924000,703.80.12 0,36000LIXA PARA FERRO UN 0,514801,433.80.18 0,03000OLEO DE LINHACA L 0,195306,513.80.28 0,15000ZARCAO L 2,4135016,096.07.52 3,15000TUBO ACO GALV NBR 5590-CL PESADA DN 25MM (1") M 114,7860036,446.95.52 0,03020FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,135304,48

LS 140,55876 BDI 190,48590Mão-de-Obra 115,21210 Material 572,42870SubMO 255,77086

08.02.005 AG-08 ABRIGO PARA GAS COM 2 BUJOES DE 13 KG UN 1.172,27

1.01.11 1,44000CARPINTEIRO H 6,552004,551.01.12 1,44000AJUDANTE DE CARPINTEIRO H 5,702403,961.01.21 0,38000FERREIRO H 1,812604,771.01.22 0,38000AJUDANTE DE FERREIRO H 1,451603,821.01.39 11,32000PEDREIRO H 52,638004,651.01.40 3,03000PINTOR H 14,271304,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,821.01.46 15,83000SERVENTE H 60,312303,812.05.03 0,24300AREIA M3 19,2456079,202.05.05 29,79000CAL HIDRATADA KG 10,128600,342.05.08 60,92000CIMENTO KG 22,540400,372.05.18 0,11300PEDRA BRITADA 2 M3 6,9031761,092.10.21 0,87000TABUAS PINHO DE 1"X12" DE 3A. M2 14,9466017,182.15.38 4,31000ACO CA-60-B $MD BITOLAS KG 11,421502,652.25.15 133,00000TIJOLO COMUM MACICO UN 29,260000,22

09/02/2011 11:38:40 Página: 102 de 0

Page 103: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.60 0,22000PREGO KG 1,005404,572.70.10 0,08000ARAME RECOZIDO N.18 KG 0,370404,633.11.52 1,00000AG-08 PORTINHOLA CHAPA ACO COMPLETA UN 244,18000244,183.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.16.91 1,00000FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD UN 3,810003,813.80.03 2,20000CAL PARA PINTURA KG 1,540000,703.80.12 0,83000LIXA PARA FERRO UN 1,186901,433.80.18 0,04000OLEO DE LINHACA L 0,260406,513.80.28 0,25000ZARCAO L 4,0225016,093.80.34 0,42000TINTA A OLEO L 3,834609,136.85.15 1,00000VALVULA E MANGUEIRA P/GAS DOMIC 3/8' CJ 17,1200017,126.85.16 1,00000BICO ESCALONADO PARA GAS 3/8' BRONZE UN 3,870003,876.85.50 2,00000BUJAO GAS 13KG COM CARGA UN 225,10000112,55

LS 176,47324 BDI 219,20599Mão-de-Obra 144,65020 Material 631,94607SubMO 321,12344

08.02.016 PROTECAO ANTICORROSIVA PARA RAMAIS SOB A TERRA M 8,75

1.01.19 0,08000AJUDANTE DE ENCANADOR H 0,327204,096.95.26 3,00000FITA PROT.ANTICORROS.LARG.50MM SCOTCHRAP/TOROFITA M 6,390002,13

LS 0,39918 BDI 1,63677Mão-de-Obra 0,32720 Material 6,39000SubMO 0,72638

08.02.017 PROTECAO MECANICA PARA RAMAIS SOB ATERRA M 6,32

1.01.18 0,20000ENCANADOR H 1,004005,021.01.19 0,20000AJUDANTE DE ENCANADOR H 0,818004,092.25.15 5,00000TIJOLO COMUM MACICO UN 1,100000,22

LS 2,22284 BDI 1,18331Mão-de-Obra 1,82200 Material 1,10000SubMO 4,04484

08.02.020 SG-01 SIFAO PARA REDE DE GAS UN 102,28

1.01.11 0,16000CARPINTEIRO H 0,728004,551.01.12 0,16000AJUDANTE DE CARPINTEIRO H 0,633603,961.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,091.01.21 0,02000FERREIRO H 0,095404,771.01.22 0,02000AJUDANTE DE FERREIRO H 0,076403,821.01.39 0,64000PEDREIRO H 2,976004,651.01.46 1,53000SERVENTE H 5,829303,812.05.03 0,02600AREIA M3 2,0592079,202.05.05 1,66000CAL HIDRATADA KG 0,564400,342.05.08 7,39000CIMENTO KG 2,734300,372.05.18 0,00400PEDRA BRITADA 2 M3 0,2443661,092.10.17 0,30000SARRAFO PINHO APARELHADO 10X2,5 CM M 1,368004,562.10.21 0,07000TABUAS PINHO DE 1"X12" DE 3A. M2 1,2026017,182.15.38 0,23000ACO CA-60-B $MD BITOLAS KG 0,609502,652.25.15 28,00000TIJOLO COMUM MACICO UN 6,160000,222.67.60 0,03000PREGO KG 0,137104,572.70.10 0,00400ARAME RECOZIDO N.18 KG 0,018524,636.08.03 1,19000TUBO ACO 1' SCH 40 S/COSTURA M 22,8123019,176.95.52 0,01140FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,051074,48

LS 24,83883 BDI 19,12677Mão-de-Obra 20,35970 Material 37,96135SubMO 45,19853

08.02.021 VG-01 VALVULA E REGULADOR DE PRESSAO DE GAS UN 380,82

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.04.36 1,00000NIPLE DUPLO FERRO GALV 3/8" UN 3,500003,506.05.01 0,10000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2") M 0,803008,036.06.01 1,00000REDUCAO 3/8"X1/2" UN 2,010002,016.06.02 1,00000REDUCAO 3/4"X1/4" UN 2,450002,456.08.34 1,00000NIPLE DUPLO FERRO GALV 3/4" UN 3,950003,956.85.10 1,00000VALVULA DE ESFERA METALICO 3/4" UN 15,4900015,496.85.22 1,00000REGULADOR SEMI-INDUST 2o ESTAGIO PRESSAO S 2,8KPA UN 150,80000150,806.85.30 1,00000VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL UN 90,0000090,006.95.52 0,03600FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,161284,48

LS 22,22840 BDI 71,21092Mão-de-Obra 18,22000 Material 269,16428SubMO 40,44840

08.02.040 TUBO ACO GALV NBR5590-CLASSE PESADA DN 20MM (3/4") INCL CONEXOES M 89,29

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.07.51 1,60000TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4") M 50,3040031,446.95.52 0,01120FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,050184,48

LS 12,22562 BDI 16,69818Mão-de-Obra 10,02100 Material 50,35418SubMO 22,24662

08.02.041 TUBO ACO GALV NBR5590-CLASSE PESADA DN 25MM (1") INCL CONEXOES M 99,64

1.01.18 1,30000ENCANADOR H 6,526005,021.01.19 1,30000AJUDANTE DE ENCANADOR H 5,317004,096.07.52 1,50000TUBO ACO GALV NBR 5590-CL PESADA DN 25MM (1") M 54,6600036,446.95.52 0,01440FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,064514,48

LS 14,44846 BDI 18,63367Mão-de-Obra 11,84300 Material 54,72451SubMO 26,29146

09/02/2011 11:38:40 Página: 103 de 0

Page 104: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.02.042 TUBO ACO GALV NBR5590-CLASSE PESADA DN 32MM (1 1/4") INCL CONEXOES M 126,08

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.07.53 1,50000TUBO ACO GALV NBR 5590-CL PESADA DN 32MM (1 1/4") M 74,1150049,416.95.52 0,01800FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,080644,48

LS 15,55988 BDI 23,57719Mão-de-Obra 12,75400 Material 74,19564SubMO 28,31388

08.02.043 TUBO ACO GALV NBR5590-CLASSE PESADA DN 40MM (1 1/2") INCL CONEXOES M 139,13

1.01.18 1,60000ENCANADOR H 8,032005,021.01.19 1,60000AJUDANTE DE ENCANADOR H 6,544004,096.07.54 1,40000TUBO ACO GALV NBR 5590-CL PESADA DN 40MM (1 1/2") M 80,6540057,616.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 17,78272 BDI 26,01621Mão-de-Obra 14,57600 Material 80,75525SubMO 32,35872

08.02.050 ENVOLVIMENTO C/ TUBO DE PVC DN 150MM EM TUBULACAO DE GAS DE RUA M 21,56

1.01.18 0,10000ENCANADOR H 0,502005,021.01.19 0,10000AJUDANTE DE ENCANADOR H 0,409004,096.25.34 1,10000TUBO PVC P/ESGOTO 150MM M 15,5100014,10

LS 1,11142 BDI 4,03246Mão-de-Obra 0,91100 Material 15,51000SubMO 2,02242

08.02.060 TUBO DE COBRE P/ GAS CLASSE A S/COST DN=1/2 (15) SOLDA FOSCOPER M 55,82

1.01.18 1,30000ENCANADOR H 6,526005,021.01.19 1,30000AJUDANTE DE ENCANADOR H 5,317004,096.30.40 1,40000TUBO DE COBRE P/ GAS DN=1/2 (15) CLASSE A S/ COST M 16,4500011,756.30.50 0,05000VARETAS PARA SOLDA FOSCOPER KG 2,6450052,90

LS 14,44846 BDI 10,43889Mão-de-Obra 11,84300 Material 19,09500SubMO 26,29146

08.02.061 TUBO DE COBRE P/ GAS CLASSE A S/COST DN=3/4 (22) SOLDA FOSCOPER M 69,62

1.01.18 1,30000ENCANADOR H 6,526005,021.01.19 1,30000AJUDANTE DE ENCANADOR H 5,317004,096.30.41 1,40000TUBO DE COBRE P/ GAS DN=3/4 (22) CLASSE A S/ COST M 26,0820018,636.30.50 0,08000VARETAS PARA SOLDA FOSCOPER KG 4,2320052,90

LS 14,44846 BDI 13,01926Mão-de-Obra 11,84300 Material 30,31400SubMO 26,29146

08.02.062 TUBO DE COBRE P/ GAS CLASSE A S/COST DN=1 (28) SOLDA FOSCOPER M 82,82

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.30.42 1,40000TUBO DE COBRE P/ GAS DN=1 (28) CLASSE A S/ COST M 33,2080023,726.30.50 0,11000VARETAS PARA SOLDA FOSCOPER KG 5,8190052,90

LS 15,55988 BDI 15,48840Mão-de-Obra 12,75400 Material 39,02700SubMO 28,31388

08.02.063 TUBO DE COBRE P/ GAS CLASSE A S/COST DN=1 1/4 (35) SOLDA FOSCOPER M 105,66

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.30.43 1,40000TUBO DE COBRE P/ GAS DN=1 1/4 (35) CLASSE A S/COST M 50,1900035,856.30.50 0,14000VARETAS PARA SOLDA FOSCOPER KG 7,4060052,90

LS 15,55988 BDI 19,75927Mão-de-Obra 12,75400 Material 57,59600SubMO 28,31388

08.02.064 TUBO DE COBRE P/ GAS CLSSE A S/COST DN=1 1/2 (42) SOLDA FOSCOPER M 122,74

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.30.44 1,40000TUBO DE COBRE P/ GAS DN=1 1/2 (42) CLASSE A S/COST M 60,4660043,196.30.50 0,17000VARETAS PARA SOLDA FOSCOPER KG 8,9930052,90

LS 16,67130 BDI 22,95292Mão-de-Obra 13,66500 Material 69,45900SubMO 30,33630

08.02.099 SERVICOS EM ABRIGO E REDE DE GAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.03.001 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN15MM (1/2") - INCL CONEXOES M 33,25

1.01.18 0,70000ENCANADOR H 3,514005,021.01.19 0,70000AJUDANTE DE ENCANADOR H 2,863004,096.05.01 1,60000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2") M 12,848008,036.95.53 0,00940FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,030833,28

LS 7,77994 BDI 6,21823Mão-de-Obra 6,37700 Material 12,87883SubMO 14,15694

08.03.002 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN20MM (3/4") - INCL CONEXOES M 41,08

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.05.02 1,60000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 17,1840010,746.95.53 0,01120FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,036743,28

LS 8,89136 BDI 7,68202Mão-de-Obra 7,28800 Material 17,22074SubMO 16,17936

08.03.003 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN25MM (1") - INCL. CONEXOES M 56,79

1.01.18 1,10000ENCANADOR H 5,522005,02

09/02/2011 11:38:40 Página: 104 de 0

Page 105: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.05.03 1,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 23,8800015,926.95.53 0,01440FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,047233,28

LS 12,22562 BDI 10,61999Mão-de-Obra 10,02100 Material 23,92723SubMO 22,24662

08.03.004 TUBO ACO GALVANIZ NBR 5580-CL MEDIA, DN32MM (1 1/4")-INCL CONEXOES M 67,75

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.05.04 1,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4") M 30,7350020,496.95.52 0,01800FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,080644,48

LS 13,33704 BDI 12,66948Mão-de-Obra 10,93200 Material 30,81564SubMO 24,26904

08.03.005 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN40MM (1 1/2")-INCL CONEXOES M 75,48

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.05.05 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2") M 32,9560023,546.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 15,55988 BDI 14,11536Mão-de-Obra 12,75400 Material 33,05725SubMO 28,31388

08.03.006 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN50MM (2") - INCL CONEXOES M 97,01

1.01.18 1,60000ENCANADOR H 8,032005,021.01.19 1,60000AJUDANTE DE ENCANADOR H 6,544004,096.05.06 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2") M 46,3400033,106.95.51 0,02720FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,171636,31

LS 17,78272 BDI 18,14018Mão-de-Obra 14,57600 Material 46,51163SubMO 32,35872

08.03.007 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN65MM (2 1/2") - INCL CONEXOES M 117,96

1.01.18 1,80000ENCANADOR H 9,036005,021.01.19 1,80000AJUDANTE DE ENCANADOR H 7,362004,096.05.07 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN65MM (2 1/2") M 59,2900042,356.95.51 0,03380FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,213286,31

LS 20,00556 BDI 22,05857Mão-de-Obra 16,39800 Material 59,50328SubMO 36,40356

08.03.008 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN80MM (3")-INCL CONEXOES M 135,53

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.05.08 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 69,4980053,466.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 22,22840 BDI 25,34340Mão-de-Obra 18,22000 Material 69,74030SubMO 40,44840

08.03.009 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN100MM (4")-INCL CONEXOES M 178,52

1.01.18 2,20000ENCANADOR H 11,044005,021.01.19 2,20000AJUDANTE DE ENCANADOR H 8,998004,096.05.09 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN100MM (4") M 100,3340077,186.95.51 0,04960FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,312986,31

LS 24,45124 BDI 33,38225Mão-de-Obra 20,04200 Material 100,64698SubMO 44,49324

08.03.010 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN 150MM (6") - INCL CONEXOES M 262,45

1.01.18 2,65000ENCANADOR H 13,303005,021.01.19 2,65000AJUDANTE DE ENCANADOR H 10,838504,096.05.11 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN150MM (6") M 159,35400122,586.95.51 0,06800FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,429086,31

LS 29,45263 BDI 49,07676Mão-de-Obra 24,14150 Material 159,78308SubMO 53,59413

08.03.012 PROTECAO ANTICORROSIVA PARA RAMAIS SOB A TERRA M 8,75

1.01.19 0,08000AJUDANTE DE ENCANADOR H 0,327204,096.95.26 3,00000FITA PROT.ANTICORROS.LARG.50MM SCOTCHRAP/TOROFITA M 6,390002,13

LS 0,39918 BDI 1,63677Mão-de-Obra 0,32720 Material 6,39000SubMO 0,72638

08.03.015 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 20MM (1/2") INCL CONEXOES M 11,32

1.01.18 0,35000ENCANADOR H 1,757005,021.01.19 0,35000AJUDANTE DE ENCANADOR H 1,431504,093.80.40 0,04000LIXA D"AGUA UN 0,026000,656.25.01 1,60000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM M 2,080001,306.95.13 0,00060ADESIVO PARA TUBOS PVC L 0,0163727,296.95.14 0,00030SOLUCAO LIMPADORA P/ PVC L 0,0060920,29

LS 3,88997 BDI 2,11759Mão-de-Obra 3,18850 Material 2,12846SubMO 7,07847

08.03.016 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 25MM (3/4") INCL CONEXOES M 13,33

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,093.80.40 0,05000LIXA D"AGUA UN 0,032500,656.25.02 1,60000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM M 2,688001,686.95.13 0,00080ADESIVO PARA TUBOS PVC L 0,0218327,296.95.14 0,00030SOLUCAO LIMPADORA P/ PVC L 0,0060920,29

09/02/2011 11:38:40 Página: 105 de 0

Page 106: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 4,44568 BDI 2,49276Mão-de-Obra 3,64400 Material 2,74842SubMO 8,08968

08.03.017 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 32MM (1") INCL CONEXOES M 17,98

1.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,093.80.40 0,06000LIXA D"AGUA UN 0,039000,656.25.03 1,50000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 32MM M 5,445003,636.95.13 0,00110ADESIVO PARA TUBOS PVC L 0,0300227,296.95.14 0,00050SOLUCAO LIMPADORA P/ PVC L 0,0101520,29

LS 5,00139 BDI 3,36376Mão-de-Obra 4,09950 Material 5,52416SubMO 9,10089

08.03.018 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/4") INCL CONEXOES M 22,19

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,093.80.40 0,07000LIXA D"AGUA UN 0,045500,656.25.04 1,50000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 40MM M 7,845005,236.95.13 0,00120ADESIVO PARA TUBOS PVC L 0,0327527,296.95.14 0,00050SOLUCAO LIMPADORA P/ PVC L 0,0101520,29

LS 5,55710 BDI 4,15046Mão-de-Obra 4,55500 Material 7,93339SubMO 10,11210

08.03.019 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 50MM (1.1/2") INCL CONEXOES M 26,21

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,093.80.40 0,08000LIXA D"AGUA UN 0,052000,656.25.05 1,40000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 50MM M 8,652006,186.95.13 0,01680ADESIVO PARA TUBOS PVC L 0,4584727,296.95.14 0,00070SOLUCAO LIMPADORA P/ PVC L 0,0142020,29

LS 6,66852 BDI 4,90158Mão-de-Obra 5,46600 Material 9,17668SubMO 12,13452

08.03.020 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 60MM (2") INCL CONEXOES M 34,98

1.01.18 0,70000ENCANADOR H 3,514005,021.01.19 0,70000AJUDANTE DE ENCANADOR H 2,863004,093.80.40 0,09000LIXA D"AGUA UN 0,058500,656.25.06 1,40000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 60MM M 14,1540010,116.95.13 0,00220ADESIVO PARA TUBOS PVC L 0,0600427,296.95.14 0,00080SOLUCAO LIMPADORA P/ PVC L 0,0162320,29

LS 7,77994 BDI 6,54251Mão-de-Obra 6,37700 Material 14,28877SubMO 14,15694

08.03.021 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 75MM (2.1/2") INCL CONEXOES M 50,70

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,093.80.40 0,10000LIXA D"AGUA UN 0,065000,656.25.07 1,40000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 75MM M 22,8480016,326.95.13 0,00310ADESIVO PARA TUBOS PVC L 0,0846027,296.95.14 0,00110SOLUCAO LIMPADORA P/ PVC L 0,0223220,29

LS 10,00278 BDI 9,48099Mão-de-Obra 8,19900 Material 23,01992SubMO 18,20178

08.03.022 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 85MM (3") INCL CONEXOES M 58,22

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,093.80.40 0,11000LIXA D"AGUA UN 0,071500,656.25.08 1,30000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM M 26,9230020,716.95.13 0,00350ADESIVO PARA TUBOS PVC L 0,0955227,296.95.14 0,00130SOLUCAO LIMPADORA P/ PVC L 0,0263820,29

LS 11,11420 BDI 10,88834Mão-de-Obra 9,11000 Material 27,11639SubMO 20,22420

08.03.023 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 110MM (4") INCL CONEXOES M 78,88

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,093.80.40 0,12000LIXA D"AGUA UN 0,078000,656.25.09 1,30000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 110MM M 41,6130032,016.95.13 0,00550ADESIVO PARA TUBOS PVC L 0,1501027,296.95.14 0,00230SOLUCAO LIMPADORA P/ PVC L 0,0466720,29

LS 12,22562 BDI 14,75091Mão-de-Obra 10,02100 Material 41,88776SubMO 22,24662

08.03.099 SERVICOS EM REDE DE AGUA FRIA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.04.001 REGISTRO DE GAVETA BRUTO DN 15MM (1/2") UN 35,05

1.01.18 0,54000ENCANADOR H 2,710805,021.01.19 0,54000AJUDANTE DE ENCANADOR H 2,208604,096.35.60 1,00000REGISTRO GAVETA AMARELO 1/2' UN 17,5300017,536.95.52 0,01120FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,050184,48

LS 6,00167 BDI 6,55529Mão-de-Obra 4,91940 Material 17,58018SubMO 10,92107

09/02/2011 11:38:40 Página: 106 de 0

Page 107: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.04.002 REGISTRO DE GAVETA BRUTO DN 20MM (3/4") UN 37,06

1.01.18 0,54000ENCANADOR H 2,710805,021.01.19 0,54000AJUDANTE DE ENCANADOR H 2,208604,096.35.61 1,00000REGISTRO GAVETA AMARELO 3/4' UN 19,1300019,136.95.52 0,01880FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,084224,48

LS 6,00167 BDI 6,93112Mão-de-Obra 4,91940 Material 19,21422SubMO 10,92107

08.04.003 REGISTRO DE GAVETA BRUTO DN 25MM (1") UN 48,07

1.01.18 0,54000ENCANADOR H 2,710805,021.01.19 0,54000AJUDANTE DE ENCANADOR H 2,208604,096.35.62 1,00000REGISTRO GAVETA AMARELO 1' UN 28,0600028,066.95.52 0,02400FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,107524,48

LS 6,00167 BDI 8,99038Mão-de-Obra 4,91940 Material 28,16752SubMO 10,92107

08.04.004 REGISTRO DE GAVETA BRUTO DN 32MM (1 1/4") UN 66,21

1.01.18 0,85000ENCANADOR H 4,267005,021.01.19 0,85000AJUDANTE DE ENCANADOR H 3,476504,096.35.63 1,00000REGISTRO GAVETA AMARELO 1 1/4' UN 36,4500036,456.95.51 0,03000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,189306,31

LS 9,44707 BDI 12,38087Mão-de-Obra 7,74350 Material 36,63930SubMO 17,19057

08.04.005 REGISTRO DE GAVETA BRUTO DN 40MM 1 1/2" UN 78,95

1.01.18 0,85000ENCANADOR H 4,267005,021.01.19 0,85000AJUDANTE DE ENCANADOR H 3,476504,096.35.64 1,00000REGISTRO GAVETA AMARELO 1 1/2' UN 46,7600046,766.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 9,44707 BDI 14,76320Mão-de-Obra 7,74350 Material 46,99726SubMO 17,19057

08.04.006 REGISTRO DE GAVETA BRUTO DN 50MM (2") UN 104,88

1.01.18 0,85000ENCANADOR H 4,267005,021.01.19 0,85000AJUDANTE DE ENCANADOR H 3,476504,096.35.65 1,00000REGISTRO GAVETA AMARELO 2' UN 67,8000067,806.95.51 0,04520FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,285216,31

LS 9,44707 BDI 19,61343Mão-de-Obra 7,74350 Material 68,08521SubMO 17,19057

08.04.007 REGISTRO DE GAVETA BRUTO DN 65MM (2 1/2") UN 248,89

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.35.66 1,00000REGISTRO GAVETA AMARELO 2 1/2' UN 178,74000178,746.95.51 0,05640FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,355886,31

LS 12,78133 BDI 46,54135Mão-de-Obra 10,47650 Material 179,09588SubMO 23,25783

08.04.008 REGISTRO DE GAVETA BRUTO DN 80MM (3") UN 358,91

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.35.67 1,00000REGISTRO GAVETA AMARELO 3' UN 268,14000268,146.95.51 0,06400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,403846,31

LS 12,78133 BDI 67,11438Mão-de-Obra 10,47650 Material 268,54384SubMO 23,25783

08.04.009 REGISTRO DE GAVETA BRUTO DN 100MM (4") UN 591,70

1.01.18 1,48000ENCANADOR H 7,429605,021.01.19 1,48000AJUDANTE DE ENCANADOR H 6,053204,096.35.69 1,00000REGISTRO GAVETA AMARELO 4' UN 450,61000450,616.95.51 0,08280FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,522476,31

LS 16,44902 BDI 110,64479Mão-de-Obra 13,48280 Material 451,13247SubMO 29,93182

08.04.015 REGISTRO DE PRESSAO BRUTO DE 1/2" UN 39,73

1.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,096.35.30 1,00000REGISTRO PRESSAO AMARELO DE 1/2' UN 23,1900023,196.95.53 0,00480FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,015743,28

LS 5,00139 BDI 7,43053Mão-de-Obra 4,09950 Material 23,20574SubMO 9,10089

08.04.016 REGISTRO DE PRESSAO BRUTO DE 3/4" UN 46,76

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,096.35.35 1,00000REGISTRO PRESSAO AMARELO DE 3/4' UN 25,8500025,856.95.52 0,00720FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,032264,48

LS 6,66852 BDI 8,74386Mão-de-Obra 5,46600 Material 25,88226SubMO 12,13452

08.04.021 REGISTRO DE GAVETA COM CANOPLA CROMADA DN 15MM (1/2") UN 69,13

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,096.35.45 1,00000REGISTRO GAVETA C/ CANOPLA CROMADA DN 1/2" UN 43,8300043,836.95.53 0,01120FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,036743,28

09/02/2011 11:38:40 Página: 107 de 0

Page 108: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 6,77966 BDI 12,92681Mão-de-Obra 5,55710 Material 43,86674SubMO 12,33676

08.04.022 REGISTRO DE GAVETA COM CANOPLA CROMADA DN 20MM (3/4") UN 76,94

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,096.35.46 1,00000REGISTRO GAVETA C/ CANOPLA CROMADA DN 3/4" UN 50,1600050,166.95.53 0,01880FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,061663,28

LS 6,77966 BDI 14,38844Mão-de-Obra 5,55710 Material 50,22166SubMO 12,33676

08.04.023 REGISTRO DE GAVETA COM CANOPLA CROMADA DN 25MM (1") UN 89,89

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,096.35.47 1,00000REGISTRO GAVETA C/ CANOPLA CROMADA DN 1" UN 60,6400060,646.95.52 0,02400FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,107524,48

LS 6,77966 BDI 16,80939Mão-de-Obra 5,55710 Material 60,74752SubMO 12,33676

08.04.024 REGISTRO DE GAVETA COM CANOPLA CROMADA DN 32MM (1 1/4") UN 123,23

1.01.18 0,95000ENCANADOR H 4,769005,021.01.19 0,95000AJUDANTE DE ENCANADOR H 3,885504,096.35.48 1,00000REGISTRO GAVETA C/ CANOPLA CROMADA DN 1 1/4" UN 80,8400080,846.95.52 0,03000FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,134404,48

LS 10,55849 BDI 23,04310Mão-de-Obra 8,65450 Material 80,97440SubMO 19,21299

08.04.025 REGISTRO DE GAVETA COM CANOPLA CROMADA DN 40MM (1 1/2") UN 137,67

1.01.18 0,95000ENCANADOR H 4,769005,021.01.19 0,95000AJUDANTE DE ENCANADOR H 3,885504,096.35.49 1,00000REGISTRO GAVETA C/ CANOPLA CROMADA DN 1 1/2" UN 92,5500092,556.95.52 0,03760FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,168454,48

LS 10,55849 BDI 25,74423Mão-de-Obra 8,65450 Material 92,71845SubMO 19,21299

08.04.031 REGISTRO DE PRESSAO C/ CANOPLA CROMADA DN 15MM (1/2") UN 74,08

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,096.35.32 1,00000REGISTRO PRESSAO C/ CANOPLA CROMADA DN 1/2" UN 47,8600047,866.95.53 0,01120FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,036743,28

LS 6,77966 BDI 13,85371Mão-de-Obra 5,55710 Material 47,89674SubMO 12,33676

08.04.032 REGISTRO DE PRESSAO C/ CANOPLA CROMADA DN 20MM (3/4") UN 78,00

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,096.35.33 1,00000REGISTRO PRESSAO C/ CANOPLA CROMADA DN 3/4" UN 51,0200051,026.95.53 0,01880FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,061663,28

LS 6,77966 BDI 14,58624Mão-de-Obra 5,55710 Material 51,08166SubMO 12,33676

08.04.041 VALVULA DE DESCARGA COMUM COM CANOPLA CROMADA LISA DN 32MM (1 1/4") UN 120,76

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.35 1,00000VALVULA DESC S/REGISTRO 1 1/4' UN 51,5400051,546.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 22,22840 BDI 22,58270Mão-de-Obra 18,22000 Material 57,73726SubMO 40,44840

08.04.042 VALVULA DE DESCARGA COMUM COM CANOPLA CROMADA LISA DN 40MM (1 1/2") UN 120,76

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.10 1,00000VALVULA DESC S/REGISTRO 1 1/2' UN 51,5400051,546.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 22,22840 BDI 22,58270Mão-de-Obra 18,22000 Material 57,73726SubMO 40,44840

08.04.043 VALVULA DE DESCARGA C/ REG INCORP DN=32MM(1 1/4) ACAB ANTIVANDALISMO UN 278,79

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.33 1,00000VALVULA DE DESCARGA 1 1/4 ACAB ANTIVANDALISMO UN 180,02000180,026.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 22,22840 BDI 52,13310Mão-de-Obra 18,22000 Material 186,21726SubMO 40,44840

08.04.044 VALVULA DE DESCARGA C/ REG INCORP DN=40MM(1 1/2) ACAB ANTIVANDALISMO UN 274,71

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.34 1,00000VALVULA DE DESCARGA 1 1/2 ACAB ANTIVANDALISMO UN 176,70000176,706.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 22,22840 BDI 51,36950Mão-de-Obra 18,22000 Material 182,89726SubMO 40,44840

09/02/2011 11:38:40 Página: 108 de 0

Page 109: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.04.048 VALVULA DE DESCARGA DE FECHAMENTO AUTOMATICO PARA MICTORIO UN 215,80

1.01.18 0,67000ENCANADOR H 3,363405,021.01.19 0,67000AJUDANTE DE ENCANADOR H 2,740304,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.40.15 1,00000VALVULA DE DESCARGA P/ MICTORIO CICLO FECH AUTOMAT UN 161,06000161,06

LS 7,44651 BDI 40,35355Mão-de-Obra 6,10370 Material 161,90000SubMO 13,55021

08.04.051 VALVULA DE DESCARGA C/REG INCORP DN 32MM (1 1/4") C/ ACAB SIMPLES UN 206,85

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.36 1,00000VALVULA DESC C/REGISTRO 1 1/4' UN 121,53000121,536.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 22,22840 BDI 38,68040Mão-de-Obra 18,22000 Material 127,72726SubMO 40,44840

08.04.052 VALVULA DE DESCARGA C/REG INCORP DN 40MM (1 1/2") C/ ACAB SIMPLES UN 203,70

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.11 1,00000VALVULA DESC C/REGISTRO 1 1/2' UN 118,97000118,976.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 22,22840 BDI 38,09160Mão-de-Obra 18,22000 Material 125,16726SubMO 40,44840

08.04.060 ENVELOPE DE CONCRETO PARA DUTOS M 19,49

1.01.39 0,23000PEDREIRO H 1,069504,651.01.46 0,75000SERVENTE H 2,857503,812.05.03 0,02500AREIA M3 1,9800079,202.05.08 7,65000CIMENTO KG 2,830500,372.05.18 0,03800PEDRA BRITADA 2 M3 2,3214261,09

LS 4,79094 BDI 3,64547Mão-de-Obra 3,92700 Material 7,13192SubMO 8,71794

08.04.099 SERVICOS EM REDE DE AGUA FRIA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.07.002 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN65MM (2 1/2")- INCL CONEXOES M 117,96

1.01.18 1,80000ENCANADOR H 9,036005,021.01.19 1,80000AJUDANTE DE ENCANADOR H 7,362004,096.05.07 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN65MM (2 1/2") M 59,2900042,356.95.51 0,03380FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,213286,31

LS 20,00556 BDI 22,05857Mão-de-Obra 16,39800 Material 59,50328SubMO 36,40356

08.07.003 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN80MM (3")-INCL CONEXOES M 135,53

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.05.08 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 69,4980053,466.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 22,22840 BDI 25,34340Mão-de-Obra 18,22000 Material 69,74030SubMO 40,44840

08.07.004 TUBO ACO GLAVANIZ NBR5580-CL MEDIA, DN100MM (4")-INCL CONEXOES M 178,52

1.01.18 2,20000ENCANADOR H 11,044005,021.01.19 2,20000AJUDANTE DE ENCANADOR H 8,998004,096.05.09 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN100MM (4") M 100,3340077,186.95.51 0,04960FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,312986,31

LS 24,45124 BDI 33,38225Mão-de-Obra 20,04200 Material 100,64698SubMO 44,49324

08.07.005 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN 150MM (6") - INCL CONEXOES M 262,45

1.01.18 2,65000ENCANADOR H 13,303005,021.01.19 2,65000AJUDANTE DE ENCANADOR H 10,838504,096.05.11 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN150MM (6") M 159,35400122,586.95.51 0,06800FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,429086,31

LS 29,45263 BDI 49,07676Mão-de-Obra 24,14150 Material 159,78308SubMO 53,59413

08.07.010 PROTECAO ANTI CORROSIVA PARA RAMAIS SOB A TERRA M 8,75

1.01.19 0,08000AJUDANTE DE ENCANADOR H 0,327204,096.95.26 3,00000FITA PROT.ANTICORROS.LARG.50MM SCOTCHRAP/TOROFITA M 6,390002,13

LS 0,39918 BDI 1,63677Mão-de-Obra 0,32720 Material 6,39000SubMO 0,72638

08.07.099 SERVICOS EM REDE DE INCENDIO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.08.002 REGISTRO DE GAVETA BRUTO DN 65MM (2 1/2") UN 248,89

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,09

09/02/2011 11:38:40 Página: 109 de 0

Page 110: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.35.66 1,00000REGISTRO GAVETA AMARELO 2 1/2' UN 178,74000178,746.95.51 0,05640FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,355886,31

LS 12,78133 BDI 46,54135Mão-de-Obra 10,47650 Material 179,09588SubMO 23,25783

08.08.003 REGISTRO DE GAVETA BRUTO DN 80MM (3") UN 358,91

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.35.67 1,00000REGISTRO GAVETA AMARELO 3' UN 268,14000268,146.95.51 0,06400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,403846,31

LS 12,78133 BDI 67,11438Mão-de-Obra 10,47650 Material 268,54384SubMO 23,25783

08.08.004 REGISTRO DE GAVETA BRUTO DN 100MM (4") UN 591,70

1.01.18 1,48000ENCANADOR H 7,429605,021.01.19 1,48000AJUDANTE DE ENCANADOR H 6,053204,096.35.69 1,00000REGISTRO GAVETA AMARELO 4' UN 450,61000450,616.95.51 0,08280FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,522476,31

LS 16,44902 BDI 110,64479Mão-de-Obra 13,48280 Material 451,13247SubMO 29,93182

08.08.010 REGISTRO GLOBO ANGULAR AMARELO 2 1/2" UN 231,33

1.01.18 1,80000ENCANADOR H 9,036005,021.01.19 1,80000AJUDANTE DE ENCANADOR H 7,362004,096.35.25 1,00000REGISTRO GLOBO ANGULAR DE 2 1/2' UN 113,31000113,316.70.09 1,00000ADAP ENG RAPIDO LATAO 2 1/2 X 2 1/2" UN 38,0600038,066.95.51 0,04800FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,302886,31

LS 20,00556 BDI 43,25758Mão-de-Obra 16,39800 Material 151,67288SubMO 36,40356

08.08.012 REGISTRO DE RECALQUE NO PASSEIO (RR-01) UN 608,72

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,091.01.39 3,00000PEDREIRO H 13,950004,651.01.46 5,20000SERVENTE H 19,812003,812.05.03 0,12000AREIA M3 9,5040079,202.05.05 4,91000CAL HIDRATADA KG 1,669400,342.05.08 36,22000CIMENTO KG 13,401400,372.05.17 0,09600PEDRA BRITADA 1 M3 5,9452861,932.25.15 90,00000TIJOLO COMUM MACICO UN 19,800000,226.35.25 1,00000REGISTRO GLOBO ANGULAR DE 2 1/2' UN 113,31000113,316.70.09 1,00000ADAP ENG RAPIDO LATAO 2 1/2 X 2 1/2" UN 38,0600038,066.95.46 1,00000TAMPAO 2.1/2" UN 41,3300041,336.95.51 0,02800FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,176686,316.96.05 1,00000TAMPA F.F. 0,60X0,40M P/ COM INSCR INCENDIO UN 153,49000153,49

LS 53,97097 BDI 113,82613Mão-de-Obra 44,23850 Material 396,68676SubMO 98,20947

08.08.015 VALVULA DE RETENCAO VERT.BRONZE TIPO LEVE DE 2 1/2" UN 198,06

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.40.65 1,00000VALVULA RET VERT BRONZE 2 1/2' UN 130,54000130,546.95.51 0,02400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,151446,31

LS 16,67130 BDI 37,03638Mão-de-Obra 13,66500 Material 130,69144SubMO 30,33630

08.08.016 VALVULA DE RETENCAO VERT.BRONZE TIPO LEVE DE 3" UN 275,11

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.40.66 1,00000VALVULA RET VERT BRONZE 3' UN 183,04000183,046.95.51 0,02880FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,181736,31

LS 22,22840 BDI 51,44413Mão-de-Obra 18,22000 Material 183,22173SubMO 40,44840

08.08.017 VALVULA DE RETENCAO VERT.BRONZE TIPO LEVE DE 4" UN 427,53

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.40.38 1,00000VALVULA RET VERT BRONZE 4" UN 306,90000306,906.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 22,22840 BDI 79,94586Mão-de-Obra 18,22000 Material 307,14230SubMO 40,44840

08.08.021 HIDRANTE COM REGISTRO TIPO GLOBO AMARELO DE 2 1/2" UN 178,28

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,093.80.28 0,06000ZARCAO L 0,9654016,096.35.25 1,00000REGISTRO GLOBO ANGULAR DE 2 1/2' UN 113,31000113,316.95.11 0,05000ESTOPA ALCATROADA KG 0,332506,65

LS 16,67130 BDI 33,33717Mão-de-Obra 13,66500 Material 114,60790SubMO 30,33630

08.08.022 ABRIGO PARA HIDRANTE 0,60X0,90X0,20 M UN 207,37

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.70.35 1,00000ABRIGO PARA HIDRANTE 0,60X0,90X0,20 M UN 128,15000128,15

09/02/2011 11:38:40 Página: 110 de 0

Page 111: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 22,22840 BDI 38,77763Mão-de-Obra 18,22000 Material 128,15000SubMO 40,44840

08.08.025 AH-02 ABRIGO PARA HIDRANTE COMPLETO COM MANGUEIRA DE 1 1/2" - 30M UN 999,03

1.01.18 5,20000ENCANADOR H 26,104005,021.01.19 5,20000AJUDANTE DE ENCANADOR H 21,268004,092.67.26 4,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,520000,132.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,114.96.71 1,00000NIPLE DUPLO FERRO GALV 2 1/2" UN 21,0900021,096.35.25 1,00000REGISTRO GLOBO ANGULAR DE 2 1/2' UN 113,31000113,316.70.01 1,00000AH-02/03 ABRIGO PARA HIDRANTE 0,60X0,90X0,17M UN 183,20000183,206.70.20 1,00000MANGUEIRA C/ADAPTADOR '1 1/2'-30 M UN 355,63000355,636.70.28 1,00000ESGUICHO LATAO 1 1/2"X1/2"C/REQUINTE UN 32,8600032,86

LS 57,79384 BDI 186,81066Mão-de-Obra 47,37200 Material 707,05440SubMO 105,16584

08.08.026 AH-03 ABRIGO PARA HIDRANTE COMPLETO COM MANGUEIRA DE 2 1/2" - 30M UN 1.238,31

1.01.18 5,20000ENCANADOR H 26,104005,021.01.19 5,20000AJUDANTE DE ENCANADOR H 21,268004,092.67.26 4,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,520000,132.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,114.96.71 1,00000NIPLE DUPLO FERRO GALV 2 1/2" UN 21,0900021,096.35.25 1,00000REGISTRO GLOBO ANGULAR DE 2 1/2' UN 113,31000113,316.70.01 1,00000AH-02/03 ABRIGO PARA HIDRANTE 0,60X0,90X0,17M UN 183,20000183,206.70.25 1,00000MANGUEIRA C/ADAPTADOR 2 1/2' X 30 M UN 519,00000519,006.70.29 1,00000ESGUICHO LATAO 2 1/2'X5/8' C/REQUINTE UN 64,0300064,03

LS 57,79384 BDI 231,55486Mão-de-Obra 47,37200 Material 901,59440SubMO 105,16584

08.08.027 MO-01 ABRIGO PARA MANGOTINHO COMPLETO UN 6.265,93

1.01.18 6,50000ENCANADOR H 32,630005,021.01.19 6,50000AJUDANTE DE ENCANADOR H 26,585004,092.67.24 4,00000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 1,120000,284.96.71 1,00000NIPLE DUPLO FERRO GALV 2 1/2" UN 21,0900021,096.05.03 1,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 15,9200015,926.35.25 1,00000REGISTRO GLOBO ANGULAR DE 2 1/2' UN 113,31000113,316.40.05 1,00000VALVULA ESFERA POLIDA LATÃO C/ALAVANCA DE AÇO UN 35,3200035,326.70.03 1,00000MO-01 ARMÁRIO PARA MANGOTINHO KIDDE 2P UN 1.606,500001.606,506.70.18 1,00000CARRETEL METALICO C/MANGUEIA 1"X30M E ESGUICHO KIDDE 1SW UN 3.169,540003.169,54

LS 72,24230 BDI 1.171,67918Mão-de-Obra 59,21500 Material 4.962,80000SubMO 131,45730

08.08.030 MANGUEIRA COM UNIAO DE ENGATE RAPIDO DE 1 1/2" M 20,43

1.01.18 0,10000ENCANADOR H 0,502005,021.01.19 0,10000AJUDANTE DE ENCANADOR H 0,409004,096.70.23 1,00000MANGUEIRA UNIAO ENGATE RAPIDO DIA 1.1/2" M 14,5900014,59

LS 1,11142 BDI 3,82086Mão-de-Obra 0,91100 Material 14,59000SubMO 2,02242

08.08.031 MANGUEIRA COM UNIAO DE ENGATE RAPIDO DE 2 1/2" M 29,24

1.01.18 0,10000ENCANADOR H 0,502005,021.01.19 0,10000AJUDANTE DE ENCANADOR H 0,409004,096.70.24 1,00000MANGUEIRA UNIAO ENGATE RAPIDO DIA 2.1/2" M 21,7500021,75

LS 1,11142 BDI 5,46766Mão-de-Obra 0,91100 Material 21,75000SubMO 2,02242

08.08.035 ESGUICHO DE LATAO C/ENGATE RAPIDO ORIFICIO DE 1/2" UN 42,90

1.01.18 0,10000ENCANADOR H 0,502005,021.01.19 0,10000AJUDANTE DE ENCANADOR H 0,409004,096.70.28 1,00000ESGUICHO LATAO 1 1/2"X1/2"C/REQUINTE UN 32,8600032,86

LS 1,11142 BDI 8,02296Mão-de-Obra 0,91100 Material 32,86000SubMO 2,02242

08.08.036 ESGUICHO DE LATAO C/ENGATE RAPIDO ORIFICIO DE 5/8" UN 40,81

1.01.18 0,10000ENCANADOR H 0,502005,021.01.19 0,10000AJUDANTE DE ENCANADOR H 0,409004,096.70.30 1,00000ESGUICHO LATAO ENG RAPIDO ORIF 1.1/2X5/8 UN 31,1600031,16

LS 1,11142 BDI 7,63196Mão-de-Obra 0,91100 Material 31,16000SubMO 2,02242

08.08.037 ESGUICHO DE LATAO C/ENGATE RAPIDO ORIFICIO DE 3/4" UN 72,74

1.01.18 0,10000ENCANADOR H 0,502005,021.01.19 0,10000AJUDANTE DE ENCANADOR H 0,409004,096.70.31 1,00000ESGUICHO LATAO ENG RAPIDO ORIF 2.1/2X3/4 UN 57,1200057,12

LS 1,11142 BDI 13,60276Mão-de-Obra 0,91100 Material 57,12000SubMO 2,02242

08.08.041 VALVULA RETENCAO HORIZ BRONZE DE 2 1/2" UN 253,67

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.40.21 1,00000VALVULA RET HORIZ BRONZE 2 1/2' UN 182,83000182,836.95.51 0,02400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,151446,31

LS 12,78133 BDI 47,43503Mão-de-Obra 10,47650 Material 182,98144SubMO 23,25783

08.08.042 VALVULA RETENCAO HORIZONTAL DE BRONZE DE 3" UN 288,81

09/02/2011 11:38:40 Página: 111 de 0

Page 112: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.40.22 1,00000VALVULA RET HORIZ BRONZE 3' UN 211,37000211,376.95.51 0,02880FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,181736,31

LS 12,78133 BDI 54,00620Mão-de-Obra 10,47650 Material 211,55173SubMO 23,25783

08.08.043 VALVULA RETENCAO HORIZONTAL BRONZE DE 4" UN 503,18

1.01.18 1,48000ENCANADOR H 7,429605,021.01.19 1,48000AJUDANTE DE ENCANADOR H 6,053204,096.40.23 1,00000VALVULA RET HORIZ BRONZE 4' UN 378,92000378,926.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 16,44902 BDI 94,09165Mão-de-Obra 13,48280 Material 379,16230SubMO 29,93182

08.08.044 EXTINTORES MANUAIS DE CO2 CAPACIDADE 4KG UN 358,38

1.01.18 0,70000ENCANADOR H 3,514005,026.70.13 1,00000EXTINTOR GAS CARBONICO 4KG C/ CARGA UN 283,57000283,57

LS 4,28708 BDI 67,01535Mão-de-Obra 3,51400 Material 283,57000SubMO 7,80108

08.08.045 EXTINTORES MANUAIS DE CO2 COM CAPACIDADE DE 6 KG UN 365,31

1.01.18 0,70000ENCANADOR H 3,514005,026.70.04 1,00000EXTINTOR GAS CARBONICO 6 KG C/CARGA UN 289,20000289,20

LS 4,28708 BDI 68,31025Mão-de-Obra 3,51400 Material 289,20000SubMO 7,80108

08.08.046 EXTINTORES MANUAIS PO QUIMICO SECO COM CAPACIDADE DE 4 KG UN 103,54

1.01.18 0,70000ENCANADOR H 3,514005,026.70.10 1,00000EXTINTOR PO QUIMICO DE 4 KG C/CARGA UN 76,3800076,38

LS 4,28708 BDI 19,36165Mão-de-Obra 3,51400 Material 76,38000SubMO 7,80108

08.08.047 EXTINTOR MANUAL PO QUIMICO SECO C/ CAPACIDADE DE 12KG UN 167,50

1.01.18 0,70000ENCANADOR H 3,514005,026.70.12 1,00000EXTINTOR PO QUIMICO 12 KG COM CARGA UN 128,38000128,38

LS 4,28708 BDI 31,32165Mão-de-Obra 3,51400 Material 128,38000SubMO 7,80108

08.08.048 EXTINTOR PORTATIL DE PO QUIMICO BC CAPACIDADE 6 KG UN 112,48

1.01.18 0,70000ENCANADOR H 3,514005,026.70.15 1,00000EXTINTOR PO QUIMICO BC 6KG COM CARGA UN 83,6500083,65

LS 4,28708 BDI 21,03375Mão-de-Obra 3,51400 Material 83,65000SubMO 7,80108

08.08.050 EXTINTORES MANUAIS DE AGUA PRESSURIZADA CAP DE 10 L UN 103,17

1.01.18 0,70000ENCANADOR H 3,514005,026.70.11 1,00000EXTINTOR DE AGUA PRESSURIZADO 10 L UN 76,0800076,08

LS 4,28708 BDI 19,29265Mão-de-Obra 3,51400 Material 76,08000SubMO 7,80108

08.08.051 EXTINTOR PORTATIL DE PO QUIMICO ABC CAPACIDADE 6 KG UN 163,29

1.01.18 0,70000ENCANADOR H 3,514005,026.70.16 1,00000EXTINTOR PO QUIMICO ABC 6KG COM CARGA UN 124,96000124,96

LS 4,28708 BDI 30,53505Mão-de-Obra 3,51400 Material 124,96000SubMO 7,80108

08.08.060 MANOMETRO INDUSTRIAL COM TOMADA INFERIOR. UN 231,05

1.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,096.05.01 0,60000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2") M 4,818008,036.65.76 1,00000MANOMETRO IND INOX ESC O A 15K/O A 400L UN 173,90000173,906.95.53 0,00880FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,028863,28

LS 5,00139 BDI 43,20498Mão-de-Obra 4,09950 Material 178,74686SubMO 9,10089

08.08.061 PRESSOSTATO (VALVULA DE FLUXO) COM SENSOR DIAFRAGMA. UN 957,50

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,061.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,094.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.30.04 6,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 3,180000,536.05.01 0,60000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2") M 4,818008,036.65.77 1,00000PRESSOSTATO INOX ATUAC O/10K-REG O/2.5K UN 705,02000705,026.95.53 0,00880FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,028863,28

LS 33,88489 BDI 179,04494Mão-de-Obra 27,77450 Material 716,79686SubMO 61,65939

08.08.069 AI-01 ABRIGO PARA BOMBA DE INCENDIO UN 1.323,98

1.01.11 2,39200CARPINTEIRO H 10,883604,551.01.12 2,39200AJUDANTE DE CARPINTEIRO H 9,472323,961.01.21 0,67000FERREIRO H 3,195904,771.01.22 0,67000AJUDANTE DE FERREIRO H 2,559403,821.01.39 14,15500PEDREIRO H 65,820754,651.01.40 4,81700PINTOR H 22,688074,711.01.41 2,59200AJUDANTE DE PINTOR H 9,901443,82

09/02/2011 11:38:40 Página: 112 de 0

Page 113: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 18,76800SERVENTE H 71,506083,812.05.03 0,35450AREIA M3 28,0764079,202.05.05 46,03000CAL HIDRATADA KG 15,650200,342.05.08 96,65000CIMENTO KG 35,760500,372.05.18 0,13920PEDRA BRITADA 2 M3 8,5037361,092.10.21 0,92000TABUAS PINHO DE 1"X12" DE 3A. M2 15,8056017,182.15.38 7,70000ACO CA-60-B $MD BITOLAS KG 20,405002,652.25.03 43,68000BLOCO DE CONCRETO 12 X 19 X 39 CM UN 69,888001,602.67.60 0,37000PREGO KG 1,690904,572.70.10 0,13400ARAME RECOZIDO N.18 KG 0,620424,633.11.93 1,00000AI-01 PORTINHOLA EM CHAPA COMPLETA UN 404,61000404,613.15.94 1,00000TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM UN 4,330004,333.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.75.02 0,72000TINTA ESMALTE L 7,171209,963.75.13 1,97000TINTA LATEX ECONOMICA L 8,510404,323.80.12 1,44000LIXA PARA FERRO UN 2,059201,433.80.28 0,43200ZARCAO L 6,9508816,09

LS 239,15362 BDI 247,57513Mão-de-Obra 196,02756 Material 641,23243SubMO 435,18118

08.08.070 CONJ MOTOR-BOMBA (CENTRIFUGA) 1/2 HP (3400 L/H -20 MCA) UN 737,88

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.51 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1/2 HP TRIF UN 529,12000529,12

LS 38,89970 BDI 137,97808Mão-de-Obra 31,88500 Material 529,12000SubMO 70,78470

08.08.071 CONJ MOTOR-BOMBA (CENTRIFUGA) 3/4 HP (7400 L/H - 20 MCA) UN 842,82

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.52 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 3/4 HP TRIF UN 614,44000614,44

LS 38,89970 BDI 157,60168Mão-de-Obra 31,88500 Material 614,44000SubMO 70,78470

08.08.072 CONJ MOTOR-BOMBA (CENTRIFUGA) 1 HP (8500 L/H - 20 MCA) UN 886,83

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.53 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1 HP TRIF UN 650,22000650,22

LS 38,89970 BDI 165,83108Mão-de-Obra 31,88500 Material 650,22000SubMO 70,78470

08.08.073 CONJ MOTOR-BOMBA (CENTRIFUGA) 1.5 HP (10000 L/H - 20 MCA) UN 1.158,11

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.65 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 1,5HP UN 870,77000870,77

LS 38,89970 BDI 216,55758Mão-de-Obra 31,88500 Material 870,77000SubMO 70,78470

08.08.074 CONJ MOTOR-BOMBA (CENTRIFUGA) 2 HP (13900 L/H - 20 MCA) UN 1.256,54

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.66 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 2 HP UN 950,80000950,80

LS 38,89970 BDI 234,96448Mão-de-Obra 31,88500 Material 950,80000SubMO 70,78470

08.08.075 CONJ MOTOR-BOMBA (CENTRIFUGA) 3 HP (25000 L/H - 20 MCA) UN 1.378,42

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.68 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 3HP UN 1.049,890001.049,89

LS 38,89970 BDI 257,75518Mão-de-Obra 31,88500 Material 1.049,89000SubMO 70,78470

08.08.076 CONJ MOTOR-BOMBA (CENTRIFUGA) 4 HP (31200 L/H - 20 MCA) UN 1.657,72

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.56 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 4HP UN 1.276,960001.276,96

LS 38,89970 BDI 309,98128Mão-de-Obra 31,88500 Material 1.276,96000SubMO 70,78470

08.08.077 CONJ MOTOR-BOMBA (CENTRIFUGA) 5 HP (31200 L/H -20 MCA) UN 1.934,31

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.57 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 5HP UN 1.501,830001.501,83

LS 38,89970 BDI 361,70138Mão-de-Obra 31,88500 Material 1.501,83000SubMO 70,78470

08.08.078 CONJ MOTOR-BOMBA (CENTRIFUGA) 7,5 HP (40000L/H 20 MCA) UN 2.682,25

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.58 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 7,5HP UN 2.109,910002.109,91

LS 38,89970 BDI 501,55978Mão-de-Obra 31,88500 Material 2.109,91000SubMO 70,78470

08.08.079 CONJ MOTOR-BOMBA (CENTRIFUGA) 10 HP (40000 L/H 20MCA) UN 3.252,08

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,09

09/02/2011 11:38:40 Página: 113 de 0

Page 114: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.65.67 1,00000CONJUNTO MOTOR BOMBA PARA INCENDIO 10HP. UN 2.573,190002.573,19

LS 38,89970 BDI 608,11418Mão-de-Obra 31,88500 Material 2.573,19000SubMO 70,78470

08.08.099 SERVICOS EM REDE DE INCENDIO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.09.001 TUBO DE FERRO FUNDIDO DN 50MM (2") - INCLUSIVE CONEXOES - DESC M 198,75

1.01.18 1,80000ENCANADOR H 9,036005,021.01.19 1,80000AJUDANTE DE ENCANADOR H 7,362004,096.10.01 1,60000TUBO DE FERRO FUNDIDO DE 50MM-HL M 117,6000073,506.10.64 1,00000ANEL DE BORRACHA HL D=50MM UN 7,500007,506.95.27 0,01000LUBRIFICANTE P/ANEL NEOPRENE KG 0,089908,99

LS 20,00556 BDI 37,16650Mão-de-Obra 16,39800 Material 125,18990SubMO 36,40356

08.09.002 TUBO DE FERRO FUNDIDO DN 75MM (3") - INCLUSIVE CONEXOES - DESC M 266,09

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.10.02 1,60000TUBO DE FERRO FUNDIDO DE 75MM-HL M 164,41600102,766.10.66 1,00000ANEL DE BORRACHA HL D=75MM UN 11,3800011,386.95.27 0,01000LUBRIFICANTE P/ANEL NEOPRENE KG 0,089908,99

LS 22,22840 BDI 49,75689Mão-de-Obra 18,22000 Material 175,88590SubMO 40,44840

08.09.003 TUBO DE FERRO FUNDIDO DN 100MM (4") - INCLUSIVE CONEXOES - DESC M 298,14

1.01.18 2,30000ENCANADOR H 11,546005,021.01.19 2,30000AJUDANTE DE ENCANADOR H 9,407004,096.10.03 1,50000TUBO DE FERRO FUNDIDO DE 100MM-HL M 182,70000121,806.10.67 1,00000ANEL DE BORRACHA HL D=100MM UN 13,0000013,006.95.27 0,02000LUBRIFICANTE P/ANEL NEOPRENE KG 0,179808,99

LS 25,56266 BDI 55,75096Mão-de-Obra 20,95300 Material 195,87980SubMO 46,51566

08.09.006 TUBO DE FERRO FUNDIDO DN 75MM (3") - INCLUSIVE CONEXOES - ESGOTO M 262,26

1.01.09 2,00000ESGOTEIRO/CAVOUQUEIRO H 9,000004,501.01.95 2,00000AJUDANTE DE ESGOTEIRO H 7,820003,916.10.02 1,60000TUBO DE FERRO FUNDIDO DE 75MM-HL M 164,41600102,766.10.66 1,00000ANEL DE BORRACHA HL D=75MM UN 11,3800011,386.95.27 0,01000LUBRIFICANTE P/ANEL NEOPRENE KG 0,089908,99

LS 20,52040 BDI 49,04205Mão-de-Obra 16,82000 Material 175,88590SubMO 37,34040

08.09.007 TUBO DE FERRO FUNDIDO DN 100MM (4") - INCLUSIVE CONEXOES - ESGOTO M 293,75

1.01.09 2,30000ESGOTEIRO/CAVOUQUEIRO H 10,350004,501.01.95 2,30000AJUDANTE DE ESGOTEIRO H 8,993003,916.10.03 1,50000TUBO DE FERRO FUNDIDO DE 100MM-HL M 182,70000121,806.10.67 1,00000ANEL DE BORRACHA HL D=100MM UN 13,0000013,006.95.27 0,02000LUBRIFICANTE P/ANEL NEOPRENE KG 0,179808,99

LS 23,59846 BDI 54,92889Mão-de-Obra 19,34300 Material 195,87980SubMO 42,94146

08.09.008 TUBO DE FERRO FUNDIDO DN 150MM (6") - INCLUSIVE CONEXOES - ESGOTO M 390,45

1.01.09 2,50000ESGOTEIRO/CAVOUQUEIRO H 11,250004,501.01.95 2,50000AJUDANTE DE ESGOTEIRO H 9,775003,916.10.04 1,40000TUBO DE FERRO FUNDIDO DE 150MM-HL M 247,68800176,926.10.75 1,00000ANEL DE BORRACHA HL D=150MM UN 22,8100022,816.95.27 0,03000LUBRIFICANTE P/ANEL NEOPRENE KG 0,269708,99

LS 25,65050 BDI 73,01194Mão-de-Obra 21,02500 Material 270,76770SubMO 46,67550

08.09.015 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/2") INCL CONEXOES M 24,86

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.30 1,50000TUBO PVC P/ESGOTO 40MM M 3,465002,316.26.70 1,00000ANEL BORRACHA P/TUBO PVC 40MM UN 0,570000,57

LS 8,89136 BDI 4,64930Mão-de-Obra 7,28800 Material 4,03500SubMO 16,17936

08.09.016 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 50MM (2") INCL CONEXOES M 28,59

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.31 1,50000TUBO PVC P/ESGOTO 50MM M 6,465004,316.26.71 1,00000ANEL BORRACHA P/TUBO PVC 50MM (2") UN 0,600000,60

LS 8,89136 BDI 5,34620Mão-de-Obra 7,28800 Material 7,06500SubMO 16,17936

08.09.017 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 75MM (3") INCL CONEXOES M 32,98

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.25.32 1,50000TUBO PVC P/ESGOTO 75MM M 7,725005,156.26.72 1,00000ANEL BORRACHA P/TUBOS PVC 75MM (3") UN 0,890000,89

LS 10,00278 BDI 6,16786Mão-de-Obra 8,19900 Material 8,61500SubMO 18,20178

09/02/2011 11:38:40 Página: 114 de 0

Page 115: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.09.018 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") INCL CONEXOES M 37,39

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.25.33 1,50000TUBO PVC P/ESGOTO 100MM M 9,000006,006.26.73 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM UN 1,180001,18

LS 11,11420 BDI 6,99297Mão-de-Obra 9,11000 Material 10,18000SubMO 20,22420

08.09.019 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") INCL CONEXOES M 66,84

1.01.09 1,80000ESGOTEIRO/CAVOUQUEIRO H 8,100004,501.01.95 1,80000AJUDANTE DE ESGOTEIRO H 7,038003,916.25.34 1,20000TUBO PVC P/ESGOTO 150MM M 16,9200014,106.26.74 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM UN 3,820003,82

LS 18,46836 BDI 12,49966Mão-de-Obra 15,13800 Material 20,74000SubMO 33,60636

08.09.030 TUBO DE ACO GALVANIZADO DN 40MM (1.1/2") - INCLUSIVE CONEXOES M 79,42

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.05.05 1,45000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2") M 34,1330023,546.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 16,67130 BDI 14,85123Mão-de-Obra 13,66500 Material 34,23425SubMO 30,33630

08.09.060 TUBO DE PVC "R" 40MM INCL CONEXOES - COL ESGOTO M 25,39

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.60 1,10000TUBO DE PVC "R" 40MMM M 4,411004,016.95.13 0,00160ADESIVO PARA TUBOS PVC L 0,0436627,296.95.14 0,00070SOLUCAO LIMPADORA P/ PVC L 0,0142020,29

LS 8,89136 BDI 4,74909Mão-de-Obra 7,28800 Material 4,46887SubMO 16,17936

08.09.061 TUBO DE PVC "R" 50MM INCL CONEXOES - COL ESGOTO M 27,30

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.61 1,10000TUBO DE PVC "R" 50MM M 5,940005,406.95.13 0,00220ADESIVO PARA TUBOS PVC L 0,0600427,296.95.14 0,00080SOLUCAO LIMPADORA P/ PVC L 0,0162320,29

LS 8,89136 BDI 5,10500Mão-de-Obra 7,28800 Material 6,01627SubMO 16,17936

08.09.062 TUBO DE PVC "R" 75MM INCL CONEXOES - COL ESGOTO M 31,58

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.25.62 1,10000TUBO DE PVC "R" 75MM M 7,359006,696.95.13 0,00350ADESIVO PARA TUBOS PVC L 0,0955227,296.95.14 0,00130SOLUCAO LIMPADORA P/ PVC L 0,0263820,29

LS 10,00278 BDI 5,90702Mão-de-Obra 8,19900 Material 7,48089SubMO 18,20178

08.09.063 TUBO DE PVC "R" 100MM INCL CONEXOES - COL ESGOTO M 39,68

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.25.63 1,10000TUBO DE PVC "R" 100MM M 11,8470010,776.95.13 0,00550ADESIVO PARA TUBOS PVC L 0,1501027,296.95.14 0,00230SOLUCAO LIMPADORA P/ PVC L 0,0466720,29

LS 11,11420 BDI 7,42163Mão-de-Obra 9,11000 Material 12,04376SubMO 20,22420

08.09.064 TUBO DE PVC "R" 150MM INCL CONEXOES - COL ESGOTO M 61,91

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.25.64 1,10000TUBO DE PVC "R" 150MM M 25,6740023,346.95.13 0,01100ADESIVO PARA TUBOS PVC L 0,3001927,296.95.14 0,00450SOLUCAO LIMPADORA P/ PVC L 0,0913120,29

LS 13,33704 BDI 11,57694Mão-de-Obra 10,93200 Material 26,06550SubMO 24,26904

08.09.099 SERVICOS EM REDE DE ESGOTO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.10.005 CAIXA SIFONADA DE PVC DN 100X150X50MM C/GRELHA PVC CROMADO UN 49,46

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.12 1,00000CX SIFONADA PVC 100X150X50MM - C/GRELHA PVC CROMAD UN 11,9000011,90

LS 15,55988 BDI 9,24919Mão-de-Obra 12,75400 Material 11,90000SubMO 28,31388

08.10.006 CAIXA SIFONADA DE PVC DN 150X150X50MM C/GRELHA METALICA UN 64,29

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.01 1,00000CX SIFONADA PVC 150X150X50MM - C/GRELHA ALUMINIO UN 23,9600023,96

09/02/2011 11:38:40 Página: 115 de 0

Page 116: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 15,55988 BDI 12,02299Mão-de-Obra 12,75400 Material 23,96000SubMO 28,31388

08.10.010 CAIXA SIFONADA DE PVC DN 100X100X50MM C/GRELHA PVC CROMADO UN 47,71

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.13 1,00000CX.SIFONADA PVC 100X100X50MM-C/GRELHA PVC CROMADO UN 10,4800010,48

LS 15,55988 BDI 8,92259Mão-de-Obra 12,75400 Material 10,48000SubMO 28,31388

08.10.036 CG-01 CAIXA DE GORDURA EM ALVENARIA UN 835,31

1.01.11 2,60000CARPINTEIRO H 11,830004,551.01.12 2,60000AJUDANTE DE CARPINTEIRO H 10,296003,961.01.21 0,17100FERREIRO H 0,815674,771.01.22 0,17100AJUDANTE DE FERREIRO H 0,653223,821.01.39 11,96000PEDREIRO H 55,614004,651.01.46 24,89300SERVENTE H 94,842333,812.05.03 0,33160AREIA M3 26,2627279,202.05.05 34,98000CAL HIDRATADA KG 11,893200,342.05.08 74,94000CIMENTO KG 27,727800,372.05.35 0,17100CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 41,57181243,112.10.21 1,02500TABUAS PINHO DE 1"X12" DE 3A. M2 17,6095017,182.15.25 16,02000ACO CA-50-A $MD BITOLAS KG 43,254002,702.15.38 1,08000ACO CA-60-B $MD BITOLAS KG 2,862002,652.25.15 522,00000TIJOLO COMUM MACICO UN 114,840000,222.40.69 1,31000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 3,288102,512.67.60 0,40000PREGO KG 1,828004,572.70.10 0,34200ARAME RECOZIDO N.18 KG 1,583464,63

LS 212,34249 BDI 156,19629Mão-de-Obra 174,05122 Material 292,72059SubMO 386,39371

08.10.038 CI-01 CAIXA DE INSPECAO 60X60CM PARA ESGOTO UN 340,63

1.01.11 0,85000CARPINTEIRO H 3,867504,551.01.12 0,85000AJUDANTE DE CARPINTEIRO H 3,366003,961.01.21 0,17000FERREIRO H 0,810904,771.01.22 0,17000AJUDANTE DE FERREIRO H 0,649403,821.01.39 6,93000PEDREIRO H 32,224504,651.01.46 11,55000SERVENTE H 44,005503,812.05.03 0,13200AREIA M3 10,4544079,202.05.05 10,92000CAL HIDRATADA KG 3,712800,342.05.08 47,92000CIMENTO KG 17,730400,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,092.05.36 0,03000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 7,60470253,492.10.14 1,54000SARRAFO PINHO APARELHADO 5X2,5 CM M 3,218602,092.10.21 0,39000TABUAS PINHO DE 1"X12" DE 3A. M2 6,7002017,182.15.25 2,00000ACO CA-50-A $MD BITOLAS KG 5,400002,702.25.15 128,00000TIJOLO COMUM MACICO UN 28,160000,222.40.69 0,86000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 2,158602,512.67.60 0,15000PREGO KG 0,685504,572.70.10 0,03000ARAME RECOZIDO N.18 KG 0,138904,63

LS 103,60704 BDI 63,69586Mão-de-Obra 84,92380 Material 88,40770SubMO 188,53084

08.10.039 CI-02 CAIXA DE INSPECAO 80X80CM PARA ESGOTO UN 859,40

1.01.11 1,29000CARPINTEIRO H 5,869504,551.01.12 1,29000AJUDANTE DE CARPINTEIRO H 5,108403,961.01.21 0,25000FERREIRO H 1,192504,771.01.22 0,25000AJUDANTE DE FERREIRO H 0,955003,821.01.39 16,81000PEDREIRO H 78,166504,651.01.46 33,54000SERVENTE H 127,787403,812.05.03 0,37000AREIA M3 29,3040079,202.05.05 33,48000CAL HIDRATADA KG 11,383200,342.05.08 114,09000CIMENTO KG 42,213300,372.05.18 0,06000PEDRA BRITADA 2 M3 3,6654061,092.05.36 0,04000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 10,13960253,492.10.14 2,34000SARRAFO PINHO APARELHADO 5X2,5 CM M 4,890602,092.10.21 0,58500TABUAS PINHO DE 1"X12" DE 3A. M2 10,0503017,182.15.25 2,90000ACO CA-50-A $MD BITOLAS KG 7,830002,702.25.15 391,00000TIJOLO COMUM MACICO UN 86,020000,222.40.69 2,21000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 5,547102,512.67.60 0,23400PREGO KG 1,069384,572.70.10 0,05000ARAME RECOZIDO N.18 KG 0,231504,63

LS 267,27675 BDI 160,70110Mão-de-Obra 219,07930 Material 212,34438SubMO 486,35605

08.10.040 CAIXA DE ALVENARIA - ESCAVACAO MANUAL COM APILOAMENTO DO FUNDO M3 52,01

1.01.46 5,00000SERVENTE H 19,050003,81

LS 23,24100 BDI 9,72693Mão-de-Obra 19,05000 Material 0,00000SubMO 42,29100

08.10.041 CAIXA DE ALVENARIA - LASTRO DE CONCRETO M3 491,74

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 20,00000SERVENTE H 76,200003,81

09/02/2011 11:38:40 Página: 116 de 0

Page 117: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,67200AREIA M3 53,2224079,202.05.08 180,00000CIMENTO KG 66,600000,372.05.18 0,80000PEDRA BRITADA 2 M3 48,8720061,09

LS 127,00200 BDI 91,95317Mão-de-Obra 104,10000 Material 168,69440SubMO 231,10200

08.10.042 CAIXA DE ALVENARIA - PAREDE DE 1/2 TIJOLO REVESTIDO M2 131,49

1.01.39 4,03000PEDREIRO H 18,739504,651.01.46 3,89000SERVENTE H 14,820903,812.05.03 0,06300AREIA M3 4,9896079,202.05.05 4,83000CAL HIDRATADA KG 1,642200,342.05.08 17,57000CIMENTO KG 6,500900,372.25.15 70,00000TIJOLO COMUM MACICO UN 15,400000,222.40.56 0,50000TINTA BETUMINOSA L 3,195006,392.40.69 0,27000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,677702,51

LS 40,94369 BDI 24,58918Mão-de-Obra 33,56040 Material 32,40540SubMO 74,50409

08.10.043 CAIXA DE ALVENARIA - PAREDE DE 1 TIJOLO REVESTIDO M2 190,08

1.01.39 4,49000PEDREIRO H 20,878504,651.01.46 5,95000SERVENTE H 22,669503,812.05.03 0,12100AREIA M3 9,5832079,202.05.05 13,96000CAL HIDRATADA KG 4,746400,342.05.08 23,94000CIMENTO KG 8,857800,372.25.15 140,00000TIJOLO COMUM MACICO UN 30,800000,222.40.56 0,50000TINTA BETUMINOSA L 3,195006,392.40.69 0,27000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,677702,51

LS 53,12856 BDI 35,54343Mão-de-Obra 43,54800 Material 57,86010SubMO 96,67656

08.10.044 CAIXA DE ALVENARIA - TAMPA DE CONCRETO M2 103,86

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,961.01.21 0,46000FERREIRO H 2,194204,771.01.22 0,46000AJUDANTE DE FERREIRO H 1,757203,821.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.05.35 0,05000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 12,15550243,112.10.21 0,10000TABUAS PINHO DE 1"X12" DE 3A. M2 1,7180017,182.10.32 0,33000CHAPA COMPENSADA RESINADA E=12MM M2 3,9930012,102.15.38 5,27000ACO CA-60-B $MD BITOLAS KG 13,965502,652.70.10 0,09000ARAME RECOZIDO N.18 KG 0,416704,63

LS 28,68147 BDI 19,42110Mão-de-Obra 23,50940 Material 32,24870SubMO 52,19087

08.10.045 RALO SIFONADO CONICO PVC DN 100MM C/GRELHA PVC CROMADO UN 43,86

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.15 1,00000RALO SIFONADO CONICO PVC DN 100MM C/GRELHA PVC CRO UN 7,350007,35

LS 15,55988 BDI 8,20269Mão-de-Obra 12,75400 Material 7,35000SubMO 28,31388

08.10.048 RALO SIFONADO DE F.FUNDIDO DN 150 MM C/GRELHA PVC CROMADO UN 289,63

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.10.64 4,00000ANEL DE BORRACHA HL D=50MM UN 30,000007,506.10.66 1,00000ANEL DE BORRACHA HL D=75MM UN 11,3800011,386.75.03 1,00000RALO SIFONADO F. FUNDIDO DN 150MM UN 144,18000144,186.75.35 3,00000PLUG F.F. 2' P/RALO UN 12,150004,056.75.53 1,00000GRELHA PVC RIGIDO ACAB.CROMADO DN 150MM UN 9,230009,236.95.27 0,02500LUBRIFICANTE P/ANEL NEOPRENE KG 0,224758,99

LS 15,55988 BDI 54,16009Mão-de-Obra 12,75400 Material 207,16475SubMO 28,31388

08.10.049 RALO SECO CONICO PVC DN 100MM C/GRELHA PVC CROMADO UN 40,58

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.10 1,00000RALO SECO CONICO PVC DN 100MM C/GRELHA PVC CROMADO UN 4,680004,68

LS 15,55988 BDI 7,58859Mão-de-Obra 12,75400 Material 4,68000SubMO 28,31388

08.10.050 RALO SECO DE F.FUNDIDO DN 100 MM C/GRELHA PVC CROMADO UN 60,82

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.02 1,00000RALO SECO F FUNDIDO DN 100MM UN 16,7800016,786.75.52 1,00000GRELHA PVC RIGIDO ACAB.CROMADO DN 100MM UN 4,360004,36

LS 15,55988 BDI 11,37439Mão-de-Obra 12,75400 Material 21,14000SubMO 28,31388

08.10.056 TERMINAL DE VENTILACAO EM PVC P/ESGOTO DN 50MM (2") UN 6,38

1.01.18 0,20000ENCANADOR H 1,004005,026.21.98 1,00000TERMINAL VENTILACAO PVC P/ESGOTO DN 50MM (2") UN 2,960002,96

LS 1,22488 BDI 1,19344Mão-de-Obra 1,00400 Material 2,96000SubMO 2,22888

09/02/2011 11:38:40 Página: 117 de 0

Page 118: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.10.057 TERMINAL DE VENTILACAO EM PVC P/ ESGOTO DN 75MM (3") UN 7,04

1.01.18 0,20000ENCANADOR H 1,004005,026.21.97 1,00000TERMINAL VENTILACAO PVC P/ ESGOTO DN 75MM (3") UN 3,500003,50

LS 1,22488 BDI 1,31764Mão-de-Obra 1,00400 Material 3,50000SubMO 2,22888

08.10.058 TERMINAL DE VENTILACAO EM PVC P/ ESGOTO DN 100MM(4") UN 8,64

1.01.18 0,20000ENCANADOR H 1,004005,026.21.96 1,00000TERMINAL VENTILACAO PVC PARA ESGOTO DN100MM (4") UN 4,800004,80

LS 1,22488 BDI 1,61664Mão-de-Obra 1,00400 Material 4,80000SubMO 2,22888

08.10.099 SERVICOS EM REDE DE ESGOTO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.11.002 TUBO DE FERRO FUNDIDO DN 50MM (2") - INCLUSIVE CONEXOES M 137,72

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.10.01 1,20000TUBO DE FERRO FUNDIDO DE 50MM-HL M 88,2000073,506.10.64 1,00000ANEL DE BORRACHA HL D=50MM UN 7,500007,506.95.27 0,01000LUBRIFICANTE P/ANEL NEOPRENE KG 0,089908,99

LS 8,89136 BDI 25,75293Mão-de-Obra 7,28800 Material 95,78990SubMO 16,17936

08.11.003 TUBO DE FERRO FUNDIDO DN 75MM (3") - INCLUSIVE CONEXOES M 188,16

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.10.02 1,20000TUBO DE FERRO FUNDIDO DE 75MM-HL M 123,31200102,766.10.66 1,00000ANEL DE BORRACHA HL D=75MM UN 11,3800011,386.95.27 0,01000LUBRIFICANTE P/ANEL NEOPRENE KG 0,089908,99

LS 10,00278 BDI 35,18625Mão-de-Obra 8,19900 Material 134,78190SubMO 18,20178

08.11.004 TUBO DE FERRO FUNDIDO DN 100MM (4") - INCLUSIVE CONEXOES M 223,35

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.10.03 1,20000TUBO DE FERRO FUNDIDO DE 100MM-HL M 146,16000121,806.10.67 1,00000ANEL DE BORRACHA HL D=100MM UN 13,0000013,006.95.27 0,02000LUBRIFICANTE P/ANEL NEOPRENE KG 0,179808,99

LS 12,22562 BDI 41,76488Mão-de-Obra 10,02100 Material 159,33980SubMO 22,24662

08.11.005 TUBO DE FERRO FUNDIDO DN 150MM (6") - INCLUSIVE CONEXOES M 321,86

1.01.18 1,30000ENCANADOR H 6,526005,021.01.19 1,30000AJUDANTE DE ENCANADOR H 5,317004,096.10.04 1,20000TUBO DE FERRO FUNDIDO DE 150MM-HL M 212,30400176,926.10.75 1,00000ANEL DE BORRACHA HL D=150MM UN 22,8100022,816.95.27 0,03000LUBRIFICANTE P/ANEL NEOPRENE KG 0,269708,99

LS 14,44846 BDI 60,18529Mão-de-Obra 11,84300 Material 235,38370SubMO 26,29146

08.11.020 TUBO DE CONCRETO - CLASSE C1 - DN 300MM M 86,64

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 3,64000SERVENTE H 13,868403,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 0,45000CIMENTO KG 0,166500,376.01.01 1,00000TUBO CONCRETO DE 30CM DIAM C-1 M 36,3100036,31

LS 18,62135 BDI 16,20130Mão-de-Obra 15,26340 Material 36,55570SubMO 33,88475

08.11.021 TUBO DE CONCRETO - CLASSE C1 - DN 400MM M 104,34

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 4,02000SERVENTE H 15,316203,812.05.03 0,00230AREIA M3 0,1821679,202.05.08 0,91000CIMENTO KG 0,336700,376.01.02 1,00000TUBO CONCRETO DE 40CM DIAM C-1 M 46,1800046,18

LS 20,95496 BDI 19,51091Mão-de-Obra 17,17620 Material 46,69886SubMO 38,13116

08.11.022 TUBO DE CONCRETO - CLASSE C1 - DN 500MM M 137,95

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 4,88000SERVENTE H 18,592803,812.05.03 0,00310AREIA M3 0,2455279,202.05.08 1,36000CIMENTO KG 0,503200,376.01.03 1,00000TUBO CONCRETO DE 50CM DIAM C-1 M 64,9700064,97

LS 25,51972 BDI 25,79593Mão-de-Obra 20,91780 Material 65,71872SubMO 46,43752

08.11.023 TUBO DE CONCRETO - CLASSE C1 - DN 600MM M 165,93

1.01.39 0,70000PEDREIRO H 3,255004,651.01.46 5,32000SERVENTE H 20,269203,812.05.03 0,00420AREIA M3 0,3326479,202.05.08 1,81000CIMENTO KG 0,669700,37

09/02/2011 11:38:40 Página: 118 de 0

Page 119: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.01.04 1,00000TUBO CONCRETO DE 60CM DIAM C-1 M 81,6800081,68

LS 28,69952 BDI 31,02840Mão-de-Obra 23,52420 Material 82,68234SubMO 52,22372

08.11.030 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/2") INCL CONEXOES M 23,72

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.30 1,10000TUBO PVC P/ESGOTO 40MM M 2,541002,316.26.70 1,00000ANEL BORRACHA P/TUBO PVC 40MM UN 0,570000,57

LS 8,89136 BDI 4,43678Mão-de-Obra 7,28800 Material 3,11100SubMO 16,17936

08.11.031 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 50MM (2") INCL CONEXOES M 26,47

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.31 1,10000TUBO PVC P/ESGOTO 50MM M 4,741004,316.26.71 1,00000ANEL BORRACHA P/TUBO PVC 50MM (2") UN 0,600000,60

LS 8,89136 BDI 4,94968Mão-de-Obra 7,28800 Material 5,34100SubMO 16,17936

08.11.032 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 75MM (3") INCL CONEXOES M 30,45

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.25.32 1,10000TUBO PVC P/ESGOTO 75MM M 5,665005,156.26.72 1,00000ANEL BORRACHA P/TUBOS PVC 75MM (3") UN 0,890000,89

LS 10,00278 BDI 5,69406Mão-de-Obra 8,19900 Material 6,55500SubMO 18,20178

08.11.033 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") INCL CONEXOES M 34,44

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.25.33 1,10000TUBO PVC P/ESGOTO 100MM M 6,600006,006.26.73 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM UN 1,180001,18

LS 11,11420 BDI 6,44097Mão-de-Obra 9,11000 Material 7,78000SubMO 20,22420

08.11.034 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") INCL CONEXOES M 53,62

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.25.34 1,10000TUBO PVC P/ESGOTO 150MM M 15,5100014,106.26.74 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM UN 3,820003,82

LS 13,33704 BDI 10,02778Mão-de-Obra 10,93200 Material 19,33000SubMO 24,26904

08.11.035 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 200MM (8") INCL CONEXOES M 90,01

1.01.09 2,00000ESGOTEIRO/CAVOUQUEIRO H 9,000004,501.01.95 2,00000AJUDANTE DE ESGOTEIRO H 7,820003,916.26.77 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 3,480003,486.26.85 1,20000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 32,3640026,97

LS 20,52040 BDI 16,83241Mão-de-Obra 16,82000 Material 35,84400SubMO 37,34040

08.11.036 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 250MM (10") INCL CONEXOES M 108,69

1.01.09 2,00000ESGOTEIRO/CAVOUQUEIRO H 9,000004,501.01.95 2,20000AJUDANTE DE ESGOTEIRO H 8,602003,916.26.78 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=250MM UN 10,2600010,266.26.86 1,20000TUBO PVC RIGIDO ESGOTO DIAM 250 MM (10") M 39,0360032,53

LS 21,47444 BDI 20,32566Mão-de-Obra 17,60200 Material 49,29600SubMO 39,07644

08.11.037 TUBO DE PVC RIGIDO JUNTA ELASTICA DN 300MM (12") INCL CONEXOES M 141,35

1.01.09 2,50000ESGOTEIRO/CAVOUQUEIRO H 11,250004,501.01.95 2,50000AJUDANTE DE ESGOTEIRO H 9,775003,916.26.79 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=300MM UN 14,6900014,696.26.87 1,20000TUBO PVC RIGIDO ESGOTO DIAM 300 MM (12") M 53,5560044,63

LS 25,65050 BDI 26,43195Mão-de-Obra 21,02500 Material 68,24600SubMO 46,67550

08.11.040 TUBO DE FERRO FUNDIDO RADIAL COM INSPECAO DE 3" UN 127,86

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.10.23 1,00000TE SANITARIO FERRO FUNDIDO 3" (75 MM) UN 60,9500060,956.10.69 1,00000PLACA CEGA FERRO FUNDIDO 3" (75 MM) UN 22,7800022,78

LS 11,11420 BDI 23,90947Mão-de-Obra 9,11000 Material 83,73000SubMO 20,22420

08.11.041 TUBO DE FERRO FUNDIDO RADIAL COM INSPECAO DE 4" M 188,68

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.10.26 1,00000TE SANITARIO FERRO FUNDIDO 4" (100 MM) UN 103,16000103,166.10.70 1,00000PLACA CEGA FERRO FUNDIDO 4" (100 MM UN 25,9700025,97

LS 13,33704 BDI 35,28178Mão-de-Obra 10,93200 Material 129,13000SubMO 24,26904

08.11.050 TUBO DE PVC "R" PARA AGUAS PLUVIAIS 40MM - INCL. CONEXOES M 25,39

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,09

09/02/2011 11:38:40 Página: 119 de 0

Page 120: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.25.60 1,10000TUBO DE PVC "R" 40MMM M 4,411004,016.95.13 0,00160ADESIVO PARA TUBOS PVC L 0,0436627,296.95.14 0,00070SOLUCAO LIMPADORA P/ PVC L 0,0142020,29

LS 8,89136 BDI 4,74909Mão-de-Obra 7,28800 Material 4,46887SubMO 16,17936

08.11.051 TUBO DE PVC "R" PARA AGUAS PLUVIAIS 50MM - INCL. CONEXOES M 27,30

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.25.61 1,10000TUBO DE PVC "R" 50MM M 5,940005,406.95.13 0,00220ADESIVO PARA TUBOS PVC L 0,0600427,296.95.14 0,00080SOLUCAO LIMPADORA P/ PVC L 0,0162320,29

LS 8,89136 BDI 5,10500Mão-de-Obra 7,28800 Material 6,01627SubMO 16,17936

08.11.052 TUBO DE PVC "R" PARA AGUAS PLUVIAIS 75MM - INCL. CONEXOES M 31,58

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.25.62 1,10000TUBO DE PVC "R" 75MM M 7,359006,696.95.13 0,00350ADESIVO PARA TUBOS PVC L 0,0955227,296.95.14 0,00130SOLUCAO LIMPADORA P/ PVC L 0,0263820,29

LS 10,00278 BDI 5,90702Mão-de-Obra 8,19900 Material 7,48089SubMO 18,20178

08.11.053 TUBO DE PVC "R" PARA AGUAS PLUVIAIS 100MM - INCL. CONEXOES M 39,68

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.25.63 1,10000TUBO DE PVC "R" 100MM M 11,8470010,776.95.13 0,00550ADESIVO PARA TUBOS PVC L 0,1501027,296.95.14 0,00230SOLUCAO LIMPADORA P/ PVC L 0,0466720,29

LS 11,11420 BDI 7,42163Mão-de-Obra 9,11000 Material 12,04376SubMO 20,22420

08.11.054 TUBO DE PVC "R" PARA AGUAS PLUVIAIS 150MM - INCL CONEXOES M 61,91

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.25.64 1,10000TUBO DE PVC "R" 150MM M 25,6740023,346.95.13 0,01100ADESIVO PARA TUBOS PVC L 0,3001927,296.95.14 0,00450SOLUCAO LIMPADORA P/ PVC L 0,0913120,29

LS 13,33704 BDI 11,57694Mão-de-Obra 10,93200 Material 26,06550SubMO 24,26904

08.11.099 SERVICOS EM REDE DE AGUAS PLUVIAIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.12.001 CONDUTOR EM CHAPA GALVANIZADA N 24 DESENV. 0,25M M 39,36

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.80.35 1,05000CHAPA GALVANIZADA N.24 CORTE 0.25M M 9,754509,29

LS 12,22562 BDI 7,36026Mão-de-Obra 10,02100 Material 9,75450SubMO 22,24662

08.12.002 CONDUTOR EM CHAPA GALVANIZADA N 26 DESENV. 0,25M M 36,86

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.80.36 1,05000CHAPA GALVANIZADA N.26 CORTE 0.25M M 7,728007,36

LS 12,22562 BDI 6,89416Mão-de-Obra 10,02100 Material 7,72800SubMO 22,24662

08.12.003 CONDUTOR DE CHAPA GALVANIZADA N 24 - DESENVOLVIMENTO DE 0,33 M M 50,64

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.80.33 1,05000CONDUTOR C/CHAPA GALV 24 DESEN 0,33M M 12,8625012,25

LS 15,55988 BDI 9,47057Mão-de-Obra 12,75400 Material 12,86250SubMO 28,31388

08.12.004 CONDUTOR DE CHAPA GALVANIZADA N 26 - DESENVOLVIMENTO DE 0,33 M M 47,36

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.80.09 1,05000CONDUTOR C/CHAPA GALV 26 DESEN 0,33M M 10,195509,71

LS 15,55988 BDI 8,85716Mão-de-Obra 12,75400 Material 10,19550SubMO 28,31388

08.12.007 LIGACAO CALHA CONDUTOR DE CHAPA ACO GALVANIZADO N.24 DIAMETRO DE 3" UN 37,11

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.80.16 1,00000LIG CALHA-COND CHAP GALV N24X1,00MX3" UN 6,850006,856.95.08 0,08000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 3,1032038,79

LS 11,11420 BDI 6,94080Mão-de-Obra 9,11000 Material 9,95320SubMO 20,22420

08.12.008 LIGACAO CALHA CONDUTOR DE CHAPA ACO GALVANIZADO N.24 DIAMETRO DE 4" UN 38,59

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.80.17 1,00000LIG CALHA-COND CHAP GALV N24X1,00MX4" UN 8,050008,05

09/02/2011 11:38:40 Página: 120 de 0

Page 121: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.95.08 0,08000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 3,1032038,79

LS 11,11420 BDI 7,21680Mão-de-Obra 9,11000 Material 11,15320SubMO 20,22420

08.12.010 CALHA OU AGUA FURTADA EM FIBRA DE VIDRO-DESENV. 0,33M M 47,18

1.01.18 0,89000ENCANADOR H 4,467805,021.01.19 0,89000AJUDANTE DE ENCANADOR H 3,640104,092.60.62 1,05000CALHA DE FIBRA DE VIDRO DES.0.33M M 19,6770018,742.67.61 0,10000PREGO ZINCADO 18X27 KG 0,683006,83

LS 9,89164 BDI 8,82269Mão-de-Obra 8,10790 Material 20,36000SubMO 17,99954

08.12.011 CALHA OU AGUA FURTADA EM FIBRA DE VIDRO-DESENV. 0,50M M 62,07

1.01.18 1,02000ENCANADOR H 5,120405,021.01.19 1,02000AJUDANTE DE ENCANADOR H 4,171804,092.60.60 1,05000CALHA DE FIBRA DE VIDRO DES.0.50M M 28,8120027,442.67.61 0,15000PREGO ZINCADO 18X27 KG 1,024506,83

LS 11,33648 BDI 11,60699Mão-de-Obra 9,29220 Material 29,83650SubMO 20,62868

08.12.012 CALHA OU AGUA FURTADA EM FIBRA DE VIDRO-DESENV. 1,00M M 99,59

1.01.18 1,18000ENCANADOR H 5,923605,021.01.19 1,18000AJUDANTE DE ENCANADOR H 4,826204,092.60.61 1,05000CALHA DE FIBRA DE VIDRO DES.1.00M M 55,0620052,442.67.61 0,30000PREGO ZINCADO 18X27 KG 2,049006,83

LS 13,11476 BDI 18,62438Mão-de-Obra 10,74980 Material 57,11100SubMO 23,86456

08.12.015 CALHA OU AGUA FURTADA EM CHAPA GALV. N 24 - CORTE 0,33M M 45,68

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,092.67.60 0,10000PREGO KG 0,457004,572.67.71 0,00180REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0220112,236.80.25 1,05000CALHA C/CHAPA GALV 24 DESENV 0,33M M 12,8625012,256.95.08 0,04000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 1,5516038,79

LS 12,22562 BDI 8,54214Mão-de-Obra 10,02100 Material 14,89311SubMO 22,24662

08.12.016 CALHA OU AGUA FURTADA EM CHAPA GALV. N 24 - CORTE 0,50M M 63,02

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.67.60 0,15000PREGO KG 0,685504,572.67.71 0,00230REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0281312,236.80.26 1,05000CALHA C/CHAPA GALV 24 DESENV 0,50M M 19,4985018,576.95.08 0,07000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 2,7153038,79

LS 15,55988 BDI 11,78550Mão-de-Obra 12,75400 Material 22,92743SubMO 28,31388

08.12.017 CALHA OU AGUA FURTADA EM CHAPA GALV. N 24 - CORTE 1,00M M 98,67

1.01.18 1,70000ENCANADOR H 8,534005,021.01.19 1,70000AJUDANTE DE ENCANADOR H 6,953004,092.67.60 0,30000PREGO KG 1,371004,572.67.71 0,00470REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0574812,236.80.27 1,05000CALHA C/CHAPA GALV 24 DESENV 1.00M M 38,9865037,136.95.08 0,14000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 5,4306038,79

LS 18,89414 BDI 18,45215Mão-de-Obra 15,48700 Material 45,84558SubMO 34,38114

08.12.021 CALHA OU AGUA FURTADA EM CHAPA GALV. N 26 - CORTE 0.33M M 42,40

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,092.67.60 0,10000PREGO KG 0,457004,572.67.71 0,00180REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0220112,236.80.01 1,05000CALHA C/CHAPA GALV 26 DESENV 0,33M M 10,195509,716.95.08 0,04000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 1,5516038,79

LS 12,22562 BDI 7,92873Mão-de-Obra 10,02100 Material 12,22611SubMO 22,24662

08.12.022 CALHA OU AGUA FURTADA EM CHAPA GALV. N 26 - CORTE 0,50M M 58,05

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.67.60 0,15000PREGO KG 0,685504,572.67.71 0,00230REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0281312,236.80.02 1,05000CALHA C/CHAPA GALV 26 DESENV 0,50M M 15,4560014,726.95.08 0,07000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 2,7153038,79

LS 15,55988 BDI 10,85573Mão-de-Obra 12,75400 Material 18,88493SubMO 28,31388

08.12.023 CALHA OU AGUA FURTADA EM CHAPA GALV. N 26 - CORTE 1,00M M 88,73

1.01.18 1,70000ENCANADOR H 8,534005,021.01.19 1,70000AJUDANTE DE ENCANADOR H 6,953004,092.67.60 0,30000PREGO KG 1,371004,572.67.71 0,00470REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0574812,236.80.30 1,05000CALHA C/CHAPA GALV 26 DESENV 1.00M M 30,9015029,436.95.08 0,14000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 5,4306038,79

09/02/2011 11:38:40 Página: 121 de 0

Page 122: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 18,89414 BDI 16,59260Mão-de-Obra 15,48700 Material 37,76058SubMO 34,38114

08.12.026 CALHA EM CHAPA DE COBRE N 26 - CORTE 0,33 M M 175,06

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,092.67.60 0,10000PREGO KG 0,457004,572.67.71 0,00300REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0366912,236.80.20 1,35000CALHA DE CHAPA DE COBRE N.26 KG 115,7220085,726.95.07 0,04000SOLDA 50X50 KG 1,8460046,15

LS 13,33704 BDI 32,73607Mão-de-Obra 10,93200 Material 118,06169SubMO 24,26904

08.12.027 CALHA EM CHAPA DE COBRE N 26 - CORTE 0,50 M M 258,33

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,092.67.60 0,15000PREGO KG 0,685504,572.67.71 0,00380REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0464712,236.80.20 2,05000CALHA DE CHAPA DE COBRE N.26 KG 175,7260085,726.95.07 0,07000SOLDA 50X50 KG 3,2305046,15

LS 16,67130 BDI 48,30570Mão-de-Obra 13,66500 Material 179,68847SubMO 30,33630

08.12.028 CALHA DE CHAPA DE COBRE N 26 - CORTE 1,00 M M 486,81

1.01.18 1,80000ENCANADOR H 9,036005,021.01.19 1,80000AJUDANTE DE ENCANADOR H 7,362004,092.67.60 0,30000PREGO KG 1,371004,572.67.71 0,00770REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0941712,236.80.20 4,10000CALHA DE CHAPA DE COBRE N.26 KG 351,4520085,726.95.07 0,14000SOLDA 50X50 KG 6,4610046,15

LS 20,00556 BDI 91,02980Mão-de-Obra 16,39800 Material 359,37817SubMO 36,40356

08.12.031 RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,16 M M 24,25

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.67.60 0,10000PREGO KG 0,457004,576.80.60 1,05000RUFO C/CHAPA GALV 24 DESENV 0,16M M 7,129506,79

LS 6,66852 BDI 4,53583Mão-de-Obra 5,46600 Material 7,58650SubMO 12,13452

08.12.032 RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,25 M M 27,47

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.67.60 0,10000PREGO KG 0,457004,576.80.61 1,05000RUFO C/CHAPA GALV 24 DESENV 0,25M M 9,744009,28

LS 6,66852 BDI 5,13717Mão-de-Obra 5,46600 Material 10,20100SubMO 12,13452

08.12.033 RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,33 M M 35,03

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.67.60 0,10000PREGO KG 0,457004,576.80.62 1,05000RUFO C/CHAPA GALV 24 DESENV 0,33M M 12,8625012,25

LS 8,33565 BDI 6,55216Mão-de-Obra 6,83250 Material 13,31950SubMO 15,16815

08.12.034 RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,50 M M 59,37

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.67.60 0,10000PREGO KG 0,457004,576.80.63 1,05000RUFO C/CHAPA GALV 24 DESENV 0,50M M 19,4985018,57

LS 15,55988 BDI 11,10196Mão-de-Obra 12,75400 Material 19,95550SubMO 28,31388

08.12.035 RUFO EM CHAPA GALVANIZADA N 24 - CORTE 1,00 M M 98,82

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.67.60 0,20000PREGO KG 0,914004,576.80.68 1,05000RUFO C/CHAPA GALV 24 DESENV 1,00M M 38,9865037,13

LS 22,22840 BDI 18,48025Mão-de-Obra 18,22000 Material 39,90050SubMO 40,44840

08.12.038 RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,16 M M 22,37

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.67.60 0,10000PREGO KG 0,457004,576.80.70 1,05000RUFO C/CHAPA GALV 26 DESENV 0,16M M 5,596505,33

LS 6,66852 BDI 4,18325Mão-de-Obra 5,46600 Material 6,05350SubMO 12,13452

08.12.039 RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,25 M M 24,99

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.67.60 0,10000PREGO KG 0,457004,576.80.71 1,05000RUFO C/CHAPA GALV 26 DESENV 0,25M M 7,728007,36

09/02/2011 11:38:40 Página: 122 de 0

Page 123: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 6,66852 BDI 4,67349Mão-de-Obra 5,46600 Material 8,18500SubMO 12,13452

08.12.040 RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,33 M M 31,77

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.67.60 0,10000PREGO KG 0,457004,576.80.72 1,05000RUFO C/CHAPA GALV 26 DESENV 0,33M M 10,206009,72

LS 8,33565 BDI 5,94117Mão-de-Obra 6,83250 Material 10,66300SubMO 15,16815

08.12.041 RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,50 M M 54,39

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.67.60 0,10000PREGO KG 0,457004,576.80.73 1,05000RUFO C/CHAPA GALV 26 DESENV 0,50M M 15,4560014,72

LS 15,55988 BDI 10,17218Mão-de-Obra 12,75400 Material 15,91300SubMO 28,31388

08.12.042 RUFO EM CHAPA GALVANIZADA N 26 - CORTE 1,00 M M 88,88

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.67.60 0,20000PREGO KG 0,914004,576.80.78 1,05000RUFO C/CHAPA GALV 26 DESENV 1,00M M 30,9015029,43

LS 22,22840 BDI 16,62070Mão-de-Obra 18,22000 Material 31,81550SubMO 40,44840

08.12.046 RUFO EM CHAPA DE COBRE N 26 - CORTE 0,16 M M 72,22

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.67.60 0,10000PREGO KG 0,457004,576.80.55 0,65000RUFO DE CHAPA DE COBRE N.26 KG 46,1240070,96

LS 6,66852 BDI 13,50457Mão-de-Obra 5,46600 Material 46,58100SubMO 12,13452

08.12.047 RUFO EM CHAPA DE COBRE N 26 - CORTE 0,25 M M 104,51

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.67.60 0,10000PREGO KG 0,457004,576.80.55 1,02000RUFO DE CHAPA DE COBRE N.26 KG 72,3792070,96

LS 6,66852 BDI 19,54327Mão-de-Obra 5,46600 Material 72,83620SubMO 12,13452

08.12.048 RUFO EM CHAPA DE COBRE N 26 - CORTE 0,33 M M 136,17

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.67.60 0,10000PREGO KG 0,457004,576.80.55 1,34000RUFO DE CHAPA DE COBRE N.26 KG 95,0864070,96

LS 8,33565 BDI 25,46366Mão-de-Obra 6,83250 Material 95,54340SubMO 15,16815

08.12.049 RUFO EM CHAPA DE COBRE N 26 - CORTE 0,50 M M 212,56

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.67.60 0,10000PREGO KG 0,457004,576.80.55 2,03000RUFO DE CHAPA DE COBRE N.26 KG 144,0488070,96

LS 15,55988 BDI 39,74853Mão-de-Obra 12,75400 Material 144,50580SubMO 28,31388

08.12.050 RUFO EM CHAPA DE COBRE N 26 - CORTE 1,00 M M 405,23

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.67.60 0,20000PREGO KG 0,914004,576.80.55 4,06000RUFO DE CHAPA DE COBRE N.26 KG 288,0976070,96

LS 22,22840 BDI 75,77580Mão-de-Obra 18,22000 Material 289,01160SubMO 40,44840

08.12.055 RUFO EM FIBRA DE VIDRO - DESENV. 0,16M M 27,58

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.60.50 1,05000RUFO DE FIBRA DE VIDRO DES. 0.16M M 9,607509,152.67.61 0,10000PREGO ZINCADO 18X27 KG 0,683006,83

LS 6,66852 BDI 5,15776Mão-de-Obra 5,46600 Material 10,29050SubMO 12,13452

08.12.056 RUFO EM FIBRA DE VIDRO - DESENV. 0,25M M 33,87

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,092.60.51 1,05000RUFO DE FIBRA DE VIDRO DES. 0.25M M 14,7210014,022.67.61 0,10000PREGO ZINCADO 18X27 KG 0,683006,83

LS 6,66852 BDI 6,33386Mão-de-Obra 5,46600 Material 15,40400SubMO 12,13452

08.12.057 RUFO EM FIBRA DE VIDRO - DESENV. 0,33M M 43,31

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,092.60.52 1,05000RUFO DE FIBRA DE VIDRO DES. 0.33M M 19,3620018,44

09/02/2011 11:38:40 Página: 123 de 0

Page 124: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.61 0,10000PREGO ZINCADO 18X27 KG 0,683006,83

LS 8,33565 BDI 8,09902Mão-de-Obra 6,83250 Material 20,04500SubMO 15,16815

08.12.058 RUFO EM FIBRA DE VIDRO - DESENV. 0,50M M 69,71

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.60.71 1,05000RUFO DE FIBRA DE VIDRO DES. 0.50M M 27,6780026,362.67.61 0,10000PREGO ZINCADO 18X27 KG 0,683006,83

LS 15,55988 BDI 13,03522Mão-de-Obra 12,75400 Material 28,36100SubMO 28,31388

08.12.059 RUFO EM FIBRA DE VIDRO - DESENV. 1,00M M 114,31

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,092.60.54 1,05000RUFO DE FIBRA DE VIDRO DES. 1.00M M 51,1245048,692.67.61 0,20000PREGO ZINCADO 18X27 KG 1,366006,83

LS 22,22840 BDI 21,37595Mão-de-Obra 18,22000 Material 52,49050SubMO 40,44840

08.12.065 GRELHA HEMISFERICA DE FERRO FUNDIDO DN 75MM (3") UN 5,46

1.01.18 0,10000ENCANADOR H 0,502005,026.75.04 1,00000GRELHA HEMISFERICA FERRO FUND DE 3" UN 3,330003,33

LS 0,61244 BDI 1,02222Mão-de-Obra 0,50200 Material 3,33000SubMO 1,11444

08.12.066 GRELHA HEMISFERICA DE FERRO FUNDIDO DN 100MM (4") UN 6,33

1.01.18 0,10000ENCANADOR H 0,502005,026.75.05 1,00000GRELHA HEMISFERICA F.FUNDIDO DN 100MM (4") UN 4,040004,04

LS 0,61244 BDI 1,18552Mão-de-Obra 0,50200 Material 4,04000SubMO 1,11444

08.12.067 GRELHA HEMISFERICA DE F F DE 6" UN 16,81

1.01.18 0,15000ENCANADOR H 0,753005,026.75.06 1,00000GRELHA HEMISFERICA FERRO FUND. DE 6" UN 12,0000012,00

LS 0,91866 BDI 3,14448Mão-de-Obra 0,75300 Material 12,00000SubMO 1,67166

08.12.070 CAIXA DE ALVENARIA - ESCAVACAO MANUAL COM APILOAMENTO DO FUNDO M3 52,01

1.01.46 5,00000SERVENTE H 19,050003,81

LS 23,24100 BDI 9,72693Mão-de-Obra 19,05000 Material 0,00000SubMO 42,29100

08.12.071 CAIXA DE ALVENARIA - LASTRO DE CONCRETO M3 491,74

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 20,00000SERVENTE H 76,200003,812.05.03 0,67200AREIA M3 53,2224079,202.05.08 180,00000CIMENTO KG 66,600000,372.05.18 0,80000PEDRA BRITADA 2 M3 48,8720061,09

LS 127,00200 BDI 91,95317Mão-de-Obra 104,10000 Material 168,69440SubMO 231,10200

08.12.072 CAIXA DE ALVENARIA - PAREDE DE 1/2 TIJOLO REVESTIDO M2 124,13

1.01.39 4,03000PEDREIRO H 18,739504,651.01.46 3,64000SERVENTE H 13,868403,812.05.03 0,06300AREIA M3 4,9896079,202.05.05 4,83000CAL HIDRATADA KG 1,642200,342.05.08 17,57000CIMENTO KG 6,500900,372.25.15 70,00000TIJOLO COMUM MACICO UN 15,400000,22

LS 39,78164 BDI 23,21212Mão-de-Obra 32,60790 Material 28,53270SubMO 72,38954

08.12.073 CAIXA DE ALVENARIA - PAREDE DE 1 TIJOLO REVESTIDO M2 182,71

1.01.39 4,49000PEDREIRO H 20,878504,651.01.46 5,70000SERVENTE H 21,717003,812.05.03 0,12100AREIA M3 9,5832079,202.05.05 13,96000CAL HIDRATADA KG 4,746400,342.05.08 23,94000CIMENTO KG 8,857800,372.25.15 140,00000TIJOLO COMUM MACICO UN 30,800000,22

LS 51,96651 BDI 34,16636Mão-de-Obra 42,59550 Material 53,98740SubMO 94,56201

08.12.074 CAIXA DE ALVENARIA - TAMPA DE CONCRETO M2 103,86

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,961.01.21 0,46000FERREIRO H 2,194204,771.01.22 0,46000AJUDANTE DE FERREIRO H 1,757203,821.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.05.35 0,05000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 12,15550243,112.10.21 0,10000TABUAS PINHO DE 1"X12" DE 3A. M2 1,7180017,182.10.32 0,33000CHAPA COMPENSADA RESINADA E=12MM M2 3,9930012,102.15.38 5,27000ACO CA-60-B $MD BITOLAS KG 13,965502,652.70.10 0,09000ARAME RECOZIDO N.18 KG 0,416704,63

LS 28,68147 BDI 19,42110Mão-de-Obra 23,50940 Material 32,24870SubMO 52,19087

09/02/2011 11:38:40 Página: 124 de 0

Page 125: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.12.077 CAIXA INSPECAO DE ALVENARIA DE TIJ DE 0,70X0,70X1,00 M UN 363,52

1.01.39 7,80000PEDREIRO H 36,270004,651.01.46 14,60000SERVENTE H 55,626003,812.05.03 0,22000AREIA M3 17,4240079,202.05.08 48,20000CIMENTO KG 17,834000,372.05.17 0,07000PEDRA BRITADA 1 M3 4,3351061,932.15.10 1,30000ACO CA-25 $MD BITOLAS KG 3,549002,732.25.15 220,00000TIJOLO COMUM MACICO UN 48,400000,22

LS 112,11312 BDI 67,97678Mão-de-Obra 91,89600 Material 91,54210SubMO 204,00912

08.12.079 CA-10 CAIXA DE AREIA 50X50 CM PARA AGUAS PLUVIAIS UN 204,96

1.01.11 0,62000CARPINTEIRO H 2,821004,551.01.12 0,62000AJUDANTE DE CARPINTEIRO H 2,455203,961.01.21 0,38000FERREIRO H 1,812604,771.01.22 0,38000AJUDANTE DE FERREIRO H 1,451603,821.01.39 3,61000PEDREIRO H 16,786504,651.01.46 7,23000SERVENTE H 27,546303,812.05.03 0,09720AREIA M3 7,6982479,202.05.05 4,63000CAL HIDRATADA KG 1,574200,342.05.08 31,84000CIMENTO KG 11,780800,372.05.18 0,04200PEDRA BRITADA 2 M3 2,5657861,092.10.21 0,39000TABUAS PINHO DE 1"X12" DE 3A. M2 6,7002017,182.15.38 0,71000ACO CA-60-B $MD BITOLAS KG 1,881502,652.25.15 70,00000TIJOLO COMUM MACICO UN 15,400000,222.40.69 0,46400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,164642,512.67.60 0,09600PREGO KG 0,438724,572.70.10 0,01240ARAME RECOZIDO N.18 KG 0,057414,63

LS 64,50530 BDI 38,32720Mão-de-Obra 52,87320 Material 49,26149SubMO 117,37850

08.12.085 GRELHA FERRO PERF. - 1,00X0,40 M UN 234,89

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,816.75.62 1,00000GRELHA FERRO PERFILADO PECA 1,00X0,40M UN 172,19000172,19

LS 10,32120 BDI 43,92338Mão-de-Obra 8,46000 Material 172,19000SubMO 18,78120

08.12.086 GRELHA FERRO PERF. 1,00X0,50 M UN 261,67

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,816.75.63 1,00000GRELHA FERRO PERFILADO PECA 1,00X0,50M UN 193,96000193,96

LS 10,32120 BDI 48,93048Mão-de-Obra 8,46000 Material 193,96000SubMO 18,78120

08.12.087 RALO SECO DE F. FUNDIDO DN 100 MM C/GRELHA PVC CROMADO UN 60,82

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.75.02 1,00000RALO SECO F FUNDIDO DN 100MM UN 16,7800016,786.75.52 1,00000GRELHA PVC RIGIDO ACAB.CROMADO DN 100MM UN 4,360004,36

LS 15,55988 BDI 11,37439Mão-de-Obra 12,75400 Material 21,14000SubMO 28,31388

08.12.095 CALHA DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,33M M 46,99

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,092.40.96 0,04000SILICONE KG 1,6468041,172.55.30 0,84000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 13,8432016,482.67.60 0,10000PREGO KG 0,457004,572.67.71 0,00080REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0097812,23

LS 12,22562 BDI 8,78678Mão-de-Obra 10,02100 Material 15,95678SubMO 22,24662

08.12.096 CALHA DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,50M M 64,97

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,092.40.96 0,07000SILICONE KG 2,8819041,172.55.30 1,27000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 20,9296016,482.67.60 0,15000PREGO KG 0,685504,572.67.71 0,00100REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0122312,23

LS 15,55988 BDI 12,14932Mão-de-Obra 12,75400 Material 24,50923SubMO 28,31388

08.12.097 CALHA DE ALUMINIO ACAB. NATUARL E=0,8MM CORTE 1,00M M 102,58

1.01.18 1,70000ENCANADOR H 8,534005,021.01.19 1,70000AJUDANTE DE ENCANADOR H 6,953004,092.40.96 0,14000SILICONE KG 5,7638041,172.55.30 2,54000TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL KG 41,8592016,482.67.60 0,30000PREGO KG 1,371004,572.67.71 0,00210REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,0256812,23

LS 18,89414 BDI 19,18219Mão-de-Obra 15,48700 Material 49,01968SubMO 34,38114

08.12.099 SERVICOS EM REDE DE AGUAS PLUVIAIS MV 298,09

09/02/2011 11:38:40 Página: 125 de 0

Page 126: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.13.001 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 25MM (3/4") INCL CONEXOES M 13,33

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,093.80.40 0,05000LIXA D"AGUA UN 0,032500,656.25.02 1,60000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM M 2,688001,686.95.13 0,00080ADESIVO PARA TUBOS PVC L 0,0218327,296.95.14 0,00030SOLUCAO LIMPADORA P/ PVC L 0,0060920,29

LS 4,44568 BDI 2,49276Mão-de-Obra 3,64400 Material 2,74842SubMO 8,08968

08.13.002 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 32MM (1") INCL CONEXOES M 17,98

1.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,093.80.40 0,06000LIXA D"AGUA UN 0,039000,656.25.03 1,50000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 32MM M 5,445003,636.95.13 0,00110ADESIVO PARA TUBOS PVC L 0,0300227,296.95.14 0,00050SOLUCAO LIMPADORA P/ PVC L 0,0101520,29

LS 5,00139 BDI 3,36376Mão-de-Obra 4,09950 Material 5,52416SubMO 9,10089

08.13.003 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/4") INCL CONEXOES M 22,19

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,093.80.40 0,07000LIXA D"AGUA UN 0,045500,656.25.04 1,50000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 40MM M 7,845005,236.95.13 0,00120ADESIVO PARA TUBOS PVC L 0,0327527,296.95.14 0,00050SOLUCAO LIMPADORA P/ PVC L 0,0101520,29

LS 5,55710 BDI 4,15046Mão-de-Obra 4,55500 Material 7,93339SubMO 10,11210

08.13.004 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 50MM (1.1/2") INCL CONEXOES M 26,21

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,093.80.40 0,08000LIXA D"AGUA UN 0,052000,656.25.05 1,40000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 50MM M 8,652006,186.95.13 0,01680ADESIVO PARA TUBOS PVC L 0,4584727,296.95.14 0,00070SOLUCAO LIMPADORA P/ PVC L 0,0142020,29

LS 6,66852 BDI 4,90158Mão-de-Obra 5,46600 Material 9,17668SubMO 12,13452

08.13.005 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 60MM (2") INCL CONEXOES M 34,98

1.01.18 0,70000ENCANADOR H 3,514005,021.01.19 0,70000AJUDANTE DE ENCANADOR H 2,863004,093.80.40 0,09000LIXA D"AGUA UN 0,058500,656.25.06 1,40000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 60MM M 14,1540010,116.95.13 0,00220ADESIVO PARA TUBOS PVC L 0,0600427,296.95.14 0,00080SOLUCAO LIMPADORA P/ PVC L 0,0162320,29

LS 7,77994 BDI 6,54251Mão-de-Obra 6,37700 Material 14,28877SubMO 14,15694

08.13.006 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 75MM (2.1/2") INCL CONEXOES M 50,70

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,093.80.40 0,10000LIXA D"AGUA UN 0,065000,656.25.07 1,40000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 75MM M 22,8480016,326.95.13 0,00310ADESIVO PARA TUBOS PVC L 0,0846027,296.95.14 0,00110SOLUCAO LIMPADORA P/ PVC L 0,0223220,29

LS 10,00278 BDI 9,48099Mão-de-Obra 8,19900 Material 23,01992SubMO 18,20178

08.13.007 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 85MM (3") INCL CONEXOES M 58,22

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,093.80.40 0,11000LIXA D"AGUA UN 0,071500,656.25.08 1,30000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM M 26,9230020,716.95.13 0,00350ADESIVO PARA TUBOS PVC L 0,0955227,296.95.14 0,00130SOLUCAO LIMPADORA P/ PVC L 0,0263820,29

LS 11,11420 BDI 10,88834Mão-de-Obra 9,11000 Material 27,11639SubMO 20,22420

08.13.008 TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 110MM (4") INCL CONEXOES M 78,88

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,093.80.40 0,12000LIXA D"AGUA UN 0,078000,656.25.09 1,30000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 110MM M 41,6130032,016.95.13 0,00550ADESIVO PARA TUBOS PVC L 0,1501027,296.95.14 0,00230SOLUCAO LIMPADORA P/ PVC L 0,0466720,29

LS 12,22562 BDI 14,75091Mão-de-Obra 10,02100 Material 41,88776SubMO 22,24662

08.13.011 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN20MM (3/4") - INCL CONEXOES M 41,08

09/02/2011 11:38:40 Página: 126 de 0

Page 127: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.05.02 1,60000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 17,1840010,746.95.53 0,01120FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,036743,28

LS 8,89136 BDI 7,68202Mão-de-Obra 7,28800 Material 17,22074SubMO 16,17936

08.13.012 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN25MM (1") - INCL CONEXOES M 56,79

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.05.03 1,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 23,8800015,926.95.53 0,01440FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M UN 0,047233,28

LS 12,22562 BDI 10,61999Mão-de-Obra 10,02100 Material 23,92723SubMO 22,24662

08.13.013 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN32MM (1 1/4")-INCL CONEXOES M 67,75

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,096.05.04 1,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4") M 30,7350020,496.95.52 0,01800FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,080644,48

LS 13,33704 BDI 12,66948Mão-de-Obra 10,93200 Material 30,81564SubMO 24,26904

08.13.014 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN40MM (1 1/2") - INCL CONEXOES M 75,48

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.05.05 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2") M 32,9560023,546.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 15,55988 BDI 14,11536Mão-de-Obra 12,75400 Material 33,05725SubMO 28,31388

08.13.015 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN50MM (2") - INCL CONEXOES M 97,01

1.01.18 1,60000ENCANADOR H 8,032005,021.01.19 1,60000AJUDANTE DE ENCANADOR H 6,544004,096.05.06 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2") M 46,3400033,106.95.51 0,02720FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,171636,31

LS 17,78272 BDI 18,14018Mão-de-Obra 14,57600 Material 46,51163SubMO 32,35872

08.13.016 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN65MM (2 1/2")-INCL CONEXOES M 117,96

1.01.18 1,80000ENCANADOR H 9,036005,021.01.19 1,80000AJUDANTE DE ENCANADOR H 7,362004,096.05.07 1,40000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN65MM (2 1/2") M 59,2900042,356.95.51 0,03380FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,213286,31

LS 20,00556 BDI 22,05857Mão-de-Obra 16,39800 Material 59,50328SubMO 36,40356

08.13.017 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN80MM (3")-INCL CONEXOES M 135,53

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.05.08 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 69,4980053,466.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 22,22840 BDI 25,34340Mão-de-Obra 18,22000 Material 69,74030SubMO 40,44840

08.13.018 TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN100MM (4")-INCL CONEXOES M 178,52

1.01.18 2,20000ENCANADOR H 11,044005,021.01.19 2,20000AJUDANTE DE ENCANADOR H 8,998004,096.05.09 1,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN100MM (4") M 100,3340077,186.95.51 0,04960FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,312986,31

LS 24,45124 BDI 33,38225Mão-de-Obra 20,04200 Material 100,64698SubMO 44,49324

08.13.099 SERVICOS EM RESERVATORIOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.14.002 REGISTRO DE GAVETA BRUTO DN 20MM (3/4") UN 37,06

1.01.18 0,54000ENCANADOR H 2,710805,021.01.19 0,54000AJUDANTE DE ENCANADOR H 2,208604,096.35.61 1,00000REGISTRO GAVETA AMARELO 3/4' UN 19,1300019,136.95.52 0,01880FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,084224,48

LS 6,00167 BDI 6,93112Mão-de-Obra 4,91940 Material 19,21422SubMO 10,92107

08.14.003 REGISTRO DE GAVETA BRUTO DN 25MM (1") UN 48,07

1.01.18 0,54000ENCANADOR H 2,710805,021.01.19 0,54000AJUDANTE DE ENCANADOR H 2,208604,096.35.62 1,00000REGISTRO GAVETA AMARELO 1' UN 28,0600028,066.95.52 0,02400FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,107524,48

LS 6,00167 BDI 8,99038Mão-de-Obra 4,91940 Material 28,16752SubMO 10,92107

08.14.004 REGISTRO DE GAVETA BRUTO DN 32MM (1 1/4") UN 66,21

1.01.18 0,85000ENCANADOR H 4,267005,021.01.19 0,85000AJUDANTE DE ENCANADOR H 3,476504,09

09/02/2011 11:38:40 Página: 127 de 0

Page 128: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.35.63 1,00000REGISTRO GAVETA AMARELO 1 1/4' UN 36,4500036,456.95.51 0,03000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,189306,31

LS 9,44707 BDI 12,38087Mão-de-Obra 7,74350 Material 36,63930SubMO 17,19057

08.14.005 REGISTRO DE GAVETA BRUTO DN 40MM (1.1/2") UN 78,95

1.01.18 0,85000ENCANADOR H 4,267005,021.01.19 0,85000AJUDANTE DE ENCANADOR H 3,476504,096.35.64 1,00000REGISTRO GAVETA AMARELO 1 1/2' UN 46,7600046,766.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,31

LS 9,44707 BDI 14,76320Mão-de-Obra 7,74350 Material 46,99726SubMO 17,19057

08.14.006 REGISTRO DE GAVETA BRUTO DN 50MM (2") UN 104,88

1.01.18 0,85000ENCANADOR H 4,267005,021.01.19 0,85000AJUDANTE DE ENCANADOR H 3,476504,096.35.65 1,00000REGISTRO GAVETA AMARELO 2' UN 67,8000067,806.95.51 0,04520FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,285216,31

LS 9,44707 BDI 19,61343Mão-de-Obra 7,74350 Material 68,08521SubMO 17,19057

08.14.007 REGISTRO DE GAVETA BRUTO DN 65MM (2.1/2") UN 248,89

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.35.66 1,00000REGISTRO GAVETA AMARELO 2 1/2' UN 178,74000178,746.95.51 0,05640FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,355886,31

LS 12,78133 BDI 46,54135Mão-de-Obra 10,47650 Material 179,09588SubMO 23,25783

08.14.008 REGISTRO DE GAVETA BRUTO DN 80MM (3") UN 358,91

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.35.67 1,00000REGISTRO GAVETA AMARELO 3' UN 268,14000268,146.95.51 0,06400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,403846,31

LS 12,78133 BDI 67,11438Mão-de-Obra 10,47650 Material 268,54384SubMO 23,25783

08.14.009 REGISTRO DE GAVETA BRUTO DN 100MM (4") UN 591,70

1.01.18 1,48000ENCANADOR H 7,429605,021.01.19 1,48000AJUDANTE DE ENCANADOR H 6,053204,096.35.69 1,00000REGISTRO GAVETA AMARELO 4' UN 450,61000450,616.95.51 0,08280FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,522476,31

LS 16,44902 BDI 110,64479Mão-de-Obra 13,48280 Material 451,13247SubMO 29,93182

08.14.016 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 1" UN 76,78

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,096.40.17 1,00000VALVULA RET HORIZ BRONZE 1' UN 47,2100047,216.95.52 0,01000FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,044804,48

LS 8,33565 BDI 14,35728Mão-de-Obra 6,83250 Material 47,25480SubMO 15,16815

08.14.017 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 1.1/4" UN 103,08

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.40.18 1,00000VALVULA RET HORIZ BRONZE 1 1/4' UN 65,5500065,556.95.52 0,01200FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,053764,48

LS 10,00278 BDI 19,27527Mão-de-Obra 8,19900 Material 65,60376SubMO 18,20178

08.14.018 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 1.1/2" UN 116,88

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.40.19 1,00000VALVULA RET HORIZ BRONZE 1 1/2' UN 74,7400074,746.95.52 0,01500FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,067204,48

LS 11,11420 BDI 21,85722Mão-de-Obra 9,11000 Material 74,80720SubMO 20,22420

08.14.019 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 2" UN 165,09

1.01.18 1,25000ENCANADOR H 6,275005,021.01.19 1,25000AJUDANTE DE ENCANADOR H 5,112504,096.40.20 1,00000VALVULA RET HORIZ BRONZE 2' UN 108,86000108,866.95.52 0,01920FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,086024,48

LS 13,89275 BDI 30,87204Mão-de-Obra 11,38750 Material 108,94602SubMO 25,28025

08.14.020 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 2.1/2" UN 253,67

1.01.18 1,15000ENCANADOR H 5,773005,021.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.40.21 1,00000VALVULA RET HORIZ BRONZE 2 1/2' UN 182,83000182,836.95.51 0,02400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,151446,31

LS 12,78133 BDI 47,43503Mão-de-Obra 10,47650 Material 182,98144SubMO 23,25783

08.14.021 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 3" UN 288,81

1.01.18 1,15000ENCANADOR H 5,773005,02

09/02/2011 11:38:40 Página: 128 de 0

Page 129: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.19 1,15000AJUDANTE DE ENCANADOR H 4,703504,096.40.22 1,00000VALVULA RET HORIZ BRONZE 3' UN 211,37000211,376.95.51 0,02880FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,181736,31

LS 12,78133 BDI 54,00620Mão-de-Obra 10,47650 Material 211,55173SubMO 23,25783

08.14.022 VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 4" UN 503,18

1.01.18 1,48000ENCANADOR H 7,429605,021.01.19 1,48000AJUDANTE DE ENCANADOR H 6,053204,096.40.23 1,00000VALVULA RET HORIZ BRONZE 4' UN 378,92000378,926.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 16,44902 BDI 94,09165Mão-de-Obra 13,48280 Material 379,16230SubMO 29,93182

08.14.026 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 1" UN 55,95

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,096.40.61 1,00000VALVULA RET VERT BRONZE 1' UN 30,2800030,286.95.52 0,01000FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,044804,48

LS 8,33565 BDI 10,46338Mão-de-Obra 6,83250 Material 30,32480SubMO 15,16815

08.14.027 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 1.1/4" UN 73,91

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.40.62 1,00000VALVULA RET VERT BRONZE 1 1/4' UN 41,8400041,846.95.52 0,01200FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,053764,48

LS 10,00278 BDI 13,82197Mão-de-Obra 8,19900 Material 41,89376SubMO 18,20178

08.14.028 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 1.1/2" UN 91,98

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.40.63 1,00000VALVULA RET VERT BRONZE 1 1/2' UN 54,4900054,496.95.52 0,01500FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,067204,48

LS 11,11420 BDI 17,19972Mão-de-Obra 9,11000 Material 54,55720SubMO 20,22420

08.14.029 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 2" UN 128,09

1.01.18 1,25000ENCANADOR H 6,275005,021.01.19 1,25000AJUDANTE DE ENCANADOR H 5,112504,096.40.64 1,00000VALVULA RET VERT BRONZE 2' UN 78,7800078,786.95.52 0,01920FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,086024,48

LS 13,89275 BDI 23,95364Mão-de-Obra 11,38750 Material 78,86602SubMO 25,28025

08.14.030 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 2.1/2" UN 198,06

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.40.65 1,00000VALVULA RET VERT BRONZE 2 1/2' UN 130,54000130,546.95.51 0,02400FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,151446,31

LS 16,67130 BDI 37,03638Mão-de-Obra 13,66500 Material 130,69144SubMO 30,33630

08.14.031 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 3" UN 275,11

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.40.66 1,00000VALVULA RET VERT BRONZE 3' UN 183,04000183,046.95.51 0,02880FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,181736,31

LS 22,22840 BDI 51,44413Mão-de-Obra 18,22000 Material 183,22173SubMO 40,44840

08.14.032 VALVULA DE RETENCAO VERTICAL DE BRONZE DE 4" UN 427,53

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.40.68 1,00000VALVULA RET VERT BRONZE 4' UN 306,90000306,906.95.51 0,03840FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,242306,31

LS 22,22840 BDI 79,94586Mão-de-Obra 18,22000 Material 307,14230SubMO 40,44840

08.14.035 VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 1" UN 53,60

1.01.18 0,75000ENCANADOR H 3,765005,021.01.19 0,75000AJUDANTE DE ENCANADOR H 3,067504,096.40.27 1,00000VALVULA RET PE C/CRIVO BRONZE 1' UN 28,3900028,396.95.52 0,00480FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,021504,48

LS 8,33565 BDI 10,02332Mão-de-Obra 6,83250 Material 28,41150SubMO 15,16815

08.14.036 VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 1.1/4" UN 74,41

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.40.28 1,00000VALVULA RET PE C/CRIVO BRONZE 1 1/4' UN 40,2500040,256.95.52 0,00600FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,026884,48

LS 11,11420 BDI 13,91525Mão-de-Obra 9,11000 Material 40,27688SubMO 20,22420

08.14.037 VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 1.1/2" UN 86,10

09/02/2011 11:38:40 Página: 129 de 0

Page 130: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.40.29 1,00000VALVULA RET PE C/CRIVO BRONZE 1 1/2' UN 49,7300049,736.95.51 0,00800FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,050486,31

LS 11,11420 BDI 16,10108Mão-de-Obra 9,11000 Material 49,78048SubMO 20,22420

08.14.038 VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 2" UN 116,71

1.01.18 1,25000ENCANADOR H 6,275005,021.01.19 1,25000AJUDANTE DE ENCANADOR H 5,112504,096.40.30 1,00000VALVULA RET PE C/CRIVO BRONZE 2' UN 69,5500069,556.95.51 0,01000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,063106,31

LS 13,89275 BDI 21,82547Mão-de-Obra 11,38750 Material 69,61310SubMO 25,28025

08.14.039 VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 2.1/2" UN 180,34

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.40.31 1,00000VALVULA RET PE C/CRIVO BRONZE 2 1/2' UN 116,21000116,216.95.51 0,01200FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,075726,31

LS 16,67130 BDI 33,72307Mão-de-Obra 13,66500 Material 116,28572SubMO 30,33630

08.14.040 VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 3" UN 242,31

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.40.32 1,00000VALVULA RET PE C/CRIVO BRONZE 3" UN 166,54000166,546.95.51 0,02000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,126206,31

LS 16,67130 BDI 45,31058Mão-de-Obra 13,66500 Material 166,66620SubMO 30,33630

08.14.045 TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 20MM (3/4") UN 49,57

1.01.18 0,30000ENCANADOR H 1,506005,021.01.19 0,30000AJUDANTE DE ENCANADOR H 1,227004,096.95.15 1,00000TORN.DE BOIA EM LATAO(BOIA PLAST)DN 20MM (3/4") UN 34,1900034,196.95.52 0,01120FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,050184,48

LS 3,33426 BDI 9,27071Mão-de-Obra 2,73300 Material 34,24018SubMO 6,06726

08.14.046 TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 25MM (1") UN 61,72

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,096.95.16 1,00000TORN.DE BOIA EM LATAO (BOIA PLAST)DN 25MM (1") UN 42,0100042,016.95.52 0,01880FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,084224,48

LS 4,44568 BDI 11,54230Mão-de-Obra 3,64400 Material 42,09422SubMO 8,08968

08.14.047 TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 32MM (1 1/4") UN 86,25

1.01.18 0,45000ENCANADOR H 2,259005,021.01.19 0,45000AJUDANTE DE ENCANADOR H 1,840504,096.95.22 1,00000TORN.DE BOIA EM LATAO (BOIA PLAST)DN 32MM (1 1/4") UN 60,9200060,926.95.52 0,02400FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,107524,48

LS 5,00139 BDI 16,12953Mão-de-Obra 4,09950 Material 61,02752SubMO 9,10089

08.14.048 TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 40MM (1 1/2") UN 103,25

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.95.17 1,00000TORN.DE BOIA EM LATAO (BOIA PLAST)DN 40MM (1 1/2") UN 73,7000073,706.95.52 0,03000FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,134404,48

LS 5,55710 BDI 19,30770Mão-de-Obra 4,55500 Material 73,83440SubMO 10,11210

08.14.049 TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN50MM (2") UN 123,32

1.01.18 0,60000ENCANADOR H 3,012005,021.01.19 0,60000AJUDANTE DE ENCANADOR H 2,454004,096.95.18 1,00000TORNEIRA DE BOIA EM LATAO (BOIA PLAST)50MM (2") UN 87,9400087,946.95.51 0,03000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,189306,31

LS 6,66852 BDI 23,06068Mão-de-Obra 5,46600 Material 88,12930SubMO 12,13452

08.14.050 RA-01 RESERVATORIO METALICO ACOPLADO 23M3 H=13,00M UN 64.031,86

6.51.11 1,00000RA-01 RESERVATORIO MET. ACOPLADO 23M3 FORN/INST UN 52.058,4300052.058,43

LS 0,00000 BDI 11.973,43890Mão-de-Obra 0,00000 Material 52.058,43000SubMO 0,00000

08.14.051 RA-02 RESERVATORIO METALICO ACOPLADO 30M3 H=13,00M UN 67.563,65

6.51.12 1,00000RA-02 RESERVATORIO MET. ACOPLADO 30M3 FORN/INST UN 54.929,8000054.929,80

LS 0,00000 BDI 12.633,85400Mão-de-Obra 0,00000 Material 54.929,80000SubMO 0,00000

08.14.052 RA-03 RESERVATORIO METALICO ACOPLADO 40M3 H=13,00M UN 70.993,26

6.51.13 1,00000RA-03 RESERVATORIO MET. ACOPLADO 40M3 FORN/INST UN 57.718,1000057.718,10

LS 0,00000 BDI 13.275,16300Mão-de-Obra 0,00000 Material 57.718,10000SubMO 0,00000

08.14.054 RA-04 RESERVATORIO METALICO ACOPLADO 23M3 H=10,00M UN 53.960,28

09/02/2011 11:38:40 Página: 130 de 0

Page 131: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.51.14 1,00000RA-04 RESERVATORIO MET. ACOPLADO 23M3 FORN/INST UN 43.870,1500043.870,15

LS 0,00000 BDI 10.090,13450Mão-de-Obra 0,00000 Material 43.870,15000SubMO 0,00000

08.14.056 RA-05 RESERVATORIO METALICO ACOPLADO 28M3 H=10,00M UN 57.725,90

6.51.15 1,00000RA-05 RESERVATORIO MET. ACOPLADO 28M3 FORN/INST UN 46.931,6300046.931,63

LS 0,00000 BDI 10.794,27490Mão-de-Obra 0,00000 Material 46.931,63000SubMO 0,00000

08.14.058 RA-06 RESERVATORIO METALICO ACOPLADO 35M3 H=10,00M UN 61.568,01

6.51.16 1,00000RA-06 RESERVATORIO MET. ACOPLADO 35M3 FORN/INST UN 50.055,3000050.055,30

LS 0,00000 BDI 11.512,71900Mão-de-Obra 0,00000 Material 50.055,30000SubMO 0,00000

08.14.059 RA-07 RESERVATORIO METALICO ACOPLADO 23M3 H=7,00M UN 43.342,49

6.51.17 1,00000RA-07 RESERVATORIO MET. ACOPLADO 23M3 FORN/INST UN 35.237,8000035.237,80

LS 0,00000 BDI 8.104,69400Mão-de-Obra 0,00000 Material 35.237,80000SubMO 0,00000

08.14.060 RA-08 RESERVATORIO METALICO ACOPLADO 28M3 H=7,00M UN 47.439,50

6.51.18 1,00000RA-08 RESERVATORIO MET. ACOPLADO 28M3 FORN/INST UN 38.568,7000038.568,70

LS 0,00000 BDI 8.870,80100Mão-de-Obra 0,00000 Material 38.568,70000SubMO 0,00000

08.14.061 RA-09 RESERVATORIO METALICO ACOPLADO 40M3 H=7,00M UN 50.899,34

6.51.19 1,00000RA-09 RESERVATORIO MET. ACOPLADO 40M3 FORN/INST UN 41.381,5800041.381,58

LS 0,00000 BDI 9.517,76340Mão-de-Obra 0,00000 Material 41.381,58000SubMO 0,00000

08.14.062 ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=3,00M M 6.297,60

6.02.12 2,00000ANEIS PRE-MOLD RES.CONCR ARM. 3,00X0,50M FORN/MONT UN 5.120,000002.560,00

LS 0,00000 BDI 1.177,60000Mão-de-Obra 0,00000 Material 5.120,00000SubMO 0,00000

08.14.063 LAJE PRE-MOLDADA D=3,00M E=8CM P/ RESERVATORIO UN 1.180,80

2.20.80 1,00000LAJE PRE-MOLD D=3,00M E=08CM P/ RESERV FORN E MONT UN 960,00000960,00

LS 0,00000 BDI 220,80000Mão-de-Obra 0,00000 Material 960,00000SubMO 0,00000

08.14.064 LAJE PRE-MOLDADA D=3,00M E=15CM P/ RESERVATORIO UN 1.820,40

2.20.81 1,00000LAJE PRE-MOLD D=3,00M E=15CM P/ RESERV FORN E MONT UN 1.480,000001.480,00

LS 0,00000 BDI 340,40000Mão-de-Obra 0,00000 Material 1.480,00000SubMO 0,00000

08.14.065 RA-10 RESERVATORIO METALICO INFERIOR 9M3 UN 19.589,10

6.51.20 1,00000RA-10 RESERVATORIO MET. INFERIOR 9M3 FORN/INST UN 15.926,1000015.926,10

LS 0,00000 BDI 3.663,00300Mão-de-Obra 0,00000 Material 15.926,10000SubMO 0,00000

08.14.066 RA-11 RESERVATORIO METALICO INFERIOR 13M3 UN 24.031,18

6.51.21 1,00000RA-11 RESERVATORIO MET. INFERIOR 13M3 FORN/INST UN 19.537,5500019.537,55

LS 0,00000 BDI 4.493,63650Mão-de-Obra 0,00000 Material 19.537,55000SubMO 0,00000

08.14.067 RA-12 RESERVATORIO METALICO INFERIOR 17M3 UN 26.965,22

6.51.22 1,00000RA-12 RESERVATORIO MET. INFERIOR 17M3 FORN/INST UN 21.922,9500021.922,95

LS 0,00000 BDI 5.042,27850Mão-de-Obra 0,00000 Material 21.922,95000SubMO 0,00000

08.14.068 RA-13 RESERVATORIO METALICO SUPERIOR 10M3 H=5,00M UN 30.739,29

6.51.23 1,00000RA-13 RESERVATORIO MET. SUPERIOR 10M3 FORN/INST UN 24.991,3000024.991,30

LS 0,00000 BDI 5.747,99900Mão-de-Obra 0,00000 Material 24.991,30000SubMO 0,00000

08.14.069 RA-14 RESERVATORIO METALICO SUPERIOR 15M3 H=5,00M UN 34.430,87

6.51.24 1,00000RA-14 RESERVATORIO MET. SUPERIOR 15M3 FORN/INST UN 27.992,5800027.992,58

LS 0,00000 BDI 6.438,29340Mão-de-Obra 0,00000 Material 27.992,58000SubMO 0,00000

08.14.070 RA-15 RESERVATORIO METALICO SUPERIOR 20M3 H=5,00M UN 36.964,45

6.51.25 1,00000RA-15 RESERVATORIO MET. SUPERIOR 20M3 FORN/INST UN 30.052,4000030.052,40

LS 0,00000 BDI 6.912,05200Mão-de-Obra 0,00000 Material 30.052,40000SubMO 0,00000

08.14.071 CONJ MOTOR-BOMBA (CENTRIFUGA) 1/2 HP (3400 L/H-20 MCA) UN 737,88

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.51 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1/2 HP TRIF UN 529,12000529,12

LS 38,89970 BDI 137,97808Mão-de-Obra 31,88500 Material 529,12000SubMO 70,78470

08.14.072 CONJ MOTOR-BOMBA(CENTRIFUGA)3/4 HP(7400 L/H-20 MCA) UN 842,82

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.52 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 3/4 HP TRIF UN 614,44000614,44

LS 38,89970 BDI 157,60168Mão-de-Obra 31,88500 Material 614,44000SubMO 70,78470

08.14.073 CONJ MOTOR-BOMBA(CENTRIFUGA)1,5 HP(10000 L/H-20 MCA) UN 1.016,64

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.59 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1 1/2 HP TRIF UN 755,76000755,76

09/02/2011 11:38:40 Página: 131 de 0

Page 132: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 38,89970 BDI 190,10528Mão-de-Obra 31,88500 Material 755,76000SubMO 70,78470

08.14.074 CONJ MOTOR-BOMBA (CENTRIFUGA) 2 HP (13900 L/H-20 MCA) UN 1.326,31

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.54 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 2 HP TRIF UN 1.007,520001.007,52

LS 38,89970 BDI 248,01008Mão-de-Obra 31,88500 Material 1.007,52000SubMO 70,78470

08.14.075 CONJ MOTOR-BOMBA(CENTRIFUGA)3 HP(25000 L/H-20 MCA) UN 1.439,90

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.55 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 3 HP TRIF UN 1.099,870001.099,87

LS 38,89970 BDI 269,25058Mão-de-Obra 31,88500 Material 1.099,87000SubMO 70,78470

08.14.078 CONJ MOTOR-BOMBA (CENTRIFUGA) 1 HP 8500 L/H-20 MCA UN 886,83

1.01.18 3,50000ENCANADOR H 17,570005,021.01.19 3,50000AJUDANTE DE ENCANADOR H 14,315004,096.65.53 1,00000CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1 HP TRIF UN 650,22000650,22

LS 38,89970 BDI 165,83108Mão-de-Obra 31,88500 Material 650,22000SubMO 70,78470

08.14.085 ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=2,50M M 4.255,80

6.01.83 2,00000ANEIS PRE-MOLD RES.CONCR ARM. 2,50X0,50M FORN/MONT UN 3.460,000001.730,00

LS 0,00000 BDI 795,80000Mão-de-Obra 0,00000 Material 3.460,00000SubMO 0,00000

08.14.086 LAJE PRE-MOLDADA D=2,50M E=8CM P/ RESERVATORIO UN 1.033,20

2.20.76 1,00000LAJE PRE-MOLD D=2,50M E=8CM P/RESERV FORN/MONT UN 840,00000840,00

LS 0,00000 BDI 193,20000Mão-de-Obra 0,00000 Material 840,00000SubMO 0,00000

08.14.087 LAJE PRE-MOLDADA D=2,50M E=15CM P/ RESERVATORIO UN 1.562,10

2.20.75 1,00000LAJE PRE-MOLD D=2,50M E=15CM P/RESERV FORN/MONT UN 1.270,000001.270,00

LS 0,00000 BDI 292,10000Mão-de-Obra 0,00000 Material 1.270,00000SubMO 0,00000

08.14.088 ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=2,12M M 3.075,00

6.01.81 2,00000ANEIS PRE-MOLD RES.CONCR ARM. 2,12X0,50M FORN/MONT UN 2.500,000001.250,00

LS 0,00000 BDI 575,00000Mão-de-Obra 0,00000 Material 2.500,00000SubMO 0,00000

08.14.089 LAJE PRE-MOLDADA D=2,12M E=8CM P/ RESERVATORIO UN 910,20

2.20.74 1,00000LAJE PRE-MOLD D=2,12M E=8CM P/RESERV FORN/MONT UN 740,00000740,00

LS 0,00000 BDI 170,20000Mão-de-Obra 0,00000 Material 740,00000SubMO 0,00000

08.14.090 LAJE PRE-MOLDADA D=2,12M E=15CM P/ RESERVATORIO UN 1.389,90

2.20.73 1,00000LAJE PRE-MOLD D=2,12M E=15CM P/RESERV FORN/MONT UN 1.130,000001.130,00

LS 0,00000 BDI 259,90000Mão-de-Obra 0,00000 Material 1.130,00000SubMO 0,00000

08.14.091 ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=1,80M M 2.361,60

6.01.80 2,00000ANEIS PRE-MOLD RES.CONCR ARM. 1,80X0,50M FORN/MONT UN 1.920,00000960,00

LS 0,00000 BDI 441,60000Mão-de-Obra 0,00000 Material 1.920,00000SubMO 0,00000

08.14.092 LAJE PRE-MOLDADA D=1,80M E=6CM P/ RESERVATORIO UN 811,80

2.20.71 1,00000LAJE PRE-MOLD D=1,80 E=6CM P/RESERV FORN/MONT UN 660,00000660,00

LS 0,00000 BDI 151,80000Mão-de-Obra 0,00000 Material 660,00000SubMO 0,00000

08.14.093 LAJE PRE-MOLDADA D=1,80M E=12CM P/ RESERVATORIO UN 1.242,30

2.20.72 1,00000LAJE PRE-MOLD D=1,80M E=12CM P/RESERV FORN/MONT UN 1.010,000001.010,00

LS 0,00000 BDI 232,30000Mão-de-Obra 0,00000 Material 1.010,00000SubMO 0,00000

08.14.096 CAIXA D`AGUA CONICA 500L POLIETILENO COM TAMPA UN 360,58

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,096.03.59 2,00000FLANGE C/SEXTAVADO ACO GALVANIZADO 3/4" UN 13,740006,876.03.60 4,00000FLANGE C/SEXTAVADO ACO GALVANIZADO 1" UN 35,480008,876.03.63 2,00000FLANGE C/SEXTAVADO ACO GALVANIZADO 2" UN 38,2800019,146.50.20 1,00000CAIXA D'AGUA CONICA 500L POLIETILENO COM TAMPA UN 146,29000146,296.95.51 0,12000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,757206,31

LS 32,20800 BDI 67,42570Mão-de-Obra 26,40000 Material 234,54720SubMO 58,60800

08.14.097 CAIXA D`AGUA CONICA 1000L POLIETILENO COM TAMPA UN 441,09

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 6,00000AJUDANTE DE ENCANADOR H 24,540004,096.03.59 2,00000FLANGE C/SEXTAVADO ACO GALVANIZADO 3/4" UN 13,740006,876.03.60 4,00000FLANGE C/SEXTAVADO ACO GALVANIZADO 1" UN 35,480008,876.03.63 2,00000FLANGE C/SEXTAVADO ACO GALVANIZADO 2" UN 38,2800019,146.50.21 1,00000CAIXA D'AGUA CONICA 1000L POLIETILENO COM TAMPA UN 193,59000193,596.95.51 0,12000FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,757206,31

09/02/2011 11:38:40 Página: 132 de 0

Page 133: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 42,18760 BDI 82,48140Mão-de-Obra 34,58000 Material 281,84720SubMO 76,76760

08.14.099 SERVICOS RESERVATORIOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.15.012 LT-07 LAVATÓRIO COM TORNEIRA DE MESA (SANIT ADM) M 1.409,37

1.01.18 1,68000ENCANADOR H 8,433605,021.01.19 1,68000AJUDANTE DE ENCANADOR H 6,871204,091.01.39 2,61600PEDREIRO H 12,164404,651.01.46 2,05500SERVENTE H 7,829553,812.05.03 0,00250AREIA M3 0,1980079,202.05.08 1,50000CIMENTO KG 0,555000,372.05.09 1,26600CIMENTO BRANCO KG 1,329301,052.66.17 1,67000CANTONEIRA 25X25CM FERRO "T" 1.1/4X1.1/4X1/8 UN 4,275202,562.67.26 6,68000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,868400,132.67.77 0,06680BUCHA TIPO S-8 (CENTO) UN 0,7421511,112.80.70 0,84000TRAVA QUIMICA GR 1,411201,683.50.36 0,68000GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 328,07960482,473.50.39 0,22000GRANITO CINZA ANDORINHA E=2CM M2 56,22100255,553.80.90 1,67000MASSA PLASTICA, LATA 400 GR - IBERE UN 9,819605,886.40.42 1,67000VALVULA ESCOAMENTO LATAO CROMADO DN 1" UN 23,3299013,976.45.03 1,67000SIFAO METALICO TIPO COPO DN 1X1 1/2" UN 82,6984049,526.55.44 1,67000CUBA OVAL DE LOUCA BRANCA UN 62,6250037,506.57.21 0,74000ESPELHO DE CRISTAL - ESP 6MM ADESIVADO M2 116,18000157,006.60.02 1,67000RESTRITOR DE VAZAO P/ 6L/MIN UN 52,0539031,176.60.60 1,67000TORNEIRA DE FECHAMENTO AUTOMATICA DE MESA UN 327,05280195,846.95.52 0,00640FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,028674,48

LS 43,06448 BDI 263,54121Mão-de-Obra 35,29875 Material 1.067,46812SubMO 78,36323

08.15.013 LT-04 LAVATORIO /BEBEDOURO COLETIVO M 1.104,65

1.01.11 4,14000CARPINTEIRO H 18,837004,551.01.12 4,14000AJUDANTE DE CARPINTEIRO H 16,394403,961.01.18 1,69500ENCANADOR H 8,508905,021.01.19 1,69500AJUDANTE DE ENCANADOR H 6,932554,091.01.21 0,72000FERREIRO H 3,434404,771.01.22 0,72000AJUDANTE DE FERREIRO H 2,750403,821.01.38 2,13000PASTILHEIRO H 11,523305,411.01.39 0,66000PEDREIRO H 3,069004,651.01.40 0,24000PINTOR H 1,130404,711.01.41 0,24000AJUDANTE DE PINTOR H 0,916803,821.01.46 3,13590SERVENTE H 11,947783,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,03000CIMENTO KG 0,381100,372.05.35 0,02320CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 5,64015243,112.05.82 8,25000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 12,952501,572.05.96 1,25000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 2,000001,602.10.09 0,83000PONTALETE PINHO DE 3"X3" M 3,137403,782.10.21 0,13800TABUAS PINHO DE 1"X12" DE 3A. M2 2,3708417,182.10.34 0,37000CHAPA COMPENSADA PLASTIFICADA E=12MM M2 7,3852019,962.15.38 5,52000ACO CA-60-B $MD BITOLAS KG 14,628002,652.67.60 0,27600PREGO KG 1,261324,572.70.10 0,09600ARAME RECOZIDO N.18 KG 0,444484,632.80.70 0,84000TRAVA QUIMICA GR 1,411201,683.20.26 1,65000PASTILHA ESMALTADA 5,0X 5,0 CM M2 132,2805080,173.75.02 0,00600TINTA ESMALTE L 0,059769,963.80.28 0,00400ZARCAO L 0,0643616,096.05.04 0,52000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4") M 10,6548020,496.40.03 0,55000VALVULA ESCOAMENTO LATAO CROMADO D=1.1/4" UN 12,0120021,846.60.62 1,67000TORNEIRA DE PAREDE ANTIVANDALISMO UN 501,53440300,326.95.52 0,00640FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,028674,48

LS 104,24281 BDI 206,56135Mão-de-Obra 85,44493 Material 708,40508SubMO 189,68774

08.15.014 LT-05 LAVATORIO COLETIVO C/ TAMPO DE CONCRETO L=50CM M 581,38

1.01.11 2,95500CARPINTEIRO H 13,445254,551.01.12 2,95500AJUDANTE DE CARPINTEIRO H 11,701803,961.01.18 1,38800ENCANADOR H 6,967765,021.01.19 1,38800AJUDANTE DE ENCANADOR H 5,676924,091.01.21 0,43300FERREIRO H 2,065414,771.01.22 0,43300AJUDANTE DE FERREIRO H 1,654063,821.01.39 2,11600PEDREIRO H 9,839404,651.01.40 0,47400PINTOR H 2,232544,711.01.46 1,55500SERVENTE H 5,924553,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,03000CIMENTO KG 0,381100,372.05.09 0,12660CIMENTO BRANCO KG 0,132931,052.05.30 0,02430CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 5,74088236,25

09/02/2011 11:38:40 Página: 133 de 0

Page 134: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.09 0,83000PONTALETE PINHO DE 3"X3" M 3,137403,782.10.21 0,26400TABUAS PINHO DE 1"X12" DE 3A. M2 4,5355217,182.10.34 0,34800CHAPA COMPENSADA PLASTIFICADA E=12MM M2 6,9460819,962.15.38 4,98300ACO CA-60-B $MD BITOLAS KG 13,204952,652.67.60 0,21100PREGO KG 0,964274,572.70.10 0,08700ARAME RECOZIDO N.18 KG 0,402814,632.80.05 0,08440COLA PVA KG 0,515686,113.80.05 0,03380DISCO DE DESBASTE 7" UN 0,300828,903.80.11 0,14350LIXA CARBETO DE SILICIO 7" UN 0,427632,983.80.54 0,12660VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 1,3774110,883.80.55 0,21100VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 4,0174419,043.80.90 1,67000MASSA PLASTICA, LATA 400 GR - IBERE UN 9,819605,886.40.42 1,67000VALVULA ESCOAMENTO LATAO CROMADO DN 1" UN 23,3299013,976.45.03 1,67000SIFAO METALICO TIPO COPO DN 1X1 1/2" UN 82,6984049,526.55.44 1,67000CUBA OVAL DE LOUCA BRANCA UN 62,6250037,506.60.59 1,67000TORNEIRA DE PRESSAO CROMADA C=15A20 CM DE 1/2" UN 119,8225071,756.95.52 0,00640FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,028674,48

LS 72,59938 BDI 108,71513Mão-de-Obra 59,50769 Material 340,56739SubMO 132,10707

08.15.015 LT-06 LAVATORIO COLETIVO C/ TAMPO DE GRANITO L=50CM M 1.333,66

1.01.18 1,38000ENCANADOR H 6,927605,021.01.19 1,38000AJUDANTE DE ENCANADOR H 5,644204,091.01.39 2,11600PEDREIRO H 9,839404,651.01.46 1,55500SERVENTE H 5,924553,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,03000CIMENTO KG 0,381100,372.05.09 1,26600CIMENTO BRANCO KG 1,329301,052.66.17 1,67000CANTONEIRA 25X25CM FERRO "T" 1.1/4X1.1/4X1/8 UN 4,275202,562.67.26 6,68000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,868400,132.67.77 0,06680BUCHA TIPO S-8 (CENTO) UN 0,7421511,112.80.70 0,84000TRAVA QUIMICA GR 1,411201,683.50.36 0,58060GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA M2 280,12208482,473.80.90 1,67000MASSA PLASTICA, LATA 400 GR - IBERE UN 9,819605,886.40.42 1,67000VALVULA ESCOAMENTO LATAO CROMADO DN 1" UN 23,3299013,976.45.03 1,67000SIFAO METALICO TIPO COPO DN 1X1 1/2" UN 82,6984049,526.55.44 1,67000CUBA OVAL DE LOUCA BRANCA UN 62,6250037,506.60.02 1,67000RESTRITOR DE VAZAO P/ 6L/MIN UN 52,0539031,176.60.62 1,67000TORNEIRA DE PAREDE ANTIVANDALISMO UN 501,53440300,326.95.52 0,00640FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,028674,48

LS 34,56962 BDI 249,38511Mão-de-Obra 28,33575 Material 1.021,37770SubMO 62,90537

08.15.016 BB-01 BEBEDOURO COLETIVO M 498,15

1.01.11 4,14000CARPINTEIRO H 18,837004,551.01.12 4,14000AJUDANTE DE CARPINTEIRO H 16,394403,961.01.18 2,25000ENCANADOR H 11,295005,021.01.19 2,25000AJUDANTE DE ENCANADOR H 9,202504,091.01.21 0,72000FERREIRO H 3,434404,771.01.22 0,72000AJUDANTE DE FERREIRO H 2,750403,821.01.38 1,27500PASTILHEIRO H 6,897755,411.01.39 0,66000PEDREIRO H 3,069004,651.01.40 0,24000PINTOR H 1,130404,711.01.41 0,24000AJUDANTE DE PINTOR H 0,916803,821.01.46 2,28000SERVENTE H 8,686803,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,03000CIMENTO KG 0,381100,372.05.35 0,02220CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 5,39704243,112.05.82 4,92000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 7,724401,572.05.96 0,74500ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,192001,602.10.09 0,49460PONTALETE PINHO DE 3"X3" M 1,869593,782.10.21 0,08220TABUAS PINHO DE 1"X12" DE 3A. M2 1,4122017,182.10.34 0,54200CHAPA COMPENSADA PLASTIFICADA E=12MM M2 10,8183219,962.15.38 5,28200ACO CA-60-B $MD BITOLAS KG 13,997302,652.67.60 0,40400PREGO KG 1,846284,572.70.10 0,14000ARAME RECOZIDO N.18 KG 0,648204,633.20.26 0,98330PASTILHA ESMALTADA 5,0X 5,0 CM M2 78,8311680,173.75.02 0,01330TINTA ESMALTE L 0,132479,963.80.28 0,00880ZARCAO L 0,1415916,096.05.04 0,88880TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4") M 18,2115120,496.40.03 2,22220VALVULA ESCOAMENTO LATAO CROMADO D=1.1/4" UN 48,5328521,846.60.40 2,22220TORNEIRA P/ BEBEDOURO DE PRESSAO TIPO JATO UN 30,2441413,616.95.52 0,01420FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,063624,48

LS 100,78963 BDI 93,15144Mão-de-Obra 82,61445 Material 221,60217SubMO 183,40408

08.15.023 MT-04 MICTORIO COLETIVO M 1.133,56

1.01.11 1,24000CARPINTEIRO H 5,642004,551.01.12 1,24000AJUDANTE DE CARPINTEIRO H 4,910403,961.01.18 2,30000ENCANADOR H 11,546005,02

09/02/2011 11:38:40 Página: 134 de 0

Page 135: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.19 2,30000AJUDANTE DE ENCANADOR H 9,407004,091.01.21 0,25000FERREIRO H 1,192504,771.01.22 0,25000AJUDANTE DE FERREIRO H 0,955003,821.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,95200SERVENTE H 7,437123,812.05.03 0,05100AREIA M3 4,0392079,202.05.05 0,96600CAL HIDRATADA KG 0,328440,342.05.08 22,22000CIMENTO KG 8,221400,372.05.17 0,01400PEDRA BRITADA 1 M3 0,8670261,932.10.09 1,86000PONTALETE PINHO DE 3"X3" M 7,030803,782.10.21 0,06200TABUAS PINHO DE 1"X12" DE 3A. M2 1,0651617,182.10.34 0,20460CHAPA COMPENSADA PLASTIFICADA E=12MM M2 4,0838219,962.15.25 2,83000ACO CA-50-A $MD BITOLAS KG 7,641002,702.35.27 0,42000DIVISORIA SANITARIA DE GRANILITE E=3CM M2 40,2612095,862.67.60 0,12400PREGO KG 0,566684,572.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.10.55 1,52000FIXACAO (FERRO TRABALHADO) KG 63,3536041,683.50.39 0,33000GRANITO CINZA ANDORINHA E=2CM M2 84,33150255,556.25.01 1,20000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM M 1,560001,306.40.15 0,55550VALVULA DE DESCARGA P/ MICTORIO CICLO FECH AUTOMAT UN 89,46883161,066.45.03 0,55550SIFAO METALICO TIPO COPO DN 1X1 1/2" UN 27,5083649,526.55.65 1,00000MICTORIO ACO INOXIDAVEL M 461,57000461,576.60.02 0,55550RESTRITOR DE VAZAO P/ 6L/MIN UN 17,3149431,17

LS 55,80282 BDI 211,96680Mão-de-Obra 45,74002 Material 820,05194SubMO 101,54284

08.15.099 SERVICOS EM BEBEDOUROS,LAVATORIOS E MICTORIOS PADRONIZADOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.16.001 BACIA SIFONADA DE LOUCA BRANCA (VDR 6L) C/ ASSENTO UN 205,97

1.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,093.70.43 0,25000MASSA PARA VIDRO KG 0,337501,356.55.02 1,00000BACIA SIFONADA LOUCA BRANCA UN 61,6600061,666.60.53 1,00000TUBO LIGACAO C/CANOPLA P/SANITARIOS UN 17,9400017,946.60.56 1,00000CONJUNTO DE FIXACAO CROMADO P/ BACIAS UN 7,020007,026.95.03 1,00000BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA UN 1,760001,766.95.50 1,00000TAMPA PLASTICA P/BACIA SANITARIA UN 17,5000017,506.95.55 1,00000ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA UN 0,570000,57

LS 33,34260 BDI 38,51582Mão-de-Obra 27,33000 Material 106,78750SubMO 60,67260

08.16.004 BACIA SIFONADA COM CAIXA DE DESCARGA ACOPLADA BRANCA UN 341,28

1.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,093.70.43 0,25000MASSA PARA VIDRO KG 0,337501,356.55.55 1,00000BACIA C/CAIXA DESC. ACOPLADA BRANCA UN 189,61000189,616.60.56 1,00000CONJUNTO DE FIXACAO CROMADO P/ BACIAS UN 7,020007,026.95.03 1,00000BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA UN 1,760001,766.95.50 1,00000TAMPA PLASTICA P/BACIA SANITARIA UN 17,5000017,506.95.55 1,00000ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA UN 0,570000,57

LS 33,34260 BDI 63,81812Mão-de-Obra 27,33000 Material 216,79750SubMO 60,67260

08.16.010LAVATORIO DE LOUCA BRANCA SEM COLUNA C/ TORNEIRA DE FECHAMAUTOMATICO

UN 453,32

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,096.40.42 1,00000VALVULA ESCOAMENTO LATAO CROMADO DN 1" UN 13,9700013,976.45.03 1,00000SIFAO METALICO TIPO COPO DN 1X1 1/2" UN 49,5200049,526.55.09 1,00000LAVATORIO BRANCO SEM COLUNA 33X45CM UN 40,7300040,736.60.13 1,00000TUBO LIGACAO CROMADO C/CANOPLA UN 17,9400017,946.60.60 1,00000TORNEIRA DE FECHAMENTO AUTOMATICA DE MESA UN 195,84000195,84

LS 27,78550 BDI 84,76892Mão-de-Obra 22,77500 Material 318,00000SubMO 50,56050

08.16.025 MICTORIO DE LOUCA SIFONADO/AUTO ASPIRANTE BRANCO UN 314,29

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,096.55.38 1,00000MICTORIO AUTO SIFONADO LOUCA BRANCA C/ KIT DE INST UN 204,96000204,96

LS 27,78550 BDI 58,76972Mão-de-Obra 22,77500 Material 204,96000SubMO 50,56050

08.16.045 TANQUE DE LOUCA BRANCA,PEQUENO C/COLUNA UN 455,47

1.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,096.40.04 1,00000VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2" UN 24,6900024,696.45.10 1,00000SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X2" UN 9,400009,406.55.20 1,00000TANQUE LOUCA BRANCA,PEQUENO C/COLUNA (50X50CM) UN 229,44000229,446.60.31 1,00000TORNEIRA PRESSAO LATAO CROM 1/2" C/ AREJ P/ TANQUE UN 46,1000046,10

09/02/2011 11:38:40 Página: 135 de 0

Page 136: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 33,34260 BDI 85,16960Mão-de-Obra 27,33000 Material 309,63000SubMO 60,67260

08.16.046 TANQUE DE LOUCA BRANCA,GRANDE C/COLUNA UN 587,24

1.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,096.40.04 1,00000VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2" UN 24,6900024,696.45.10 1,00000SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X2" UN 9,400009,406.55.70 1,00000TANQUE DE LOUCA BRANCA,GRANDE C/COLUNA (55X60CM) UN 336,57000336,576.60.31 1,00000TORNEIRA PRESSAO LATAO CROM 1/2" C/ AREJ P/ TANQUE UN 46,1000046,10

LS 33,34260 BDI 109,80950Mão-de-Obra 27,33000 Material 416,76000SubMO 60,67260

08.16.050 SABONETEIRA DE LOUCA BRANCA DE 7,5X15 CM UN 40,39

1.01.06 1,00000AZULEJISTA H 5,290005,291.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,376.55.16 1,00000SABONETEIRA LOUCA BRANCA 7.5X15CM UN 12,1900012,19

LS 11,10200 BDI 7,55348Mão-de-Obra 9,10000 Material 12,63920SubMO 20,20200

08.16.051 SABONETEIRA DE LOUCA BRANCA DE 15X15 CM UN 43,80

1.01.06 1,00000AZULEJISTA H 5,290005,291.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,376.55.18 1,00000SABONETEIRA LOUCA BRANCA DIMENSAO APROX 15X15CM UN 14,9600014,96

LS 11,10200 BDI 8,19058Mão-de-Obra 9,10000 Material 15,40920SubMO 20,20200

08.16.065 PAPELEIRA DE LOUCA BRANCA DE 15X15CM UN 42,79

1.01.06 1,00000AZULEJISTA H 5,290005,291.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,376.55.14 1,00000PAPELEIRA LOUCA BRANCA UN 14,1400014,14

LS 11,10200 BDI 8,00198Mão-de-Obra 9,10000 Material 14,58920SubMO 20,20200

08.16.070 CABIDE DE LOUCA BRANCA COM 2 GANCHOS UN 30,97

1.01.06 1,00000AZULEJISTA H 5,290005,291.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,376.55.07 1,00000CABIDE DE LOUCA C/2 GANCHOS BRANCO UN 4,530004,53

LS 11,10200 BDI 5,79168Mão-de-Obra 9,10000 Material 4,97920SubMO 20,20200

08.16.083 VA-01 VARAL/TOALHEIRO UN 244,16

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,40000SERVENTE H 1,524003,812.67.47 6,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 3,000000,502.67.78 0,06000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,044400,743.13.39 1,00000VA-01 VARAL TOALHEIRO UN 187,95000187,95

LS 4,12848 BDI 45,65658Mão-de-Obra 3,38400 Material 190,99440SubMO 7,51248

08.16.089 BR-01 BACIA P/ SANITARIO ACESSIVEL CJ 1.691,66

1.01.18 4,50000ENCANADOR H 22,590005,021.01.19 4,50000AJUDANTE DE ENCANADOR H 18,405004,091.01.39 0,75000PEDREIRO H 3,487504,651.01.46 0,75000SERVENTE H 2,857503,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 1,00000CIMENTO KG 0,370000,372.25.15 7,00000TIJOLO COMUM MACICO UN 1,540000,222.67.47 12,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 6,000000,502.67.78 0,12000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,088800,743.13.35 2,00000BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE UN 516,58000258,293.70.43 0,25000MASSA PARA VIDRO KG 0,337501,356.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.14 1,00000VALV DESCARGA REG 1 1/2"-1 1/4" C ACAB(BR01/BR003) UN 121,06000121,066.55.03 1,00000BACIA SANITARIA ACESSIVEL UN 275,48000275,486.55.14 1,00000PAPELEIRA LOUCA BRANCA UN 14,1400014,146.60.19 1,00000DUCHA HIGIENICA UN 144,11000144,116.60.53 1,00000TUBO LIGACAO C/CANOPLA P/SANITARIOS UN 17,9400017,946.60.56 1,00000CONJUNTO DE FIXACAO CROMADO P/ BACIAS UN 7,020007,026.95.03 1,00000BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA UN 1,760001,766.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,316.95.54 1,00000ASSENTO C/TAMPA DE MADEIRA MDF-LAQ.OU RES.POL.BRANCA UN 156,65000156,656.95.55 1,00000ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA UN 0,570000,57

LS 57,75480 BDI 316,32690Mão-de-Obra 47,34000 Material 1.270,23956SubMO 105,09480

09/02/2011 11:38:40 Página: 136 de 0

Page 137: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.16.090 BR-02 LAVATORIO PARA SANITARIO ACESSIVEL CJ 1.430,77

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,091.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,812.67.47 12,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 6,000000,502.67.78 0,12000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,088800,742.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.13.36 1,00000BARRA APOIO P/LAVAT CROMADO D=30/35MM C/FLANGES UN 664,93000664,936.40.42 1,00000VALVULA ESCOAMENTO LATAO CROMADO DN 1" UN 13,9700013,976.45.16 1,00000SIFAO PVC RIGIDO TIPO COPO DN 1X1 1/2" UN 8,900008,906.55.11 1,00000LAVATÓRIO ACESSÍVEL UN 173,36000173,366.60.02 1,00000RESTRITOR DE VAZAO P/ 6L/MIN UN 31,1700031,176.60.13 1,00000TUBO LIGACAO CROMADO C/CANOPLA UN 17,9400017,946.60.75 1,00000TORNEIRA PRES 1/2" C/ALAVANCA TIPO MESA CROMADO UN 176,66000176,666.95.52 0,00640FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,028674,48

LS 38,10670 BDI 267,54271Mão-de-Obra 31,23500 Material 1.093,88747SubMO 69,34170

08.16.091 BR-03 BOX PARA SANITARIO ACESSIVEL CJ 2.016,54

1.01.18 4,50000ENCANADOR H 22,590005,021.01.19 4,50000AJUDANTE DE ENCANADOR H 18,405004,091.01.39 0,75000PEDREIRO H 3,487504,651.01.46 0,75000SERVENTE H 2,857503,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 1,00000CIMENTO KG 0,370000,372.25.15 7,00000TIJOLO COMUM MACICO UN 1,540000,222.67.47 12,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 6,000000,502.67.78 0,12000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,088800,742.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.13.35 2,00000BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE UN 516,58000258,293.70.43 0,25000MASSA PARA VIDRO KG 0,337501,356.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,966.40.14 1,00000VALV DESCARGA REG 1 1/2"-1 1/4" C ACAB(BR01/BR003) UN 121,06000121,066.55.03 1,00000BACIA SANITARIA ACESSIVEL UN 275,48000275,486.55.12 1,00000LAVATÓRIO DE CANTO ACESSÍVEL UN 55,4600055,466.55.14 1,00000PAPELEIRA LOUCA BRANCA UN 14,1400014,146.60.02 1,00000RESTRITOR DE VAZAO P/ 6L/MIN UN 31,1700031,176.60.19 1,00000DUCHA HIGIENICA UN 144,11000144,116.60.53 1,00000TUBO LIGACAO C/CANOPLA P/SANITARIOS UN 17,9400017,946.60.56 1,00000CONJUNTO DE FIXACAO CROMADO P/ BACIAS UN 7,020007,026.60.75 1,00000TORNEIRA PRES 1/2" C/ALAVANCA TIPO MESA CROMADO UN 176,66000176,666.95.03 1,00000BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA UN 1,760001,766.95.51 0,03760FITA VEDANTE PARA ROSCA ROLO 1" X 50 M UN 0,237266,316.95.54 1,00000ASSENTO C/TAMPA DE MADEIRA MDF-LAQ.OU RES.POL.BRANCA UN 156,65000156,656.95.55 1,00000ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA UN 0,570000,57

LS 57,75480 BDI 377,07680Mão-de-Obra 47,34000 Material 1.534,36956SubMO 105,09480

08.16.092 BR-04 BARRA DE APOIO COM FIXAÇÃO LATERAL UN 457,50

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,812.67.47 9,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 4,500000,502.67.78 0,09000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,066600,743.13.50 1,00000BARRA DE APOIO P/ LAV BANC CROM D=30/35MM C/FLANGE UN 358,00000358,00

LS 5,16060 BDI 85,55016Mão-de-Obra 4,23000 Material 362,56660SubMO 9,39060

08.16.093 BR-05 TROCADOR ACESSÍVEL UN 1.594,26

1.01.06 1,34980AZULEJISTA H 7,140445,291.01.11 3,82000CARPINTEIRO H 17,381004,551.01.12 3,82000AJUDANTE DE CARPINTEIRO H 15,127203,961.01.21 0,85000FERREIRO H 4,054504,771.01.22 0,85000AJUDANTE DE FERREIRO H 3,247003,821.01.39 1,92280PEDREIRO H 8,941024,651.01.46 3,71180SERVENTE H 14,141963,812.05.03 0,02150AREIA M3 1,7028079,202.05.05 4,33620CAL HIDRATADA KG 1,474310,342.05.08 4,90720CIMENTO KG 1,815660,372.05.36 0,28860CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 73,15721253,492.05.81 3,30000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,155000,352.05.96 0,29040ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,464641,602.10.14 5,73000SARRAFO PINHO APARELHADO 5X2,5 CM M 11,975702,092.10.21 0,19100TABUAS PINHO DE 1"X12" DE 3A. M2 3,2813817,182.10.34 0,63030CHAPA COMPENSADA PLASTIFICADA E=12MM M2 12,5807919,962.15.38 9,77500ACO CA-60-B $MD BITOLAS KG 25,903752,652.25.02 9,00000BLOCO CONCRETO DE 9X39X19CM UN 13,410001,492.67.26 4,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,520000,132.67.47 12,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 6,000000,502.67.60 0,38200PREGO KG 1,745744,57

09/02/2011 11:38:40 Página: 137 de 0

Page 138: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.67.78 0,12000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,088800,742.70.10 0,17000ARAME RECOZIDO N.18 KG 0,787104,633.01.60 1,61100BR-05 TAMPO MDF 25MM C/LAMINADO POSTFORMING 6MM M2 447,29415277,653.13.35 2,00000BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE UN 516,58000258,293.20.01 0,69300AZULEJO LISO BRANCO BRILHANTE M2 15,7657522,756.55.07 1,00000CABIDE DE LOUCA C/2 GANCHOS BRANCO UN 4,530004,53

LS 85,44041 BDI 298,11466Mão-de-Obra 70,03312 Material 1.140,67718SubMO 155,47353

08.16.099 SERVICOS EM LOUCAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.17.013 MICTORIO COLETIVO DE ACO INOXIDAVEL M 701,84

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,096.40.04 0,50000VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2" UN 12,3450024,696.45.11 0,50000SIFAO METALITO TIPO COPO DN 1 1/2X1 1/2" UN 29,8500059,706.55.65 1,00000MICTORIO ACO INOXIDAVEL M 461,57000461,576.60.50 1,20000ESPARGIDOR P/MICTORIO ACO INOX UN 16,2840013,57

LS 27,78550 BDI 131,24019Mão-de-Obra 22,77500 Material 520,04900SubMO 50,56050

08.17.030 TAMPO PARA PIA MARMORE NACIONAL ESPESSURA DE 3 CM M2 601,30

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 2,00000CIMENTO KG 0,740000,376.56.52 1,00000TAMPO PIA EM MARMORE BRANCO NAC 3CM M2 446,60000446,60

LS 20,64240 BDI 112,43835Mão-de-Obra 16,92000 Material 451,30000SubMO 37,56240

08.17.037 CHUVEIRO ANTIVANDALISMO UN 424,73

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.60.20 1,00000CHUVEIRO SIMPLES C/ VALVULA DE ACION HIDROMEC UN 314,98000314,98

LS 16,67130 BDI 79,42275Mão-de-Obra 13,66500 Material 314,98000SubMO 30,33630

08.17.038 CHUVEIRO SIMPLES C/ARTICULACAO, LATAO CROMADO DN 15MM (1/2") UN 150,49

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.60.21 1,00000CHUVEIRO SIMPLES ARTICUL LATAO CROM DN 15MM (1/2") UN 112,24000112,24

LS 5,55710 BDI 28,14098Mão-de-Obra 4,55500 Material 112,24000SubMO 10,11210

08.17.040 CHUVEIRO ELETRICO DE 220V/5400W UN 177,30

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,094.75.05 1,00000CHUVEIRO ELETRICO 220V/5400 W UN 117,27000117,276.60.14 1,00000TUBO LIGACAO CROM C/CANOPLA P/CHUV UN 10,7600010,76

LS 8,85720 BDI 33,15386Mão-de-Obra 7,26000 Material 128,03000SubMO 16,11720

08.17.041 CHUVEIRO ELETRICO COM RESISTENCIA BLINDADA UN 318,78

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,094.75.09 1,00000CHUVEIRO ELETRICO COM RESISTENCIA BLINDADA UN 232,30000232,306.60.14 1,00000TUBO LIGACAO CROM C/CANOPLA P/CHUV UN 10,7600010,76

LS 8,85720 BDI 59,61076Mão-de-Obra 7,26000 Material 243,06000SubMO 16,11720

08.17.043 AQUECEDOR ELETRICO DE PASSAGEM COM RESISTENCIA BLINDADA UN 555,73

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,094.75.01 1,00000AQUECEDOR ELETRICO DE PASSAGEM C/ RESIST BLINDADA UN 435,70000435,70

LS 8,85720 BDI 103,91796Mão-de-Obra 7,26000 Material 435,70000SubMO 16,11720

08.17.046 CAIXA DE DESCARGA CAPACIDADE 18 L DE PLASTICO DE SOBREPOR UN 147,05

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,096.05.05 2,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2") M 47,0800023,546.50.02 1,00000CAIXA DESCARGA SOBREPOR PLASTICO UN 21,9200021,92

LS 27,78550 BDI 27,49892Mão-de-Obra 22,77500 Material 69,00000SubMO 50,56050

08.17.050 BEBEDOURO ELETRICO COM CAPACIDADE DE 40 L UN 824,52

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.18 1,00000ENCANADOR H 5,020005,02

09/02/2011 11:38:40 Página: 138 de 0

Page 139: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,094.75.04 1,00000BEBEDOURO ELETRICO CAP 40L C/SIST REFRIG UN 629,10000629,10

LS 22,66760 BDI 154,17995Mão-de-Obra 18,58000 Material 629,10000SubMO 41,24760

08.17.051 BEBEDOURO ELETRICO COM CAPACIDADE DE 80 L UN 1.014,50

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,094.75.08 1,00000BEBEDOURO ELETRICO CAP 80L C/SIST REFRIG UN 783,55000783,55

LS 22,66760 BDI 189,70345Mão-de-Obra 18,58000 Material 783,55000SubMO 41,24760

08.17.052 EX-01 EXAUSTOR AXIAL DN 40CM UN 936,12

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,061.01.39 1,88000PEDREIRO H 8,742004,651.01.40 0,15000PINTOR H 0,706504,711.01.44 0,83000SERRALHEIRO H 6,706408,081.01.45 0,83000AJUDANTE SERRALHEIRO H 3,602204,341.01.46 1,68000SERVENTE H 6,400803,812.05.03 0,01000AREIA M3 0,7920079,202.05.08 4,40000CIMENTO KG 1,628000,372.75.24 0,50000TELA DE NYLON TIPO MOSQUITEIRO M2 2,735005,473.12.15 6,00000GRADIL DE FERRO (TIPO PMSP) KG 69,4200011,573.75.02 0,06000TINTA ESMALTE L 0,597609,963.76.50 6,00000GALVANIZACAO A FOGO KG 10,620001,773.91.11 1,00000EXAUSTOR AXIAL DN 40CM 1/3 HP UN 545,49000545,494.25.02 5,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 15,400003,084.30.05 15,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 12,450000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.58 1,00000INTERRUPTOR 1 TECLA BIPOLAR COMPL UN 10,4200010,42

LS 49,24274 BDI 175,04800Mão-de-Obra 40,36290 Material 671,47260SubMO 89,60564

08.17.055 FILTRO PRESSAO CUNO(AQUALAR)C/ELEM FILTR CARVAO ATIVADO E CEL 180/L/H UN 312,43

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.05.02 1,50000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 16,1100010,746.35.33 1,00000REGISTRO PRESSAO C/ CANOPLA CROMADA DN 3/4" UN 51,0200051,026.41.20 1,00000FILTRO CUNO(AQUALAR)C/ELEM FILT CARVAO/CEL 180/L/H UN 125,54000125,546.60.42 1,00000BICO DE SAIDA CROMADO P/FILTRO PRESSAO UN 20,8900020,89

LS 22,22840 BDI 58,42193Mão-de-Obra 18,22000 Material 213,56000SubMO 40,44840

08.17.056 FILTRO PRESSAO CUNO (AQUALAR)C/ELEM FILTRANTE CARVAO E CEL 360/L/H UN 432,51

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,096.05.02 1,50000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 16,1100010,746.35.33 1,00000REGISTRO PRESSAO C/ CANOPLA CROMADA DN 3/4" UN 51,0200051,026.41.02 1,00000FILTRO CUNO(AQUALAR)ABS C/ELEM FIL CAR/CEL 360/L/H UN 223,17000223,176.60.42 1,00000BICO DE SAIDA CROMADO P/FILTRO PRESSAO UN 20,8900020,89

LS 22,22840 BDI 80,87683Mão-de-Obra 18,22000 Material 311,19000SubMO 40,44840

08.17.058 FT-02 FILTRO PARA AGUA POTAVEL UN 378,12

1.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,094.96.70 1,00000NIPLE DUPLO FERRO GALV 3/4' UN 2,610002,616.05.01 0,20000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2") M 1,606008,036.05.02 0,20000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 2,1480010,746.05.23 1,00000COTOVELO FERRO GALVANIZADO DE 1/2' UN 2,460002,466.05.24 1,00000COTOVELO FERRO GALV DE 3/4' UN 3,970003,976.05.45 1,00000NIPLE DUPLO DE REDUCAO FERRO GALV 3/4" X 1/2" UN 2,710002,716.05.52 1,00000UNIAO FERRO GALV DE 3/4' UN 26,4800026,486.06.85 1,00000NIPLE DUPLO FERRO GALV 1/2" UN 1,820001,826.41.02 1,00000FILTRO CUNO(AQUALAR)ABS C/ELEM FIL CAR/CEL 360/L/H UN 223,17000223,17

LS 22,22840 BDI 70,70715Mão-de-Obra 18,22000 Material 266,97400SubMO 40,44840

08.17.065 SUPORTE PARA TALHA EM MARMORE DE CANTO UN 76,97

1.01.46 1,00000SERVENTE H 3,810003,811.01.92 1,00000ARTIFICE H 4,830004,832.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,373.61.98 0,12000SUPORTE P/TALHA DE CANTO EM MARMORE 3CM M2 42,95280357,94

LS 10,54080 BDI 14,39404Mão-de-Obra 8,64000 Material 43,40200SubMO 19,18080

08.17.066 SUPORTE PARA TALHA EM MARMORE DE CENTRO UN 75,25

1.01.46 1,00000SERVENTE H 3,810003,811.01.92 1,00000ARTIFICE H 4,830004,83

09/02/2011 11:38:40 Página: 139 de 0

Page 140: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,373.61.99 0,12000SUPORTE P/TALHA DE CENTRO EM MARMORE 3CM M2 41,55240346,27

LS 10,54080 BDI 14,07195Mão-de-Obra 8,64000 Material 42,00160SubMO 19,18080

08.17.075 TANQUE SIMPLES DE CONCRETO PRE-MOLDADO 600X600MM/APOIO EM ALVENARIA UN 171,49

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,091.01.39 1,49000PEDREIRO H 6,928504,651.01.40 0,39000PINTOR H 1,836904,711.01.41 0,08000AJUDANTE DE PINTOR H 0,305603,821.01.46 1,90000SERVENTE H 7,239003,812.05.03 0,02800AREIA M3 2,2176079,202.05.05 5,31000CAL HIDRATADA KG 1,805400,342.05.08 4,53000CIMENTO KG 1,676100,372.25.15 19,60000TIJOLO COMUM MACICO UN 4,312000,223.75.13 0,21000TINTA LATEX ECONOMICA L 0,907204,323.80.09 0,17000SELADOR P/PINTURA LATEX L 1,693209,963.80.39 0,25000LIXA PARA MADEIRA UN 0,082500,336.40.40 1,00000VALVULA PLASTICA DE 1 1/2' UN 3,260003,266.45.12 1,00000SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2" UN 8,060008,066.55.51 1,00000TANQUE PREMOLDADO CONCRETO DE 60CM UN 28,5400028,546.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 47,68370 BDI 32,06751Mão-de-Obra 39,08500 Material 52,65525SubMO 86,76870

08.17.076 TANQUE SIMPLES DE CONCRETO PRE-MOLDADO 600X600MM UN 111,34

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,096.40.40 1,00000VALVULA PLASTICA DE 1 1/2' UN 3,260003,266.45.12 1,00000SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2" UN 8,060008,066.55.51 1,00000TANQUE PREMOLDADO CONCRETO DE 60CM UN 28,5400028,546.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 27,78550 BDI 20,82000Mão-de-Obra 22,77500 Material 39,96125SubMO 50,56050

08.17.077 RESTRITOR DE VAZAO 12L/MIN PARA CHUVEIRO SIMPLES UN 37,35

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.60.01 1,00000RESTRITOR DE VAZAO P/ 12L/MIN UN 17,1900017,19

LS 6,77966 BDI 6,98436Mão-de-Obra 5,55710 Material 18,03000SubMO 12,33676

08.17.078 RESTRITOR DE VAZAO 6L/MIN PARA TORNEIRAS E MISTURADORES UN 54,54

1.01.18 0,61000ENCANADOR H 3,062205,021.01.19 0,61000AJUDANTE DE ENCANADOR H 2,494904,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.60.02 1,00000RESTRITOR DE VAZAO P/ 6L/MIN UN 31,1700031,17

LS 6,77966 BDI 10,19976Mão-de-Obra 5,55710 Material 32,01000SubMO 12,33676

08.17.080 TORNEIRA DE LAVAGEM COM CANOPLA DE 1/2" UN 51,87

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.60.25 1,00000TORNEIRA PRESSAO USO GERAL 140X15MM (1/2")CROM UN 32,0300032,036.95.52 0,00640FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,028674,48

LS 5,55710 BDI 9,69928Mão-de-Obra 4,55500 Material 32,05867SubMO 10,11210

08.17.081 TJ-03 TORNEIRA DE JARDIM UN 201,41

1.01.18 0,70000ENCANADOR H 3,514005,021.01.19 0,70000AJUDANTE DE ENCANADOR H 2,863004,091.01.39 0,66000PEDREIRO H 3,069004,651.01.46 0,96000SERVENTE H 3,657603,812.05.03 0,02060AREIA M3 1,6315279,202.05.05 2,58000CAL HIDRATADA KG 0,877200,342.05.08 4,59000CIMENTO KG 1,698300,372.05.17 0,02500PEDRA BRITADA 1 M3 1,5482561,932.25.15 30,00000TIJOLO COMUM MACICO UN 6,600000,222.80.70 0,50000TRAVA QUIMICA GR 0,840001,683.65.55 1,00000TC-11 PLACA DE CONCR. PRE-MOLD PERF. 59,5X34,5X5CM UN 38,0100038,016.05.02 1,00000TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4") M 10,7400010,746.05.24 2,00000COTOVELO FERRO GALV DE 3/4' UN 7,940003,976.23.70 1,00000ADAPT.PVC SOLD.CURTO C/BOLSA/ROSCA D=25MMX3/4" UN 0,490000,496.25.33 1,00000TUBO PVC P/ESGOTO 100MM M 6,000006,006.60.23 1,00000TORNEIRA DE PRESSAO 3/4 ACION RESTR C/ CHAVE DEST UN 58,1500058,156.95.52 0,03000FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,134404,48

LS 15,98639 BDI 37,66242Mão-de-Obra 13,10360 Material 134,65967SubMO 29,08999

08.17.084 TORNEIRA ELETRICA - ELETRODUTO DE POLIETILENO UN 376,93

09/02/2011 11:38:40 Página: 140 de 0

Page 141: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,061.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,094.26.12 12,00000ELETRODUTO DE POLIETILENO 25 MM M 5,400000,454.30.07 24,00000FIO DE 6,00 MM2 (ISOL PVC ANTICHAMA 750V) M 48,000002,004.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.25 1,00000ESPELHO 4"X2" UN 1,240001,244.55.35 1,00000TOMADA 2P + T 20A - 250V SEM PLACA UN 9,990009,994.56.25 1,00000PLUG PARA TOMADA 2P + T 20A-250V (PIAL 650671) UN 7,860007,864.75.07 1,00000TORNEIRA ELETRICA P/PIA UN 95,7900095,79

LS 74,87750 BDI 70,48408Mão-de-Obra 61,37500 Material 170,20000SubMO 136,25250

08.17.085 TORNEIRA DE FECHAMENTO AUTOMATICO DE MESA UN 271,76

1.01.18 1,20000ENCANADOR H 6,024005,021.01.19 1,20000AJUDANTE DE ENCANADOR H 4,908004,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.60.60 1,00000TORNEIRA DE FECHAMENTO AUTOMATICA DE MESA UN 195,84000195,84

LS 13,33704 BDI 50,81828Mão-de-Obra 10,93200 Material 196,68000SubMO 24,26904

08.17.086 TORNEIRA DE FECHAMENTO AUTOMATICO DE PAREDE UN 238,79

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.60.61 1,00000TORNEIRA DE FECHAMENTO AUTOMATICO DE PAREDE UN 162,97000162,97

LS 16,67130 BDI 44,65365Mão-de-Obra 13,66500 Material 163,81000SubMO 30,33630

08.17.087 TORNEIRA DE PAREDE ANTIVANDALISMO UN 414,91

1.01.18 1,83000ENCANADOR H 9,186605,021.01.19 1,83000AJUDANTE DE ENCANADOR H 7,484704,096.60.62 1,00000TORNEIRA DE PAREDE ANTIVANDALISMO UN 300,32000300,32

LS 20,33899 BDI 77,58597Mão-de-Obra 16,67130 Material 300,32000SubMO 37,01029

08.17.088 TORNEIRA DE USO RESTRITO DE 1/2 UN 92,28

1.01.18 0,67000ENCANADOR H 3,363405,021.01.19 0,67000AJUDANTE DE ENCANADOR H 2,740304,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.60.24 1,00000TORNEIRA DE PRESSAO 1/2 ACION RESTR C/ CHAVE DEST UN 60,6400060,64

LS 7,44651 BDI 17,25695Mão-de-Obra 6,10370 Material 61,48000SubMO 13,55021

08.17.089 TORNEIRA DE USO RESTRITO DE 3/4 UN 89,22

1.01.18 0,67000ENCANADOR H 3,363405,021.01.19 0,67000AJUDANTE DE ENCANADOR H 2,740304,092.80.70 0,50000TRAVA QUIMICA GR 0,840001,686.60.23 1,00000TORNEIRA DE PRESSAO 3/4 ACION RESTR C/ CHAVE DEST UN 58,1500058,15

LS 7,44651 BDI 16,68425Mão-de-Obra 6,10370 Material 58,99000SubMO 13,55021

08.17.099 SERVICOS EM APARELHOS E METAIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.50.001 DE TUBULACOES EM GERAL INCLUINDO CONEXOES, CAIXAS E RALOS M 4,16

1.01.46 0,40000SERVENTE H 1,524003,81

LS 1,85928 BDI 0,77815Mão-de-Obra 1,52400 Material 0,00000SubMO 3,38328

08.50.020 DE CALHAS E RUFOS EM CHAPAS METALICAS M 2,39

1.01.46 0,23000SERVENTE H 0,876303,81

LS 1,06909 BDI 0,44744Mão-de-Obra 0,87630 Material 0,00000SubMO 1,94539

08.50.021 DE CONDUTORES APARENTES M 1,56

1.01.46 0,15000SERVENTE H 0,571503,81

LS 0,69723 BDI 0,29181Mão-de-Obra 0,57150 Material 0,00000SubMO 1,26873

08.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.60.005 DE REGISTROS E VALVULAS DE DESCARGA UN 37,31

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,09

LS 16,67130 BDI 6,97735Mão-de-Obra 13,66500 Material 0,00000SubMO 30,33630

08.60.006 DE VALVULAS DE RETENCAO UN 15,07

1.01.18 1,10000ENCANADOR H 5,522005,02

LS 6,73684 BDI 2,81953Mão-de-Obra 5,52200 Material 0,00000SubMO 12,25884

09/02/2011 11:38:40 Página: 141 de 0

Page 142: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.60.007 DE TORNEIRAS UN 3,56

1.01.18 0,26000ENCANADOR H 1,305205,02

LS 1,59234 BDI 0,66644Mão-de-Obra 1,30520 Material 0,00000SubMO 2,89754

08.60.010 DE SIFOES UN 5,48

1.01.18 0,40000ENCANADOR H 2,008005,02

LS 2,44976 BDI 1,02529Mão-de-Obra 2,00800 Material 0,00000SubMO 4,45776

08.60.011 DE APARELHOS SANITARIOS INCLUINDO ACESSORIOS UN 27,41

1.01.18 2,00000ENCANADOR H 10,040005,02

LS 12,24880 BDI 5,12642Mão-de-Obra 10,04000 Material 0,00000SubMO 22,28880

08.60.012 DE CAIXA DE DESCARGA DE SOBREPOR UN 10,41

1.01.18 0,76000ENCANADOR H 3,815205,02

LS 4,65454 BDI 1,94804Mão-de-Obra 3,81520 Material 0,00000SubMO 8,46974

08.60.013 DE RESERVATORIOS DE FIBRO CIMENTO ATE 1000 LITROS UN 74,62

1.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,09

LS 33,34260 BDI 13,95470Mão-de-Obra 27,33000 Material 0,00000SubMO 60,67260

08.60.014 DE CONJUNTO DE MOTOR-BOMBA UN 109,66

1.01.18 8,00000ENCANADOR H 40,160005,02

LS 48,99520 BDI 20,50570Mão-de-Obra 40,16000 Material 0,00000SubMO 89,15520

08.60.015 DE HIDRANTE DE PAREDE COMPLETO UN 41,12

1.01.18 3,00000ENCANADOR H 15,060005,02

LS 18,37320 BDI 7,68964Mão-de-Obra 15,06000 Material 0,00000SubMO 33,43320

08.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.70.005 DE REGISTRO E VALVULAS DE DESCARGA UN 75,38

1.01.18 3,00000ENCANADOR H 15,060005,021.01.19 3,00000AJUDANTE DE ENCANADOR H 12,270004,093.80.28 0,03000ZARCAO L 0,4827016,096.95.11 0,02000ESTOPA ALCATROADA KG 0,133006,65

LS 33,34260 BDI 14,09631Mão-de-Obra 27,33000 Material 0,61570SubMO 60,67260

08.70.006 DE VALVULA DE RETENCAO UN 25,91

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,093.80.28 0,04000ZARCAO L 0,6436016,096.95.11 0,03000ESTOPA ALCATROADA KG 0,199506,65

LS 11,11420 BDI 4,84548Mão-de-Obra 9,11000 Material 0,84310SubMO 20,22420

08.70.007 DE TORNEIRAS UN 12,43

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,09

LS 5,55710 BDI 2,32578Mão-de-Obra 4,55500 Material 0,00000SubMO 10,11210

08.70.010 DE SIFOES UN 12,43

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,09

LS 5,55710 BDI 2,32578Mão-de-Obra 4,55500 Material 0,00000SubMO 10,11210

08.70.011 DE APARELHOS SANITARIOS INCLUINDO ACESSORIOS UN 99,50

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,09

LS 44,45680 BDI 18,60626Mão-de-Obra 36,44000 Material 0,00000SubMO 80,89680

08.70.012 DE CAIXAS DE DESCARGA DE SOBREPOR UN 62,18

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,09

LS 27,78550 BDI 11,62892Mão-de-Obra 22,77500 Material 0,00000SubMO 50,56050

08.70.013 DE RESERVATORIO DE FIBRO-CIMENTO ATE 1000 L UN 99,50

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,09

LS 44,45680 BDI 18,60626Mão-de-Obra 36,44000 Material 0,00000SubMO 80,89680

08.70.014 DE CONJUNTO MOTOR BOMBA UN 99,50

1.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,09

09/02/2011 11:38:40 Página: 142 de 0

Page 143: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 44,45680 BDI 18,60626Mão-de-Obra 36,44000 Material 0,00000SubMO 80,89680

08.70.015 DE HIDRANTE DE PAREDE COMPLETO UN 129,35

1.01.18 5,20000ENCANADOR H 26,104005,021.01.19 5,20000AJUDANTE DE ENCANADOR H 21,268004,09

LS 57,79384 BDI 24,18814Mão-de-Obra 47,37200 Material 0,00000SubMO 105,16584

08.70.099 RECOLOCACOES DE INSTALACOES HIDRAULICAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.80.010 CANOPLA PARA REGISTROS UN 17,72

1.01.19 0,17000AJUDANTE DE ENCANADOR H 0,695304,096.95.59 1,00000CANOPLA P/REGISTRO 3/4' UN 12,8700012,87

LS 0,84827 BDI 3,31512Mão-de-Obra 0,69530 Material 12,87000SubMO 1,54357

08.80.011 CANOPLA PARA VALVULA DE DESCARGA UN 71,97

1.01.19 0,17000AJUDANTE DE ENCANADOR H 0,695304,096.95.58 1,00000CANOPLA P/VALVULA DESCARGA UN 56,9700056,97

LS 0,84827 BDI 13,45812Mão-de-Obra 0,69530 Material 56,97000SubMO 1,54357

08.80.012 VOLANTE CROMADO PARA REGISTRO UN 13,97

1.01.19 0,17000AJUDANTE DE ENCANADOR H 0,695304,096.95.62 1,00000VOLANTE CROMADO LISO P/REGISTRO UN 9,820009,82

LS 0,84827 BDI 2,61362Mão-de-Obra 0,69530 Material 9,82000SubMO 1,54357

08.80.015 BOTAO PARA VALVULA DE DESCARGA UN 30,80

1.01.19 0,17000AJUDANTE DE ENCANADOR H 0,695304,096.95.56 1,00000BOTAO P/VALVULA DESCARGA UN 23,5000023,50

LS 0,84827 BDI 5,76002Mão-de-Obra 0,69530 Material 23,50000SubMO 1,54357

08.80.018 ACABAMENTO ANTIVANDALISMO PARA VALVULA DE DESCARGA UN 165,76

1.01.18 0,80000ENCANADOR H 4,016005,021.01.19 0,80000AJUDANTE DE ENCANADOR H 3,272004,096.40.69 1,00000ACABAMENTO P/ VALVULA DE DESCARGA ANTIVANDALISMO UN 118,59000118,59

LS 8,89136 BDI 30,99695Mão-de-Obra 7,28800 Material 118,59000SubMO 16,17936

08.80.019 REPARO PARA CAIXA DE DESCARGA ACOPLADA CJ 101,88

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.95.48 1,00000KIT REPARO PARA CAIXA ACOPLADA CJ 62,6100062,61

LS 11,11420 BDI 19,05187Mão-de-Obra 9,11000 Material 62,61000SubMO 20,22420

08.80.020 REPARO DE VALVULA DE DESCARGA UN 50,33

1.01.18 0,90000ENCANADOR H 4,518005,021.01.19 0,90000AJUDANTE DE ENCANADOR H 3,681004,096.95.47 1,00000REPARO P/VALVULA DESCARGA HIDRA LISA II UN 22,7200022,72

LS 10,00278 BDI 9,41201Mão-de-Obra 8,19900 Material 22,72000SubMO 18,20178

08.80.021 TUBO DE DESCARGA EM PVC DN=40MM UN 19,76

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.25.51 1,00000TUBO DE DESCARGA EM PVC (D=40MM) UN 5,960005,96

LS 5,55710 BDI 3,69658Mão-de-Obra 4,55500 Material 5,96000SubMO 10,11210

08.80.031 TORNEIRA DE PRESSAO CROMADA DE 1/2" EM PAREDE UN 94,59

1.01.18 0,25000ENCANADOR H 1,255005,021.01.19 0,25000AJUDANTE DE ENCANADOR H 1,022504,096.60.59 1,00000TORNEIRA DE PRESSAO CROMADA C=15A20 CM DE 1/2" UN 71,7500071,756.95.52 0,02260FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,101254,48

LS 2,77855 BDI 17,68868Mão-de-Obra 2,27750 Material 71,85125SubMO 5,05605

08.80.032 TORNEIRA PARA LAVATORIO DE LOUCA BRANCA OU BANCADA UN 60,10

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.60.13 1,00000TUBO LIGACAO CROMADO C/CANOPLA UN 17,9400017,946.60.27 1,00000TORNEIRA LAV CROM 1/2'X110MM UN 20,6100020,616.95.52 0,04520FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,202504,48

LS 5,55710 BDI 11,23886Mão-de-Obra 4,55500 Material 38,75250SubMO 10,11210

08.80.091 RECARGA DE EXTINTOR DE GAS CARBONICO DE 6 LITROS UN 48,87

1.01.46 0,17000SERVENTE H 0,647703,812.04.35 1,00000RECARGA EXTINTOR GAS CARBONICO 6KG UN 38,3000038,30

LS 0,79019 BDI 9,13972Mão-de-Obra 0,64770 Material 38,30000SubMO 1,43789

09/02/2011 11:38:40 Página: 143 de 0

Page 144: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

08.80.092 RECARGA DE EXTINTOR DE ESPUMA DE 10 LITROS UN 10,66

1.01.46 0,17000SERVENTE H 0,647703,812.04.36 1,00000RECARGA EXTINTOR ESPUMA 10 L UN 7,230007,23

LS 0,79019 BDI 1,99362Mão-de-Obra 0,64770 Material 7,23000SubMO 1,43789

08.80.093 RECARGA DE EXTINTOR DE PO QUIMICO DE 4 KG UN 32,45

1.01.46 0,17000SERVENTE H 0,647703,812.04.37 1,00000RECARGA EXTINTOR PO QUIMICO 4KG UN 24,9500024,95

LS 0,79019 BDI 6,06922Mão-de-Obra 0,64770 Material 24,95000SubMO 1,43789

08.80.095 EXTINTOR DE INCENDIO DE AGUA PRESSURIZADA 10L : RECARGA UN 25,87

1.01.46 0,17000SERVENTE H 0,647703,812.04.39 1,00000RECARGA EXTINTOR AGUA PRESSURIZADA 10L UN 19,6000019,60

LS 0,79019 BDI 4,83872Mão-de-Obra 0,64770 Material 19,60000SubMO 1,43789

08.80.099 OUTROS SERVICOS DE REDE DE GAS E AGUA FRIA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.82.012 RALO SIFONADO F.FUNDIDO DN 150MM C/GRELHA PVC CROMADO UN 294,62

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,096.10.64 4,00000ANEL DE BORRACHA HL D=50MM UN 30,000007,506.10.66 1,00000ANEL DE BORRACHA HL D=75MM UN 11,3800011,386.75.03 1,00000RALO SIFONADO F. FUNDIDO DN 150MM UN 144,18000144,186.75.35 4,00000PLUG F.F. 2' P/RALO UN 16,200004,056.75.53 1,00000GRELHA PVC RIGIDO ACAB.CROMADO DN 150MM UN 9,230009,236.95.27 0,02500LUBRIFICANTE P/ANEL NEOPRENE KG 0,224758,99

LS 15,55988 BDI 55,09159Mão-de-Obra 12,75400 Material 211,21475SubMO 28,31388

08.82.023 GRELHA METALICA CROMADA DIAM 15 CM UN 41,92

1.01.46 0,10000SERVENTE H 0,381003,816.75.65 1,00000GRELHA LATAO CROM DIAM 15 CM P/CX SIFON UN 33,2400033,24

LS 0,46482 BDI 7,83974Mão-de-Obra 0,38100 Material 33,24000SubMO 0,84582

08.82.024 GRELHA METALICA CROMADA DIAM 10 CM UN 24,37

1.01.46 0,10000SERVENTE H 0,381003,816.75.64 1,00000GRELHA LATAO CROM DIAM 10 CM P/CX SIFON UN 18,9700018,97

LS 0,46482 BDI 4,55764Mão-de-Obra 0,38100 Material 18,97000SubMO 0,84582

08.82.030 GRELHA DE FERRO FUNDIDO DE 20X20 CM UN 19,20

1.01.46 0,10000SERVENTE H 0,381003,816.75.40 1,00000GRELHA FERRO FUNDIDO 20X20CM UN 14,7700014,77

LS 0,46482 BDI 3,59164Mão-de-Obra 0,38100 Material 14,77000SubMO 0,84582

08.82.031 GRELHA DE FERRO FUNDIDO DE 15X15 CM UN 12,36

1.01.46 0,10000SERVENTE H 0,381003,816.75.41 1,00000GRELHA FERRO FUNDIDO 15X15CM UN 9,210009,21

LS 0,46482 BDI 2,31284Mão-de-Obra 0,38100 Material 9,21000SubMO 0,84582

08.82.040 SIFAO METALICO TIPO COPO DN 2X2" UN 131,07

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.45.15 1,00000SIFAO METALICO TIPO COPO DN 2X2" UN 96,4500096,45

LS 5,55710 BDI 24,50928Mão-de-Obra 4,55500 Material 96,45000SubMO 10,11210

08.82.041 SIFAO METALICO TIPO COPO DN 1 1/2 X 1 1/2" UN 85,86

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.45.11 1,00000SIFAO METALITO TIPO COPO DN 1 1/2X1 1/2" UN 59,7000059,70

LS 5,55710 BDI 16,05678Mão-de-Obra 4,55500 Material 59,70000SubMO 10,11210

08.82.045 SIFAO PVC RIGIDO TIPO COPO DN 2X2" UN 15,44

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,096.45.05 1,00000SIFAO PVC RIGIDO TIPO COPO DN 2X2" UN 4,470004,47

LS 4,44568 BDI 2,88873Mão-de-Obra 3,64400 Material 4,47000SubMO 8,08968

08.82.046 SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2" UN 19,86

1.01.18 0,40000ENCANADOR H 2,008005,021.01.19 0,40000AJUDANTE DE ENCANADOR H 1,636004,096.45.12 1,00000SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2" UN 8,060008,06

LS 4,44568 BDI 3,71443Mão-de-Obra 3,64400 Material 8,06000SubMO 8,08968

08.82.050 DESENTUPIMENTO DE RAMAIS DE ESGOTO M 5,74

09/02/2011 11:38:40 Página: 144 de 0

Page 145: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.09 0,25000ESGOTEIRO/CAVOUQUEIRO H 1,125004,501.01.95 0,25000AJUDANTE DE ESGOTEIRO H 0,977503,91

LS 2,56505 BDI 1,07354Mão-de-Obra 2,10250 Material 0,00000SubMO 4,66755

08.82.055 LIMPEZA SIMPLES EM CALHAS METALICAS M 2,01

1.01.19 0,18000AJUDANTE DE ENCANADOR H 0,736204,09

LS 0,89816 BDI 0,37590Mão-de-Obra 0,73620 Material 0,00000SubMO 1,63436

08.82.056 LIMPEZA SIMPLES EM LAJES/CALHAS DE CONCRETO M2 4,68

1.01.46 0,45000SERVENTE H 1,714503,81

LS 2,09169 BDI 0,87542Mão-de-Obra 1,71450 Material 0,00000SubMO 3,80619

08.82.061 SOLDA E REBITAGEM EM CALHAS DE CHAPA GALVANIZADA M 42,23

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,092.67.71 0,01000REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO KG 0,1223012,236.95.08 0,10000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 3,8790038,79

LS 16,67130 BDI 7,89765Mão-de-Obra 13,66500 Material 4,00130SubMO 30,33630

08.82.062 SOLDA EM CHAPA GALVANIZADA M 38,35

1.01.18 1,35000ENCANADOR H 6,777005,021.01.19 1,35000AJUDANTE DE ENCANADOR H 5,521504,096.95.08 0,10000SOLDA LIGA CHUMBO E ESTANHO 70:30 KG 3,8790038,79

LS 15,00417 BDI 7,17178Mão-de-Obra 12,29850 Material 3,87900SubMO 27,30267

08.82.099 OUTROS SERVICOS DE REDES DE ESGOTO E AGUAS PLUVIAIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.84.005 TAMPA DE PLASTICO PARA BACIA SANITARIA UN 23,20

1.01.19 0,15000AJUDANTE DE ENCANADOR H 0,613504,096.95.50 1,00000TAMPA PLASTICA P/BACIA SANITARIA UN 17,5000017,50

LS 0,74847 BDI 4,33825Mão-de-Obra 0,61350 Material 17,50000SubMO 1,36197

08.84.012 BOLSA PLASTICA PARA BACIA SANITARIA UN 6,39

1.01.18 0,17000ENCANADOR H 0,853405,021.01.19 0,17000AJUDANTE DE ENCANADOR H 0,695304,096.95.03 1,00000BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA UN 1,760001,76

LS 1,88941 BDI 1,19557Mão-de-Obra 1,54870 Material 1,76000SubMO 3,43811

08.84.015 CAIXA DE DESCARGA DE SOBREPOR - PLASTICA UN 93,91

1.01.18 2,50000ENCANADOR H 12,550005,021.01.19 2,50000AJUDANTE DE ENCANADOR H 10,225004,096.25.49 1,00000TUBO DESCARGA PVC DE 1 1/2"LONGO UN 3,870003,876.50.02 1,00000CAIXA DESCARGA SOBREPOR PLASTICO UN 21,9200021,92

LS 27,78550 BDI 17,56062Mão-de-Obra 22,77500 Material 25,79000SubMO 50,56050

08.84.018 BOIA E CORRENTE PARA CAIXA DE DESCARGA UN 21,47

1.01.18 0,25000ENCANADOR H 1,255005,021.01.19 0,25000AJUDANTE DE ENCANADOR H 1,022504,096.95.67 1,00000BOIA E CORRENTE P/CAIXA DESCARGA UN 12,4000012,40

LS 2,77855 BDI 4,01489Mão-de-Obra 2,27750 Material 12,40000SubMO 5,05605

08.84.020 SUPORTE DE FERRO FUNDIDO PARA LAVATORIO UN 25,40

1.01.06 1,00000AZULEJISTA H 5,290005,291.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 1,00000CIMENTO KG 0,370000,37

LS 11,10200 BDI 4,74978Mão-de-Obra 9,10000 Material 0,44920SubMO 20,20200

08.84.027 TANQUE PRE-MOLDADO DE CONCRETO DE 60X50 CM UN 81,30

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,816.55.51 1,00000TANQUE PREMOLDADO CONCRETO DE 60CM UN 28,5400028,54

LS 20,64240 BDI 15,20355Mão-de-Obra 16,92000 Material 28,54000SubMO 37,56240

08.84.028 TANQUE PRE-MOLDADO DE CONCRETO DE 70X60 CM UN 81,30

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,816.55.51 1,00000TANQUE PREMOLDADO CONCRETO DE 60CM UN 28,5400028,54

LS 20,64240 BDI 15,20355Mão-de-Obra 16,92000 Material 28,54000SubMO 37,56240

08.84.029 TANQUE PRE-MOLDADO DE CONCRETO DE 80X70 CM UN 64,65

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,81

09/02/2011 11:38:40 Página: 145 de 0

Page 146: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.55.19 1,00000TANQUE PRE-MOLD CONCRETO 80X70CM UN 15,0000015,00

LS 20,64240 BDI 12,08935Mão-de-Obra 16,92000 Material 15,00000SubMO 37,56240

08.84.037 FILTRO DE PRESSAO CUNO (AQUALAR)C/ELEM FILTRANTE CARVAO E CEL 360/L/H UN 311,81

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.41.02 1,00000FILTRO CUNO(AQUALAR)ABS C/ELEM FIL CAR/CEL 360/L/H UN 223,17000223,17

LS 16,67130 BDI 58,30645Mão-de-Obra 13,66500 Material 223,17000SubMO 30,33630

08.84.042 ELEMENTO FILTRANTE CUNO (AQUALAR)ELEM FILTRANTE CARVAO E CEL/180L/H UN 43,34

1.01.18 0,25000ENCANADOR H 1,255005,026.41.13 1,00000ELEMENTO FILTRANTE CUNO(AQUALAR)CARVAO/CEL 180 L/H UN 32,4500032,45

LS 1,53110 BDI 8,10430Mão-de-Obra 1,25500 Material 32,45000SubMO 2,78610

08.84.043 ELEMENTO FILTRANTE CUNO (AQUALAR) CARVAO E CELULOSE 360 L/H UN 59,65

1.01.18 0,25000ENCANADOR H 1,255005,026.41.12 1,00000ELEMENTO FILTRANTE CUNO CARVAO/CELULOSE 360L/H UN 45,7100045,71

LS 1,53110 BDI 11,15410Mão-de-Obra 1,25500 Material 45,71000SubMO 2,78610

08.84.047 TAMPO DE PIA EM MARMORE BRANCO NACIONAL DE 3 CM M2 601,30

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 2,00000CIMENTO KG 0,740000,376.56.52 1,00000TAMPO PIA EM MARMORE BRANCO NAC 3CM M2 446,60000446,60

LS 20,64240 BDI 112,43835Mão-de-Obra 16,92000 Material 451,30000SubMO 37,56240

08.84.048 TAMPO DE PIA EM GRANILITE M2 322,21

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 2,00000CIMENTO KG 0,740000,376.56.53 1,00000TAMPO PIA EM GRANILITE M2 219,70000219,70

LS 20,64240 BDI 60,25135Mão-de-Obra 16,92000 Material 224,40000SubMO 37,56240

08.84.049 TAMPO ACO INOX (304) C/ CUBA SIMPLES - CH.22 M2 1.225,02

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 2,00000CIMENTO KG 0,740000,376.56.35 1,11000TAMPO ACO INOX(304)CHAPA 18-1,50X0,60M CUBA SIMPL UN 953,68980859,18

LS 20,64240 BDI 229,06901Mão-de-Obra 16,92000 Material 958,38980SubMO 37,56240

08.84.050 TAMPO ACO INOX (304) C/ CUBA DUPLA - CH.22 M2 1.506,37

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 2,00000CIMENTO KG 0,740000,376.56.36 0,83000TAMPO ACO INOX(304)CHAPA 18 - 2,00X0,60M CUBA DUPL UN 1.182,434601.424,62

LS 20,64240 BDI 281,68031Mão-de-Obra 16,92000 Material 1.187,13460SubMO 37,56240

08.84.054 CUBA SIMPLES ACO INOX(304) - CHAPA 22 560X330X140MM - SEM PERTENCES UN 107,55

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.56.08 1,00000CUBA SIMPLES ACO INOX 304 CH 22 560X330X140MM UN 67,2200067,22

LS 11,11420 BDI 20,11217Mão-de-Obra 9,11000 Material 67,22000SubMO 20,22420

08.84.055 CUBA SIMPLES ACO INOX(304) CHAP.22 - 400X340X140MM - SEM PERTENCES UN 155,72

1.01.18 1,00000ENCANADOR H 5,020005,021.01.19 1,00000AJUDANTE DE ENCANADOR H 4,090004,096.56.11 1,00000CUBA SIMPLES ACO INOX 304 CH22 400X340X140MM UN 106,38000106,38

LS 11,11420 BDI 29,11897Mão-de-Obra 9,11000 Material 106,38000SubMO 20,22420

08.84.058 CUBA DUPLA ACO INOX(304) CHAPA 22 835X340X140MM - SEM PERTENCES UN 372,66

1.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,096.56.07 1,00000CUBA DUPLA ACO INOX 304 CH 22-835X340X140MM UN 272,64000272,64

LS 16,67130 BDI 69,68455Mão-de-Obra 13,66500 Material 272,64000SubMO 30,33630

08.84.060 TAMPO LISO EM ACO INOX (304) CHAPA 20 M2 537,21

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,00000SERVENTE H 7,620003,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 2,00000CIMENTO KG 0,740000,376.56.38 1,00000TAMPO LISO EM ACO INOX (304) - CHAPA 20 M2 394,50000394,50

09/02/2011 11:38:40 Página: 146 de 0

Page 147: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 20,64240 BDI 100,45535Mão-de-Obra 16,92000 Material 399,20000SubMO 37,56240

08.84.073 VALVULA AMERICANA UN 27,03

1.01.46 0,10000SERVENTE H 0,381003,816.40.45 1,00000VALVULA AMERICANA P/PIA 3 1/2' UN 21,1300021,13

LS 0,46482 BDI 5,05444Mão-de-Obra 0,38100 Material 21,13000SubMO 0,84582

08.84.075 VALVULA DE METAL AMARELO DE 2' UN 17,37

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.40.46 1,00000VALVULA AMARELA DE 2" UN 4,010004,01

LS 5,55710 BDI 3,24808Mão-de-Obra 4,55500 Material 4,01000SubMO 10,11210

08.84.076 VALVULA DE METAL CROMADO DE 1 1/2" UN 42,80

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,096.40.04 1,00000VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2" UN 24,6900024,69

LS 5,55710 BDI 8,00448Mão-de-Obra 4,55500 Material 24,69000SubMO 10,11210

08.84.083 ESPARGIDOR DE FERRO GALVANIZADO P/MICTORIO TIPO COCHO M 40,15

1.01.18 1,10000ENCANADOR H 5,522005,021.01.19 1,10000AJUDANTE DE ENCANADOR H 4,499004,096.60.07 1,00000ESPARGIDOR ACO GALV 3/4" P/ MICTORIO COLETIVO M 10,3600010,366.95.52 0,00940FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M UN 0,042114,48

LS 12,22562 BDI 7,50921Mão-de-Obra 10,02100 Material 10,40211SubMO 22,24662

08.84.090 MANGUEIRA PARA HIDRANTE DIAM 1 1/2' L=15,00M UN 298,87

1.01.19 0,25000AJUDANTE DE ENCANADOR H 1,022504,096.70.22 1,00000MANGUEIRA C/ADAPTADOR 1 1/2' X 15M UN 240,72000240,72

LS 1,24745 BDI 55,88769Mão-de-Obra 1,02250 Material 240,72000SubMO 2,26995

08.84.091 MANGUEIRA PARA HIDRANTE DIAM 1 1/2' L=30,00M UN 440,21

1.01.19 0,25000AJUDANTE DE ENCANADOR H 1,022504,096.70.20 1,00000MANGUEIRA C/ADAPTADOR '1 1/2'-30 M UN 355,63000355,63

LS 1,24745 BDI 82,31699Mão-de-Obra 1,02250 Material 355,63000SubMO 2,26995

08.84.095 MT-01/02/03 MICTORIO COLETIVO (PARTE CIVIL) M 423,31

1.01.06 4,34000AZULEJISTA H 22,958605,291.01.11 1,35000CARPINTEIRO H 6,142504,551.01.12 1,35000AJUDANTE DE CARPINTEIRO H 5,346003,961.01.21 0,20000FERREIRO H 0,954004,771.01.22 0,20000AJUDANTE DE FERREIRO H 0,764003,821.01.28 0,51000LADRILHISTA H 2,575505,051.01.39 4,57000PEDREIRO H 21,250504,651.01.46 8,56000SERVENTE H 32,613603,812.05.03 0,28000AREIA M3 22,1760079,202.05.05 34,30000CAL HIDRATADA KG 11,662000,342.05.08 23,55000CIMENTO KG 8,713500,372.05.09 0,54000CIMENTO BRANCO KG 0,567001,052.05.17 0,02000PEDRA BRITADA 1 M3 1,2386061,932.10.21 0,08000TABUAS PINHO DE 1"X12" DE 3A. M2 1,3744017,182.10.32 0,25000CHAPA COMPENSADA RESINADA E=12MM M2 3,0250012,102.15.25 2,28000ACO CA-50-A $MD BITOLAS KG 6,156002,702.25.15 46,00000TIJOLO COMUM MACICO UN 10,120000,222.66.19 0,85000CANTONEIRA 'L' ALUM 1/2X1/2X1/8' M 2,227002,622.66.59 2,60000CANTONEIRA "L" ALUMINIO 1"X1"X1/8" M 14,664005,643.20.01 2,39000AZULEJO LISO BRANCO BRILHANTE M2 54,3725022,753.60.35 0,88000RODAPE CERAMICO VERMELHO 7.5X1 5CM M 2,279202,59

LS 112,97773 BDI 79,15626Mão-de-Obra 92,60470 Material 138,57520SubMO 205,58243

08.84.096 LT-01/02/03 LAVATORIO COLETIVO (PARTE CIVIL) M 363,68

1.01.06 3,99000AZULEJISTA H 21,107105,291.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 1,84000AJUDANTE DE CARPINTEIRO H 7,286403,961.01.21 1,84000FERREIRO H 8,776804,771.01.22 0,23000AJUDANTE DE FERREIRO H 0,878603,821.01.28 0,23000LADRILHISTA H 1,161505,051.01.39 3,93000PEDREIRO H 18,274504,651.01.46 6,87000SERVENTE H 26,174703,812.05.03 0,10300AREIA M3 8,1576079,202.05.05 13,05000CAL HIDRATADA KG 4,437000,342.05.08 23,85000CIMENTO KG 8,824500,372.05.09 0,50000CIMENTO BRANCO KG 0,525001,052.05.17 0,02000PEDRA BRITADA 1 M3 1,2386061,932.10.21 0,09000TABUAS PINHO DE 1"X12" DE 3A. M2 1,5462017,182.10.32 0,30000CHAPA COMPENSADA RESINADA E=12MM M2 3,6300012,10

09/02/2011 11:38:40 Página: 147 de 0

Page 148: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.15.38 2,60000ACO CA-60-B $MD BITOLAS KG 6,890002,652.25.15 65,00000TIJOLO COMUM MACICO UN 14,300000,222.66.19 1,00000CANTONEIRA 'L' ALUM 1/2X1/2X1/8' M 2,620002,622.66.77 1,00000PERFIL ALUMINIO 'L' 10X1MM M 0,850000,852.67.60 0,19000PREGO KG 0,868304,572.70.10 0,04000ARAME RECOZIDO N.18 KG 0,185204,633.20.01 2,19000AZULEJO LISO BRANCO BRILHANTE M2 49,8225022,75

LS 105,39531 BDI 68,00636Mão-de-Obra 86,38960 Material 103,89490SubMO 191,78491

08.84.099 OUTROS SERVICOS DE APARELHOS E METAIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

08.86.001 CLORADOR TIPO OMS DE FLUXO CONTINUO DE DIAM 1.50X2.00M COMPLETA UN 724,47

6.97.32 1,00000CLORADOR OMS DIAM 1.5X2M-FORN/COLOC UN 589,00000589,00

LS 0,00000 BDI 135,47000Mão-de-Obra 0,00000 Material 589,00000SubMO 0,00000

08.86.010 CAIXA DE DIVISAO PARA FOSSAS DE DIAM = 1,00 M H = 1,00 M UN 146,06

6.97.20 1,00000CAIXA DIV OMS 1.X1.M 4 A 8 SALAS COLOCADA UN 118,75000118,75

LS 0,00000 BDI 27,31250Mão-de-Obra 0,00000 Material 118,75000SubMO 0,00000

08.86.099 OUTROS SERVICOS DE TRATAMENTO DE DESPEJOS SANITARIOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.01.030TE-01 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO112,5KVA-ELETROP

UN 37.781,92

1.01.11 0,84000CARPINTEIRO H 3,822004,551.01.12 0,84000AJUDANTE DE CARPINTEIRO H 3,326403,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,56000FERREIRO H 2,671204,771.01.22 0,56000AJUDANTE DE FERREIRO H 2,139203,821.01.39 18,95000PEDREIRO H 88,117504,651.01.40 6,01000PINTOR H 28,307104,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 27,74000SERVENTE H 105,689403,812.05.03 1,05000AREIA M3 83,1600079,202.05.05 43,33000CAL HIDRATADA KG 14,732200,342.05.08 187,57000CIMENTO KG 69,400900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,54000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,022404,562.10.21 0,38000TABUAS PINHO DE 1"X12" DE 3A. M2 6,5284017,182.15.38 6,33000ACO CA-60-B $MD BITOLAS KG 16,774502,652.25.15 537,77000TIJOLO COMUM MACICO UN 118,309400,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 0,81000GRAFITE L 10,4652012,923.75.42 2,31000TINTA LATEX STANDARD L 14,899506,453.80.09 1,85000SELADOR P/PINTURA LATEX L 18,426009,963.80.12 3,00000LIXA PARA FERRO UN 4,290001,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,49000ZARCAO L 7,8841016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.50 1,00000POSTE DE CONCRETO CIRCULAR 12M/1000 DAN UN 1.582,080001.582,084.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.04 1,00000TRANSF 112.5KVA AT=13.2KV/5%BT= UN 7.154,410007.154,414.21.49 1,00000CABEÇOTE DE ALUMÍNIO DN=80MM UN 11,3100011,314.21.72 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 41,1600011,764.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,154.30.16 3,50000CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V) M 31,045008,874.30.20 10,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 336,4000033,644.30.23 30,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 1.976,4000065,884.30.38 6,00000CABO DE COBRE NU DE 16 MM2 M 44,940007,494.30.54 12,00000CABO DE COBRE NU 50 MM2 M 251,1600020,934.31.30 12,00000CORDOALHA DE COBRE NU DE 95 MM2 M 460,9200038,414.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,664.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.59 3,00000FUSIVEL NH DE 300 A 400A UN 98,4600032,824.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.04 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X115CM UN 622,25000622,254.51.07 1,00000CAIXA DE MEDICÃO TIPO A3 P/POSTO PRIMÁRIO CH.16 MS UN 603,05000603,054.51.14 2,00000CAIXA TIPO "S" 60X110CM # 16 MSG UN 611,48000305,744.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.09 3,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 10,410003,47

09/02/2011 11:38:40 Página: 148 de 0

Page 149: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.37 8,00000TERMINAL PRES P/CABO 185MM2 UN 74,480009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.13 2,00000MÃO FRANCESA PLANA 993MM UN 33,0000016,504.95.14 1,00000SELA PARA CRUZETA MADEIRA UN 5,840005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.34 4,00000PARAFUSO ABAULADO M 16X45MM UN 6,280001,574.95.35 2,00000PARAFUSO ABAULADO M 10X115MM UN 2,280001,144.95.37 3,00000PARAFUSO ABAULADO M 16X150MM UN 9,000003,004.95.39 3,00000ARRUELA QUADRADA 58MM FURO 18MM UN 2,730000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.432,90222 BDI 7.064,91329Mão-de-Obra 6.092,54280 Material 17.191,56930SubMO 13.525,44502

09.01.031 TE-02 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 150KVA-ELETROP. UN 41.004,37

1.01.11 0,84000CARPINTEIRO H 3,822004,551.01.12 0,84000AJUDANTE DE CARPINTEIRO H 3,326403,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,56000FERREIRO H 2,671204,771.01.22 0,56000AJUDANTE DE FERREIRO H 2,139203,821.01.39 18,95000PEDREIRO H 88,117504,651.01.40 6,01000PINTOR H 28,307104,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 27,74000SERVENTE H 105,689403,812.05.03 1,05000AREIA M3 83,1600079,202.05.05 43,33000CAL HIDRATADA KG 14,732200,342.05.08 187,57000CIMENTO KG 69,400900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,54000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,022404,562.10.21 0,38000TABUAS PINHO DE 1"X12" DE 3A. M2 6,5284017,182.15.38 6,33000ACO CA-60-B $MD BITOLAS KG 16,774502,652.25.15 537,77000TIJOLO COMUM MACICO UN 118,309400,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 0,81000GRAFITE L 10,4652012,923.75.42 2,31000TINTA LATEX STANDARD L 14,899506,453.80.09 1,85000SELADOR P/PINTURA LATEX L 18,426009,963.80.12 3,00000LIXA PARA FERRO UN 4,290001,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,49000ZARCAO L 7,8841016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.50 1,00000POSTE DE CONCRETO CIRCULAR 12M/1000 DAN UN 1.582,080001.582,084.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.05 1,00000TRANSF 150 KVA AT=13,2+/-5%BT=220/227 UN 8.697,420008.697,424.21.47 2,00000CABEÇOTE DE ALUMÍNIO DN=65MM UN 13,080006,544.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 12,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 436,4400036,374.30.19 20,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 488,2000024,414.30.21 60,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 2.575,8000042,934.30.38 15,00000CABO DE COBRE NU DE 16 MM2 M 112,350007,494.30.41 15,00000CABO DE COBRE NU DE 35 MM2 M 275,1000018,344.31.30 12,00000CORDOALHA DE COBRE NU DE 95 MM2 M 460,9200038,414.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,664.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.59 3,00000FUSIVEL NH DE 300 A 400A UN 98,4600032,824.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.04 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X115CM UN 622,25000622,254.51.07 1,00000CAIXA DE MEDICÃO TIPO A3 P/POSTO PRIMÁRIO CH.16 MS UN 603,05000603,05

09/02/2011 11:38:40 Página: 149 de 0

Page 150: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.51.14 2,00000CAIXA TIPO "S" 60X110CM # 16 MSG UN 611,48000305,744.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.09 3,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 10,410003,474.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.36 16,00000TERMINAL PRES P/CABO 150MM2 UN 119,200007,454.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.13 2,00000MÃO FRANCESA PLANA 993MM UN 33,0000016,504.95.14 1,00000SELA PARA CRUZETA MADEIRA UN 5,840005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.34 4,00000PARAFUSO ABAULADO M 16X45MM UN 6,280001,574.95.35 2,00000PARAFUSO ABAULADO M 10X115MM UN 2,280001,144.95.37 3,00000PARAFUSO ABAULADO M 16X150MM UN 9,000003,004.95.39 3,00000ARRUELA QUADRADA 58MM FURO 18MM UN 2,730000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.432,90222 BDI 7.667,48454Mão-de-Obra 6.092,54280 Material 19.811,44430SubMO 13.525,44502

09.01.032 TE-03 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 225KVA-ELETROP. UN 47.199,94

1.01.11 0,84000CARPINTEIRO H 3,822004,551.01.12 0,84000AJUDANTE DE CARPINTEIRO H 3,326403,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,56000FERREIRO H 2,671204,771.01.22 0,56000AJUDANTE DE FERREIRO H 2,139203,821.01.39 18,95000PEDREIRO H 88,117504,651.01.40 6,01000PINTOR H 28,307104,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 27,74000SERVENTE H 105,689403,812.05.03 1,05000AREIA M3 83,1600079,202.05.05 43,33000CAL HIDRATADA KG 14,732200,342.05.08 187,57000CIMENTO KG 69,400900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,54000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,022404,562.10.21 0,38000TABUAS PINHO DE 1"X12" DE 3A. M2 6,5284017,182.15.38 6,33000ACO CA-60-B $MD BITOLAS KG 16,774502,652.25.15 537,77000TIJOLO COMUM MACICO UN 118,309400,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 0,81000GRAFITE L 10,4652012,923.75.42 2,31000TINTA LATEX STANDARD L 14,899506,453.80.09 1,85000SELADOR P/PINTURA LATEX L 18,426009,963.80.12 3,00000LIXA PARA FERRO UN 4,290001,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,49000ZARCAO L 7,8841016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.50 1,00000POSTE DE CONCRETO CIRCULAR 12M/1000 DAN UN 1.582,080001.582,084.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.06 1,00000TRANSF 225KVA AT=13.2KV+-5%BT=220/127 UN 11.753,9900011.753,994.21.49 2,00000CABEÇOTE DE ALUMÍNIO DN=80MM UN 22,6200011,314.21.75 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 86,3100024,664.21.77 12,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 493,8000041,154.30.20 20,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 672,8000033,644.30.23 60,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 3.952,8000065,884.30.38 15,00000CABO DE COBRE NU DE 16 MM2 M 112,350007,494.30.41 15,00000CABO DE COBRE NU DE 35 MM2 M 275,1000018,344.31.30 12,00000CORDOALHA DE COBRE NU DE 95 MM2 M 460,9200038,414.36.88 1,00000CHAVE SECCIONADORA NH 3X500A S/ FUSIVEIS UN 556,61000556,614.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.67 3,00000FUSIVEL NH DE 425 A 630A UN 137,9100045,97

09/02/2011 11:38:40 Página: 150 de 0

Page 151: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.04 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X115CM UN 622,25000622,254.51.07 1,00000CAIXA DE MEDICÃO TIPO A3 P/POSTO PRIMÁRIO CH.16 MS UN 603,05000603,054.51.14 2,00000CAIXA TIPO "S" 60X110CM # 16 MSG UN 611,48000305,744.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.09 3,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 10,410003,474.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.37 16,00000TERMINAL PRES P/CABO 185MM2 UN 148,960009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.13 2,00000MÃO FRANCESA PLANA 993MM UN 33,0000016,504.95.14 1,00000SELA PARA CRUZETA MADEIRA UN 5,840005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.34 4,00000PARAFUSO ABAULADO M 16X45MM UN 6,280001,574.95.35 2,00000PARAFUSO ABAULADO M 10X115MM UN 2,280001,144.95.37 3,00000PARAFUSO ABAULADO M 16X150MM UN 9,000003,004.95.39 3,00000ARRUELA QUADRADA 58MM FURO 18MM UN 2,730000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.432,90222 BDI 8.826,00604Mão-de-Obra 6.092,54280 Material 24.848,49430SubMO 13.525,44502

09.01.033 TE-04 POSTO DE TRANSFORMAÇÃO DE ENERGIA POSTE C/TRAFO 300KVA ELETROP. UN 50.013,41

1.01.11 0,84000CARPINTEIRO H 3,822004,551.01.12 0,84000AJUDANTE DE CARPINTEIRO H 3,326403,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,56000FERREIRO H 2,671204,771.01.22 0,56000AJUDANTE DE FERREIRO H 2,139203,821.01.39 18,95000PEDREIRO H 88,117504,651.01.40 6,01000PINTOR H 28,307104,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 27,74000SERVENTE H 105,689403,812.05.03 1,05000AREIA M3 83,1600079,202.05.05 43,33000CAL HIDRATADA KG 14,732200,342.05.08 187,57000CIMENTO KG 69,400900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,54000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,022404,562.10.21 0,38000TABUAS PINHO DE 1"X12" DE 3A. M2 6,5284017,182.15.38 6,33000ACO CA-60-B $MD BITOLAS KG 16,774502,652.25.15 537,77000TIJOLO COMUM MACICO UN 118,309400,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 0,81000GRAFITE L 10,4652012,923.75.42 2,31000TINTA LATEX STANDARD L 14,899506,453.80.09 1,85000SELADOR P/PINTURA LATEX L 18,426009,963.80.12 3,00000LIXA PARA FERRO UN 4,290001,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,49000ZARCAO L 7,8841016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.50 1,00000POSTE DE CONCRETO CIRCULAR 12M/1000 DAN UN 1.582,080001.582,084.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.07 1,00000TRANSF 300KVA AT=13.2KV+-5%BT=220/127 UN 13.415,1300013.415,134.21.47 3,00000CABEÇOTE DE ALUMÍNIO DN=65MM UN 19,620006,544.21.75 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 86,3100024,664.21.76 18,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 654,6600036,374.30.19 20,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 488,2000024,414.30.22 90,00000CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V) M 4.757,4000052,864.30.41 15,00000CABO DE COBRE NU DE 35 MM2 M 275,1000018,344.31.30 12,00000CORDOALHA DE COBRE NU DE 95 MM2 M 460,9200038,414.36.88 1,00000CHAVE SECCIONADORA NH 3X500A S/ FUSIVEIS UN 556,61000556,61

09/02/2011 11:38:40 Página: 151 de 0

Page 152: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.67 3,00000FUSIVEL NH DE 425 A 630A UN 137,9100045,974.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.04 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X115CM UN 622,25000622,254.51.07 1,00000CAIXA DE MEDICÃO TIPO A3 P/POSTO PRIMÁRIO CH.16 MS UN 603,05000603,054.51.14 2,00000CAIXA TIPO "S" 60X110CM # 16 MSG UN 611,48000305,744.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.09 3,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 10,410003,474.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.37 16,00000TERMINAL PRES P/CABO 185MM2 UN 148,960009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.14 1,00000SELA PARA CRUZETA MADEIRA UN 5,840005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.35 2,00000PARAFUSO ABAULADO M 10X115MM UN 2,280001,144.95.37 3,00000PARAFUSO ABAULADO M 16X150MM UN 9,000003,004.95.39 3,00000ARRUELA QUADRADA 58MM FURO 18MM UN 2,730000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.432,90222 BDI 9.352,10114Mão-de-Obra 6.092,54280 Material 27.135,86430SubMO 13.525,44502

09.01.036 POSTO DE TRANSFORMACAO EM POSTE C/TRAFO 75KVA PADRAO CESP/CPFL UN 29.260,55

1.01.15 297,50000ELETRICISTA H 1.609,475005,411.01.16 297,50000AJUDANTE ELETRICISTA H 1.207,850004,061.01.17 297,50000ELETRICISTA PARA ALTA TENSAO H 2.231,250007,502.70.29 0,82950ARAME GALVANIZADO N.12 KG 5,416646,534.01.14 1,00000POSTE RED TRICONICO 400KGX9M UN 563,41000563,414.05.02 6,00000ISOLADOR DE DISCO DE 175MM DE VIDRO UN 123,9600020,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.03 1,00000TRANSF 75KVA,AT=132KV+-5%BT=220/127 UN 5.621,150005.621,154.21.12 2,00000CURVA ACO GALV QUENTE 89MM (3 1/2")X90-CACHIMBO UN 33,5800016,794.21.67 2,00000LUVA ACO GALV QUENTE (NBR 5624) 89 MM (3 1/2") UN 6,680003,344.21.78 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 90 MM (3 1/2") M 40,4100013,474.25.04 2,00000ELETRODUTO PVC RIGIDO 38MM (1 1/4) M 10,620005,314.30.15 6,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 27,720004,624.30.23 40,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 2.635,2000065,884.30.41 24,00000CABO DE COBRE NU DE 35 MM2 M 440,1600018,344.31.30 3,00000CORDOALHA DE COBRE NU DE 95 MM2 M 115,2300038,414.36.58 1,00000CHAVE FACA BLIND TRIP C/FUSIVEL 400A UN 926,85000926,854.51.23 1,00000CAIXA P/TRANSF COR 60X70X25CM CESP UN 55,7100055,714.51.25 1,00000CAIXA P/MEDICAO ENERGIA/ATIV/REATI 70X60X25CM CESP UN 75,8500075,854.80.06 3,00000PARA RAIO TIPO VALVULA-15KV C/FERRAG UN 385,98000128,664.80.08 4,00000HASTE COPERWELD 19MM (3/4)X3 M UN 280,9200070,234.80.09 4,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 13,880003,474.85.30 4,00000CINTA ACO GALVANIZADO DE 170MM UN 57,6400014,414.85.45 4,00000BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2") UN 18,000004,504.94.35 1,00000TERMINAL PRES P/CABO 95MM2 UN 5,030005,034.94.37 12,00000TERMINAL PRES P/CABO 185MM2 UN 111,720009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.95.02 4,00000PORCA QUADRADA P/PARAF N 16 UN 2,200000,554.95.09 2,00000CRUZETA MADEIRA DE 2400MM UN 147,9800073,994.95.12 4,00000MAO FRANCESA 710 MM UN 29,480007,374.95.14 2,00000SELA PARA CRUZETA MADEIRA UN 11,680005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 10,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 22,300002,234.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.34 2,00000PARAFUSO ABAULADO M 16X45MM UN 3,140001,574.95.35 4,00000PARAFUSO ABAULADO M 10X115MM UN 4,560001,144.95.36 2,00000PARAFUSO QUADRADO M 16X45MM UN 3,400001,704.95.37 2,00000PARAFUSO ABAULADO M 16X150MM UN 6,000003,004.95.38 4,00000ARRUELA QUADRADA 34MM FURO 12MM UN 1,360000,34

09/02/2011 11:38:40 Página: 152 de 0

Page 153: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.39 8,00000ARRUELA QUADRADA 58MM FURO 18MM UN 7,280000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.66 2,00000SUPORTE P/TRANSF EM POSTE/ESTALEIRO UN 123,4000061,704.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.50 2,00000NIPLE DUPLO FERRO GALV 3" UN 62,6800031,346.20.95 4,00000TUBO CERAMICO DN 300MM (12") M 179,8800044,97

LS 6.159,26150 BDI 5.471,48682Mão-de-Obra 5.048,57500 Material 12.581,23664SubMO 11.207,83650

09.01.037 TE-05 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 112,5KVA-CPFL UN 37.832,79

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,53000FERREIRO H 2,528104,771.01.22 0,53000AJUDANTE DE FERREIRO H 2,024603,821.01.39 18,16000PEDREIRO H 84,444004,651.01.40 5,76000PINTOR H 27,129604,711.01.41 0,93000AJUDANTE DE PINTOR H 3,552603,821.01.46 26,59000SERVENTE H 101,307903,812.05.03 1,00000AREIA M3 79,2000079,202.05.05 41,53000CAL HIDRATADA KG 14,120200,342.05.08 179,83000CIMENTO KG 66,537100,372.05.18 0,19000PEDRA BRITADA 2 M3 11,6071061,092.10.17 1,47000SARRAFO PINHO APARELHADO 10X2,5 CM M 6,703204,562.10.21 0,36000TABUAS PINHO DE 1"X12" DE 3A. M2 6,1848017,182.15.38 5,23000ACO CA-60-B $MD BITOLAS KG 13,859502,652.25.15 515,59000TIJOLO COMUM MACICO UN 113,429800,222.67.60 0,15000PREGO KG 0,685504,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 1,10000GRAFITE L 14,2120012,923.75.42 1,70000TINTA LATEX STANDARD L 10,965006,453.80.09 1,78000SELADOR P/PINTURA LATEX L 17,728809,963.80.12 4,08000LIXA PARA FERRO UN 5,834401,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,68000ZARCAO L 10,9412016,093.80.40 2,70000LIXA D"AGUA UN 1,755000,654.01.51 1,00000POSTE DE CONCRETO CIRCULAR 10,50M/400 DAN UN 616,39000616,394.05.02 3,00000ISOLADOR DE DISCO DE 175MM DE VIDRO UN 61,9800020,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.04 1,00000TRANSF 112.5KVA AT=13.2KV/5%BT= UN 7.154,410007.154,414.21.49 1,00000CABEÇOTE DE ALUMÍNIO DN=80MM UN 11,3100011,314.21.72 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 41,1600011,764.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,154.30.20 10,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 336,4000033,644.30.23 30,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 1.976,4000065,884.30.39 6,00000CABO DE COBRE NU DE 95 MM2 M 253,3200042,224.30.41 40,00000CABO DE COBRE NU DE 35 MM2 M 733,6000018,344.36.58 1,00000CHAVE FACA BLIND TRIP C/FUSIVEL 400A UN 926,85000926,854.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.05 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 180X160CM UN 820,80000820,804.51.06 1,00000CAIXA DE MEDIÇÃO B.T. (180X160X40) # 16 MSF-CPFL UN 912,00000912,004.80.06 3,00000PARA RAIO TIPO VALVULA-15KV C/FERRAG UN 385,98000128,664.80.08 8,00000HASTE COPERWELD 19MM (3/4)X3 M UN 561,8400070,234.80.09 8,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 27,760003,474.80.50 8,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 222,0000027,754.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 2,00000CINTA ACO GALVANIZADO DE 170MM UN 28,8200014,414.85.45 3,00000BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2") UN 13,500004,504.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.37 8,00000TERMINAL PRES P/CABO 185MM2 UN 74,480009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 4,00000PORCA QUADRADA P/PARAF N 16 UN 2,200000,554.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 2,00000SELA PARA CRUZETA MADEIRA UN 11,680005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 10,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 22,300002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.34 2,00000PARAFUSO ABAULADO M 16X45MM UN 3,140001,574.95.35 3,00000PARAFUSO ABAULADO M 10X115MM UN 3,420001,144.95.36 2,00000PARAFUSO QUADRADO M 16X45MM UN 3,400001,70

09/02/2011 11:38:40 Página: 153 de 0

Page 154: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.37 2,00000PARAFUSO ABAULADO M 16X150MM UN 6,000003,004.95.38 4,00000ARRUELA QUADRADA 34MM FURO 12MM UN 1,360000,344.95.39 8,00000ARRUELA QUADRADA 58MM FURO 18MM UN 7,280000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.66 2,00000SUPORTE P/TRANSF EM POSTE/ESTALEIRO UN 123,4000061,704.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,654.96.50 2,00000NIPLE DUPLO FERRO GALV 3" UN 62,6800031,34

LS 7.420,58266 BDI 7.074,42580Mão-de-Obra 6.082,44480 Material 17.255,34560SubMO 13.503,02746

09.01.038 TE-06 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 150KVA-CPFL UN 41.327,52

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,53000FERREIRO H 2,528104,771.01.22 0,53000AJUDANTE DE FERREIRO H 2,024603,821.01.39 18,16000PEDREIRO H 84,444004,651.01.40 5,76000PINTOR H 27,129604,711.01.41 0,93000AJUDANTE DE PINTOR H 3,552603,821.01.46 26,59000SERVENTE H 101,307903,812.05.03 1,00000AREIA M3 79,2000079,202.05.05 41,53000CAL HIDRATADA KG 14,120200,342.05.08 179,83000CIMENTO KG 66,537100,372.05.18 0,19000PEDRA BRITADA 2 M3 11,6071061,092.10.17 1,47000SARRAFO PINHO APARELHADO 10X2,5 CM M 6,703204,562.10.21 0,36000TABUAS PINHO DE 1"X12" DE 3A. M2 6,1848017,182.15.38 5,23000ACO CA-60-B $MD BITOLAS KG 13,859502,652.25.15 515,59000TIJOLO COMUM MACICO UN 113,429800,222.67.60 0,15000PREGO KG 0,685504,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 1,10000GRAFITE L 14,2120012,923.75.42 1,70000TINTA LATEX STANDARD L 10,965006,453.80.09 1,78000SELADOR P/PINTURA LATEX L 17,728809,963.80.12 4,08000LIXA PARA FERRO UN 5,834401,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,68000ZARCAO L 10,9412016,093.80.40 2,70000LIXA D"AGUA UN 1,755000,654.01.13 1,00000POSTE CONCRETO 600KGF H=10.5M UN 853,70000853,704.05.02 3,00000ISOLADOR DE DISCO DE 175MM DE VIDRO UN 61,9800020,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.05.16 2,00000ISOLADOR TIPO CASTANHA 85MM PORC 1KV UN 16,420008,214.10.05 1,00000TRANSF 150 KVA AT=13,2+/-5%BT=220/227 UN 8.697,420008.697,424.21.47 2,00000CABEÇOTE DE ALUMÍNIO DN=65MM UN 13,080006,544.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 12,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 436,4400036,374.30.19 20,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 488,2000024,414.30.21 60,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 2.575,8000042,934.30.41 40,00000CABO DE COBRE NU DE 35 MM2 M 733,6000018,344.30.43 24,00000CABO DE COBRE NU DE 70 MM2 M 827,2800034,474.36.58 1,00000CHAVE FACA BLIND TRIP C/FUSIVEL 400A UN 926,85000926,854.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.06 1,00000CAIXA DE MEDIÇÃO B.T. (180X160X40) # 16 MSF-CPFL UN 912,00000912,004.80.06 3,00000PARA RAIO TIPO VALVULA-15KV C/FERRAG UN 385,98000128,664.80.08 8,00000HASTE COPERWELD 19MM (3/4)X3 M UN 561,8400070,234.80.09 8,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 27,760003,474.80.50 8,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 222,0000027,754.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 2,00000CINTA ACO GALVANIZADO DE 170MM UN 28,8200014,414.85.44 6,00000BUCHA E ARRUELA EM ZAMAK 76 MM (3") UN 19,200003,204.94.34 1,00000TERMINAL PRES P/CABO 70MM2 UN 3,320003,324.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 4,00000PORCA QUADRADA P/PARAF N 16 UN 2,200000,554.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 2,00000SELA PARA CRUZETA MADEIRA UN 11,680005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 10,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 22,300002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.37 3,00000PARAFUSO ABAULADO M 16X150MM UN 9,000003,00

09/02/2011 11:38:40 Página: 154 de 0

Page 155: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.39 13,00000ARRUELA QUADRADA 58MM FURO 18MM UN 11,830000,914.95.41 24,00000TERMINAL PRES P/CABO 120MM2 UN 181,200007,554.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.95.87 2,00000PARAFUSO QUADRADO M 16X150MM UN 5,700002,854.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,654.96.50 4,00000NIPLE DUPLO FERRO GALV 3" UN 125,3600031,34

LS 7.420,58266 BDI 7.727,91100Mão-de-Obra 6.082,44480 Material 20.096,58560SubMO 13.503,02746

09.01.039 TE-07 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 225KVA-CPFL UN 46.869,43

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,53000FERREIRO H 2,528104,771.01.22 0,53000AJUDANTE DE FERREIRO H 2,024603,821.01.39 18,16000PEDREIRO H 84,444004,651.01.40 5,76000PINTOR H 27,129604,711.01.41 0,93000AJUDANTE DE PINTOR H 3,552603,821.01.46 26,59000SERVENTE H 101,307903,812.05.03 1,00000AREIA M3 79,2000079,202.05.05 41,53000CAL HIDRATADA KG 14,120200,342.05.08 179,83000CIMENTO KG 66,537100,372.05.18 0,19000PEDRA BRITADA 2 M3 11,6071061,092.10.17 1,47000SARRAFO PINHO APARELHADO 10X2,5 CM M 6,703204,562.10.21 0,36000TABUAS PINHO DE 1"X12" DE 3A. M2 6,1848017,182.15.38 5,23000ACO CA-60-B $MD BITOLAS KG 13,859502,652.25.15 515,59000TIJOLO COMUM MACICO UN 113,429800,222.67.60 0,15000PREGO KG 0,685504,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 1,10000GRAFITE L 14,2120012,923.75.42 1,70000TINTA LATEX STANDARD L 10,965006,453.80.09 1,78000SELADOR P/PINTURA LATEX L 17,728809,963.80.12 4,08000LIXA PARA FERRO UN 5,834401,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,68000ZARCAO L 10,9412016,093.80.40 2,70000LIXA D"AGUA UN 1,755000,654.01.53 1,00000POSTE DE CONCRETO CIRCULAR 10,50M/1000 DAN UN 1.264,390001.264,394.05.02 3,00000ISOLADOR DE DISCO DE 175MM DE VIDRO UN 61,9800020,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.05.16 2,00000ISOLADOR TIPO CASTANHA 85MM PORC 1KV UN 16,420008,214.10.06 1,00000TRANSF 225KVA AT=13.2KV+-5%BT=220/127 UN 11.753,9900011.753,994.21.49 2,00000CABEÇOTE DE ALUMÍNIO DN=80MM UN 22,6200011,314.21.75 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 86,3100024,664.21.77 12,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 493,8000041,154.30.20 20,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 672,8000033,644.30.23 60,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 3.952,8000065,884.30.41 40,00000CABO DE COBRE NU DE 35 MM2 M 733,6000018,344.30.43 6,00000CABO DE COBRE NU DE 70 MM2 M 206,8200034,474.36.59 1,00000CHAVE FACA BLIND TRIP C/FUSIVEL 600A UN 1.099,330001.099,334.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.06 1,00000CAIXA DE MEDIÇÃO B.T. (180X160X40) # 16 MSF-CPFL UN 912,00000912,004.80.06 3,00000PARA RAIO TIPO VALVULA-15KV C/FERRAG UN 385,98000128,664.80.08 8,00000HASTE COPERWELD 19MM (3/4)X3 M UN 561,8400070,234.80.09 8,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 27,760003,474.80.50 8,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 222,0000027,754.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 2,00000CINTA ACO GALVANIZADO DE 170MM UN 28,8200014,414.85.45 3,00000BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2") UN 13,500004,504.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.37 8,00000TERMINAL PRES P/CABO 185MM2 UN 74,480009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 4,00000PORCA QUADRADA P/PARAF N 16 UN 2,200000,554.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 2,00000SELA PARA CRUZETA MADEIRA UN 11,680005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 10,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 22,300002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.37 2,00000PARAFUSO ABAULADO M 16X150MM UN 6,000003,004.95.39 2,00000ARRUELA QUADRADA 58MM FURO 18MM UN 1,820000,91

09/02/2011 11:38:40 Página: 155 de 0

Page 156: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.95.87 2,00000PARAFUSO QUADRADO M 16X150MM UN 5,700002,854.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,654.96.50 2,00000NIPLE DUPLO FERRO GALV 3" UN 62,6800031,34

LS 7.420,58266 BDI 8.764,20360Mão-de-Obra 6.082,44480 Material 24.602,20560SubMO 13.503,02746

09.01.040 TE-08 POSTO DE TRANSFORMAÇÃO DE ENERGIA POSTE C/TRAFO 300KVA-CPFL UN 50.952,74

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,53000FERREIRO H 2,528104,771.01.22 0,53000AJUDANTE DE FERREIRO H 2,024603,821.01.39 18,16000PEDREIRO H 84,444004,651.01.40 5,76000PINTOR H 27,129604,711.01.41 0,93000AJUDANTE DE PINTOR H 3,552603,821.01.46 26,59000SERVENTE H 101,307903,812.05.03 1,00000AREIA M3 79,2000079,202.05.05 41,53000CAL HIDRATADA KG 14,120200,342.05.08 179,83000CIMENTO KG 66,537100,372.05.18 0,19000PEDRA BRITADA 2 M3 11,6071061,092.10.17 1,47000SARRAFO PINHO APARELHADO 10X2,5 CM M 6,703204,562.10.21 0,36000TABUAS PINHO DE 1"X12" DE 3A. M2 6,1848017,182.15.38 5,23000ACO CA-60-B $MD BITOLAS KG 13,859502,652.25.15 515,59000TIJOLO COMUM MACICO UN 113,429800,222.67.60 0,15000PREGO KG 0,685504,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,632.80.56 1,10000GRAFITE L 14,2120012,923.75.42 1,70000TINTA LATEX STANDARD L 10,965006,453.80.09 1,78000SELADOR P/PINTURA LATEX L 17,728809,963.80.12 4,08000LIXA PARA FERRO UN 5,834401,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,68000ZARCAO L 10,9412016,093.80.40 2,70000LIXA D"AGUA UN 1,755000,654.01.53 1,00000POSTE DE CONCRETO CIRCULAR 10,50M/1000 DAN UN 1.264,390001.264,394.05.02 3,00000ISOLADOR DE DISCO DE 175MM DE VIDRO UN 61,9800020,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.05.16 2,00000ISOLADOR TIPO CASTANHA 85MM PORC 1KV UN 16,420008,214.10.07 1,00000TRANSF 300KVA AT=13.2KV+-5%BT=220/127 UN 13.415,1300013.415,134.21.47 3,00000CABEÇOTE DE ALUMÍNIO DN=65MM UN 19,620006,544.21.75 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 86,3100024,664.21.76 18,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 654,6600036,374.30.19 20,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 488,2000024,414.30.22 90,00000CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V) M 4.757,4000052,864.30.39 6,00000CABO DE COBRE NU DE 95 MM2 M 253,3200042,224.30.41 40,00000CABO DE COBRE NU DE 35 MM2 M 733,6000018,344.36.59 1,00000CHAVE FACA BLIND TRIP C/FUSIVEL 600A UN 1.099,330001.099,334.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.05 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 180X160CM UN 820,80000820,804.51.06 1,00000CAIXA DE MEDIÇÃO B.T. (180X160X40) # 16 MSF-CPFL UN 912,00000912,004.80.06 3,00000PARA RAIO TIPO VALVULA-15KV C/FERRAG UN 385,98000128,664.80.08 8,00000HASTE COPERWELD 19MM (3/4)X3 M UN 561,8400070,234.80.09 8,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 27,760003,474.80.50 8,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 222,0000027,754.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 2,00000CINTA ACO GALVANIZADO DE 170MM UN 28,8200014,414.85.45 3,00000BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2") UN 13,500004,504.94.34 3,00000TERMINAL PRES P/CABO 70MM2 UN 9,960003,324.94.36 8,00000TERMINAL PRES P/CABO 150MM2 UN 59,600007,454.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 2,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 126,0000063,004.95.02 4,00000PORCA QUADRADA P/PARAF N 16 UN 2,200000,554.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 2,00000SELA PARA CRUZETA MADEIRA UN 11,680005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 10,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 22,300002,234.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.37 2,00000PARAFUSO ABAULADO M 16X150MM UN 6,000003,004.95.39 13,00000ARRUELA QUADRADA 58MM FURO 18MM UN 11,830000,914.95.43 3,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 7,050002,35

09/02/2011 11:38:40 Página: 156 de 0

Page 157: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 3,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 33,6900011,234.95.87 2,00000PARAFUSO QUADRADO M 16X150MM UN 5,700002,854.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,654.96.50 4,00000NIPLE DUPLO FERRO GALV 3" UN 125,3600031,34

LS 7.420,58266 BDI 9.527,74840Mão-de-Obra 6.082,44480 Material 27.921,96560SubMO 13.503,02746

09.01.046TE-09 POSTO DE TRANSFORMAÇÃO DE ENERGIA POSTE C/TRAFO 112,5KVAELEKTRO

UN 36.065,27

1.01.11 0,86000CARPINTEIRO H 3,913004,551.01.12 0,86000AJUDANTE DE CARPINTEIRO H 3,405603,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,57000FERREIRO H 2,718904,771.01.22 0,57000AJUDANTE DE FERREIRO H 2,177403,821.01.39 19,53000PEDREIRO H 90,814504,651.01.40 6,19000PINTOR H 29,154904,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 28,59000SERVENTE H 108,927903,812.05.03 1,08000AREIA M3 85,5360079,202.05.05 44,66000CAL HIDRATADA KG 15,184400,342.05.08 193,37000CIMENTO KG 71,546900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,58000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,204804,562.10.21 0,39000TABUAS PINHO DE 1"X12" DE 3A. M2 6,7002017,182.15.38 6,52000ACO CA-60-B $MD BITOLAS KG 17,278002,652.25.15 554,40000TIJOLO COMUM MACICO UN 121,968000,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,11000ARAME RECOZIDO N.18 KG 0,509304,632.80.56 0,66000GRAFITE L 8,5272012,923.75.42 2,36000TINTA LATEX STANDARD L 15,222006,453.80.09 1,87000SELADOR P/PINTURA LATEX L 18,625209,963.80.12 3,06000LIXA PARA FERRO UN 4,375801,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,50000ZARCAO L 8,0450016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.51 1,00000POSTE DE CONCRETO CIRCULAR 10,50M/400 DAN UN 616,39000616,394.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.04 1,00000TRANSF 112.5KVA AT=13.2KV/5%BT= UN 7.154,410007.154,414.21.49 1,00000CABEÇOTE DE ALUMÍNIO DN=80MM UN 11,3100011,314.21.72 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 41,1600011,764.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,154.30.20 10,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 336,4000033,644.30.23 30,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 1.976,4000065,884.30.54 12,00000CABO DE COBRE NU 50 MM2 M 251,1600020,934.31.30 3,50000CORDOALHA DE COBRE NU DE 95 MM2 M 134,4350038,414.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,664.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.59 3,00000FUSIVEL NH DE 300 A 400A UN 98,4600032,824.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.03 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X95CM UN 520,60000520,604.51.09 1,00000CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO UN 638,24000638,244.51.11 1,00000CAIXA TIPO 'T' 60X90X25CM ELETROPAULO UN 234,14000234,144.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.09 3,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 10,410003,474.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.35 3,00000TERMINAL PRES P/CABO 95MM2 UN 15,090005,034.94.37 8,00000TERMINAL PRES P/CABO 185MM2 UN 74,480009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 4,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 252,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.12 4,00000MAO FRANCESA 710 MM UN 29,480007,374.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 4,00000SELA PARA CRUZETA MADEIRA UN 23,360005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.37 32,00000PARAFUSO ABAULADO M 16X150MM UN 96,000003,00

09/02/2011 11:38:40 Página: 157 de 0

Page 158: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.39 32,00000ARRUELA QUADRADA 58MM FURO 18MM UN 29,120000,914.95.43 9,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 21,150002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 9,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 101,0700011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.441,49028 BDI 6.743,91257Mão-de-Obra 6.099,58220 Material 15.780,28650SubMO 13.541,07248

09.01.047 TE-10 POSTO DE TRANSFORMAÇÃO DE ENERGIA POSTE C/TRAFO 150KVA ELEKTRO UN 39.631,97

1.01.11 0,86000CARPINTEIRO H 3,913004,551.01.12 0,86000AJUDANTE DE CARPINTEIRO H 3,405603,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,57000FERREIRO H 2,718904,771.01.22 0,57000AJUDANTE DE FERREIRO H 2,177403,821.01.39 19,53000PEDREIRO H 90,814504,651.01.40 6,19000PINTOR H 29,154904,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 28,59000SERVENTE H 108,927903,812.05.03 1,08000AREIA M3 85,5360079,202.05.05 44,66000CAL HIDRATADA KG 15,184400,342.05.08 193,37000CIMENTO KG 71,546900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,58000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,204804,562.10.21 0,39000TABUAS PINHO DE 1"X12" DE 3A. M2 6,7002017,182.15.38 6,52000ACO CA-60-B $MD BITOLAS KG 17,278002,652.25.15 554,40000TIJOLO COMUM MACICO UN 121,968000,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,11000ARAME RECOZIDO N.18 KG 0,509304,632.80.56 0,66000GRAFITE L 8,5272012,923.75.42 2,36000TINTA LATEX STANDARD L 15,222006,453.80.09 1,87000SELADOR P/PINTURA LATEX L 18,625209,963.80.12 3,06000LIXA PARA FERRO UN 4,375801,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,50000ZARCAO L 8,0450016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.13 1,00000POSTE CONCRETO 600KGF H=10.5M UN 853,70000853,704.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.05 1,00000TRANSF 150 KVA AT=13,2+/-5%BT=220/227 UN 8.697,420008.697,424.21.47 2,00000CABEÇOTE DE ALUMÍNIO DN=65MM UN 13,080006,544.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 12,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 436,4400036,374.30.19 20,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 488,2000024,414.30.21 60,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 2.575,8000042,934.30.43 7,00000CABO DE COBRE NU DE 70 MM2 M 241,2900034,474.30.54 12,00000CABO DE COBRE NU 50 MM2 M 251,1600020,934.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,664.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.59 3,00000FUSIVEL NH DE 300 A 400A UN 98,4600032,824.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.03 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X95CM UN 520,60000520,604.51.09 1,00000CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO UN 638,24000638,244.51.11 1,00000CAIXA TIPO 'T' 60X90X25CM ELETROPAULO UN 234,14000234,144.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.34 6,00000TERMINAL PRES P/CABO 70MM2 UN 19,920003,324.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 4,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 252,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.12 4,00000MAO FRANCESA 710 MM UN 29,480007,374.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 4,00000SELA PARA CRUZETA MADEIRA UN 23,360005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.37 32,00000PARAFUSO ABAULADO M 16X150MM UN 96,000003,004.95.39 32,00000ARRUELA QUADRADA 58MM FURO 18MM UN 29,120000,91

09/02/2011 11:38:40 Página: 158 de 0

Page 159: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.41 16,00000TERMINAL PRES P/CABO 120MM2 UN 120,800007,554.95.43 9,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 21,150002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 9,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 101,0700011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.441,49028 BDI 7.410,85622Mão-de-Obra 6.099,58220 Material 18.680,04150SubMO 13.541,07248

09.01.048 TE-11 POSTO DE TRANSFORMAÇÃO DE ENERGIA POSTE C/TRAFO 225KVA ELEKTRO UN 45.872,11

1.01.11 0,86000CARPINTEIRO H 3,913004,551.01.12 0,86000AJUDANTE DE CARPINTEIRO H 3,405603,961.01.15 345,00000ELETRICISTA H 1.866,450005,411.01.16 345,00000AJUDANTE ELETRICISTA H 1.400,700004,061.01.17 345,00000ELETRICISTA PARA ALTA TENSAO H 2.587,500007,501.01.21 0,57000FERREIRO H 2,718904,771.01.22 0,57000AJUDANTE DE FERREIRO H 2,177403,821.01.39 19,53000PEDREIRO H 90,814504,651.01.40 6,19000PINTOR H 29,154904,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 28,59000SERVENTE H 108,927903,812.05.03 1,08000AREIA M3 85,5360079,202.05.05 44,66000CAL HIDRATADA KG 15,184400,342.05.08 193,37000CIMENTO KG 71,546900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,58000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,204804,562.10.21 0,39000TABUAS PINHO DE 1"X12" DE 3A. M2 6,7002017,182.15.38 6,52000ACO CA-60-B $MD BITOLAS KG 17,278002,652.25.15 554,40000TIJOLO COMUM MACICO UN 121,968000,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,11000ARAME RECOZIDO N.18 KG 0,509304,632.80.56 0,66000GRAFITE L 8,5272012,923.75.42 2,36000TINTA LATEX STANDARD L 15,222006,453.80.09 1,87000SELADOR P/PINTURA LATEX L 18,625209,963.80.12 3,06000LIXA PARA FERRO UN 4,375801,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,50000ZARCAO L 8,0450016,093.80.40 2,77000LIXA D"AGUA UN 1,800500,654.01.13 1,00000POSTE CONCRETO 600KGF H=10.5M UN 853,70000853,704.05.03 3,00000ISOLADOR DISCO 150MM DE PORCELANA UN 94,9800031,664.05.07 3,00000ISOLADOR DE PINO 15KV-PORCELANA UN 30,5100010,174.10.06 1,00000TRANSF 225KVA AT=13.2KV+-5%BT=220/127 UN 11.753,9900011.753,994.21.49 2,00000CABEÇOTE DE ALUMÍNIO DN=80MM UN 22,6200011,314.21.75 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 86,3100024,664.21.77 12,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 493,8000041,154.30.20 20,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 672,8000033,644.30.23 60,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 3.952,8000065,884.30.54 12,00000CABO DE COBRE NU 50 MM2 M 251,1600020,934.31.30 7,00000CORDOALHA DE COBRE NU DE 95 MM2 M 268,8700038,414.36.88 1,00000CHAVE SECCIONADORA NH 3X500A S/ FUSIVEIS UN 556,61000556,614.37.12 3,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 371,49000123,834.41.67 3,00000FUSIVEL NH DE 425 A 630A UN 137,9100045,974.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.51.03 1,00000PORTA EXTERNA METÁLICA C/VENEZIANAS 185X95CM UN 520,60000520,604.51.09 1,00000CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO UN 638,24000638,244.51.11 1,00000CAIXA TIPO 'T' 60X90X25CM ELETROPAULO UN 234,14000234,144.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,234.80.50 3,00000CAIXA DE INSPEÇÃO P/TERRA (250X250X250)MM UN 83,2500027,754.80.70 3,00000PARA-RAIO DE LINHA 15KV UN 385,98000128,664.85.10 2,00000SUPORTE PARA TRANSFORMADOR - NBR 5440 UN 296,00000148,004.85.11 2,00000ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159 UN 76,0000038,004.85.30 1,00000CINTA ACO GALVANIZADO DE 170MM UN 14,4100014,414.85.62 4,00000BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2") UN 4,560001,144.94.35 6,00000TERMINAL PRES P/CABO 95MM2 UN 30,180005,034.94.37 16,00000TERMINAL PRES P/CABO 185MM2 UN 148,960009,314.94.61 3,00000CORTA CIRCUITO FUSIVEL UN 265,6500088,554.94.63 4,00000CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M UN 252,0000063,004.95.02 32,00000PORCA QUADRADA P/PARAF N 16 UN 17,600000,554.95.12 4,00000MAO FRANCESA 710 MM UN 29,480007,374.95.13 4,00000MÃO FRANCESA PLANA 993MM UN 66,0000016,504.95.14 4,00000SELA PARA CRUZETA MADEIRA UN 23,360005,844.95.17 3,00000OLHAL PARA PARAFUSO M-16(5/8") UN 21,660007,224.95.20 3,00000GRAMPO TENSOR UNIVERSAL (CARACOL) UN 13,380004,464.95.28 9,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 20,070002,234.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,224.95.33 3,00000GANCHO OLHAL UN 21,030007,014.95.37 32,00000PARAFUSO ABAULADO M 16X150MM UN 96,000003,00

09/02/2011 11:38:40 Página: 159 de 0

Page 160: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.95.39 32,00000ARRUELA QUADRADA 58MM FURO 18MM UN 29,120000,914.95.43 9,00000CONECTOR SPLIT-BOLT P/CABO 16MM2 UN 21,150002,354.95.82 9,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 18,360002,044.95.86 9,00000PINO P/ISOLADOR RIGIDO (CRUZETA) UN 101,0700011,234.96.02 3,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 9,450003,154.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,924.96.27 0,20000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 18,7300093,65

LS 7.441,49028 BDI 8.577,71292Mão-de-Obra 6.099,58220 Material 23.753,33150SubMO 13.541,07248

09.01.099 SERVICOS DE LIGACOES EM TENSAO PRIMARIA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.02.011 AT-01 ENTRADA AEREA PARA TELEFONE UN 680,31

1.01.39 2,98000PEDREIRO H 13,857004,651.01.46 4,93000SERVENTE H 18,783303,812.05.03 0,07400AREIA M3 5,8608079,202.05.05 3,28000CAL HIDRATADA KG 1,115200,342.05.08 21,43000CIMENTO KG 7,929100,372.05.17 0,03500PEDRA BRITADA 1 M3 2,1675561,932.05.18 0,01300PEDRA BRITADA 2 M3 0,7941761,092.25.15 57,00000TIJOLO COMUM MACICO UN 12,540000,222.40.56 0,34000TINTA BETUMINOSA L 2,172606,394.01.20 1,00000POSTE DE ACO GALV 3 1/2'X 6M UN 324,95000324,954.94.81 1,00000ALCA COM ISOLADOR PORCELANA TELESP UN 6,150006,154.94.87 1,00000TAMPAO FERRO FUNDIDO T-16 TELEBRAS UN 104,76000104,764.95.67 1,00000CABECOTE TIPO TELESP UN 2,960002,966.25.02 5,50000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM M 9,240001,68

LS 39,82117 BDI 127,21320Mão-de-Obra 32,64030 Material 480,63942SubMO 72,46147

09.02.042 DPS - DISPOSITIVO PROTECAO CONTRA SURTOS (TELEFONIA) UN 73,32

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.45.15 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS TEL 20KA UN 40,6900040,69

LS 10,39806 BDI 13,71054Mão-de-Obra 8,52300 Material 40,69000SubMO 18,92106

09.02.043 DPS - DISPOSITIVO PROTECAO CONTRA SURTOS (ENERGIA) UN 132,97

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,19

LS 10,39806 BDI 24,86554Mão-de-Obra 8,52300 Material 89,19000SubMO 18,92106

09.02.047 DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X300A UN 1.477,28

1.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,061.01.17 0,90000ELETRICISTA PARA ALTA TENSAO H 6,750007,504.35.55 1,00000DISJUNTOR TERMOMAGNETICO 3X300A UN 1.177,950001.177,95

LS 12,69288 BDI 276,24078Mão-de-Obra 10,40400 Material 1.177,95000SubMO 23,09688

09.02.048 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 240MM2 C/ ELETRODUTOS UN 3.943,05

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.34 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS UN 47,8700047,874.21.46 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS UN 62,2900062,294.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.66 2,00000LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3") UN 13,880006,944.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,154.30.24 27,00000CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V) M 2.341,4400086,724.30.42 3,50000CABO DE COBRE NU DE 120 MM2 M 196,1400056,044.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.44 1,00000BUCHA E ARRUELA EM ZAMAK 76 MM (3") UN 3,200003,204.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 737,31997Mão-de-Obra 47,35000 Material 3.100,62200SubMO 105,11700

09.02.049 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 240MM2 C/ ELETRODUTOS UN 4.903,04

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.34 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS UN 47,8700047,874.21.46 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS UN 62,2900062,294.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.66 2,00000LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3") UN 13,880006,944.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,15

09/02/2011 11:38:40 Página: 160 de 0

Page 161: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.30.24 36,00000CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V) M 3.121,9200086,724.30.42 3,50000CABO DE COBRE NU DE 120 MM2 M 196,1400056,044.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.44 1,00000BUCHA E ARRUELA EM ZAMAK 76 MM (3") UN 3,200003,204.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 916,83037Mão-de-Obra 47,35000 Material 3.881,10200SubMO 105,11700

09.02.056 AE-22 ABRIGO ENTRADA DE ENERGIA 38/76KVA CPFL UN 2.468,24

1.01.11 0,68000CARPINTEIRO H 3,094004,551.01.12 0,68000AJUDANTE DE CARPINTEIRO H 2,692803,961.01.15 17,00000ELETRICISTA H 91,970005,411.01.16 15,00000AJUDANTE ELETRICISTA H 60,900004,061.01.21 0,33100FERREIRO H 1,578874,771.01.22 0,33100AJUDANTE DE FERREIRO H 1,264423,821.01.39 15,34000PEDREIRO H 71,331004,651.01.40 2,86000PINTOR H 13,470604,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,821.01.46 22,80000SERVENTE H 86,868003,812.05.03 0,62000AREIA M3 49,1040079,202.05.05 33,04000CAL HIDRATADA KG 11,233600,342.05.08 150,20000CIMENTO KG 55,574000,372.05.18 0,15720PEDRA BRITADA 2 M3 9,6033561,092.10.17 1,24140SARRAFO PINHO APARELHADO 10X2,5 CM M 5,660784,562.10.21 0,49600TABUAS PINHO DE 1"X12" DE 3A. M2 8,5212817,182.15.38 3,83000ACO CA-60-B $MD BITOLAS KG 10,149502,652.25.15 440,00000TIJOLO COMUM MACICO UN 96,800000,222.67.60 0,12000PREGO KG 0,548404,572.70.10 0,07600ARAME RECOZIDO N.18 KG 0,351884,632.80.56 0,65200GRAFITE L 8,4238412,923.80.03 4,35000CAL PARA PINTURA KG 3,045000,703.80.12 2,50000LIXA PARA FERRO UN 3,575001,433.80.18 0,70000OLEO DE LINHACA L 4,557006,513.80.28 0,39000ZARCAO L 6,2751016,094.01.03 1,00000POSTE DE CONCRETO DUPLO T 300DAN 7,50M UN 341,16000341,164.05.10 1,00000ISOLADOR ROLDANA BAIXA TENSAO UN 2,250002,254.51.11 1,00000CAIXA TIPO 'T' 60X90X25CM ELETROPAULO UN 234,14000234,144.51.13 1,00000CAIXA TIPO "L" 60X90X25CM ELETROPAULO UN 277,84000277,844.63.06 0,02000MOLDE CLASSE R PARA CONEXAO EXOTERMICA UN 1,8126090,634.63.11 0,00200ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA) UN 0,50746253,734.63.21 1,00000CARTUCHO P/CONEXÃO EXOTERM.CABO/HASTE P/CABO 50MM2 UN 17,4400017,444.80.08 1,00000HASTE COPERWELD 19MM (3/4)X3 M UN 70,2300070,234.85.28 2,00000CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM UN 36,0800018,044.95.84 1,00000ARMACAO SECUNDARIA 1 ESTRIBO UN 7,940007,94

LS 408,79722 BDI 461,54093Mão-de-Obra 335,07969 Material 1.262,82279SubMO 743,87691

09.02.059 AE-19 ABRIGO ENTRADA DE ENERGIA 22KVA AES/BANDEIRANTE/CPFL/ELEKTRO UN 1.309,54

1.01.11 0,29000CARPINTEIRO H 1,319504,551.01.12 0,29000AJUDANTE DE CARPINTEIRO H 1,148403,961.01.15 14,00000ELETRICISTA H 75,740005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.21 0,20000FERREIRO H 0,954004,771.01.22 0,20000AJUDANTE DE FERREIRO H 0,764003,821.01.39 9,66000PEDREIRO H 44,919004,651.01.40 1,39000PINTOR H 6,546904,711.01.41 0,09000AJUDANTE DE PINTOR H 0,343803,821.01.46 14,01000SERVENTE H 53,378103,812.05.03 0,32400AREIA M3 25,6608079,202.05.05 52,42000CAL HIDRATADA KG 17,822800,342.05.08 50,06000CIMENTO KG 18,522200,372.05.18 0,04900PEDRA BRITADA 2 M3 2,9934161,092.10.17 0,52000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,371204,562.10.21 0,13000TABUAS PINHO DE 1"X12" DE 3A. M2 2,2334017,182.15.38 2,25000ACO CA-60-B $MD BITOLAS KG 5,962502,652.25.15 308,00000TIJOLO COMUM MACICO UN 67,760000,222.67.60 0,05000PREGO KG 0,228504,572.70.10 0,04000ARAME RECOZIDO N.18 KG 0,185204,632.80.56 0,07500GRAFITE L 0,9690012,923.80.03 2,24000CAL PARA PINTURA KG 1,568000,703.80.12 2,00000LIXA PARA FERRO UN 2,860001,433.80.18 0,04000OLEO DE LINHACA L 0,260406,513.80.28 0,04500ZARCAO L 0,7240516,094.01.01 1,00000POSTE DE CONCRETO DUPLO T 90DAN 7,50M UN 186,67000186,674.05.10 1,00000ISOLADOR ROLDANA BAIXA TENSAO UN 2,250002,254.51.08 1,00000CAIXA CH.ACO - 18 TIPO II 560X300X200 MM EXTERNA UN 72,5100072,514.63.06 0,02000MOLDE CLASSE R PARA CONEXAO EXOTERMICA UN 1,8126090,634.63.11 0,00200ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA) UN 0,50746253,73

09/02/2011 11:38:40 Página: 161 de 0

Page 162: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.63.21 1,00000CARTUCHO P/CONEXÃO EXOTERM.CABO/HASTE P/CABO 50MM2 UN 17,4400017,444.80.08 1,00000HASTE COPERWELD 19MM (3/4)X3 M UN 70,2300070,234.85.28 2,00000CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM UN 36,0800018,044.95.84 1,00000ARMACAO SECUNDARIA 1 ESTRIBO UN 7,940007,94

LS 285,27711 BDI 244,87464Mão-de-Obra 233,83370 Material 545,56152SubMO 519,11081

09.02.060 AE-20 ABRIGO ENTRADA DE ENERGIA 38KVA AES/BANDEIRANTE/CPFL/ELEKTRA UN 1.717,07

1.01.11 0,35000CARPINTEIRO H 1,592504,551.01.12 0,35000AJUDANTE DE CARPINTEIRO H 1,386003,961.01.15 14,00000ELETRICISTA H 75,740005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.21 0,26000FERREIRO H 1,240204,771.01.22 0,26000AJUDANTE DE FERREIRO H 0,993203,821.01.39 12,34000PEDREIRO H 57,381004,651.01.40 2,19000PINTOR H 10,314904,711.01.41 0,25000AJUDANTE DE PINTOR H 0,955003,821.01.46 17,92000SERVENTE H 68,275203,812.05.03 0,41200AREIA M3 32,6304079,202.05.05 66,46000CAL HIDRATADA KG 22,596400,342.05.08 64,55000CIMENTO KG 23,883500,372.05.18 0,08500PEDRA BRITADA 2 M3 5,1926561,092.10.17 0,64000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,918404,562.10.21 0,16000TABUAS PINHO DE 1"X12" DE 3A. M2 2,7488017,182.15.25 3,01000ACO CA-50-A $MD BITOLAS KG 8,127002,702.25.15 385,28000TIJOLO COMUM MACICO UN 84,761600,222.67.60 0,06000PREGO KG 0,274204,572.70.10 0,05000ARAME RECOZIDO N.18 KG 0,231504,632.80.56 0,21000GRAFITE L 2,7132012,923.80.03 2,90000CAL PARA PINTURA KG 2,030000,703.80.12 2,00000LIXA PARA FERRO UN 2,860001,433.80.18 0,06000OLEO DE LINHACA L 0,390606,513.80.28 0,12000ZARCAO L 1,9308016,094.01.02 1,00000POSTE DE CONCRETO DUPLO T 200DAN 7,50M UN 279,14000279,144.05.10 1,00000ISOLADOR ROLDANA BAIXA TENSAO UN 2,250002,254.51.21 1,00000CAIXA P/ MEDICAO 50X60X25CM 'ELETROPAULO' UN 195,46000195,464.63.06 0,02000MOLDE CLASSE R PARA CONEXAO EXOTERMICA UN 1,8126090,634.63.11 0,00200ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA) UN 0,50746253,734.63.21 1,00000CARTUCHO P/CONEXÃO EXOTERM.CABO/HASTE P/CABO 50MM2 UN 17,4400017,444.80.08 1,00000HASTE COPERWELD 19MM (3/4)X3 M UN 70,2300070,234.85.28 2,00000CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM UN 36,0800018,044.95.84 1,00000ARMACAO SECUNDARIA 1 ESTRIBO UN 7,940007,94

LS 325,24956 BDI 321,07923Mão-de-Obra 266,59800 Material 804,14911SubMO 591,84756

09.02.061 AE-21 ABRIGO ENTRADA DE ENERGIA 38 A 76 KVA AES/BANDEIRANTE/ELEKTRO UN 3.280,36

1.01.11 0,86000CARPINTEIRO H 3,913004,551.01.12 0,86000AJUDANTE DE CARPINTEIRO H 3,405603,961.01.15 20,00000ELETRICISTA H 108,200005,411.01.16 18,00000AJUDANTE ELETRICISTA H 73,080004,061.01.21 0,57000FERREIRO H 2,718904,771.01.22 0,57000AJUDANTE DE FERREIRO H 2,177403,821.01.39 19,53000PEDREIRO H 90,814504,651.01.40 6,19000PINTOR H 29,154904,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,821.01.46 28,59000SERVENTE H 108,927903,812.05.03 1,08000AREIA M3 85,5360079,202.05.05 44,66000CAL HIDRATADA KG 15,184400,342.05.08 193,37000CIMENTO KG 71,546900,372.05.18 0,20000PEDRA BRITADA 2 M3 12,2180061,092.10.17 1,58000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,204804,562.10.21 0,39000TABUAS PINHO DE 1"X12" DE 3A. M2 6,7002017,182.15.38 6,52000ACO CA-60-B $MD BITOLAS KG 17,278002,652.25.15 554,40000TIJOLO COMUM MACICO UN 121,968000,222.67.60 0,16000PREGO KG 0,731204,572.70.10 0,11000ARAME RECOZIDO N.18 KG 0,509304,632.80.56 0,83000GRAFITE L 10,7236012,923.80.03 4,54000CAL PARA PINTURA KG 3,178000,703.80.12 3,00000LIXA PARA FERRO UN 4,290001,433.80.18 0,90000OLEO DE LINHACA L 5,859006,513.80.28 0,50000ZARCAO L 8,0450016,094.01.03 1,00000POSTE DE CONCRETO DUPLO T 300DAN 7,50M UN 341,16000341,164.05.10 1,00000ISOLADOR ROLDANA BAIXA TENSAO UN 2,250002,254.51.09 1,00000CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO UN 638,24000638,244.51.11 1,00000CAIXA TIPO 'T' 60X90X25CM ELETROPAULO UN 234,14000234,144.63.06 0,02000MOLDE CLASSE R PARA CONEXAO EXOTERMICA UN 1,8126090,634.63.11 0,00200ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA) UN 0,50746253,734.63.21 1,00000CARTUCHO P/CONEXÃO EXOTERM.CABO/HASTE P/CABO 50MM2 UN 17,4400017,444.80.08 1,00000HASTE COPERWELD 19MM (3/4)X3 M UN 70,2300070,23

09/02/2011 11:38:40 Página: 162 de 0

Page 163: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.85.28 2,00000CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM UN 36,0800018,044.95.84 1,00000ARMACAO SECUNDARIA 1 ESTRIBO UN 7,940007,94

LS 519,97888 BDI 613,40162Mão-de-Obra 426,21220 Material 1.720,77246SubMO 946,19108

09.02.062 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 10MM2 C/ ELETRODUTOS UN 498,59

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,062.63.60 1,00000BUCHA E ARRUELA EM ZAMACK 15MM (1/2") UN 0,300000,304.20.52 1,00000CURVA ACO GALV QUENTE 25 MM (1") X 90 GRAUS UN 3,730003,734.20.80 1,00000CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS UN 2,130002,134.21.41 1,00000CURVA ACO GALV QUENTE 25 MM (1") X 180 GRAUS UN 5,430005,434.21.59 2,00000LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2") UN 1,580000,794.21.61 2,00000LUVA ACO GALV QUENTE (NBR 5624) 25 MM (1") UN 2,220001,114.21.70 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2") M 24,255006,934.21.72 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 70,5600011,764.30.14 27,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 81,270003,014.30.37 3,50000CABO DE COBRE NU DE 10 MM2 M 17,885005,114.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.39 1,00000BUCHA E ARRUELA EM ZAMAK 25 MM (1") UN 0,590000,594.96.22 0,20000BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16" M 1,106005,53

LS 57,76700 BDI 93,23349Mão-de-Obra 47,35000 Material 300,24600SubMO 105,11700

09.02.063 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 16MM2 C/ ELETRODUTOS UN 602,54

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,062.63.60 1,00000BUCHA E ARRUELA EM ZAMACK 15MM (1/2") UN 0,300000,304.20.80 1,00000CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS UN 2,130002,134.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.59 2,00000LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2") UN 1,580000,794.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.70 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2") M 24,255006,934.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.15 27,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 124,740004,624.30.38 3,50000CABO DE COBRE NU DE 16 MM2 M 26,215007,494.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.22 0,20000BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16" M 1,106005,53

LS 57,76700 BDI 112,67079Mão-de-Obra 47,35000 Material 384,75600SubMO 105,11700

09.02.064 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 25MM2 C/ ELETRODUTOS UN 756,43

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.20.51 1,00000CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS UN 2,710002,714.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.60 2,00000LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4") UN 1,700000,854.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.71 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 33,285009,514.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.16 27,00000CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V) M 239,490008,874.30.38 3,50000CABO DE COBRE NU DE 16 MM2 M 26,215007,494.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.38 1,00000BUCHA E ARRUELA EM ZAMAK 19 MM (3/4") UN 0,360000,364.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.23 0,20000BARRAMENTO COBRE 100 A - 3/8"X1/8" M 1,682008,41

LS 57,76700 BDI 141,44747Mão-de-Obra 47,35000 Material 509,87200SubMO 105,11700

09.02.065 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 35MM2 C/ ELETRODUTOS UN 883,05

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.20.51 1,00000CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS UN 2,710002,714.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.60 2,00000LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4") UN 1,700000,854.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.71 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 33,285009,514.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.17 27,00000CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V) M 329,1300012,194.30.40 3,50000CABO DE COBRE NU DE 25 MM2 M 38,7100011,064.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.38 1,00000BUCHA E ARRUELA EM ZAMAK 19 MM (3/4") UN 0,360000,364.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.24 0,20000BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8" M 2,4900012,45

LS 57,76700 BDI 165,12436Mão-de-Obra 47,35000 Material 612,81500SubMO 105,11700

09.02.066 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 50MM2 C/ ELETRODUTOS UN 1.104,79

09/02/2011 11:38:40 Página: 163 de 0

Page 164: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.20.52 1,00000CURVA ACO GALV QUENTE 25 MM (1") X 90 GRAUS UN 3,730003,734.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.43 1,00000CURVA ACO GALV QUENTE 38 MM (1 1/2") X 180 GRAUS UN 19,1600019,164.21.61 2,00000LUVA ACO GALV QUENTE (NBR 5624) 25 MM (1") UN 2,220001,114.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.72 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 41,1600011,764.21.74 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 120,8400020,144.30.18 27,00000CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V) M 459,2700017,014.30.40 3,50000CABO DE COBRE NU DE 25 MM2 M 38,7100011,064.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.39 1,00000BUCHA E ARRUELA EM ZAMAK 25 MM (1") UN 0,590000,594.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.96.24 0,20000BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8" M 2,4900012,45

LS 57,76700 BDI 206,58761Mão-de-Obra 47,35000 Material 793,09000SubMO 105,11700

09.02.067 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 70MM2 C/ ELETRODUTOS UN 1.462,36

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.03 1,00000CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO UN 8,620008,624.21.30 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS UN 16,6300016,634.21.44 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS UN 28,6600028,664.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.64 2,00000LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2") UN 6,520003,264.21.73 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 53,9000015,404.21.75 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 147,9600024,664.30.19 27,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 659,0700024,414.30.41 3,50000CABO DE COBRE NU DE 35 MM2 M 64,1900018,344.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.85.42 1,00000BUCHA E ARRUELA EM ZAMAK 51 MM (2") UN 1,540001,544.96.25 0,20000BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8" M 3,4140017,07

LS 57,76700 BDI 273,44953Mão-de-Obra 47,35000 Material 1.083,79400SubMO 105,11700

09.02.068 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 95MM2 C/ ELETRODUTOS UN 1.780,03

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.03 1,00000CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO UN 8,620008,624.21.30 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS UN 16,6300016,634.21.44 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS UN 28,6600028,664.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.64 2,00000LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2") UN 6,520003,264.21.73 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 53,9000015,404.21.75 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 147,9600024,664.30.20 27,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 908,2800033,644.30.54 3,50000CABO DE COBRE NU 50 MM2 M 73,2550020,934.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.85.42 1,00000BUCHA E ARRUELA EM ZAMAK 51 MM (2") UN 1,540001,544.96.25 0,20000BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8" M 3,4140017,07

LS 57,76700 BDI 332,85278Mão-de-Obra 47,35000 Material 1.342,06900SubMO 105,11700

09.02.069 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 120MM2 C/ ELETRODUTOS UN 2.324,00

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.32 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS UN 34,8400034,844.21.45 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS UN 50,4500050,454.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.65 2,00000LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2") UN 9,720004,864.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 218,2200036,374.30.21 27,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 1.159,1100042,934.30.43 3,50000CABO DE COBRE NU DE 70 MM2 M 120,6450034,474.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.43 1,00000BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2") UN 2,430002,434.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 434,56982Mão-de-Obra 47,35000 Material 1.784,31700SubMO 105,11700

09.02.070 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 150MM2 C/ ELETRODUTOS UN 2.687,14

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.32 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS UN 34,8400034,844.21.45 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS UN 50,4500050,45

09/02/2011 11:38:40 Página: 164 de 0

Page 165: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.65 2,00000LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2") UN 9,720004,864.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 218,2200036,374.30.22 27,00000CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V) M 1.427,2200052,864.30.39 3,50000CABO DE COBRE NU DE 95 MM2 M 147,7700042,224.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.43 1,00000BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2") UN 2,430002,434.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 502,47387Mão-de-Obra 47,35000 Material 2.079,55200SubMO 105,11700

09.02.071 CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 185MM2 C/ ELETRODUTOS UN 3.191,46

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.34 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS UN 47,8700047,874.21.46 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS UN 62,2900062,294.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.66 2,00000LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3") UN 13,880006,944.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,154.30.23 27,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 1.778,7600065,884.30.39 3,50000CABO DE COBRE NU DE 95 MM2 M 147,7700042,224.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.44 1,00000BUCHA E ARRUELA EM ZAMAK 76 MM (3") UN 3,200003,204.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 596,77847Mão-de-Obra 47,35000 Material 2.489,57200SubMO 105,11700

09.02.072 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 10MM2 C/ ELETRUDUTOS UN 572,15

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,062.63.60 1,00000BUCHA E ARRUELA EM ZAMACK 15MM (1/2") UN 0,300000,304.20.80 1,00000CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS UN 2,130002,134.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.59 2,00000LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2") UN 1,580000,794.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.70 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2") M 24,255006,934.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.14 36,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 108,360003,014.30.37 3,50000CABO DE COBRE NU DE 10 MM2 M 17,885005,114.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.22 0,20000BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16" M 1,106005,53

LS 57,76700 BDI 106,98749Mão-de-Obra 47,35000 Material 360,04600SubMO 105,11700

09.02.073 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 16MM2 C/ ELETRODUTOS UN 654,39

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,062.63.60 1,00000BUCHA E ARRUELA EM ZAMACK 15MM (1/2") UN 0,300000,304.20.80 1,00000CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS UN 2,130002,134.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.59 2,00000LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2") UN 1,580000,794.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.70 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2") M 24,255006,934.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.15 36,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 166,320004,624.30.38 3,50000CABO DE COBRE NU DE 16 MM2 M 26,215007,494.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.23 0,20000BARRAMENTO COBRE 100 A - 3/8"X1/8" M 1,682008,41

LS 57,76700 BDI 122,36667Mão-de-Obra 47,35000 Material 426,91200SubMO 105,11700

09.02.074 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 25MM2 C/ ELETRODUTOS UN 854,62

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.20.51 1,00000CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS UN 2,710002,714.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.60 2,00000LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4") UN 1,700000,854.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.71 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 33,285009,514.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.16 36,00000CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V) M 319,320008,87

09/02/2011 11:38:40 Página: 165 de 0

Page 166: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.30.38 3,50000CABO DE COBRE NU DE 16 MM2 M 26,215007,494.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.38 1,00000BUCHA E ARRUELA EM ZAMAK 19 MM (3/4") UN 0,360000,364.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.23 0,20000BARRAMENTO COBRE 100 A - 3/8"X1/8" M 1,682008,41

LS 57,76700 BDI 159,80837Mão-de-Obra 47,35000 Material 589,70200SubMO 105,11700

09.02.075 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 35MM2 C/ ELETRODUTOS UN 1.017,99

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.20.51 1,00000CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS UN 2,710002,714.20.83 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS UN 7,290007,294.21.42 1,00000CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS UN 11,4500011,454.21.60 2,00000LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4") UN 1,700000,854.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.71 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 33,285009,514.21.73 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 92,4000015,404.30.17 36,00000CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V) M 438,8400012,194.30.40 3,50000CABO DE COBRE NU DE 25 MM2 M 38,7100011,064.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.38 1,00000BUCHA E ARRUELA EM ZAMAK 19 MM (3/4") UN 0,360000,364.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.96.24 0,20000BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8" M 2,4900012,45

LS 57,76700 BDI 190,35766Mão-de-Obra 47,35000 Material 722,52500SubMO 105,11700

09.02.076 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 50MM2 C/ ELETRODUTOS UN 1.293,09

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.20.52 1,00000CURVA ACO GALV QUENTE 25 MM (1") X 90 GRAUS UN 3,730003,734.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.43 1,00000CURVA ACO GALV QUENTE 38 MM (1 1/2") X 180 GRAUS UN 19,1600019,164.21.61 2,00000LUVA ACO GALV QUENTE (NBR 5624) 25 MM (1") UN 2,220001,114.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.72 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 41,1600011,764.21.74 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 120,8400020,144.30.18 36,00000CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V) M 612,3600017,014.30.40 3,50000CABO DE COBRE NU DE 25 MM2 M 38,7100011,064.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.39 1,00000BUCHA E ARRUELA EM ZAMAK 25 MM (1") UN 0,590000,594.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.96.24 0,20000BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8" M 2,4900012,45

LS 57,76700 BDI 241,79831Mão-de-Obra 47,35000 Material 946,18000SubMO 105,11700

09.02.077 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 70MM2 C/ ELETRODUTOS UN 1.732,57

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.03 1,00000CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO UN 8,620008,624.21.30 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS UN 16,6300016,634.21.44 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS UN 28,6600028,664.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.64 2,00000LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2") UN 6,520003,264.21.73 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 53,9000015,404.21.75 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 147,9600024,664.30.19 36,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 878,7600024,414.30.41 3,50000CABO DE COBRE NU DE 35 MM2 M 64,1900018,344.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.85.42 1,00000BUCHA E ARRUELA EM ZAMAK 51 MM (2") UN 1,540001,544.96.25 0,20000BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8" M 3,4140017,07

LS 57,76700 BDI 323,97823Mão-de-Obra 47,35000 Material 1.303,48400SubMO 105,11700

09.02.078 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 95MM2 C/ ELETRODUTOS UN 2.152,43

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.03 1,00000CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO UN 8,620008,624.21.30 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS UN 16,6300016,634.21.44 1,00000CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS UN 28,6600028,664.21.62 2,00000LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") UN 3,240001,624.21.64 2,00000LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2") UN 6,520003,264.21.73 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 53,9000015,404.21.75 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 147,9600024,664.30.20 36,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 1.211,0400033,644.30.54 3,50000CABO DE COBRE NU 50 MM2 M 73,2550020,934.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.40 1,00000BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4") UN 0,860000,864.85.42 1,00000BUCHA E ARRUELA EM ZAMAK 51 MM (2") UN 1,540001,544.96.25 0,20000BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8" M 3,4140017,07

09/02/2011 11:38:40 Página: 166 de 0

Page 167: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 57,76700 BDI 402,48758Mão-de-Obra 47,35000 Material 1.644,82900SubMO 105,11700

09.02.079 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 120MM2 C/ ELETRODUTOS UN 2.799,23

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.32 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS UN 34,8400034,844.21.45 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS UN 50,4500050,454.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.65 2,00000LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2") UN 9,720004,864.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 218,2200036,374.30.21 36,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 1.545,4800042,934.30.43 3,50000CABO DE COBRE NU DE 70 MM2 M 120,6450034,474.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.43 1,00000BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2") UN 2,430002,434.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 523,43492Mão-de-Obra 47,35000 Material 2.170,68700SubMO 105,11700

09.02.080 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 150MM2 C/ ELETRODUTOS UN 3.272,30

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.32 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS UN 34,8400034,844.21.45 1,00000CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS UN 50,4500050,454.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.65 2,00000LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2") UN 9,720004,864.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.76 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 218,2200036,374.30.22 36,00000CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V) M 1.902,9600052,864.30.39 3,50000CABO DE COBRE NU DE 95 MM2 M 147,7700042,224.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.43 1,00000BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2") UN 2,430002,434.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 611,89407Mão-de-Obra 47,35000 Material 2.555,29200SubMO 105,11700

09.02.081 CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 185MM2 C/ ELETRODUTOS UN 3.920,75

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.21.04 1,00000CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO UN 9,720009,724.21.34 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS UN 47,8700047,874.21.46 1,00000CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS UN 62,2900062,294.21.63 2,00000LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2") UN 4,960002,484.21.66 2,00000LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3") UN 13,880006,944.21.74 3,50000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 70,4900020,144.21.77 6,00000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 246,9000041,154.30.23 36,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 2.371,6800065,884.30.39 3,50000CABO DE COBRE NU DE 95 MM2 M 147,7700042,224.45.10 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA UN 89,1900089,194.85.41 1,00000BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2") UN 1,050001,054.85.44 1,00000BUCHA E ARRUELA EM ZAMAK 76 MM (3") UN 3,200003,204.96.26 0,20000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 13,4920067,46

LS 57,76700 BDI 733,15007Mão-de-Obra 47,35000 Material 3.082,49200SubMO 105,11700

09.02.082 CONJ ENTRADA P/ TELEFONE EM ENTRADA DE ENERGIA UN 305,99

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.20.51 3,00000CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS UN 8,130002,714.21.40 1,00000CURVA ACO GALV QUENTE 19 MM (3/4") X 180 GRAUS UN 3,240003,244.21.60 5,00000LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4") UN 4,250000,854.21.71 8,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 76,080009,514.30.60 11,00000FIO TRANCADO PARA TELEFONE - PADRAO TELEBRAS M 2,420000,224.45.15 1,00000DPS - DISPOSITIVO DE PROT. CONTRA SURTOS TEL 20KA UN 40,6900040,694.51.32 1,00000CAIXA VENEZIANA 'TELESP' 15X25X10CM UN 25,7200025,724.85.30 2,00000CINTA ACO GALVANIZADO DE 170MM UN 28,8200014,414.85.38 2,00000BUCHA E ARRUELA EM ZAMAK 19 MM (3/4") UN 0,720000,364.94.81 1,00000ALCA COM ISOLADOR PORCELANA TELESP UN 6,150006,15

LS 28,88350 BDI 57,21906Mão-de-Obra 23,67500 Material 196,22000SubMO 52,55850

09.02.083 CHAVE SECCIONADORA NH C/ CARGA 3X125A TAM 00 C/ FUSIVEIS UN 150,40

1.01.15 2,00000ELETRICISTA H 10,820005,414.35.11 1,00000CHAVE SECCIONADORA NH 3X125A SECA UN 78,1900078,194.41.52 3,00000FUSIVEL NH ATE 125 A UN 20,070006,69

LS 13,20040 BDI 28,12449Mão-de-Obra 10,82000 Material 98,26000SubMO 24,02040

09/02/2011 11:38:40 Página: 167 de 0

Page 168: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.02.084 CHAVE SECCIONADORA NH C/ CARGA 3X250A TAM 01 C/ FUSIVEIS UN 390,18

1.01.15 2,00000ELETRICISTA H 10,820005,414.37.07 1,00000CHAVE SECCIONADORA NH C/ CARGA 3X250A TAM 01 S/FUS UN 214,00000214,004.41.56 3,00000FUSIVEL NH DE 200 A 250A UN 79,2000026,40

LS 13,20040 BDI 72,96069Mão-de-Obra 10,82000 Material 293,20000SubMO 24,02040

09.02.085 CHAVE SECCIONADORA NH C/ CARGA 3X400A TAM 02 C/ FUSIVEIS UN 506,93

1.01.15 2,00000ELETRICISTA H 10,820005,414.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,664.41.59 3,00000FUSIVEL NH DE 300 A 400A UN 98,4600032,82

LS 13,20040 BDI 94,79229Mão-de-Obra 10,82000 Material 388,12000SubMO 24,02040

09.02.086 DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A UN 56,20

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.10 1,00000DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A UN 26,7700026,77

LS 10,39806 BDI 10,50894Mão-de-Obra 8,52300 Material 26,77000SubMO 18,92106

09.02.087 DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A UN 65,27

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.12 1,00000DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A UN 34,1500034,15

LS 10,39806 BDI 12,20634Mão-de-Obra 8,52300 Material 34,15000SubMO 18,92106

09.02.088 DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A UN 62,71

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.15 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A UN 32,0700032,07

LS 10,39806 BDI 11,72794Mão-de-Obra 8,52300 Material 32,07000SubMO 18,92106

09.02.089 DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A UN 72,21

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.40 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A UN 39,7900039,79

LS 10,39806 BDI 13,50354Mão-de-Obra 8,52300 Material 39,79000SubMO 18,92106

09.02.090 DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A UN 191,88

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.65 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A UN 137,08000137,08

LS 10,39806 BDI 35,88024Mão-de-Obra 8,52300 Material 137,08000SubMO 18,92106

09.02.091 DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X125A A 3X225A UN 191,88

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.65 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A UN 137,08000137,08

LS 10,39806 BDI 35,88024Mão-de-Obra 8,52300 Material 137,08000SubMO 18,92106

09.02.092 CHAVE FACA SECA 2X200A BASE MARMORE UN 95,49

1.01.15 2,00000ELETRICISTA H 10,820005,414.36.44 1,00000CHAVE FACA SECA 2X200A MARMORE UN 53,6200053,62

LS 13,20040 BDI 17,85729Mão-de-Obra 10,82000 Material 53,62000SubMO 24,02040

09.02.093 CHAVE FACA SECA 2X400A BASE MARMORE UN 200,72

1.01.15 2,00000ELETRICISTA H 10,820005,414.36.52 1,00000CHAVE FACA SECA 2X400A MARMORE UN 139,17000139,17

LS 13,20040 BDI 37,53379Mão-de-Obra 10,82000 Material 139,17000SubMO 24,02040

09.02.094 CHAVE FACA SECA 3X200A BASE MARMORE UN 102,10

1.01.15 2,00000ELETRICISTA H 10,820005,414.36.49 1,00000CHAVE FACA SECA 3X200A 'MARMORE' UN 58,9900058,99

LS 13,20040 BDI 19,09239Mão-de-Obra 10,82000 Material 58,99000SubMO 24,02040

09.02.095 CHAVE FACA SECA 3X400A BASE MARMORE UN 273,87

1.01.15 2,00000ELETRICISTA H 10,820005,414.36.50 1,00000CHAVE FACA SECA 3X400A 'MAMORE' UN 198,64000198,64

LS 13,20040 BDI 51,21189Mão-de-Obra 10,82000 Material 198,64000SubMO 24,02040

09.02.096 CHAVE SECCIONADORA NH 3X125A SECA UN 116,86

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.35.11 1,00000CHAVE SECCIONADORA NH 3X125A SECA UN 78,1900078,19

LS 9,24272 BDI 21,85201Mão-de-Obra 7,57600 Material 78,19000SubMO 16,81872

09.02.097 CHAVE SECCIONADORA NH 3X250A SECA UN 836,89

09/02/2011 11:38:40 Página: 168 de 0

Page 169: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.35.12 1,00000CHAVE SECCIONADORA NH 3X250A SECA UN 659,38000659,38

LS 11,55340 BDI 156,49278Mão-de-Obra 9,47000 Material 659,38000SubMO 21,02340

09.02.098 CHAVE SECCIONADORA NH 3X400A SECA UN 1.162,45

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.35.13 1,00000CHAVE SECCIONADORA NH 3X400A SECA UN 919,86000919,86

LS 13,86408 BDI 217,37026Mão-de-Obra 11,36400 Material 919,86000SubMO 25,22808

09.02.099 SERVICOS DE ENTRADA DE BAIXA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.03.001 FIO DE 4 MM2 - 750 V DE ISOLACAO M 3,11

1.01.15 0,05500ELETRICISTA H 0,297555,411.01.16 0,05500AJUDANTE ELETRICISTA H 0,223304,064.30.06 1,00000FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V) M 1,380001,38

LS 0,63544 BDI 0,58335Mão-de-Obra 0,52085 Material 1,38000SubMO 1,15629

09.03.002 FIO DE 6 MM2 - 750 V DE ISOLACAO M 4,01

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.30.07 1,00000FIO DE 6,00 MM2 (ISOL PVC ANTICHAMA 750V) M 2,000002,00

LS 0,69320 BDI 0,75012Mão-de-Obra 0,56820 Material 2,00000SubMO 1,26140

09.03.003 FIO DE 10 MM2 - 750 V DE ISOLACAO M 6,66

1.01.15 0,09000ELETRICISTA H 0,486905,411.01.16 0,09000AJUDANTE ELETRICISTA H 0,365404,064.30.08 1,00000FIO DE 10,0 MM2 (ISOL PVC ANTICHAMA 750V) M 3,530003,53

LS 1,03981 BDI 1,24708Mão-de-Obra 0,85230 Material 3,53000SubMO 1,89211

09.03.004 CABO DE 16 MM2 - 750 V DE ISOLACAO M 9,04

1.01.15 0,13000ELETRICISTA H 0,703305,411.01.16 0,13000AJUDANTE ELETRICISTA H 0,527804,064.30.15 1,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 4,620004,62

LS 1,50194 BDI 1,69120Mão-de-Obra 1,23110 Material 4,62000SubMO 2,73304

09.03.005 CABO DE 25 MM2 - 750 V DE ISOLACAO M 17,37

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.30.16 1,00000CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V) M 8,870008,87

LS 2,88835 BDI 3,24895Mão-de-Obra 2,36750 Material 8,87000SubMO 5,25585

09.03.006 CABO DE 35 MM2 - 750 V DE ISOLACAO M 25,33

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.30.17 1,00000CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V) M 12,1900012,19

LS 4,62136 BDI 4,73785Mão-de-Obra 3,78800 Material 12,19000SubMO 8,40936

09.03.007 CABO DE 50 MM2 - 750 V DE ISOLACAO M 36,43

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.30.18 1,00000CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V) M 17,0100017,01

LS 6,93204 BDI 6,81353Mão-de-Obra 5,68200 Material 17,01000SubMO 12,61404

09.03.008 CABO DE 70 MM2 - 750 V DE ISOLACAO M 48,12

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.30.19 1,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 24,4100024,41

LS 8,08738 BDI 8,99907Mão-de-Obra 6,62900 Material 24,41000SubMO 14,71638

09.03.009 CABO DE 95 MM2 - 750 V DE ISOLACAO M 69,82

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.30.20 1,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 33,6400033,64

LS 12,70874 BDI 13,05612Mão-de-Obra 10,41700 Material 33,64000SubMO 23,12574

09.03.010 CABO DE 120 MM2 - 750 V DE ISOLACAO M 86,42

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.30.21 1,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 42,9300042,93

LS 15,01942 BDI 16,15990Mão-de-Obra 12,31100 Material 42,93000SubMO 27,33042

09/02/2011 11:38:40 Página: 169 de 0

Page 170: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.03.011 CABO DE 150 MM2 - 750 V DE ISOLACAO M 103,80

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.30.22 1,00000CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V) M 52,8600052,86

LS 17,33010 BDI 19,41087Mão-de-Obra 14,20500 Material 52,86000SubMO 31,53510

09.03.012 CABO DE 185 MM2 - 750 V DE ISOLACAO M 130,16

1.01.15 1,90000ELETRICISTA H 10,279005,411.01.16 1,90000AJUDANTE ELETRICISTA H 7,714004,064.30.23 1,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 65,8800065,88

LS 21,95146 BDI 24,33963Mão-de-Obra 17,99300 Material 65,88000SubMO 39,94446

09.03.013 CABO DE 240 MM2 - 750 V DE ISOLACAO M 160,96

1.01.15 2,10000ELETRICISTA H 11,361005,411.01.16 2,10000AJUDANTE ELETRICISTA H 8,526004,064.30.24 1,00000CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V) M 86,7200086,72

LS 24,26214 BDI 30,09990Mão-de-Obra 19,88700 Material 86,72000SubMO 44,14914

09.03.014 CABO DE 300 MM2 - 750 V DE ISOLACAO M 193,80

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.31.71 1,00000EL-CABO DE COBRE 750 V-L-SECAO 300 MM2 M 115,52000115,52

LS 23,10680 BDI 36,24036Mão-de-Obra 18,94000 Material 115,52000SubMO 42,04680

09.03.017 CABO DE 4 MM2 - 1000V DE ISOLAÇÃO M 4,89

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.31.57 1,03000EL-CABO DE COBRE 1000 V-C-SECAO 4 MM2 M 2,719202,64

LS 0,69320 BDI 0,91554Mão-de-Obra 0,56820 Material 2,71920SubMO 1,26140

09.03.018 CABO DE 6 MM2 - 1000V DE ISOLAÇÃO M 6,47

1.01.15 0,10000ELETRICISTA H 0,541005,411.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.31.58 1,03000EL-CABO DE COBRE 1000 V-D-SECAO 6 MM2 M 3,162103,07

LS 1,15534 BDI 1,21082Mão-de-Obra 0,94700 Material 3,16210SubMO 2,10234

09.03.019 CABO DE 10 MM2 - 1000V DE ISOLAÇÃO M 10,51

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.31.59 1,03000EL-CABO DE COBRE 1000 V-E-SECAO 10 MM2 M 5,397205,24

LS 1,73301 BDI 1,96666Mão-de-Obra 1,42050 Material 5,39720SubMO 3,15351

09.03.020 CABO DE 16 MM2 - 1000V DE ISOLAÇÃO M 17,35

1.01.15 0,29000ELETRICISTA H 1,568905,411.01.16 0,29000AJUDANTE ELETRICISTA H 1,177404,064.31.60 1,03000EL-CABO DE COBRE 1000 V-F-SECAO 16 MM2 M 8,013407,78

LS 3,35049 BDI 3,24534Mão-de-Obra 2,74630 Material 8,01340SubMO 6,09679

09.03.021 CABO DE 25 MM2 - 1000V DE ISOLAÇÃO M 27,88

1.01.15 0,48000ELETRICISTA H 2,596805,411.01.16 0,48000AJUDANTE ELETRICISTA H 1,948804,064.31.61 1,03000EL-CABO DE COBRE 1000 V-G-SECAO 25 MM2 M 12,5763012,21

LS 5,54563 BDI 5,21353Mão-de-Obra 4,54560 Material 12,57630SubMO 10,09123

09.03.022 CABO DE 35 MM2 - 1000V DE ISOLAÇÃO M 39,28

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.31.62 1,03000EL-CABO DE COBRE 1000 V-H-SECAO 35 MM2 M 17,2216016,72

LS 8,08738 BDI 7,34574Mão-de-Obra 6,62900 Material 17,22160SubMO 14,71638

09.03.023 CABO DE 50 MM2 - 1000V DE ISOLAÇÃO M 51,20

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.31.63 1,03000EL-CABO DE COBRE 1000 V-I-SECAO 50 MM2 M 24,8127024,09

LS 9,24272 BDI 9,57523Mão-de-Obra 7,57600 Material 24,81270SubMO 16,81872

09.03.024 CABO DE 70 MM2 - 1000V DE ISOLAÇÃO M 68,28

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.31.64 1,03000EL-CABO DE COBRE 1000 V-J-SECAO 70 MM2 M 34,4947033,49

LS 11,55340 BDI 12,76916Mão-de-Obra 9,47000 Material 34,49470SubMO 21,02340

09.03.025 CABO DE 95 MM2 - 1000V DE ISOLAÇÃO M 85,01

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,06

09/02/2011 11:38:40 Página: 170 de 0

Page 171: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.31.65 1,03000EL-CABO DE COBRE 1000 V-K-SECAO 95 MM2 M 41,7871040,57

LS 15,01942 BDI 15,89703Mão-de-Obra 12,31100 Material 41,78710SubMO 27,33042

09.03.026 CABO DE 120 MM2 - 1000V DE ISOLAÇÃO M 110,68

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.31.66 1,03000EL-CABO DE COBRE 1000 V-L-SECAO 120 MM2 M 58,4525056,75

LS 17,33010 BDI 20,69715Mão-de-Obra 14,20500 Material 58,45250SubMO 31,53510

09.03.027 CABO DE 150 MM2 - 1000V DE ISOLAÇÃO M 134,39

1.01.15 1,70000ELETRICISTA H 9,197005,411.01.16 1,70000AJUDANTE ELETRICISTA H 6,902004,064.31.67 1,03000EL-CABO DE COBRE 1000 V-M-SECAO 150 MM2 M 73,5214071,38

LS 19,64078 BDI 25,13007Mão-de-Obra 16,09900 Material 73,52140SubMO 35,73978

09.03.028 CABO DE 185 MM2 - 1000V DE ISOLAÇÃO M 159,54

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.31.68 1,03000EL-CABO DE COBRE 1000 V-N-SECAO 185 MM2 M 87,6633085,11

LS 23,10680 BDI 29,83332Mão-de-Obra 18,94000 Material 87,66330SubMO 42,04680

09.03.029 CABO DE 240 MM2 - 1000V DE ISOLAÇÃO M 188,14

1.01.15 2,20000ELETRICISTA H 11,902005,411.01.16 2,20000AJUDANTE ELETRICISTA H 8,932004,064.31.69 1,03000EL-CABO DE COBRE 1000 V-O-SECAO 240 MM2 M 106,70800103,60

LS 25,41748 BDI 35,18068Mão-de-Obra 20,83400 Material 106,70800SubMO 46,25148

09.03.030 CABO DE 300 MM2 - 1000V DE ISOLAÇÃO M 275,30

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.31.70 1,03000EL-CABO DE COBRE 1000 V-P-SECAO 300 MM2 M 171,26840166,28

LS 28,88350 BDI 51,48019Mão-de-Obra 23,67500 Material 171,26840SubMO 52,55850

09.03.046 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 25MM - INCL CONEXOES M 17,09

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.25.02 1,10000ELETRODUTO PVC RIGIDO 25MM (3/4') M 3,388003,08

LS 5,77670 BDI 3,19693Mão-de-Obra 4,73500 Material 3,38800SubMO 10,51170

09.03.047 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 32MM - INCL CONEXOES M 21,42

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.25.03 1,10000ELETRODUTO PVC RIGIDO 32MM (1') M 4,807004,37

LS 6,93204 BDI 4,00684Mão-de-Obra 5,68200 Material 4,80700SubMO 12,61404

09.03.048 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 40MM - INCL CONEXOES M 25,28

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.25.04 1,10000ELETRODUTO PVC RIGIDO 38MM (1 1/4) M 5,841005,31

LS 8,08738 BDI 4,72820Mão-de-Obra 6,62900 Material 5,84100SubMO 14,71638

09.03.049 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 50MM - INCL CONEXOES M 27,62

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.25.05 1,10000ELETRODUTO PVC RIGIDO 50MM (1 1/2') M 5,643005,13

LS 9,24272 BDI 5,16620Mão-de-Obra 7,57600 Material 5,64300SubMO 16,81872

09.03.050 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 60MM - INCL CONEXOES M 31,13

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.25.06 1,10000ELETRODUTO PVC RIGIDO 60MM (2') M 6,391005,81

LS 10,39806 BDI 5,82177Mão-de-Obra 8,52300 Material 6,39100SubMO 18,92106

09.03.051 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 75MM - INCL CONEXOES M 40,97

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.25.07 1,10000ELETRODUTO PVC RIGIDO 75MM (2 1/2') M 12,2870011,17

LS 11,55340 BDI 7,66139Mão-de-Obra 9,47000 Material 12,28700SubMO 21,02340

09.03.052 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 85MM - INCL CONEXOES M 48,94

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.25.08 1,10000ELETRODUTO PVC RIGIDO 85MM (3') M 16,6650015,15

LS 12,70874 BDI 9,15187Mão-de-Obra 10,41700 Material 16,66500SubMO 23,12574

09/02/2011 11:38:40 Página: 171 de 0

Page 172: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.03.053 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 110MM -INCL CONEXOES M 63,28

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.25.09 1,10000ELETRODUTO PVC RIGIDO 110MM (4') M 24,1230021,93

LS 15,01942 BDI 11,83429Mão-de-Obra 12,31100 Material 24,12300SubMO 27,33042

09.03.058 ELETRODUTO EM POLIETILENO DE 25MM-INCLUSIVE CONEXOES M 13,53

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.26.12 1,10000ELETRODUTO DE POLIETILENO 25 MM M 0,495000,45

LS 5,77670 BDI 2,53154Mão-de-Obra 4,73500 Material 0,49500SubMO 10,51170

09.03.059 ELETRODUTO EM POLIETILENO DE 32MM-INCLUSIVE CONEXOES M 16,50

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.26.14 1,10000ELETRODUTO DE POLIETILENO 32 MM M 0,803000,73

LS 6,93204 BDI 3,08592Mão-de-Obra 5,68200 Material 0,80300SubMO 12,61404

09.03.090 ENVELOPE DE CONCRETO PARA DUTOS M 10,19

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,53000SERVENTE H 2,019303,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 2,52000CIMENTO KG 0,932400,372.05.17 0,00670PEDRA BRITADA 1 M3 0,4149361,93

LS 3,59815 BDI 1,90688Mão-de-Obra 2,94930 Material 1,74333SubMO 6,54745

09.03.099 SERVICOS DE INTERLIGACAO AO QUADRO GERAL MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.04.006 CAIXA EM CHAPA DE AÇO 16 COM PORTA E FECHO M2 834,86

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.51.22 0,80000CUBICULO: QUADRO GERAL PORTA/FECH/ACO 100x125x25CM UN 573,63200717,04

LS 57,76700 BDI 156,11227Mão-de-Obra 47,35000 Material 573,63200SubMO 105,11700

09.04.007 QUADRO GERAL : CHAVE SECCIONADORA NH C/ FUSIVEL 3X125A UN 141,54

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.35.11 1,00000CHAVE SECCIONADORA NH 3X125A SECA UN 78,1900078,194.41.52 3,00000FUSIVEL NH ATE 125 A UN 20,070006,69

LS 9,24272 BDI 26,46811Mão-de-Obra 7,57600 Material 98,26000SubMO 16,81872

09.04.008 QUADRO GERAL : CHAVE SECCIONADORA NH C/ FUSIVEL 3X250A UN 386,49

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.37.05 1,00000CHAVE SECCIONADORA NH 3X250A S/ FUSIVEIS UN 214,00000214,004.41.56 3,00000FUSIVEL NH DE 200 A 250A UN 79,2000026,40

LS 11,55340 BDI 72,27138Mão-de-Obra 9,47000 Material 293,20000SubMO 21,02340

09.04.009 QUADRO GERAL : CHAVE SECCIONADORA NH C/ FUSIVEL 3X400A UN 508,41

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,664.41.59 3,00000FUSIVEL NH DE 300 A 400A UN 98,4600032,82

LS 13,86408 BDI 95,07006Mão-de-Obra 11,36400 Material 388,12000SubMO 25,22808

09.04.010 QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 30 A UN 22,76

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.36.45 1,00000CHAVE FACA SECA 3X30A 'MARMORE' UN 10,1000010,10

LS 4,62136 BDI 4,25715Mão-de-Obra 3,78800 Material 10,10000SubMO 8,40936

09.04.011 QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 60 A UN 32,30

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,65

LS 6,93204 BDI 6,04073Mão-de-Obra 5,68200 Material 13,65000SubMO 12,61404

09.04.012 QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 100 A UN 64,52

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.36.47 1,00000CHAVE FACA SECA 3X100A 'MARMORE' UN 35,6400035,64

LS 9,24272 BDI 12,06551Mão-de-Obra 7,57600 Material 35,64000SubMO 16,81872

09/02/2011 11:38:40 Página: 172 de 0

Page 173: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.04.014 QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 200 A UN 98,41

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.36.49 1,00000CHAVE FACA SECA 3X200A 'MARMORE' UN 58,9900058,99

LS 11,55340 BDI 18,40308Mão-de-Obra 9,47000 Material 58,99000SubMO 21,02340

09.04.015 QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 400 A UN 275,35

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.36.50 1,00000CHAVE FACA SECA 3X400A 'MAMORE' UN 198,64000198,64

LS 13,86408 BDI 51,48966Mão-de-Obra 11,36400 Material 198,64000SubMO 25,22808

09.04.016 CHAVE SECCIONADORA NH C/FUSIVEL 3X630A UN 832,85

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.37.20 1,00000CHAVE SECCIONADORA NH S/FUSÍVEL 3X630A UN 513,98000513,984.41.67 3,00000FUSIVEL NH DE 425 A 630A UN 137,9100045,97

LS 13,86408 BDI 155,73716Mão-de-Obra 11,36400 Material 651,89000SubMO 25,22808

09.04.019 QUADRO GERAL - DISJUNTOR TERMOMAGNETICO 3X10A A 3X50A UN 62,71

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.15 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A UN 32,0700032,07

LS 10,39806 BDI 11,72794Mão-de-Obra 8,52300 Material 32,07000SubMO 18,92106

09.04.020 QUADRO GERAL - DISJUNTOR TERMOMAGNETICO 3X60A A 3X100A UN 72,21

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.40 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A UN 39,7900039,79

LS 10,39806 BDI 13,50354Mão-de-Obra 8,52300 Material 39,79000SubMO 18,92106

09.04.021 QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X200A UN 188,47

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.35.56 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X200A UN 134,31000134,31

LS 10,39806 BDI 35,24314Mão-de-Obra 8,52300 Material 134,31000SubMO 18,92106

09.04.022 QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X400A UN 1.626,29

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.35.57 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X400A UN 1.303,270001.303,27

LS 10,39806 BDI 304,10394Mão-de-Obra 8,52300 Material 1.303,27000SubMO 18,92106

09.04.023 QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X600A UN 2.683,98

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.35.58 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X600A UN 2.163,180002.163,18

LS 10,39806 BDI 501,88324Mão-de-Obra 8,52300 Material 2.163,18000SubMO 18,92106

09.04.024 QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X800A UN 4.898,23

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.35.59 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X800A UN 3.963,380003.963,38

LS 10,39806 BDI 915,92924Mão-de-Obra 8,52300 Material 3.963,38000SubMO 18,92106

09.04.025 DISJUNTOR TERMOMAGNETICO 3X125A A 3X225A UN 191,88

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.65 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A UN 137,08000137,08

LS 10,39806 BDI 35,88024Mão-de-Obra 8,52300 Material 137,08000SubMO 18,92106

09.04.028 QUADRO GERAL-DISJUNTOR TERMOMAGNETICO 3X300A UN 1.477,28

1.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,061.01.17 0,90000ELETRICISTA PARA ALTA TENSAO H 6,750007,504.35.55 1,00000DISJUNTOR TERMOMAGNETICO 3X300A UN 1.177,950001.177,95

LS 12,69288 BDI 276,24078Mão-de-Obra 10,40400 Material 1.177,95000SubMO 23,09688

09.04.036 INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 40A/30MA UN 216,74

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.93 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/30MA UN 120,87000120,874.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

09/02/2011 11:38:40 Página: 173 de 0

Page 174: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 11,55340 BDI 40,52908Mão-de-Obra 9,47000 Material 155,19000SubMO 21,02340

09.04.037 INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 63A/30MA UN 251,93

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.94 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/30MA UN 149,48000149,484.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 47,10938Mão-de-Obra 9,47000 Material 183,80000SubMO 21,02340

09.04.038 INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 40A/300 mA UN 224,65

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.95 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/300MA UN 127,30000127,304.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 42,00798Mão-de-Obra 9,47000 Material 161,62000SubMO 21,02340

09.04.039 INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 63A/300 mA UN 242,42

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.96 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/300MA UN 141,75000141,754.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 45,33148Mão-de-Obra 9,47000 Material 176,07000SubMO 21,02340

09.04.040 QUADRO GERAL-BARRAMENTO DE 30 A M 7,65

1.01.15 0,25000ELETRICISTA H 1,352505,414.96.21 1,00000BARRAMENTO COBRE 6X1MM P/30A - 1/4"X1/16" M 3,220003,22

LS 1,65005 BDI 1,43119Mão-de-Obra 1,35250 Material 3,22000SubMO 3,00255

09.04.041 QUADRO GERAL-BARRAMENTO DE 60 A M 10,49

1.01.15 0,25000ELETRICISTA H 1,352505,414.96.22 1,00000BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16" M 5,530005,53

LS 1,65005 BDI 1,96249Mão-de-Obra 1,35250 Material 5,53000SubMO 3,00255

09.04.042 QUADRO GERAL-BARRAMENTO DE 100 A M 14,03

1.01.15 0,25000ELETRICISTA H 1,352505,414.96.23 1,00000BARRAMENTO COBRE 100 A - 3/8"X1/8" M 8,410008,41

LS 1,65005 BDI 2,62489Mão-de-Obra 1,35250 Material 8,41000SubMO 3,00255

09.04.043 QUADRO GERAL-BARRAMENTO DE 150 A M 19,74

1.01.15 0,30000ELETRICISTA H 1,623005,414.96.24 1,00000BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8" M 12,4500012,45

LS 1,98006 BDI 3,69220Mão-de-Obra 1,62300 Material 12,45000SubMO 3,60306

09.04.044 QUADRO GERAL-BARRAMENTO DE 200 A M 25,42

1.01.15 0,30000ELETRICISTA H 1,623005,414.96.25 1,00000BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8" M 17,0700017,07

LS 1,98006 BDI 4,75480Mão-de-Obra 1,62300 Material 17,07000SubMO 3,60306

09.04.045 QUADRO GERAL-BARRAMENTO DE 400 A M 87,40

1.01.15 0,30000ELETRICISTA H 1,623005,414.96.26 1,00000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 67,4600067,46

LS 1,98006 BDI 16,34450Mão-de-Obra 1,62300 Material 67,46000SubMO 3,60306

09.04.046 QUADRO GERAL-BARRAMENTO DE 800 A M 165,00

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.95.03 1,00000ISOLADOR DE BAIXA TENSAO, EM PORCELANA UN 2,830002,834.96.27 1,00000BARRAMENTO COBRE 800A 2"X1/4" (TRIFÁSICO) M 93,6500093,65

LS 20,70340 BDI 30,85528Mão-de-Obra 16,97000 Material 96,48000SubMO 37,67340

09.04.047 QUADRO GERAL-BARRAMENTO DE 1000 A M 245,77

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,061.01.17 1,50000ELETRICISTA PARA ALTA TENSAO H 11,250007,504.95.03 1,00000ISOLADOR DE BAIXA TENSAO, EM PORCELANA UN 2,830002,834.96.28 1,00000BARRAMENTO COBRE 1000A - 3"X1/4" M 140,48000140,48

09/02/2011 11:38:40 Página: 174 de 0

Page 175: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 31,05510 BDI 45,95862Mão-de-Obra 25,45500 Material 143,31000SubMO 56,51010

09.04.049 QUADRO GERAL - BARRAMENTO DE 600A M 136,11

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.95.03 1,00000ISOLADOR DE BAIXA TENSAO, EM PORCELANA UN 2,830002,834.96.29 1,00000BARRAMENTO DE COBRE 600A-1 1/2" X 1/4" M 70,1600070,16

LS 20,70340 BDI 25,45258Mão-de-Obra 16,97000 Material 72,99000SubMO 37,67340

09.04.050 PLACA DE ACRILICO TRANSPARENTE ESP=5MM PROTECAO A CONTATO ACIDENTAL M2 197,24

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,062.67.31 6,00000PARAFUSO AUTO-ATARRACHANTE CABECA OVAL 4,8 X 75MM UN 0,840000,143.71.30 1,10000ACRILICO TRANSPARENTE ESP=5MM M2 142,70300129,73

LS 9,24272 BDI 36,88320Mão-de-Obra 7,57600 Material 143,54300SubMO 16,81872

09.04.072 QUADRO GERAL - ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 32 MM INCL CONEX M 21,42

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.25.03 1,10000ELETRODUTO PVC RIGIDO 32MM (1') M 4,807004,37

LS 6,93204 BDI 4,00684Mão-de-Obra 5,68200 Material 4,80700SubMO 12,61404

09.04.075 QUADRO GERAL - CABO DE COBRE NU DE 6 MM2 M 4,56

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.30.36 1,00000CABO DE COBRE NU DE 6 MM2 M 2,450002,45

LS 0,69320 BDI 0,85362Mão-de-Obra 0,56820 Material 2,45000SubMO 1,26140

09.04.076 QUADRO GERAL - CABO DE COBRE NU DE 10 MM2 M 8,61

1.01.15 0,09000ELETRICISTA H 0,486905,411.01.16 0,09000AJUDANTE ELETRICISTA H 0,365404,064.30.37 1,00000CABO DE COBRE NU DE 10 MM2 M 5,110005,11

LS 1,03981 BDI 1,61048Mão-de-Obra 0,85230 Material 5,11000SubMO 1,89211

09.04.077 QUADRO GERAL - CABO DE COBRE NU DE 16 MM2 M 12,57

1.01.15 0,13000ELETRICISTA H 0,703305,411.01.16 0,13000AJUDANTE ELETRICISTA H 0,527804,064.30.38 1,00000CABO DE COBRE NU DE 16 MM2 M 7,490007,49

LS 1,50194 BDI 2,35130Mão-de-Obra 1,23110 Material 7,49000SubMO 2,73304

09.04.078 QUADRO GERAL - CABO DE COBRE NU DE 25 MM2 M 20,06

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.30.40 1,00000CABO DE COBRE NU DE 25 MM2 M 11,0600011,06

LS 2,88835 BDI 3,75265Mão-de-Obra 2,36750 Material 11,06000SubMO 5,25585

09.04.079 QUADRO GERAL - CABO DE COBRE NU DE 35 MM2 M 32,90

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.30.41 1,00000CABO DE COBRE NU DE 35 MM2 M 18,3400018,34

LS 4,62136 BDI 6,15235Mão-de-Obra 3,78800 Material 18,34000SubMO 8,40936

09.04.080 QUADRO GERAL - CABO DE COBRE NU DE 50 MM2 M 41,25

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.30.54 1,00000CABO DE COBRE NU 50 MM2 M 20,9300020,93

LS 6,93204 BDI 7,71513Mão-de-Obra 5,68200 Material 20,93000SubMO 12,61404

09.04.081 QUADRO GERAL - CABO DE COBRE NU DE 70 MM2 M 60,49

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.30.43 1,00000CABO DE COBRE NU DE 70 MM2 M 34,4700034,47

LS 8,08738 BDI 11,31287Mão-de-Obra 6,62900 Material 34,47000SubMO 14,71638

09.04.082 QUADRO GERAL - CABO DE COBRE NU DE 95 MM2 M 80,37

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.30.39 1,00000CABO DE COBRE NU DE 95 MM2 M 42,2200042,22

LS 12,70874 BDI 15,02952Mão-de-Obra 10,41700 Material 42,22000SubMO 23,12574

09.04.083 QUADRO GERAL - CABO DE COBRE NU DE 120 MM2 M 102,54

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.30.42 1,00000CABO DE COBRE NU DE 120 MM2 M 56,0400056,04

09/02/2011 11:38:40 Página: 175 de 0

Page 176: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 15,01942 BDI 19,17520Mão-de-Obra 12,31100 Material 56,04000SubMO 27,33042

09.04.086 TERRA COMPLETO UN 180,35

1.01.15 1,33000ELETRICISTA H 7,195305,411.01.16 1,33000AJUDANTE ELETRICISTA H 5,399804,064.80.08 1,00000HASTE COPERWELD 19MM (3/4)X3 M UN 70,2300070,234.80.09 1,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 3,470003,476.20.95 1,00000TUBO CERAMICO DN 300MM (12") M 44,9700044,97

LS 15,36602 BDI 33,72516Mão-de-Obra 12,59510 Material 118,67000SubMO 27,96112

09.04.087 DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A UN 175,07

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.46.65 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A UN 137,08000137,08

LS 2,88835 BDI 32,73725Mão-de-Obra 2,36750 Material 137,08000SubMO 5,25585

09.04.089 DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X35A A 1X50A UN 15,02

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.46.31 1,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X35A A 1X50A UN 6,960006,96

LS 2,88835 BDI 2,80965Mão-de-Obra 2,36750 Material 6,96000SubMO 5,25585

09.04.090 DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A 1X30A UN 11,45

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.46.30 1,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 4,060004,06

LS 2,88835 BDI 2,14265Mão-de-Obra 2,36750 Material 4,06000SubMO 5,25585

09.04.091 DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A UN 39,39

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.46.10 1,00000DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A UN 26,7700026,77

LS 2,88835 BDI 7,36595Mão-de-Obra 2,36750 Material 26,77000SubMO 5,25585

09.04.092 DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A UN 48,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.46.12 1,00000DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A UN 34,1500034,15

LS 2,88835 BDI 9,06335Mão-de-Obra 2,36750 Material 34,15000SubMO 5,25585

09.04.094 DISJUNTOR BIPOLAR TERMOMAG. 2X125A A 2X225A UN 61,81

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.46.13 1,00000DISJUNTOR BIPOLAR TERMOMAGNÉTICO 2X125A A 2X225A UN 45,0000045,00

LS 2,88835 BDI 11,55885Mão-de-Obra 2,36750 Material 45,00000SubMO 5,25585

09.04.095 DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X50A A 1X70A UN 20,52

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.45.62 1,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X60A A 1X70A UN 11,4300011,43

LS 2,88835 BDI 3,83775Mão-de-Obra 2,36750 Material 11,43000SubMO 5,25585

09.04.096 DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X90A A 1X100A UN 21,96

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.45.72 1,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X90A A 1X100A UN 12,6000012,60

LS 2,88835 BDI 4,10685Mão-de-Obra 2,36750 Material 12,60000SubMO 5,25585

09.04.099 SERVICOS DE QUADRO GERAL MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.05.002 ELETROD ACO GALV QUENTE (NBR 5624) 20 MM (3/4") - INCL CONEXOES M 27,79

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.21.71 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 9,985509,51

LS 6,93204 BDI 5,19789Mão-de-Obra 5,68200 Material 9,98550SubMO 12,61404

09.05.003 ELETROD ACO GALV QUENTE (NBR 5624) 25 MM (1") - INCL CONEXOES M 33,28

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.21.72 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1") M 12,3480011,76

LS 8,08738 BDI 6,22481Mão-de-Obra 6,62900 Material 12,34800SubMO 14,71638

09.05.004 ELETROD ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") - INCL CONEXOES M 40,57

09/02/2011 11:38:40 Página: 176 de 0

Page 177: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.21.73 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 16,1700015,40

LS 9,24272 BDI 7,58741Mão-de-Obra 7,57600 Material 16,17000SubMO 16,81872

09.05.005 ELETROD ACO GALV QUENTE (NBR 5624) 40 MM (1 1/2") - INCL CONEXOES M 49,28

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.21.74 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2") M 21,1470020,14

LS 10,39806 BDI 9,21565Mão-de-Obra 8,52300 Material 21,14700SubMO 18,92106

09.05.006 ELETROD ACO GALV QUENTE (NBR 5624) 50 MM (2") - INCL CONEXOES M 57,70

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.21.75 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2") M 25,8930024,66

LS 11,55340 BDI 10,79077Mão-de-Obra 9,47000 Material 25,89300SubMO 21,02340

09.05.007 ELETROD ACO GALV. QUENTE (NBR5624) 65MM(2X1/2") INCL CONEXOES M 75,41

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.21.76 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2") M 38,1885036,37

LS 12,70874 BDI 14,10228Mão-de-Obra 10,41700 Material 38,18850SubMO 23,12574

09.05.008 ELETROD ACO GALV QUENTE (NBR5624) 80MM(3") INCL CONEXOES M 84,17

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.21.77 1,05000ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3") M 43,2075041,15

LS 13,86408 BDI 15,74018Mão-de-Obra 11,36400 Material 43,20750SubMO 25,22808

09.05.013 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 25MM - INCL CONEXOES M 17,09

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.25.02 1,10000ELETRODUTO PVC RIGIDO 25MM (3/4') M 3,388003,08

LS 5,77670 BDI 3,19693Mão-de-Obra 4,73500 Material 3,38800SubMO 10,51170

09.05.014 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 32MM - INCL CONEXOES M 21,42

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.25.03 1,10000ELETRODUTO PVC RIGIDO 32MM (1') M 4,807004,37

LS 6,93204 BDI 4,00684Mão-de-Obra 5,68200 Material 4,80700SubMO 12,61404

09.05.015 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 40MM - INCL CONEXOES M 25,28

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.25.04 1,10000ELETRODUTO PVC RIGIDO 38MM (1 1/4) M 5,841005,31

LS 8,08738 BDI 4,72820Mão-de-Obra 6,62900 Material 5,84100SubMO 14,71638

09.05.016 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 50MM - INCL CONEXOES M 27,62

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.25.05 1,10000ELETRODUTO PVC RIGIDO 50MM (1 1/2') M 5,643005,13

LS 9,24272 BDI 5,16620Mão-de-Obra 7,57600 Material 5,64300SubMO 16,81872

09.05.017 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 60MM - INCL CONEXOES M 31,13

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.25.06 1,10000ELETRODUTO PVC RIGIDO 60MM (2') M 6,391005,81

LS 10,39806 BDI 5,82177Mão-de-Obra 8,52300 Material 6,39100SubMO 18,92106

09.05.018 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 75MM - INCL CONEXOES M 40,97

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.25.07 1,10000ELETRODUTO PVC RIGIDO 75MM (2 1/2') M 12,2870011,17

LS 11,55340 BDI 7,66139Mão-de-Obra 9,47000 Material 12,28700SubMO 21,02340

09.05.019 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 85MM - INCL CONEXOES M 48,94

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.25.08 1,10000ELETRODUTO PVC RIGIDO 85MM (3') M 16,6650015,15

LS 12,70874 BDI 9,15187Mão-de-Obra 10,41700 Material 16,66500SubMO 23,12574

09.05.020 ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 110MM -INCL CONEXOES M 63,28

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.25.09 1,10000ELETRODUTO PVC RIGIDO 110MM (4') M 24,1230021,93

09/02/2011 11:38:40 Página: 177 de 0

Page 178: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 15,01942 BDI 11,83429Mão-de-Obra 12,31100 Material 24,12300SubMO 27,33042

09.05.036 ELETRODUTO EM POLIETILENO DE 25MM-INCLUSIVE CONEXOES M 13,53

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.26.12 1,10000ELETRODUTO DE POLIETILENO 25 MM M 0,495000,45

LS 5,77670 BDI 2,53154Mão-de-Obra 4,73500 Material 0,49500SubMO 10,51170

09.05.037 ELETRODUTO EM POLIETILENO DE 32MM-INCLUSIVE CONEXOES M 16,50

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.26.14 1,10000ELETRODUTO DE POLIETILENO 32 MM M 0,803000,73

LS 6,93204 BDI 3,08592Mão-de-Obra 5,68200 Material 0,80300SubMO 12,61404

09.05.040 ENVELOPE DE CONCRETO PARA DUTOS M 10,19

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,53000SERVENTE H 2,019303,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 2,52000CIMENTO KG 0,932400,372.05.17 0,00670PEDRA BRITADA 1 M3 0,4149361,93

LS 3,59815 BDI 1,90688Mão-de-Obra 2,94930 Material 1,74333SubMO 6,54745

09.05.042 QUADRO DISTRIBUICAO, DISJ. GERAL 30A P/ 4 A 8 DISJS. UN 170,75

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.11.03 1,00000QUADRO DISTR CAPAC P/ 4 A 8 DISJ C/ BARRAMENTO UN 96,7800096,78

LS 23,10680 BDI 31,93016Mão-de-Obra 18,94000 Material 96,78000SubMO 42,04680

09.05.045 QUADRO DISTRIBUICAO, DISJ. GERAL 50A P/ 10 A 12 DISJS. UN 176,43

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.11.05 1,00000QUADRO DISTR CAPAC P/ 10 A 12 DISJ C/ BARRAMENTO UN 101,40000101,40

LS 23,10680 BDI 32,99276Mão-de-Obra 18,94000 Material 101,40000SubMO 42,04680

09.05.047 QUADRO DISTRIBUICAO, DISJ. GERAL 60A P/ 14 A 20 DISJS. UN 244,20

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.11.07 1,00000QUADRO DISTR CAPAC P/ 14 A 20 DISJ C/ BARRAMENTO UN 135,47000135,47

LS 34,66020 BDI 45,66425Mão-de-Obra 28,41000 Material 135,47000SubMO 63,07020

09.05.051 QUADRO DISTRIBUICAO, DISJ. GERAL 80A P/ 22 A 26 DISJS. UN 347,54

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.11.10 1,00000QUADRO DISTR CAPAC P/ 22 A 26 DISJ C/ BARRAMENTO UN 198,46000198,46

LS 46,21360 BDI 64,98733Mão-de-Obra 37,88000 Material 198,46000SubMO 84,09360

09.05.054 QUADRO DISTRIBUICAO, DISJ. GERAL 100A P/ 28 A 42 DISJS. UN 640,35

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.11.12 1,00000QUADRO DISTR CAPAC P/ 28 A 42 DISJ C/ BARRAMENTO UN 415,50000415,50

LS 57,76700 BDI 119,74191Mão-de-Obra 47,35000 Material 415,50000SubMO 105,11700

09.05.061 QUADRO AUTOMATICO CAPACIDADE PARA 42 DISJ C/ BARRAMENTO UN 640,35

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.11.12 1,00000QUADRO DISTR CAPAC P/ 28 A 42 DISJ C/ BARRAMENTO UN 415,50000415,50

LS 57,76700 BDI 119,74191Mão-de-Obra 47,35000 Material 415,50000SubMO 105,11700

09.05.069 INTERRUPTOR TIPO AUTOMÁTICO DE BÓIA UN 66,25

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.55.50 1,00000AUTOMATICO DE BOIA CONTATO MERCURIO UN 32,8400032,84

LS 11,55340 BDI 12,38858Mão-de-Obra 9,47000 Material 32,84000SubMO 21,02340

09.05.070 DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A UN 48,44

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.46.10 1,00000DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A UN 26,7700026,77

LS 6,93204 BDI 9,05833Mão-de-Obra 5,68200 Material 26,77000SubMO 12,61404

09.05.071 DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A UN 57,51

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.46.12 1,00000DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A UN 34,1500034,15

LS 6,93204 BDI 10,75573Mão-de-Obra 5,68200 Material 34,15000SubMO 12,61404

09/02/2011 11:38:40 Página: 178 de 0

Page 179: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.05.073 DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 12,75

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.46.30 1,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 4,060004,06

LS 3,46602 BDI 2,38442Mão-de-Obra 2,84100 Material 4,06000SubMO 6,30702

09.05.074 DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A UN 62,71

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.15 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A UN 32,0700032,07

LS 10,39806 BDI 11,72794Mão-de-Obra 8,52300 Material 32,07000SubMO 18,92106

09.05.075 DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A UN 72,21

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.46.40 1,00000DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A UN 39,7900039,79

LS 10,39806 BDI 13,50354Mão-de-Obra 8,52300 Material 39,79000SubMO 18,92106

09.05.076 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 3/4 A 1 HP UN 735,35

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.50 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.2,5-4A UN 76,5500076,554.17.70 1,00000CONTACTOR TRIPOLAR ATE 9A UN 89,3200089,324.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 5,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 68,1500013,634.40.10 5,00000FUSIVEL DIAZED ATE 25A UN 5,550001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 69,32040 BDI 137,50532Mão-de-Obra 56,82000 Material 471,70880SubMO 126,14040

09.05.077 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 1 1/2 A 2 HP UN 735,35

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.51 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.4-6,3A UN 76,5500076,554.17.70 1,00000CONTACTOR TRIPOLAR ATE 9A UN 89,3200089,324.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 5,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 68,1500013,634.40.10 5,00000FUSIVEL DIAZED ATE 25A UN 5,550001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 69,32040 BDI 137,50532Mão-de-Obra 56,82000 Material 471,70880SubMO 126,14040

09.05.078 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 2 A 3 HP UN 737,87

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.52 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.6,3-10A UN 76,3600076,364.17.71 1,00000CONTACTOR TRIPOLAR ATE 12A UN 91,5600091,564.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 5,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 68,1500013,634.40.10 5,00000FUSIVEL DIAZED ATE 25A UN 5,550001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 69,32040 BDI 137,97682Mão-de-Obra 56,82000 Material 473,75880SubMO 126,14040

09.05.079 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 3 A 4 HP UN 687,15

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.53 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.8-12,5A UN 79,3400079,344.17.71 1,00000CONTACTOR TRIPOLAR ATE 12A UN 91,5600091,56

09/02/2011 11:38:40 Página: 179 de 0

Page 180: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 69,32040 BDI 128,49162Mão-de-Obra 56,82000 Material 432,51880SubMO 126,14040

09.05.080 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 4 A 5 HP UN 749,19

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.54 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.10-16A UN 79,5700079,574.17.72 1,00000CONTACTOR TRIPOLAR ATE 16A UN 97,5500097,554.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 5,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 68,1500013,634.40.10 5,00000FUSIVEL DIAZED ATE 25A UN 5,550001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 69,32040 BDI 140,09282Mão-de-Obra 56,82000 Material 482,95880SubMO 126,14040

09.05.081 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 7,5 HP UN 790,56

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.55 1,00000RELE BIMET.DE SOBREC FAIXA AJUST 16-25A UN 94,8800094,884.17.73 1,00000CONTACTOR TRIPOLAR ATE 25A UN 115,88000115,884.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 5,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 68,1500013,634.40.10 5,00000FUSIVEL DIAZED ATE 25A UN 5,550001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 69,32040 BDI 147,83002Mão-de-Obra 56,82000 Material 516,59880SubMO 126,14040

09.05.082 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA BIFASICO DE 3/4 A 1 HP UN 717,15

1.01.15 6,20000ELETRICISTA H 33,542005,411.01.16 6,20000AJUDANTE ELETRICISTA H 25,172004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.52 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.6,3-10A UN 76,3600076,364.17.70 1,00000CONTACTOR TRIPOLAR ATE 9A UN 89,3200089,324.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.41 1,00000CHAVE FACA SECA 2X60A BASE ' MARMORE' UN 9,580009,584.40.01 4,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 54,5200013,634.40.10 4,00000FUSIVEL DIAZED ATE 25A UN 4,440001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 71,63108 BDI 134,10239Mão-de-Obra 58,71400 Material 452,70880SubMO 130,34508

09.05.083 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA BIFASICO DE 1 1/2 A 2 HP UN 723,57

1.01.15 6,20000ELETRICISTA H 33,542005,411.01.16 6,20000AJUDANTE ELETRICISTA H 25,172004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.53 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.8-12,5A UN 79,3400079,344.17.71 1,00000CONTACTOR TRIPOLAR ATE 12A UN 91,5600091,564.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.41 1,00000CHAVE FACA SECA 2X60A BASE ' MARMORE' UN 9,580009,584.40.01 4,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 54,5200013,634.40.10 4,00000FUSIVEL DIAZED ATE 25A UN 4,440001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

09/02/2011 11:38:40 Página: 180 de 0

Page 181: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 71,63108 BDI 135,30299Mão-de-Obra 58,71400 Material 457,92880SubMO 130,34508

09.05.084 QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA BIFASICO DE 2 A 3 HP UN 723,85

1.01.15 6,20000ELETRICISTA H 33,542005,411.01.16 6,20000AJUDANTE ELETRICISTA H 25,172004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,132.67.77 0,08000BUCHA TIPO S-8 (CENTO) UN 0,8888011,114.17.54 1,00000RELE BIMET.DE SOBREC.-FAIXA AJUST.10-16A UN 79,5700079,574.17.71 1,00000CONTACTOR TRIPOLAR ATE 12A UN 91,5600091,564.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,654.36.41 1,00000CHAVE FACA SECA 2X60A BASE ' MARMORE' UN 9,580009,584.40.01 4,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 54,5200013,634.40.10 4,00000FUSIVEL DIAZED ATE 25A UN 4,440001,114.46.30 2,00000DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A UN 8,120004,064.51.16 1,00000CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM UN 170,72000170,724.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 71,63108 BDI 135,35589Mão-de-Obra 58,71400 Material 458,15880SubMO 130,34508

09.05.085 QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 3/4 A 2 HP UN 378,56

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.70 1,00000CONTACTOR TRIPOLAR ATE 9A UN 89,3200089,324.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 70,78793Mão-de-Obra 37,88000 Material 223,68000SubMO 84,09360

09.05.086 QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 2 A 4 HP UN 381,31

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.71 1,00000CONTACTOR TRIPOLAR ATE 12A UN 91,5600091,564.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 71,30313Mão-de-Obra 37,88000 Material 225,92000SubMO 84,09360

09.05.087 QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 5 HP UN 388,68

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.72 1,00000CONTACTOR TRIPOLAR ATE 16A UN 97,5500097,554.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 72,68083Mão-de-Obra 37,88000 Material 231,91000SubMO 84,09360

09.05.088 QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 7,5 HP UN 411,23

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.73 1,00000CONTACTOR TRIPOLAR ATE 25A UN 115,88000115,884.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,654.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 76,89673Mão-de-Obra 37,88000 Material 250,24000SubMO 84,09360

09.05.089 QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 10 HP UN 511,94

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.74 1,00000CONTACTOR TRIPOLAR ATE 32A UN 167,89000167,894.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,25

09/02/2011 11:38:40 Página: 181 de 0

Page 182: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.36.47 1,00000CHAVE FACA SECA 3X100A 'MARMORE' UN 35,6400035,644.40.02 2,00000BASE FUSIVEIS DIAZED COMPLETA P/ 63 A UN 34,5800017,294.41.02 2,00000FUSIVEL DIAZED RAP/RET 2/35 A $MD UN 2,780001,394.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 95,72913Mão-de-Obra 37,88000 Material 332,12000SubMO 84,09360

09.05.090 QUADRO COMANDO PARA BOMBA DE INCENDIO BIFASICO DE 3/4 A 1 HP UN 373,55

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.70 1,00000CONTACTOR TRIPOLAR ATE 9A UN 89,3200089,324.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.41 1,00000CHAVE FACA SECA 2X60A BASE ' MARMORE' UN 9,580009,584.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 69,85183Mão-de-Obra 37,88000 Material 219,61000SubMO 84,09360

09.05.091 QUADRO COMANDO PARA BOMBA DE INCENDIO BIFASICO DE 1 1/2 A 2 HP UN 376,31

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.67.26 8,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 1,040000,134.17.71 1,00000CONTACTOR TRIPOLAR ATE 12A UN 91,5600091,564.26.01 3,00000ELETRODUTO FLEXIVEL PVC 1/2' M 3,750001,254.36.41 1,00000CHAVE FACA SECA 2X60A BASE ' MARMORE' UN 9,580009,584.40.01 2,00000BASE FUSIVEIS DIAZED COMPLETA ATE 25A UN 27,2600013,634.40.10 2,00000FUSIVEL DIAZED ATE 25A UN 2,220001,114.51.17 1,00000CAIXA CHAPA FERRO 16 DE 50X30X25CM UN 85,1200085,124.85.68 4,00000BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2") UN 1,320000,33

LS 46,21360 BDI 70,36703Mão-de-Obra 37,88000 Material 221,85000SubMO 84,09360

09.05.092 INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 40A/30 mA UN 216,74

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.93 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/30MA UN 120,87000120,874.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 40,52908Mão-de-Obra 9,47000 Material 155,19000SubMO 21,02340

09.05.093 INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 63A/30 mA UN 251,93

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.94 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/30MA UN 149,48000149,484.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 47,10938Mão-de-Obra 9,47000 Material 183,80000SubMO 21,02340

09.05.094 INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 40A/300 mA UN 224,65

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.95 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/300MA UN 127,30000127,304.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 42,00798Mão-de-Obra 9,47000 Material 161,62000SubMO 21,02340

09.05.095 INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 63A/300 mA UN 242,42

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.14 3,00000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 9,030003,014.30.15 3,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 13,860004,624.45.96 1,00000INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/300MA UN 141,75000141,754.94.30 3,00000TERMINAL PRESSAO CABO 10MM2 UN 5,310001,774.95.82 3,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 6,120002,04

LS 11,55340 BDI 45,33148Mão-de-Obra 9,47000 Material 176,07000SubMO 21,02340

09.05.096 CENTRAL DE SISTEMA DE ALARME ATÉ 12 ENDEREÇOS UN 556,10

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

09/02/2011 11:38:40 Página: 182 de 0

Page 183: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.75.50 1,00000CENTRAL DE SISTEMA DE ALARME ATÉ 12 ENDEREÇOS UN 404,07000404,07

LS 26,40690 BDI 103,98804Mão-de-Obra 21,64500 Material 404,07000SubMO 48,05190

09.05.097 CENTRAL DE SISTEMA DE ALARME DE 13 A 24 ENDEREÇOS UN 748,57

1.01.15 3,50000ELETRICISTA H 18,935005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.75.51 1,00000CENTRAL DE SISTEMA DE ALARME DE 13 A 24 ENDEREÇOS UN 539,52000539,52

LS 37,96030 BDI 139,97692Mão-de-Obra 31,11500 Material 539,52000SubMO 69,07530

09.05.099 SERVICOS DE DUTOS/QUADROS PARCIAIS LUZ/QUADROS TELEFOE MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.06.001 CAIXA DE PASSAGEM ESTAMPADA COM TAMPA PLASTICA DE 4"X2" UN 11,64

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.25 1,00000ESPELHO 4"X2" UN 1,240001,24

LS 3,46602 BDI 2,17742Mão-de-Obra 2,84100 Material 3,16000SubMO 6,30702

09.06.002 CAIXA DE PASSAGEM ESTAMPADA COM TAMPA PLASTICA DE 4"X4" UN 20,19

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,36

LS 4,62136 BDI 3,77645Mão-de-Obra 3,78800 Material 8,01000SubMO 8,40936

09.06.005 CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 10X10X8 CM UN 14,39

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.50.01 1,00000CAIXA PASS CH TAMPA PARAF 10X10X8 CM UN 3,290003,29

LS 4,62136 BDI 2,69085Mão-de-Obra 3,78800 Material 3,29000SubMO 8,40936

09.06.007 CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 15X15X8 CM UN 22,39

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.50.02 1,00000CAIXA PASS CH TAMPA PARAF 15X15X8 CM UN 5,590005,59

LS 6,93204 BDI 4,18693Mão-de-Obra 5,68200 Material 5,59000SubMO 12,61404

09.06.009 CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 20X20X10 CM UN 34,45

1.01.15 0,90000ELETRICISTA H 4,869005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.50.03 1,00000CAIXA PASS CH TAMPA PARAF 20X20X10 CM UN 9,090009,09

LS 10,39806 BDI 6,44254Mão-de-Obra 8,52300 Material 9,09000SubMO 18,92106

09.06.012 CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 30X30X12 CM UN 52,45

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.50.05 1,00000CAIXA PASS CH TAMPA PARAF 30X30X12 CM UN 17,4200017,42

LS 13,86408 BDI 9,80906Mão-de-Obra 11,36400 Material 17,42000SubMO 25,22808

09.06.015 CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 40X40X15 CM UN 74,05

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.50.07 1,00000CAIXA PASS CH TAMPA PARAF 40X40X15 CM UN 28,6700028,67

LS 17,33010 BDI 13,84717Mão-de-Obra 14,20500 Material 28,67000SubMO 31,53510

09.06.019 CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 50X50X15 CM UN 99,32

1.01.15 1,90000ELETRICISTA H 10,279005,411.01.16 1,90000AJUDANTE ELETRICISTA H 7,714004,064.50.09 1,00000CAIXA PASS CH TAMPA PARAF 50X50X15 CM UN 40,8100040,81

LS 21,95146 BDI 18,57353Mão-de-Obra 17,99300 Material 40,81000SubMO 39,94446

09.06.025 CAIXA DE PASSAGEM EM ALVENARIA DE 0,40X0,40X0,40 M UN 116,12

1.01.39 2,12000PEDREIRO H 9,858004,651.01.46 4,54000SERVENTE H 17,297403,812.05.03 0,07700AREIA M3 6,0984079,202.05.05 2,40000CAL HIDRATADA KG 0,816000,342.05.08 17,80000CIMENTO KG 6,586000,372.05.17 0,04100PEDRA BRITADA 1 M3 2,5391361,932.15.10 3,00000ACO CA-25 $MD BITOLAS KG 8,190002,732.25.15 45,00000TIJOLO COMUM MACICO UN 9,900000,22

LS 33,12959 BDI 21,71534Mão-de-Obra 27,15540 Material 34,12953SubMO 60,28499

09.06.026 CAIXA DE PASSAGEM EM ALVENARIA DE 0,60X0,60X0,60 M UN 243,59

09/02/2011 11:38:40 Página: 183 de 0

Page 184: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 4,72000PEDREIRO H 21,948004,651.01.46 9,60000SERVENTE H 36,576003,812.05.03 0,15900AREIA M3 12,5928079,202.05.05 5,70000CAL HIDRATADA KG 1,938000,342.05.08 37,15000CIMENTO KG 13,745500,372.05.17 0,07200PEDRA BRITADA 1 M3 4,4589661,932.15.10 4,50000ACO CA-25 $MD BITOLAS KG 12,285002,732.25.15 105,00000TIJOLO COMUM MACICO UN 23,100000,22

LS 71,39928 BDI 45,55001Mão-de-Obra 58,52400 Material 68,12026SubMO 129,92328

09.06.027 CAIXA DE PASSAGEM EM ALVENARIA DE 0,80X0,80X0,80 M UN 400,66

1.01.39 7,94000PEDREIRO H 36,921004,651.01.46 16,08000SERVENTE H 61,264803,812.05.03 0,25600AREIA M3 20,2752079,202.05.05 9,88000CAL HIDRATADA KG 3,359200,342.05.08 58,98000CIMENTO KG 21,822600,372.05.17 0,10400PEDRA BRITADA 1 M3 6,4407261,932.15.10 5,80000ACO CA-25 $MD BITOLAS KG 15,834002,732.25.15 182,00000TIJOLO COMUM MACICO UN 40,040000,22

LS 119,78668 BDI 74,92117Mão-de-Obra 98,18580 Material 107,77172SubMO 217,97248

09.06.028 CAIXA DE PASSAGEM EM ALVENARIA DE 1,00X1,00X1,00 M UN 601,66

1.01.39 12,00000PEDREIRO H 55,800004,651.01.46 24,28000SERVENTE H 92,506803,812.05.03 0,37500AREIA M3 29,7000079,202.05.05 15,20000CAL HIDRATADA KG 5,168000,342.05.08 86,95000CIMENTO KG 32,171500,372.05.17 0,14800PEDRA BRITADA 1 M3 9,1656461,932.15.10 8,10000ACO CA-25 $MD BITOLAS KG 22,113002,732.25.15 280,00000TIJOLO COMUM MACICO UN 61,600000,22

LS 180,93430 BDI 112,50662Mão-de-Obra 148,30680 Material 159,91814SubMO 329,24110

09.06.029 CAIXA DE PASSAGEM EM ALVENARIA DE 1,00X1,00X0,50 M UN 372,96

1.01.39 7,14000PEDREIRO H 33,201004,651.01.46 14,39000SERVENTE H 54,825903,812.05.03 0,26900AREIA M3 21,3048079,202.05.05 7,60000CAL HIDRATADA KG 2,584000,342.05.08 71,06000CIMENTO KG 26,292200,372.05.17 0,07600PEDRA BRITADA 1 M3 4,7066861,932.15.10 8,10000ACO CA-25 $MD BITOLAS KG 22,113002,732.25.15 140,00000TIJOLO COMUM MACICO UN 30,800000,22

LS 107,39282 BDI 69,74069Mão-de-Obra 88,02690 Material 107,80068SubMO 195,41972

09.06.035 CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 10X10X6CM UN 53,26

1.01.15 1,40000ELETRICISTA H 7,574005,411.01.16 1,40000AJUDANTE ELETRICISTA H 5,684004,064.50.20 1,00000CAIXA DE PASSAGEM DE ALUM. 10X10X6CM ANTI-UMIDADE UN 13,8700013,87

LS 16,17476 BDI 9,95964Mão-de-Obra 13,25800 Material 13,87000SubMO 29,43276

09.06.036 CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 15X15X10CM UN 72,25

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.50.21 1,00000CAIXA DE PASSAGEM DE ALUM. 15X15X10CM ANTI-UMIDADE UN 27,2100027,21

LS 17,33010 BDI 13,51137Mão-de-Obra 14,20500 Material 27,21000SubMO 31,53510

09.06.037 CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 20X20X10CM UN 92,25

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.50.22 1,00000CAIXA DE PASSAGEM DE ALUM. 20X20X10CM ANTI-UMIDADE UN 43,4700043,47

LS 17,33010 BDI 17,25117Mão-de-Obra 14,20500 Material 43,47000SubMO 31,53510

09.06.038 CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 30X30X12CM UN 198,80

1.01.15 1,60000ELETRICISTA H 8,656005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,064.50.23 1,00000CAIXA DE PASSAGEM DE ALUM. 30X30X12CM ANTI-UMIDADE UN 127,99000127,99

LS 18,48544 BDI 37,17431Mão-de-Obra 15,15200 Material 127,99000SubMO 33,63744

09.06.039 CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 40X40X20CM UN 299,75

1.01.15 1,80000ELETRICISTA H 9,738005,411.01.16 1,80000AJUDANTE ELETRICISTA H 7,308004,064.50.24 1,00000CAIXA DE PASSAGEM DE ALUM. 40X40X20CM ANTI-UMIDADE UN 205,86000205,86

LS 20,79612 BDI 56,05149Mão-de-Obra 17,04600 Material 205,86000SubMO 37,84212

09.06.045 QUADRO EM CHAPA COM PORTA E FECHADURA (TELEBRAS) DE 20X20X12CM UN 69,56

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

09/02/2011 11:38:40 Página: 184 de 0

Page 185: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.12.01 1,00000QUADRO EMBUTIR TELESP/TELEBRAS 20X20X12CM /1 PORTA UN 35,5300035,53

LS 11,55340 BDI 13,00728Mão-de-Obra 9,47000 Material 35,53000SubMO 21,02340

09.06.047 QUADRO EM CHAPA COM PORTA E FECHADURA (TELEBRAS) DE 40X40X12CM UN 115,31

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.12.03 1,00000QUADRO EMBUTIR TELESP/TELEBRAS 40X40X12CM /1 PORTA UN 72,7300072,73

LS 11,55340 BDI 21,56328Mão-de-Obra 9,47000 Material 72,73000SubMO 21,02340

09.06.049 QUADRO EM CHAPA COM PORTA E FECHADURA (TELEBRAS) DE 60X60X12CM UN 203,00

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.12.06 1,00000QUADRO EMBUTIR TELESP/TELEBRAS 60X60X12CM/2 PORTAS UN 123,00000123,00

LS 23,10680 BDI 37,96076Mão-de-Obra 18,94000 Material 123,00000SubMO 42,04680

09.06.099 SERVICOS DE CAIXAS DE PASSAGEM MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.07.003 FIO DE 1,50 MM2 - 750 V DE ISOLACAO M 1,68

1.01.15 0,04000ELETRICISTA H 0,216405,411.01.16 0,04000AJUDANTE ELETRICISTA H 0,162404,064.30.04 1,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 0,530000,53

LS 0,46214 BDI 0,31532Mão-de-Obra 0,37880 Material 0,53000SubMO 0,84094

09.07.004 FIO DE 2,50 MM2 - 750 V DE ISOLACAO M 2,31

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.30.05 1,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 0,830000,83

LS 0,57767 BDI 0,43267Mão-de-Obra 0,47350 Material 0,83000SubMO 1,05117

09.07.005 FIO DE 4 MM2 - 750 V DE ISOLACAO M 3,11

1.01.15 0,05500ELETRICISTA H 0,297555,411.01.16 0,05500AJUDANTE ELETRICISTA H 0,223304,064.30.06 1,00000FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V) M 1,380001,38

LS 0,63544 BDI 0,58335Mão-de-Obra 0,52085 Material 1,38000SubMO 1,15629

09.07.006 FIO DE 6 MM2 - 750 V DE ISOLACAO M 4,01

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.30.07 1,00000FIO DE 6,00 MM2 (ISOL PVC ANTICHAMA 750V) M 2,000002,00

LS 0,69320 BDI 0,75012Mão-de-Obra 0,56820 Material 2,00000SubMO 1,26140

09.07.007 FIO DE 10 MM2 - 750 V DE ISOLACAO M 6,66

1.01.15 0,09000ELETRICISTA H 0,486905,411.01.16 0,09000AJUDANTE ELETRICISTA H 0,365404,064.30.08 1,00000FIO DE 10,0 MM2 (ISOL PVC ANTICHAMA 750V) M 3,530003,53

LS 1,03981 BDI 1,24708Mão-de-Obra 0,85230 Material 3,53000SubMO 1,89211

09.07.009 FIO TRANCADO PARA TELEFONE - PAD. TELEBRAS M 0,78

1.01.15 0,02000ELETRICISTA H 0,108205,411.01.16 0,02000AJUDANTE ELETRICISTA H 0,081204,064.30.60 1,00000FIO TRANCADO PARA TELEFONE - PADRAO TELEBRAS M 0,220000,22

LS 0,23107 BDI 0,14731Mão-de-Obra 0,18940 Material 0,22000SubMO 0,42047

09.07.011 CABO DE 10 MM2 - 750 V DE ISOLACAO M 7,17

1.01.15 0,13000ELETRICISTA H 0,703305,411.01.16 0,13000AJUDANTE ELETRICISTA H 0,527804,064.30.14 1,03000CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V) M 3,100303,01

LS 1,50194 BDI 1,34167Mão-de-Obra 1,23110 Material 3,10030SubMO 2,73304

09.07.012 CABO DE 16 MM2 - 750 V DE ISOLACAO M 13,18

1.01.15 0,29000ELETRICISTA H 1,568905,411.01.16 0,29000AJUDANTE ELETRICISTA H 1,177404,064.30.15 1,00000CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V) M 4,620004,62

LS 3,35049 BDI 2,46486Mão-de-Obra 2,74630 Material 4,62000SubMO 6,09679

09.07.013 CABO DE 25 MM2 - 750 V DE ISOLACAO M 17,37

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.30.16 1,00000CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V) M 8,870008,87

LS 2,88835 BDI 3,24895Mão-de-Obra 2,36750 Material 8,87000SubMO 5,25585

09.07.014 CABO DE 35 MM2 - 750 V DE ISOLACAO M 25,33

1.01.15 0,40000ELETRICISTA H 2,164005,41

09/02/2011 11:38:40 Página: 185 de 0

Page 186: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.30.17 1,00000CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V) M 12,1900012,19

LS 4,62136 BDI 4,73785Mão-de-Obra 3,78800 Material 12,19000SubMO 8,40936

09.07.015 CABO DE 50 MM2 - 750 V DE ISOLACAO M 36,43

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.30.18 1,00000CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V) M 17,0100017,01

LS 6,93204 BDI 6,81353Mão-de-Obra 5,68200 Material 17,01000SubMO 12,61404

09.07.016 CABO DE 70 MM2 - 750 V DE ISOLACAO M 48,12

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.30.19 1,00000CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V) M 24,4100024,41

LS 8,08738 BDI 8,99907Mão-de-Obra 6,62900 Material 24,41000SubMO 14,71638

09.07.017 CABO DE 95 MM2 - 750 V DE ISOLACAO M 69,82

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.30.20 1,00000CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V) M 33,6400033,64

LS 12,70874 BDI 13,05612Mão-de-Obra 10,41700 Material 33,64000SubMO 23,12574

09.07.018 CABO DE 120 MM2 - 750 V DE ISOLACAO M 86,42

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.30.21 1,00000CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V) M 42,9300042,93

LS 15,01942 BDI 16,15990Mão-de-Obra 12,31100 Material 42,93000SubMO 27,33042

09.07.019 CABO DE 150 MM2 - 750 V DE ISOLACAO M 103,80

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.30.22 1,00000CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V) M 52,8600052,86

LS 17,33010 BDI 19,41087Mão-de-Obra 14,20500 Material 52,86000SubMO 31,53510

09.07.020 CABO DE 185 MM2 - 750 V DE ISOLACAO M 130,16

1.01.15 1,90000ELETRICISTA H 10,279005,411.01.16 1,90000AJUDANTE ELETRICISTA H 7,714004,064.30.23 1,00000CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V) M 65,8800065,88

LS 21,95146 BDI 24,33963Mão-de-Obra 17,99300 Material 65,88000SubMO 39,94446

09.07.021 CABO DE 240 MM2 - 750 V DE ISOLACAO M 160,96

1.01.15 2,10000ELETRICISTA H 11,361005,411.01.16 2,10000AJUDANTE ELETRICISTA H 8,526004,064.30.24 1,00000CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V) M 86,7200086,72

LS 24,26214 BDI 30,09990Mão-de-Obra 19,88700 Material 86,72000SubMO 44,14914

09.07.022 CABO DE 300 MM2 - 750 V DE ISOLACAO M 193,80

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.31.71 1,00000EL-CABO DE COBRE 750 V-L-SECAO 300 MM2 M 115,52000115,52

LS 23,10680 BDI 36,24036Mão-de-Obra 18,94000 Material 115,52000SubMO 42,04680

09.07.030 CABO DE 1,5 MM2 - 1000 V - 2 ISOLACOES M 1,68

1.01.15 0,04000ELETRICISTA H 0,216405,411.01.16 0,04000AJUDANTE ELETRICISTA H 0,162404,064.31.55 1,03000EL-CABO DE COBRE 1000 V-A-SECAO 1,5 MM2 M 0,525300,51

LS 0,46214 BDI 0,31423Mão-de-Obra 0,37880 Material 0,52530SubMO 0,84094

09.07.031 CABO DE 2,5 MM2 - 1000V DE ISOLAÇÃO M 3,73

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.31.56 1,03000EL-CABO DE COBRE 1000 V-B-SECAO 2,5 MM2 M 1,987901,93

LS 0,57767 BDI 0,69899Mão-de-Obra 0,47350 Material 1,98790SubMO 1,05117

09.07.032 CABO DE 4 MM2 - 1000V DE ISOLAÇÃO M 4,89

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.31.57 1,03000EL-CABO DE COBRE 1000 V-C-SECAO 4 MM2 M 2,719202,64

LS 0,69320 BDI 0,91554Mão-de-Obra 0,56820 Material 2,71920SubMO 1,26140

09.07.033 CABO DE 6 MM2 - 1000V DE ISOLAÇÃO M 6,47

1.01.15 0,10000ELETRICISTA H 0,541005,411.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.31.58 1,03000EL-CABO DE COBRE 1000 V-D-SECAO 6 MM2 M 3,162103,07

LS 1,15534 BDI 1,21082Mão-de-Obra 0,94700 Material 3,16210SubMO 2,10234

09/02/2011 11:38:40 Página: 186 de 0

Page 187: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.07.034 CABO DE 10 MM2 - 1000V DE ISOLAÇÃO M 10,51

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.31.59 1,03000EL-CABO DE COBRE 1000 V-E-SECAO 10 MM2 M 5,397205,24

LS 1,73301 BDI 1,96666Mão-de-Obra 1,42050 Material 5,39720SubMO 3,15351

09.07.035 CABO DE 16 MM2 - 1000V DE ISOLAÇÃO M 17,35

1.01.15 0,29000ELETRICISTA H 1,568905,411.01.16 0,29000AJUDANTE ELETRICISTA H 1,177404,064.31.60 1,03000EL-CABO DE COBRE 1000 V-F-SECAO 16 MM2 M 8,013407,78

LS 3,35049 BDI 3,24534Mão-de-Obra 2,74630 Material 8,01340SubMO 6,09679

09.07.036 CABO DE 25 MM2 - 1000V DE ISOLAÇÃO M 27,88

1.01.15 0,48000ELETRICISTA H 2,596805,411.01.16 0,48000AJUDANTE ELETRICISTA H 1,948804,064.31.61 1,03000EL-CABO DE COBRE 1000 V-G-SECAO 25 MM2 M 12,5763012,21

LS 5,54563 BDI 5,21353Mão-de-Obra 4,54560 Material 12,57630SubMO 10,09123

09.07.037 CABO DE 35 MM2 - 1000V DE ISOLAÇÃO M 39,28

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.31.62 1,03000EL-CABO DE COBRE 1000 V-H-SECAO 35 MM2 M 17,2216016,72

LS 8,08738 BDI 7,34574Mão-de-Obra 6,62900 Material 17,22160SubMO 14,71638

09.07.038 CABO DE 50 MM2 - 1000V DE ISOLAÇÃO M 51,20

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.31.63 1,03000EL-CABO DE COBRE 1000 V-I-SECAO 50 MM2 M 24,8127024,09

LS 9,24272 BDI 9,57523Mão-de-Obra 7,57600 Material 24,81270SubMO 16,81872

09.07.039 CABO DE 70 MM2 - 1000V DE ISOLAÇÃO M 68,28

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.31.64 1,03000EL-CABO DE COBRE 1000 V-J-SECAO 70 MM2 M 34,4947033,49

LS 11,55340 BDI 12,76916Mão-de-Obra 9,47000 Material 34,49470SubMO 21,02340

09.07.040 CABO DE 95 MM2 - 1000V DE ISOLAÇÃO M 85,01

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.31.65 1,03000EL-CABO DE COBRE 1000 V-K-SECAO 95 MM2 M 41,7871040,57

LS 15,01942 BDI 15,89703Mão-de-Obra 12,31100 Material 41,78710SubMO 27,33042

09.07.041 CABO DE 120 MM2 - 1000V DE ISOLAÇÃO M 110,68

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.31.66 1,03000EL-CABO DE COBRE 1000 V-L-SECAO 120 MM2 M 58,4525056,75

LS 17,33010 BDI 20,69715Mão-de-Obra 14,20500 Material 58,45250SubMO 31,53510

09.07.042 CABO DE 150 MM2 - 1000V DE ISOLAÇÃO M 134,39

1.01.15 1,70000ELETRICISTA H 9,197005,411.01.16 1,70000AJUDANTE ELETRICISTA H 6,902004,064.31.67 1,03000EL-CABO DE COBRE 1000 V-M-SECAO 150 MM2 M 73,5214071,38

LS 19,64078 BDI 25,13007Mão-de-Obra 16,09900 Material 73,52140SubMO 35,73978

09.07.043 CABO DE 185 MM2 - 1000V DE ISOLAÇÃO M 159,54

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.31.68 1,03000EL-CABO DE COBRE 1000 V-N-SECAO 185 MM2 M 87,6633085,11

LS 23,10680 BDI 29,83332Mão-de-Obra 18,94000 Material 87,66330SubMO 42,04680

09.07.044 CABO DE 240 MM2 - 1000V DE ISOLAÇÃO M 188,14

1.01.15 2,20000ELETRICISTA H 11,902005,411.01.16 2,20000AJUDANTE ELETRICISTA H 8,932004,064.31.69 1,03000EL-CABO DE COBRE 1000 V-O-SECAO 240 MM2 M 106,70800103,60

LS 25,41748 BDI 35,18068Mão-de-Obra 20,83400 Material 106,70800SubMO 46,25148

09.07.045 CABO DE 300 MM2 - 1000 V - 2 ISOLACOES M 275,30

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.31.70 1,03000EL-CABO DE COBRE 1000 V-P-SECAO 300 MM2 M 171,26840166,28

LS 28,88350 BDI 51,48019Mão-de-Obra 23,67500 Material 171,26840SubMO 52,55850

09.07.061 FIO BICOLOR POLARIZADO P/ SOM 2X0,75MM2 M 2,87

1.01.15 0,04000ELETRICISTA H 0,216405,411.01.16 0,04000AJUDANTE ELETRICISTA H 0,162404,06

09/02/2011 11:38:40 Página: 187 de 0

Page 188: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.30.66 1,00000FIO BICOLOR POLARIZADO 2X0,75MM2 M 1,500001,50

LS 0,46214 BDI 0,53842Mão-de-Obra 0,37880 Material 1,50000SubMO 0,84094

09.07.062 FIO BICOLOR POLARIZADO P/ SOM 2X1,00MM2 M 3,38

1.01.15 0,04000ELETRICISTA H 0,216405,411.01.16 0,04000AJUDANTE ELETRICISTA H 0,162404,064.30.67 1,00000FIO BICOLOR POLARIZADO 2X1,00MM2 M 1,910001,91

LS 0,46214 BDI 0,63272Mão-de-Obra 0,37880 Material 1,91000SubMO 0,84094

09.07.063 FIO BICOLOR POLARIZADO P/ SOM 2X1,50MM2 M 4,63

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.30.68 1,00000FIO BICOLOR POLARIZADO 2X1,50MM2 M 2,720002,72

LS 0,57767 BDI 0,86737Mão-de-Obra 0,47350 Material 2,72000SubMO 1,05117

09.07.064 FIO BICOLOR POLARIZADO P/ SOM 2X2,50MM2 M 7,00

1.01.15 0,07000ELETRICISTA H 0,378705,411.01.16 0,07000AJUDANTE ELETRICISTA H 0,284204,064.30.69 1,00000FIO BICOLOR POLARIZADO 2X2,50MM2 M 4,220004,22

LS 0,80874 BDI 1,30908Mão-de-Obra 0,66290 Material 4,22000SubMO 1,47164

09.07.065 CABO DE CONTROLE 3X1,5MM2 ATE 1KV DE ISOLAÇÃO M 4,28

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.30.75 1,00000CABO DE CONTROLE 3X1,5MM2 ATE 1KV DE ISOLAÇÃO M 2,430002,43

LS 0,57767 BDI 0,80067Mão-de-Obra 0,47350 Material 2,43000SubMO 1,05117

09.07.066 CABO DE CONTROLE 5X1,5MM2 ATE 1KV DE ISOLAÇÃO M 6,05

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.30.76 1,00000CABO DE CONTROLE 5X1,5MM2 ATE 1KV DE ISOLAÇÃO M 3,660003,66

LS 0,69320 BDI 1,13192Mão-de-Obra 0,56820 Material 3,66000SubMO 1,26140

09.07.067 CABO DE CONTROLE 7X1,5MM2 ATE 1KV DE ISOLAÇÃO M 7,88

1.01.15 0,07000ELETRICISTA H 0,378705,411.01.16 0,07000AJUDANTE ELETRICISTA H 0,284204,064.30.77 1,00000CABO DE CONTROLE 7X1,5MM2 ATE 1KV DE ISOLAÇÃO M 4,940004,94

LS 0,80874 BDI 1,47468Mão-de-Obra 0,66290 Material 4,94000SubMO 1,47164

09.07.099 SERVICOS DE ENFIACAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.08.002 INTERRUPTOR DE 1 TECLA SIMPLES EM CX.4"X2"-ELETROD.AÇO GALV.A QUENTE UN 116,98

1.01.15 2,30000ELETRICISTA H 12,443005,411.01.16 2,30000AJUDANTE ELETRICISTA H 9,338004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.56 1,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 2,930002,93

LS 26,57282 BDI 21,87618Mão-de-Obra 21,78100 Material 46,76000SubMO 48,35382

09.08.003 INTERRUPTOR DE 2 TECLAS SIMPLES EM CX.4"X2"-ELETROD.AÇO GALV.A QUENTE UN 154,91

1.01.15 3,40000ELETRICISTA H 18,394005,411.01.16 3,40000AJUDANTE ELETRICISTA H 13,804004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.68 1,00000INTERRUPTOR 2 TECLAS SILENT SEM ESPELHO UN 5,660005,66

LS 39,28156 BDI 28,96840Mão-de-Obra 32,19800 Material 54,47000SubMO 71,47956

09.08.004 INTERRUPTOR DE 3 TECLAS SIMPLES EM CX.4"X2"-ELETROD.AÇO GALV.A QUENTE UN 164,05

1.01.15 3,40000ELETRICISTA H 18,394005,411.01.16 3,40000AJUDANTE ELETRICISTA H 13,804004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.69 1,00000INTERRUPTOR 3 TECLAS SILENT SEM ESPELHO UN 8,110008,11

LS 39,28156 BDI 30,67730Mão-de-Obra 32,19800 Material 61,90000SubMO 71,47956

09.08.005INTERRUPTOR DE 1 TECLA BIPOLAR SIMPLES EM CX.4"X2"-ELETROD.DE AÇOGALV.A QUENTE

UN 125,07

1.01.15 2,30000ELETRICISTA H 12,443005,411.01.16 2,30000AJUDANTE ELETRICISTA H 9,338004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,83

09/02/2011 11:38:40 Página: 188 de 0

Page 189: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.63 1,00000INTERRUPTOR 1 TECLA BIPOLAR SEM ESPELHO UN 9,500009,50

LS 26,57282 BDI 23,38728Mão-de-Obra 21,78100 Material 53,33000SubMO 48,35382

09.08.006 2 INTERRUPTORES DE 1 TECLA BIP.SIMPL.CX.4"X4"-ELETR.AÇO GALV.A QUENTE UN 173,99

1.01.15 3,40000ELETRICISTA H 18,394005,411.01.16 3,40000AJUDANTE ELETRICISTA H 13,804004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.72 1,00000CONDULETE DE ALUMINIO 4"X4" "C" D=3/4" UN 12,4900012,494.56.63 2,00000INTERRUPTOR 1 TECLA BIPOLAR SEM ESPELHO UN 19,000009,50

LS 39,28156 BDI 32,53570Mão-de-Obra 32,19800 Material 69,98000SubMO 71,47956

09.08.007 INTERRUPTOR DE 1 TECLA PARAL.SIMPL.CX.4"X2"-ELETR.AÇO GALV.A QUENTE UN 149,91

1.01.15 3,40000ELETRICISTA H 18,394005,411.01.16 3,40000AJUDANTE ELETRICISTA H 13,804004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.57 1,00000INTERRUPTOR PARAL 1 TECLA S/ESPELHO UN 4,080004,08

LS 39,28156 BDI 28,03230Mão-de-Obra 32,19800 Material 50,40000SubMO 71,47956

09.08.008 INTERRUPTOR DE 1 TECLA PARAL.BIP.CX.4"X2"-ELETR.AÇO GALV.A QUENTE UN 158,23

1.01.15 3,40000ELETRICISTA H 18,394005,411.01.16 3,40000AJUDANTE ELETRICISTA H 13,804004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.70 1,00000INTERRUPTOR PARALELO BIPOLAR SEM ESPELHO UN 10,8500010,85

LS 39,28156 BDI 29,58940Mão-de-Obra 32,19800 Material 57,17000SubMO 71,47956

09.08.009INTERRUPTOR DE 1 TECLA SIMPL.E TOMADA 2P+T UNIV.CX.4"X4" ELETR.AÇOGALV.A QUENTE

UN 120,15

1.01.15 2,30000ELETRICISTA H 12,443005,411.01.16 2,30000AJUDANTE ELETRICISTA H 9,338004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.49 1,00000INTERRUPTOR 1 TECLA E TOMADA SEM ESPELHO UN 5,500005,50

LS 26,57282 BDI 22,46728Mão-de-Obra 21,78100 Material 49,33000SubMO 48,35382

09.08.013TOMADA 2P+T PADRAO NBR 14136, CORRENTE 10A-250V-ELETR. AÇO GALV. AQUENTE

UN 127,30

1.01.15 2,30000ELETRICISTA H 12,443005,411.01.16 2,80000AJUDANTE ELETRICISTA H 11,368004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.55.19 1,00000TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V UN 4,320004,32

LS 29,04942 BDI 23,80510Mão-de-Obra 23,81100 Material 50,64000SubMO 52,86042

09.08.014 TOMADA 2P+T PINO CHATO POLARIZ.CORR.15A-250V-ELETR.AÇO GALV.QUENTE UN 129,50

1.01.15 2,30000ELETRICISTA H 12,443005,411.01.16 2,80000AJUDANTE ELETRICISTA H 11,368004,064.21.71 3,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 28,530009,514.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.07 1,00000TOMADA 2P + T PINOS CHATOS POLARIZ. CORRENTE 15A 250V UN 6,110006,11

LS 29,04942 BDI 24,21680Mão-de-Obra 23,81100 Material 52,43000SubMO 52,86042

09.08.016TOMADA 2P+T PADRAO NBR 14136, CORRENTE 20A-250V-ELETR.AÇO GALV.AQUENTE

UN 151,49

1.01.15 2,30000ELETRICISTA H 12,443005,411.01.16 2,80000AJUDANTE ELETRICISTA H 11,368004,064.21.71 4,00000ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4") M 38,040009,514.30.06 12,00000FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V) M 16,560001,384.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.56.08 1,00000TOMADA 2P+T PADRAO NBR 14136 CORRENTE 20A-250V UN 5,390005,39

LS 29,04942 BDI 28,32920Mão-de-Obra 23,81100 Material 70,31000SubMO 52,86042

09.08.029 INTERRUPTOR DE 1 TECLA-ELETRODUTO DE POLIETILENO UN 66,28

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.52 1,00000INTERRUPTOR 1 TECLA SILENTOQUE COMPL UN 3,590003,59

09/02/2011 11:38:40 Página: 189 de 0

Page 190: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 23,10680 BDI 12,39396Mão-de-Obra 18,94000 Material 11,84000SubMO 42,04680

09.08.030 INTERRUPTOR DE 2 TECLAS-ELETRODUTO DE POLIETILENO UN 104,01

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.53 1,00000INTERRUPTOR 2 TECLAS SILENTOQUE COMPL UN 6,160006,16

LS 35,81554 BDI 19,44938Mão-de-Obra 29,35700 Material 19,39000SubMO 65,17254

09.08.032 INTERRUPTOR DE 3 TECLAS-ELETRODUTO DE POLIETILENO UN 112,92

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.54 1,00000INTERRUPTOR 3 TECLAS SILENTOQUE COMPL UN 8,430008,43

LS 35,81554 BDI 21,11688Mão-de-Obra 29,35700 Material 26,64000SubMO 65,17254

09.08.033 2 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE POLIETILENO UN 111,13

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.56 2,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 5,860002,93

LS 35,81554 BDI 20,78108Mão-de-Obra 29,35700 Material 25,18000SubMO 65,17254

09.08.034 3 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE POLIETILENO UN 136,92

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.56 1,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 2,930002,93

LS 46,21360 BDI 25,60443Mão-de-Obra 37,88000 Material 27,23000SubMO 84,09360

09.08.036 INTERRUPTOR DE 1 TECLA BIPOLAR EM CAIXA 4"X2"-ELETRODUTO POLIETILENO UN 74,68

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.58 1,00000INTERRUPTOR 1 TECLA BIPOLAR COMPL UN 10,4200010,42

LS 23,10680 BDI 13,96486Mão-de-Obra 18,94000 Material 18,67000SubMO 42,04680

09.08.038 2 INTERRUPTORES 1 TECLA BIPOLAR EM CAIXA 4"X4"-ELETRODUTO POLIETILENO UN 116,65

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.26.12 6,00000ELETRODUTO DE POLIETILENO 25 MM M 2,700000,454.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.59 1,00000INTERRUPTOR 2 TECLAS BIPOLAR S/ESP UN 9,000009,00

LS 35,81554 BDI 21,81378Mão-de-Obra 29,35700 Material 29,67000SubMO 65,17254

09.08.039 3 INTERRUPTORES 1 TECLA BIPOLAR EM CAIXA 4"X4"-ELETRODUTO POLIETILENO UN 144,13

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.56 3,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 8,790002,93

LS 46,21360 BDI 26,95223Mão-de-Obra 37,88000 Material 33,09000SubMO 84,09360

09.08.041 INTERRUPTORES EM PARALELO EM CAIXA 4"X2"-ELETRODUTO DE POLIETILENO UN 99,39

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.51 1,00000INTERRUPTOR 1 TECLA PARAL SILENT COMPL UN 4,900004,90

09/02/2011 11:38:40 Página: 190 de 0

Page 191: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 35,81554 BDI 18,58688Mão-de-Obra 29,35700 Material 15,64000SubMO 65,17254

09.08.043 INTERRUPTORES EM PARALELO BIPOLAR EM CAIXA 4"X2"-ELETR. POLIETILENO UN 110,77

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.55 1,00000INTERRUPTOR PARALELO BIPOLAR COMPL UN 14,1500014,15

LS 35,81554 BDI 20,71438Mão-de-Obra 29,35700 Material 24,89000SubMO 65,17254

09.08.045 INTERRUPTOR DE 1 TECLA E TOMADA EM CAIXA 4"X2"-ELETR. POLIETILENO UN 70,10

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.50 1,00000INTERRUPTOR 1 TECLA SIMPLES E TOMADA 2P+T UNIV.COM UN 6,700006,70

LS 23,10680 BDI 13,10926Mão-de-Obra 18,94000 Material 14,95000SubMO 42,04680

09.08.047 TOMADA SIMPLES DE EMBUTIR DE 110/220V USO GERAL-ELETR POLIETILENO UN 67,08

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.01 1,00000TOMADA UNIV. SIMPLES, 2 P - 10A-250V COMPL. 4"X2" UN 4,240004,24

LS 23,10680 BDI 12,54346Mão-de-Obra 18,94000 Material 12,49000SubMO 42,04680

09.08.048 TOMADA BIFASICA DE 220V APARELHOS FIXOS-ELETRODUTO DE POLIETILENO UN 181,23

1.01.15 5,50000ELETRICISTA H 29,755005,411.01.16 5,50000AJUDANTE ELETRICISTA H 22,330004,064.26.12 12,00000ELETRODUTO DE POLIETILENO 25 MM M 5,400000,454.30.05 24,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 19,920000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.25 1,00000ESPELHO 4"X2" UN 1,240001,244.56.06 1,00000TOMADA UNIVERSAL SIMPLES,2 POLOS -10A-250V S/PLAC. UN 3,240003,24

LS 63,54370 BDI 33,89020Mão-de-Obra 52,08500 Material 31,72000SubMO 115,62870

09.08.050 TOMADA DE PISO-ELETRODUTO DE POLIETILENO UN 106,93

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.26.12 4,00000ELETRODUTO DE POLIETILENO 25 MM M 1,800000,454.30.05 8,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 6,640000,834.56.11 1,00000

TOMADA DE PISO 2P+T PADRAO NBR 14136 CORRENTE 10A-250V CX.4"X2" INCL.ESPELHO

UN 25,9400025,94

LS 28,88350 BDI 19,99586Mão-de-Obra 23,67500 Material 34,38000SubMO 52,55850

09.08.052 PONTO SECO PARA TELEFONE-ELETRODUTO DE POLIETILENO UN 105,89

1.01.15 3,50000ELETRICISTA H 18,935005,411.01.16 3,50000AJUDANTE ELETRICISTA H 14,210004,064.26.12 10,00000ELETRODUTO DE POLIETILENO 25 MM M 4,500000,454.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,36

LS 40,43690 BDI 19,80114Mão-de-Obra 33,14500 Material 12,51000SubMO 73,58190

09.08.054 BOTAO PARA CAMPAINHA-ELETRODUTO DE POLIETILENO UN 183,38

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.26.12 10,00000ELETRODUTO DE POLIETILENO 25 MM M 4,500000,454.30.05 40,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 33,200000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.62 1,00000BOTAO DE CAMPAINHA COMPLETO UN 4,360004,36

LS 57,76700 BDI 34,29231Mão-de-Obra 47,35000 Material 43,98000SubMO 105,11700

09.08.055 BOTOEIRA PARA ACIONAMENTO DA BOMBA DE INCENDIO UN 255,98

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.25.02 10,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 30,800003,084.30.05 40,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 33,200000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.51 1,00000BOTOEIRA COMANDO LIG-DESL P/BOMBA UN 37,0800037,08

LS 57,76700 BDI 47,86691Mão-de-Obra 47,35000 Material 103,00000SubMO 105,11700

09.08.056 CIGARRA-ELETRODUTO DE POLIETILENO UN 136,97

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,06

09/02/2011 11:38:40 Página: 191 de 0

Page 192: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.26.12 3,00000ELETRODUTO DE POLIETILENO 25 MM M 1,350000,454.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.36 1,00000CAIXA ESTAMPADA 3X3' UN 1,940001,944.94.90 1,00000CIGARRA TIPO FABRICA UN 50,5300050,53

LS 28,88350 BDI 25,61246Mão-de-Obra 23,67500 Material 58,80000SubMO 52,55850

09.08.057 PONTO SECO P/ INSTALACAO DE SOM/TV/ALARME-ELETR.POLIETILENO UN 80,03

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.26.12 10,00000ELETRODUTO DE POLIETILENO 25 MM M 4,500000,454.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,36

LS 28,88350 BDI 14,96576Mão-de-Obra 23,67500 Material 12,51000SubMO 52,55850

09.08.058 INTERRUPTOR DE 1 TECLA SIMPLES CAIXA 4"X2"-ELETR PVC RÍGIDO UN 75,98

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.52 1,00000INTERRUPTOR 1 TECLA SILENTOQUE COMPL UN 3,590003,59

LS 23,10680 BDI 14,20866Mão-de-Obra 18,94000 Material 19,73000SubMO 42,04680

09.08.060 INTERRUPTOR 2 TECLAS SIMPL CAIXA DE 4"X2"-ELETR PVC RÍGIDO UN 113,71

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.53 1,00000INTERRUPTOR 2 TECLAS SILENTOQUE COMPL UN 6,160006,16

LS 35,81554 BDI 21,26408Mão-de-Obra 29,35700 Material 27,28000SubMO 65,17254

09.08.062 INTERRUPTOR 3 TECLAS SIMPL CAIXA 4"X2"-ELETR PVC RÍGIDO UN 122,63

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.54 1,00000INTERRUPTOR 3 TECLAS SILENTOQUE COMPL UN 8,430008,43

LS 35,81554 BDI 22,93158Mão-de-Obra 29,35700 Material 34,53000SubMO 65,17254

09.08.063 2 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE PVC UN 120,83

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.56 2,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 5,860002,93

LS 35,81554 BDI 22,59578Mão-de-Obra 29,35700 Material 33,07000SubMO 65,17254

09.08.065 3 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE PVC UN 153,84

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.56 3,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 8,790002,93

LS 46,21360 BDI 28,76693Mão-de-Obra 37,88000 Material 40,98000SubMO 84,09360

09.08.067 INTERRUPTOR 1 TECLA BIPOL SIMPL CAIXA 4"X2"-ELETR PVC RÍGIDO UN 84,38

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.58 1,00000INTERRUPTOR 1 TECLA BIPOLAR COMPL UN 10,4200010,42

LS 23,10680 BDI 15,77956Mão-de-Obra 18,94000 Material 26,56000SubMO 42,04680

09.08.069 2 INTERRUPTORES 1 TECLA BIPOL SIMPL CAIXA 4"X4"-ELETR PVC RÍGIDO UN 137,00

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,65

09/02/2011 11:38:40 Página: 192 de 0

Page 193: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.63 2,00000INTERRUPTOR 1 TECLA BIPOLAR SEM ESPELHO UN 19,000009,50

LS 35,81554 BDI 25,61798Mão-de-Obra 29,35700 Material 46,21000SubMO 65,17254

09.08.070 3 INTERRUPTORES DE 1 TECLA BIPOLAR EM CAIXA 4"X4"-ELETRODUTO DE PVC UN 153,84

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,364.56.56 3,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 8,790002,93

LS 46,21360 BDI 28,76693Mão-de-Obra 37,88000 Material 40,98000SubMO 84,09360

09.08.071 INTERRUPTOR 1 TECLA PARALELO SIMPL CAIXA 4"X2"-ELETR PVC RÍGIDO UN 109,10

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.51 1,00000INTERRUPTOR 1 TECLA PARAL SILENT COMPL UN 4,900004,90

LS 35,81554 BDI 20,40158Mão-de-Obra 29,35700 Material 23,53000SubMO 65,17254

09.08.073 INTERRUPTOR 1 TECLA PARALELO BIPOL CAIXA 4"X2"-ELETR PVC RÍGIDO UN 120,48

1.01.15 3,10000ELETRICISTA H 16,771005,411.01.16 3,10000AJUDANTE ELETRICISTA H 12,586004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.55 1,00000INTERRUPTOR PARALELO BIPOLAR COMPL UN 14,1500014,15

LS 35,81554 BDI 22,52908Mão-de-Obra 29,35700 Material 32,78000SubMO 65,17254

09.08.075 INTERRUPTOR 1 TECLA SIMPLES/TOMADA 2P+T UNIV CAIXA 4"X4"-ELETR PVC RÍG UN 79,81

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.50 1,00000INTERRUPTOR 1 TECLA SIMPLES E TOMADA 2P+T UNIV.COM UN 6,700006,70

LS 23,10680 BDI 14,92396Mão-de-Obra 18,94000 Material 22,84000SubMO 42,04680

09.08.077 TOMADA SIMPLES DE EMBUTIR DE 110/220V USO GERAL-ELETRODUTO DE PVC UN 76,78

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 6,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 4,980000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.01 1,00000TOMADA UNIV. SIMPLES, 2 P - 10A-250V COMPL. 4"X2" UN 4,240004,24

LS 23,10680 BDI 14,35816Mão-de-Obra 18,94000 Material 20,38000SubMO 42,04680

09.08.078 TOMADA BIFASICA DE 220V APARELHOS FIXOS-ELETRODUTO DE PVC UN 85,68

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.25 1,00000ESPELHO 4"X2" UN 1,240001,244.56.06 1,00000TOMADA UNIVERSAL SIMPLES,2 POLOS -10A-250V S/PLAC. UN 3,240003,24

LS 25,58340 BDI 16,02258Mão-de-Obra 20,97000 Material 23,11000SubMO 46,55340

09.08.079 TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V-ELETR. PVC RÍGIDO UN 87,01

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.19 1,00000TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V UN 4,320004,324.55.25 1,00000ESPELHO 4"X2" UN 1,240001,24

LS 25,58340 BDI 16,27098Mão-de-Obra 20,97000 Material 24,19000SubMO 46,55340

09.08.080 TOMADA DE PISO 2P+T PADRAO NBR 14136 CORRENTE 10A-250V-ELETR PVC RÍGIDO UN 112,48

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.25.02 4,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 12,320003,084.30.05 8,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 6,640000,834.56.11 1,00000

TOMADA DE PISO 2P+T PADRAO NBR 14136 CORRENTE 10A-250V CX.4"X2" INCL.ESPELHO

UN 25,9400025,94

09/02/2011 11:38:40 Página: 193 de 0

Page 194: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 25,58340 BDI 21,03428Mão-de-Obra 20,97000 Material 44,90000SubMO 46,55340

09.08.081 PONTO SECO PARA TELEFONE-ELETRODUTO DE PVC UN 69,52

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 6,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 18,480003,084.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,36

LS 16,50660 BDI 13,00112Mão-de-Obra 13,53000 Material 26,49000SubMO 30,03660

09.08.082 TOMADA DE PISO PARA TEL/LOGICA - ELETRODUTO DE PVC UN 114,82

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 6,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 18,480003,084.56.12 1,00000TOMADA DE PISO TEL/LOGICA CX.4"X2" INCL ESPELHO UN 32,8300032,83

LS 23,10680 BDI 21,47206Mão-de-Obra 18,94000 Material 51,31000SubMO 42,04680

09.08.083 BOTAO PARA CIGARRA - ELETRODUTO DE PVC UN 76,74

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.25.02 10,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 30,800003,084.30.04 20,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 10,600000,534.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.62 1,00000BOTAO DE CAMPAINHA COMPLETO UN 4,360004,36

LS 8,08738 BDI 14,35117Mão-de-Obra 6,62900 Material 47,68000SubMO 14,71638

09.08.084 CIGARRA PARA CHAMADA DE AULA - ELETRODUTO DE PVC UN 117,62

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.25.02 6,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 18,480003,084.30.05 12,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 9,960000,834.51.36 1,00000CAIXA ESTAMPADA 3X3' UN 1,940001,944.94.90 1,00000CIGARRA TIPO FABRICA UN 50,5300050,53

LS 8,08738 BDI 21,99407Mão-de-Obra 6,62900 Material 80,91000SubMO 14,71638

09.08.085 PONTO SECO P/INSTALACAO DE SOM/TV/ALARME/LOGICA - ELETRODUTO PVC UN 69,52

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.25.02 6,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 18,480003,084.51.37 1,00000CAIXA 4"X4" UN 3,650003,654.55.26 1,00000ESPELHO 4"X4" UN 4,360004,36

LS 16,50660 BDI 13,00112Mão-de-Obra 13,53000 Material 26,49000SubMO 30,03660

09.08.086 ACIONADOR DO ALARME DE INCENDIO UN 130,67

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.25.02 10,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 30,800003,084.30.04 20,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 10,600000,534.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.56.62 1,00000BOTAO DE CAMPAINHA COMPLETO UN 4,360004,36

LS 32,18360 BDI 24,43603Mão-de-Obra 26,38000 Material 47,68000SubMO 58,56360

09.08.087 SIRENE PARA ALARME DE EMERGENCIA- ELETRODUTO DE PVC UN 60,30

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.25.02 4,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 12,320003,084.51.36 1,00000CAIXA ESTAMPADA 3X3' UN 1,940001,944.94.85 1,00000SIRENE BITONAL ELETRICA 12/24V ALCANCE 100M UN 20,0500020,05

LS 8,08738 BDI 11,27607Mão-de-Obra 6,62900 Material 34,31000SubMO 14,71638

09.08.088 TOMADA 2P+T PINO CHATO POLARIZ.CORR.15A-250V-ELETR.PVC RIGIDO UN 89,21

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.05 9,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 7,470000,834.51.35 1,00000CAIXA 4"X2" UN 1,920001,924.55.25 1,00000ESPELHO 4"X2" UN 1,240001,244.56.07 1,00000TOMADA 2P + T PINOS CHATOS POLARIZ. CORRENTE 15A 250V UN 6,110006,11

LS 25,58340 BDI 16,68268Mão-de-Obra 20,97000 Material 25,98000SubMO 46,55340

09.08.089 TOMADA 2P+T PADRAO NBR 14136, CORRENTE 20A-250V-ELETR.PVC RIGIDO UN 94,41

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,50000AJUDANTE ELETRICISTA H 10,150004,064.25.02 3,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 9,240003,084.30.06 9,00000FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V) M 12,420001,384.51.35 1,00000CAIXA 4"X2" UN 1,920001,92

09/02/2011 11:38:40 Página: 194 de 0

Page 195: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.55.25 1,00000ESPELHO 4"X2" UN 1,240001,244.56.08 1,00000TOMADA 2P+T PADRAO NBR 14136 CORRENTE 20A-250V UN 5,390005,39

LS 25,58340 BDI 17,65558Mão-de-Obra 20,97000 Material 30,21000SubMO 46,55340

09.08.099 SERVICOS DE INTERRUPTORES E TOMADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.09.025 IL-13 REFLETOR PARA LAMPADA DE VAPOR METÁLICO 70W UN 292,19

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.51 1,00000IL-13 REFLETOR TIPO INDUSTRIAL(DD) UN 68,0800068,084.65.36 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL 70W/220W UN 152,66000152,66

LS 9,24272 BDI 54,63851Mão-de-Obra 7,57600 Material 220,74000SubMO 16,81872

09.09.026 IL-14 REFLETOR COM GRADE PARA LAMPADA DE VAPOR METÁLICO 70 W UN 297,76

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.52 1,00000IL-14 REFLETOR TIPO INDUSTRIAL (DC)C/TELA UN 72,6100072,614.65.36 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL 70W/220W UN 152,66000152,66

LS 9,24272 BDI 55,68041Mão-de-Obra 7,57600 Material 225,27000SubMO 16,81872

09.09.034 IL-42 LUMINARIA C/ DIFUSOR P/ LAMPADA FLUOR (2X32W) UN 156,26

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.61.74 1,00000LUMINARIA P/ LAMP FLUOR 2X32W C/ DIF/SOQ (IL-42) UN 68,3900068,394.65.13 2,00000LAMPADA FLUORESCENTE DE 32W UN 11,400005,704.97.25 1,00000REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W-220V UN 24,1300024,13

LS 12,70874 BDI 29,22052Mão-de-Obra 10,41700 Material 103,92000SubMO 23,12574

09.09.036 IL-57 REFLETOR C/ TELA P/ VAPOR MET 150W UN 464,12

1.01.15 1,60000ELETRICISTA H 8,656005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,064.60.89 1,00000IL-57 REFLETOR INDUSTRIAL (DC) C/ TELA PROTETORA UN 109,01000109,014.65.28 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL 150W/220V UN 187,63000187,634.97.14 1,00000REATOR SIMPLES P/ VAPOR MET AFP 150W-220V CAP/IGN UN 47,0600047,06

LS 18,48544 BDI 86,78761Mão-de-Obra 15,15200 Material 343,70000SubMO 33,63744

09.09.037 IL-58 ILUMINACAO P/ QUADRA DE ESP. COB. LAMP. VAPOR METALICO (1X250W) UN 391,28

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.60.90 1,00000IL-58 PROJETOR P/ VAPOR METALICO (1X250W) UN 149,95000149,954.65.29 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V UN 49,6400049,644.97.15 1,00000REATOR SIMPLES P/ VAPOR MET AFP 250W-220V CAP/IGN UN 55,4600055,46

LS 34,66020 BDI 73,16765Mão-de-Obra 28,41000 Material 255,05000SubMO 63,07020

09.09.044 IL-05 ARANDELA BLINDADA UN 213,57

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.23 1,00000IL-05 ARANDELA BLINDADA P/LAMP. FLUORESCENTE COMPACTA 23W-25W UN 146,00000146,004.65.05 1,00000LAMPADA FLUORESCENTE COMPACTA 23W UN 10,8200010,82

LS 9,24272 BDI 39,93691Mão-de-Obra 7,57600 Material 156,82000SubMO 16,81872

09.09.046IL-59 ILUMINAÇÃO P/PASSAGEM COBERTA E CIRCULAÇÕES -LAMP.FLUORESC.COMPACTA (1X23W)

UN 93,88

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.24 1,00000IL-59 ARAND.BLIND.ALUM.V.VIDRO (TARTARUGA) P/LAMP.FLUORESC.COMPACTA 23-25W UN 48,6900048,694.65.05 1,00000LAMPADA FLUORESCENTE COMPACTA 23W UN 10,8200010,82

LS 9,24272 BDI 17,55561Mão-de-Obra 7,57600 Material 59,51000SubMO 16,81872

09.09.050 IL-28 ILUMINACAO AUTONOMA DE EMERGENCIA UN 172,66

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.60.50 1,00000IL-28 ILUMINACAO AUTONOMA DE EMERGENCIA-COMPLETA UN 117,25000117,25

LS 12,70874 BDI 32,28642Mão-de-Obra 10,41700 Material 117,25000SubMO 23,12574

09.09.051 IL-44 LUMINARIA PARA LAMPADA FLUORESCENTE (1X32W) UN 95,45

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.60.62 1,00000CALHA P/LUNIMARIA FLUOR 1X32W C/REFL ALUM E SOQUET UN 38,3000038,304.65.13 1,00000LAMPADA FLUORESCENTE DE 32W UN 5,700005,704.97.24 1,00000REATOR PT RAP P/FLUOR AFP 1/32W-220V UN 20,9900020,99

LS 6,93204 BDI 17,84893Mão-de-Obra 5,68200 Material 64,99000SubMO 12,61404

09.09.052 IL-45 LUMINARIA PARA LAMPADA FLUORESCENTE (2X32W) UN 131,58

09/02/2011 11:38:40 Página: 195 de 0

Page 196: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.60.61 1,00000CALHA P/LUMINARIA FLUOR 2X32W C/REFL ALUM E SOQUET UN 48,3200048,324.65.13 2,00000LAMPADA FLUORESCENTE DE 32W UN 11,400005,704.97.25 1,00000REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W-220V UN 24,1300024,13

LS 12,70874 BDI 24,60442Mão-de-Obra 10,41700 Material 83,85000SubMO 23,12574

09.09.054 IL-47 LUMINARIA ABERTA C/ REFLETOR E PEND P/FLUOR (1X32W) UN 171,41

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.60.62 1,00000CALHA P/LUNIMARIA FLUOR 1X32W C/REFL ALUM E SOQUET UN 38,3000038,304.61.29 2,00000SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE UN 61,7600030,884.65.13 1,00000LAMPADA FLUORESCENTE DE 32W UN 5,700005,704.97.12 1,00000REATOR ELETR P/ LAMP FLUOR AFP 1/32W-220V C/PROT UN 20,9900020,99

LS 6,93204 BDI 32,05373Mão-de-Obra 5,68200 Material 126,75000SubMO 12,61404

09.09.055 IL-48 LUMINARIA ABERTA C/ REFLETOR E PEND P/FLUOR (2X32W) UN 207,54

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.60.61 1,00000CALHA P/LUMINARIA FLUOR 2X32W C/REFL ALUM E SOQUET UN 48,3200048,324.61.29 2,00000SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE UN 61,7600030,884.65.13 2,00000LAMPADA FLUORESCENTE DE 32W UN 11,400005,704.97.13 1,00000REATOR ELETR P/ LAMP FLUOR AFP 2/32W-220V C/PROT UN 24,1300024,13

LS 12,70874 BDI 38,80922Mão-de-Obra 10,41700 Material 145,61000SubMO 23,12574

09.09.060IL-60 LUMINARIA DE SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESCENTE(2X32W)

UN 197,07

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.61.40 1,00000

CALHA P/LUMINARIA SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESC. 2x32W ESOQUETES

UN 101,57000101,574.65.13 2,00000LAMPADA FLUORESCENTE DE 32W UN 11,400005,704.97.25 1,00000REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W-220V UN 24,1300024,13

LS 12,70874 BDI 36,85192Mão-de-Obra 10,41700 Material 137,10000SubMO 23,12574

09.09.061 IL-61 LUMINARIA DE EMBUTIR C/ REFLETOR E ALETAS P/ LAMP. FLUORESCENTE UN 189,41

1.01.15 1,20000ELETRICISTA H 6,492005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.61.41 1,00000

CALHA P/LUMINARIA EMBUTIR P/REFLETOR E ALETAS P/LAMP.FLUORESC. 2X32W ESOQUETES

UN 93,2400093,244.65.13 2,00000LAMPADA FLUORESCENTE DE 32W UN 11,400005,704.97.25 1,00000REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W-220V UN 24,1300024,13

LS 13,86408 BDI 35,41956Mão-de-Obra 11,36400 Material 128,77000SubMO 25,22808

09.09.062IL-62 LUMINARIA DE SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESCENTE(4X16W)

UN 260,47

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.61.42 1,00000

CALHA P/LUMINARIA SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESC.4X16W ESOQUETES

UN 113,18000113,184.65.14 4,00000LAMPADA FLUORESCENTE 16W-220V UN 23,000005,754.97.25 2,00000REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W-220V UN 48,2600024,13

LS 15,01942 BDI 48,70720Mão-de-Obra 12,31100 Material 184,44000SubMO 27,33042

09.09.063 IL-63 LUMINARIA DE EMBUTIR C/ REFLETOR E ALETAS P/ LAMP. FLUORESCENTE UN 252,31

1.01.15 1,40000ELETRICISTA H 7,574005,411.01.16 1,40000AJUDANTE ELETRICISTA H 5,684004,064.61.43 1,00000

CALHA P/LUMINÁRIA EMBUTIR C/REFLETOR E ALETAS P/LAMP.FLUORESC.4X16W ESOQUETES

UN 104,44000104,444.65.14 4,00000LAMPADA FLUORESCENTE 16W-220V UN 23,000005,754.97.25 2,00000REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W-220V UN 48,2600024,13

LS 16,17476 BDI 47,18054Mão-de-Obra 13,25800 Material 175,70000SubMO 29,43276

09.09.099 SERVICOS DE ILUMINACAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.10.002 CENTRO DE LUZ EM CAIXA FM-ELETRODUTO DE POLIETILENO UN 110,50

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,064.26.12 6,00000ELETRODUTO DE POLIETILENO 25 MM M 2,700000,454.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.40 1,00000CAIXA PASSAGEM FUNDO MOVEL 4"X4" (TIPO FM2) UN 3,730003,734.85.49 4,00000BUCHA DE ENCAIXE 25MM - POLIETILENO UN 1,200000,30

LS 36,97088 BDI 20,66432Mão-de-Obra 30,30400 Material 22,57000SubMO 67,27488

09.10.003 CENTRO DE LUZ EM CAIXA FM ELETRODUTO DE PVC UN 132,47

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,064.25.02 6,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 18,480003,08

09/02/2011 11:38:40 Página: 196 de 0

Page 197: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.40 1,00000CAIXA PASSAGEM FUNDO MOVEL 4"X4" (TIPO FM2) UN 3,730003,736.23.56 4,00000LUVA DE PRESSAO PVC DE 25MM (3/4") UN 3,280000,82

LS 36,97088 BDI 24,77212Mão-de-Obra 30,30400 Material 40,43000SubMO 67,27488

09.10.011 CENTRO DE LUZ EM CONDULETE-ELETRODUTO DE PVC UN 137,76

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,064.25.02 6,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 18,480003,084.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.85.50 3,00000BRACADEIRA ACO GALV ELETROLITICO 19 MM (3/4") UN 0,990000,33

LS 36,97088 BDI 25,76112Mão-de-Obra 30,30400 Material 44,73000SubMO 67,27488

09.10.013 CENTRO DE LUZ EM CONDULETE-ELETRODUTO DE POLIETILENO UN 118,35

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,064.26.12 6,00000ELETRODUTO DE POLIETILENO 25 MM M 2,700000,454.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.85.50 3,00000BRACADEIRA ACO GALV ELETROLITICO 19 MM (3/4") UN 0,990000,33

LS 36,97088 BDI 22,13172Mão-de-Obra 30,30400 Material 28,95000SubMO 67,27488

09.10.021 CENTRO DE LUZ EM PERFILADOS-CAIXA FM UN 213,23

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,064.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.51.40 1,00000CAIXA PASSAGEM FUNDO MOVEL 4"X4" (TIPO FM2) UN 3,730003,734.94.70 6,00000CANALETA PERFURADA CH 14 GALV(SISA SRS-1650-P-14GE M 87,4200014,57

LS 36,97088 BDI 39,87392Mão-de-Obra 30,30400 Material 106,09000SubMO 67,27488

09.10.023 CENTRO DE LUZ EM PERFILADO-TOMADA DE LIGACAO - ELETR POLIETILENO UN 200,97

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,062.67.21 2,00000PARAFUSO P/ MADEIRA 6,1X75MM UN 0,380000,192.67.50 1,00000PORCAS E CONTRA-PORCAS 3/8' CJ 0,160000,162.67.77 0,02000BUCHA TIPO S-8 (CENTO) UN 0,2222011,114.26.12 0,50000ELETRODUTO DE POLIETILENO 25 MM M 0,225000,454.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.56.20 1,00000TOMADA LIGACAO ALUMINIO P/PERFILADO UN 4,560004,564.61.04 1,00000SUPORTE CURTO PARA LUMINARIA UN 0,450000,454.94.71 6,00000PERFILADO EM CHAPA ACO 38X38MM M 66,3000011,054.94.78 1,00000SUPORTE PARA PERFILADOS UN 2,050002,054.96.40 1,00000DISTANCIADOR PARA VERGALHAO 3/8' UN 0,200000,204.96.42 1,00000VERGALHAO GALVANIZADO 3/8' M 6,630006,63

LS 36,97088 BDI 37,58018Mão-de-Obra 30,30400 Material 96,11720SubMO 67,27488

09.10.024 CENTRO DE LUZ EM PERFILADO-TOMADA DE LIGACAO - ELETRODUTO DE PVC UN 202,58

1.01.15 3,20000ELETRICISTA H 17,312005,411.01.16 3,20000AJUDANTE ELETRICISTA H 12,992004,062.67.21 2,00000PARAFUSO P/ MADEIRA 6,1X75MM UN 0,380000,192.67.50 1,00000PORCAS E CONTRA-PORCAS 3/8' CJ 0,160000,162.67.77 0,02000BUCHA TIPO S-8 (CENTO) UN 0,2222011,114.25.02 0,50000ELETRODUTO PVC RIGIDO 25MM (3/4') M 1,540003,084.30.05 18,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 14,940000,834.56.20 1,00000TOMADA LIGACAO ALUMINIO P/PERFILADO UN 4,560004,564.61.04 1,00000SUPORTE CURTO PARA LUMINARIA UN 0,450000,454.94.71 6,00000PERFILADO EM CHAPA ACO 38X38MM M 66,3000011,054.94.78 1,00000SUPORTE PARA PERFILADOS UN 2,050002,054.96.40 1,00000DISTANCIADOR PARA VERGALHAO 3/8' UN 0,200000,204.96.42 1,00000VERGALHAO GALVANIZADO 3/8' M 6,630006,63

LS 36,97088 BDI 37,88263Mão-de-Obra 30,30400 Material 97,43220SubMO 67,27488

09.10.030 SENSOR DE PRESENÇA INTERNO UN 57,79

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.25.02 1,00000ELETRODUTO PVC RIGIDO 25MM (3/4') M 3,080003,084.30.04 4,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 2,120000,534.51.36 1,00000CAIXA ESTAMPADA 3X3' UN 1,940001,944.94.84 1,00000SENSOR DE PRESENÇA INTERNO UN 23,0300023,03

LS 9,24272 BDI 10,80741Mão-de-Obra 7,57600 Material 30,17000SubMO 16,81872

09.10.099 SERVICOS DE CENTROS DE LUZ MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09/02/2011 11:38:40 Página: 197 de 0

Page 198: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.11.010 LUMIN DECORATIVA PARA JARDIM COM LAMP INCANDESCENTE DE 300 W UN 348,14

1.01.15 1,60000ELETRICISTA H 8,656005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,064.60.96 1,00000LUMINARIA DEC JARDIM C/LAMP INCAND 300W UN 249,41000249,41

LS 18,48544 BDI 65,10091Mão-de-Obra 15,15200 Material 249,41000SubMO 33,63744

09.11.011 LUMIN DECORATIVA PARA JARDIM COM LAMP COM LAMP MISTA DE 250 W UN 382,21

1.01.15 1,60000ELETRICISTA H 8,656005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,064.60.97 1,00000LUMINARIA DEC JARDIM C/LAMP MISTA 250W UN 277,11000277,11

LS 18,48544 BDI 71,47191Mão-de-Obra 15,15200 Material 277,11000SubMO 33,63744

09.11.012 LUMIN DECORATIVA PARA JARDIM COM LAMP VAPOR DE MERCURIO DE 250 W UN 352,39

1.01.15 1,60000ELETRICISTA H 8,656005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,064.60.98 1,00000LUMINARIA DEC JARDIM C/LAMP VA MERC 250W UN 252,86000252,86

LS 18,48544 BDI 65,89441Mão-de-Obra 15,15200 Material 252,86000SubMO 33,63744

09.11.021 IL-37 LUMINARIA C/GRADE C/LAMP. VAPOR SÓDIO 150W C/ BRACO ACO GALV. UN 225,76

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.60.30 1,00000BRACO ACO GALVANIZADO DIAM 25.4MMX1.0M P/ILUM.EXT. UN 32,8300032,834.60.76 1,00000IL-37 LUMINARIA COM GRADE P/LAMPADA VAPOR SODIO 150W UN 72,5100072,514.63.01 1,00000CHUMBADOR P/ FIXACAO BRACO - ILUM. EXT. - 1/2" UN 4,390004,394.65.25 1,00000LAMPADA MISTA 160W/220V UN 10,7500010,75

LS 34,66020 BDI 42,21655Mão-de-Obra 28,41000 Material 120,48000SubMO 63,07020

09.11.026 IL-50 LUMINARIA VAPOR MET 2X250W C/ POSTE CONCR TUB 11M (QE) UN 1.885,67

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,961.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,061.01.39 1,50000PEDREIRO H 6,975004,651.01.46 10,00000SERVENTE H 38,100003,812.05.03 0,04400AREIA M3 3,4848079,202.05.08 24,42000CIMENTO KG 9,035400,372.05.18 0,13100PEDRA BRITADA 2 M3 8,0027961,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.32 0,46000CHAPA COMPENSADA RESINADA E=12MM M2 5,5660012,104.01.12 1,00000POSTE CONCR TUB OCO 11M C/JANELA INSPECAO UN 460,13000460,134.30.05 24,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 19,920000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.60.55 1,00000CRUZETA P/FIX 2 LUMIN EXTERNA UN 183,52000183,524.60.84 2,00000IL-50 PROJETOR P/ LAMP VAPOR MET 250W UN 362,40000181,204.65.29 2,00000LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V UN 99,2800049,644.97.15 2,00000REATOR SIMPLES P/ VAPOR MET AFP 250W-220V CAP/IGN UN 110,9200055,46

LS 141,82866 BDI 352,60515Mão-de-Obra 116,25300 Material 1.274,98419SubMO 258,08166

09.11.028 IL-52 LUMINARIA P/ VAPOR DE SODIO 1X150W EM POSTE TUB 7M UN 915,98

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,961.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,061.01.39 1,50000PEDREIRO H 6,975004,651.01.46 8,00000SERVENTE H 30,480003,812.05.03 0,04400AREIA M3 3,4848079,202.05.08 24,42000CIMENTO KG 9,035400,372.05.18 0,13100PEDRA BRITADA 2 M3 8,0027961,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.32 0,46000CHAPA COMPENSADA RESINADA E=12MM M2 5,5660012,104.01.11 1,00000POSTE CONCR TUB OCO 7M C/JANELA INSPECAO UN 303,48000303,484.30.04 16,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 8,480000,534.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.60.30 1,00000BRACO ACO GALVANIZADO DIAM 25.4MMX1.0M P/ILUM.EXT. UN 32,8300032,834.60.85 1,00000IL-52 LUMINARIA ABERTA P/ LAMP VAPOR DE SODIO 150W UN 29,4000029,404.65.30 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V UN 20,7500020,754.80.61 1,00000BRACADEIRA DE ACO GALVANIZADO P/POSTE REDONDO UN 67,6000067,604.97.16 1,00000REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN UN 44,2300044,23

LS 109,42546 BDI 171,28161Mão-de-Obra 89,69300 Material 545,58419SubMO 199,11846

09.11.035 IL-06 LUZ DE OBSTACULO COM LAMPADA DE 60W UN 201,56

1.01.15 2,10000ELETRICISTA H 11,361005,411.01.16 2,10000AJUDANTE ELETRICISTA H 8,526004,064.17.41 1,00000IL-06RELE FOTOELETRICO UN 32,2300032,234.21.57 1,00000COTOVELO DE REDUCAO ACO GALV QUENTE 1" X 3/4" UN 3,150003,154.60.63 1,00000IL-06 LUZ DE OBSTACULO PARA LAMPADA 60 W UN 45,3400045,34

09/02/2011 11:38:40 Página: 198 de 0

Page 199: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.65.04 1,00000LAMPADA INCANDESCENTE 60W UN 1,300001,304.96.70 1,00000NIPLE DUPLO FERRO GALV 3/4' UN 2,610002,614.96.72 1,00000TE REDUCAO FERRO GALV 2'X1' UN 28,9500028,956.05.04 0,30000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4") M 6,1470020,49

LS 24,26214 BDI 37,69151Mão-de-Obra 19,88700 Material 119,72700SubMO 44,14914

09.11.038 IL-51 LUMINARIA P/ VAPOR MET P/SOM/ELETR (2X250W) UN 1.959,09

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,961.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,061.01.39 1,50000PEDREIRO H 6,975004,651.01.46 10,00000SERVENTE H 38,100003,812.05.03 0,04400AREIA M3 3,4848079,202.05.08 24,42000CIMENTO KG 9,035400,372.05.18 0,13100PEDRA BRITADA 2 M3 8,0027961,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.32 0,46000CHAPA COMPENSADA RESINADA E=12MM M2 5,5660012,104.01.18 1,00000POSTE CONCR TUBULAR OCO 11M C/ ACESSORIOS P/ SOM UN 483,09000483,094.30.05 24,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 19,920000,834.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.55.71 1,00000CONDULETE ALUMÍNIO 4"X2" XD=3/4" C/ TOMADA BLINDADA PADRÃO NBR 14136-10A-220VUN 15,7100015,714.60.55 1,00000CRUZETA P/FIX 2 LUMIN EXTERNA UN 183,52000183,524.60.84 2,00000IL-50 PROJETOR P/ LAMP VAPOR MET 250W UN 362,40000181,204.65.29 2,00000LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V UN 99,2800049,644.97.15 2,00000REATOR SIMPLES P/ VAPOR MET AFP 250W-220V CAP/IGN UN 110,9200055,46

LS 153,38206 BDI 366,33463Mão-de-Obra 125,72300 Material 1.313,65419SubMO 279,10506

09.11.060 IL-30 LUMINARIA EM POSTE H= 2,50 M C/ LAMPADA VAPOR SÓDIO 70W UN 1.175,95

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,961.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,061.01.39 1,90000PEDREIRO H 8,835004,651.01.46 8,06000SERVENTE H 30,708603,812.05.03 0,08400AREIA M3 6,6528079,202.05.08 46,20000CIMENTO KG 17,094000,372.05.18 0,18400PEDRA BRITADA 2 M3 11,2405661,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.32 0,46000CHAPA COMPENSADA RESINADA E=12MM M2 5,5660012,104.01.09 1,00000POSTE EM ACO ZINCADO H=2.50M DIAM 60MM UN 320,10000320,104.30.05 16,00000FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V) M 13,280000,834.51.61 1,00000CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM UN 149,96000149,964.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.61.38 1,00000IL - 30 LUMINARIA TIPO PRACA UN 172,19000172,194.65.39 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 70W/220V UN 13,4400013,444.97.18 1,00000REATOR SIMPLES P/VAPOR SODIO AFP 70W 220V CAP/IGN UN 30,0600030,06

LS 111,97355 BDI 219,89465Mão-de-Obra 91,78160 Material 752,30856SubMO 203,75515

09.11.068 IL-53 LUMINARIA P/ VAPOR DE SODIO 1X150W EM POSTE 6M UN 1.823,36

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,961.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,061.01.39 1,90000PEDREIRO H 8,835004,651.01.46 8,06000SERVENTE H 30,708603,812.05.03 0,08400AREIA M3 6,6528079,202.05.08 46,20000CIMENTO KG 17,094000,372.05.18 0,18400PEDRA BRITADA 2 M3 11,2405661,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.32 0,46000CHAPA COMPENSADA RESINADA E=12MM M2 5,5660012,102.67.14 4,00000CHUMBADOR P/ FIXACAO POSTE METALICO 1/2"X300MM UN 26,760006,694.01.25 1,00000POSTE GALV,TELECON RETO, FLANGEADO 88,9 MM X 6,0 M UN 807,46000807,464.30.04 16,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 8,480000,534.51.61 1,00000CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM UN 149,96000149,964.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.60.86 1,00000IL 53/54 LUMINARIA P/ LAMP VAPOR DE SODIO 150W UN 136,06000136,064.65.30 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V UN 20,7500020,754.94.91 1,00000SUPORTE P/LUMINARIA SIMPLES - IL-53/IL-33/IL35 UN 31,6800031,684.97.16 1,00000REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN UN 44,2300044,23

LS 111,97355 BDI 340,95515Mão-de-Obra 91,78160 Material 1.278,65856SubMO 203,75515

09.11.070 IL-54 LUMINARIA P/ VAPOR DE SODIO 2X150W EM POSTE 6M UN 2.084,96

1.01.11 2,80000CARPINTEIRO H 12,740004,551.01.12 2,80000AJUDANTE DE CARPINTEIRO H 11,088003,961.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,06

09/02/2011 11:38:40 Página: 199 de 0

Page 200: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 1,90000PEDREIRO H 8,835004,651.01.46 8,06000SERVENTE H 30,708603,812.05.03 0,08400AREIA M3 6,6528079,202.05.08 46,20000CIMENTO KG 17,094000,372.05.18 0,18400PEDRA BRITADA 2 M3 11,2405661,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.32 0,46000CHAPA COMPENSADA RESINADA E=12MM M2 5,5660012,102.67.14 4,00000CHUMBADOR P/ FIXACAO POSTE METALICO 1/2"X300MM UN 26,760006,694.01.25 1,00000POSTE GALV,TELECON RETO, FLANGEADO 88,9 MM X 6,0 M UN 807,46000807,464.30.04 16,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 8,480000,534.51.61 1,00000CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM UN 149,96000149,964.51.71 1,00000CONDULETE DE ALUMINIO 4"X2" "C" D=3/4" UN 10,3200010,324.60.86 2,00000IL 53/54 LUMINARIA P/ LAMP VAPOR DE SODIO 150W UN 272,12000136,064.65.30 2,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V UN 41,5000020,754.94.92 1,00000SUPORTE P/LUMINARIA DUPLA - IL-54/IL-34/IL-36 UN 43,3200043,324.97.16 2,00000REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN UN 88,4600044,23

LS 111,97355 BDI 389,87155Mão-de-Obra 91,78160 Material 1.491,33856SubMO 203,75515

09.11.072 IL-55 PROJETOR MEDIO P/ VAPOR DE SODIO 150W UN 255,21

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.87 1,00000IL-55 PROJETOR MEDIO P/ LAMP VAPOR DE SODIO 150W UN 125,69000125,694.65.30 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V UN 20,7500020,754.97.16 1,00000REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN UN 44,2300044,23

LS 9,24272 BDI 47,72241Mão-de-Obra 7,57600 Material 190,67000SubMO 16,81872

09.11.073 IL-56 PROJETOR P/ VAPOR DE SODIO 250W UN 335,92

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.60.88 1,00000IL-56 PROJETOR P/ LAMP VAPOR DE SODIO 250W UN 125,69000125,694.65.31 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 250W/220V UN 24,9700024,974.97.17 1,00000REATOR SIMPLES P/VAPOR SODIO AFP 250W-220V CAP/IGN UN 59,3800059,38

LS 34,66020 BDI 62,81535Mão-de-Obra 28,41000 Material 210,04000SubMO 63,07020

09.11.099 SERVICOS DE ILUMINACAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.12.099 SERVICOS DE APARELHOS ELETRICOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.13.012 PP-02 PARA RAIO FRANKLIN COM HASTE 3MX2" UN 507,60

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.80.03 1,00000CONJ CONTRAVENTAGEM EM ACO GALV C/SUPORT FIXO,D=2" UN 96,1800096,184.80.07 1,00000BASE DE FIXACAO EM FERRO FUNDIDO P/ MASTROS,D=2" UN 52,0200052,024.80.62 1,00000CAPTOR TIPO FRANKLIN,LATAO CROMADO,CONECTOR DUPLO UN 60,0700060,076.05.06 3,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2") M 99,3000033,10

LS 57,76700 BDI 94,91801Mão-de-Obra 47,35000 Material 307,57000SubMO 105,11700

09.13.013 PP-03 PARA-RAIO FRANKLIN COM HASTE 6,00M E DIAM=2" UN 629,74

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.80.03 1,00000CONJ CONTRAVENTAGEM EM ACO GALV C/SUPORT FIXO,D=2" UN 96,1800096,184.80.07 1,00000BASE DE FIXACAO EM FERRO FUNDIDO P/ MASTROS,D=2" UN 52,0200052,024.80.62 1,00000CAPTOR TIPO FRANKLIN,LATAO CROMADO,CONECTOR DUPLO UN 60,0700060,076.05.06 6,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2") M 198,6000033,10

LS 57,76700 BDI 117,75701Mão-de-Obra 47,35000 Material 406,87000SubMO 105,11700

09.13.015 BARRA CHATA ACO GALVANIZADO (3/4"X1/8") - CAPTOR P/ PARA RAIOS M 29,21

1.01.15 0,75000ELETRICISTA H 4,057505,411.01.16 0,75000AJUDANTE ELETRICISTA H 3,045004,062.67.24 0,63000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 0,176400,283.11.90 0,50400CAIXILHARIA EM FERRO KG 6,9148813,723.76.50 0,50400GALVANIZACAO A FOGO KG 0,892081,77

LS 8,66505 BDI 5,46271Mão-de-Obra 7,10250 Material 7,98336SubMO 15,76755

09.13.016 BARRA CHATA ALUMUNIO (1/2"X1/4") - CAPTOR P/ PARA RAIOS M 29,43

1.01.15 0,75000ELETRICISTA H 4,057505,411.01.16 0,75000AJUDANTE ELETRICISTA H 3,045004,062.67.24 0,63000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 0,176400,283.11.91 0,22900CAIXILHARIA EM ALUMINIO KG 7,9852334,87

LS 8,66505 BDI 5,50371Mão-de-Obra 7,10250 Material 8,16163SubMO 15,76755

09.13.018 BARRA CHATA ACO GALVANIZADO (3/4"X1/8") - DESCIDA P/ PARA RAIO M 22,74

09/02/2011 11:38:40 Página: 200 de 0

Page 201: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,062.67.24 0,63000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 0,176400,283.11.90 0,50400CAIXILHARIA EM FERRO KG 6,9148813,723.76.50 0,50400GALVANIZACAO A FOGO KG 0,892081,77

LS 5,77670 BDI 4,25386Mão-de-Obra 4,73500 Material 7,98336SubMO 10,51170

09.13.019 BARRA CHATA ALUMINIO (1/2"X1/8") - DESCIDA P/ PARA RAIOS M 18,05

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,062.67.24 0,63000PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA CJ 0,176400,283.11.91 0,11450CAIXILHARIA EM ALUMINIO KG 3,9926234,87

LS 5,77670 BDI 3,37656Mão-de-Obra 4,73500 Material 4,16902SubMO 10,51170

09.13.020 CABO DE COBRE NU DE 35 MM2 - COM SUPORTES DE FIXACAO M 60,90

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.05.20 1,00000ISOLADOR CASTANHA PARA CABO 35 MM2 UN 10,1500010,154.30.41 1,00000CABO DE COBRE NU DE 35 MM2 M 18,3400018,34

LS 11,55340 BDI 11,38808Mão-de-Obra 9,47000 Material 28,49000SubMO 21,02340

09.13.021 CABO DE COBRE NU DE 70 MM2 - COM SUPORTES DE FIXACAO M 91,49

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.05.17 1,00000ISOLADOR CASTANHA P/ CABO DE 70 MM2 UN 18,8900018,894.30.43 1,00000CABO DE COBRE NU DE 70 MM2 M 34,4700034,47

LS 11,55340 BDI 17,10818Mão-de-Obra 9,47000 Material 53,36000SubMO 21,02340

09.13.022 CABO DE COBRE NU DE 95 MM2 - COM SUPORTES DE FIXACAO M 86,14

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.05.18 1,00000ISOLADOR CASTANHA P/CABO N.4/0 AWG UN 10,6000010,604.31.30 1,00000CORDOALHA DE COBRE NU DE 95 MM2 M 38,4100038,41

LS 11,55340 BDI 16,10768Mão-de-Obra 9,47000 Material 49,01000SubMO 21,02340

09.13.023 CABO DE COBRE NU DE 50 MM2 - SOB A TERRA M 40,52

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.30.54 1,00000CABO DE COBRE NU 50 MM2 M 20,9300020,93

LS 6,60325 BDI 7,57752Mão-de-Obra 5,41250 Material 20,93000SubMO 12,01575

09.13.024 CORDOALHA DE AÇO GALV. A QUENTE 50MM2 (3/8") C/SUP.DE FIXAÇÃO M 35,83

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.05.21 0,25000ISOLADOR CASTANHA P/CABO 50MM2 UN 3,7500015,004.31.40 1,00000CORDOALHA DE AÇO GALV. 50MM2 M 4,360004,36

LS 11,55340 BDI 6,70068Mão-de-Obra 9,47000 Material 8,11000SubMO 21,02340

09.13.025 CORDOALHA DE AÇO GALV. A QUENTE 80MM2 (7/16") SOB A TERRA M 24,26

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.31.42 1,00000CORDOALHA DE ACO GALV. 80MM2 (7/16") M 7,710007,71

LS 6,60325 BDI 4,53692Mão-de-Obra 5,41250 Material 7,71000SubMO 12,01575

09.13.026 TERRA COMPLETO - 3 HASTES UN 707,73

1.01.11 1,58400CARPINTEIRO H 7,207204,551.01.12 1,58400AJUDANTE DE CARPINTEIRO H 6,272643,961.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,061.01.21 0,42000FERREIRO H 2,003404,771.01.22 0,42000AJUDANTE DE FERREIRO H 1,604403,821.01.39 3,76500PEDREIRO H 17,507254,651.01.46 11,22900SERVENTE H 42,782493,812.05.03 0,10500AREIA M3 8,3160079,202.05.05 9,72000CAL HIDRATADA KG 3,304800,342.05.08 25,13100CIMENTO KG 9,298470,372.05.18 0,33000PEDRA BRITADA 2 M3 20,1597061,092.05.36 0,06000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,20940253,492.10.14 2,88000SARRAFO PINHO APARELHADO 5X2,5 CM M 6,019202,092.10.21 0,72000TABUAS PINHO DE 1"X12" DE 3A. M2 12,3696017,182.15.25 4,83000ACO CA-50-A $MD BITOLAS KG 13,041002,702.25.15 117,00000TIJOLO COMUM MACICO UN 25,740000,222.40.69 0,32400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,813242,512.67.60 0,28800PREGO KG 1,316164,572.70.10 0,08400ARAME RECOZIDO N.18 KG 0,388924,634.80.08 3,00000HASTE COPERWELD 19MM (3/4)X3 M UN 210,6900070,23

09/02/2011 11:38:40 Página: 201 de 0

Page 202: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.80.09 4,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 13,880003,47

LS 129,06060 BDI 132,34073Mão-de-Obra 105,78738 Material 340,54649SubMO 234,84798

09.13.027 TERRA SIMPLES - 1 HASTE UN 234,48

1.01.11 0,52800CARPINTEIRO H 2,402404,551.01.12 0,52800AJUDANTE DE CARPINTEIRO H 2,090883,961.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.21 0,14000FERREIRO H 0,667804,771.01.22 0,14000AJUDANTE DE FERREIRO H 0,534803,821.01.39 1,25500PEDREIRO H 5,835754,651.01.46 3,74300SERVENTE H 14,260833,812.05.03 0,03500AREIA M3 2,7720079,202.05.05 3,24000CAL HIDRATADA KG 1,101600,342.05.08 8,37700CIMENTO KG 3,099490,372.05.18 0,11000PEDRA BRITADA 2 M3 6,7199061,092.05.36 0,02000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 5,06980253,492.10.14 0,96000SARRAFO PINHO APARELHADO 5X2,5 CM M 2,006402,092.10.21 0,24000TABUAS PINHO DE 1"X12" DE 3A. M2 4,1232017,182.15.25 1,61000ACO CA-50-A $MD BITOLAS KG 4,347002,702.25.15 39,00000TIJOLO COMUM MACICO UN 8,580000,222.40.69 0,10800IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,271082,512.67.60 0,09600PREGO KG 0,438724,572.70.10 0,02800ARAME RECOZIDO N.18 KG 0,129644,634.80.08 1,00000HASTE COPERWELD 19MM (3/4)X3 M UN 70,2300070,234.80.09 1,00000CONECTOR P/ HASTE TERRA DN 19MM (3/4") UN 3,470003,47

LS 43,02020 BDI 43,84754Mão-de-Obra 35,26246 Material 112,35883SubMO 78,28266

09.13.031 TUBO DE PVC 2"X 3M PARA PROTECAO DE CORDOALHA UN 49,44

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.25.06 3,30000ELETRODUTO PVC RIGIDO 60MM (2') M 19,173005,81

LS 11,55340 BDI 9,24517Mão-de-Obra 9,47000 Material 19,17300SubMO 21,02340

09.13.032 CONEXAO EXOTERMICA CABO/CABO UN 32,98

1.01.15 1,00000ELETRICISTA H 5,410005,414.63.05 0,02000MOLDE CLASSE C PARA CONEXÃO EXOTERMICA UN 1,8126090,634.63.10 0,00200ALICATE P/ MOLDE CLASSE C (CONEXAO EXOTERMICA) UN 0,30574152,874.63.20 1,00000CARTUCHO P/CONEXÃO EXOTERM.CABO/CABO 50MM2 UN 12,6900012,69

LS 6,60020 BDI 6,16826Mão-de-Obra 5,41000 Material 14,80834SubMO 12,01020

09.13.033 CONEXAO EXOTERMICA CABO/HASTE UN 42,03

1.01.15 1,20000ELETRICISTA H 6,492005,414.63.06 0,02000MOLDE CLASSE R PARA CONEXAO EXOTERMICA UN 1,8126090,634.63.11 0,00200ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA) UN 0,50746253,734.63.21 1,00000CARTUCHO P/CONEXÃO EXOTERM.CABO/HASTE P/CABO 50MM2 UN 17,4400017,44

LS 7,92024 BDI 7,85963Mão-de-Obra 6,49200 Material 19,76006SubMO 14,41224

09.13.034 CONEXAO EXOTERMICA EM ESTRUTURA METALICA UN 38,82

1.01.15 1,00000ELETRICISTA H 5,410005,414.63.05 0,02000MOLDE CLASSE C PARA CONEXÃO EXOTERMICA UN 1,8126090,634.63.10 0,00200ALICATE P/ MOLDE CLASSE C (CONEXAO EXOTERMICA) UN 0,30574152,874.63.22 1,00000CARTUCHO P/CONEXÃO EXOT.VB ESTR.MET.P/CABO 35MM2 UN 17,4400017,44

LS 6,60020 BDI 7,26076Mão-de-Obra 5,41000 Material 19,55834SubMO 12,01020

09.13.099 SERVICOS DE PARA-RAIOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.50.001 REMOCAO DE OLEO DE DISJUNTOR OU TRANSFORMADOR EM CABINE PRIMARIA L 0,44

1.01.16 0,04000AJUDANTE ELETRICISTA H 0,162404,06

LS 0,19813 BDI 0,08292Mão-de-Obra 0,16240 Material 0,00000SubMO 0,36053

09.50.003REMOCAO DE ISOLADOR TIPO DISCO COMPL, INCL GANCHO DE SUSPENSAOOLHAL

UN 3,87

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,06

LS 1,73301 BDI 0,72531Mão-de-Obra 1,42050 Material 0,00000SubMO 3,15351

09.50.004 REMOCAO DE BUCHA DE PASSAGEM INT/EXT, OU DE CHAPA P/ BUCHA PASS A.T. UN 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.50.005 REMOCAO DE BUCHA DE PASSAGEM PARA NEUTRO EM CABINE PRIMARIA UN 7,75

1.01.15 0,30000ELETRICISTA H 1,623005,41

09/02/2011 11:38:40 Página: 202 de 0

Page 203: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,06

LS 3,46602 BDI 1,45062Mão-de-Obra 2,84100 Material 0,00000SubMO 6,30702

09.50.007 REMOCAO DE CANTONEIRA METALICA M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.50.008 REMOCAO DE ISOLADOR TIPO CASTANHA, INCLUSIVE GANCHO DE SUSTENTACAO UN 1,10

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,06

LS 0,49532 BDI 0,20730Mão-de-Obra 0,40600 Material 0,00000SubMO 0,90132

09.50.009 REMOCAO DE ISOLADOR TIPO PINO PARA A.T., INCLUSIVE PINO UN 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.50.011 REMOCAO DE VERGALHAO DE COBRE M 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.50.013 REMOCAO DE MUFLA EXTERNA TRIPOLAR UN 55,41

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,06

LS 24,75990 BDI 10,36263Mão-de-Obra 20,29500 Material 0,00000SubMO 45,05490

09.50.014 REMOCAO DE MUFLA INTERNA TRIPOLAR UN 36,94

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

LS 16,50660 BDI 6,90842Mão-de-Obra 13,53000 Material 0,00000SubMO 30,03660

09.50.016 REMOCAO DE CABO DE A.T. TRIPOLAR M 18,47

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 8,25330 BDI 3,45421Mão-de-Obra 6,76500 Material 0,00000SubMO 15,01830

09.50.018 REMOCAO CHAVE SECCION TRIP SECA, COMANDO POR VARA/ESTRIBO FRONTAL UN 73,89

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,06

LS 33,01320 BDI 13,81684Mão-de-Obra 27,06000 Material 0,00000SubMO 60,07320

09.50.020 REMOCAO DE TRANSFORMADOR DE POTENCIAL COMPLETO UN 16,80

1.01.15 0,65000ELETRICISTA H 3,516505,411.01.16 0,65000AJUDANTE ELETRICISTA H 2,639004,06

LS 7,50971 BDI 3,14300Mão-de-Obra 6,15550 Material 0,00000SubMO 13,66521

09.50.022 REMOCAO DE DISJUNTOR DE VOLUME NORMAL OU REDUZIDO UN 94,36

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

LS 42,16320 BDI 17,64634Mão-de-Obra 34,56000 Material 0,00000SubMO 76,72320

09.50.023REMOCAO DE MANOPLA DE COMANDO DE DISJUNTOR DE A.T.(ENGRENAGEMINTERNA)

UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.50.024 REMOCAO DE JANELA DE VENTILACAO PADRAO LIGHT UN 18,47

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 8,25330 BDI 3,45421Mão-de-Obra 6,76500 Material 0,00000SubMO 15,01830

09.50.025 REMOCAO RELE DE SOBRE-CORRENTE,INFRATENSAO/BOBINA MINIMA DO DISJ A.T. UN 11,81

1.01.15 0,80000ELETRICISTA H 4,328005,41

LS 5,28016 BDI 2,20988Mão-de-Obra 4,32800 Material 0,00000SubMO 9,60816

09.50.026 REMOCAO DE TRANSFORMADOR DE POTENCIA EM CABINE PRIMARIA UN 168,25

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

LS 75,17640 BDI 31,46317Mão-de-Obra 61,62000 Material 0,00000SubMO 136,79640

09.50.027 REMOCAO DE TRANSFORMADOR DE POTENCIA EM POSTE OU ESTALEIRO UN 186,73

09/02/2011 11:38:40 Página: 203 de 0

Page 204: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 4,50000ELETRICISTA H 24,345005,411.01.16 9,00000AJUDANTE ELETRICISTA H 36,540004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

LS 83,42970 BDI 34,91738Mão-de-Obra 68,38500 Material 0,00000SubMO 151,81470

09.50.028 REMOCAO DE POSTE DE CONCRETO UN 295,58

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,06

LS 132,06500 BDI 55,27245Mão-de-Obra 108,25000 Material 0,00000SubMO 240,31500

09.50.030 REMOCAO DE PARA-RAIO TIPO CRISTAL VALVE EM POSTE SINGELO OU ESTALEIRO UN 51,71

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

LS 23,10680 BDI 9,67076Mão-de-Obra 18,94000 Material 0,00000SubMO 42,04680

09.50.031 REMOCAO DE PARA-RAIO TIPO CRISTAL-VALVE EM CABINE PRIMARIA UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.50.032 REMOCAO DE CRUZETA DE MADEIRA UN 55,41

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,06

LS 24,75990 BDI 10,36263Mão-de-Obra 20,29500 Material 0,00000SubMO 45,05490

09.50.033 REMOCAO DE MAO FRANCESA UN 11,08

1.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 4,95320 BDI 2,07304Mão-de-Obra 4,06000 Material 0,00000SubMO 9,01320

09.50.034 REMOCAO DE CHAVE FUSIVEL INDICADORA TIPO MATHEUS UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.50.036 REMOCAO DE SUPORTE DE TRANSFORMADOR EM POSTE SINGELO OU ESTALEIRO UN 17,73

1.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,06

LS 7,92512 BDI 3,31686Mão-de-Obra 6,49600 Material 0,00000SubMO 14,42112

09.50.037 REMOCAO CINTA FIXACAO DE ELETRODUTO OU SELA P/CRUZETA MAD EM POSTE UN 5,54

1.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 2,47660 BDI 1,03652Mão-de-Obra 2,03000 Material 0,00000SubMO 4,50660

09.50.039 REMOCAO DE CAIXAS DE MEDICAO OU CAIXAS P/ TRANSF. DE CORRENTE UN 29,55

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

LS 13,20650 BDI 5,52725Mão-de-Obra 10,82500 Material 0,00000SubMO 24,03150

09.50.099 DEMOLICOES DE ALTA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.52.001 REMOCAO DE POSTE ACO GALV. OU CAIXA ACO P/ ENTRADA ENERGIA EM B.T. UN 103,43

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,06

LS 46,21360 BDI 19,34153Mão-de-Obra 37,88000 Material 0,00000SubMO 84,09360

09.52.002 REMOCAO DE POSTE DE CONCRETO DE ENTRADA EM B.T. UN 129,29

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,06

LS 57,76700 BDI 24,17691Mão-de-Obra 47,35000 Material 0,00000SubMO 105,11700

09.52.003 REMOCAO DE ARMACAO TIPO BRAQUET UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.004 REMOCAO DE CABECOTE TIPO TELESP UN 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.52.005 REMOCAO DE CAIXA DE ENTRADA DE TELEFONE PADRAO TELESP UN 51,71

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

09/02/2011 11:38:40 Página: 204 de 0

Page 205: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 23,10680 BDI 9,67076Mão-de-Obra 18,94000 Material 0,00000SubMO 42,04680

09.52.007 REMOCAO DE TUBULACAO ELETRICA EMBUTIDA ATE 2" M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.52.008 REMOCAO DE TUBULACAO ELETRICA EMBUTIDA ACIMA DE 2" M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.009 REMOCAO DE TUBULACAO ELETRICA APARENTE ATE 2" M 3,23

1.01.15 0,12500ELETRICISTA H 0,676255,411.01.16 0,12500AJUDANTE ELETRICISTA H 0,507504,06

LS 1,44418 BDI 0,60442Mão-de-Obra 1,18375 Material 0,00000SubMO 2,62793

09.52.010 REMOCAO DE TUBULACAO ELETRICA APARENTE ACIMA 2" M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.52.015 REMOCAO DE CAIXA PARA FUSIVEL OU TOMADA INSTALADA EM PERFILADOS UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.016 REMOCAO DE CAIXAS ESTAMPADAS UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.52.017 REMOCAO DE FIO EMBUTIDO ATE 16 MM2 M 0,64

1.01.15 0,02500ELETRICISTA H 0,135255,411.01.16 0,02500AJUDANTE ELETRICISTA H 0,101504,06

LS 0,28884 BDI 0,12089Mão-de-Obra 0,23675 Material 0,00000SubMO 0,52559

09.52.018 REMOCAO DE CABO EMBUTIDO ACIMA DE 16 MM2 M 1,29

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,06

LS 0,57767 BDI 0,24177Mão-de-Obra 0,47350 Material 0,00000SubMO 1,05117

09.52.019 REMOCAO DE FIO APARENTE ATE 16 MM2 M 0,77

1.01.15 0,03000ELETRICISTA H 0,162305,411.01.16 0,03000AJUDANTE ELETRICISTA H 0,121804,06

LS 0,34660 BDI 0,14506Mão-de-Obra 0,28410 Material 0,00000SubMO 0,63070

09.52.020 REMOCAO DE CABO APARENTE ACIMA DE 16 MM2 M 1,55

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,06

LS 0,69320 BDI 0,29012Mão-de-Obra 0,56820 Material 0,00000SubMO 1,26140

09.52.021 REMOCAO DE TERMINAIS ,CONECTORES DE PRESSAO OU ROLDANAS PARA CABOS UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.52.022 REMOCAO DE TERMINAIS OU CONECTORES DE SOLDA PARA CABOS UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.026REMOCAO DE FUNDO OU PORTAS MADEIRA/METAL .P/QUADROS OU CAIXASPASSAGEM

M2 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.52.028 REMOCAO DE FECHADURAS TIPO YALE (Q.DISTRIBUICAO) UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.52.029 REMOCAO DE CHAVES BASE MARMORE,NH UNIPOLAR OU DISJUNT.NO-FUSE EM BT UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,41

09/02/2011 11:38:40 Página: 205 de 0

Page 206: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.030 REMOCAO DE DISJUNTOR QUICK-LAG OU BASE P/ FUSIVEL DIAZED EM B.T UN 3,23

1.01.15 0,12500ELETRICISTA H 0,676255,411.01.16 0,12500AJUDANTE ELETRICISTA H 0,507504,06

LS 1,44418 BDI 0,60442Mão-de-Obra 1,18375 Material 0,00000SubMO 2,62793

09.52.034 REMOCAO DE BASE OU CHAVE PARA FUSIVEL NH TIPO UNIPOLAR UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.035 REMOCAO DE CHAVE OU BASE NH TRIPOL. OU CHAVE PACCO ROTATIVA EM B.T UN 19,39

1.01.15 0,75000ELETRICISTA H 4,057505,411.01.16 0,75000AJUDANTE ELETRICISTA H 3,045004,06

LS 8,66505 BDI 3,62654Mão-de-Obra 7,10250 Material 0,00000SubMO 15,76755

09.52.037REMOCAO DE CHAVE DE ACAO RAPIDA,COMANDO FRONTAL MONTADO EM PAINELB.T

UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.52.039 REMOCAO DE BARRAMENTO DE COBRE M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.52.099 DEMOLICOES DE BAIXA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.54.001 REMOCAO DE INTERRUPTORES TOMADAS BOTOES DE CAMPAINHA E CIGARRAS UN 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.54.002 REMOCAO DE CHAVE AUTOMATICA DA BOIA UN 15,51

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,06

LS 6,93204 BDI 2,90123Mão-de-Obra 5,68200 Material 0,00000SubMO 12,61404

09.54.003REMOCAO DE CONTACTOR MAGNETICO P/ QUADRO DE COMANDO DE BOMBARECALQUE

UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.54.004 REMOCAO DE MOTOR BOMBA DE RECALQUE UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.54.005 REMOCAO AP.ILUM FLUORESC.C/PLAFON E PEND,OU CANOPLA P/ LUM.PENDENTE UN 3,87

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,06

LS 1,73301 BDI 0,72531Mão-de-Obra 1,42050 Material 0,00000SubMO 3,15351

09.54.006REMOCAO APARELHO ILUMINACAO,PLAFONS E PENDENTES P/LAMPADASFLUORESC

UN 3,87

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,06

LS 1,73301 BDI 0,72531Mão-de-Obra 1,42050 Material 0,00000SubMO 3,15351

09.54.007REMOCAO DE SOQUETES P/ LAMPADAS INCANDES OU DE CORRENTES P/PENDENTES

UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.54.011REMOCAO DE REATORES P/ LAMP.HG EM CX.PASSAG.OU P/ LAMP.FLUORESCENTES

UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

09/02/2011 11:38:40 Página: 206 de 0

Page 207: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.54.013 REMOCAO DE REATORES PARA LAMPADAS HG EM POSTES UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.54.014 REMOCAO DE AP. ILUMIN. EM POSTES OU DE PROJETORES EM FACHADAS UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.54.016 REMOCAO DE PROJETORES EM JARDINS OU DE LUZ DE OBSTACULO UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.54.017 REMOCAO DE ARANDELA EXTERNA EM BRACO DE FERRO UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.54.018 REMOCAO DO APARELHO A PROVA DE TEMPO, GASES E VAPOR UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.54.019 REMOCAO DE CRUZETAS DE FERRO PARA FIXACAO DE PROJETORES UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.54.020 REMOCAO DE POSTE CURVO, INCLUINDO BASES DE FIXACAO UN 129,29

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,06

LS 57,76700 BDI 24,17691Mão-de-Obra 47,35000 Material 0,00000SubMO 105,11700

09.54.021 REMOCAO DE POSTE DE FERRO RETO ENGASTADO NO SOLO UN 206,87

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,06

LS 92,42720 BDI 38,68306Mão-de-Obra 75,76000 Material 0,00000SubMO 168,18720

09.54.099 DEMOLICOES DE APARELHOS E EQUIPAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.56.001 REMOCAO DE CAPTOR DE PARA-RAIOS TIPO FRANKLIN OU RADIATIVO UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.56.003 REMOCAO DE BASE E HASTE DE PARA-RAIO UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.56.004 REMOCAO CABOS E ESTICADORES OU DE BRACADEIRAS P/ 3 ESTAIS EM P.RAIOS M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.56.005 REMOCAO DE CABO DE COBRE NU M 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.56.006 REMOCAO DE CABO COBRE NU PARA ATERRAMENTO M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.56.007 REMOCAO DE CONECTOR TIPO SPLIT-BOLDT PARA CABOS DE ATERRAMENTO UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

09/02/2011 11:38:40 Página: 207 de 0

Page 208: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.56.009 REMOCAO DE BRACADEIRAS PARA PASSAGEM DE CABOS DE COBRE NU UN 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.56.012 REMOCAO DE TUBO DE PROTECAO DE CABO DE COBRE NU INCL. FIXACOES UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.56.099 DEMOLICOES DE PARA-RAIOS E ATERRAMENTO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.60.003 DE ISOLADOR TIPO DISCO COMPL INCL GANCHO DE SUSPENSAO TIPO OLHAL UN 3,87

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,06

LS 1,73301 BDI 0,72531Mão-de-Obra 1,42050 Material 0,00000SubMO 3,15351

09.60.004 DE BUCHA DE PASS.INT/EXT, OU DE CHAPA ACO P/ BUCHA PASSAGEM A.T. UN 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.60.007 DE CANTONEIRA METALICA M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.60.008 DE ISOLADOR TIPO CASTANHA INCL GANCHO DE SUSTENTACAO UN 1,10

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,06

LS 0,49532 BDI 0,20730Mão-de-Obra 0,40600 Material 0,00000SubMO 0,90132

09.60.009 DE ISOLADOR TIPO PINO PARA A.T. INCLUSIVE PINO UN 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.60.011 DE VERGALHAO DE COBRE M 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.60.012 DE TERMINAL OU CONECTOR PARA VERGALHAO DE COBRE UN 2,21

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 0,99064 BDI 0,41461Mão-de-Obra 0,81200 Material 0,00000SubMO 1,80264

09.60.018 DE CHAVE SECCION TRIP SECA, COMANDO POR VARA/ESTRIBO FRONTAL UN 73,89

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,06

LS 33,01320 BDI 13,81684Mão-de-Obra 27,06000 Material 0,00000SubMO 60,07320

09.60.020 DE TRANSFORMADOR DE POTENCIAL COMPLETO UN 16,80

1.01.15 0,65000ELETRICISTA H 3,516505,411.01.16 0,65000AJUDANTE ELETRICISTA H 2,639004,06

LS 7,50971 BDI 3,14300Mão-de-Obra 6,15550 Material 0,00000SubMO 13,66521

09.60.022 DE DISJUNTOR DE VOLUME NORMAL OU REDUZIDO UN 94,36

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

LS 42,16320 BDI 17,64634Mão-de-Obra 34,56000 Material 0,00000SubMO 76,72320

09.60.023 DE MANOPLA DE COMANDO DO DISJUNTOR DE A.T. (ENGRENAGEM INTERNA) UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.60.026 DE TRANSFORMADOR DE POTENCIA EM CABINE PRIMARIA UN 168,25

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

09/02/2011 11:38:40 Página: 208 de 0

Page 209: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 75,17640 BDI 31,46317Mão-de-Obra 61,62000 Material 0,00000SubMO 136,79640

09.60.027 DE TRANSFORMADOR DE POTENCIA EM POSTE OU ESTALEIRO UN 186,73

1.01.15 4,50000ELETRICISTA H 24,345005,411.01.16 9,00000AJUDANTE ELETRICISTA H 36,540004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

LS 83,42970 BDI 34,91738Mão-de-Obra 68,38500 Material 0,00000SubMO 151,81470

09.60.028 DE POSTE DE CONCRETO UN 295,58

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,06

LS 132,06500 BDI 55,27245Mão-de-Obra 108,25000 Material 0,00000SubMO 240,31500

09.60.034 DE CHAVE FUSIVEL INDICADORA TIPO MATHEUS UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.60.099 RETIRADAS DE ALTA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.62.001 DE POSTE GALVANIZADO DE ENTRADA EM B.T. UN 103,43

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,06

LS 46,21360 BDI 19,34153Mão-de-Obra 37,88000 Material 0,00000SubMO 84,09360

09.62.002 DE POSTE DE CONCRETO DE ENTRADA EM B.T. UN 129,29

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,06

LS 57,76700 BDI 24,17691Mão-de-Obra 47,35000 Material 0,00000SubMO 105,11700

09.62.003 DE ARMACAO T BRAQUET, CONDULETES OU DE CX.FUSIV/TOMADAS EM PERFILADO UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.62.004 DE CABECOTE TELESP OU DE BASE P/DISJUNTOR QUICK LAG UN 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.62.009 DE TUBULACAO ELETRICA APARENTE ATE 2" M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.62.010 DE TUBULACAO ELETRICA APARENTE ACIMA 2" M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.62.012 DE PERFILADOS M 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.62.014 DE GANCHOS DE SUSTENTACAO DE LUMINARIAS EM PERFILADOS UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.62.017 DE FIO EMBUTIDO ATE 16 MM2 M 1,29

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,06

LS 0,57767 BDI 0,24177Mão-de-Obra 0,47350 Material 0,00000SubMO 1,05117

09.62.018 DE CABO EMBUTIDO ACIMA DE 16 MM2 M 2,58

1.01.15 0,10000ELETRICISTA H 0,541005,411.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,06

LS 1,15534 BDI 0,48354Mão-de-Obra 0,94700 Material 0,00000SubMO 2,10234

09.62.019 DE FIO APARENTE ATE 16 MM2 M 1,55

1.01.15 0,06000ELETRICISTA H 0,324605,411.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,06

09/02/2011 11:38:40 Página: 209 de 0

Page 210: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,69320 BDI 0,29012Mão-de-Obra 0,56820 Material 0,00000SubMO 1,26140

09.62.020 DE CABO APARENTE ACIMA DE 16 MM2 M 3,10

1.01.15 0,12000ELETRICISTA H 0,649205,411.01.16 0,12000AJUDANTE ELETRICISTA H 0,487204,06

LS 1,38641 BDI 0,58025Mão-de-Obra 1,13640 Material 0,00000SubMO 2,52281

09.62.021 DE TERMINAIS/CONECTORES DE PRESSAO P/CABOS OU DE ROLDANAS UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.62.024 E DESMONTAGEM Q.DISTRIB, CAIXA PASSAGEM OU Q. CHAMADA M2 51,71

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

LS 23,10680 BDI 9,67076Mão-de-Obra 18,94000 Material 0,00000SubMO 42,04680

09.62.099 RETIRADAS DE BAIXA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.64.004 DE MOTOR DE BOMBA DE RECALQUE UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.64.005 DE APARELHO DE ILUMINACAO, PLAFONS E PENDENTES P/LAMPADAS INCANDESC UN 2,58

1.01.15 0,10000ELETRICISTA H 0,541005,411.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,06

LS 1,15534 BDI 0,48354Mão-de-Obra 0,94700 Material 0,00000SubMO 2,10234

09.64.006 DE APARELHOS DE ILUMINACAO, PLAFONS E PENDENTES P/LAMPADAS FLUORESC UN 1,66

1.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,06

LS 0,74298 BDI 0,31096Mão-de-Obra 0,60900 Material 0,00000SubMO 1,35198

09.64.014 DE AP.ILUM.EM POSTE,ARANDELA EXT BRACO ACO OU PROJET EM FECHADA UN 38,78

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,06

LS 17,33010 BDI 7,25307Mão-de-Obra 14,20500 Material 0,00000SubMO 31,53510

09.64.016 DE PROJETORES EM JARDINS UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.64.018 DE APARELHO A PROVA DE TEMPO, GASES E VAPOR UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.64.020 DE POSTE CURVO, INCLUINDO BASES DE FIXACAO UN 129,29

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,06

LS 57,76700 BDI 24,17691Mão-de-Obra 47,35000 Material 0,00000SubMO 105,11700

09.64.021 DE POSTE DE FERRO RETO ENGASTADO NO SOLO UN 206,87

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,06

LS 92,42720 BDI 38,68306Mão-de-Obra 75,76000 Material 0,00000SubMO 168,18720

09.64.022 DE POSTE DE CONCRETO DE ATE 10 M ACIMA DO SOLO UN 295,58

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,06

LS 132,06500 BDI 55,27245Mão-de-Obra 108,25000 Material 0,00000SubMO 240,31500

09.64.099 RETIRADAS DE APARELHOS E EQUIPAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.66.001 DE CAPTOR DE PARA-RAIOS TIPO FRANKLIN UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.66.003 DE BASE E HASTE,OU DE BRACADEIRA C/3 ESTAIS EM PARA-RAIOS UN 25,85

09/02/2011 11:38:40 Página: 210 de 0

Page 211: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.66.004 DE CABOS DE ACO E ESTICADORES DE PARA-RAIOS M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.66.005 DE CABO DE COBRE NU M 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.66.006 DE CABO DE COBRE NU PARA ATERRAMENTO M 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.66.007 DE CONECTOR TIPO SPLIT-BOLDT PARA CABOS DE ATERRAMENTO UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.66.009 DE BRACADEIRAS PARA PASSAGEM DE CABO DE COBRE NU UN 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.66.099 RETIRADAS DE PARA-RAIOS E ATERRAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.70.003 DE ISOLADOR TIPO DISCO COMPL, INCLUS GANCHO DE SUSPENSAO TIPO OLHAL UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.70.004 DE BUCHA PASS.INT/EXT OU DE CH.ACO P/BUCHA PASSAGEM EM A.T UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.70.007 DE CANTONEIRA METALICA M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.70.008 DE ISOLADOR CASTANHA OU DE TERMINAL/CONEC. P/BARRAM.COBRE A.T UN 2,21

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 0,99064 BDI 0,41461Mão-de-Obra 0,81200 Material 0,00000SubMO 1,80264

09.70.009 DE ISOLADOR TIPO PINO PARA A.T. INCLUSIVE PINO UN 15,51

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,06

LS 6,93204 BDI 2,90123Mão-de-Obra 5,68200 Material 0,00000SubMO 12,61404

09.70.011 DE VERGALHAO DE COBRE M 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.70.018 DE CHAVE SECCIONADORA TRIP SECA,COMANDO POR VARA/ESTRIBO FRONTAL UN 121,07

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,50

LS 54,09480 BDI 22,64000Mão-de-Obra 44,34000 Material 0,00000SubMO 98,43480

09.70.020 DE CH.FUSIV.INDICADORA OU DE TRANSF.DE POTENCIAL COMPL. A.T UN 43,08

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,061.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,50

LS 19,25160 BDI 8,05727Mão-de-Obra 15,78000 Material 0,00000SubMO 35,03160

09.70.022 DE DISJUNTOR DE VOLUME NORMAL OU REDUZIDO UN 227,34

09/02/2011 11:38:40 Página: 211 de 0

Page 212: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,50

LS 101,57720 BDI 42,51256Mão-de-Obra 83,26000 Material 0,00000SubMO 184,83720

09.70.023 DE MANOPLA DE COMANDO DO DISJUNTOR DE A.T. (ENGRENAGEM INTERNA) UN 36,09

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,50

LS 16,12840 BDI 6,75013Mão-de-Obra 13,22000 Material 0,00000SubMO 29,34840

09.70.026 DE TRANSFORMADOR DE POTENCIA EM POSTE OU CAB.PRIMARIA UN 377,47

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 4,00000ELETRICISTA PARA ALTA TENSAO H 30,000007,50

LS 168,65280 BDI 70,58534Mão-de-Obra 138,24000 Material 0,00000SubMO 306,89280

09.70.028 DE POSTE DE CONCRETO UN 262,62

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,50

LS 117,33960 BDI 49,10951Mão-de-Obra 96,18000 Material 0,00000SubMO 213,51960

09.70.099 RECOLOCACOES DE ALTA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.72.001 DE POSTE GALVANIZADO DE ENTRADA B.T. UN 188,73

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,50

LS 84,32640 BDI 35,29267Mão-de-Obra 69,12000 Material 0,00000SubMO 153,44640

09.72.002 DE POSTE DE CONCRETO DE ENTRADA EM B.T. UN 262,62

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,50

LS 117,33960 BDI 49,10951Mão-de-Obra 96,18000 Material 0,00000SubMO 213,51960

09.72.003 DE CABECOTE TELESP,ARMACAO BRAQUET OU CONECTORES PRESSAO P/CABOS UN 10,34

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,06

LS 4,62136 BDI 1,93415Mão-de-Obra 3,78800 Material 0,00000SubMO 8,40936

09.72.009 DE TUBULACAO ELETRICA APARENTE ATE 2" M 7,75

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,06

LS 3,46602 BDI 1,45062Mão-de-Obra 2,84100 Material 0,00000SubMO 6,30702

09.72.010 DE TUBULACAO ELETRICA APARENTE ACIMA DE 2" M 15,51

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,06

LS 6,93204 BDI 2,90123Mão-de-Obra 5,68200 Material 0,00000SubMO 12,61404

09.72.011 DE CONDULETES OU DE CX.FUSIV. OU DE TOMADA INSTAL. EM PERFILADOS UN 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.72.012 DE PERFILADOS M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.72.014 DE GANCHOS DE SUSTENTACAO DE LUMINARIAS E PERFILADOS UN 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.72.017 DE FIO EMBUTIDO ATE 16 MM2 M 1,29

1.01.15 0,05000ELETRICISTA H 0,270505,411.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,06

LS 0,57767 BDI 0,24177Mão-de-Obra 0,47350 Material 0,00000SubMO 1,05117

09.72.018 DE CABO EMBUTIDO ACIMA DE 16 MM2 M 2,58

09/02/2011 11:38:40 Página: 212 de 0

Page 213: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 0,10000ELETRICISTA H 0,541005,411.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,06

LS 1,15534 BDI 0,48354Mão-de-Obra 0,94700 Material 0,00000SubMO 2,10234

09.72.019 DE FIO APARENTE ATE 16 MM2 M 0,77

1.01.15 0,03000ELETRICISTA H 0,162305,411.01.16 0,03000AJUDANTE ELETRICISTA H 0,121804,06

LS 0,34660 BDI 0,14506Mão-de-Obra 0,28410 Material 0,00000SubMO 0,63070

09.72.020 DE CABO APARENTE ACIMA DE 16 MM2 M 7,75

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,06

LS 3,46602 BDI 1,45062Mão-de-Obra 2,84100 Material 0,00000SubMO 6,30702

09.72.023 DE ROLDANAS UN 7,75

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,06

LS 3,46602 BDI 1,45062Mão-de-Obra 2,84100 Material 0,00000SubMO 6,30702

09.72.024 E MONTAGEM DE Q.DISTRIB,CX DE PASSAG MET OU Q.CHAMADA M2 154,22

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.39 4,00000PEDREIRO H 18,600004,65

LS 68,90560 BDI 28,83869Mão-de-Obra 56,48000 Material 0,00000SubMO 125,38560

09.72.031 DE BASE DE DISJUNTOR TIPO QUICK-LAG EM CHAPA DE FERRO UN 6,46

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,06

LS 2,88835 BDI 1,20885Mão-de-Obra 2,36750 Material 0,00000SubMO 5,25585

09.72.099 RECOLOCACOES DE BAIXA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.74.004 DE MOTOR DE BOMBA DE RECALQUE UN 77,57

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,06

LS 34,66020 BDI 14,50615Mão-de-Obra 28,41000 Material 0,00000SubMO 63,07020

09.74.005 DE AP.ILUM.(PLAFON OU PEND.)P/LAMP.INCAND OU DE PROJET EM JARDINS UN 20,68

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,06

LS 9,24272 BDI 3,86831Mão-de-Obra 7,57600 Material 0,00000SubMO 16,81872

09.74.006DE APARELHO DE ILUMINACAO,PLAFONS OU PENDENTES P/ LAMPFLUORESCENTES

UN 2,95

1.01.15 0,20000ELETRICISTA H 1,082005,41

LS 1,32004 BDI 0,55247Mão-de-Obra 1,08200 Material 0,00000SubMO 2,40204

09.74.014 DE APARELHOS DE ILUMINACAO EM POSTE UN 103,43

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,06

LS 46,21360 BDI 19,34153Mão-de-Obra 37,88000 Material 0,00000SubMO 84,09360

09.74.015 DE PROJ.EM FACHADAS OU AP.ILUMIN.A PROVA DE TEMPO UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.74.017 DE ARANDELA EXTERNA EM BRACO DE FERRO UN 51,71

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

LS 23,10680 BDI 9,67076Mão-de-Obra 18,94000 Material 0,00000SubMO 42,04680

09.74.020 DE POSTE CURVO, INCLUINDO BASE DE FIXACAO UN 188,73

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,50

LS 84,32640 BDI 35,29267Mão-de-Obra 69,12000 Material 0,00000SubMO 153,44640

09.74.021 DE POSTE DE FERRO RETO ENGASTADO NO SOLO UN 262,62

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,50

09/02/2011 11:38:40 Página: 213 de 0

Page 214: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 117,33960 BDI 49,10951Mão-de-Obra 96,18000 Material 0,00000SubMO 213,51960

09.74.022 DE POSTE DE CONCRETO DE ATE 10 M ACIMA DO SOLO UN 317,75

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 22,00000AJUDANTE ELETRICISTA H 89,320004,06

LS 141,97140 BDI 59,41852Mão-de-Obra 116,37000 Material 0,00000SubMO 258,34140

09.74.099 RECOLOCACOES DE APARELHOS E EQUIPAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.76.001 DE CAPTOR DE PARA-RAIOS TIPO FRANKLIN OU RADIOATIVO UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.76.003 DE BASE E HASTE DE PARA-RAIOS UN 103,43

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,06

LS 46,21360 BDI 19,34153Mão-de-Obra 37,88000 Material 0,00000SubMO 84,09360

09.76.004 DE CABO ACO E ESTICADORES,OU DE CABO COBRE NU P/ATERR. P.RAIOS M 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.76.005 DE CABO DE COBRE NU M 12,92

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

LS 5,77670 BDI 2,41769Mão-de-Obra 4,73500 Material 0,00000SubMO 10,51170

09.76.007 DE CONECTOR TIPO SPLIT-BOOLT PARA CABOS DE ATERRAMENTO UN 5,17

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,06

LS 2,31068 BDI 0,96708Mão-de-Obra 1,89400 Material 0,00000SubMO 4,20468

09.76.009 DE BRACADEIRAS PARA 3 ESTAIS OU PARA PASSAGEM DE CABO DE COBRE NU UN 25,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,06

LS 11,55340 BDI 4,83538Mão-de-Obra 9,47000 Material 0,00000SubMO 21,02340

09.76.099 RECOLOCACOES DE PARA-RAIOS E ATERRAMENTO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.80.001 OLEO P/DISJUNTOR EM TRANSFOMADOR DE ALTA TENSAO EM CABINE L 11,59

1.01.16 0,04000AJUDANTE ELETRICISTA H 0,162404,064.46.80 1,00000OLEO MINERAL P/DISJUNTOR E TRANSF L 9,070009,07

LS 0,19813 BDI 2,16902Mão-de-Obra 0,16240 Material 9,07000SubMO 0,36053

09.80.002 OLEO PARA TRANSFORMADOR DE ALTA TENSAO EM POSTE SINGELO OU ESTALEIRO L 11,82

1.01.16 0,06000AJUDANTE ELETRICISTA H 0,243604,064.46.80 1,00000OLEO MINERAL P/DISJUNTOR E TRANSF L 9,070009,07

LS 0,29719 BDI 2,21048Mão-de-Obra 0,24360 Material 9,07000SubMO 0,54079

09.80.003 ISOLADOR TIPO DISCO 15 KV 6" (150 MM) UN 71,27

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.35.04 1,00000ISOLADOR TIPO DISCO P/15 KV UN 53,7400053,74

LS 2,31068 BDI 13,32728Mão-de-Obra 1,89400 Material 53,74000SubMO 4,20468

09.80.004 CHAPA DE FERRO DE 1,50 X 0,50 M PARA BUCHA DE PASSAGEM UN 419,60

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.94.03 1,00000CHAPA FERRO 1.5X0.5X1/4' P/BUCHA PASS UN 330,63000330,63

LS 5,77670 BDI 78,46259Mão-de-Obra 4,73500 Material 330,63000SubMO 10,51170

09.80.005 BUCHA PARA PASSAGEM INTERNA/EXTERNA COM ISOLACAO PARA 15 KV UN 203,11

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.85.47 1,00000BUCHA PASSAG PARA NEUTRO UN 154,62000154,62

LS 5,77670 BDI 37,98029Mão-de-Obra 4,73500 Material 154,62000SubMO 10,51170

09.80.006 BUCHA DE PASSAGEM PARA NEUTRO UN 200,52

1.01.15 0,40000ELETRICISTA H 2,164005,41

09/02/2011 11:38:40 Página: 214 de 0

Page 215: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.85.47 1,00000BUCHA PASSAG PARA NEUTRO UN 154,62000154,62

LS 4,62136 BDI 37,49675Mão-de-Obra 3,78800 Material 154,62000SubMO 8,40936

09.80.007 CANTONEIRA DE FERRO 1 1/2" X 1 1/2" X 1/8" M 19,04

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,062.66.14 1,00000CANTONEIRA DE FERRO 1 1/2" X 1 1/2" X 1/8" M 4,970004,97

LS 5,77670 BDI 3,56079Mão-de-Obra 4,73500 Material 4,97000SubMO 10,51170

09.80.008 JANELA DE VENTILACAO PADRAO LIGHT DE 0,40 X 0,40 X 0,15 M UN 49,03

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 2,00000SERVENTE H 7,620003,814.51.65 1,00000JANELA VENTILACAO LIGHT 40X40X15CM UN 12,6300012,63

LS 14,96940 BDI 9,16996Mão-de-Obra 12,27000 Material 12,63000SubMO 27,23940

09.80.009 ISOLADOR TIPO CASTANHA INCLUINDO GRAMPO DE SUSTENTACAO UN 8,98

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.05.15 1,00000ISOLADOR 'CASTANHA' C/GRAMPO SUSTENT UN 5,500005,50

LS 0,99064 BDI 1,67961Mão-de-Obra 0,81200 Material 5,50000SubMO 1,80264

09.80.010 ISOLADOR TIPO PINO PARA 15 KV, INCLUSIVE PINO, INSTALADO EM CABINE UN 28,02

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.05.07 1,00000ISOLADOR DE PINO 15KV-PORCELANA UN 10,1700010,17

LS 6,93204 BDI 5,24033Mão-de-Obra 5,68200 Material 10,17000SubMO 12,61404

09.80.011 ISOLADOR TIPO PINO PARA 15 KV, INCLUSIVE PINO, INSTALADO EM POSTE UN 31,90

1.01.15 0,75000ELETRICISTA H 4,057505,411.01.16 0,75000AJUDANTE ELETRICISTA H 3,045004,064.05.07 1,00000ISOLADOR DE PINO 15KV-PORCELANA UN 10,1700010,17

LS 8,66505 BDI 5,96564Mão-de-Obra 7,10250 Material 10,17000SubMO 15,76755

09.80.012 VERGALHAO DE COBRE DE 3/8" (10MM) M 34,58

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.96.30 1,00000VERGALHAO DE COBRE DE 3/8" M 19,7100019,71

LS 4,62136 BDI 6,46745Mão-de-Obra 3,78800 Material 19,71000SubMO 8,40936

09.80.013 VERGALHAO DE COBRE DE 1/2" (12,5MM) M 51,10

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.96.41 1,00000VERGALHAO COBRE 1/2' M 33,1400033,14

LS 4,62136 BDI 9,55635Mão-de-Obra 3,78800 Material 33,14000SubMO 8,40936

09.80.014 TERMINAL OU CONECTOR PARA VERGALHAO DE COBRE DE 3/8" (10 MM2) UN 13,13

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.95.27 1,00000TERMINAL P/VERGALHAO COBRE 3/8' UN 8,880008,88

LS 0,99064 BDI 2,45701Mão-de-Obra 0,81200 Material 8,88000SubMO 1,80264

09.80.015 TERMINAL OU CONECTOR PARA VERGALHAO DE COBRE DE 1/2" (12,5 MM2) UN 16,75

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.94.55 1,00000TERMINAL P/VERGALHAO COBRE 1/2' UN 11,8200011,82

LS 0,99064 BDI 3,13321Mão-de-Obra 0,81200 Material 11,82000SubMO 1,80264

09.80.016 MUFLA TRIPOLAR EXTERNA PARA CABO ATE 2 AWG/15KV UN 895,48

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 10,00000AJUDANTE ELETRICISTA H 40,600004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.05.33 1,00000MUFLA TRIPOLAR EXT P/CABO 35MM2/15KV UN 561,20000561,20

LS 91,68300 BDI 167,44759Mão-de-Obra 75,15000 Material 561,20000SubMO 166,83300

09.80.017 MUFLA TERMINAL UNIPOLAR EXTERNA P/ CABO ISOLAÇÃO XLPE 15KV ATE 35MM2 UN 280,67

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.05.30 1,00000MUFLA TERM UNIP EXT CABO ISOL XLPE 15KV ATE 35MM2 UN 129,76000129,76

LS 54,09480 BDI 52,48480Mão-de-Obra 44,34000 Material 129,76000SubMO 98,43480

09.80.018 MUFLA TRIPOLAR INTERNA PARA CABO SECO (THV SINTENAX) ATE 2 AWG/15 KV UN 687,02

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.05.32 1,00000MUFLA TRIPOLAR INT P/CABO 35MM2/15KV UN 421,76000421,76

LS 75,17640 BDI 128,46797Mão-de-Obra 61,62000 Material 421,76000SubMO 136,79640

09/02/2011 11:38:40 Página: 215 de 0

Page 216: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.80.019 MUFLA TERMINAL UNIPOLAR INTERNA P/ CABO ISOLAÇÃO XLPE 15KV ATE 35MM2 UN 206,42

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.05.31 1,00000MUFLA TERM UNIP INT CABO ISOL XLPE 15KV ATE 35MM2 UN 99,4300099,43

LS 37,58820 BDI 38,60049Mão-de-Obra 30,81000 Material 99,43000SubMO 68,39820

09.80.021 CABO SECO TRIPOLAR (THV SINTENAX) 3X25 MM2 / 15KV M 59,66

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.31.11 1,00000CABO THV SINTENAX 3X25MM2/15KV M 32,8900032,89

LS 8,58392 BDI 11,15728Mão-de-Obra 7,03600 Material 32,89000SubMO 15,61992

09.80.022 CABO SECO TRIPOLAR (THV SINTENAX) 3 X 35 MM2 / 15KV M 70,57

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.31.12 1,00000CABO THV SINTENAX 3X35MM2/KV M 37,8500037,85

LS 10,72990 BDI 13,19623Mão-de-Obra 8,79500 Material 37,85000SubMO 19,52490

09.80.023 CABO SECO UNIPOLAR (THV SINTENAX) 16 MM2/15 KV M 43,83

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.31.01 1,00000CABO THV SINTENAX 1X16MM2/15KV M 27,8300027,83

LS 4,29196 BDI 8,19719Mão-de-Obra 3,51800 Material 27,83000SubMO 7,80996

09.80.024 CABO DE POTENCIA UNIPOLAR ISOLAÇÃO XLPE CLASSE 15KV 25MM2 M 44,75

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,90000AJUDANTE ELETRICISTA H 3,654004,064.31.13 1,00000CABO DE POT UNIP ISOL XLPE CLASSE 15KV 25MM2 M 24,6700024,67

LS 6,43794 BDI 8,36854Mão-de-Obra 5,27700 Material 24,67000SubMO 11,71494

09.80.025 CABO DE POTENCIA UNIPOLAR ISOLAÇÃO XLPE CLASSE 15KV 35MM2 M 59,59

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 1,20000AJUDANTE ELETRICISTA H 4,872004,064.31.14 1,00000CABO DE POT UNIP ISOL XLPE CLASSE 15KV 35MM2 M 32,8300032,83

LS 8,58392 BDI 11,14348Mão-de-Obra 7,03600 Material 32,83000SubMO 15,61992

09.80.026 CHAVE SECCIONADORA TRIPOLAR SECA PARA 200A/15 KV C/ CMD PROLONGADO UN 1.095,86

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.36.91 1,00000CHAVE SECC TRIP SECA 200A/15KV S/FS UN 792,51000792,51

LS 54,09480 BDI 204,91730Mão-de-Obra 44,34000 Material 792,51000SubMO 98,43480

09.80.029 CHAVE FUSIVEL INDIC 'MATHEUS' P/100 A/15 KV RUPTURA 1200A POSTE/ESTAL UN 195,39

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,061.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,504.37.12 1,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 123,83000123,83

LS 19,25160 BDI 36,53817Mão-de-Obra 15,78000 Material 123,83000SubMO 35,03160

09.80.030 CHAVE FUSIVEL INDIC 'MATHEUS' P/100A/15 KV RUPTURA 1200A EM CABINE UN 188,01

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,061.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,504.37.12 1,00000CHAVE 'MATHEUS' 100A/15KV RUPT 1200A UN 123,83000123,83

LS 15,95028 BDI 35,15648Mão-de-Obra 13,07400 Material 123,83000SubMO 29,02428

09.80.031 CHAVE FUSIVEL INDIC 'MATHEUS' P/ 50/15KV RUPTURA 1200A EM POSTE/ESTAL UN 234,83

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,061.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,504.35.35 1,00000CHAVE FUSIV INDIC 15KV/50A RUP 1200A UN 155,89000155,89

LS 19,25160 BDI 43,91197Mão-de-Obra 15,78000 Material 155,89000SubMO 35,03160

09.80.032 CHAVE FUSIVEL INDIC 'MATHEUS' P/ 50A/15KV RUPTURA 1200A EM CABINE UN 227,44

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 1,60000AJUDANTE ELETRICISTA H 6,496004,061.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,504.35.35 1,00000CHAVE FUSIV INDIC 15KV/50A RUP 1200A UN 155,89000155,89

LS 15,95028 BDI 42,53028Mão-de-Obra 13,07400 Material 155,89000SubMO 29,02428

09.80.033 TRANSFORMADOR DE CORRENTE PARA A.T. 15 KV UN 700,85

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,06

09/02/2011 11:38:40 Página: 216 de 0

Page 217: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,504.10.15 1,00000TRANSFORMADOR CORRENTE-15KV AT(TAXAX 10=$) UN 534,77000534,77

LS 19,25160 BDI 131,05437Mão-de-Obra 15,78000 Material 534,77000SubMO 35,03160

09.80.034 TRANSFORMADOR DE POTENCIAL 400 W/220V COM FUSIVEL DE A.T. 15 KV UN 1.691,38

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,061.01.17 0,30000ELETRICISTA PARA ALTA TENSAO H 2,250007,504.10.09 1,00000TRANSFORMADOR DE POTENCIAL-15 KV UN 1.340,080001.340,08

LS 19,25160 BDI 316,27567Mão-de-Obra 15,78000 Material 1.340,08000SubMO 35,03160

09.80.036 DIS VL REDUZ OLEO 15KV/250 PL15B MVA 630 ACION. MANUAL - COMPLETO UN 13.832,21

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 6,00000AJUDANTE ELETRICISTA H 24,360004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.46.56 1,00000DISJ. VOL. RED. OLEO 15KV/250 PL15B MVA 630 COMPL UN 11.102,9100011.102,91

LS 78,47040 BDI 2.586,51109Mão-de-Obra 64,32000 Material 11.102,91000SubMO 142,79040

09.80.038 BOBINA MINIMA DO DISJUNTOR UN 854,64

1.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.46.70 1,00000BOBINA MINIMA DO DISJUNTOR OLEO UN 678,18000678,18

LS 9,15000 BDI 159,81090Mão-de-Obra 7,50000 Material 678,18000SubMO 16,65000

09.80.039 RELE FALTA-DE-FASE TRIFASICO TIPO ST 220/110 V PEXTRON OU SIMILAR UN 384,64

1.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.40 1,00000RELE FALTA-DE-FASE TRIF ST 220/110V UN 296,07000296,07

LS 9,15000 BDI 71,92560Mão-de-Obra 7,50000 Material 296,07000SubMO 16,65000

09.80.040 RELE DE SOBRE-CORRENTE DO DISJUNTOR UN 580,12

1.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.42 1,00000RELE DE SOBRECORRENTE DO DISJ.SACE UN 455,00000455,00

LS 9,15000 BDI 108,47950Mão-de-Obra 7,50000 Material 455,00000SubMO 16,65000

09.80.041 MANOPLA DE COMANDO DE DISJUNTOR DE A. T. UN 186,20

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.46.75 1,00000MANOPLA DE COMANDO P/DISJUNTOR A.T. UN 122,04000122,04

LS 16,12840 BDI 34,81933Mão-de-Obra 13,22000 Material 122,04000SubMO 29,34840

09.80.042 TAPETE DE BORRACHA DE 100 X 100 X 0,5 CM UN 177,67

1.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.97.60 1,00000TAPETE BORRACHA 100X100X0.5CM UN 144,00000144,00

LS 0,24766 BDI 33,22365Mão-de-Obra 0,20300 Material 144,00000SubMO 0,45066

09.80.043 LUVA DE BORRACHA PARA A.T. 20 KV PR 527,60

1.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.97.67 1,00000LUVA BORRACHA P/ A.T. 20KV PR 428,50000428,50

LS 0,24766 BDI 98,65865Mão-de-Obra 0,20300 Material 428,50000SubMO 0,45066

09.80.044 VARA MANOPLA DE FENOLITE DE 2,70 M P/ CHAVE SECCIONADORA - 15 KV UN 152,45

1.01.16 0,05000AJUDANTE ELETRICISTA H 0,203004,064.95.97 1,00000VARA MANOPLA FENOLITE 2.70M P/CH SEC UN 123,50000123,50

LS 0,24766 BDI 28,50865Mão-de-Obra 0,20300 Material 123,50000SubMO 0,45066

09.80.045 PARA-RAIO TIPO CRISTAL-VALVE PARA 15 KV EM POSTE OU CABINE UN 133,28

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.80.42 1,00000PARA RAIOS CRISTAL VALUE 15 KV UN 70,0000070,00

LS 21,08160 BDI 24,92317Mão-de-Obra 17,28000 Material 70,00000SubMO 38,36160

09.80.047 BRACADEIRA DE ELETRODUTO EM POSTE UN 51,49

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.95.69 1,00000BRACADEIRA P/ELETRODUTO EM POSTE UN 33,4600033,46

LS 4,62136 BDI 9,62995Mão-de-Obra 3,78800 Material 33,46000SubMO 8,40936

09.80.048 SELA PARA CRUZETA DE MADEIRA UN 44,12

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.95.14 1,00000SELA PARA CRUZETA MADEIRA UN 5,840005,84

LS 16,50660 BDI 8,25162Mão-de-Obra 13,53000 Material 5,84000SubMO 30,03660

09.80.049 SUPORTE DE TRANSFORMADOR EM POSTE OU ESTALEIRO UN 149,78

09/02/2011 11:38:40 Página: 217 de 0

Page 218: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.95.66 1,00000SUPORTE P/TRANSF EM POSTE/ESTALEIRO UN 61,7000061,70

LS 33,01320 BDI 28,00784Mão-de-Obra 27,06000 Material 61,70000SubMO 60,07320

09.80.050 CRUZETA DE MADEIRA DE 2400 MM UN 164,89

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.95.09 1,00000CRUZETA MADEIRA DE 2400MM UN 73,9900073,99

LS 33,01320 BDI 30,83454Mão-de-Obra 27,06000 Material 73,99000SubMO 60,07320

09.80.051 MAO FRANCESA DE 700 MM UN 34,92

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.95.12 1,00000MAO FRANCESA 710 MM UN 7,370007,37

LS 11,55340 BDI 6,53048Mão-de-Obra 9,47000 Material 7,37000SubMO 21,02340

09.80.052 CAIXA PARA TRANSFORMADOR DE CORRENTE PADRAO CESP UN 152,65

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.51.23 1,00000CAIXA P/TRANSF COR 60X70X25CM CESP UN 55,7100055,71

LS 37,58820 BDI 28,54489Mão-de-Obra 30,81000 Material 55,71000SubMO 68,39820

09.80.053 CAIXA DE MEDICAO PADRAO CESP - 0,70 X 0,60 X 0,25 M UN 324,54

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.51.21 1,00000CAIXA P/ MEDICAO 50X60X25CM 'ELETROPAULO' UN 195,46000195,46

LS 37,58820 BDI 60,68739Mão-de-Obra 30,81000 Material 195,46000SubMO 68,39820

09.80.054 CAIXA DE MEDICAO PADRAO LIGHT 1,00 X 1,00 X 0,25 M UN 1.223,90

1.01.15 2,50000ELETRICISTA H 13,525005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,061.01.17 0,50000ELETRICISTA PARA ALTA TENSAO H 3,750007,504.51.10 1,00000CAIXA MEDICAO 1.0X1.0X0.30M ELETROP. UN 911,63000911,63

LS 45,84150 BDI 228,86070Mão-de-Obra 37,57500 Material 911,63000SubMO 83,41650

09.80.055 TRANSF-POT 45 KVA-A.T.13,2(5%)B.T.220/127V(5%)EM POSTE/ESTALEIRO UN 5.346,80

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 4,00000ELETRICISTA PARA ALTA TENSAO H 30,000007,504.10.01 1,00000TRANSF 45KVA,AT=132KV+-5%BT=220/127 UN 4.040,100004.040,10

LS 168,65280 BDI 999,80834Mão-de-Obra 138,24000 Material 4.040,10000SubMO 306,89280

09.80.057 TRANSF-POT 75 KVA-A.T.13,2 KV(5%)B.T.220/127V(5%)EM POSTE/ESTALEIRO UN 7.291,49

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 4,00000ELETRICISTA PARA ALTA TENSAO H 30,000007,504.10.03 1,00000TRANSF 75KVA,AT=132KV+-5%BT=220/127 UN 5.621,150005.621,15

LS 168,65280 BDI 1.363,44984Mão-de-Obra 138,24000 Material 5.621,15000SubMO 306,89280

09.80.058 TRANSF-POT 112,5 KVA-A.T.13,2 KV(5%)220/127V(5%) EM POSTE /ESTALEIRO UN 9.271,77

1.01.15 10,00000ELETRICISTA H 54,100005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,061.01.17 5,00000ELETRICISTA PARA ALTA TENSAO H 37,500007,504.10.04 1,00000TRANSF 112.5KVA AT=13.2KV/5%BT= UN 7.154,410007.154,41

LS 210,81600 BDI 1.733,74598Mão-de-Obra 172,80000 Material 7.154,41000SubMO 383,61600

09.80.059 TRANSF-POT 112,5 KVA-A.T.13,2 KV(5%)B.T.220/127V(5%) EM CABINE UN 9.177,40

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 4,00000ELETRICISTA PARA ALTA TENSAO H 30,000007,504.10.04 1,00000TRANSF 112.5KVA AT=13.2KV/5%BT= UN 7.154,410007.154,41

LS 168,65280 BDI 1.716,09964Mão-de-Obra 138,24000 Material 7.154,41000SubMO 306,89280

09.80.060 TRANSF-POT 150 KVA-A.T.13,2 KV(5%) B.T. 220/127V(5%) EM CABINE UN 11.075,30

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 4,00000ELETRICISTA PARA ALTA TENSAO H 30,000007,504.10.05 1,00000TRANSF 150 KVA AT=13,2+/-5%BT=220/227 UN 8.697,420008.697,42

LS 168,65280 BDI 2.070,99194Mão-de-Obra 138,24000 Material 8.697,42000SubMO 306,89280

09.80.061 TRANSF-POT 225 KVA-A.T.13,2 KV(5%)B.T. 220/127(5%) EM CABINE UN 14.929,25

1.01.15 10,00000ELETRICISTA H 54,100005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,06

09/02/2011 11:38:40 Página: 218 de 0

Page 219: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.17 5,00000ELETRICISTA PARA ALTA TENSAO H 37,500007,504.10.06 1,00000TRANSF 225KVA AT=13.2KV+-5%BT=220/127 UN 11.753,9900011.753,99

LS 210,81600 BDI 2.791,64938Mão-de-Obra 172,80000 Material 11.753,99000SubMO 383,61600

09.80.062 TRANSF-POT 300 KVA-A.T.13,2 KV(5%)B.T. 220/127(5%) EM CABINE UN 16.972,45

1.01.15 10,00000ELETRICISTA H 54,100005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,061.01.17 5,00000ELETRICISTA PARA ALTA TENSAO H 37,500007,504.10.07 1,00000TRANSF 300KVA AT=13.2KV+-5%BT=220/127 UN 13.415,1300013.415,13

LS 210,81600 BDI 3.173,71158Mão-de-Obra 172,80000 Material 13.415,13000SubMO 383,61600

09.80.063 TRANSF-POT 500 KVA-A.T.13,2 KV(5%)B.T. 220/127V(5%) EM CABINE UN 26.494,68

1.01.15 10,00000ELETRICISTA H 54,100005,411.01.16 20,00000AJUDANTE ELETRICISTA H 81,200004,061.01.17 5,00000ELETRICISTA PARA ALTA TENSAO H 37,500007,504.10.08 1,00000TRANSF 500KVA AT=13.2KV+-5%BT=220/127 UN 21.156,7800021.156,78

LS 210,81600 BDI 4.954,29108Mão-de-Obra 172,80000 Material 21.156,78000SubMO 383,61600

09.80.064 MUDANCA DE TAP DO TRANSFORMADOR UN 147,78

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,06

LS 66,02640 BDI 27,63367Mão-de-Obra 54,12000 Material 0,00000SubMO 120,14640

09.80.065 LIMPEZA DE POSTO PRIMARIO E PINTURA DOS BARRAMENTOS UN 525,42

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 32,00000AJUDANTE ELETRICISTA H 129,920004,063.80.34 0,75000TINTA A OLEO L 6,847509,133.80.60 5,00000TINNER L 32,500006,506.95.11 0,50000ESTOPA ALCATROADA KG 3,325006,65

LS 211,30400 BDI 98,25060Mão-de-Obra 173,20000 Material 42,67250SubMO 384,50400

09.80.067 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 2 KVAR-220V/60HZ UN 261,39

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.01 1,00000CAPACITOR 2KVAR-220V/60HZ UN 63,7100063,71

LS 81,77660 BDI 48,87882Mão-de-Obra 67,03000 Material 63,71000SubMO 148,80660

09.80.068 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 2,5 KVAR-220V/60HZ UN 408,82

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.02 1,00000CAPACITOR 2.5KVAR-220V/60HZ UN 183,57000183,57

LS 81,77660 BDI 76,44662Mão-de-Obra 67,03000 Material 183,57000SubMO 148,80660

09.80.069 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 3KVAR-220V/60HZ UN 277,60

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.03 1,00000CAPACITOR 3 KVAR -220V/60HZ UN 76,8900076,89

LS 81,77660 BDI 51,91022Mão-de-Obra 67,03000 Material 76,89000SubMO 148,80660

09.80.070 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 4KVAR-220V/60HZ UN 295,38

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.04 1,00000CAPACITOR 4 KVAR -220V/60HZ UN 91,3400091,34

LS 81,77660 BDI 55,23372Mão-de-Obra 67,03000 Material 91,34000SubMO 148,80660

09.80.071 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 5 KVAR-220/60HZ UN 423,60

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.05 1,00000CAPACITOR 5 KVAR -220V/60HZ UN 195,59000195,59

LS 81,77660 BDI 79,21122Mão-de-Obra 67,03000 Material 195,59000SubMO 148,80660

09.80.072 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 6 KVAR-220V/60HZ UN 319,94

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.06 1,00000CAPACITOR 6 KVAR -220V/60HZ UN 111,31000111,31

LS 81,77660 BDI 59,82682Mão-de-Obra 67,03000 Material 111,31000SubMO 148,80660

09.80.074 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 7,5 KVAR-220V/60HZ UN 496,57

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,06

09/02/2011 11:38:40 Página: 219 de 0

Page 220: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.07 1,00000CAPACITOR 7.5KVAR-220V/60HZ UN 254,91000254,91

LS 81,77660 BDI 92,85482Mão-de-Obra 67,03000 Material 254,91000SubMO 148,80660

09.80.075 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 8KVAR-220/60HZ UN 339,30

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.08 1,00000CAPACITOR 8 KVAR -220V/60HZ UN 127,05000127,05

LS 81,77660 BDI 63,44702Mão-de-Obra 67,03000 Material 127,05000SubMO 148,80660

09.80.076 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 10KVAR - 220 V/60HZ UN 736,91

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 1,00000ELETRICISTA PARA ALTA TENSAO H 7,500007,504.17.09 1,00000CAPACITOR 10 KVAR-220V/60HZ UN 450,31000450,31

LS 81,77660 BDI 137,79682Mão-de-Obra 67,03000 Material 450,31000SubMO 148,80660

09.80.077 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 12 KVAR - 220V/60HZ UN 472,20

1.01.15 7,00000ELETRICISTA H 37,870005,411.01.16 10,00000AJUDANTE ELETRICISTA H 40,600004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.10 1,00000CAPACITOR 12 KVAR-220V/60HZ UN 176,40000176,40

LS 114,03340 BDI 88,29778Mão-de-Obra 93,47000 Material 176,40000SubMO 207,50340

09.80.078 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 12,5 KVAR-220V/60HZ UN 916,89

1.01.15 7,00000ELETRICISTA H 37,870005,411.01.16 10,00000AJUDANTE ELETRICISTA H 40,600004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.11 1,00000CAPACITOR 12.5KVAR-220V/60HZ UN 537,94000537,94

LS 114,03340 BDI 171,45198Mão-de-Obra 93,47000 Material 537,94000SubMO 207,50340

09.80.079 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 15 KVAR-220V/60HZ UN 945,73

1.01.15 7,00000ELETRICISTA H 37,870005,411.01.16 10,00000AJUDANTE ELETRICISTA H 40,600004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.12 1,00000CAPACITOR 15 KVAR -220V/60HZ UN 561,39000561,39

LS 114,03340 BDI 176,84548Mão-de-Obra 93,47000 Material 561,39000SubMO 207,50340

09.80.080 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 18 KVAR-220V/60HZ UN 1.083,86

1.01.15 7,00000ELETRICISTA H 37,870005,411.01.16 10,00000AJUDANTE ELETRICISTA H 40,600004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.13 1,00000CAPACITOR 18 KVAR -220V/60HZ UN 673,69000673,69

LS 114,03340 BDI 202,67448Mão-de-Obra 93,47000 Material 673,69000SubMO 207,50340

09.80.081 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 20 KVAR-220V/60HZ UN 1.101,66

1.01.15 7,00000ELETRICISTA H 37,870005,411.01.16 10,00000AJUDANTE ELETRICISTA H 40,600004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.14 1,00000CAPACITOR 20 KVAR -220V/60HZ UN 688,16000688,16

LS 114,03340 BDI 206,00258Mão-de-Obra 93,47000 Material 688,16000SubMO 207,50340

09.80.082 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 24 KVAR-220V/60HZ UN 705,77

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.15 1,00000CAPACITOR 24KVAR-220V/60HZ UN 336,26000336,26

LS 130,54000 BDI 131,97400Mão-de-Obra 107,00000 Material 336,26000SubMO 237,54000

09.80.083 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 25 KVAR-220V/60HZ UN 1.311,43

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.16 1,00000CAPACITOR 25 KVAR -220V/60HZ UN 828,67000828,67

LS 130,54000 BDI 245,22830Mão-de-Obra 107,00000 Material 828,67000SubMO 237,54000

09.80.084 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 30 KVAR-220V/60HZ UN 1.451,19

1.01.15 8,00000ELETRICISTA H 43,280005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.17 1,00000CAPACITOR 30 KVAR -220V/60HZ UN 942,29000942,29

LS 130,54000 BDI 271,36090Mão-de-Obra 107,00000 Material 942,29000SubMO 237,54000

09.80.085 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 40 KVAR-220V/60HZ UN 1.886,67

1.01.15 10,00000ELETRICISTA H 54,100005,41

09/02/2011 11:38:40 Página: 220 de 0

Page 221: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.18 1,00000CAPACITOR 40 KVAR -220V/60HZ UN 1.236,270001.236,27

LS 163,55320 BDI 352,79314Mão-de-Obra 134,06000 Material 1.236,27000SubMO 297,61320

09.80.086 CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 50KVAR-220V/60HZ UN 2.149,07

1.01.15 10,00000ELETRICISTA H 54,100005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.17.19 1,00000CAPACITOR 50 KVAR -220V/60HZ UN 1.449,600001.449,60

LS 163,55320 BDI 401,85904Mão-de-Obra 134,06000 Material 1.449,60000SubMO 297,61320

09.80.088 APARELHO ILUM.EMERGENCIA C/3 PROJETORES P/CABINE PRIM.AUTON.1H A 3H UN 408,58

1.01.15 10,00000ELETRICISTA H 54,100005,411.01.16 16,00000AJUDANTE ELETRICISTA H 64,960004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.60.22 1,00000APARELHO EMERGENCIA 3 PROJ AUTONOMIA 1 A 3 H. UN 34,5700034,57

LS 163,55320 BDI 76,40214Mão-de-Obra 134,06000 Material 34,57000SubMO 297,61320

09.80.090 PLACA DE AVISO EM CABINE PRIMARIA UN 53,44

1.01.46 0,50000SERVENTE H 1,905003,814.95.32 1,00000PLACA AVISO 30X40CM 'PERIGO...A.T.' UN 39,2200039,22

LS 2,32410 BDI 9,99329Mão-de-Obra 1,90500 Material 39,22000SubMO 4,22910

09.80.099 OUTROS SERVICOS EM ALTA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.82.001 POSTE DE ACO GALVANIZADO DE 3 1/2" X 6,00 M UN 588,42

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.01.20 1,00000POSTE DE ACO GALV 3 1/2'X 6M UN 324,95000324,95

LS 84,32640 BDI 110,03117Mão-de-Obra 69,12000 Material 324,95000SubMO 153,44640

09.82.002 POSTE DE CONCRETO PERFIL I DE 6,00 X 300 KG UN 632,03

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.01.10 1,00000POSTE CONCR 'I' 6MX300KG UN 300,33000300,33

LS 117,33960 BDI 118,18541Mão-de-Obra 96,18000 Material 300,33000SubMO 213,51960

09.82.004 CABECOTE TIPO TELESP UN 13,98

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.95.67 1,00000CABECOTE TIPO TELESP UN 2,960002,96

LS 4,62136 BDI 2,61495Mão-de-Obra 3,78800 Material 2,96000SubMO 8,40936

09.82.005 BRAQUET COM 2 ISOLADORES PARA B.T. UN 11,65

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.96.65 1,00000BRAQUETE COM 2 ISOLADORES P/B.T. UN 3,170003,17

LS 3,46602 BDI 2,17972Mão-de-Obra 2,84100 Material 3,17000SubMO 6,30702

09.82.006 BRAQUET COM 3 ISOLADORES PARA B.T. UN 16,37

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.95.04 1,00000BRAQUETE COM 3 ISOLADORES P/ B.T. UN 4,900004,90

LS 4,62136 BDI 3,06115Mão-de-Obra 3,78800 Material 4,90000SubMO 8,40936

09.82.007 BRAQUET COM 4 ISOLADORES PARA B.T. UN 21,05

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.96.66 1,00000BRAQUETE COM 4 ISOLADORES P/B.T. UN 6,610006,61

LS 5,77670 BDI 3,93799Mão-de-Obra 4,73500 Material 6,61000SubMO 10,51170

09.82.009 CAIXA ESTAMPADA 4" X 2" UN 7,90

1.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.35 1,00000CAIXA 4"X2" UN 1,920001,92

LS 2,47660 BDI 1,47812Mão-de-Obra 2,03000 Material 1,92000SubMO 4,50660

09.82.010 CAIXA ESTAMPADA 4" X 4" UN 10,03

1.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.37 1,00000CAIXA 4"X4" UN 3,650003,65

LS 2,47660 BDI 1,87602Mão-de-Obra 2,03000 Material 3,65000SubMO 4,50660

09/02/2011 11:38:40 Página: 221 de 0

Page 222: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.82.011 BRACADEIRA PARA FIXACAO DE ELETRODUTO UN 4,39

1.01.15 0,15000ELETRICISTA H 0,811505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.85.53 1,00000BRACADEIRA ACO GALV ELETROLITICO 25 MM (1") UN 0,420000,42

LS 1,73301 BDI 0,82191Mão-de-Obra 1,42050 Material 0,42000SubMO 3,15351

09.82.015 ROLDANA DE PORCELANA COM PARAFUSO DE 30 X 30 MM UN 8,75

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.94.23 1,00000ROLDANA PORCELANA C/PARAF 30X30MM UN 0,810000,81

LS 3,46602 BDI 1,63692Mão-de-Obra 2,84100 Material 0,81000SubMO 6,30702

09.82.020 FIO DE COBRE 2 X 1,50 MM2 PLASTICHUMBO M 6,94

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.30.11 1,00000FIO DE COBRE 2X1.5MM2 PLASTICHUMBO M 1,440001,44

LS 2,31068 BDI 1,29828Mão-de-Obra 1,89400 Material 1,44000SubMO 4,20468

09.82.021 FIO DE COBRE 2 X 2,50 MM2 PLASTICHUMBO M 7,92

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.30.12 1,00000FIO DE COBRE 2X2.5MM2 PLASTICHUMBO M 2,240002,24

LS 2,31068 BDI 1,48228Mão-de-Obra 1,89400 Material 2,24000SubMO 4,20468

09.82.025 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 10MM UN 9,93

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.94.30 1,00000TERMINAL PRESSAO CABO 10MM2 UN 1,770001,77

LS 3,46602 BDI 1,85772Mão-de-Obra 2,84100 Material 1,77000SubMO 6,30702

09.82.026 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 16MM UN 10,26

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.95.82 1,00000TERMINAL PRES P/CABO 16MM2(6AWG) UN 2,040002,04

LS 3,46602 BDI 1,91982Mão-de-Obra 2,84100 Material 2,04000SubMO 6,30702

09.82.027 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 25MM UN 10,52

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.94.31 1,00000TERMINAL PRES P/CABO 25MM2 UN 2,250002,25

LS 3,46602 BDI 1,96812Mão-de-Obra 2,84100 Material 2,25000SubMO 6,30702

09.82.028 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 35MM UN 13,08

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.95.28 1,00000TERMINAL PRES P/CABO 35MM2(2AWG) UN 2,230002,23

LS 4,62136 BDI 2,44705Mão-de-Obra 3,78800 Material 2,23000SubMO 8,40936

09.82.029 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 50MM UN 14,36

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.94.32 1,00000TERMINAL PRES P/CABO 50MM2 UN 3,270003,27

LS 4,62136 BDI 2,68625Mão-de-Obra 3,78800 Material 3,27000SubMO 8,40936

09.82.030 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 70MM UN 14,42

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.94.34 1,00000TERMINAL PRES P/CABO 70MM2 UN 3,320003,32

LS 4,62136 BDI 2,69775Mão-de-Obra 3,78800 Material 3,32000SubMO 8,40936

09.82.031 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 95MM UN 16,53

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.94.35 1,00000TERMINAL PRES P/CABO 95MM2 UN 5,030005,03

LS 4,62136 BDI 3,09105Mão-de-Obra 3,78800 Material 5,03000SubMO 8,40936

09.82.032 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 120MM UN 22,21

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.95.41 1,00000TERMINAL PRES P/CABO 120MM2 UN 7,550007,55

LS 5,77670 BDI 4,15419Mão-de-Obra 4,73500 Material 7,55000SubMO 10,51170

09.82.033 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 150MM UN 22,09

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,06

09/02/2011 11:38:40 Página: 222 de 0

Page 223: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.94.36 1,00000TERMINAL PRES P/CABO 150MM2 UN 7,450007,45

LS 5,77670 BDI 4,13119Mão-de-Obra 4,73500 Material 7,45000SubMO 10,51170

09.82.034 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 185MM UN 24,38

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.94.37 1,00000TERMINAL PRES P/CABO 185MM2 UN 9,310009,31

LS 5,77670 BDI 4,55899Mão-de-Obra 4,73500 Material 9,31000SubMO 10,51170

09.82.035 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 240MM UN 26,21

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.95.42 1,00000TERMINAL PRES P/CABO 240MM2 UN 10,8000010,80

LS 5,77670 BDI 4,90169Mão-de-Obra 4,73500 Material 10,80000SubMO 10,51170

09.82.037 CXA PASSAG OU QUADRO DE DISTR C/PORTA,TRINCO E FECH T YALE PROF 10CM M2 422,12

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,061.01.39 4,00000PEDREIRO H 18,600004,654.51.15 6,20000CAIXA PASSAGEM 45X36X10CM 098237 UN 217,8060035,13

LS 68,90560 BDI 78,93407Mão-de-Obra 56,48000 Material 217,80600SubMO 125,38560

09.82.041 BASE DE MADEIRA EM PINHO DE 1" PARA FUNDO DE QUADROS M2 63,36

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.51.60 1,00000FUNDO DE QUADRO EM PINHO 1' DE 2. UN 9,470009,47

LS 23,10680 BDI 11,84886Mão-de-Obra 18,94000 Material 9,47000SubMO 42,04680

09.82.042 BASE DE CHAPA DE FERRO N 14 PARA FIXACAO DE DISJUNTOR NO Q.D. M2 135,01

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.40.31 1,00000BASE CHAPA 14 P/FIX DISJ NO Q.D. M2 46,7000046,70

LS 34,66020 BDI 25,24715Mão-de-Obra 28,41000 Material 46,70000SubMO 63,07020

09.82.046 FECHADURA TIPO YALE UN 36,00

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,063.15.64 1,00000FECHADURA TIPO YALE/CROMADA PARA ARMARIO UN 8,250008,25

LS 11,55340 BDI 6,73288Mão-de-Obra 9,47000 Material 8,25000SubMO 21,02340

09.82.047 CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 30 A - BASE MARMORE UN 31,09

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.20 1,00000CHAVE 'MARMORE' 3X30 A C/FUS CARTUCHO UN 14,7700014,77

LS 5,77670 BDI 5,81479Mão-de-Obra 4,73500 Material 14,77000SubMO 10,51170

09.82.048 CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 60 A - BASE MARMORE UN 42,14

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.22 1,00000CHAVE 'MARMORE' 3X60 A C/FUS CARTUCHO UN 23,7500023,75

LS 5,77670 BDI 7,88019Mão-de-Obra 4,73500 Material 23,75000SubMO 10,51170

09.82.049 CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 100 A- BASE MARMORE UN 77,35

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.23 1,00000CHAVE 'MARMORE' 3X100A C/FUS CARTUCHO UN 52,3800052,38

LS 5,77670 BDI 14,46509Mão-de-Obra 4,73500 Material 52,38000SubMO 10,51170

09.82.050 CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 200 A - BASE MARMORE UN 166,50

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.36.30 1,00000CHAVE FACA'MARMORE'3X200A C/FUS CARTUCHO UN 114,35000114,35

LS 11,55340 BDI 31,13588Mão-de-Obra 9,47000 Material 114,35000SubMO 21,02340

09.82.055 CHAVE FACA SECA 2X30 A BASE MARMORE UN 21,26

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.40 1,00000CHAVE GERAL DE FACA SECA 2X30A UN 6,780006,78

LS 5,77670 BDI 3,97709Mão-de-Obra 4,73500 Material 6,78000SubMO 10,51170

09.82.056 CHAVE FACA SECA 2 X 60 A - BASE MARMORE UN 24,71

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.41 1,00000CHAVE FACA SECA 2X60A BASE ' MARMORE' UN 9,580009,58

LS 5,77670 BDI 4,62109Mão-de-Obra 4,73500 Material 9,58000SubMO 10,51170

09/02/2011 11:38:40 Página: 223 de 0

Page 224: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.82.057 CHAVE FACA SECA 2 X 100A - BASE MARMORE UN 43,70

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.42 1,00000CHAVE FACA SECA 2X100A BASE 'MARMORE' UN 25,0200025,02

LS 5,77670 BDI 8,17229Mão-de-Obra 4,73500 Material 25,02000SubMO 10,51170

09.82.060 CHAVE FACA SECA 3X30 A - BASE MARMORE UN 25,35

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.45 1,00000CHAVE FACA SECA 3X30A 'MARMORE' UN 10,1000010,10

LS 5,77670 BDI 4,74069Mão-de-Obra 4,73500 Material 10,10000SubMO 10,51170

09.82.061 CHAVE FACA SECA 3X60 A - BASE MARMORE UN 29,71

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.46 1,00000CHAVE FACA SECA 3X60A 'MARMORE' UN 13,6500013,65

LS 5,77670 BDI 5,55719Mão-de-Obra 4,73500 Material 13,65000SubMO 10,51170

09.82.062 CHAVE FACA SECA 3X100 A - BASE MARMORE UN 56,76

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.47 1,00000CHAVE FACA SECA 3X100A 'MARMORE' UN 35,6400035,64

LS 5,77670 BDI 10,61489Mão-de-Obra 4,73500 Material 35,64000SubMO 10,51170

09.82.063 CHAVE FACA SECA 3X200 A - BASE MARMORE UN 98,41

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.36.49 1,00000CHAVE FACA SECA 3X200A 'MARMORE' UN 58,9900058,99

LS 11,55340 BDI 18,40308Mão-de-Obra 9,47000 Material 58,99000SubMO 21,02340

09.82.064 CHAVE FACA SECA 3X400 A - BASE MARMORE UN 270,18

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.36.50 1,00000CHAVE FACA SECA 3X400A 'MAMORE' UN 198,64000198,64

LS 11,55340 BDI 50,52258Mão-de-Obra 9,47000 Material 198,64000SubMO 21,02340

09.82.065 CHAVE FACA SECA 3 X 600 A - BASE MARMORE UN 484,89

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.36.51 1,00000CHAVE FACA SECA 3X600A BASE 'MARMORE' UN 373,20000373,20

LS 11,55340 BDI 90,67138Mão-de-Obra 9,47000 Material 373,20000SubMO 21,02340

09.82.069 CHAVE REVERSIVEL 3X30 A - BASE MARMORE UN 53,08

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.10 1,00000CHAVE REVERSIVEL 3X30 A BASE MARMORE UN 32,6500032,65

LS 5,77670 BDI 9,92719Mão-de-Obra 4,73500 Material 32,65000SubMO 10,51170

09.82.070 CHAVE REVERSIVEL 3 X 60 A - BASE MARMORE UN 67,94

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.36.12 1,00000CHAVE REVERSIVEL 3X60 A BASE MARMORE UN 44,7300044,73

LS 5,77670 BDI 12,70559Mão-de-Obra 4,73500 Material 44,73000SubMO 10,51170

09.82.075 BASE DE CHAPA DE FERRO PARA DISJUNTOR QUICK - LAG UN 19,73

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.40.30 1,00000BASE CHAPA FERRO P/DISJ QUICK-LAG UN 5,530005,53

LS 5,77670 BDI 3,68959Mão-de-Obra 4,73500 Material 5,53000SubMO 10,51170

09.82.084 CHAVE BLINDADA COM FUSIVEIS DE 3 X 30 A - B.T. UN 201,88

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.36.70 1,00000CHAVE BLINDADA C/FUSIVEL 3X30A B.T. UN 122,09000122,09

LS 23,10680 BDI 37,75146Mão-de-Obra 18,94000 Material 122,09000SubMO 42,04680

09.82.085 CHAVE BLINDADA COM FUSIVEIS DE 3 X 60 A - B.T. UN 289,75

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.36.71 1,00000CHAVE BLINDADA C/FUSIVEL 3X60 A B.T. UN 193,53000193,53

LS 23,10680 BDI 54,18266Mão-de-Obra 18,94000 Material 193,53000SubMO 42,04680

09.82.086 CHAVE BLINDADA COM FUSIVEIS DE 3X100 A - B.T. UN 594,37

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,06

09/02/2011 11:38:40 Página: 224 de 0

Page 225: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.36.55 1,00000CHAVE FACA BLIND TRIP C/FUSIV 100A UN 420,16000420,16

LS 34,66020 BDI 111,14295Mão-de-Obra 28,41000 Material 420,16000SubMO 63,07020

09.82.087 CHAVE BLINDADA COM FUSIVEIS DE 3X200 A - B.T. UN 1.515,68

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.36.57 1,00000CHAVE FACA BLIND TRIP C/FUSIV 200A UN 1.148,170001.148,17

LS 46,21360 BDI 283,42063Mão-de-Obra 37,88000 Material 1.148,17000SubMO 84,09360

09.82.090 CHAVE SECCIONADORA NH 3X125A COM FUSIVEIS UN 168,14

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.36.85 1,00000CHAVE SECCIONADORA NH 3X125A C/ FUSIVEIS UN 94,6600094,66

LS 23,10680 BDI 31,44256Mão-de-Obra 18,94000 Material 94,66000SubMO 42,04680

09.82.091 CHAVE SECCIONADORA NH 3X250A COM FUSIVEIS UN 436,11

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.36.86 1,00000CHAVE SECCIONADORA NH 3X250A C/ FUSIVEIS UN 312,52000312,52

LS 23,10680 BDI 81,55036Mão-de-Obra 18,94000 Material 312,52000SubMO 42,04680

09.82.092 CHAVE SECCIONADORA NH 3X400A COM FUSIVEIS UN 632,03

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.36.87 1,00000CHAVE SECCIONADORA NH 3X400A C/ FUSIVEIS UN 471,80000471,80

LS 23,10680 BDI 118,18476Mão-de-Obra 18,94000 Material 471,80000SubMO 42,04680

09.82.093 CHAVE SECCIONADORA NH 3X600A COM FUSIVEIS UN 997,94

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.36.89 1,00000CHAVE SECCIONADORA NH 3X600A C/ FUSIVEIS UN 769,29000769,29

LS 23,10680 BDI 186,60746Mão-de-Obra 18,94000 Material 769,29000SubMO 42,04680

09.82.095 PERFFILADO EM CHAPA DE ACO 38X38MM M 27,88

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.94.71 1,10000PERFILADO EM CHAPA ACO 38X38MM M 12,1550011,05

LS 5,77670 BDI 5,21334Mão-de-Obra 4,73500 Material 12,15500SubMO 10,51170

09.82.096 BASE ABERTA PARA FUSIVEIS TIPO DIAZED DE 20 A A 25 A UN 32,66

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.40.40 1,00000BASE ARDOSIA ABERTA P/FUS 20/25A UN 5,530005,53

LS 11,55340 BDI 6,10728Mão-de-Obra 9,47000 Material 5,53000SubMO 21,02340

09.82.097 BASE ABERTA PARA FUSIVEIS TIPO DIAZED DE 35 A A 63 A UN 35,31

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.40.41 1,00000BASE ARDOSIA ABERTA P/FUS 35/63A UN 7,690007,69

LS 11,55340 BDI 6,60408Mão-de-Obra 9,47000 Material 7,69000SubMO 21,02340

09.82.099 OUTROS SERVICOS DE BAIXA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.83.001 CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X100 A PAINEL BL.B.T UN 188,30

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.36.95 1,00000CHAVE SECC ACAO RAPIDA 3X100 A UN 90,0200090,02

LS 34,66020 BDI 35,21075Mão-de-Obra 28,41000 Material 90,02000SubMO 63,07020

09.83.002 CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X200 A PAINEL BL.B.T UN 681,99

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.36.96 1,00000CHAVE SECC ACAO RAPIDA 3X200 A UN 491,40000491,40

LS 34,66020 BDI 127,52815Mão-de-Obra 28,41000 Material 491,40000SubMO 63,07020

09.83.003 CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X400 A PAINEL BL.B.T UN 459,71

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.37.03 1,00000CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL UN 289,66000289,66

LS 46,21360 BDI 85,96333Mão-de-Obra 37,88000 Material 289,66000SubMO 84,09360

09.83.004 CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X630 A PAINEL BL.B.T UN 772,82

1.01.15 4,00000ELETRICISTA H 21,640005,41

09/02/2011 11:38:40 Página: 225 de 0

Page 226: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.36.98 1,00000CHAVE SECC ACAO RAPIDA 3X630 A UN 544,22000544,22

LS 46,21360 BDI 144,51213Mão-de-Obra 37,88000 Material 544,22000SubMO 84,09360

09.83.008 FUSIVEL DIAZED TIPO RAPIDO OU RETARDADO DE 2 A 35 A UN 6,88

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.02 1,00000FUSIVEL DIAZED RAP/RET 2/35 A $MD UN 1,390001,39

LS 2,31068 BDI 1,28678Mão-de-Obra 1,89400 Material 1,39000SubMO 4,20468

09.83.009 FUSIVEL DIAZED TIPO RAPIDO OU RETARDADO DE 50 A 63 A UN 7,06

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.01 1,00000FUSIVEL DIAZED RAP/RET 50/63 A $MD UN 1,540001,54

LS 2,31068 BDI 1,32128Mão-de-Obra 1,89400 Material 1,54000SubMO 4,20468

09.83.013 FUSIVEL NH DE 150/160A UN 17,34

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.53 1,00000FUSIVEL NH DE 150/160A UN 9,900009,90

LS 2,31068 BDI 3,24408Mão-de-Obra 1,89400 Material 9,90000SubMO 4,20468

09.83.014 FUSIVEL NH DE 300 A 400A UN 45,54

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.59 1,00000FUSIVEL NH DE 300 A 400A UN 32,8200032,82

LS 2,31068 BDI 8,51568Mão-de-Obra 1,89400 Material 32,82000SubMO 4,20468

09.83.015 FUSIVEL NH DE 425 A 630 A UN 61,71

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.67 1,00000FUSIVEL NH DE 425 A 630A UN 45,9700045,97

LS 2,31068 BDI 11,54018Mão-de-Obra 1,89400 Material 45,97000SubMO 4,20468

09.83.016 FUSIVEL NH ATE 125A UN 13,40

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.52 1,00000FUSIVEL NH ATE 125 A UN 6,690006,69

LS 2,31068 BDI 2,50578Mão-de-Obra 1,89400 Material 6,69000SubMO 4,20468

09.83.017 FUSIVEL NH DE 200 A 250A UN 37,64

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.56 1,00000FUSIVEL NH DE 200 A 250A UN 26,4000026,40

LS 2,31068 BDI 7,03908Mão-de-Obra 1,89400 Material 26,40000SubMO 4,20468

09.83.019 FUSIVEL CARTUCHO DE 30 A UN 5,97

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.80 1,00000FUSIVEL CARTUCHO 30A UN 0,650000,65

LS 2,31068 BDI 1,11658Mão-de-Obra 1,89400 Material 0,65000SubMO 4,20468

09.83.020 FUSIVEL CARTUCHO DE 60A UN 6,79

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.82 1,00000FUSIVEL CARTUCHO 60A UN 1,320001,32

LS 2,31068 BDI 1,27068Mão-de-Obra 1,89400 Material 1,32000SubMO 4,20468

09.83.025 FUSIVEL FACA DE 100 A UN 12,35

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.20 1,00000FUSIVEL FACA 100 A UN 5,840005,84

LS 2,31068 BDI 2,31028Mão-de-Obra 1,89400 Material 5,84000SubMO 4,20468

09.83.026 FUSIVEL FACA DE 200 A UN 22,55

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.41.24 1,00000FUSIVEL FACA 200 A UN 14,1300014,13

LS 2,31068 BDI 4,21698Mão-de-Obra 1,89400 Material 14,13000SubMO 4,20468

09.83.030 BARRA DE COBRE PARA NEUTRO - 30 A UN 9,13

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.21 1,00000BARRAMENTO COBRE 6X1MM P/30A - 1/4"X1/16" M 3,220003,22

LS 2,31068 BDI 1,70768Mão-de-Obra 1,89400 Material 3,22000SubMO 4,20468

09/02/2011 11:38:40 Página: 226 de 0

Page 227: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.83.031 BARRA DE COBRE PARA NEUTRO - 60 A UN 11,97

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.22 1,00000BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16" M 5,530005,53

LS 2,31068 BDI 2,23898Mão-de-Obra 1,89400 Material 5,53000SubMO 4,20468

09.83.032 BARRA DE COBRE PARA NEUTRO - 100 A UN 15,51

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.23 1,00000BARRAMENTO COBRE 100 A - 3/8"X1/8" M 8,410008,41

LS 2,31068 BDI 2,90138Mão-de-Obra 1,89400 Material 8,41000SubMO 4,20468

09.83.033 BARRA DE COBRE PARA NEUTRO - 200 A UN 26,16

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.25 1,00000BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8" M 17,0700017,07

LS 2,31068 BDI 4,89318Mão-de-Obra 1,89400 Material 17,07000SubMO 4,20468

09.83.034 BARRA DE COBRE PARA NEUTRO - 400 A UN 88,14

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.26 1,00000BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8" M 67,4600067,46

LS 2,31068 BDI 16,48288Mão-de-Obra 1,89400 Material 67,46000SubMO 4,20468

09.83.035 BARRA DE COBRE PARA NEUTRO - 600 A UN 34,51

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.20 1,00000BARRA NEUTRO 600A 1 1/2" X 1/4" UN 23,8600023,86

LS 2,31068 BDI 6,45488Mão-de-Obra 1,89400 Material 23,86000SubMO 4,20468

09.83.040 CONTAC.MAG.ABERTO C/RELE BIM.P/COR NOM.10A QD.CMD BOMBA RECALQUE UN 199,55

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.17.30 1,00000CONTACTOR MAGNET 10 A 098340 UN 57,1200057,12

LS 57,76700 BDI 37,31451Mão-de-Obra 47,35000 Material 57,12000SubMO 105,11700

09.83.041 CONTAC.MAG.ABERTO C/RELE BIM.P/COR.NOM.DE 11 A 16A QD.CMD BOMBA RECAL UN 210,40

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.17.31 1,00000CONTACTOR MAGNET 11/16 A 098341 UN 65,9400065,94

LS 57,76700 BDI 39,34311Mão-de-Obra 47,35000 Material 65,94000SubMO 105,11700

09.83.042 CONTAC.MAG.ABERTO C/RELE BIM.P/COR.NOM.DE 17 A 32A QD.CMD BOMBA RECAL UN 283,70

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.17.32 1,00000CONTACTOR MAGNET 17/32 A 098342 UN 125,54000125,54

LS 57,76700 BDI 53,05111Mão-de-Obra 47,35000 Material 125,54000SubMO 105,11700

09.83.045 BOTOEIRA DE COMANDO LIGA-DESLIGA PARA COMANDO DE BOMBA RECALQUE UN 149,04

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.55.51 1,00000BOTOEIRA COMANDO LIG-DESL P/BOMBA UN 37,0800037,08

LS 46,21360 BDI 27,86993Mão-de-Obra 37,88000 Material 37,08000SubMO 84,09360

09.83.099 OUTROS SERVICOS DE BAIXA TENSAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.84.001 INTERRUPTOR DE 1 TECLA UN 8,95

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.56.56 1,00000INTERRUPTOR 1 TECLA SILENT S/ESPELHO UN 2,930002,93

LS 2,39303 BDI 1,67544Mão-de-Obra 1,96150 Material 2,93000SubMO 4,35453

09.84.002 INTERRUPTOR DE 2 TECLAS UN 17,71

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.56.59 1,00000INTERRUPTOR 2 TECLAS BIPOLAR S/ESP UN 9,000009,00

LS 2,97070 BDI 3,31331Mão-de-Obra 2,43500 Material 9,00000SubMO 5,40570

09.84.003 INTERRUPTOR DE 3 TECLAS UN 17,91

1.01.15 0,35000ELETRICISTA H 1,893505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.56.69 1,00000INTERRUPTOR 3 TECLAS SILENT SEM ESPELHO UN 8,110008,11

09/02/2011 11:38:40 Página: 227 de 0

Page 228: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 3,54837 BDI 3,35038Mão-de-Obra 2,90850 Material 8,11000SubMO 6,45687

09.84.004 INTERRUPTOR PARALELO UN 10,37

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.56.57 1,00000INTERRUPTOR PARAL 1 TECLA S/ESPELHO UN 4,080004,08

LS 2,39303 BDI 1,93994Mão-de-Obra 1,96150 Material 4,08000SubMO 4,35453

09.84.008 TOMADA UNIVERSAL DE 10 A - 2 POLOS UN 9,34

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.56.06 1,00000TOMADA UNIVERSAL SIMPLES,2 POLOS -10A-250V S/PLAC. UN 3,240003,24

LS 2,39303 BDI 1,74674Mão-de-Obra 1,96150 Material 3,24000SubMO 4,35453

09.84.009 TOMADA TRIPOLAR 15A - 125/250V - 2P+TERRA UN 11,96

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.55.19 1,00000TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V UN 4,320004,32

LS 2,97070 BDI 2,23691Mão-de-Obra 2,43500 Material 4,32000SubMO 5,40570

09.84.011 TOMADA DE PISO UNIVERSAL COM TAMPA LATONADA - 2 POLOS UN 10,16

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,25000AJUDANTE ELETRICISTA H 1,015004,064.56.10 1,00000TOMADA BIPOLAR P/PISO UN 3,010003,01

LS 2,88835 BDI 1,90115Mão-de-Obra 2,36750 Material 3,01000SubMO 5,25585

09.84.012 TOMADA DE PISO COM TAMPA LATONADA - 3 POLOS E TERRA UN 12,18

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.56.17 1,00000TOMADA TRIPOLAR P/PISO UN 3,600003,60

LS 3,46602 BDI 2,27861Mão-de-Obra 2,84100 Material 3,60000SubMO 6,30702

09.84.017 BOTAO DE CAMPAINHA UN 9,75

1.01.15 0,25000ELETRICISTA H 1,352505,411.01.16 0,15000AJUDANTE ELETRICISTA H 0,609004,064.56.61 1,00000BOTAO DE CAMPAINHA S/ESPELHO UN 3,580003,58

LS 2,39303 BDI 1,82494Mão-de-Obra 1,96150 Material 3,58000SubMO 4,35453

09.84.020 ESPELHO DE 4'X2' UN 2,63

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.55.25 1,00000ESPELHO 4"X2" UN 1,240001,24

LS 0,49532 BDI 0,49250Mão-de-Obra 0,40600 Material 1,24000SubMO 0,90132

09.84.021 ESPELHO 4'X4' UN 6,47

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.55.26 1,00000ESPELHO 4"X4" UN 4,360004,36

LS 0,49532 BDI 1,21010Mão-de-Obra 0,40600 Material 4,36000SubMO 0,90132

09.84.024 ESPELHO CEGO DE CHAPA DE FERRO 4'X2' UN 1,89

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.56.40 1,00000ESPELHO CEGO CHAPA FERRO 4'X2' UN 0,640000,64

LS 0,49532 BDI 0,35450Mão-de-Obra 0,40600 Material 0,64000SubMO 0,90132

09.84.025 ESPELHO CEGO EM CHAPA DE FERRO DE 4" X 4" UN 2,05

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.56.41 1,00000ESPELHO CEGO CHAPA FERRO 4'X4' UN 0,770000,77

LS 0,49532 BDI 0,38440Mão-de-Obra 0,40600 Material 0,77000SubMO 0,90132

09.84.030 CIGARRA TIPO FABRICA UN 75,08

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.94.90 1,00000CIGARRA TIPO FABRICA UN 50,5300050,53

LS 5,77670 BDI 14,03959Mão-de-Obra 4,73500 Material 50,53000SubMO 10,51170

09.84.031 SIRENE 110/220 V UN 417,87

1.01.15 0,70000ELETRICISTA H 3,787005,411.01.16 0,70000AJUDANTE ELETRICISTA H 2,842004,064.94.80 1,00000SIRENE ELETROMECANICA ROTATIVA 110/220V UN 325,02000325,02

LS 8,08738 BDI 78,13937Mão-de-Obra 6,62900 Material 325,02000SubMO 14,71638

09.84.035 PLAFON DE ALUMINIO DE SOBREPOR - BOCA 10 PARA GLOBO TIPO BRASIL UN 11,78

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.60.46 1,00000PLAFON ALUM SOBREPOR BOCA 10 'BR' UN 1,170001,17

09/02/2011 11:38:40 Página: 228 de 0

Page 229: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 4,62136 BDI 2,20325Mão-de-Obra 3,78800 Material 1,17000SubMO 8,40936

09.84.036 PLAFON DE ALUMINIO DE SOBREPOR - BOCA 15 PARA GLOBO TIPO BRASIL UN 13,89

1.01.15 0,40000ELETRICISTA H 2,164005,411.01.16 0,40000AJUDANTE ELETRICISTA H 1,624004,064.60.47 1,00000PLAFON ALUM SOBREPOR BOCA 15 'BR' UN 2,890002,89

LS 4,62136 BDI 2,59885Mão-de-Obra 3,78800 Material 2,89000SubMO 8,40936

09.84.043 GLOBO TIPO BRASIL - BOCA 10 UN 15,52

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.60.40 1,00000GLOBO LEITOSO TIPO BRASIL 10X23 CM UN 10,8200010,82

LS 0,99064 BDI 2,90321Mão-de-Obra 0,81200 Material 10,82000SubMO 1,80264

09.84.044 GLOBO TIPO BRASIL - BOCA 15 UN 22,20

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.60.41 1,00000GLOBO LEITOSO TIPO BRASIL 15X30 CM UN 16,2500016,25

LS 0,99064 BDI 4,15211Mão-de-Obra 0,81200 Material 16,25000SubMO 1,80264

09.84.047 LUMINARIA DE FERRO ESMALTADO TIPO BEDD - 14" UN 96,66

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.60.51 1,00000IL-13 REFLETOR TIPO INDUSTRIAL(DD) UN 68,0800068,08

LS 5,77670 BDI 18,07609Mão-de-Obra 4,73500 Material 68,08000SubMO 10,51170

09.84.048 LUMINARIA DE FERRO ESMALTADO TIPO BEDD - 16" UN 158,69

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.60.70 1,00000LUMIN F.ESMAL 16'BEDD C/SOQ E FLANGE UN 118,51000118,51

LS 5,77670 BDI 29,67499Mão-de-Obra 4,73500 Material 118,51000SubMO 10,51170

09.84.050 RECEPTACULO PORCELANA P/LAMP INCAND P/ PLAFONS SOBREPOR-ROSCA E-27 UN 9,59

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.97.05 1,00000SOQUETE PORCELANA C/ROSCA E-27 UN 1,490001,49

LS 3,46602 BDI 1,79332Mão-de-Obra 2,84100 Material 1,49000SubMO 6,30702

09.84.051 RECEPTACULO P/LAMPADA HG OU MHL P/LUMINARIA EXT.OU PROJ-ROSCA E-40 UN 23,85

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.94.20 1,00000SOQUETE P/LAMP HG/MHL 098451 UN 8,880008,88

LS 5,77670 BDI 4,46009Mão-de-Obra 4,73500 Material 8,88000SubMO 10,51170

09.84.052 SOQUETE P/LAMPADA FLUORESCENTE TIPO ANTI-VIBR. S/PORTA-STAR UN 3,24

1.01.15 0,13330ELETRICISTA H 0,721155,414.94.21 1,00000SOQUETE P/LAMP FLUORESCENTE S/PORTA STA UN 1,040001,04

LS 0,87981 BDI 0,60742Mão-de-Obra 0,72115 Material 1,04000SubMO 1,60096

09.84.053 RECEPTACULO P/ LAMPADA FLUORESCENTE COM PORTA STARTEL UN 10,82

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.94.22 1,00000SOQUETE P/LAMP FLUORESCENTE C/PORTA STA UN 4,600004,60

LS 2,31068 BDI 2,02508Mão-de-Obra 1,89400 Material 4,60000SubMO 4,20468

09.84.054 PORTA LAMP ROSCA E-27 P/PLAFON PEND,EM BAQUELITE,FIX.P/ROSCA 1/8" UN 15,81

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.97.02 1,00000PORTA LAMP E27,BAQUELITE,FIX R.1/8"-4A-250V UN 2,350002,35

LS 5,77670 BDI 2,95819Mão-de-Obra 4,73500 Material 2,35000SubMO 10,51170

09.84.055 PORTA LAMP ROSCA E-27,PORCEL.C/FLANGE FIX.P/PRATO FIX.P/ROSCA 3/8" GAS UN 21,47

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.97.01 1,00000PORTA LAMP E27,PORCEL.C/FLANGE,FIX.3/8"GAS,4A-250V UN 6,950006,95

LS 5,77670 BDI 4,01619Mão-de-Obra 4,73500 Material 6,95000SubMO 10,51170

09.84.060 CORRENTE PARA PENDENTE DE APARELHO PARA ILUMINACAO M 13,90

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.97.04 1,00000CORRENTE P/PENDENTE APAR ILUMINACAO M 0,790000,79

LS 5,77670 BDI 2,59939Mão-de-Obra 4,73500 Material 0,79000SubMO 10,51170

09.84.063 CALHA TIPO PLAFON. PARA 1 LAMP. FLUORESCENTE 40 W UN 38,65

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.61.80 1,00000CALHA P/ LUMINARIA FLUOR. 1 X 40 W SEM SOQUETES UN 10,4000010,40

09/02/2011 11:38:40 Página: 229 de 0

Page 230: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 11,55340 BDI 7,22738Mão-de-Obra 9,47000 Material 10,40000SubMO 21,02340

09.84.064 CALHA TIPO PLAFON. PARA 3 LAMPADAS FLUORESCENTES 40 W UN 43,71

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.61.81 1,00000CALHA P/ LUMINARIA FLUOR. 3 X 40 W SEM SOQUETES UN 14,5200014,52

LS 11,55340 BDI 8,17498Mão-de-Obra 9,47000 Material 14,52000SubMO 21,02340

09.84.065 CALHA TIPO PLAFON PARA 2 LAMPADAS FLUORESCENTES DE 20 W UN 35,13

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.60.35 1,00000CALHA P/ LUMIN. FLUOR. 2 X 20 W SEM SOQUETES UN 7,540007,54

LS 11,55340 BDI 6,56958Mão-de-Obra 9,47000 Material 7,54000SubMO 21,02340

09.84.066 CALHA TIPO PLAFON PARA 4 LAMPADAS FLUORESCENTES DE 20 W UN 54,64

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.36 1,00000CALHA P/ LUMIN. FLUOR. 4 X 20 W SEM SOQUETES UN 12,8900012,89

LS 17,33010 BDI 10,21777Mão-de-Obra 14,20500 Material 12,89000SubMO 31,53510

09.84.067 CALHA TIPO PLAFON PARA 2 LAMPADAS FLUORESCENTES DE 40 W UN 37,46

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.60.37 1,00000CALHA P/ LUMIN. FLUOR. 2 X 40 W SEM SOQUETES UN 9,440009,44

LS 11,55340 BDI 7,00658Mão-de-Obra 9,47000 Material 9,44000SubMO 21,02340

09.84.068 CALHA TIPO PLAFON PARA 4 LAMPADAS FLUORESCENTES DE 40 W UN 62,07

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.38 1,00000CALHA P/ LUMIN. FLUOR. 4 X 40 W SEM SOQUETES UN 18,9300018,93

LS 17,33010 BDI 11,60697Mão-de-Obra 14,20500 Material 18,93000SubMO 31,53510

09.84.070 CANOPLA DE FIXACAO PARA PENDENTE DE LUMINARIA FLUORESCENTE UN 19,64

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.61.03 1,00000CANOPLA FIX PENDENTE LUM FLUORESC UN 5,460005,46

LS 5,77670 BDI 3,67349Mão-de-Obra 4,73500 Material 5,46000SubMO 10,51170

09.84.073 STARTER PARA LAMPADA FLUORESCENTE DE 40 W UN 6,18

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.97.06 1,00000STARTER P/LAMP FLUORESCENTE 40W UN 0,820000,82

LS 2,31068 BDI 1,15568Mão-de-Obra 1,89400 Material 0,82000SubMO 4,20468

09.84.081 REATOR ELETRONICO P/LAMPADA FLUORESC.AFP 1X32W - 220V UN 51,67

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.12 1,00000REATOR ELETR P/ LAMP FLUOR AFP 1/32W-220V C/PROT UN 20,9900020,99

LS 11,55340 BDI 9,66308Mão-de-Obra 9,47000 Material 20,99000SubMO 21,02340

09.84.082 REATOR ELETRONICO P/LAMPADA FLUORESC.AFP 2X32W - 220V UN 68,46

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.97.13 1,00000REATOR ELETR P/ LAMP FLUOR AFP 2/32W-220V C/PROT UN 24,1300024,13

LS 17,33010 BDI 12,80297Mão-de-Obra 14,20500 Material 24,13000SubMO 31,53510

09.84.083 REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 110V/20W UN 47,88

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.26 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/20W-110V UN 17,9100017,91

LS 11,55340 BDI 8,95468Mão-de-Obra 9,47000 Material 17,91000SubMO 21,02340

09.84.084 REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 220V/20W UN 47,88

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.30 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/20W-220V UN 17,9100017,91

LS 11,55340 BDI 8,95468Mão-de-Obra 9,47000 Material 17,91000SubMO 21,02340

09.84.085 REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 110V/2X20W UN 68,00

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.97.27 1,00000REATOR PT RAP P/FLUOR AFP 2/20W-110V UN 23,7500023,75

LS 17,33010 BDI 12,71557Mão-de-Obra 14,20500 Material 23,75000SubMO 31,53510

09.84.086 REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 220V/2X20W UN 71,42

09/02/2011 11:38:40 Página: 230 de 0

Page 231: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.97.31 1,00000REATOR PT RAP P/FLUOR AFP 2/20W-220V UN 26,5300026,53

LS 17,33010 BDI 13,35497Mão-de-Obra 14,20500 Material 26,53000SubMO 31,53510

09.84.087 REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 110V/40W UN 50,06

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.28 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/40W-110V UN 19,6800019,68

LS 11,55340 BDI 9,36178Mão-de-Obra 9,47000 Material 19,68000SubMO 21,02340

09.84.088 REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 220V/40W UN 57,27

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.32 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V UN 25,5400025,54

LS 11,55340 BDI 10,70958Mão-de-Obra 9,47000 Material 25,54000SubMO 21,02340

09.84.089 REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 110V/2X40W UN 49,84

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.97.29 1,00000REATOR PT RAP P/FLUOR AFP 2/40W-110V UN 30,0100030,01

LS 5,77670 BDI 9,31999Mão-de-Obra 4,73500 Material 30,01000SubMO 10,51170

09.84.090 REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 220V/2X40W UN 70,46

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.97.33 1,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 25,7500025,75

LS 17,33010 BDI 13,17557Mão-de-Obra 14,20500 Material 25,75000SubMO 31,53510

09.84.092 REATOR PARA LAMPADA HG - 220V/250W UN 79,40

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.41 1,00000REATOR P/LAMPADA HG 220V/250W UN 43,5300043,53

LS 11,55340 BDI 14,84728Mão-de-Obra 9,47000 Material 43,53000SubMO 21,02340

09.84.093 REATOR PARA LAMPADA VAPOR DE MERCURIO HG 220V/400W - AFP UN 83,75

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.42 1,00000REATOR P/LAMP VAPOR DE MERCURIO HG 400W/220V AFP UN 47,0700047,07

LS 11,55340 BDI 15,66148Mão-de-Obra 9,47000 Material 47,07000SubMO 21,02340

09.84.094 REATOR P/ LAMP. PART. RAP. ALTO FATOR DE POT. 1/110V-110W UN 97,49

1.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.50 1,00000REATOR P/ LAMP. FLUOR. PART. RAP. AFP 1/110W-110V UN 70,2500070,25

LS 4,95320 BDI 18,23054Mão-de-Obra 4,06000 Material 70,25000SubMO 9,01320

09.84.095 REATOR P/ LAMP. FLUOR. RAP. AUTO FATOR POT. 2/110W-220V UN 100,90

1.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.51 1,00000REATOR P/ LAMP. FLUOR. PART. RAP. AFP 2/110W-220V UN 73,0200073,02

LS 4,95320 BDI 18,86764Mão-de-Obra 4,06000 Material 73,02000SubMO 9,01320

09.84.096 REATOR SIMPLES P/ LAMP FLUOR CONV F POTENCIA NATURAL - 220V/20W UN 37,98

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.54 1,00000REATOR CONV P/ FLUOR F POTENCIA NATURAL 1/20W-220V UN 9,860009,86

LS 11,55340 BDI 7,10318Mão-de-Obra 9,47000 Material 9,86000SubMO 21,02340

09.84.097 REATOR SIMPLES P/ LAMP FLUOR CONV F POTENCIA NATURAL - 220V/40W UN 37,26

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.97.55 1,00000REATOR CONV P/ FLUOR F POTENCIA NATURAL 1/40W-220V UN 9,270009,27

LS 11,55340 BDI 6,96748Mão-de-Obra 9,47000 Material 9,27000SubMO 21,02340

09.84.099 OUTROS SERVICOS DE APARELHOS E EQUIPAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.85.001 LAMPADA INCANDESCENTE DE 60W UN 3,81

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.65.04 1,00000LAMPADA INCANDESCENTE 60W UN 1,300001,30

LS 0,99064 BDI 0,71361Mão-de-Obra 0,81200 Material 1,30000SubMO 1,80264

09.85.005 LAMPADA FLUORESCENTE DE 32W UN 8,11

1.01.16 0,10000AJUDANTE ELETRICISTA H 0,406004,064.65.13 1,00000LAMPADA FLUORESCENTE DE 32W UN 5,700005,70

09/02/2011 11:38:40 Página: 231 de 0

Page 232: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,49532 BDI 1,51830Mão-de-Obra 0,40600 Material 5,70000SubMO 0,90132

09.85.006 LAMPADA FLUORESCENTE COMPACTA 23W UN 15,52

1.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.65.05 1,00000LAMPADA FLUORESCENTE COMPACTA 23W UN 10,8200010,82

LS 0,99064 BDI 2,90321Mão-de-Obra 0,81200 Material 10,82000SubMO 1,80264

09.85.010 LAMPADA VAPOR DE SODIO 70W UN 24,28

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.65.39 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 70W/220V UN 13,4400013,44

LS 3,46602 BDI 4,54182Mão-de-Obra 2,84100 Material 13,44000SubMO 6,30702

09.85.011 LAMPADA VAPOR DE SODIO 150W UN 33,28

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.65.30 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V UN 20,7500020,75

LS 3,46602 BDI 6,22312Mão-de-Obra 2,84100 Material 20,75000SubMO 6,30702

09.85.012 LAMPADA VAPOR DE SODIO 250W UN 38,47

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.65.31 1,00000LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 250W/220V UN 24,9700024,97

LS 3,46602 BDI 7,19372Mão-de-Obra 2,84100 Material 24,97000SubMO 6,30702

09.85.017 LAMPADA VAPOR METÁLICO 70W UN 195,52

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.65.36 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL 70W/220W UN 152,66000152,66

LS 3,46602 BDI 36,56242Mão-de-Obra 2,84100 Material 152,66000SubMO 6,30702

09.85.018 LAMPADA VAPOR METALICO 150W UN 238,54

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.65.28 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL 150W/220V UN 187,63000187,63

LS 3,46602 BDI 44,60552Mão-de-Obra 2,84100 Material 187,63000SubMO 6,30702

09.85.019 LAMPADA VAPOR METALICO 250W UN 68,81

1.01.15 0,30000ELETRICISTA H 1,623005,411.01.16 0,30000AJUDANTE ELETRICISTA H 1,218004,064.65.29 1,00000LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V UN 49,6400049,64

LS 3,46602 BDI 12,86782Mão-de-Obra 2,84100 Material 49,64000SubMO 6,30702

09.85.023 LUMIN. BLINDADA ARANDELA P/ LAMP. MISTA 160 W UN 174,22

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.61.89 1,00000LUM. BLINDADA - ARANDELA PARA LAMP. MISTA 160 W UN 124,83000124,83

LS 9,24272 BDI 32,57921Mão-de-Obra 7,57600 Material 124,83000SubMO 16,81872

09.85.024 LUMIN. BLINDADA PLAFONIER P/ LAMP. MISTA 160W UN 146,60

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.61.88 1,00000LUM. BLINDADA - PLAFONIER PARA LAMP. MISTA 160 W UN 102,37000102,37

LS 9,24272 BDI 27,41341Mão-de-Obra 7,57600 Material 102,37000SubMO 16,81872

09.85.025 LUMIN. BLINDADA ARANDELA P/ LAMP. INCANDESC. 100 W UN 200,26

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.23 1,00000IL-05 ARANDELA BLINDADA P/LAMP. FLUORESCENTE COMPACTA 23W-25W UN 146,00000146,00

LS 9,24272 BDI 37,44831Mão-de-Obra 7,57600 Material 146,00000SubMO 16,81872

09.85.026 IL-08 LUMINÁRIA PARA LÂMPADA FLUORESCENTE (1X40W) UN 76,86

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.60.66 1,00000CALHA P/LUMINARIA FLUOR.1X40W C/SOQUETES(IL-08/19) UN 20,8600020,864.65.11 1,00000LAMPADA FLUORESCENTE DE 40W/220V UN 3,480003,484.97.32 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V UN 25,5400025,54

LS 6,93204 BDI 14,37363Mão-de-Obra 5,68200 Material 49,88000SubMO 12,61404

09.85.027 IL-09 LUMINÁRIA PARA LÂMPADA FLUORESCENTE (2X40W) UN 106,30

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.60.64 1,00000CALHA P/LUMINARIA FLUOR.2X40W C/SOQUETES(IL-09/20) UN 30,5900030,594.65.11 2,00000LAMPADA FLUORESCENTE DE 40W/220V UN 6,960003,484.97.33 1,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 25,7500025,75

09/02/2011 11:38:40 Página: 232 de 0

Page 233: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 12,70874 BDI 19,87792Mão-de-Obra 10,41700 Material 63,30000SubMO 23,12574

09.85.028 IL-10 LUMINÁRIA PARA LÂMPADA FLUORESCENTE (4X40W) UN 158,14

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.68 1,00000CALHA P/LUMINARIA FLUOR.4X40W C/SOQUETES(IL 10/21) UN 31,6200031,624.65.11 4,00000LAMPADA FLUORESCENTE DE 40W/220V UN 13,920003,484.97.33 2,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 51,5000025,75

LS 17,33010 BDI 29,57227Mão-de-Obra 14,20500 Material 97,04000SubMO 31,53510

09.85.029 IL-11 LUMINÁRIA PARA LÂMPADA FLUORESCENTE (2X20W) UN 89,39

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.60.57 1,00000CALHA P/LUMINARIA FLUOR.2X20W C/SOQUETES (IL - 11) UN 16,1200016,124.65.10 2,00000LAMPADA FLUORESCENTE DE 20 W UN 6,900003,454.97.31 1,00000REATOR PT RAP P/FLUOR AFP 2/20W-220V UN 26,5300026,53

LS 12,70874 BDI 16,71542Mão-de-Obra 10,41700 Material 49,55000SubMO 23,12574

09.85.030 IL-12 LUMINÁRIA PARA LÂMPADA FLUORESCENTE (4X20W) UN 154,08

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.58 1,00000CALHA P/LUMINARIA FLUOR.4X20W C/SOQUETES (IL - 12) UN 26,8800026,884.65.10 4,00000LAMPADA FLUORESCENTE DE 20 W UN 13,800003,454.97.31 2,00000REATOR PT RAP P/FLUOR AFP 2/20W-220V UN 53,0600026,53

LS 17,33010 BDI 28,81327Mão-de-Obra 14,20500 Material 93,74000SubMO 31,53510

09.85.031 IL-19 LUMINÁRIA P/ LÂMPADA FLUOR C/PENDENTE (1X40W) UN 114,85

1.01.15 0,60000ELETRICISTA H 3,246005,411.01.16 0,60000AJUDANTE ELETRICISTA H 2,436004,064.60.66 1,00000CALHA P/LUMINARIA FLUOR.1X40W C/SOQUETES(IL-08/19) UN 20,8600020,864.61.29 1,00000SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE UN 30,8800030,884.65.11 1,00000LAMPADA FLUORESCENTE DE 40W/220V UN 3,480003,484.97.32 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V UN 25,5400025,54

LS 6,93204 BDI 21,47603Mão-de-Obra 5,68200 Material 80,76000SubMO 12,61404

09.85.032 IL-20 LUMINÁRIA P/ LÂMPADA FLUOR C/PENDENTE (2X40W) UN 144,28

1.01.15 1,10000ELETRICISTA H 5,951005,411.01.16 1,10000AJUDANTE ELETRICISTA H 4,466004,064.60.64 1,00000CALHA P/LUMINARIA FLUOR.2X40W C/SOQUETES(IL-09/20) UN 30,5900030,594.61.29 1,00000SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE UN 30,8800030,884.65.11 2,00000LAMPADA FLUORESCENTE DE 40W/220V UN 6,960003,484.97.33 1,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 25,7500025,75

LS 12,70874 BDI 26,98032Mão-de-Obra 10,41700 Material 94,18000SubMO 23,12574

09.85.033 IL-21 LUMINÁRIA P/ LÂMPADA FLUOR C/PENDENTE (4X40W) UN 196,12

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.68 1,00000CALHA P/LUMINARIA FLUOR.4X40W C/SOQUETES(IL 10/21) UN 31,6200031,624.61.29 1,00000SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE UN 30,8800030,884.65.11 4,00000LAMPADA FLUORESCENTE DE 40W/220V UN 13,920003,484.97.33 2,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 51,5000025,75

LS 17,33010 BDI 36,67467Mão-de-Obra 14,20500 Material 127,92000SubMO 31,53510

09.85.034 IL-38 LUMINÁRIA PARA LÂMPADA FLUORESCENTE (3X40W) UN 148,91

1.01.15 1,30000ELETRICISTA H 7,033005,411.01.16 1,30000AJUDANTE ELETRICISTA H 5,278004,064.61.85 1,00000CALHA P/LUMINARIA FLUOR 3X40W C/ SOQUETES (IL-38) UN 32,0100032,014.65.11 3,00000LAMPADA FLUORESCENTE DE 40W/220V UN 10,440003,484.97.32 1,00000REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V UN 25,5400025,544.97.33 1,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 25,7500025,75

LS 15,01942 BDI 27,84620Mão-de-Obra 12,31100 Material 93,74000SubMO 27,33042

09.85.035 ARANDELA SIMPLES C/REFLETOR ESMALT E BRACO F G C/BASE DE FIXACAO UN 542,15

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.60.26 1,00000ARANDELA SIMPLES C/REFL ESM 098535 UN 398,73000398,73

LS 23,10680 BDI 101,37866Mão-de-Obra 18,94000 Material 398,73000SubMO 42,04680

09.85.036 LUMINÁRIA EM CALHA P/EMBUTIR DIFUSOR PLAST LAMP FLUOR (2X40W) UN 131,70

1.01.15 0,80000ELETRICISTA H 4,328005,411.01.16 0,80000AJUDANTE ELETRICISTA H 3,248004,064.60.81 1,00000EL-LUMI EMBUT DIF PLAST LAMP FLUOR 2X40W UN 90,2600090,26

LS 9,24272 BDI 24,62811Mão-de-Obra 7,57600 Material 90,26000SubMO 16,81872

09.85.037 BRACO ACO GALVANIZADO DN 1 1/2" X 2,00 M UN 202,10

1.01.15 2,00000ELETRICISTA H 10,820005,41

09/02/2011 11:38:40 Página: 233 de 0

Page 234: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.97.11 1,00000BRACO ACO GALVAN 1.1/2" AFAST BASE 2,00M UN 122,27000122,27

LS 23,10680 BDI 37,79286Mão-de-Obra 18,94000 Material 122,27000SubMO 42,04680

09.85.039 BRACO ACO GALVANIZADO DE 1" X 1.00M UN 92,09

1.01.15 2,00000ELETRICISTA H 10,820005,411.01.16 2,00000AJUDANTE ELETRICISTA H 8,120004,064.60.30 1,00000BRACO ACO GALVANIZADO DIAM 25.4MMX1.0M P/ILUM.EXT. UN 32,8300032,83

LS 23,10680 BDI 17,22166Mão-de-Obra 18,94000 Material 32,83000SubMO 42,04680

09.85.040 LUMINÁRIA EM CALHA P/EMBUTIR DIFUSOR PLAST LAMP FLUOR (4X40W) UN 172,61

1.01.15 1,05000ELETRICISTA H 5,680505,411.01.16 1,05000AJUDANTE ELETRICISTA H 4,263004,064.60.83 1,00000EL-LUMI EMBUT DIF PLAST LAMP FLUOR 4X40W UN 118,26000118,26

LS 12,13107 BDI 32,27695Mão-de-Obra 9,94350 Material 118,26000SubMO 22,07457

09.85.041 LUMIN.(APARELHO) FECH. P/ILUMIN. EXTERNA P/LAMP.V.MERC. OU MISTA 250W UN 224,37

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.61.37 1,00000IL-33A36 LUMINARIA P/LAMPADA V.MERCURIO/MISTA 250W UN 150,88000150,88

LS 17,33010 BDI 41,95547Mão-de-Obra 14,20500 Material 150,88000SubMO 31,53510

09.85.042 FLUORESCENTE EM PERFILADO (2X40W) - PROJ EMERGÊNCIA UN 247,58

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,062.66.90 7,00000PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM UN 1,120000,162.67.40 7,00000PARAFUSO 3/8 X 3/4 C/ARRUELA/PORCA UN 2,310000,332.68.10 0,07000BUCHA PLASTICA TIPO S-10 (CENTO) UN 0,173602,484.30.04 20,00000FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V) M 10,600000,534.65.11 2,00000LAMPADA FLUORESCENTE DE 40W/220V UN 6,960003,484.85.65 4,00000SUPORTE LONGO P/ LUMINARIA EM PERFILADO ACO GALV. UN 5,320001,334.94.21 4,00000SOQUETE P/LAMP FLUORESCENTE S/PORTA STA UN 4,160001,044.94.71 4,50000PERFILADO EM CHAPA ACO 38X38MM M 49,7250011,054.94.72 1,00000EMENDA INTERNA "I" UN 0,760000,764.94.73 1,00000JUNCAO ANGULAR DUPLA P/ PERFILADO (TIPO SISA -SRS) UN 0,890000,894.94.74 13,00000CONECTOR MULTIPLO MARCA SINDAL TIPO 112 UN 6,760000,524.94.75 1,00000CANTONEIRA 3 FUROS 38X76 MM UN 0,270000,274.94.76 1,00000BASE COM 4 FUROS - FIXACAO EXTERNA UN 2,400002,404.97.33 1,00000REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP UN 25,7500025,75

LS 46,21360 BDI 46,29721Mão-de-Obra 37,88000 Material 117,19860SubMO 84,09360

09.85.043 LUMINARIA ABERTA (APARELHO) TIPO ECON. P/ LAMP. V. MERC./MISTA 250W UN 117,90

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.71 1,00000IL-37 LUMIN. ABERTA - LAMP. V. MERC./MISTA 160W UN 64,3200064,32

LS 17,33010 BDI 22,04667Mão-de-Obra 14,20500 Material 64,32000SubMO 31,53510

09.85.044 PROJETOR ANGULAR (APARELHO) P/ ILUMIN. QUADRA P/ LAMP. V. MERC. 400W UN 259,59

1.01.15 1,50000ELETRICISTA H 8,115005,411.01.16 1,50000AJUDANTE ELETRICISTA H 6,090004,064.60.75 1,00000IL-02 PROJETOR ANGULAR P/LAMPADA V.MERCURIO 400W UN 179,52000179,52

LS 17,33010 BDI 48,54267Mão-de-Obra 14,20500 Material 179,52000SubMO 31,53510

09.85.045 CRUZETA DE FERRO GALVANIZADO PARA 2 PROJETORES UN 303,30

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,064.60.55 1,00000CRUZETA P/FIX 2 LUMIN EXTERNA UN 183,52000183,52

LS 34,66020 BDI 56,71575Mão-de-Obra 28,41000 Material 183,52000SubMO 63,07020

09.85.047 POSTE ACO GALVANIZADO RETO 4" X6.00M P/ILUMIN EXTERNA UN 1.122,46

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 5,00000AJUDANTE ELETRICISTA H 20,300004,064.01.25 1,00000POSTE GALV,TELECON RETO, FLANGEADO 88,9 MM X 6,0 M UN 807,46000807,46

LS 57,76700 BDI 209,89271Mão-de-Obra 47,35000 Material 807,46000SubMO 105,11700

09.85.048 POSTE DE FERRO GALV.TIPO CURVO,C/JANELAS INSP.R=7 M ACIMA DO SOLO UN 946,40

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 8,00000AJUDANTE ELETRICISTA H 32,480004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,504.01.21 1,00000POSTE FG CURVO C/JAN INSP R=7M ACIMA UN 615,99000615,99

LS 84,32640 BDI 176,97037Mão-de-Obra 69,12000 Material 615,99000SubMO 153,44640

09.85.049 POSTE DE FERRO GALV.TIPO RETO, C/JANELA INSP. R=10M ACIMA DO SOLO UN 2.144,16

1.01.15 6,00000ELETRICISTA H 32,460005,411.01.16 12,00000AJUDANTE ELETRICISTA H 48,720004,061.01.17 2,00000ELETRICISTA PARA ALTA TENSAO H 15,000007,50

09/02/2011 11:38:40 Página: 234 de 0

Page 235: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

4.01.35 1,00000POSTE ACO GALV RETO C/ JAN INSP 4"X2"X10M UN 1.529,700001.529,70

LS 117,33960 BDI 400,94051Mão-de-Obra 96,18000 Material 1.529,70000SubMO 213,51960

09.85.052 POSTE DE CONCRETO TUBULAR OCO DE 7 M DE COMPR C/ JANELA ISNPECAO UN 691,04

1.01.15 5,00000ELETRICISTA H 27,050005,411.01.16 22,00000AJUDANTE ELETRICISTA H 89,320004,064.01.11 1,00000POSTE CONCR TUB OCO 7M C/JANELA INSPECAO UN 303,48000303,48

LS 141,97140 BDI 129,21892Mão-de-Obra 116,37000 Material 303,48000SubMO 258,34140

09.85.060 CONDULETE DE 1" UN 30,41

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.53 1,00000CONDULETE DE 1" UN 14,2200014,22

LS 5,77670 BDI 5,68829Mão-de-Obra 4,73500 Material 14,22000SubMO 10,51170

09.85.061 CONDULETE DE 1 1/4" UN 39,18

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.54 1,00000CONDULETE DE 1 1/4" UN 21,3500021,35

LS 5,77670 BDI 7,32819Mão-de-Obra 4,73500 Material 21,35000SubMO 10,51170

09.85.062 CONDULETE DE 1 1/2" UN 48,09

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.55 1,00000CONDULETE DE 1 1/2" UN 28,5900028,59

LS 5,77670 BDI 8,99339Mão-de-Obra 4,73500 Material 28,59000SubMO 10,51170

09.85.063 CONDULETE DE 2" UN 67,73

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.56 1,00000CONDULETE DE 2" UN 44,5600044,56

LS 5,77670 BDI 12,66649Mão-de-Obra 4,73500 Material 44,56000SubMO 10,51170

09.85.064 CONDULETE DE 3/4" UN 25,62

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.70 1,00000CONDULETE DE ALUMINIO 4"X2"XD=3/4" UN 10,3200010,32

LS 5,77670 BDI 4,79129Mão-de-Obra 4,73500 Material 10,32000SubMO 10,51170

09.85.065 CONDULETE DE 1/2" UN 24,38

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.51.50 1,00000CONDULETE DE 1/2" UN 9,310009,31

LS 5,77670 BDI 4,55899Mão-de-Obra 4,73500 Material 9,31000SubMO 10,51170

09.85.080 MOTOR PARA BOMBA DE RECALQUE DE 1/2 HP - 220 V BIFASICO UN 524,10

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,066.65.70 1,00000MOTOR 1/2 HP BIFASICO P/BOMBA RECALQ UN 363,03000363,03

LS 34,66020 BDI 98,00305Mão-de-Obra 28,41000 Material 363,03000SubMO 63,07020

09.85.081 MOTOR PARA BOMBA DE RECALQUE DE 3/4 HP - 220 V BIFASICO UN 613,52

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,066.65.71 1,00000MOTOR 3/4 HP BIFASICO P/BOMBA RECALQ UN 435,73000435,73

LS 34,66020 BDI 114,72405Mão-de-Obra 28,41000 Material 435,73000SubMO 63,07020

09.85.082 MOTOR PARA BOMBA DE RECALQUE DE 1 HP - 220 V BIFASICO UN 675,03

1.01.15 3,00000ELETRICISTA H 16,230005,411.01.16 3,00000AJUDANTE ELETRICISTA H 12,180004,066.65.72 1,00000MOTOR 1 HP BIFASICO P/BOMBA RECALQ UN 485,74000485,74

LS 34,66020 BDI 126,22635Mão-de-Obra 28,41000 Material 485,74000SubMO 63,07020

09.85.083 MOTOR PARA BOMBA DE RECALQUE DE 2 HP - 220 V TRIFASICO UN 692,76

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,066.65.73 1,00000MOTOR 2 HP TRIFASICO P/BOMBA RECALQUE UN 479,13000479,13

LS 46,21360 BDI 129,54143Mão-de-Obra 37,88000 Material 479,13000SubMO 84,09360

09.85.084 MOTOR PARA BOMBA DE RECALQUE DE 3 HP - 220 V TRIFASICO UN 802,55

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,066.65.74 1,00000MOTOR 3 HP TRIFASICO P/BOMBA RECALQUE UN 568,39000568,39

LS 46,21360 BDI 150,07123Mão-de-Obra 37,88000 Material 568,39000SubMO 84,09360

09/02/2011 11:38:40 Página: 235 de 0

Page 236: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

09.85.085 MOTOR PARA BOMBA DE RECALQUE DE 5 HP - 220 V TRIFASICO UN 995,91

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,066.65.75 1,00000MOTOR 5 HP TRIFASICO P/BOMBA RECALQUE UN 725,59000725,59

LS 46,21360 BDI 186,22723Mão-de-Obra 37,88000 Material 725,59000SubMO 84,09360

09.85.099 OUTROS SERVICOS DE APARELHOS E EQUIPAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

09.86.001CAPTOR TIPO FRANKLIN, BOUQUET NIQUELADO DE 4 PONTAS-CONECTORGRANDE

UN 177,32

1.01.15 4,00000ELETRICISTA H 21,640005,411.01.16 4,00000AJUDANTE ELETRICISTA H 16,240004,064.80.62 1,00000CAPTOR TIPO FRANKLIN,LATAO CROMADO,CONECTOR DUPLO UN 60,0700060,07

LS 46,21360 BDI 33,15763Mão-de-Obra 37,88000 Material 60,07000SubMO 84,09360

09.86.005 CABO DE COBRE NU DE 25 MM2 PARA ATERRAMENTO M 18,77

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.30.40 1,00000CABO DE COBRE NU DE 25 MM2 M 11,0600011,06

LS 2,31068 BDI 3,51088Mão-de-Obra 1,89400 Material 11,06000SubMO 4,20468

09.86.006 CABO DE COBRE NU DE 35 MM2 PARA ATERRAMENTO M 27,72

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.30.41 1,00000CABO DE COBRE NU DE 35 MM2 M 18,3400018,34

LS 2,31068 BDI 5,18528Mão-de-Obra 1,89400 Material 18,34000SubMO 4,20468

09.86.010 CABO DE COBRE NU DE 25 MM2 PARA PARA-RAIOS M 26,53

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.30.40 1,00000CABO DE COBRE NU DE 25 MM2 M 11,0600011,06

LS 5,77670 BDI 4,96149Mão-de-Obra 4,73500 Material 11,06000SubMO 10,51170

09.86.011 CABO DE COBRE NU DE 35 MM2 PARA PARA RAIOS M 35,48

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.30.41 1,00000CABO DE COBRE NU DE 35 MM2 M 18,3400018,34

LS 5,77670 BDI 6,63589Mão-de-Obra 4,73500 Material 18,34000SubMO 10,51170

09.86.012 CABO DE COBRE NU DE 95 MM2 PARA PARA-RAIOS M 60,17

1.01.15 0,50000ELETRICISTA H 2,705005,411.01.16 0,50000AJUDANTE ELETRICISTA H 2,030004,064.31.30 1,00000CORDOALHA DE COBRE NU DE 95 MM2 M 38,4100038,41

LS 5,77670 BDI 11,25199Mão-de-Obra 4,73500 Material 38,41000SubMO 10,51170

09.86.020 SUPORTE SIMPLES COM ROLDANA PARA CABO DE COBRE NU 25 A 35 MM2 UN 29,96

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.80.35 1,00000SUPORTE SIMPLES C/ROLDANA P/ 2AWG UN 3,340003,34

LS 11,55340 BDI 5,60358Mão-de-Obra 9,47000 Material 3,34000SubMO 21,02340

09.86.021 SUPORTE SIMPLES COM ROLDANA PARA CABO DE COBRE NU 95 A 70 MM2 UN 29,96

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.80.36 1,00000SUPORTE SIMPLES C/ROLDANA P/ 3/0 AWG UN 3,340003,34

LS 11,55340 BDI 5,60358Mão-de-Obra 9,47000 Material 3,34000SubMO 21,02340

09.86.025 CONECTOR TIPO SPLIT-BOLT PARA CABO DE 25 MM2 UN 8,28

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.01 1,00000CONECTOR SPLIT-BOOLT P/CABO 25MM2 UN 2,530002,53

LS 2,31068 BDI 1,54898Mão-de-Obra 1,89400 Material 2,53000SubMO 4,20468

09.86.026 CONECTOR TIPO SPLIT-BOLT PARA CABO DE 35 MM2 UN 9,04

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.02 1,00000CONECTOR SPLIT-BOOLT P/CABO 35MM2 UN 3,150003,15

LS 2,31068 BDI 1,69158Mão-de-Obra 1,89400 Material 3,15000SubMO 4,20468

09.86.027 CONECTOR TIPO SPLIT-BOLT PARA CABO DE 95 MM2 UN 16,14

1.01.15 0,20000ELETRICISTA H 1,082005,411.01.16 0,20000AJUDANTE ELETRICISTA H 0,812004,064.96.05 1,00000CONECTOR SPLIT-BOOLT P/CABO 95MM2 UN 8,920008,92

09/02/2011 11:38:40 Página: 236 de 0

Page 237: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 2,31068 BDI 3,01868Mão-de-Obra 1,89400 Material 8,92000SubMO 4,20468

09.86.035 ELETRODUTO DE PVC DE 2" X 3,00 M PARA PROTECAO DE CABO DE COBRE NU UN 47,29

1.01.15 1,00000ELETRICISTA H 5,410005,411.01.16 1,00000AJUDANTE ELETRICISTA H 4,060004,064.25.06 3,00000ELETRODUTO PVC RIGIDO 60MM (2') M 17,430005,81

LS 11,55340 BDI 8,84428Mão-de-Obra 9,47000 Material 17,43000SubMO 21,02340

09.86.099 OUTROS SERVICOS DE PARA-RAIOS E ATERRAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

10.01.003 FORRO EM LAMINA PVC 100MM E=8A10MM ENTARUGAMENTO DE MADEIRA M2 75,24

1.01.11 0,95000CARPINTEIRO H 4,322504,551.01.12 0,95000AJUDANTE DE CARPINTEIRO H 3,762003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.65.61 0,05000PREGO GALVANIZADO 12X12 KG 0,458509,172.67.60 0,25000PREGO KG 1,142504,573.40.36 0,57000ARREMATES PARA FORRO LAMINAS PVC 100MM M 1,248302,193.40.37 1,00000FORRO LAMINA PVC 100MM E=8A10MM (SO LAMINA) COL M2 23,7500023,75

LS 9,86309 BDI 14,06954Mão-de-Obra 8,08450 Material 43,22430SubMO 17,94759

10.01.004 FORRO EM LAMINA PVC 100MM E=8A10MM SEMI-ENTARUGAMENTO DE MADEIRA M2 50,93

1.01.11 0,41000CARPINTEIRO H 1,865504,551.01.12 0,41000AJUDANTE DE CARPINTEIRO H 1,623603,962.10.17 1,62000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,387204,562.65.61 0,05000PREGO GALVANIZADO 12X12 KG 0,458509,172.67.60 0,18000PREGO KG 0,822604,573.40.36 0,57000ARREMATES PARA FORRO LAMINAS PVC 100MM M 1,248302,193.40.37 1,00000FORRO LAMINA PVC 100MM E=8A10MM (SO LAMINA) COL M2 23,7500023,75

LS 4,25670 BDI 9,52485Mão-de-Obra 3,48910 Material 33,66660SubMO 7,74580

10.01.006 FORRO EM LAMINA PVC 100MM E=8A10MM SUSTENTACAO METALICA - COLOCADO M2 42,43

3.40.35 1,00000FORRO LAMINA PVC 100MM E=8A10MM INCL SUST MET-COL M2 33,2500033,253.40.36 0,57000ARREMATES PARA FORRO LAMINAS PVC 100MM M 1,248302,19

LS 0,00000 BDI 7,93461Mão-de-Obra 0,00000 Material 34,49830SubMO 0,00000

10.01.007 FORRO EM LAMINA DE PVC 200MM E=8A12MM ENTARUGAMENTO DE MADEIRA M2 89,89

1.01.11 0,90000CARPINTEIRO H 4,095004,551.01.12 0,90000AJUDANTE DE CARPINTEIRO H 3,564003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.65.61 0,05000PREGO GALVANIZADO 12X12 KG 0,458509,172.67.60 0,25000PREGO KG 1,142504,573.40.28 0,57000ARREMATES PARA FORRO LAMINAS DE PVC 200MM M 1,316702,313.40.38 1,00000FORRO LAMINAS PVC 200MM E=15MM COLOCADO M2 36,5400036,54

LS 9,34398 BDI 16,80971Mão-de-Obra 7,65900 Material 56,08270SubMO 17,00298

10.01.008 FORRO EM LAMINA DE PVC 200MM E=8A12MM SEMI-ENTARUGAMENTO DE MADEIRA M2 66,17

1.01.11 0,39000CARPINTEIRO H 1,774504,551.01.12 0,39000AJUDANTE DE CARPINTEIRO H 1,544403,962.10.17 1,62000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,387204,562.65.61 0,04000PREGO GALVANIZADO 12X12 KG 0,366809,172.67.60 0,18000PREGO KG 0,822604,573.40.28 0,57000ARREMATES PARA FORRO LAMINAS DE PVC 200MM M 1,316702,313.40.38 1,00000FORRO LAMINAS PVC 200MM E=15MM COLOCADO M2 36,5400036,54

LS 4,04906 BDI 12,37429Mão-de-Obra 3,31890 Material 46,43330SubMO 7,36796

10.01.010 FORRO EM LAMINA DE PVC 200MM E=8A12MM SUSTENTACAO METALICA - COLOCADO M2 55,01

3.40.28 0,57000ARREMATES PARA FORRO LAMINAS DE PVC 200MM M 1,316702,313.40.39 1,00000FORRO LAMINAS PVC 200MM E=15MM INCL SUST MET COLOC M2 43,4100043,41

LS 0,00000 BDI 10,28714Mão-de-Obra 0,00000 Material 44,72670SubMO 0,00000

10.01.011 FORRO TIPO FIBRAROC COM PERFIL CARTOLA - PROJ.MOD.81 M2 74,73

1.01.11 0,02800CARPINTEIRO H 0,127404,551.01.12 0,02800AJUDANTE DE CARPINTEIRO H 0,110883,962.10.05 0,00060MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 0,837411.395,692.50.13 0,03900FERRAGEM P/MADEIRAMENTO DE TELHADOS KG 0,5171413,263.40.31 1,00000FORRO FIBRAROC 50X125CM COLOCADO M2 58,8800058,88

LS 0,29070 BDI 13,97561Mão-de-Obra 0,23828 Material 60,23455SubMO 0,52898

10.01.013 FORRO DE PLACA MINERAL (625X625X13)MM INCL PERFIS FORN/INST. M2 55,17

3.40.32 1,00000FORN INST FORRO PLACA MINERAL (625X625X13)MM PERF. M2 44,8600044,86

LS 0,00000 BDI 10,31780Mão-de-Obra 0,00000 Material 44,86000SubMO 0,00000

09/02/2011 11:38:40 Página: 237 de 0

Page 238: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

10.01.014 FORRO DE PLACA MINERAL (1250X625X13)MM INCLUSIVE PERFIS FORNEC/INSTAL. M2 53,71

3.40.33 1,00000FORNEC.E INST. PLACA MINERAL (1250X625X13)MM PERFIL M2 43,6700043,67

LS 0,00000 BDI 10,04410Mão-de-Obra 0,00000 Material 43,67000SubMO 0,00000

10.01.020 FORRO DE TABUA APAR CUMARU/ANGELIM 10X1CM M/F SEMI ENTARUGADO M2 92,84

1.01.11 0,66000CARPINTEIRO H 3,003004,551.01.12 0,66000AJUDANTE DE CARPINTEIRO H 2,613603,962.10.17 1,62000SARRAFO PINHO APARELHADO 10X2,5 CM M 7,387204,562.67.60 0,18000PREGO KG 0,822604,573.40.42 1,10000TABUA APARELHADA CUMARU/ANGELIM M/F 10X1CM M2 54,8020049,82

LS 6,85225 BDI 17,36055Mão-de-Obra 5,61660 Material 63,01180SubMO 12,46885

10.01.021 FORRO DE TABUAS APAR CUMARU/ANGELIM 10X1CM M/F ENTARUGADO M2 117,14

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.67.60 0,25000PREGO KG 1,142504,573.40.42 1,10000TABUA APARELHADA CUMARU/ANGELIM M/F 10X1CM M2 54,8020049,82

LS 12,45864 BDI 21,90523Mão-de-Obra 10,21200 Material 72,56950SubMO 22,67064

10.01.027 FORRO DE TABUAS APAR CEDRINHO CERNE M/F C/CUPINICIDA SEMI ENTARUGADO M2 76,17

1.01.11 0,66000CARPINTEIRO H 3,003004,551.01.12 0,66600AJUDANTE DE CARPINTEIRO H 2,637363,962.11.04 1,10000TABUA DE CEDRINHO CERNE MACHO FEMEA 10X1CM P/FORRO M2 40,9640037,242.11.20 1,62000SARRAFO BRUTO DE CEDRINHO 10X2,5CM M 5,005803,092.11.40 0,60000ARREMATE MEIA CANA EM CEDRINHO 2X2CM M 1,284002,142.67.60 0,18000PREGO KG 0,822604,573.80.59 0,30000TRATAMENTO CUPINICIDA PARA MADEIRA L 1,332004,44

LS 6,88124 BDI 14,24390Mão-de-Obra 5,64036 Material 49,40840SubMO 12,52160

10.01.028 FORRO DE TABUAS APAR CEDRINHO CERNE M/F C/CUPINICIDA ENTARUGADO M2 97,53

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.11.04 1,10000TABUA DE CEDRINHO CERNE MACHO FEMEA 10X1CM P/FORRO M2 40,9640037,242.11.20 2,50000SARRAFO BRUTO DE CEDRINHO 10X2,5CM M 7,725003,092.11.21 2,50000SARRAFO BRUTO DE CEDRINHO 5X2,5CM M 4,175001,672.11.40 0,60000ARREMATE MEIA CANA EM CEDRINHO 2X2CM M 1,284002,142.67.60 0,25000PREGO KG 1,142504,573.80.59 0,30000TRATAMENTO CUPINICIDA PARA MADEIRA L 1,332004,44

LS 12,45864 BDI 18,23742Mão-de-Obra 10,21200 Material 56,62250SubMO 22,67064

10.01.037 FORRO DE RIPAS 5X1CM EM XADREZ CEDRINHO CERNE C/ CUPINICIDA M2 101,59

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,50000AJUDANTE DE CARPINTEIRO H 5,940003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.10.63 22,00000RIPA CEDRINHO CERNE APARELHADA 5X1CM M 37,180001,692.67.60 0,25000PREGO KG 1,142504,573.80.59 0,30000TRATAMENTO CUPINICIDA PARA MADEIRA L 1,332004,44

LS 14,46310 BDI 18,99745Mão-de-Obra 11,85500 Material 56,27950SubMO 26,31810

10.01.038 FORRO DE RIPAS 5X1CM EM XADREZ ANGELIM M2 128,91

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.10.64 22,00000RIPA ANGELIM APARELHADA 5X1CM M 62,480002,842.67.60 0,25000PREGO KG 1,142504,57

LS 13,49686 BDI 24,10569Mão-de-Obra 11,06300 Material 80,24750SubMO 24,55986

10.01.045 FORRO C/CHAPA FIBRA MADEIRA PRENSADA DURA LISA 3MM M2 63,47

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.14 1,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 3,762002,092.10.17 3,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 15,960004,562.35.51 1,05000CHAPA FIB MAD PRENS DURA LISA (1.22X2.75M) E= 3MM M2 8,074507,692.67.60 0,25000PREGO KG 1,142504,57

LS 12,45864 BDI 11,87022Mão-de-Obra 10,21200 Material 28,93900SubMO 22,67064

10.01.046 FORRO C/CHAPA FIBRA MADEIRA PRENSADA ISOLANTE 12MM M2 65,17

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.14 1,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 3,762002,092.10.17 3,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 15,960004,562.35.53 1,05000CHAPA FIBRA (MAD PRENS ISOLANTE (60X60CM)-ESP 12MM M2 9,450009,00

09/02/2011 11:38:40 Página: 238 de 0

Page 239: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.60 0,25000PREGO KG 1,142504,57

LS 12,45864 BDI 12,18658Mão-de-Obra 10,21200 Material 30,31450SubMO 22,67064

10.01.047 FORRO C/CHAPA FIBRA MADEIRA PRENSADA ISOLANTE TERMO-ACUSTICAS M2 76,02

1.01.11 1,20000CARPINTEIRO H 5,460004,551.01.12 1,20000AJUDANTE DE CARPINTEIRO H 4,752003,962.10.14 1,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 3,762002,092.10.17 3,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 15,960004,562.35.52 1,05000CHAPA FIB (MAD PRENS ISOL TER ACUST(30X30CM)-E19MM M2 18,2700017,402.67.60 0,25000PREGO KG 1,142504,57

LS 12,45864 BDI 14,21518Mão-de-Obra 10,21200 Material 39,13450SubMO 22,67064

10.01.049 FORRO DE GESSO ACARTONADO INCL ESTRUTURA M2 49,54

3.40.60 1,00000FORRO GESSO ACARTONADO FORN COLOCADO INCL ESTRUTUR M2 40,2800040,28

LS 0,00000 BDI 9,26440Mão-de-Obra 0,00000 Material 40,28000SubMO 0,00000

10.01.050 FORRO DE PLACA DE GESSO QUADRICULADA M2 33,11

3.40.56 1,00000FORRO PLACA DE GESSO COM COLOCACAO M2 26,9200026,92

LS 0,00000 BDI 6,19160Mão-de-Obra 0,00000 Material 26,92000SubMO 0,00000

10.01.051 FORRO DE PLACA DE GESSO COM FUROS SIMETRICOS M2 33,11

3.40.56 1,00000FORRO PLACA DE GESSO COM COLOCACAO M2 26,9200026,92

LS 0,00000 BDI 6,19160Mão-de-Obra 0,00000 Material 26,92000SubMO 0,00000

10.01.052 FORRO DE PLACA DE GESSO COM FUROS ASSIMETRICOS M2 33,11

3.40.56 1,00000FORRO PLACA DE GESSO COM COLOCACAO M2 26,9200026,92

LS 0,00000 BDI 6,19160Mão-de-Obra 0,00000 Material 26,92000SubMO 0,00000

10.01.053 FORRO DE PLACA DE GESSO C/ISOLACAO TERMO-ACUSTICA-QUADRICULADAS M2 59,45

3.40.55 1,00000FORRO PLACA GESSO COM ISOLAM TERMO-ACUST M2 48,3400048,34

LS 0,00000 BDI 11,11820Mão-de-Obra 0,00000 Material 48,34000SubMO 0,00000

10.01.054 FORRO DE PLACA DE GESSO C/ISOLACAO TERMO-ACUSTICA-FUROS SIMETRICOS M2 59,45

3.40.55 1,00000FORRO PLACA GESSO COM ISOLAM TERMO-ACUST M2 48,3400048,34

LS 0,00000 BDI 11,11820Mão-de-Obra 0,00000 Material 48,34000SubMO 0,00000

10.01.055 FORRO DE PLACA DE GESSO C/ISOLACAO TERMO-ACUSTICA-FUROS ASSIMETRICO M2 59,45

3.40.55 1,00000FORRO PLACA GESSO COM ISOLAM TERMO-ACUST M2 48,3400048,34

LS 0,00000 BDI 11,11820Mão-de-Obra 0,00000 Material 48,34000SubMO 0,00000

10.01.056 ESTRUTURA DE ALUMINIO PARA APLICACAO DE FORRO DE GESSO M2 16,83

3.13.93 1,00000ESTRUTURA METALICA P/FORRO DE GESSO M2 13,6900013,69

LS 0,00000 BDI 3,14870Mão-de-Obra 0,00000 Material 13,69000SubMO 0,00000

10.01.057 FORRO DE PLACA DE GESSO REMOVIVEL M2 45,76

3.40.26 1,00000FORRO DE PLACA DE GESSO REMOVIVEL M2 37,2100037,21

LS 0,00000 BDI 8,55830Mão-de-Obra 0,00000 Material 37,21000SubMO 0,00000

10.01.058 ISOLACAO TERMOACUSTICA - LA DE VIDRO ESP 1" M2 14,89

1.01.46 0,20000SERVENTE H 0,762003,812.45.70 1,00000LA VIDRO ESP. 1" P/ISOLAMENTO M2 10,4200010,42

LS 0,92964 BDI 2,78568Mão-de-Obra 0,76200 Material 10,42000SubMO 1,69164

10.01.059 ISOLACAO TERMOACUSTICA - LA DE VIDRO E=2" M2 19,85

1.01.46 0,20000SERVENTE H 0,762003,812.45.03 1,00000ISOLACAO TERMOACUSTICA - LA DE VIDRO E=2" M2 14,4500014,45

LS 0,92964 BDI 3,71258Mão-de-Obra 0,76200 Material 14,45000SubMO 1,69164

10.01.060 ISOLACAO TERMICA - CHAPA DE ISOPOR E=30MM M2 8,33

1.01.46 0,05000SERVENTE H 0,190503,812.45.14 1,05000ISOLACAO TERMICA - CHAPA DE ISOPOR E=30MM M2 6,352506,05

LS 0,23241 BDI 1,55834Mão-de-Obra 0,19050 Material 6,35250SubMO 0,42291

10.01.061 ISOLACAO TERMOACUSTICA - LA DE ROCHA E=2`` M2 18,71

1.01.46 0,20000SERVENTE H 0,762003,812.45.04 1,00000ISOLACAO TERMOACUS-LA DE ROCHA DENSID 32 KG/M3 E=2 M2 13,5200013,52

LS 0,92964 BDI 3,49868Mão-de-Obra 0,76200 Material 13,52000SubMO 1,69164

10.01.099 FORROS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

10.50.001 DE FORRO DE ESTUQUE OU MADEIRA, INCLUSIVE ENTARUGAMENTO M2 1,66

1.01.46 0,16000SERVENTE H 0,609603,81

09/02/2011 11:38:40 Página: 239 de 0

Page 240: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,74371 BDI 0,31126Mão-de-Obra 0,60960 Material 0,00000SubMO 1,35331

10.50.002 DE FORROS DE MADEIRA, EXCLUSIVE ENTARUGAMENTO M2 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

10.50.003 DE FORRO EM GESSO M2 2,28

1.01.46 0,22000SERVENTE H 0,838203,81

LS 1,02260 BDI 0,42799Mão-de-Obra 0,83820 Material 0,00000SubMO 1,86080

10.50.004 DE ENTARUGAMENTO M2 0,83

1.01.46 0,08000SERVENTE H 0,304803,81

LS 0,37186 BDI 0,15563Mão-de-Obra 0,30480 Material 0,00000SubMO 0,67666

10.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

10.60.001 DE FORROS DE MADEIRA PREGADOS (PLACAS OU TABUAS) M2 6,50

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.12 0,28000AJUDANTE DE CARPINTEIRO H 1,108803,96

LS 2,90702 BDI 1,21666Mão-de-Obra 2,38280 Material 0,00000SubMO 5,28982

10.60.002 DE FORROS EM PLACAS APOIADAS M2 3,48

1.01.11 0,15000CARPINTEIRO H 0,682504,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,96

LS 1,55733 BDI 0,65178Mão-de-Obra 1,27650 Material 0,00000SubMO 2,83383

10.60.005 RETIRADA DE FORRO DE PVC EM LAMINAS M2 6,50

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.12 0,28000AJUDANTE DE CARPINTEIRO H 1,108803,96

LS 2,90702 BDI 1,21666Mão-de-Obra 2,38280 Material 0,00000SubMO 5,28982

10.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

10.70.001 DE FORRO DE MADEIRA PREGADO (PLACAS OU TABUAS) M2 7,42

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.67.60 0,08000PREGO KG 0,365604,57

LS 3,11466 BDI 1,38765Mão-de-Obra 2,55300 Material 0,36560SubMO 5,66766

10.70.002 DE FORRO EM PLACAS APOIADAS M2 3,48

1.01.11 0,15000CARPINTEIRO H 0,682504,551.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,96

LS 1,55733 BDI 0,65178Mão-de-Obra 1,27650 Material 0,00000SubMO 2,83383

10.70.005 RECOLOCACAO DE FORRO DE PVC EM LAMINAS M2 6,50

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.12 0,28000AJUDANTE DE CARPINTEIRO H 1,108803,96

LS 2,90702 BDI 1,21666Mão-de-Obra 2,38280 Material 0,00000SubMO 5,28982

10.70.099 RECOLOCACOES DE FORROS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

10.80.002 FORRO DE RIPAS DE PEROBA APARELHADA DE 5 X 1 CM - EM XADRES M2 112,40

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.10.60 22,00000RIPA DE PEROBA 1X5CM M 49,060002,232.67.60 0,25000PREGO KG 1,142504,57

LS 13,49686 BDI 21,01909Mão-de-Obra 11,06300 Material 66,82750SubMO 24,55986

10.80.003 FORRO DE RIPAS DE PINHO APARELHADA DE 5 X 1 CM-EM XADRES M2 89,67

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,962.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.67.60 0,25000PREGO KG 1,142504,573.40.40 22,00000RIPA PINHO APARELHADA 5X1CM P/FORRO M 30,580001,39

LS 13,49686 BDI 16,76869Mão-de-Obra 11,06300 Material 48,34750SubMO 24,55986

09/02/2011 11:38:40 Página: 240 de 0

Page 241: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

10.80.005 FORRO EM LAMINA PVC - 100MM - SOMENTE LAMINAS M2 30,74

3.40.36 0,57000ARREMATES PARA FORRO LAMINAS PVC 100MM M 1,248302,193.40.37 1,00000FORRO LAMINA PVC 100MM E=8A10MM (SO LAMINA) COL M2 23,7500023,75

LS 0,00000 BDI 5,74961Mão-de-Obra 0,00000 Material 24,99830SubMO 0,00000

10.80.010 FORRO DE ESTUQUE M2 97,91

1.01.11 0,80000CARPINTEIRO H 3,640004,551.01.12 0,80000AJUDANTE DE CARPINTEIRO H 3,168003,961.01.39 1,70000PEDREIRO H 7,905004,651.01.46 2,40000SERVENTE H 9,144003,812.05.03 0,04000AREIA M3 3,1680079,202.05.05 7,60000CAL HIDRATADA KG 2,584000,342.05.08 4,39000CIMENTO KG 1,624300,372.10.14 2,50000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,225002,092.10.17 2,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 11,400004,562.67.60 0,20000PREGO KG 0,914004,572.80.03 1,10000TELA PARA ESTUQUE M2 1,727001,57

LS 29,10554 BDI 18,30911Mão-de-Obra 23,85700 Material 26,64230SubMO 52,96254

10.80.016 PLACAS PARA FORROS ISOLANTES BISOTADO DE 12 MM M2 19,29

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.12 0,25000AJUDANTE DE CARPINTEIRO H 0,990003,963.40.27 1,05000PLACA P/FORRO ISOL BISOTADO 12MM M2 10,9620010,44

LS 2,59555 BDI 3,60756Mão-de-Obra 2,12750 Material 10,96200SubMO 4,72305

10.80.017 PLACAS DE MADEIRA MINERALIZADA M2 23,68

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,963.40.14 1,05000CHAPA MAD MINERALIZADA S/PINTURA M2 15,4770014,74

LS 2,07644 BDI 4,42875Mão-de-Obra 1,70200 Material 15,47700SubMO 3,77844

10.80.018 PERFIL DE FERRO SECCAO CARTOLA EM CHAPA N 20 P/SUST DE FORRO M 12,31

1.01.11 0,24000CARPINTEIRO H 1,092004,551.01.12 0,24000AJUDANTE DE CARPINTEIRO H 0,950403,962.65.88 1,05000PERFIL METALICO SECCAO CARTOLA PARA FORRO M 5,481005,22

LS 2,49173 BDI 2,30348Mão-de-Obra 2,04240 Material 5,48100SubMO 4,53413

10.80.020 TABUAS DE PINHO DE 10 X 1 CM TIPO MACHO-FEMEA PARA FORRO M2 51,20

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.67.60 0,08000PREGO KG 0,365604,573.40.41 1,10000TABUA PINHO MACHO-FEMEA 1X10CM-FORRO M2 35,5960032,36

LS 3,11466 BDI 9,57473Mão-de-Obra 2,55300 Material 35,96160SubMO 5,66766

10.80.022 TABUAS DE PEROBA DE 10X1CM TIPO MACHO/FEMEA PARA FORROS M2 70,71

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.67.60 0,08000PREGO KG 0,365604,573.55.13 1,10000TABUA DE PEROBA 10X1CM TIPO MACHO/FEMEA M2 51,4580046,78

LS 3,11466 BDI 13,22299Mão-de-Obra 2,55300 Material 51,82360SubMO 5,66766

10.80.029 TABUAS DE CEDRINHO CERNE MACHO FEMEA 10X1CM TRATADO C/CUPINICIDA M2 61,02

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.11.04 1,10000TABUA DE CEDRINHO CERNE MACHO FEMEA 10X1CM P/FORRO M2 40,9640037,242.11.40 0,60000ARREMATE MEIA CANA EM CEDRINHO 2X2CM M 1,284002,142.67.60 0,08000PREGO KG 0,365604,573.80.59 0,30000TRATAMENTO CUPINICIDA PARA MADEIRA L 1,332004,44

LS 3,11466 BDI 11,41105Mão-de-Obra 2,55300 Material 43,94560SubMO 5,66766

10.80.030 REPREGAMENTO DE FORROS DE MADEIRA M2 2,70

1.01.11 0,20000CARPINTEIRO H 0,910004,552.67.60 0,04000PREGO KG 0,182804,57

LS 1,11020 BDI 0,50669Mão-de-Obra 0,91000 Material 0,18280SubMO 2,02020

10.80.035 PERFIL DE FERRO PARA REFORCO DE FORRO, INCLUSIVE SOLDA KG 4,58

2.50.15 1,00000ESTRUT METAL-FORN,COLOC,ANTI-FERRUG KG 3,730003,73

LS 0,00000 BDI 0,85790Mão-de-Obra 0,00000 Material 3,73000SubMO 0,00000

10.80.037 ENTARUGAMENTO PARA FORROS EM CHAPAS DE FIBRA DE MADEIRA PRENSADA M2 47,73

1.01.11 0,95000CARPINTEIRO H 4,322504,551.01.12 0,95000AJUDANTE DE CARPINTEIRO H 3,762003,962.10.14 1,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 3,762002,092.10.17 3,50000SARRAFO PINHO APARELHADO 10X2,5 CM M 15,960004,562.67.60 0,25000PREGO KG 1,142504,57

09/02/2011 11:38:40 Página: 241 de 0

Page 242: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 9,86309 BDI 8,92678Mão-de-Obra 8,08450 Material 20,86450SubMO 17,94759

10.80.099 SERVICOS EM FORROS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.01.001IMPERMEABILIZACAO DE SUB-SOLOS C/ARG CIM-AREIA 1:3 CONTENDOHIDROFUGO

M2 35,36

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,25000SERVENTE H 4,762503,812.05.03 0,02400AREIA M3 1,9008079,202.05.08 11,27000CIMENTO KG 4,169900,372.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 12,05055 BDI 6,61290Mão-de-Obra 9,87750 Material 6,82370SubMO 21,92805

11.01.002 IMPERMEABILIZACAO DE SUB-SOLOS C/ARG CIM-AREIA 1:3 HIDR TINTA BETUM M2 45,30

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,45000SERVENTE H 5,524503,812.05.03 0,02400AREIA M3 1,9008079,202.05.08 11,27000CIMENTO KG 4,169900,372.40.56 1,00000TINTA BETUMINOSA L 6,390006,392.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 12,98019 BDI 8,47168Mão-de-Obra 10,63950 Material 13,21370SubMO 23,61969

11.01.003 IMPERMEABILIZACAO POR CRISTALIZACAO - SUB SOLOS M2 8,49

1.01.39 0,10000PEDREIRO H 0,465004,652.40.09 3,00000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 4,290001,432.40.10 0,15000EMULSAO ADESIVA PVA KG 1,5855010,57

LS 0,56730 BDI 1,58879Mão-de-Obra 0,46500 Material 5,87550SubMO 1,03230

11.01.010 IMPERMEAB C/ ARGAM POLIMERICA P/ CORTINAS E POCOS DE ELEV - 4 DEMAOS M2 14,19

1.01.87 0,25000APLICADOR H 1,147504,591.01.88 0,25000AJUDANTE DE APLICADOR H 0,987503,952.40.76 4,00000IMPERM ARGAMASSA POLIMERICA KG 6,800001,70

LS 2,60470 BDI 2,65413Mão-de-Obra 2,13500 Material 6,80000SubMO 4,73970

11.01.099 IMPERMEABILIZACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.02.022 IMPERMEABILIZACAO MULTIMEMBRANAS ASFALTICAS - FELTRO ASFALTO M2 102,15

2.40.78 1,00000IMPERM MULTIMENBR ASFALT FELTRO ASFALTO-APLICADA M2 83,0500083,05

LS 0,00000 BDI 19,10150Mão-de-Obra 0,00000 Material 83,05000SubMO 0,00000

11.02.023 IMPERMEABILIZACAO COM MANTA ELASTOMERICA BUTILICA OU EPDM M2 138,07

2.40.62 1,00000IMPERM MANTA ELASTOMER 0,8MM BUTIL/EPDM-APLICADA M2 112,26000112,26

LS 0,00000 BDI 25,81980Mão-de-Obra 0,00000 Material 112,26000SubMO 0,00000

11.02.024 IMPERMEABILIZACAO COM MANTA ASFALTICA PRE FABRICADA 4MM M2 88,44

2.40.75 1,00000IMPERM MANTA ASFALTICA PRE-FABRICADA 4MM-APLICADA M2 71,9100071,91

LS 0,00000 BDI 16,53930Mão-de-Obra 0,00000 Material 71,91000SubMO 0,00000

11.02.025 IMPERMEABILIZACAO COM MANTA ASFALTICA PRE FABRICADA 4MM - ACAB AREIA M2 92,38

2.40.88 1,00000IMPERM MANTA ASFALT PRE-FABR 4MM,ACAB AREIA-APLIC M2 75,1100075,11

LS 0,00000 BDI 17,27530Mão-de-Obra 0,00000 Material 75,11000SubMO 0,00000

11.02.026 IMPERM C/ EMULSAO ACRILICA ESTRUT C/ VEU DE POLIESTER-6 DEMAOS / 2 EST M2 35,29

1.01.87 0,38000APLICADOR H 1,744204,591.01.88 0,38000AJUDANTE DE APLICADOR H 1,501003,952.40.27 2,00000VEU DE POLIESTER M2 6,020003,012.40.98 1,88000IMPERMEABILIZANTE FLEXIVEL DE BASE ACRILICA KG 15,472408,23

LS 3,95914 BDI 6,60025Mão-de-Obra 3,24520 Material 21,49240SubMO 7,20434

11.02.027 IMPERMEABILIZACAO C/ EMULSAO ACRILICA - 6 DEMAOS M2 27,89

1.01.87 0,38000APLICADOR H 1,744204,591.01.88 0,38000AJUDANTE DE APLICADOR H 1,501003,952.40.98 1,88000IMPERMEABILIZANTE FLEXIVEL DE BASE ACRILICA KG 15,472408,23

LS 3,95914 BDI 5,21565Mão-de-Obra 3,24520 Material 15,47240SubMO 7,20434

11.02.028 IMPERMEABILIZACAO EMULSAO ASFALTICA ELASTOMERICA 4 DEMAOS M2 21,74

1.01.87 0,30000APLICADOR H 1,377004,591.01.88 0,30000AJUDANTE DE APLICADOR H 1,185003,952.40.25 0,60000TINTA PRIMER SOLUCAO ASFALTICA L 4,194006,992.40.77 1,25000IMPERM EMULSAO ASFALTICA ELASTOMERICA KG 7,800006,24

LS 3,12564 BDI 4,06678Mão-de-Obra 2,56200 Material 11,99400SubMO 5,68764

09/02/2011 11:38:40 Página: 242 de 0

Page 243: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

11.02.029IMPERM EMULSAO ASFALT ELASTOMERICA ESTRUT VEU POLIESTER 6 DEMAOS/2EST

M2 37,01

1.01.87 0,43000APLICADOR H 1,973704,591.01.88 0,43000AJUDANTE DE APLICADOR H 1,698503,952.40.25 0,60000TINTA PRIMER SOLUCAO ASFALTICA L 4,194006,992.40.27 2,00000VEU DE POLIESTER M2 6,020003,012.40.77 1,88000IMPERM EMULSAO ASFALTICA ELASTOMERICA KG 11,731206,24

LS 4,48008 BDI 6,92242Mão-de-Obra 3,67220 Material 21,94520SubMO 8,15228

11.02.030 PINTURA C/ TINTA ALUMINIO PARA PROTECAO DA IMPERMEABILIZACAO-3 DEMAOS M2 43,09

1.01.87 0,20000APLICADOR H 0,918004,591.01.88 0,20000AJUDANTE DE APLICADOR H 0,790003,952.40.24 1,20000TINTA ALUMINIO BASE ASFALTICA L 31,2480026,04

LS 2,08376 BDI 8,05914Mão-de-Obra 1,70800 Material 31,24800SubMO 3,79176

11.02.031 PINTURA C/ EMULSAO ACRILICA - 3 DEMAOS M2 14,17

1.01.87 0,20000APLICADOR H 0,918004,591.01.88 0,20000AJUDANTE DE APLICADOR H 0,790003,952.40.98 0,94000IMPERMEABILIZANTE FLEXIVEL DE BASE ACRILICA KG 7,736208,23

LS 2,08376 BDI 2,65143Mão-de-Obra 1,70800 Material 7,73620SubMO 3,79176

11.02.035 IMPERMEAB C/ MANTA ASF PRE-FABR 4MM ACAB ALUMIN SEM PROT MECANICA M2 91,31

2.40.74 1,00000MANTA ASFALTICA PRE-FABRICADA ALUM 4MM FORN/APLIC M2 74,2400074,24

LS 0,00000 BDI 17,07520Mão-de-Obra 0,00000 Material 74,24000SubMO 0,00000

11.02.050 ISOLACAO TERMOACUSTICA - LA DE VIDRO ESP 1" M2 14,89

1.01.46 0,20000SERVENTE H 0,762003,812.45.70 1,00000LA VIDRO ESP. 1" P/ISOLAMENTO M2 10,4200010,42

LS 0,92964 BDI 2,78568Mão-de-Obra 0,76200 Material 10,42000SubMO 1,69164

11.02.052 ISOLAMENTO TERMICO COM ESPUMA DE POLIURETANO ESPESSURA DE 3 CM M2 34,52

1.01.87 0,20000APLICADOR H 0,918004,592.45.56 1,00000ESPUMA POLIURETANO ESP 3CM P/ISOLAMENTO M2 26,0300026,03

LS 1,11996 BDI 6,45563Mão-de-Obra 0,91800 Material 26,03000SubMO 2,03796

11.02.053 ISOLAMENTO TERMICO COM TIJOLOS CERAMICOS FURADOS ESPESSURA DE 10 CM M2 23,03

1.01.39 0,10000PEDREIRO H 0,465004,651.01.46 0,40000SERVENTE H 1,524003,812.25.16 27,00000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 14,310000,53

LS 2,42658 BDI 4,30688Mão-de-Obra 1,98900 Material 14,31000SubMO 4,41558

11.02.054 ISOLAMENTO TERMICO COM CAMADAS DE ARGILA EXPANDIDA M3 289,78

1.01.46 2,00000SERVENTE H 7,620003,812.45.02 1,00000ARGILA EXPANDIDA M3 218,68000218,68

LS 9,29640 BDI 54,18717Mão-de-Obra 7,62000 Material 218,68000SubMO 16,91640

11.02.055 FORNEC E COLOCACAO DE ISOPOR P/ TRATAMENTO ACUSTICO ENTRE LAJES M3 271,42

1.01.46 0,20000SERVENTE H 0,762003,812.45.15 1,00000ISOPOR PARA ISOLACAO ACUSTICA M3 218,98000218,98

LS 0,92964 BDI 50,75448Mão-de-Obra 0,76200 Material 218,98000SubMO 1,69164

11.02.061 PROTECAO TERMO-MECANICA C/LAJOTAS CERAM VERM INCL ARGAM ASSENT M2 70,46

1.01.28 1,50000LADRILHISTA H 7,575005,051.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 10,63000CIMENTO KG 3,933100,373.45.09 1,05000LAJOTAS CERAM VERM P/PROTEC TERMO-MECAN M2 25,1265023,93

LS 14,12211 BDI 13,17707Mão-de-Obra 11,57550 Material 31,59400SubMO 25,69761

11.02.062 PROTECAO TERMO-MECANICA C/LADR HIDRAUL 1 COR INCL ARGAM ASSENT M2 79,27

1.01.28 1,50000LADRILHISTA H 7,575005,051.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 10,63000CIMENTO KG 3,933100,373.65.19 1,05000LADRILHO HIDRAULICO 20X20CM 1 COR M2 32,2875030,75

LS 14,12211 BDI 14,82410Mão-de-Obra 11,57550 Material 38,75500SubMO 25,69761

11.02.064 REGULARIZACAO DE SUPERFICIE P/ PREPARO IMPERM 1:3 E=2,5CM M2 19,85

1.01.39 0,41650PEDREIRO H 1,936734,651.01.46 0,66650SERVENTE H 2,539373,812.05.03 0,02630AREIA M3 2,0829679,202.05.08 11,15000CIMENTO KG 4,125500,37

LS 5,46083 BDI 3,71344Mão-de-Obra 4,47609 Material 6,20846SubMO 9,93692

11.02.065 ARGAMASSA P/ PROT MECANICA EM SUPERFICIE IMPERM TRACO 1:7 E=3CM M2 14,11

09/02/2011 11:38:40 Página: 243 de 0

Page 244: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,02600AREIA M3 2,0592079,202.05.08 2,50000CIMENTO KG 0,925000,372.40.31 1,15000PAPEL KRAFT BETUMADO M2 0,839500,73

LS 4,20717 BDI 2,64025Mão-de-Obra 3,44850 Material 3,82370SubMO 7,65567

11.02.099 IMPERMEABILIZACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.03.001 COM ARGAMASSA CIM AREIA 1:3 COM HIDROFUGO (APLICACAO INTERNA) M2 35,36

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,25000SERVENTE H 4,762503,812.05.03 0,02400AREIA M3 1,9008079,202.05.08 11,27000CIMENTO KG 4,169900,372.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 12,05055 BDI 6,61290Mão-de-Obra 9,87750 Material 6,82370SubMO 21,92805

11.03.002 COM ARGAMASSA CIM AREIA 1:3 COM HIDROFUGO E TINTA BET (APLIC INTERNA) M2 45,30

1.01.39 1,10000PEDREIRO H 5,115004,651.01.46 1,45000SERVENTE H 5,524503,812.05.03 0,02400AREIA M3 1,9008079,202.05.08 11,27000CIMENTO KG 4,169900,372.40.56 1,00000TINTA BETUMINOSA L 6,390006,392.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 12,98019 BDI 8,47168Mão-de-Obra 10,63950 Material 13,21370SubMO 23,61969

11.03.003 IMPERMEABILIZACAO ARGAMASA POLIMERICA P/ RESEVATORIO - 4 DEMAOS M2 14,19

1.01.87 0,25000APLICADOR H 1,147504,591.01.88 0,25000AJUDANTE DE APLICADOR H 0,987503,952.40.76 4,00000IMPERM ARGAMASSA POLIMERICA KG 6,800001,70

LS 2,60470 BDI 2,65413Mão-de-Obra 2,13500 Material 6,80000SubMO 4,73970

11.03.004 IMPERMEABILIZACAO POR CRISTALIZACAO - RESERVATORIOS ENTERRADOS M2 8,49

1.01.39 0,10000PEDREIRO H 0,465004,652.40.09 3,00000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 4,290001,432.40.10 0,15000EMULSAO ADESIVA PVA KG 1,5855010,57

LS 0,56730 BDI 1,58879Mão-de-Obra 0,46500 Material 5,87550SubMO 1,03230

11.03.010 COM TINTA BETUMINOSA (APLICACAO EXTERNA) M2 6,53

1.01.46 0,25000SERVENTE H 0,952503,812.40.56 0,50000TINTA BETUMINOSA L 3,195006,39

LS 1,16205 BDI 1,22120Mão-de-Obra 0,95250 Material 3,19500SubMO 2,11455

11.03.099 IMPERMEABILIZACOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.04.001 JUNTAS DE DILATACAO EM CHAPA DE COBRE N 26 M 112,91

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,30000SERVENTE H 1,143003,812.67.60 0,05000PREGO KG 0,228504,572.80.03 0,50000TELA PARA ESTUQUE M2 0,785001,572.81.01 1,05000CHAPA DE COBRE NUM 26 X 30CM P/JUNT DIL M 82,0575078,15

LS 4,79826 BDI 21,11452Mão-de-Obra 3,93300 Material 83,07100SubMO 8,73126

11.04.002 JUNTAS DE DILATACAO FUGENBAND ELASTICO PERFIL 0-12 M 39,87

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,30000SERVENTE H 1,143003,813.60.25 1,00000JUNTA DILATACAO FUGEMBAND 120MM M 23,6900023,69

LS 4,79826 BDI 7,45689Mão-de-Obra 3,93300 Material 23,69000SubMO 8,73126

11.04.003 JUNTAS DE DILATACAO FUGENBANB ELASTICO PERFIL 0-22 M 59,01

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,30000SERVENTE H 1,143003,813.60.27 1,00000JUNTA DILATACAO FUGEMBAND 220MM M 39,2500039,25

LS 4,79826 BDI 11,03569Mão-de-Obra 3,93300 Material 39,25000SubMO 8,73126

11.04.004 JUNTAS DE DILATACAO/MASTIQUE ELASTICO OU POLIURETANO C3 0,14

1.01.87 0,00300APLICADOR H 0,013774,592.80.65 1,00000MASTIQUE ELASTICO POLIURETANO P/JUNTAS C3 0,090000,09

LS 0,01680 BDI 0,02773Mão-de-Obra 0,01377 Material 0,09000SubMO 0,03057

11.04.010 MANGUEIRA PLASTICA FLEXIVEL PARA JUNTA DE DILATACAO M 6,18

09/02/2011 11:38:40 Página: 244 de 0

Page 245: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,10000SERVENTE H 0,381003,816.70.21 1,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 2,120002,12

LS 1,59942 BDI 1,15700Mão-de-Obra 1,31100 Material 2,12000SubMO 2,91042

11.04.012 ISOPOR PARA SUPORTE DE MASTIQUE M 3,84

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,10000SERVENTE H 0,381003,812.45.13 0,05000ISOPOR ESP= 20 MM M2 0,216504,33

LS 1,59942 BDI 0,71919Mão-de-Obra 1,31100 Material 0,21650SubMO 2,91042

11.04.021 JUNTA ELASTICA ESTRUTURAL NEOPRENE (REF 2020F) INCLUSIVE LIMPEZA M 127,05

3.60.28 1,00000JUNTA ELAST ESTR NEOPRENE-REF JJ2020F EPDM APLIC M 103,30000103,30

LS 0,00000 BDI 23,75900Mão-de-Obra 0,00000 Material 103,30000SubMO 0,00000

11.04.022 JUNTA ELASTICA ESTRUTURAL NEOPRENE (REF 2027M) INCLUSIVE LIMPEZA M 114,32

3.60.24 1,00000JUNTA ELAST ESTR NEOPRENE-REF JJ2027M EPDM APLIC M 92,9500092,95

LS 0,00000 BDI 21,37850Mão-de-Obra 0,00000 Material 92,95000SubMO 0,00000

11.04.030 PERFIL DE ALUMINIO DE 1"X1"X1/8" M 25,41

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,812.65.98 1,00000PERFIL ALUMINIO 1'X1'X1/8' M 5,640005,64

LS 8,25696 BDI 4,75294Mão-de-Obra 6,76800 Material 5,64000SubMO 15,02496

11.04.041SELANTE DE POLIURETANO P/JUNTAS MOVIMENTACAO/DESSOLIDARIZACAOQUADRO

M 15,11

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.40.91 0,30000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 6,5160021,722.80.74 0,04000FITA CREPE (ROLO) UN 0,134403,36

LS 3,09636 BDI 2,82550Mão-de-Obra 2,53800 Material 6,65040SubMO 5,63436

11.04.099 SERVICOS EM JUNTAS DE DILATACAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.50.001 IMPERMEABILIZACOES COM MULTIMEMBRANAS ASFALT - ELEM SINT M2 5,20

1.01.46 0,50000SERVENTE H 1,905003,81

LS 2,32410 BDI 0,97269Mão-de-Obra 1,90500 Material 0,00000SubMO 4,22910

11.50.002 ARGAMASSA COM IMPERMEABILIZANTE M2 6,24

1.01.46 0,60000SERVENTE H 2,286003,81

LS 2,78892 BDI 1,16723Mão-de-Obra 2,28600 Material 0,00000SubMO 5,07492

11.50.003 ISOLAMENTO TERMICO COM CONCRETO CELULAR ETC M2 1,04

1.01.46 0,10000SERVENTE H 0,381003,81

LS 0,46482 BDI 0,19454Mão-de-Obra 0,38100 Material 0,00000SubMO 0,84582

11.50.004 ISOLAMENTO TERMICO DE MANTA DE LA DE VIDRO M2 0,52

1.01.46 0,05000SERVENTE H 0,190503,81

LS 0,23241 BDI 0,09727Mão-de-Obra 0,19050 Material 0,00000SubMO 0,42291

11.50.005 PROTECAO TERMOMECANICA COM CONCRETO CELULAR M2 5,20

1.01.46 0,50000SERVENTE H 1,905003,81

LS 2,32410 BDI 0,97269Mão-de-Obra 1,90500 Material 0,00000SubMO 4,22910

11.50.050 JUNTAS DE DILATACAO METALICAS M 2,08

1.01.46 0,20000SERVENTE H 0,762003,81

LS 0,92964 BDI 0,38908Mão-de-Obra 0,76200 Material 0,00000SubMO 1,69164

11.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.60.001 ISOLAMENTO TERMICO COM CONCRETO CELULAR OU TIJOLOS CERAMICOS M2 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

11.60.002 ISOLAMENTO TERMICO COM DOLOMITA/SEIXOS ROLADOS/ARGILA EXPANDIDA M2 1,04

1.01.46 0,10000SERVENTE H 0,381003,81

LS 0,46482 BDI 0,19454Mão-de-Obra 0,38100 Material 0,00000SubMO 0,84582

11.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

09/02/2011 11:38:40 Página: 245 de 0

Page 246: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.70.015 ISOLAMENTO TERMICO EM BRITAS, SEIXOS ROLADOS E ARGILA EXPANDIDA M3 44,73

1.01.46 4,30000SERVENTE H 16,383003,81

LS 19,98726 BDI 8,36516Mão-de-Obra 16,38300 Material 0,00000SubMO 36,37026

11.70.099 RECOLOCACOES DE IMPERMEABILIZACOES/JUNTA DE DILATACAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

11.80.099 SERVICOS DE IMPERMEABILIZACAO/JUNTAS DE DILATACAO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.01.001 CHAPISCO M2 6,70

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,25000SERVENTE H 0,952503,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,39000CIMENTO KG 0,514300,37

LS 2,58030 BDI 1,25286Mão-de-Obra 2,11500 Material 0,75190SubMO 4,69530

12.01.006 EMBOCO DESEMPENADO M2 23,42

1.01.39 0,74000PEDREIRO H 3,441004,651.01.46 0,97000SERVENTE H 3,695703,812.05.03 0,01300AREIA M3 1,0296079,202.05.05 3,81000CAL HIDRATADA KG 1,295400,342.05.08 2,37000CIMENTO KG 0,876900,37

LS 8,70677 BDI 4,38044Mão-de-Obra 7,13670 Material 3,20190SubMO 15,84347

12.01.099 REVESTIMENTOS PARA TETOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.02.001 CHAPISCO M2 6,70

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,25000SERVENTE H 0,952503,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,39000CIMENTO KG 0,514300,37

LS 2,58030 BDI 1,25286Mão-de-Obra 2,11500 Material 0,75190SubMO 4,69530

12.02.004 CHAPISCO ROLADO PARA SUPERFICIES LISAS M2 8,51

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,25000SERVENTE H 0,952503,812.05.03 0,00610AREIA M3 0,4831279,202.05.08 2,43000CIMENTO KG 0,899100,372.05.99 0,25000ADESIVO P/ ARGAMASSA E CHAPISCO BIANCO/SIKAFIX L 1,365005,46

LS 2,29665 BDI 1,59307Mão-de-Obra 1,88250 Material 2,74722SubMO 4,17915

12.02.005 EMBOCO M2 19,35

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,75000SERVENTE H 2,857503,812.05.03 0,01300AREIA M3 1,0296079,202.05.05 3,81000CAL HIDRATADA KG 1,295400,342.05.08 2,37000CIMENTO KG 0,876900,37

LS 6,88995 BDI 3,62005Mão-de-Obra 5,64750 Material 3,20190SubMO 12,53745

12.02.006 EMBOCO DESEMPENADO M2 23,42

1.01.39 0,74000PEDREIRO H 3,441004,651.01.46 0,97000SERVENTE H 3,695703,812.05.03 0,01300AREIA M3 1,0296079,202.05.05 3,81000CAL HIDRATADA KG 1,295400,342.05.08 2,37000CIMENTO KG 0,876900,37

LS 8,70677 BDI 4,38044Mão-de-Obra 7,13670 Material 3,20190SubMO 15,84347

12.02.007 REBOCO M2 13,99

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,64000SERVENTE H 2,438403,812.05.03 0,00600AREIA M3 0,4752079,202.05.05 0,97000CAL HIDRATADA KG 0,329800,34

LS 5,81135 BDI 2,61734Mão-de-Obra 4,76340 Material 0,80500SubMO 10,57475

12.02.009 REVESTIMENTO COM GESSO M2 11,88

1.01.23 0,50000GESSEIRO H 2,250004,501.01.46 0,25000SERVENTE H 0,952503,812.05.80 5,00000GESSO KG 2,550000,51

09/02/2011 11:38:40 Página: 246 de 0

Page 247: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 3,90705 BDI 2,22170Mão-de-Obra 3,20250 Material 2,55000SubMO 7,10955

12.02.010 REVESTIMENTO TEXTURIZADO ACRILICO BRANCO M2 14,61

1.01.40 0,46000PINTOR H 2,166604,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.75.05 1,10000TEXTURA ACRILICA - BRANCA L 6,226005,66

LS 3,10929 BDI 2,73330Mão-de-Obra 2,54860 Material 6,22600SubMO 5,65789

12.02.011 REVESTIMENTO TEXTURIZADO ACRILICO BRANCO E PINTURA ACRILICA M2 17,61

1.01.40 0,55000PINTOR H 2,590504,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.05 1,10000TEXTURA ACRILICA - BRANCA L 6,226005,663.75.42 0,10000TINTA LATEX STANDARD L 0,645006,45

LS 4,09249 BDI 3,29314Mão-de-Obra 3,35450 Material 6,87100SubMO 7,44699

12.02.012 CERAMICA ESMALTADA 10X10CM - LARANJA,VERMELHO,AMARELO M2 94,65

1.01.28 1,03000LADRILHISTA H 5,201505,051.01.46 1,55000SERVENTE H 5,905503,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,96000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,536001,603.45.36 1,05000CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL M2 49,0140046,68

LS 13,55054 BDI 17,70023Mão-de-Obra 11,10700 Material 52,30000SubMO 24,65754

12.02.013 CERAMICA ESMALTADA 10X10CM - AZUL,VERDE,PRETO M2 77,77

1.01.28 1,03000LADRILHISTA H 5,201505,051.01.46 1,55000SERVENTE H 5,905503,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,96000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,536001,603.45.34 1,05000CERAMICA ESMALTADA 10X10CM-AZUL,VERDE,PRETO M2 35,2905033,61

LS 13,55054 BDI 14,54383Mão-de-Obra 11,10700 Material 38,57650SubMO 24,65754

12.02.014 CERAMICA ESMALTADA 10X10CM - BRANCO,AREIA,BEGE,OCRE,CINZA M2 74,38

1.01.28 1,03000LADRILHISTA H 5,201505,051.01.46 1,55000SERVENTE H 5,905503,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,96000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,536001,603.45.35 1,05000CERAMICA ESMALT.10X10CM-BRAN,AREIA,BEGE,OCRE,CINZA M2 32,5290030,98

LS 13,55054 BDI 13,90868Mão-de-Obra 11,10700 Material 35,81500SubMO 24,65754

12.02.029 CERAMICA ESMALTADA 20X20CM M2 54,46

1.01.28 0,33000LADRILHISTA H 1,666505,051.01.46 0,50000SERVENTE H 1,905003,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,44000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,704001,603.45.13 1,05000CERAMICA ESMALTADA LISA 20X20CM M2 33,8940032,28

LS 4,35723 BDI 10,18365Mão-de-Obra 3,57150 Material 36,34800SubMO 7,92873

12.02.037 REVESTIMENTO COM AZULEJOS LISOS, BRANCO BRILHANTE M2 48,37

1.01.06 0,53000AZULEJISTA H 2,803705,291.01.46 0,80000SERVENTE H 3,048003,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,44000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,704001,603.20.01 1,05000AZULEJO LISO BRANCO BRILHANTE M2 23,8875022,75

LS 7,13907 BDI 9,04642Mão-de-Obra 5,85170 Material 26,34150SubMO 12,99077

12.02.038 PERFIL SEXTAVADO EM ALUMINIO PARA AZULEJO M 19,61

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,60000SERVENTE H 2,286003,812.66.67 1,00000CANTONEIRA PIN-CAM-PERFIL AZUL SEXT M 2,610002,61

LS 7,32732 BDI 3,66696Mão-de-Obra 6,00600 Material 2,61000SubMO 13,33332

12.02.039 PERFIL EM ALUMINIO PARA REBOCO M 20,75

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,60000SERVENTE H 2,286003,813.35.15 1,00000CANTONEIRA PERFIL EM ALUMINIO REBOCO M 3,540003,54

LS 7,32732 BDI 3,88086Mão-de-Obra 6,00600 Material 3,54000SubMO 13,33332

12.02.050 REVESTIMENTO TEXT. ACRIL. PIGMENTADO (CORES PRONTAS) - ACAB RANHURADO M2 21,59

1.01.40 0,60500PINTOR H 2,849554,711.01.41 0,22000AJUDANTE DE PINTOR H 0,840403,823.75.04 1,00000TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS) L 7,370007,373.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,96

LS 4,50174 BDI 4,03735Mão-de-Obra 3,68995 Material 9,36200SubMO 8,19169

12.02.051 REVESTIMENTO TEXTURIZADO ACRILICO PIGMENTADO (CORES PRONTAS) M2 16,71

1.01.40 0,55000PINTOR H 2,590504,71

09/02/2011 11:38:40 Página: 247 de 0

Page 248: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.04 0,83330TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS) L 6,141427,37

LS 4,09249 BDI 3,12534Mão-de-Obra 3,35450 Material 6,14142SubMO 7,44699

12.02.072 GUARNICAO P/ACABAM JUNTAS DILATACAO- DE CEDRO APARELHADO 5 X 1 CM M 7,69

1.01.92 0,30000ARTIFICE H 1,449004,832.67.26 2,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,260000,132.67.77 0,02000BUCHA TIPO S-8 (CENTO) UN 0,2222011,113.01.52 1,00000GUARNICAO PEROBA 5CM M 2,560002,56

LS 1,76778 BDI 1,43957Mão-de-Obra 1,44900 Material 3,04220SubMO 3,21678

12.02.099 REVESTIMENTOS P/ PAREDES INTERNAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.04.001 CHAPISCO M2 6,70

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,25000SERVENTE H 0,952503,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,39000CIMENTO KG 0,514300,37

LS 2,58030 BDI 1,25286Mão-de-Obra 2,11500 Material 0,75190SubMO 4,69530

12.04.002 CHAPISCO FINO PENEIRADO M2 5,25

1.01.39 0,10000PEDREIRO H 0,465004,651.01.46 0,22000SERVENTE H 0,838203,812.05.03 0,00610AREIA M3 0,4831279,202.05.08 2,43000CIMENTO KG 0,899100,37

LS 1,58990 BDI 0,98333Mão-de-Obra 1,30320 Material 1,38222SubMO 2,89310

12.04.005 EMBOCO M2 19,35

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,75000SERVENTE H 2,857503,812.05.03 0,01300AREIA M3 1,0296079,202.05.05 3,81000CAL HIDRATADA KG 1,295400,342.05.08 2,37000CIMENTO KG 0,876900,37

LS 6,88995 BDI 3,62005Mão-de-Obra 5,64750 Material 3,20190SubMO 12,53745

12.04.006 EMBOCO DESEMPENADO M2 23,42

1.01.39 0,74000PEDREIRO H 3,441004,651.01.46 0,97000SERVENTE H 3,695703,812.05.03 0,01300AREIA M3 1,0296079,202.05.05 3,81000CAL HIDRATADA KG 1,295400,342.05.08 2,37000CIMENTO KG 0,876900,37

LS 8,70677 BDI 4,38044Mão-de-Obra 7,13670 Material 3,20190SubMO 15,84347

12.04.007 REBOCO M2 13,99

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,64000SERVENTE H 2,438403,812.05.03 0,00600AREIA M3 0,4752079,202.05.05 0,97000CAL HIDRATADA KG 0,329800,34

LS 5,81135 BDI 2,61734Mão-de-Obra 4,76340 Material 0,80500SubMO 10,57475

12.04.013 REVESTIMENTO TEXT. ACRIL. PIGMENTADO (CORES PRONTAS)- ACAB RANHURADO M2 21,59

1.01.40 0,60500PINTOR H 2,849554,711.01.41 0,22000AJUDANTE DE PINTOR H 0,840403,823.75.04 1,00000TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS) L 7,370007,373.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,96

LS 4,50174 BDI 4,03735Mão-de-Obra 3,68995 Material 9,36200SubMO 8,19169

12.04.014 REVESTIMENTO TEXTURIZADO ACRILICO PIGMENTADO (CORES PRONTA) M2 16,71

1.01.40 0,55000PINTOR H 2,590504,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.04 0,83330TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS) L 6,141427,37

LS 4,09249 BDI 3,12534Mão-de-Obra 3,35450 Material 6,14142SubMO 7,44699

12.04.018 REVESTIMENTO TEXTURIZADO ACRILICO BRANCO M2 14,61

1.01.40 0,46000PINTOR H 2,166604,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.75.05 1,10000TEXTURA ACRILICA - BRANCA L 6,226005,66

LS 3,10929 BDI 2,73330Mão-de-Obra 2,54860 Material 6,22600SubMO 5,65789

12.04.019 REVESTIMENTO TEXTURIZADO ACRILICO BRANCO E PINTURA ACRILICA M2 17,61

1.01.40 0,55000PINTOR H 2,590504,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.05 1,10000TEXTURA ACRILICA - BRANCA L 6,226005,663.75.42 0,10000TINTA LATEX STANDARD L 0,645006,45

09/02/2011 11:38:40 Página: 248 de 0

Page 249: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 4,09249 BDI 3,29314Mão-de-Obra 3,35450 Material 6,87100SubMO 7,44699

12.04.020 REVESTIMENTO COM PASTILHAS NATURAIS 2,5X2,5CM M2 159,18

1.01.38 0,66000PASTILHEIRO H 3,570605,411.01.46 1,00000SERVENTE H 3,810003,812.05.82 5,00000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 7,850001,572.05.96 0,76000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,216001,603.20.22 1,05000PASTILHA NATURAL 2,5X2,5CM M2 103,9710099,02

LS 9,00433 BDI 29,76704Mão-de-Obra 7,38060 Material 113,03700SubMO 16,38493

12.04.021 REVESTIMENTO COM PASTILHAS NATURAIS 5,0X5,0CM M2 145,31

1.01.38 0,66000PASTILHEIRO H 3,570605,411.01.46 1,00000SERVENTE H 3,810003,812.05.82 5,00000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 7,850001,572.05.96 0,76000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,216001,603.20.23 1,05000PASTILHA NATURAL 5,0X5,0CM M2 92,6940088,28

LS 9,00433 BDI 27,17333Mão-de-Obra 7,38060 Material 101,76000SubMO 16,38493

12.04.022 REVESTIMENTO COM PASTILHAS ESMALTADAS 2,5X 2,5 CM M2 122,94

1.01.38 0,66000PASTILHEIRO H 3,570605,411.01.46 1,00000SERVENTE H 3,810003,812.05.82 5,00000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 7,850001,572.05.96 0,76000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,216001,603.20.24 1,05000PASTILHA ESMALTADA 2,5X 2,5 CM M2 74,5080070,96

LS 9,00433 BDI 22,99055Mão-de-Obra 7,38060 Material 83,57400SubMO 16,38493

12.04.023 REVESTIMENTO COM PASTILHAS ESMALTADAS 4,0X 4,0 CM M2 119,11

1.01.38 0,66000PASTILHEIRO H 3,570605,411.01.46 1,00000SERVENTE H 3,810003,812.05.82 5,00000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 7,850001,572.05.96 0,76000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,216001,603.20.25 1,05000PASTILHA ESMALTADA 4,0X 4,0 CM M2 71,3895067,99

LS 9,00433 BDI 22,27330Mão-de-Obra 7,38060 Material 80,45550SubMO 16,38493

12.04.024 REVESTIMENTO COM PASTILHAS ESMALTADAS 5,0X 5,0 CM M2 134,84

1.01.38 0,66000PASTILHEIRO H 3,570605,411.01.46 1,00000SERVENTE H 3,810003,812.05.82 5,00000ARGAMASSA QUARTZOLIT PARA PASTILHAS KG 7,850001,572.05.96 0,76000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,216001,603.20.26 1,05000PASTILHA ESMALTADA 5,0X 5,0 CM M2 84,1785080,17

LS 9,00433 BDI 25,21477Mão-de-Obra 7,38060 Material 93,24450SubMO 16,38493

12.04.040 REVESTIMENTO C/ PLAQUETA LAMINADA M2 93,86

1.01.28 2,00000LADRILHISTA H 10,100005,051.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,64000SERVENTE H 6,248403,812.05.03 0,02800AREIA M3 2,2176079,202.05.05 4,98000CAL HIDRATADA KG 1,693200,342.05.08 3,90000CIMENTO KG 1,443000,373.35.62 1,05000PLAQUETA LAMINADA PARA REVESTIMENTO M2 26,4075025,15

LS 24,48345 BDI 17,55202Mão-de-Obra 20,06840 Material 31,76130SubMO 44,55185

12.04.048 CERAMICA ESMALTADA 10X10CM - LARANJA,VERMELHO,AMARELO M2 94,78

1.01.28 1,03000LADRILHISTA H 5,201505,051.01.46 1,55000SERVENTE H 5,905503,812.05.83 5,00000ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III KG 1,850000,372.05.96 0,96000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,536001,603.45.36 1,05000CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL M2 49,0140046,68

LS 13,55054 BDI 17,72323Mão-de-Obra 11,10700 Material 52,40000SubMO 24,65754

12.04.049 CERAMICA ESMALTADA 10X10CM - AZUL,VERDE,PRETO M2 77,90

1.01.28 1,03000LADRILHISTA H 5,201505,051.01.46 1,55000SERVENTE H 5,905503,812.05.83 5,00000ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III KG 1,850000,372.05.96 0,96000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,536001,603.45.34 1,05000CERAMICA ESMALTADA 10X10CM-AZUL,VERDE,PRETO M2 35,2905033,61

LS 13,55054 BDI 14,56683Mão-de-Obra 11,10700 Material 38,67650SubMO 24,65754

12.04.050 CERAMICA ESMALTADA 10X10CM - BRANCO,AREIA,BEGE,OCRE,CINZA M2 74,50

1.01.28 1,03000LADRILHISTA H 5,201505,051.01.46 1,55000SERVENTE H 5,905503,812.05.83 5,00000ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III KG 1,850000,372.05.96 0,96000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,536001,603.45.35 1,05000CERAMICA ESMALT.10X10CM-BRAN,AREIA,BEGE,OCRE,CINZA M2 32,5290030,98

LS 13,55054 BDI 13,93168Mão-de-Obra 11,10700 Material 35,91500SubMO 24,65754

09/02/2011 11:38:40 Página: 249 de 0

Page 250: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

12.04.069 CERAMICA ESMALTADA 10X20CM -VERMELHO,LARANJA,AMARELO M2 49,06

1.01.28 0,57000LADRILHISTA H 2,878505,051.01.46 0,85000SERVENTE H 3,238503,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,72000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,152001,603.45.37 1,05000CERAMICA ESMALTADA 10X20CM-VERMELHO,LARANJA,AMAREL M2 23,4045022,29

LS 7,46274 BDI 9,17384Mão-de-Obra 6,11700 Material 26,30650SubMO 13,57974

12.04.070 CERAMICA ESMALTADA 10X20CM - AZUL,VERDE,PRETO M2 41,20

1.01.28 0,57000LADRILHISTA H 2,878505,051.01.46 0,85000SERVENTE H 3,238503,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,72000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,152001,603.45.38 1,05000CERAMICA ESMALTADA 10X20CM-AZUL,VERDE,PRETO M2 17,0205016,21

LS 7,46274 BDI 7,70552Mão-de-Obra 6,11700 Material 19,92250SubMO 13,57974

12.04.072 CERAMICA ESMALTADA 10X20CM - BRANCO,AREIA,BEGE,OCRE CINZA M2 41,20

1.01.28 0,57000LADRILHISTA H 2,878505,051.01.46 0,85000SERVENTE H 3,238503,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,72000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 1,152001,603.45.39 1,05000CERAMICA ESMALT.10X20CM-BRAN,BEGE,CINZA,OCRE,AREIA M2 17,0205016,21

LS 7,46274 BDI 7,70552Mão-de-Obra 6,11700 Material 19,92250SubMO 13,57974

12.04.090 REVESTIMENTO FULGET - GRANULA 0 E 1 - CINZA M2 80,02

3.25.02 1,00000FULGET GRANA 0 E 1 CINZA - APLICADO M2 65,0600065,06

LS 0,00000 BDI 14,96380Mão-de-Obra 0,00000 Material 65,06000SubMO 0,00000

12.04.091 REVESTIMENTO FULGET - GRANULA 2 - CINZA M2 87,82

3.25.03 1,00000FULGET GRANA 2 CINZA - APLICADO M2 71,4000071,40

LS 0,00000 BDI 16,42200Mão-de-Obra 0,00000 Material 71,40000SubMO 0,00000

12.04.099 REVESTIMENTOS PARA PAREDES EXTERNAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.50.001 DE REVESTIMENTO EM ARGAMASSA/GESSO EM FORRO E PAREDES M2 5,83

1.01.39 0,05000PEDREIRO H 0,232504,651.01.46 0,50000SERVENTE H 1,905003,81

LS 2,60775 BDI 1,09141Mão-de-Obra 2,13750 Material 0,00000SubMO 4,74525

12.50.002 DE REVEST DE AZULEJOS, PASTILHAS E LADRILHOS INCL ARG ASSENTAMENTO M2 8,75

1.01.39 0,07500PEDREIRO H 0,348754,651.01.46 0,75000SERVENTE H 2,857503,81

LS 3,91163 BDI 1,63711Mão-de-Obra 3,20625 Material 0,00000SubMO 7,11788

12.50.003 SOMENTE DE AZULEJO M2 2,91

1.01.39 0,02500PEDREIRO H 0,116254,651.01.46 0,25000SERVENTE H 0,952503,81

LS 1,30387 BDI 0,54570Mão-de-Obra 1,06875 Material 0,00000SubMO 2,37263

12.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.60.001DE MARMORE PEDRAS OU GRANITOS INCL DEMOLICAO ARGAMASSAASSENTAMENTO

M2 18,72

1.01.46 1,80000SERVENTE H 6,858003,81

LS 8,36676 BDI 3,50170Mão-de-Obra 6,85800 Material 0,00000SubMO 15,22476

12.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.70.001 DE MARMORE, PEDRAS E GRANITOS M2 61,49

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,65000SERVENTE H 10,096503,812.05.03 0,02900AREIA M3 2,2968079,202.05.05 5,15000CAL HIDRATADA KG 1,751000,342.05.08 7,80000CIMENTO KG 2,886000,37

LS 23,66373 BDI 11,49863Mão-de-Obra 19,39650 Material 6,93380SubMO 43,06023

12.70.099 RECOLOCACOES DE REVESTIMENTOS DE FORRO E PAREDE MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

09/02/2011 11:38:40 Página: 250 de 0

Page 251: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

12.80.002 CHAPISCO RUSTICO COM PEDRA BRITADA 1 M2 10,65

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,39000SERVENTE H 1,485903,812.05.03 0,00800AREIA M3 0,6336079,202.05.08 3,42000CIMENTO KG 1,265400,372.05.17 0,00600PEDRA BRITADA 1 M3 0,3715861,93

LS 3,51470 BDI 1,99322Mão-de-Obra 2,88090 Material 2,27058SubMO 6,39560

12.80.030 REPARO EM TRINCAS E RACHADURAS M 7,43

1.01.39 0,29500PEDREIRO H 1,371754,651.01.46 0,16500SERVENTE H 0,628653,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,20000CAL HIDRATADA KG 0,068000,342.05.08 0,50000CIMENTO KG 0,185000,372.15.10 0,35000ACO CA-25 $MD BITOLAS KG 0,955502,73

LS 2,44049 BDI 1,39044Mão-de-Obra 2,00040 Material 1,60450SubMO 4,44089

12.80.050 CANTONEIRA DE FERRO DE 1"X1"X1/8" M 22,37

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,812.66.15 1,00000PERFIL L DE FERRO 1"X1"X1/8" M 3,170003,17

LS 8,25696 BDI 4,18484Mão-de-Obra 6,76800 Material 3,17000SubMO 15,02496

12.80.051 CANTONEIRA DE ALUMINIO DE 1"X1"X1/8" M 23,33

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,60000SERVENTE H 2,286003,812.65.98 1,00000PERFIL ALUMINIO 1'X1'X1/8' M 5,640005,64

LS 7,32732 BDI 4,36386Mão-de-Obra 6,00600 Material 5,64000SubMO 13,33332

12.80.099 SERVICOS EM REVESTIMENTOS DE FORRO E PAREDE MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.01.004 LASTRO DE CONCRETO C/ HIDROFUGO E=5CM M2 23,55

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,03000AREIA M3 2,3760079,202.05.08 10,00000CIMENTO KG 3,700000,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,092.40.69 0,30600IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,768062,51

LS 5,42046 BDI 4,40476Mão-de-Obra 4,44300 Material 9,28766SubMO 9,86346

13.01.006 LASTRO DE PEDRA BRITADA - 5CM M2 5,69

1.01.46 0,15000SERVENTE H 0,571503,812.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,09

LS 0,69723 BDI 1,06460Mão-de-Obra 0,57150 Material 3,35995SubMO 1,26873

13.01.009 ENCHIMENTO DE LAJE COM CARVAO VEGETAL M3 185,99

1.01.46 1,03000SERVENTE H 3,924303,812.45.20 285,00000CARVAO VEGETAL KG 142,500000,50

LS 4,78765 BDI 34,77875Mão-de-Obra 3,92430 Material 142,50000SubMO 8,71195

13.01.010 ENCHIMENTO DE REBAIXO DE LAJE COM TIJ CERAMICOS FURADOS M3 223,14

1.01.46 5,00000SERVENTE H 19,050003,812.25.16 262,50000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 139,125000,53

LS 23,24100 BDI 41,72568Mão-de-Obra 19,05000 Material 139,12500SubMO 42,29100

13.01.011 ENCHIMENTO DE REBAIXO DE LAJE COM CACOS DE CONCR CELULAR M3 264,19

1.01.46 5,00000SERVENTE H 19,050003,813.30.25 1,00000CONCRETO CELULAR (CACOS) M3 172,50000172,50

LS 23,24100 BDI 49,40193Mão-de-Obra 19,05000 Material 172,50000SubMO 42,29100

13.01.015 ARGAMASSA DE REGULARIZACAO CIM/AREIA 1:3 ESP=2,50CM M2 19,85

1.01.39 0,41650PEDREIRO H 1,936734,651.01.46 0,66650SERVENTE H 2,539373,812.05.03 0,02630AREIA M3 2,0829679,202.05.08 11,15000CIMENTO KG 4,125500,37

LS 5,46083 BDI 3,71344Mão-de-Obra 4,47609 Material 6,20846SubMO 9,93692

13.01.016 ARGAMASSA DE REGULARIZACAO CIM/AREIA 1:3 C/ IMPERM. ESP=2,50CM M2 20,80

1.01.39 0,41650PEDREIRO H 1,936734,651.01.46 0,66650SERVENTE H 2,539373,812.05.03 0,02630AREIA M3 2,0829679,20

09/02/2011 11:38:40 Página: 251 de 0

Page 252: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.08 11,15000CIMENTO KG 4,125500,372.40.69 0,30600IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,768062,51

LS 5,46083 BDI 3,89009Mão-de-Obra 4,47609 Material 6,97652SubMO 9,93692

13.01.099 SERVICOS DE LASTROS E/OU ENCHIMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.02.004 CIMENTADO DESEMPENADO E ALISADO C/ CORANTE E=3,5CM INCL ARG REG M2 38,59

1.01.39 1,17000PEDREIRO H 5,440504,651.01.46 0,93000SERVENTE H 3,543303,812.05.03 0,03680AREIA M3 2,9145679,202.05.08 15,61000CIMENTO KG 5,775700,372.10.60 0,30000RIPA DE PEROBA 1X5CM M 0,669002,233.80.38 0,10000PIGMENTO EM PO PARA ARGAMASSA KG 2,0770020,77

LS 10,96024 BDI 7,21747Mão-de-Obra 8,98380 Material 11,43626SubMO 19,94404

13.02.005 CIMENTADO DESEMPENADO ALISADO E=3,50CM INCL ARG REG M2 36,04

1.01.39 1,17000PEDREIRO H 5,440504,651.01.46 0,93000SERVENTE H 3,543303,812.05.03 0,03680AREIA M3 2,9145679,202.05.08 15,61000CIMENTO KG 5,775700,372.10.60 0,30000RIPA DE PEROBA 1X5CM M 0,669002,23

LS 10,96024 BDI 6,73976Mão-de-Obra 8,98380 Material 9,35926SubMO 19,94404

13.02.007 PISO DE CONCRETO LISO-FUNDACAO DIRETA FCK-25 MPA M2 98,28

1.01.21 0,30000FERREIRO H 1,431004,771.01.22 0,30000AJUDANTE DE FERREIRO H 1,146003,821.01.39 0,83000PEDREIRO H 3,859504,651.01.46 0,83000SERVENTE H 3,162303,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,89000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,584201,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,08000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,7376021,722.40.93 0,26700BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,034710,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,443.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,948.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 11,93608 BDI 18,37778Mão-de-Obra 9,78367 Material 58,18363SubMO 21,71975

13.02.009 PISO DE CONCRETO CAMURCADO-FUNDACAO DIRETA FCK-25 MPA M2 93,25

1.01.21 0,30000FERREIRO H 1,431004,771.01.22 0,30000AJUDANTE DE FERREIRO H 1,146003,821.01.39 0,61000PEDREIRO H 2,836504,651.01.46 0,61000SERVENTE H 2,324103,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,89000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,584201,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,08000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,7376021,722.40.93 0,26700BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,034710,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,01070FITA CREPE 25MM X 50M UN 0,049334,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,948.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 9,66541 BDI 17,43879Mão-de-Obra 7,92247 Material 58,23295SubMO 17,58788

13.02.010 QE-26 QUADRA DE ESPORTES/DE CONCRETO/LAJE ALVEOLAR M2 13,59

1.01.39 0,38000PEDREIRO H 1,767004,651.01.40 0,02000PINTOR H 0,094204,711.01.41 0,02000AJUDANTE DE PINTOR H 0,076403,821.01.46 0,38000SERVENTE H 1,447803,812.40.91 0,05000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,0860021,722.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,03000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,6432021,442.80.81 0,02830FITA CREPE 25MM X 50M UN 0,130464,61

09/02/2011 11:38:40 Página: 252 de 0

Page 253: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.75.17 0,01210TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,072966,03

LS 4,13019 BDI 2,54281Mão-de-Obra 3,38540 Material 3,54013SubMO 7,51559

13.02.011 QE-27 QUADRA DE ESPORTES/PISO DE CONCRETO/PRE-LAJE TRELICADA M2 13,59

1.01.39 0,38000PEDREIRO H 1,767004,651.01.40 0,02000PINTOR H 0,094204,711.01.41 0,02000AJUDANTE DE PINTOR H 0,076403,821.01.46 0,38000SERVENTE H 1,447803,812.40.91 0,05000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,0860021,722.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,03000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,6432021,442.80.81 0,02830FITA CREPE 25MM X 50M UN 0,130464,613.75.17 0,01210TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,072966,03

LS 4,13019 BDI 2,54281Mão-de-Obra 3,38540 Material 3,54013SubMO 7,51559

13.02.012 QE-28 QUADRA DE ESPORTES/PISO COM PROTECAO ACUSTICA SOBRE LAJE M2 163,56

1.01.21 0,28460FERREIRO H 1,357544,771.01.22 0,28460AJUDANTE DE FERREIRO H 1,087173,821.01.39 0,86660PEDREIRO H 4,029694,651.01.40 0,02000PINTOR H 0,094204,711.01.41 0,02000AJUDANTE DE PINTOR H 0,076403,821.01.46 0,86660SERVENTE H 3,301753,812.05.37 0,08000CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA M3 23,60160295,022.15.07 0,67000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,192601,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,11000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,3892021,722.40.93 0,20000BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,026000,132.45.09 1,00000MANTA DE LÃ DE ROCHA ENVELOPADA DENS 144KG/M3 M2 65,6800065,682.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,03630FITA CREPE 25MM X 50M UN 0,167344,613.75.17 0,01210TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,072966,03

LS 12,13504 BDI 30,58529Mão-de-Obra 9,94675 Material 110,89773SubMO 22,08179

13.02.013 QE-29 ESPACO MULTIESPORTIVO/PISO DE CONCRETO/LAJE ALVEOLAR M2 22,68

1.01.39 0,72000PEDREIRO H 3,348004,651.01.40 0,01800PINTOR H 0,084784,711.01.41 0,01800AJUDANTE DE PINTOR H 0,068763,821.01.46 0,72000SERVENTE H 2,743203,812.40.91 0,09750SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,1177021,722.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,03000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,6432021,442.80.81 0,03130FITA CREPE 25MM X 50M UN 0,144294,613.75.17 0,01100TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,066336,03

LS 7,61858 BDI 4,24174Mão-de-Obra 6,24474 Material 4,57902SubMO 13,86332

13.02.014 QE-30 ESPACO MULTIESPORTIVO/PISO DE CONCRETO/PRE-LAJE TRELICADA M2 22,73

1.01.39 0,72000PEDREIRO H 3,348004,651.01.40 0,02000PINTOR H 0,094204,711.01.41 0,02000AJUDANTE DE PINTOR H 0,076403,821.01.46 0,72000SERVENTE H 2,743203,812.40.91 0,09750SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,1177021,722.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,03000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,6432021,442.80.81 0,03130FITA CREPE 25MM X 50M UN 0,144294,613.75.17 0,01210TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,072966,03

LS 7,63940 BDI 4,25198Mão-de-Obra 6,26180 Material 4,58566SubMO 13,90120

13.02.015 QE-31 ESPACO MULTIESPORTIVO/PISO COM PROTECAO ACUSTICA SOBRE LAJE M2 165,33

1.01.21 0,28560FERREIRO H 1,362314,771.01.22 0,28560AJUDANTE DE FERREIRO H 1,090993,821.01.39 0,87000PEDREIRO H 4,045504,651.01.40 0,02000PINTOR H 0,094204,711.01.41 0,02000AJUDANTE DE PINTOR H 0,076403,821.01.46 0,87000SERVENTE H 3,314703,812.05.37 0,08000CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA M3 23,60160295,022.15.07 0,75000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,335001,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,16500SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 3,5838021,722.40.93 0,22500BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,029250,132.45.09 1,00000MANTA DE LÃ DE ROCHA ENVELOPADA DENS 144KG/M3 M2 65,6800065,682.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,44

09/02/2011 11:38:40 Página: 253 de 0

Page 254: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.80.81 0,04050FITA CREPE 25MM X 50M UN 0,186714,613.75.17 0,01210TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,072966,03

LS 12,18061 BDI 30,91707Mão-de-Obra 9,98410 Material 112,25734SubMO 22,16471

13.02.017 LADRILHOS HIDRAULICOS DE 20X20 CM LISOS EM UMA COR M2 58,80

1.01.28 0,70000LADRILHISTA H 3,535005,051.01.46 0,70000SERVENTE H 2,667003,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,353.65.19 1,05000LADRILHO HIDRAULICO 20X20CM 1 COR M2 32,2875030,75

LS 7,56644 BDI 10,99537Mão-de-Obra 6,20200 Material 34,03750SubMO 13,76844

13.02.019 LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DE ALERTA M2 94,97

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.65.25 1,00000LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL ALERTA M2 63,4000063,40

LS 5,62542 BDI 17,75965Mão-de-Obra 4,61100 Material 66,97946SubMO 10,23642

13.02.020 LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DIRECIONAL M2 94,97

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.65.27 1,00000LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL DIREC. M2 63,4000063,40

LS 5,62542 BDI 17,75965Mão-de-Obra 4,61100 Material 66,97946SubMO 10,23642

13.02.023 BORRACHA COLADA - PISO TATIL DIRECIONAL M2 156,85

1.01.87 0,67000APLICADOR H 3,075304,591.01.88 0,67000AJUDANTE DE APLICADOR H 2,646503,952.80.06 0,40000COLA DE CONTATO A BASE DE NEOPRENE KG 9,1080022,773.55.41 1,00000PLACAS BORRACHA 250X250MM E=4MM TATIL ALER/DIR-COL M2 105,00000105,003.80.12 0,50000LIXA PARA FERRO UN 0,715001,43

LS 6,98060 BDI 29,33084Mão-de-Obra 5,72180 Material 114,82300SubMO 12,70240

13.02.024 BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL DIRECIONAL M2 178,02

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.55.40 1,00000PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG M2 130,92000130,92

LS 5,62542 BDI 33,28925Mão-de-Obra 4,61100 Material 134,49946SubMO 10,23642

13.02.026CERAMICA ESMALTADA ANTIDERRAPANTE 30X30CM A 45X45CM PEI 4 OU PEI 5 /COEF.ATRITO 0,30 A 0,60

M2 47,11

1.01.28 0,70000LADRILHISTA H 3,535005,051.01.46 0,70000SERVENTE H 2,667003,812.05.83 5,00000ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III KG 1,850000,372.05.96 0,32000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,512001,602.40.91 0,11000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,3892021,723.45.32 1,05000CER ESM ANT.30X30/45X45 PEI4/PEI5/COEF 0,30 A 0,60 M2 19,7820018,84

LS 7,56644 BDI 8,80938Mão-de-Obra 6,20200 Material 24,53320SubMO 13,76844

13.02.031 QE-32 QUADRA DE ESPORTES/PISO DE CONCRETO ARMADO/FUNDACAO DIRETA M2 77,87

1.01.21 0,03750FERREIRO H 0,178884,771.01.22 0,03750AJUDANTE DE FERREIRO H 0,143253,821.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03750PINTOR H 0,176634,711.01.41 0,03750AJUDANTE DE PINTOR H 0,143253,821.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,27800BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 0,494841,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.56 0,06000TINTA BETUMINOSA L 0,383406,392.40.91 0,07500SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,6290021,722.40.93 0,09200BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,011960,132.70.10 0,02800ARAME RECOZIDO N.18 KG 0,129644,632.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,03170FITA CREPE 25MM X 50M UN 0,146144,61

09/02/2011 11:38:40 Página: 254 de 0

Page 255: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01600TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,096486,038.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 3,07302 BDI 14,56141Mão-de-Obra 2,51887 Material 57,71857SubMO 5,59189

13.02.032 FAIXA ANTIDERRAPANTE A BASE DE RES.E AREIA QUARTZOSA L=4CM M 8,75

1.01.87 0,30000APLICADOR H 1,377004,591.01.88 0,30000AJUDANTE DE APLICADOR H 1,185003,952.80.81 0,10000FITA CREPE 25MM X 50M UN 0,461004,613.30.40 0,07500AREIA QUARTZOSA FINA -(FILLER P/COMP.S)-O.BAUNGAR KG 0,333004,443.55.14 0,01500RESINA EPOXICA (COMPOUND S ) O. BOUMGART KG 0,6333042,22

LS 3,12564 BDI 1,63644Mão-de-Obra 2,56200 Material 1,42730SubMO 5,68764

13.02.033 QE-33 ESPACO MULTIESPORTIVO/PISO DE CONCRETO ARMADO/FUNDACAO DIRETA M2 78,91

1.01.21 0,03800FERREIRO H 0,181264,771.01.22 0,03800AJUDANTE DE FERREIRO H 0,145163,821.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03800PINTOR H 0,178984,711.01.41 0,03800AJUDANTE DE PINTOR H 0,145163,821.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,22000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 0,391601,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18100TELA TELCON Q138 (PAINEL) M2 11,8454310,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.56 0,06000TINTA BETUMINOSA L 0,383406,392.40.91 0,11630SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,5260421,722.40.93 0,06900BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,008970,132.70.10 0,02900ARAME RECOZIDO N.18 KG 0,134274,632.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,03750FITA CREPE 25MM X 50M UN 0,172884,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01600TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,096486,038.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 3,08347 BDI 14,75718Mão-de-Obra 2,52743 Material 58,55078SubMO 5,61089

13.02.034 GRANILITE CINZA / CIM. COMUM 8MM C/ POLIMENTO M2 56,64

1.01.46 0,80000SERVENTE H 3,048003,812.05.08 9,00000CIMENTO KG 3,330000,373.30.15 1,00000FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 34,8800034,883.60.26 2,50000JUNTA PLASTICA 9,0X4,0MM PARA PISO M 1,075000,43

LS 3,71856 BDI 10,59186Mão-de-Obra 3,04800 Material 39,28500SubMO 6,76656

13.02.038 GRANILITE PRETO/CIMENTO COMUM E=8MM COM POLIMENTO M2 57,76

1.01.46 0,50000SERVENTE H 1,905003,812.05.08 9,00000CIMENTO KG 3,330000,373.30.15 1,00000FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 34,8800034,883.60.26 2,50000JUNTA PLASTICA 9,0X4,0MM PARA PISO M 1,075000,433.80.38 0,16600PIGMENTO EM PO PARA ARGAMASSA KG 3,4478220,77

LS 2,32410 BDI 10,80124Mão-de-Obra 1,90500 Material 42,73282SubMO 4,22910

13.02.040 PISO DE ALTA RESISTENCIA TIPO MEDIO, POLIDO E=8MM PRETO/CIMENTO COMUM M2 55,61

1.01.46 0,50000SERVENTE H 1,905003,812.05.08 8,00000CIMENTO KG 2,960000,373.55.33 1,00000PISO ALTA RESISTENCIA MEDIO POLIDO E=8MM APLICADO M2 33,5000033,503.60.26 2,50000JUNTA PLASTICA 9,0X4,0MM PARA PISO M 1,075000,433.80.38 0,16600PIGMENTO EM PO PARA ARGAMASSA KG 3,4478220,77

LS 2,32410 BDI 10,39874Mão-de-Obra 1,90500 Material 40,98282SubMO 4,22910

13.02.041 PISO DE ALTA RESISTENCIA TIPO MEDIO, POLIDO E=8MM CINZA/CIMENTO COMUM M2 51,36

1.01.46 0,50000SERVENTE H 1,905003,812.05.08 8,00000CIMENTO KG 2,960000,373.55.33 1,00000PISO ALTA RESISTENCIA MEDIO POLIDO E=8MM APLICADO M2 33,5000033,503.60.26 2,50000JUNTA PLASTICA 9,0X4,0MM PARA PISO M 1,075000,43

LS 2,32410 BDI 9,60574Mão-de-Obra 1,90500 Material 37,53500SubMO 4,22910

13.02.047 SOALHO DE TABUAS DE IPE DE 10X2CM SOBRE LASTRO/LAJE M2 208,73

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,961.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,85000SERVENTE H 3,238503,81

09/02/2011 11:38:40 Página: 255 de 0

Page 256: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,02900AREIA M3 2,2968079,202.05.08 10,50000CIMENTO KG 3,885000,372.05.17 0,03900PEDRA BRITADA 1 M3 2,4152761,932.10.56 2,25000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 9,922504,412.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,512.67.60 0,20000PREGO KG 0,914004,573.55.20 1,10000TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO M2 117,23800106,58

LS 17,73697 BDI 39,03101Mão-de-Obra 14,53850 Material 137,42457SubMO 32,27547

13.02.048 SOALHO DE TABUAS DE IPE DE 20X2CM SOBRE LASTRO/LAJE M2 217,76

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,961.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,02900AREIA M3 2,2968079,202.05.08 10,50000CIMENTO KG 3,885000,372.05.17 0,03900PEDRA BRITADA 1 M3 2,4152761,932.10.56 2,25000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 9,922504,412.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,512.67.60 0,20000PREGO KG 0,914004,573.55.21 1,10000TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO M2 124,58600113,26

LS 17,73697 BDI 40,72105Mão-de-Obra 14,53850 Material 144,77257SubMO 32,27547

13.02.049QE-34 QUADRA DE ESPORTES/PISO FIBRA POLIPROPILENO CORRUGADO/FUNDDIR

M2 67,66

1.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03750PINTOR H 0,176634,711.01.41 0,03750AJUDANTE DE PINTOR H 0,143253,821.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,67000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,192601,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.56 0,05950TINTA BETUMINOSA L 0,380216,392.40.91 0,11000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,3892021,722.40.93 0,20000BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,026000,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.21 0,24000FIBRA DE POLIPROPILENO CORRUGADA KG 3,9192016,332.80.81 0,03670FITA CREPE 25MM X 50M UN 0,169194,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01560TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,094076,038.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 2,68003 BDI 12,65226Mão-de-Obra 2,19675 Material 50,13306SubMO 4,87677

13.02.050 QE-35 ESPACO MULTIESPORTIVO/PISO FIBRA POLIPROP CORRUGADO/FUND DIR M2 65,01

1.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03750PINTOR H 0,176634,711.01.41 0,03750AJUDANTE DE PINTOR H 0,143253,821.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,75000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,335001,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.56 0,05950TINTA BETUMINOSA L 0,380216,392.40.91 0,16500SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 3,5838021,722.40.93 0,22500BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,029250,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.21 0,02400FIBRA DE POLIPROPILENO CORRUGADA KG 0,3919216,332.80.81 0,04380FITA CREPE 25MM X 50M UN 0,201924,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01560TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,094076,038.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 2,68003 BDI 12,15677Mão-de-Obra 2,19675 Material 47,97876SubMO 4,87677

13.02.052 TRATAMENTO SELADOR PARA GRANILITE - BASE AGUA M2 7,12

1.01.87 0,06000APLICADOR H 0,275404,591.01.88 0,06000AJUDANTE DE APLICADOR H 0,237003,953.80.44 0,05000JONSEAL 220 L 3,6725073,453.80.45 0,02860TRAFFIC L 0,9844134,42

LS 0,62513 BDI 1,33272Mão-de-Obra 0,51240 Material 4,65691SubMO 1,13753

09/02/2011 11:38:40 Página: 256 de 0

Page 257: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

13.02.053 BORRACHA COLADA - PISO TATIL DE ALERTA M2 156,85

1.01.87 0,67000APLICADOR H 3,075304,591.01.88 0,67000AJUDANTE DE APLICADOR H 2,646503,952.80.06 0,40000COLA DE CONTATO A BASE DE NEOPRENE KG 9,1080022,773.55.41 1,00000PLACAS BORRACHA 250X250MM E=4MM TATIL ALER/DIR-COL M2 105,00000105,003.80.12 0,50000LIXA PARA FERRO UN 0,715001,43

LS 6,98060 BDI 29,33084Mão-de-Obra 5,72180 Material 114,82300SubMO 12,70240

13.02.055 BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL DE ALERTA M2 178,02

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.55.40 1,00000PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG M2 130,92000130,92

LS 5,62542 BDI 33,28925Mão-de-Obra 4,61100 Material 134,49946SubMO 10,23642

13.02.058 SINALIZAÇÃO VISUAL DE DEGRAUS-PINTURA ESMALTE EPOXI CJ 7,97

1.01.40 0,33000PINTOR H 1,554304,711.01.41 0,33000AJUDANTE DE PINTOR H 1,260603,822.80.81 0,03000FITA CREPE 25MM X 50M UN 0,138304,613.75.48 0,00300TINTA ESMALTE EPOXI BI COMPONENTE L 0,0994833,16

LS 3,43418 BDI 1,49198Mão-de-Obra 2,81490 Material 0,23778SubMO 6,24908

13.02.059 SINALIZAÇÃO VISUAL DE DEGRAUS-FITA ADESIVA CJ 8,00

1.01.40 0,33000PINTOR H 1,554304,711.01.41 0,33000AJUDANTE DE PINTOR H 1,260603,823.87.20 0,01670FITA ADESIVA P/DEMARCAÇÃO PISO (3M SCOTCH 471)AMAR UN 0,2610215,63

LS 3,43418 BDI 1,49732Mão-de-Obra 2,81490 Material 0,26102SubMO 6,24908

13.02.061 PISO DE BORRACHA SINT PASTILHADA COR PRETA ESP 7MM FIXAVEL C/AR M2 121,71

1.01.39 0,66700PEDREIRO H 3,101554,651.01.46 0,91700SERVENTE H 3,493773,812.05.03 0,02600AREIA M3 2,0592079,202.05.08 12,93500CIMENTO KG 4,785950,372.80.05 0,35700COLA PVA KG 2,181276,113.55.45 1,05000PISO DE BORRACHA SINTETICA PASTILHADO PRETO 7MM M2 75,2850071,70

LS 8,04629 BDI 22,75920Mão-de-Obra 6,59532 Material 84,31142SubMO 14,64161

13.02.062 PISO DE BORRACHA SINT CANELADO COR PRETA ESP 7MM FIXAVEL C/ARG M2 119,07

1.01.39 0,66700PEDREIRO H 3,101554,651.01.46 0,91700SERVENTE H 3,493773,812.05.03 0,02600AREIA M3 2,0592079,202.05.08 12,93500CIMENTO KG 4,785950,372.80.05 0,35700COLA PVA KG 2,181276,113.55.43 1,05000PISO DE BORRACHA SINTETICA CANELADO PRETO 7MM M2 73,1430069,66

LS 8,04629 BDI 22,26654Mão-de-Obra 6,59532 Material 82,16942SubMO 14,64161

13.02.066 PISO DE COCNCRETO/LAJE ALVEOLAR (TIPO LAJE ZERO) M2 12,88

1.01.39 0,38000PEDREIRO H 1,767004,651.01.46 0,38000SERVENTE H 1,447803,812.40.91 0,05000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,0860021,722.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,03000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,6432021,44

LS 3,92206 BDI 2,40892Mão-de-Obra 3,21480 Material 3,33670SubMO 7,13686

13.02.067 PISO DE CONCRETO/LAJE TRELICADA (TIPO LAJE ZERO) M2 12,88

1.01.39 0,38000PEDREIRO H 1,767004,651.01.46 0,38000SERVENTE H 1,447803,812.40.91 0,05000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,0860021,722.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,03000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,6432021,44

LS 3,92206 BDI 2,40892Mão-de-Obra 3,21480 Material 3,33670SubMO 7,13686

13.02.068PISO DE CONCRETO SOBRE LAJE IMPERMEABILIZADA OU SOBRE PROTECAOACUSTIC

M2 82,42

1.01.21 0,28460FERREIRO H 1,357544,771.01.22 0,28460AJUDANTE DE FERREIRO H 1,087173,821.01.39 0,86000PEDREIRO H 3,999004,651.01.46 0,86000SERVENTE H 3,276603,812.05.37 0,08000CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA M3 23,60160295,022.15.07 0,89000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,584201,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,11000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 2,3892021,72

09/02/2011 11:38:40 Página: 257 de 0

Page 258: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.40.93 0,26700BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,034710,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,01130FITA CREPE 25MM X 50M UN 0,052094,61

LS 11,85878 BDI 15,41205Mão-de-Obra 9,72031 Material 45,42982SubMO 21,57910

13.02.073 CERAMICA EXTRUDADA (GRUPO ABSORÇAO A-1) M2 111,57

1.01.28 0,90000LADRILHISTA H 4,545005,051.01.46 0,90000SERVENTE H 3,429003,812.05.81 6,27000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 2,194500,352.05.97 2,32000ARGAMASSA P/ REJ BASE EPOXI - CERAMICA EXTRUDADA KG 14,082406,073.45.43 1,05000CERAMICA ESTRUDADA 24X11 OU 11X11 OU 18X18CM M2 56,7315054,03

LS 9,72828 BDI 20,86346Mão-de-Obra 7,97400 Material 73,00840SubMO 17,70228

13.02.074 PORCELANATO (GRUPO ABSORÇAO B1-A M2 74,82

1.01.28 0,90000LADRILHISTA H 4,545005,051.01.46 0,90000SERVENTE H 3,429003,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,352.05.96 0,27000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,432001,603.45.61 1,05000PORCELANATO M2 40,9500039,00

LS 9,72828 BDI 13,99188Mão-de-Obra 7,97400 Material 43,13200SubMO 17,70228

13.02.075 CHAPAS VINILICAS (COR ESPECIFICAR) ESPESSURA DE 2 MM M2 58,45

2.05.08 1,10000CIMENTO KG 0,407000,373.55.08 1,05000PISO VINILICO (COLOCADO) 2MM M2 47,1135044,87

LS 0,00000 BDI 10,92972Mão-de-Obra 0,00000 Material 47,52050SubMO 0,00000

13.02.077 CHAPAS VINILICAS/TRANSITO PESADO (COR ESPECIFICAR) ESP 2MM M2 104,55

2.05.08 1,10000CIMENTO KG 0,407000,373.55.59 1,05000PISO VINILICO / TRANSITO PESADO - 2MM - COLOCADO M2 84,5985080,57

LS 0,00000 BDI 19,55127Mão-de-Obra 0,00000 Material 85,00550SubMO 0,00000

13.02.083 SOALHO DE TABUAS DE PEROBA DE 10X2,0CM SOBRE LASTRO/LAJE M2 199,43

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,961.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,02900AREIA M3 2,2968079,202.05.08 10,50000CIMENTO KG 3,885000,372.05.17 0,03900PEDRA BRITADA 1 M3 2,4152761,932.10.56 2,25000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 9,922504,412.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,512.67.60 0,20000PREGO KG 0,914004,573.55.02 1,10000TABUA DE PEROBA DE 10 X 2.0 CM PARA SOALHO M2 109,6810099,71

LS 17,73697 BDI 37,29290Mão-de-Obra 14,53850 Material 129,86757SubMO 32,27547

13.02.084 SOALHO DE TABUAS DE PEROBA DE 20X2,0CM SOBRE LASTRO/LAJE M2 206,59

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,961.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,85000SERVENTE H 3,238503,812.05.03 0,02900AREIA M3 2,2968079,202.05.08 10,50000CIMENTO KG 3,885000,372.05.17 0,03900PEDRA BRITADA 1 M3 2,4152761,932.10.56 2,25000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 9,922504,412.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,512.67.60 0,20000PREGO KG 0,914004,573.55.23 1,10000TABUA PEROBA 20X2,0CM MACHO/FEM P/SOALHO M2 115,50000105,00

LS 17,73697 BDI 38,63127Mão-de-Obra 14,53850 Material 135,68657SubMO 32,27547

13.02.086 TACO DE IPE/CUMARU 7X21X2CM COLADO M2 91,01

1.01.49 0,70000TAQUEIRO H 3,185004,551.01.91 1,00000AJUDANTE DE TAQUEIRO H 3,960003,963.55.27 1,05000TACO DE IPE/CUMARU 7X21X2CM PARA COLA M2 52,6365050,133.90.76 0,50000COLA BRANCA ESPECIF P/PISO TACOS MADEIRA KG 5,5000011,00

LS 8,71690 BDI 17,01963Mão-de-Obra 7,14500 Material 58,13650SubMO 15,86190

13.02.087 TACO DE IPE/CUMARU 10X40X2CM COLADO M2 111,65

1.01.49 0,35000TAQUEIRO H 1,592504,551.01.91 0,50000AJUDANTE DE TAQUEIRO H 1,980003,963.55.51 1,05000TACO DE IPE/CUMARU 10X40X2CM PARA COLA M2 77,3430073,663.90.76 0,50000COLA BRANCA ESPECIF P/PISO TACOS MADEIRA KG 5,5000011,00

LS 4,35845 BDI 20,87801Mão-de-Obra 3,57250 Material 82,84300SubMO 7,93095

13.02.089 TACO DE IPE/CUMARU 7X35X2CM COLADO M2 116,23

1.01.49 1,20000TAQUEIRO H 5,460004,55

09/02/2011 11:38:40 Página: 258 de 0

Page 259: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.91 1,20000AJUDANTE DE TAQUEIRO H 4,752003,963.55.26 1,05000TACO DE IPE/CUMARU 7X35X2CM PARA COLA M2 66,3285063,173.90.76 0,50000COLA BRANCA ESPECIF P/PISO TACOS MADEIRA KG 5,5000011,00

LS 12,45864 BDI 21,73480Mão-de-Obra 10,21200 Material 71,82850SubMO 22,67064

13.02.092 SINTEKO - DUAS DEMAOS INCLUSIVE RASPAGEM - APLICADO M2 28,95

3.55.76 1,00000RASPAGEM/CALAFETACAO/SINTEKO EM TACOS -APLICADO M2 23,5400023,54

LS 0,00000 BDI 5,41420Mão-de-Obra 0,00000 Material 23,54000SubMO 0,00000

13.02.093 RASPAGEM COM CALAFETACAO E APLICACAO DE CERA M2 26,62

3.55.69 1,00000RASPAGEM/CALAFETACAO/CERA EM TACOS - APLICADO M2 21,6500021,65

LS 0,00000 BDI 4,97950Mão-de-Obra 0,00000 Material 21,65000SubMO 0,00000

13.02.099 SERVICOS DE REVESTIMENTO DE PISOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.03.042 PEDRA ARDOSIA 40X40CM E=7A10MM M2 50,06

1.01.39 0,92000PEDREIRO H 4,278004,651.01.46 1,30000SERVENTE H 4,953003,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 10,63000CIMENTO KG 3,933100,372.05.83 5,00000ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III KG 1,850000,373.50.02 1,05000PEDRA ARDOSIA 40X40CM E=7A10MM M2 11,8965011,33

LS 11,26182 BDI 9,36257Mão-de-Obra 9,23100 Material 20,21400SubMO 20,49282

13.03.099 SERVICOS DE REVESTIMENTO DE PISOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.04.001 DEGRAUS EM ARGAMASSA DE CIMENTO E AREIA 1:3 ESPESSURA DE 2 CM M 28,28

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,01600AREIA M3 1,2672079,202.05.08 6,96000CIMENTO KG 2,575200,37

LS 10,52616 BDI 5,28921Mão-de-Obra 8,62800 Material 3,84240SubMO 19,15416

13.04.004 DEGRAU DE CONCRETO LISO M 61,90

1.01.39 2,23000PEDREIRO H 10,369504,651.01.46 1,70000SERVENTE H 6,477003,812.05.03 0,01700AREIA M3 1,3464079,202.05.05 1,08000CAL HIDRATADA KG 0,367200,342.05.08 5,70000CIMENTO KG 2,109000,372.05.18 0,01400PEDRA BRITADA 2 M3 0,8552661,092.25.15 23,00000TIJOLO COMUM MACICO UN 5,060000,222.66.78 1,20000FERRO CANTONEIRA 1X1X1/8' KG 3,192002,66

LS 20,55273 BDI 11,57569Mão-de-Obra 16,84650 Material 12,92986SubMO 37,39923

13.04.026 DEGRAUS DE GRANILITE MOLDADOS NO LOCAL M 72,37

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,01600AREIA M3 1,2672079,202.05.08 5,32000CIMENTO KG 1,968400,373.50.31 1,00000DEGRAU GRANILITE APLICADO (MOLD LOCAL) M 36,4500036,45

LS 10,52616 BDI 13,53315Mão-de-Obra 8,62800 Material 39,68560SubMO 19,15416

13.04.027 DEGRAUS DE GRANILITE PRE-MOLDADOS M 36,83

1.01.46 0,35000SERVENTE H 1,333503,812.05.03 0,01600AREIA M3 1,2672079,202.05.08 5,32000CIMENTO KG 1,968400,373.55.30 1,00000DEGRAU GRANILITE FORNECIDO E APLICADO M 23,7500023,75

LS 1,62687 BDI 6,88757Mão-de-Obra 1,33350 Material 26,98560SubMO 2,96037

13.04.031 DEGRAUS COM MASSA GRANITICA ALTA RESISTENCIA TIPO MEDIO 8 MM M 92,47

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,01600AREIA M3 1,2672079,202.05.08 7,46000CIMENTO KG 2,760200,373.55.35 1,00000DEGRAU MASSA GRANIT ALT RESIST MED 8MM M 52,0000052,00

LS 10,52616 BDI 17,29176Mão-de-Obra 8,62800 Material 56,02740SubMO 19,15416

13.04.040 DEGRAUS DE CHAPA VINILICA ESPESS 2 MM M 95,09

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,01600AREIA M3 1,2672079,202.05.08 6,96000CIMENTO KG 2,575200,37

09/02/2011 11:38:40 Página: 259 de 0

Page 260: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.55.37 1,00000DEGRAU VINILICO 2MM C/TEST-FORN,COLOC M 54,3200054,32

LS 10,52616 BDI 17,78281Mão-de-Obra 8,62800 Material 58,16240SubMO 19,15416

13.04.050 DEGRAU DE BORRACHA SINTETICA COR PRETA C/TESTEIRA FIXAVEL C/ARG M 79,39

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,01300AREIA M3 1,0296079,202.05.08 6,46800CIMENTO KG 2,393160,372.80.05 0,17900COLA PVA KG 1,093696,113.55.18 1,05000DEGRAU BORRACHA SINTETICA INCL TESTEIRA M 42,4725040,45

LS 9,65142 BDI 14,84682Mão-de-Obra 7,91100 Material 46,98895SubMO 17,56242

13.04.099 SERVICOS DE REVESTIMENTO DE DEGRAUS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.05.001 RODAPES DE ARGAM CIMENTO E AREIA 1:3 COM ALTURA DE 5 CM M 12,58

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 0,69000CIMENTO KG 0,255300,37

LS 5,43949 BDI 2,35350Mão-de-Obra 4,45860 Material 0,33450SubMO 9,89809

13.05.002 RODAPES DE ARGAM CIMENTO E AREIA 1:3 COM ALTURA DE 7 CM M 17,22

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 0,96000CIMENTO KG 0,355200,372.40.91 0,15000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 3,2580021,72

LS 5,62542 BDI 3,22185Mão-de-Obra 4,61100 Material 3,77160SubMO 10,23642

13.05.003 RODAPE DE CIMENTADO DE 15 CM M 13,07

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,34000CIMENTO KG 0,495800,37

LS 5,43949 BDI 2,44524Mão-de-Obra 4,45860 Material 0,73340SubMO 9,89809

13.05.004 RODAPES DE ARGAM CIMENTO E AREIA 1:3 COM ALTURA DE 10 CM M 12,99

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,38000CIMENTO KG 0,510600,37

LS 5,43949 BDI 2,43043Mão-de-Obra 4,45860 Material 0,66900SubMO 9,89809

13.05.005 RODAPE DE ARGAMASSA DE CIM/AREIA 1:3 PARA ESCADA M 21,28

1.01.39 0,82800PEDREIRO H 3,850204,651.01.46 0,92400SERVENTE H 3,520443,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,90000CIMENTO KG 0,703000,37

LS 8,99218 BDI 3,97979Mão-de-Obra 7,37064 Material 0,94060SubMO 16,36282

13.05.008 RODAPES DE PEROBA DE 5X1,5CM M 16,32

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,961.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,20000SERVENTE H 0,762003,812.67.60 0,04000PREGO KG 0,182804,573.61.06 1,03000CORDAO MEIA CANA 1X1 CM M 3,625603,523.61.39 1,03000RODAPE PEROBA 5X1,5CM M 1,431701,39

LS 4,41213 BDI 3,05181Mão-de-Obra 3,61650 Material 5,24010SubMO 8,02863

13.05.009 RODAPES DE PEROBA DE 7X1,5CM M 22,75

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,961.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,20000SERVENTE H 0,762003,812.67.60 0,04000PREGO KG 0,182804,573.60.02 1,03000RODAPE PEROBA 7X1,5CM M 6,664106,473.61.06 1,03000CORDAO MEIA CANA 1X1 CM M 3,625603,52

LS 4,41213 BDI 4,25526Mão-de-Obra 3,61650 Material 10,47250SubMO 8,02863

13.05.012 RODAPES DE IPE DE 5X1,5CM M 23,46

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,961.01.39 0,15000PEDREIRO H 0,697504,65

09/02/2011 11:38:40 Página: 260 de 0

Page 261: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 0,20000SERVENTE H 0,762003,812.67.60 0,04000PREGO KG 0,182804,573.60.57 1,03000RODAPE DE IPE 5X1,5CM M 7,240907,033.61.06 1,03000CORDAO MEIA CANA 1X1 CM M 3,625603,52

LS 4,41213 BDI 4,38792Mão-de-Obra 3,61650 Material 11,04930SubMO 8,02863

13.05.013 RODAPES DE IPE/CUMARU DE 7X2CM M 24,89

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,961.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,20000SERVENTE H 0,762003,812.67.60 0,04000PREGO KG 0,182804,573.60.56 1,03000RODAPE DE IPE/CUMARU 7X2CM M 8,404808,163.61.06 1,03000CORDAO MEIA CANA 1X1 CM M 3,625603,52

LS 4,41213 BDI 4,65562Mão-de-Obra 3,61650 Material 12,21320SubMO 8,02863

13.05.014 RODAPES DE LADRILHO HIDRAULICO UMA COR COM 10 CM DE ALTURA M 25,78

1.01.28 0,60000LADRILHISTA H 3,030005,051.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,06000CIMENTO KG 0,392200,373.61.30 1,00000RODAPE LADRILHO HIDRAULICO ALT 10CM M 8,870008,87

LS 6,29959 BDI 4,82149Mão-de-Obra 5,16360 Material 9,49980SubMO 11,46319

13.05.015 RODAPE BOLEADO EM CERAMICA EXTRUDADA M 27,54

1.01.28 0,25000LADRILHISTA H 1,262505,051.01.46 0,25000SERVENTE H 0,952503,812.05.81 0,62000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,217000,352.05.97 0,23200ARGAMASSA P/ REJ BASE EPOXI - CERAMICA EXTRUDADA KG 1,408246,073.61.47 1,05000RODAPE BOLEADO EM CERAMICA EXTRUDADA M 15,8550015,10

LS 2,70230 BDI 5,15143Mão-de-Obra 2,21500 Material 17,48024SubMO 4,91730

13.05.016 RODAPE BOLEADO EM PORCELANATO M 33,07

1.01.28 0,25000LADRILHISTA H 1,262505,051.01.46 0,25000SERVENTE H 0,952503,812.05.81 0,75000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,262500,352.05.96 0,05000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 0,080001,603.61.48 1,05000RODAPE BOLEADO EM PORCELANATO M 21,6300020,60

LS 2,70230 BDI 6,18465Mão-de-Obra 2,21500 Material 21,97250SubMO 4,91730

13.05.020 RODAPES DE GRANILITE SIMPLES DE 10 CM M 24,73

1.01.46 0,05000SERVENTE H 0,190503,812.05.08 0,90000CIMENTO KG 0,333000,373.60.80 1,00000RODAPE FORN GRAN APLI/POL IN LOCO E=10MM H=10CM M 19,3500019,35

LS 0,23241 BDI 4,62436Mão-de-Obra 0,19050 Material 19,68300SubMO 0,42291

13.05.021 RODAPE DE GRANILITE SIMPLES DE 7-CM M 29,09

1.01.46 0,10000SERVENTE H 0,381003,812.05.08 0,63000CIMENTO KG 0,233100,372.40.91 0,15000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 3,2580021,723.60.81 1,00000RODAPE FORN GRAN APLIC/POL IN LOCO E=10MM H=7CM M 19,3200019,32

LS 0,46482 BDI 5,44109Mão-de-Obra 0,38100 Material 22,81110SubMO 0,84582

13.05.024 RODAPES DE GRANILITE PARA ESCADA DE 10 CM M 25,56

1.01.46 0,05000SERVENTE H 0,190503,812.05.08 1,00000CIMENTO KG 0,370000,373.60.82 1,00000RODAPE FORN GRAN APL/POL IN LOCO E=10MM H=10CM/ESC M 19,9900019,99

LS 0,23241 BDI 4,78007Mão-de-Obra 0,19050 Material 20,36000SubMO 0,42291

13.05.025 RODAPE DE GRANILITE PARA ESCADA DE 7-CM M 24,44

1.01.46 0,03500SERVENTE H 0,133353,812.05.08 0,70000CIMENTO KG 0,259000,373.60.83 1,00000RODAPE FORN GRAN APL/POL IN LOCO E=10MM H=7CM ESC M 19,3200019,32

LS 0,16269 BDI 4,57126Mão-de-Obra 0,13335 Material 19,57900SubMO 0,29604

13.05.028 RODAPES DE MASSA GRANIT ALTA RESISTENCIA DE 10 CM TIPO MEDIO SIMPLES M 30,99

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,06000CIMENTO KG 0,392200,373.61.40 1,00000RODAPE MASSA GRANIT ALT RES 10CM SIM MED M 14,6700014,67

LS 5,43949 BDI 5,79552Mão-de-Obra 4,45860 Material 15,29980SubMO 9,89809

13.05.029 RODAPE EM PLACAS ALTA RESIST.DE 7CM TIPO MEDIO SIMPLES FORN/APLIC M 18,58

1.01.39 0,35000PEDREIRO H 1,627504,651.01.46 0,40000SERVENTE H 1,524003,81

09/02/2011 11:38:40 Página: 261 de 0

Page 262: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,00200AREIA M3 0,1584079,202.05.08 0,75000CIMENTO KG 0,277500,373.60.33 1,00000RODAPE EM PLACAS ALTA RESIST APLIC 7A10 M 7,680007,68

LS 3,84483 BDI 3,47581Mão-de-Obra 3,15150 Material 8,11590SubMO 6,99633

13.05.030 RODAPES MASSA GRANIT ALTA RES 10CM MEDIO P/ESCADA INCL TRIANG M 34,87

1.01.39 0,70000PEDREIRO H 3,255004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 1,74000CIMENTO KG 0,643800,373.61.31 1,00000RODAPE M GRANIT ALT RES 10CM MED P/ESCAD M 15,3500015,35

LS 6,57409 BDI 6,52107Mão-de-Obra 5,38860 Material 16,38980SubMO 11,96269

13.05.031 RODAPE DE ALTA RESISTENCIA 7-CM TIPO MEDIO PARA ESCADA INCL TRIANGULO M 29,50

1.01.39 0,49000PEDREIRO H 2,278504,651.01.46 0,40000SERVENTE H 1,524003,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,22000CIMENTO KG 0,451400,373.61.43 1,00000RODAPE MASSA GRANIT ALT RES 7-CM C/ TRIANG M 14,9400014,94

LS 4,63905 BDI 5,51801Mão-de-Obra 3,80250 Material 15,54980SubMO 8,44155

13.05.068 RODAPE VINILICO DE 5 CM SIMPLES M 19,75

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 0,61000CIMENTO KG 0,225700,373.60.39 1,00000RODAPE VINILICO 5 CM SIMPLES M 5,860005,86

LS 5,43949 BDI 3,69449Mão-de-Obra 4,45860 Material 6,16490SubMO 9,89809

13.05.069 RODAPE VINILICO DE 7 CM SIMPLES M 18,67

1.01.39 0,55000PEDREIRO H 2,557504,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 0,92000CIMENTO KG 0,340400,373.61.53 1,00000RODAPE VINILICO 7CM SIMPLES M 4,270004,27

LS 5,72314 BDI 3,49210Mão-de-Obra 4,69110 Material 4,76880SubMO 10,41424

13.05.070 RODAPE VINILICO DE 7,5 CM SIMPLES M 19,55

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,22000CIMENTO KG 0,451400,373.61.51 1,00000RODAPE VINILICO 7,5CM SIMPLES - SEM COLOCACAO M 4,280004,28

LS 6,00679 BDI 3,65686Mão-de-Obra 4,92360 Material 4,96900SubMO 10,93039

13.05.074 RODAPE VINILICO DE 5 CM PARA ESCADA M 19,10

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00200AREIA M3 0,1584079,202.05.08 1,46000CIMENTO KG 0,540200,373.61.54 1,00000RODAPE VINILICO 5CM P/ESCADA M 3,900003,90

LS 6,00679 BDI 3,57167Mão-de-Obra 4,92360 Material 4,59860SubMO 10,93039

13.05.075 RODAPE VINILICO DE 7,5 CM PARA ESCADA M 20,63

1.01.39 0,65000PEDREIRO H 3,022504,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 1,77000CIMENTO KG 0,654900,373.61.52 1,00000RODAPE VINILICO 7,5CM PARA ESCADA M 4,280004,28

LS 6,29044 BDI 3,85881Mão-de-Obra 5,15610 Material 5,33090SubMO 11,44654

13.05.078 RODAPE CERAMICA ANTIDERRAPANTE (TP MONOQUEIMA) DE 8CM M 20,26

1.01.28 0,20000LADRILHISTA H 1,010005,051.01.46 0,20000SERVENTE H 0,762003,812.05.81 0,40000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 0,140000,352.40.91 0,15000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 3,2580021,723.61.46 1,05000RODAPE CERAMICA ANTIDERRAP (TP MONOQUEIMA) 30X8CM M 9,145508,71

LS 2,16184 BDI 3,78979Mão-de-Obra 1,77200 Material 12,54350SubMO 3,93384

13.05.080 RODAPE DE BORRACHA SINT COR PRETA FAIXA 7CM E=7MM FIXAVEL C/ARG M 25,03

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00100AREIA M3 0,0792079,202.05.08 0,61000CIMENTO KG 0,225700,373.61.10 1,00000RODAPE BORRACHA SINT PRETO 7-CM M 10,1500010,15

09/02/2011 11:38:40 Página: 262 de 0

Page 263: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 5,43949 BDI 4,68119Mão-de-Obra 4,45860 Material 10,45490SubMO 9,89809

13.05.085 RODAPE DE ALUMINIO DE 7X1 CM M 12,95

1.01.11 0,50000CARPINTEIRO H 2,275004,552.67.26 2,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,260000,132.67.77 0,02000BUCHA TIPO S-8 (CENTO) UN 0,2222011,113.61.01 1,00000RODAPE ALUMINIO ANODIZ 7X1CM AR.5-AR.6 M 5,000005,00

LS 2,77550 BDI 2,42252Mão-de-Obra 2,27500 Material 5,48220SubMO 5,05050

13.05.099 SERVICOS DE REVESTIMENTO DE RODAPES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.06.005 SOLEIRA DE ARGAMASSA CIM/AREIA 1:3 EM RAMPA M 13,17

1.01.39 0,39440PEDREIRO H 1,833964,651.01.46 0,51510SERVENTE H 1,962533,812.05.03 0,00800AREIA M3 0,6336079,202.05.08 2,46000CIMENTO KG 0,910200,372.05.18 0,01210PEDRA BRITADA 2 M3 0,7391961,09

LS 4,63172 BDI 2,46358Mão-de-Obra 3,79649 Material 2,28299SubMO 8,42821

13.06.008 SOLEIRAS DE 15CM DE TABUAS DE IPE M 189,61

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,961.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,20000SERVENTE H 0,762003,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 1,50000CIMENTO KG 0,555000,372.05.17 0,00600PEDRA BRITADA 1 M3 0,3715861,932.10.56 0,30000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 1,323004,412.40.69 0,05000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,125502,512.67.60 0,03000PREGO KG 0,137104,573.60.58 1,03000SOLEIRA 15CM TABUA DE IPE M2 136,71190132,73

LS 7,99100 BDI 35,45705Mão-de-Obra 6,55000 Material 139,62008SubMO 14,54100

13.06.009 SOLEIRAS DE 25CM DE TABUAS DE IPE M 241,01

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,961.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,30000SERVENTE H 1,143003,812.05.03 0,00900AREIA M3 0,7128079,202.05.08 2,55000CIMENTO KG 0,943500,372.05.17 0,01000PEDRA BRITADA 1 M3 0,6193061,932.10.56 0,50000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 2,205004,412.40.69 0,09000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,225902,512.67.60 0,05000PREGO KG 0,228504,573.60.59 1,30000SOLEIRA 25CM TABUA DE IPE M2 174,59000134,30

LS 9,02312 BDI 45,06715Mão-de-Obra 7,39600 Material 179,52500SubMO 16,41912

13.06.010 SOLEIRAS DE 15CM DE TABUAS DE PEROBA M 42,56

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,961.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,20000SERVENTE H 0,762003,812.05.03 0,00500AREIA M3 0,3960079,202.05.08 1,50000CIMENTO KG 0,555000,372.05.17 0,00600PEDRA BRITADA 1 M3 0,3715861,932.10.56 0,30000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 1,323004,412.40.69 0,05000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,125502,512.67.60 0,03000PREGO KG 0,137104,573.61.97 1,03000SOL 15 CM TABUA PEROBA M 17,1598016,66

LS 7,99100 BDI 7,96007Mão-de-Obra 6,55000 Material 20,06798SubMO 14,54100

13.06.040 SOLEIRAS DE 25CM DE TABUAS DE PEROBA M 74,18

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,961.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,30000SERVENTE H 1,143003,812.05.03 0,00900AREIA M3 0,7128079,202.05.08 2,55000CIMENTO KG 0,943500,372.05.17 0,01000PEDRA BRITADA 1 M3 0,6193061,932.10.56 0,50000CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM M 2,205004,412.40.69 0,09000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,225902,512.67.60 0,05000PREGO KG 0,228504,573.61.96 1,30000SOL 25 CM TABUA PEROBA M 38,9610029,97

LS 9,02312 BDI 13,87248Mão-de-Obra 7,39600 Material 43,89600SubMO 16,41912

09/02/2011 11:38:40 Página: 263 de 0

Page 264: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

13.06.074 SO-14 SOLEIRA EM CIMENTADO L=15,5CM DESNIVEL 1,5CM M 65,25

1.01.39 0,71300PEDREIRO H 3,315454,651.01.46 0,81500SERVENTE H 3,105153,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 8,64200CIMENTO KG 3,197540,373.50.90 1,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 33,9400033,94

LS 7,83313 BDI 12,20253Mão-de-Obra 6,42060 Material 38,80074SubMO 14,25373

13.06.075 SO-15 SOLEIRA EM CIMENTADO L=22CM DESNIVEL 1,5CM M 72,13

1.01.39 0,88600PEDREIRO H 4,119904,651.01.46 1,03200SERVENTE H 3,931923,812.05.03 0,02900AREIA M3 2,2968079,202.05.08 12,26400CIMENTO KG 4,537680,373.50.90 1,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 33,9400033,94

LS 9,82322 BDI 13,48939Mão-de-Obra 8,05182 Material 40,77448SubMO 17,87504

13.06.076 SO-16 SOLEIRA EM GRANILITE L=15,5CM DESNIVEL 1,5CM M 69,45

1.01.39 0,53200PEDREIRO H 2,473804,651.01.46 0,79500SERVENTE H 3,028953,811.01.87 0,00900APLICADOR H 0,041314,591.01.88 0,00900AJUDANTE DE APLICADOR H 0,035553,952.05.03 0,01500AREIA M3 1,1880079,202.05.08 7,61700CIMENTO KG 2,818290,373.30.15 0,15500FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 5,4064034,883.50.90 1,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 33,9400033,943.80.44 0,00800JONSEAL 220 L 0,5876073,453.80.45 0,00400TRAFFIC L 0,1376834,42

LS 6,80712 BDI 12,98688Mão-de-Obra 5,57961 Material 44,07797SubMO 12,38673

13.06.077 SO-17 SOLEIRA EM GRANILITE L=22CM DESNIVEL 1,5CM M 78,12

1.01.39 0,62900PEDREIRO H 2,924854,651.01.46 1,00300SERVENTE H 3,821433,811.01.87 0,01300APLICADOR H 0,059674,591.01.88 0,01300AJUDANTE DE APLICADOR H 0,051353,952.05.03 0,02100AREIA M3 1,6632079,202.05.08 10,81000CIMENTO KG 3,999700,373.30.15 0,22000FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 7,6736034,883.50.90 1,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 33,9400033,943.80.44 0,01100JONSEAL 220 L 0,8079573,453.80.45 0,00600TRAFFIC L 0,2065234,42

LS 8,36591 BDI 14,60826Mão-de-Obra 6,85730 Material 48,29097SubMO 15,22321

13.06.082 SO-22 SOLEIRA DE GRANITO EM NIVEL (L= 14 A 17CM) M 72,93

1.01.39 0,60000PEDREIRO H 2,790004,651.01.46 0,40000SERVENTE H 1,524003,812.05.03 0,00350AREIA M3 0,2772079,202.05.05 0,57000CAL HIDRATADA KG 0,193800,342.05.08 1,14000CIMENTO KG 0,421800,373.50.91 0,17000GRANITO CINZA ANDORINHA LEVIGADO (E=2CM) M2 48,82910287,23

LS 5,26308 BDI 13,63877Mão-de-Obra 4,31400 Material 49,72190SubMO 9,57708

13.06.083 SO-23 SOLEIRA DE GRANITO EM NIVEL (L=19 A 22CM) M 94,46

1.01.39 0,78000PEDREIRO H 3,627004,651.01.46 0,52000SERVENTE H 1,981203,812.05.03 0,00460AREIA M3 0,3643279,202.05.05 0,74000CAL HIDRATADA KG 0,251600,342.05.08 1,48000CIMENTO KG 0,547600,373.50.91 0,22000GRANITO CINZA ANDORINHA LEVIGADO (E=2CM) M2 63,19060287,23

LS 6,84200 BDI 17,66500Mão-de-Obra 5,60820 Material 64,35412SubMO 12,45020

13.06.084 SO-24 - SOLEIRA DE GRANITO RAMPADA DESN.ATÉ 1,5CM-2PÇ (L=14 À 17CM) M 104,71

1.01.39 0,70000PEDREIRO H 3,255004,651.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,00400AREIA M3 0,3168079,202.05.05 0,60000CAL HIDRATADA KG 0,204000,342.05.08 1,20000CIMENTO KG 0,444000,373.50.90 1,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 33,9400033,943.50.91 0,13500GRANITO CINZA ANDORINHA LEVIGADO (E=2CM) M2 38,77605287,23

LS 6,29520 BDI 19,58129Mão-de-Obra 5,16000 Material 73,68085SubMO 11,45520

13.06.085 SO-25 SOLEIRA DE GRANITO RAMPADA DESN.ATÉ 1,5CM 2 PÇ (L=19 A 22CM) M 126,26

1.01.39 0,88000PEDREIRO H 4,092004,651.01.46 0,62000SERVENTE H 2,362203,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,79000CAL HIDRATADA KG 0,268600,342.05.08 1,58000CIMENTO KG 0,584600,37

09/02/2011 11:38:40 Página: 264 de 0

Page 265: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.50.90 1,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 33,9400033,943.50.91 0,18500GRANITO CINZA ANDORINHA LEVIGADO (E=2CM) M2 53,13755287,23

LS 7,87412 BDI 23,61067Mão-de-Obra 6,45420 Material 88,32675SubMO 14,32832

13.06.086 SO-26 SOLEIRA DE GRANITO RAMPADA DESN.ATÉ 1,5CM 3 PÇ (L=14 A 17CM) M 136,40

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00400AREIA M3 0,3168079,202.05.05 0,60000CAL HIDRATADA KG 0,204000,342.05.08 1,20000CIMENTO KG 0,444000,373.50.90 2,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 67,8800033,943.50.91 0,10000GRANITO CINZA ANDORINHA LEVIGADO (E=2CM) M2 28,72300287,23

LS 7,32732 BDI 25,50726Mão-de-Obra 6,00600 Material 97,56780SubMO 13,33332

13.06.087 SO-27 SOLEIRA DE GRANITO RAMPADA DESN.ATÉ 1,5CM 3 PÇ (L=19 A 22CM) M 157,95

1.01.39 0,98000PEDREIRO H 4,557004,651.01.46 0,72000SERVENTE H 2,743203,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,79000CAL HIDRATADA KG 0,268600,342.05.08 1,58000CIMENTO KG 0,584600,373.50.90 2,00000GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE) M 67,8800033,943.50.91 0,15000GRANITO CINZA ANDORINHA LEVIGADO (E=2CM) M2 43,08450287,23

LS 8,90624 BDI 29,53663Mão-de-Obra 7,30020 Material 112,21370SubMO 16,20644

13.06.099 SERVICOS DE REVESTIMENTO DE SOLEIRAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.07.002 PE-02 PEITORIL M 46,49

1.01.11 0,83000CARPINTEIRO H 3,776504,551.01.12 0,83000AJUDANTE DE CARPINTEIRO H 3,286803,961.01.39 1,17000PEDREIRO H 5,440504,651.01.46 0,39000SERVENTE H 1,485903,812.05.03 0,01200AREIA M3 0,9504079,202.05.08 4,86000CIMENTO KG 1,798200,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.10.21 0,04000TABUAS PINHO DE 1"X12" DE 3A. M2 0,6872017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,31

LS 17,06743 BDI 8,69327Mão-de-Obra 13,98970 Material 6,73967SubMO 31,05713

13.07.099 SERVICOS DE REVESTIMENTO DE PEITORIS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.50.001 DEMOLICAO PISO DE CONCRETO SIMPLES CAPEADO M3 135,24

1.01.46 13,00000SERVENTE H 49,530003,81

LS 60,42660 BDI 25,29002Mão-de-Obra 49,53000 Material 0,00000SubMO 109,95660

13.50.002 DEMOLICAO PISO GRANIL LADR HID/CER CACOS INCLUSIVE BASE M2 16,34

1.01.39 0,14000PEDREIRO H 0,651004,651.01.46 1,40000SERVENTE H 5,334003,81

LS 7,30170 BDI 3,05594Mão-de-Obra 5,98500 Material 0,00000SubMO 13,28670

13.50.003 DEMOLICAO PISO TACOS DE MADEIRA INCLUSIVE ARG ASSENTAMENTO M2 12,05

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,96

LS 5,38630 BDI 2,25430Mão-de-Obra 4,41500 Material 0,00000SubMO 9,80130

13.50.004 DEMOLICAO PISO SOALHO DE TABUAS INCLUSIVE VIGAMENTOS M2 10,85

1.01.11 0,09000CARPINTEIRO H 0,409504,551.01.12 0,90000AJUDANTE DE CARPINTEIRO H 3,564003,96

LS 4,84767 BDI 2,02887Mão-de-Obra 3,97350 Material 0,00000SubMO 8,82117

13.50.006 DE ASSOALHO SOMENTE TABUAS M2 5,42

1.01.11 0,04500CARPINTEIRO H 0,204754,551.01.12 0,45000AJUDANTE DE CARPINTEIRO H 1,782003,96

LS 2,42384 BDI 1,01444Mão-de-Obra 1,98675 Material 0,00000SubMO 4,41059

13.50.010 DE PISOS VINILICOS E DE BORRACHA INCL ARG ASSENT E REGULARIZACAO M2 4,16

1.01.46 0,40000SERVENTE H 1,524003,81

LS 1,85928 BDI 0,77815Mão-de-Obra 1,52400 Material 0,00000SubMO 3,38328

13.50.015DEMOLICAO REVEST DE DEGRAUS DE ARG/GRAN/CACOS/LADRIL INCL ARGASSENT

M2 5,20

1.01.46 0,50000SERVENTE H 1,905003,81

09/02/2011 11:38:40 Página: 265 de 0

Page 266: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 2,32410 BDI 0,97269Mão-de-Obra 1,90500 Material 0,00000SubMO 4,22910

13.50.016 DEMOLICAO RODAPES EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO M 1,24

1.01.46 0,12000SERVENTE H 0,457203,81

LS 0,55778 BDI 0,23345Mão-de-Obra 0,45720 Material 0,00000SubMO 1,01498

13.50.017 DEMOLICAO SOLEIRAS EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO M 1,56

1.01.46 0,15000SERVENTE H 0,571503,81

LS 0,69723 BDI 0,29181Mão-de-Obra 0,57150 Material 0,00000SubMO 1,26873

13.50.018 DEMOLICAO PEITORIS EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO M 1,24

1.01.46 0,12000SERVENTE H 0,457203,81

LS 0,55778 BDI 0,23345Mão-de-Obra 0,45720 Material 0,00000SubMO 1,01498

13.50.019 DEMOLICAO GUARDA-CORPOS EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO M 1,24

1.01.46 0,12000SERVENTE H 0,457203,81

LS 0,55778 BDI 0,23345Mão-de-Obra 0,45720 Material 0,00000SubMO 1,01498

13.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.60.001 DE PISO VINILICO E BORRACHA M2 2,31

1.01.39 0,10000PEDREIRO H 0,465004,651.01.46 0,10000SERVENTE H 0,381003,81

LS 1,03212 BDI 0,43197Mão-de-Obra 0,84600 Material 0,00000SubMO 1,87812

13.60.002 DE PISO DE BORRACHA ARGAMASSADO M2 5,08

1.01.39 0,22000PEDREIRO H 1,023004,651.01.46 0,22000SERVENTE H 0,838203,81

LS 2,27066 BDI 0,95033Mão-de-Obra 1,86120 Material 0,00000SubMO 4,13186

13.60.003 DE PISO DE CERAMICA OU LADRILHOS HIDRAULICOS M2 15,60

1.01.46 1,50000SERVENTE H 5,715003,81

LS 6,97230 BDI 2,91808Mão-de-Obra 5,71500 Material 0,00000SubMO 12,68730

13.60.004 DE PISO DE TACOS DE MADEIRA M2 6,24

1.01.46 0,60000SERVENTE H 2,286003,81

LS 2,78892 BDI 1,16723Mão-de-Obra 2,28600 Material 0,00000SubMO 5,07492

13.60.005 DE SOALHO INCLUSIVE VIGAMENTO M2 13,94

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,96

LS 6,22932 BDI 2,60712Mão-de-Obra 5,10600 Material 0,00000SubMO 11,33532

13.60.006 DE SOALHO SOMENTE TABUAS M2 8,13

1.01.11 0,35000CARPINTEIRO H 1,592504,551.01.12 0,35000AJUDANTE DE CARPINTEIRO H 1,386003,96

LS 3,63377 BDI 1,52082Mão-de-Obra 2,97850 Material 0,00000SubMO 6,61227

13.60.007 DE PISO DE PEDRA M2 13,52

1.01.46 1,30000SERVENTE H 4,953003,81

LS 6,04266 BDI 2,52900Mão-de-Obra 4,95300 Material 0,00000SubMO 10,99566

13.60.008 DE PISO DE GRANITO OU MARMORE M2 16,64

1.01.46 1,60000SERVENTE H 6,096003,81

LS 7,43712 BDI 3,11262Mão-de-Obra 6,09600 Material 0,00000SubMO 13,53312

13.60.009 DE DEGRAUS E ESPELHOS EM PEDRA M 10,40

1.01.46 1,00000SERVENTE H 3,810003,81

LS 4,64820 BDI 1,94539Mão-de-Obra 3,81000 Material 0,00000SubMO 8,45820

13.60.010 DE DEGRAUS E ESP DE GRANITO OU MARMORE M 12,48

1.01.46 1,20000SERVENTE H 4,572003,81

LS 5,57784 BDI 2,33446Mão-de-Obra 4,57200 Material 0,00000SubMO 10,14984

13.60.011 DE RODAPES DE CERAM LADR-HIDR GRANITO OU MARMORE M 2,08

1.01.46 0,20000SERVENTE H 0,762003,81

LS 0,92964 BDI 0,38908Mão-de-Obra 0,76200 Material 0,00000SubMO 1,69164

13.60.012 DE RODAPES DE MADEIRA INCLUSIVE CORDAO M 1,62

1.01.12 0,15000AJUDANTE DE CARPINTEIRO H 0,594003,96

LS 0,72468 BDI 0,30330Mão-de-Obra 0,59400 Material 0,00000SubMO 1,31868

09/02/2011 11:38:40 Página: 266 de 0

Page 267: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

13.60.013 DE SOLEIRAS EM GERAL M 2,08

1.01.46 0,20000SERVENTE H 0,762003,81

LS 0,92964 BDI 0,38908Mão-de-Obra 0,76200 Material 0,00000SubMO 1,69164

13.60.014 DE PEITORIS EM GERAL M 2,08

1.01.46 0,20000SERVENTE H 0,762003,81

LS 0,92964 BDI 0,38908Mão-de-Obra 0,76200 Material 0,00000SubMO 1,69164

13.60.015 DE GUARDA-CORPOS EM GERAL M 2,08

1.01.46 0,20000SERVENTE H 0,762003,81

LS 0,92964 BDI 0,38908Mão-de-Obra 0,76200 Material 0,00000SubMO 1,69164

13.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.70.001 DE PISO VINILICO E BORRACHA M2 8,58

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,812.80.73 0,20000COLA PARA PISO VINILICO L 3,2240016,12

LS 2,06424 BDI 1,60546Mão-de-Obra 1,69200 Material 3,22400SubMO 3,75624

13.70.002 DE PISO DE BORRACHA ARGAMASSADO M2 39,87

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 14,92000CIMENTO KG 5,520400,37

LS 13,39011 BDI 7,45669Mão-de-Obra 10,97550 Material 8,05480SubMO 24,36561

13.70.005 REPREGAMENTO DE SOALHO DE PEROBA M2 2,70

1.01.11 0,20000CARPINTEIRO H 0,910004,552.67.60 0,04000PREGO KG 0,182804,57

LS 1,11020 BDI 0,50669Mão-de-Obra 0,91000 Material 0,18280SubMO 2,02020

13.70.050 DE RODAPES E CORDOES DE MADEIRA M 5,88

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,96

LS 2,63154 BDI 1,10136Mão-de-Obra 2,15700 Material 0,00000SubMO 4,78854

13.70.099 RECOLOCACOES DE PISOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

13.80.002 LASTRO DE CONCRETO M3 452,22

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 16,00000SERVENTE H 60,960003,812.05.03 0,60000AREIA M3 47,5200079,202.05.08 200,00000CIMENTO KG 74,000000,372.05.18 0,80000PEDRA BRITADA 2 M3 48,8720061,09

LS 108,40920 BDI 84,56208Mão-de-Obra 88,86000 Material 170,39200SubMO 197,26920

13.80.003 LASTRO DE BRITA GRADUADA COMPACTAÇÃO MECÂNICA E=8CM M2 9,43

1.01.46 0,21800SERVENTE H 0,830583,812.05.23 0,08000BRITA GRADUADA M3 5,4448068,068.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,83

LS 1,01331 BDI 1,76375Mão-de-Obra 0,83058 Material 5,82458SubMO 1,84389

13.80.005 DEGRAU DE CONCRETO LISO M 61,90

1.01.39 2,23000PEDREIRO H 10,369504,651.01.46 1,70000SERVENTE H 6,477003,812.05.03 0,01700AREIA M3 1,3464079,202.05.05 1,08000CAL HIDRATADA KG 0,367200,342.05.08 5,70000CIMENTO KG 2,109000,372.05.18 0,01400PEDRA BRITADA 2 M3 0,8552661,092.25.15 23,00000TIJOLO COMUM MACICO UN 5,060000,222.66.78 1,20000FERRO CANTONEIRA 1X1X1/8' KG 3,192002,66

LS 20,55273 BDI 11,57569Mão-de-Obra 16,84650 Material 12,92986SubMO 37,39923

13.80.006 ENDURECEDOR SUPERFICIAL PARA CONCRETO M2 5,20

1.01.40 0,30000PINTOR H 1,413004,712.80.17 0,17000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,093106,43

LS 1,72386 BDI 0,97289Mão-de-Obra 1,41300 Material 1,09310SubMO 3,13686

13.80.007 PISO DE CONCRETO FCK=25MPA E=5CM M2 19,05

1.01.39 0,15000PEDREIRO H 0,697504,65

09/02/2011 11:38:40 Página: 267 de 0

Page 268: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 0,15000SERVENTE H 0,571503,812.05.36 0,05000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,67450253,49

LS 1,54818 BDI 3,56309Mão-de-Obra 1,26900 Material 12,67450SubMO 2,81718

13.80.010 SOALHO DE TABUAS DE PEROBA DE 10X2,0CM SOBRE VIGAMENTO 6X12CM M2 188,88

1.01.11 1,10000CARPINTEIRO H 5,005004,551.01.12 1,10000AJUDANTE DE CARPINTEIRO H 4,356003,962.10.26 2,25000VIGAS PEROBA DE 6X12 CM M 22,185009,862.67.60 0,20000PREGO KG 0,914004,573.55.02 1,10000TABUA DE PEROBA DE 10 X 2.0 CM PARA SOALHO M2 109,6810099,71

LS 11,42042 BDI 35,31913Mão-de-Obra 9,36100 Material 132,78000SubMO 20,78142

13.80.011 SOALHO DE PEROBA 10X2,0CM (SOMENTE TABUAS) M2 149,29

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,962.67.60 0,08000PREGO KG 0,365604,573.55.02 1,10000TABUA DE PEROBA DE 10 X 2.0 CM PARA SOALHO M2 109,6810099,71

LS 6,22932 BDI 27,91784Mão-de-Obra 5,10600 Material 110,04660SubMO 11,33532

13.80.012 SOALHO DE TABUAS DE IPE 20X2CM (SOMENTE TABUAS) M2 167,40

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,962.67.60 0,04000PREGO KG 0,182804,573.55.21 1,10000TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO M2 124,58600113,26

LS 6,22932 BDI 31,30395Mão-de-Obra 5,10600 Material 124,76880SubMO 11,33532

13.80.013 ISOLAMENTO COM LONA PRETA M2 1,54

1.01.46 0,03000SERVENTE H 0,114303,812.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,91

LS 0,13945 BDI 0,28859Mão-de-Obra 0,11430 Material 1,00100SubMO 0,25375

13.80.014 FRESAMENTO DE PISO CIMENTADO M2 11,74

1.01.39 0,12000PEDREIRO H 0,558004,651.01.46 0,20000SERVENTE H 0,762003,818.01.50 0,13000FRESADORA DE PISO 8"-5,5HP H 0,880106,778.80.08 0,33000JOGO DE ROSETAS DE DESBASTE DE VIDEA UN 5,7420017,40

LS 1,61040 BDI 2,19708Mão-de-Obra 1,32000 Material 6,62210SubMO 2,93040

13.80.015 PISO VINILICO DE 2MM DE ESPESSURA M2 55,19

3.55.08 1,00000PISO VINILICO (COLOCADO) 2MM M2 44,8700044,87

LS 0,00000 BDI 10,32010Mão-de-Obra 0,00000 Material 44,87000SubMO 0,00000

13.80.016 PISO VINILICO DE 3,2MM DE ESPESSURA M2 69,47

3.55.19 1,00000PISO VINILICO (COLOCADO) 3,2MM M2 56,4800056,48

LS 0,00000 BDI 12,99040Mão-de-Obra 0,00000 Material 56,48000SubMO 0,00000

13.80.018 REPARO COMPLETO EM GRANILITE-RASPAGEM/ESTUCAMENTO/POLIMENTO M2 20,07

3.65.12 1,00000RASPAGEM, ESTUCAMENTO E POLIMENTO DE GRANILITE M2 16,3200016,32

LS 0,00000 BDI 3,75360Mão-de-Obra 0,00000 Material 16,32000SubMO 0,00000

13.80.021 ARGAMASSA DE REGULARIZACAO CIMENTO/AREIA 1:3 E=2,50CM M2 19,85

1.01.39 0,41650PEDREIRO H 1,936734,651.01.46 0,66650SERVENTE H 2,539373,812.05.03 0,02630AREIA M3 2,0829679,202.05.08 11,15000CIMENTO KG 4,125500,37

LS 5,46083 BDI 3,71344Mão-de-Obra 4,47609 Material 6,20846SubMO 9,93692

13.80.022 COLAGEM COM NATA DE CIMENTO E ADESIVO P/ ARGAMASSA E CHAPISCO M2 10,10

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,30000SERVENTE H 1,143003,812.05.08 1,50000CIMENTO KG 0,555000,372.80.16 0,50000ADESIVO PARA ARGAMASSA E CHAPISCO KG 3,055006,11

LS 2,52906 BDI 1,88877Mão-de-Obra 2,07300 Material 3,61000SubMO 4,60206

13.80.023 SOALHO DE TABUAS DE IPE 10X2CM SOBRE VIGAMENTO 6X16CM M2 206,86

1.01.11 1,10000CARPINTEIRO H 5,005004,551.01.12 1,10000AJUDANTE DE CARPINTEIRO H 4,356003,962.10.27 2,25000VIGAS PEROBA DE 6X16 CM M 29,2500013,002.67.60 0,20000PREGO KG 0,914004,573.55.20 1,10000TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO M2 117,23800106,58

LS 11,42042 BDI 38,68219Mão-de-Obra 9,36100 Material 147,40200SubMO 20,78142

13.80.024 SOALHO DE TABUAS DE IPE 20X2CM SOBRE VIGAMENTO 6X16CM M2 215,34

1.01.11 1,10000CARPINTEIRO H 5,005004,551.01.12 1,10000AJUDANTE DE CARPINTEIRO H 4,356003,96

09/02/2011 11:38:40 Página: 268 de 0

Page 269: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.27 2,25000VIGAS PEROBA DE 6X16 CM M 29,2500013,002.67.60 0,10000PREGO KG 0,457004,573.55.21 1,10000TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO M2 124,58600113,26

LS 11,42042 BDI 40,26712Mão-de-Obra 9,36100 Material 154,29300SubMO 20,78142

13.80.025 REPREGAMENTO DE SOALHO DE MADEIRA M2 2,70

1.01.11 0,20000CARPINTEIRO H 0,910004,552.67.60 0,04000PREGO KG 0,182804,57

LS 1,11020 BDI 0,50669Mão-de-Obra 0,91000 Material 0,18280SubMO 2,02020

13.80.026 SOALHO DE TABUA DE IPE 20X2CM SOBRE VIGAMENTO 6X12CM M2 206,65

1.01.11 1,10000CARPINTEIRO H 5,005004,551.01.12 1,10000AJUDANTE DE CARPINTEIRO H 4,356003,962.10.26 2,25000VIGAS PEROBA DE 6X12 CM M 22,185009,862.67.60 0,10000PREGO KG 0,457004,573.55.21 1,10000TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO M2 124,58600113,26

LS 11,42042 BDI 38,64217Mão-de-Obra 9,36100 Material 147,22800SubMO 20,78142

13.80.027 SOALHO DE TABUAS DE IPE 10X2,0CM SOBRE VIGAMENTO 6X12CM M2 198,17

1.01.11 1,10000CARPINTEIRO H 5,005004,551.01.12 1,10000AJUDANTE DE CARPINTEIRO H 4,356003,962.10.26 2,25000VIGAS PEROBA DE 6X12 CM M 22,185009,862.67.60 0,20000PREGO KG 0,914004,573.55.20 1,10000TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO M2 117,23800106,58

LS 11,42042 BDI 37,05724Mão-de-Obra 9,36100 Material 140,33700SubMO 20,78142

13.80.028 SOALHO DE IPE 10X2,0CM (SOMENTE TABUAS) M2 158,59

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,962.67.60 0,08000PREGO KG 0,365604,573.55.20 1,10000TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO M2 117,23800106,58

LS 6,22932 BDI 29,65595Mão-de-Obra 5,10600 Material 117,60360SubMO 11,33532

13.80.032 TELA Q-92 PARA PISO DE CONCRETO M2 8,85

1.01.21 0,03000FERREIRO H 0,143104,771.01.22 0,03000AJUDANTE DE FERREIRO H 0,114603,822.15.44 1,05000TELA TELCON Q-92 M2 6,625506,31

LS 0,31439 BDI 1,65545Mão-de-Obra 0,25770 Material 6,62550SubMO 0,57209

13.80.033 TELA Q-138 E ESPAÇADOR TRELIÇADO P/PISO DE CONCRETO M2 16,71

1.01.21 0,04000FERREIRO H 0,190804,771.01.22 0,04000AJUDANTE DE FERREIRO H 0,152803,822.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,05000TELA TELCON Q138 (PAINEL) M2 10,5315010,03

LS 0,41919 BDI 3,12554Mão-de-Obra 0,34360 Material 12,82650SubMO 0,76279

13.80.034 PISO DE CONCRETO FCK=25MPA E=8CM DESEMPENAMENTO MECÂNICO M2 45,03

1.01.39 0,18000PEDREIRO H 0,837004,651.01.46 0,18000SERVENTE H 0,685803,811.01.55 0,02660OPERADOR H 0,184876,952.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,433.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,94

LS 2,08336 BDI 8,42208Mão-de-Obra 1,70767 Material 32,82670SubMO 3,79103

13.80.035 PISO DE CONCRETO COM FIBRA FCK=25MPA E=8CM DESEMPENAMENTO MECÂNICO M2 46,76

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,443.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,94

LS 2,28978 BDI 8,74517Mão-de-Obra 1,87687 Material 33,85582SubMO 4,16665

13.80.050 RODAPE DE GRANILITE EM PLACAS FORN/APLIC M 45,65

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,56000SERVENTE H 2,133603,812.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,06000CIMENTO KG 0,392200,373.60.42 1,00000RODAPE GRANILITE EM PLACAS M 26,5900026,59

LS 5,43949 BDI 8,53712Mão-de-Obra 4,45860 Material 27,21980SubMO 9,89809

13.80.051 RODAPE DE MARMORE DE 15CM M 59,14

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,10000SERVENTE H 0,381003,81

09/02/2011 11:38:40 Página: 269 de 0

Page 270: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,00300AREIA M3 0,2376079,202.05.08 1,06000CIMENTO KG 0,392200,373.60.52 1,00000RODAPE MARMORE 15CM M 41,4500041,45

LS 3,30132 BDI 11,06004Mão-de-Obra 2,70600 Material 42,07980SubMO 6,00732

13.80.055 CORDAO DE PEROBA M 6,37

1.01.11 0,15000CARPINTEIRO H 0,682504,552.67.60 0,01000PREGO KG 0,045704,573.61.06 1,03000CORDAO MEIA CANA 1X1 CM M 3,625603,52

LS 0,83265 BDI 1,19288Mão-de-Obra 0,68250 Material 3,67130SubMO 1,51515

13.80.056 RODAPE DE PEROBA DE 7X1,5 CM COM CORDAO M 19,74

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,20000AJUDANTE DE CARPINTEIRO H 0,792003,962.67.60 0,06000PREGO KG 0,274204,573.60.02 1,10000RODAPE PEROBA 7X1,5CM M 7,117006,473.61.06 1,10000CORDAO MEIA CANA 1X1 CM M 3,872003,52

LS 2,63154 BDI 3,69190Mão-de-Obra 2,15700 Material 11,26320SubMO 4,78854

13.80.060 DEGRAU DE GRANILITE M 55,68

1.01.39 1,20000PEDREIRO H 5,580004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,01000AREIA M3 0,7920079,202.05.08 4,26000CIMENTO KG 1,576200,373.55.30 1,00000DEGRAU GRANILITE FORNECIDO E APLICADO M 23,7500023,75

LS 10,52616 BDI 10,41264Mão-de-Obra 8,62800 Material 26,11820SubMO 19,15416

13.80.061 DEGRAUS DE MARMORE M 156,44

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 0,35000SERVENTE H 1,333503,812.05.03 0,00800AREIA M3 0,6336079,202.05.08 2,45000CIMENTO KG 0,906500,373.60.50 1,00000ESPELHO MARMORE 19CM M 48,6200048,623.60.51 1,00000PATAMAR MARMORE 26CM M 63,7500063,75

LS 7,29987 BDI 29,25450Mão-de-Obra 5,98350 Material 113,91010SubMO 13,28337

13.80.062 DEGRAU VINILICO COM TESTEIRA DE BORRACHA M 66,81

3.55.37 1,00000DEGRAU VINILICO 2MM C/TEST-FORN,COLOC M 54,3200054,32

LS 0,00000 BDI 12,49360Mão-de-Obra 0,00000 Material 54,32000SubMO 0,00000

13.80.065 TESTEIRA DE BORRACHA M 12,50

3.60.43 1,00000TESTEIRA BORRACHA P/DEGRAU VINIL FC M 10,1700010,17

LS 0,00000 BDI 2,33910Mão-de-Obra 0,00000 Material 10,17000SubMO 0,00000

13.80.066 PISO BORRACHA SINT PASTILHADO PRETO ESPES 4/5MM - COLADO M2 76,05

2.05.03 0,03650AREIA M3 2,8908079,202.05.08 10,95000CIMENTO KG 4,051500,372.80.73 0,40000COLA PARA PISO VINILICO L 6,4480016,123.55.42 1,10000PISO BORR SINT PASTILHADO PRETO E=4/5MM COLADO M2 48,4440044,04

LS 0,00000 BDI 14,22189Mão-de-Obra 0,00000 Material 61,83430SubMO 0,00000

13.80.099 SERVICOS EM PISOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

14.01.002 VIDRO LISO COMUM INCOLOR DE 3MM M2 57,16

1.01.86 1,00000VIDRACEIRO H 5,710005,713.70.43 2,00000MASSA PARA VIDRO KG 2,700001,353.70.81 1,10000VIDRO LISO COMUM INCOLOR - 3MM M2 31,0970028,27

LS 6,96620 BDI 10,68884Mão-de-Obra 5,71000 Material 33,79700SubMO 12,67620

14.01.004 VIDRO LISO COMUM INCOLOR DE 4MM M2 68,62

1.01.86 1,00000VIDRACEIRO H 5,710005,713.70.43 2,00000MASSA PARA VIDRO KG 2,700001,353.70.82 1,10000VIDRO LISO COMUM INCOLOR - 4MM M2 40,4140036,74

LS 6,96620 BDI 12,83175Mão-de-Obra 5,71000 Material 43,11400SubMO 12,67620

14.01.006 VIDRO LISO COMUM INCOLOR DE 5MM M2 81,89

1.01.86 1,10000VIDRACEIRO H 6,281005,713.70.43 2,00000MASSA PARA VIDRO KG 2,700001,353.70.83 1,10000VIDRO LISO COMUM INCOLOR - 5MM M2 49,9400045,40

LS 7,66282 BDI 15,31428Mão-de-Obra 6,28100 Material 52,64000SubMO 13,94382

14.01.008 VIDRO LISO COMUM INCOLOR DE 6MM M2 99,20

1.01.86 1,10000VIDRACEIRO H 6,281005,71

09/02/2011 11:38:40 Página: 270 de 0

Page 271: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.70.43 2,50000MASSA PARA VIDRO KG 3,375001,353.70.84 1,10000VIDRO LISO COMUM INCOLOR - 6MM M2 63,3380057,58

LS 7,66282 BDI 18,55107Mão-de-Obra 6,28100 Material 66,71300SubMO 13,94382

14.01.032 VIDRO LISO FOSCO (DESPOLIDO) ESPESS 3 MM M2 120,03

1.01.86 2,00000VIDRACEIRO H 11,420005,713.70.78 1,10000VIDRO LISO FOSCO (DESPOLIDO) ESP 3MM M2 72,2370065,67

LS 13,93240 BDI 22,44556Mão-de-Obra 11,42000 Material 72,23700SubMO 25,35240

14.01.035 VIDRO IMPRESSO INCOLOR (E=4MM) M2 61,04

1.01.86 1,00000VIDRACEIRO H 5,710005,713.70.43 2,00000MASSA PARA VIDRO KG 2,700001,353.70.68 1,10000VIDRO FANTASIA INCOLOR 4MM M2 34,2540031,14

LS 6,96620 BDI 11,41495Mão-de-Obra 5,71000 Material 36,95400SubMO 12,67620

14.01.040 VIDRO ARAMADO DE 7/8 MM M2 154,54

1.01.86 1,50000VIDRACEIRO H 8,565005,713.70.43 2,50000MASSA PARA VIDRO KG 3,375001,353.70.75 1,10000VIDRO ARAMADO 7 MM M2 103,2570093,87

LS 10,44930 BDI 28,89865Mão-de-Obra 8,56500 Material 106,63200SubMO 19,01430

14.01.060 FECHAMENTO EM VIDRO LAMINADO 5+5MM INC ACESS ALUM (CX/ELEVADOR) M2 396,67

3.70.10 1,00000FORN E INST DE VIDRO LAMINADO 5+5MM INC ACESS ALUM M2 322,50000322,50

LS 0,00000 BDI 74,17500Mão-de-Obra 0,00000 Material 322,50000SubMO 0,00000

14.01.070 VITRAL EM POLIESTER REFORC C/FIBER-GLASS 2 FACES MART 3MM M2 182,65

3.71.01 1,00000VITRAL 3MM POLIEST/FIBER-FORN-COLOC M2 148,50000148,50

LS 0,00000 BDI 34,15500Mão-de-Obra 0,00000 Material 148,50000SubMO 0,00000

14.01.071 VITRAL EM POLIESTER REFORC C/FIBER-GLASS 2 FACES MART 5MM M2 237,45

3.71.02 1,00000VITRAL 5MM POLIEST/FIBER-FORN-COLOC M2 193,05000193,05

LS 0,00000 BDI 44,40150Mão-de-Obra 0,00000 Material 193,05000SubMO 0,00000

14.01.099 SERVICOS EM VIDROS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

14.02.001 EP-01 ESPELHO UN 206,28

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,812.67.26 4,00000PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA CJ 0,520000,132.67.70 0,08000REBITE TIPO POP 440 (CENTO) UN 0,355204,442.67.78 0,04000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,029600,743.72.01 1,00000EP-01 ESPELHO 60X45X3MM C/ MOLDURA ALUM ANODIZ UN 157,42000157,42

LS 5,16060 BDI 38,57454Mão-de-Obra 4,23000 Material 158,32480SubMO 9,39060

14.02.002 ARMARIO PLAST C/ESPELHO P/BANH (SOBREPOR 31X36X9CM) UN 50,55

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,816.55.86 1,00000ARMARIO PLAST C/ESPELHO P/BANH (SOBREP 31X36X9CM) UN 31,7100031,71

LS 5,16060 BDI 9,45314Mão-de-Obra 4,23000 Material 31,71000SubMO 9,39060

14.02.010 ESPELHO DE CRISTAL M2 192,10

1.01.86 1,00000VIDRACEIRO H 5,710005,716.57.20 1,00000ESPELHO DE CRISTAL-ESPESSURA 6MM M2 143,51000143,51

LS 6,96620 BDI 35,92283Mão-de-Obra 5,71000 Material 143,51000SubMO 12,67620

14.02.099 SERVICOS DE ESPELHOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

14.60.001 DE VIDRO INCLUSIVE RASPAGEM DE MASSA OU RETIRADA DE BAGUETES M2 7,79

1.01.86 0,50000VIDRACEIRO H 2,855005,71

LS 3,48310 BDI 1,45776Mão-de-Obra 2,85500 Material 0,00000SubMO 6,33810

14.60.099 RETIRADAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

14.70.001 DE VIDRO INCLUSIVE EMASSAMENTO OU RECOLOCACAO DE BAGUETES M2 34,50

1.01.86 2,00000VIDRACEIRO H 11,420005,713.70.43 2,00000MASSA PARA VIDRO KG 2,700001,35

LS 13,93240 BDI 6,45205Mão-de-Obra 11,42000 Material 2,70000SubMO 25,35240

14.70.099 RECOLOCACOES DE VIDRO MV 298,09

09/02/2011 11:38:40 Página: 271 de 0

Page 272: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

14.80.099 SERVICOS EM VIDROS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

15.01.001 OLEO EM ESTRUTURA METALICA M2 8,91

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 3,23056 BDI 1,66705Mão-de-Obra 2,64800 Material 1,36950SubMO 5,87856

15.01.002 GRAFITE EM ESTRUTURA METALICA M2 9,61

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,822.80.56 0,15000GRAFITE L 1,9380012,92

LS 3,23056 BDI 1,79781Mão-de-Obra 2,64800 Material 1,93800SubMO 5,87856

15.01.003 PINTURA ALUMINIO EM ESTRUTURA METALICA M2 9,78

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.07 0,15000TINTA ESMALTE SINTETICO - ALUMINIO L 2,0775013,85

LS 3,23056 BDI 1,82989Mão-de-Obra 2,64800 Material 2,07750SubMO 5,87856

15.01.004 ESMALTE EM ESTRUTURA METALICA M2 9,06

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.02 0,15000TINTA ESMALTE L 1,494009,96

LS 3,23056 BDI 1,69569Mão-de-Obra 2,64800 Material 1,49400SubMO 5,87856

15.01.005 PINTURA PARA ESTRUTURA DE ALUMINIO C/ TINTA ESMALTE AUTOMOTIVA M2 12,16

1.01.40 0,30000PINTOR H 1,413004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.75.50 0,06300FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 1,2102319,213.80.35 0,13000ESMALTE AUTOMOTIVO (TIPO DUCO) L 2,7859021,433.80.60 0,03300TINNER L 0,214506,50

LS 3,12198 BDI 2,27507Mão-de-Obra 2,55900 Material 4,21063SubMO 5,68098

15.01.008 ESMALTE POLIURETANO ACRILICO ALIFATICO P/ESTR.METALICA M2 48,99

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,821.01.46 0,40000SERVENTE H 1,524003,811.01.55 0,40000OPERADOR H 2,780006,953.75.03 0,13750ESMALTE EPOXI L 3,1281322,753.75.51 0,08300PRIMER EPOXI RICO EM ZINCO L 3,5100742,293.76.33 0,08300ESMALTE POLIURETANO ACRILICO ALIFATICO L 2,5414630,628.01.97 0,40000EQUIPAMENTO JATO DE AREIA COMPLETO C/COMPRESSOR H 8,7640021,919.10.21 4,00000OXIDO DE ALUMINIO KG 4,760001,19

LS 9,41352 BDI 9,16163Mão-de-Obra 7,71600 Material 22,70366SubMO 17,12952

15.01.010 OLEO SEM APAREL E EMASS PREVIOS EM ESTRUT DE MAD APARENTE (GALPOES) M2 9,83

1.01.40 0,35000PINTOR H 1,648504,711.01.41 0,35000AJUDANTE DE PINTOR H 1,337003,823.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 3,64231 BDI 1,83938Mão-de-Obra 2,98550 Material 1,36950SubMO 6,62781

15.01.012 ESMALTE S/APAREL EMASS PREVIOS EM ESTRUTURA DE MADEIRA APARENTES M2 9,98

1.01.40 0,35000PINTOR H 1,648504,711.01.41 0,35000AJUDANTE DE PINTOR H 1,337003,823.75.02 0,15000TINTA ESMALTE L 1,494009,96

LS 3,64231 BDI 1,86802Mão-de-Obra 2,98550 Material 1,49400SubMO 6,62781

15.01.015VERNIZ SEM APARELHAMENTO E EMAS PREVIOS EM ESTRUT DE MADEIRAAPARENTE

M2 10,15

1.01.40 0,35000PINTOR H 1,648504,711.01.41 0,35000AJUDANTE DE PINTOR H 1,337003,823.80.50 0,15000VERNIZ SINTETICO BRILHANTE L 1,6305010,87

LS 3,64231 BDI 1,89941Mão-de-Obra 2,98550 Material 1,63050SubMO 6,62781

15.01.030 GALVANIZACAO A FOGO - ESTRUTURAS KG 3,42

1.01.40 0,01000PINTOR H 0,047104,711.01.41 0,01000AJUDANTE DE PINTOR H 0,038203,823.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.76.50 1,00000GALVANIZACAO A FOGO KG 1,770001,773.80.12 0,02000LIXA PARA FERRO UN 0,028601,43

09/02/2011 11:38:40 Página: 272 de 0

Page 273: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,10407 BDI 0,63958Mão-de-Obra 0,08530 Material 2,59140SubMO 0,18937

15.01.032 PRIMER P/ GALVANIZADOS (GALVITE/SIMILAR) - ESTRUTURAS M2 6,33

1.01.40 0,20000PINTOR H 0,942004,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.80.66 0,15000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 2,2110014,74

LS 1,61528 BDI 1,18456Mão-de-Obra 1,32400 Material 2,21100SubMO 2,93928

15.01.035 FUNDO ANTI-OXIDANTE EM ESTRUTURAS M2 8,18

1.01.40 0,24000PINTOR H 1,130404,711.01.41 0,12000AJUDANTE DE PINTOR H 0,458403,823.80.12 0,50000LIXA PARA FERRO UN 0,715001,433.80.28 0,15000ZARCAO L 2,4135016,09

LS 1,93834 BDI 1,53080Mão-de-Obra 1,58880 Material 3,12850SubMO 3,52714

15.01.099 PINTURAS EM ESTRUTURAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

15.02.003 MASSA CORRIDA PVA M2 10,03

1.01.40 0,30000PINTOR H 1,413004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.17 0,50000MASSA NIVELADORA INTERIOR L 1,140002,283.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 2,65594 BDI 1,87679Mão-de-Obra 2,17700 Material 3,32700SubMO 4,83294

15.02.005 LATEX M2 13,97

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.13 0,25000TINTA LATEX ECONOMICA L 1,080004,323.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 4,44995 BDI 2,61382Mão-de-Obra 3,64750 Material 3,26700SubMO 8,09745

15.02.006 LATEX COM MASSA CORRIDA M2 21,56

1.01.40 0,75000PINTOR H 3,532504,711.01.41 0,60000AJUDANTE DE PINTOR H 2,292003,823.75.13 0,25000TINTA LATEX ECONOMICA L 1,080004,323.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.17 0,50000MASSA NIVELADORA INTERIOR L 1,140002,283.80.40 0,60000LIXA D"AGUA UN 0,390000,65

LS 7,10589 BDI 4,03245Mão-de-Obra 5,82450 Material 4,60200SubMO 12,93039

15.02.010 LATEX EM ELEMENTO VAZADO M2 13,97

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.13 0,25000TINTA LATEX ECONOMICA L 1,080004,323.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 4,44995 BDI 2,61382Mão-de-Obra 3,64750 Material 3,26700SubMO 8,09745

15.02.012 MASSA CORRIDA A OLEO M2 15,95

1.01.40 0,35000PINTOR H 1,648504,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.16 0,50000MASSA PARA MADEIRA L 4,360008,723.80.40 0,30000LIXA D"AGUA UN 0,195000,653.80.61 0,20000LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE L 2,2160011,08

LS 3,40929 BDI 2,98420Mão-de-Obra 2,79450 Material 6,77100SubMO 6,20379

15.02.015 OLEO M2 15,73

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.34 0,25000TINTA A OLEO L 2,282509,133.80.40 0,30000LIXA D"AGUA UN 0,195000,653.80.61 0,20000LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE L 2,2160011,08

LS 4,44995 BDI 2,94192Mão-de-Obra 3,64750 Material 4,69350SubMO 8,09745

15.02.016 OLEO COM MASSA CORRIDA M2 28,96

1.01.40 0,80000PINTOR H 3,768004,711.01.41 0,70000AJUDANTE DE PINTOR H 2,674003,823.80.16 0,50000MASSA PARA MADEIRA L 4,360008,723.80.34 0,25000TINTA A OLEO L 2,282509,133.80.40 0,60000LIXA D"AGUA UN 0,390000,653.80.61 0,20000LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE L 2,2160011,08

09/02/2011 11:38:40 Página: 273 de 0

Page 274: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 7,85924 BDI 5,41644Mão-de-Obra 6,44200 Material 9,24850SubMO 14,30124

15.02.019 ESMALTE M2 15,98

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.02 0,25000TINTA ESMALTE L 2,490009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,653.80.61 0,20000LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE L 2,2160011,08

LS 4,44995 BDI 2,98964Mão-de-Obra 3,64750 Material 4,90100SubMO 8,09745

15.02.020 MASSA NIVELADORA PARA EXTERIOR E INTERIOR M2 14,59

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.09 0,25000SELADOR P/PINTURA LATEX L 2,490009,963.80.14 0,30000MASSA NIVELADORA EXTERIOR/INTERIOR L 1,152003,843.80.40 0,20000LIXA D"AGUA UN 0,130000,65

LS 4,44995 BDI 2,72997Mão-de-Obra 3,64750 Material 3,77200SubMO 8,09745

15.02.025 TINTA ACRILICA M2 14,63

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.42 0,25000TINTA LATEX STANDARD L 1,612506,453.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 4,44995 BDI 2,73630Mão-de-Obra 3,64750 Material 3,79950SubMO 8,09745

15.02.026 TINTA ACRILICA COM MASSA CORRIDA M2 23,17

1.01.40 0,75000PINTOR H 3,532504,711.01.41 0,60000AJUDANTE DE PINTOR H 2,292003,823.75.42 0,25000TINTA LATEX STANDARD L 1,612506,453.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.14 0,50000MASSA NIVELADORA EXTERIOR/INTERIOR L 1,920003,843.80.40 0,60000LIXA D"AGUA UN 0,390000,65

LS 7,10589 BDI 4,33433Mão-de-Obra 5,82450 Material 5,91450SubMO 12,93039

15.02.030 TINTA NITROSINTETICA MULTICOLORIDA (QUANTIL) M2 23,82

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.13 0,15000TINTA LATEX ECONOMICA L 0,648004,323.75.25 0,18000TINTA NITRO SINTETICA (QUANTIL) L 8,4384046,883.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 4,44995 BDI 4,45530Mão-de-Obra 3,64750 Material 11,27340SubMO 8,09745

15.02.031 TINTA NITROSINTETICA MULTICOLORIDA (QUANTIL) COM MASSA CORRIDA M2 32,33

1.01.40 0,80000PINTOR H 3,768004,711.01.41 0,65000AJUDANTE DE PINTOR H 2,483003,823.75.13 0,15000TINTA LATEX ECONOMICA L 0,648004,323.75.25 0,18000TINTA NITRO SINTETICA (QUANTIL) L 8,4384046,883.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.17 0,50000MASSA NIVELADORA INTERIOR L 1,140002,283.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 7,62622 BDI 6,04684Mão-de-Obra 6,25100 Material 12,41340SubMO 13,87722

15.02.035 TINTA EPOXICA M2 56,40

1.01.40 1,00000PINTOR H 4,710004,711.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,823.75.45 0,50000TINTA-BASE EPOXI L 17,9600035,923.80.40 0,30000LIXA D"AGUA UN 0,195000,653.80.41 0,30000SELADOR PARA TINTA EPOXI L 8,7630029,21

LS 10,40660 BDI 10,54656Mão-de-Obra 8,53000 Material 26,91800SubMO 18,93660

15.02.036 TINTA EPOXICA COM MASSA CORRIDA M2 91,69

1.01.40 1,50000PINTOR H 7,065004,711.01.41 1,50000AJUDANTE DE PINTOR H 5,730003,823.75.45 0,50000TINTA-BASE EPOXI L 17,9600035,923.80.15 0,80000MASSA-BASE EPOXI L 18,7680023,463.80.40 1,00000LIXA D"AGUA UN 0,650000,653.80.41 0,30000SELADOR PARA TINTA EPOXI L 8,7630029,21

LS 15,60990 BDI 17,14556Mão-de-Obra 12,79500 Material 46,14100SubMO 28,40490

15.02.050 OLEO EM FORRO DE MADEIRA M2 17,55

1.01.40 0,60000PINTOR H 2,826004,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.16 0,10000MASSA PARA MADEIRA L 0,872008,723.80.34 0,40000TINTA A OLEO L 3,652009,13

09/02/2011 11:38:40 Página: 274 de 0

Page 275: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.80.39 0,25000LIXA PARA MADEIRA UN 0,082500,33

LS 5,31188 BDI 3,28265Mão-de-Obra 4,35400 Material 4,60650SubMO 9,66588

15.02.052 ESMALTE EM FORRO DE MADEIRA M2 17,96

1.01.40 0,60000PINTOR H 2,826004,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.02 0,40000TINTA ESMALTE L 3,984009,963.80.16 0,10000MASSA PARA MADEIRA L 0,872008,723.80.39 0,25000LIXA PARA MADEIRA UN 0,082500,33

LS 5,31188 BDI 3,35901Mão-de-Obra 4,35400 Material 4,93850SubMO 9,66588

15.02.055 ENVERNIZAMENTO EM FORRO DE MADEIRA M2 12,48

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.39 0,50000LIXA PARA MADEIRA UN 0,165000,333.80.50 0,30000VERNIZ SINTETICO BRILHANTE L 3,2610010,87

LS 3,69660 BDI 2,33510Mão-de-Obra 3,03000 Material 3,42600SubMO 6,72660

15.02.060 FUNDO PREPARADOR PARA REVESTIMENTO COM GESSO M2 4,31

1.01.40 0,09000PINTOR H 0,423904,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.80.10 0,12000FUNDO PREPARADOR DE PAREDE L 1,3296011,083.80.60 0,06000TINNER L 0,390006,50

LS 0,98320 BDI 0,80700Mão-de-Obra 0,80590 Material 1,71960SubMO 1,78910

15.02.079 PINTURA ACRILICA PARA PISOS M2 12,33

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,823.75.17 0,25000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,507506,03

LS 4,68297 BDI 2,30666Mão-de-Obra 3,83850 Material 1,50750SubMO 8,52147

15.02.099 PINTURAS EM FORROS/PAREDES INTERNAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

15.03.001 MASSA CORRIDA A OLEO EM ESQUADRIAS DE MADEIRA M2 10,97

1.01.40 0,35000PINTOR H 1,648504,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.16 0,30000MASSA PARA MADEIRA L 2,616008,723.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,33

LS 3,40929 BDI 2,05132Mão-de-Obra 2,79450 Material 2,71500SubMO 6,20379

15.03.003 OLEO SEM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA M2 14,57

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.34 0,40000TINTA A OLEO L 3,652009,133.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,33

LS 4,44995 BDI 2,72514Mão-de-Obra 3,64750 Material 3,75100SubMO 8,09745

15.03.004 OLEO COM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA M2 25,54

1.01.40 0,80000PINTOR H 3,768004,711.01.41 0,70000AJUDANTE DE PINTOR H 2,674003,823.80.16 0,30000MASSA PARA MADEIRA L 2,616008,723.80.34 0,40000TINTA A OLEO L 3,652009,133.80.39 0,60000LIXA PARA MADEIRA UN 0,198000,33

LS 7,85924 BDI 4,77647Mão-de-Obra 6,44200 Material 6,46600SubMO 14,30124

15.03.005 OLEO EM MADEIRA SEM APARELHAMENTO E EMASS PREVIOS (PORTOES-CERCAS) M2 13,89

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,823.80.34 0,20000TINTA A OLEO L 1,826009,13

LS 5,20330 BDI 2,59769Mão-de-Obra 4,26500 Material 1,82600SubMO 9,46830

15.03.006 ESMALTE SEM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA M2 13,14

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.02 0,25000TINTA ESMALTE L 2,490009,963.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,33

LS 4,44995 BDI 2,45788Mão-de-Obra 3,64750 Material 2,58900SubMO 8,09745

15.03.007 ESMALTE COM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA M2 24,11

1.01.40 0,80000PINTOR H 3,768004,711.01.41 0,70000AJUDANTE DE PINTOR H 2,674003,823.75.02 0,25000TINTA ESMALTE L 2,490009,963.80.16 0,30000MASSA PARA MADEIRA L 2,616008,723.80.39 0,60000LIXA PARA MADEIRA UN 0,198000,33

09/02/2011 11:38:40 Página: 275 de 0

Page 276: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 7,85924 BDI 4,50921Mão-de-Obra 6,44200 Material 5,30400SubMO 14,30124

15.03.009 ESMALTE EM CERCAS PORTOES E GRADIS M2 6,17

1.01.40 0,24000PINTOR H 1,130404,711.01.41 0,12000AJUDANTE DE PINTOR H 0,458403,823.75.02 0,15000TINTA ESMALTE L 1,494009,96

LS 1,93834 BDI 1,15486Mão-de-Obra 1,58880 Material 1,49400SubMO 3,52714

15.03.010 VERNIZ PLASTICO BASE POLIURET EM ESQUADRIAS E PECAS MADEIRA EXTERNA M2 13,63

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,333.80.49 0,30000VERNIZ POLIURETANO L 3,4080011,36

LS 4,16264 BDI 2,54878Mão-de-Obra 3,41200 Material 3,50700SubMO 7,57464

15.03.012 ENVERNIZAMENTO EM ESQUADRIAS DE MADEIRA M2 12,48

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.39 0,50000LIXA PARA MADEIRA UN 0,165000,333.80.50 0,30000VERNIZ SINTETICO BRILHANTE L 3,2610010,87

LS 3,69660 BDI 2,33510Mão-de-Obra 3,03000 Material 3,42600SubMO 6,72660

15.03.015 ENCERAMENTO DE ESQUADRIAS DE MADEIRA M2 18,55

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,333.80.52 0,10000VERNIZ (A BONECA) L 0,636006,363.90.63 0,20000CERA PARA PISO KG 5,7320028,66

LS 4,73726 BDI 3,47007Mão-de-Obra 3,88300 Material 6,46700SubMO 8,62026

15.03.020 OLEO EM ESQUADRIAS DE FERRO M2 15,85

1.01.40 0,56000PINTOR H 2,637604,711.01.41 0,56000AJUDANTE DE PINTOR H 2,139203,823.80.34 0,25000TINTA A OLEO L 2,282509,13

LS 5,82770 BDI 2,96401Mão-de-Obra 4,77680 Material 2,28250SubMO 10,60450

15.03.021 ESMALTE EM ESQUADRIAS DE FERRO M2 16,10

1.01.40 0,56000PINTOR H 2,637604,711.01.41 0,56000AJUDANTE DE PINTOR H 2,139203,823.75.02 0,25000TINTA ESMALTE L 2,490009,96

LS 5,82770 BDI 3,01173Mão-de-Obra 4,77680 Material 2,49000SubMO 10,60450

15.03.022 GRAFITE EM ESQUADRIAS DE FERRO M2 17,01

1.01.40 0,56000PINTOR H 2,637604,711.01.41 0,56000AJUDANTE DE PINTOR H 2,139203,822.80.56 0,25000GRAFITE L 3,2300012,92

LS 5,82770 BDI 3,18193Mão-de-Obra 4,77680 Material 3,23000SubMO 10,60450

15.03.024 PINTURA ALUMINIO EM ESQUADRIAS DE FERRO M2 17,30

1.01.40 0,56000PINTOR H 2,637604,711.01.41 0,56000AJUDANTE DE PINTOR H 2,139203,823.75.07 0,25000TINTA ESMALTE SINTETICO - ALUMINIO L 3,4625013,85

LS 5,82770 BDI 3,23541Mão-de-Obra 4,77680 Material 3,46250SubMO 10,60450

15.03.030 GALVANIZACAO A FOGO - ESQUADRIAS KG 3,42

1.01.40 0,01000PINTOR H 0,047104,711.01.41 0,01000AJUDANTE DE PINTOR H 0,038203,823.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.76.50 1,00000GALVANIZACAO A FOGO KG 1,770001,773.80.12 0,02000LIXA PARA FERRO UN 0,028601,43

LS 0,10407 BDI 0,63958Mão-de-Obra 0,08530 Material 2,59140SubMO 0,18937

15.03.032 PRIMER P/ GALVANIZADOS (GALVIT/SIMILAR) - ESQUADRIAS M2 16,17

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,823.80.66 0,25000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 3,6850014,74

LS 5,20330 BDI 3,02526Mão-de-Obra 4,26500 Material 3,68500SubMO 9,46830

15.03.035 FUNDO ANTI-OXIDANTE EM ESQUADRIAS M2 18,87

1.01.40 0,56000PINTOR H 2,637604,711.01.41 0,56000AJUDANTE DE PINTOR H 2,139203,823.80.12 0,50000LIXA PARA FERRO UN 0,715001,433.80.28 0,25000ZARCAO L 4,0225016,09

LS 5,82770 BDI 3,52866Mão-de-Obra 4,77680 Material 4,73750SubMO 10,60450

09/02/2011 11:38:40 Página: 276 de 0

Page 277: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

15.03.040 OLEO EM RODAPES, BAGUETES E MOLDURAS DE MADEIRA M 2,18

1.01.40 0,10000PINTOR H 0,471004,713.80.34 0,08000TINTA A OLEO L 0,730409,13

LS 0,57462 BDI 0,40849Mão-de-Obra 0,47100 Material 0,73040SubMO 1,04562

15.03.041 ESMALTE EM RODAPES, BAGUETES E MOLDURAS DE MADEIRA M 2,26

1.01.40 0,10000PINTOR H 0,471004,713.75.02 0,08000TINTA ESMALTE L 0,796809,96

LS 0,57462 BDI 0,42376Mão-de-Obra 0,47100 Material 0,79680SubMO 1,04562

15.03.050 ENVERNIZAMENTO DE RODAPES,BAGUETES OU MOLDURAS DE MADEIRA M 2,09

1.01.40 0,08000PINTOR H 0,376804,713.80.50 0,08000VERNIZ SINTETICO BRILHANTE L 0,8696010,87

LS 0,45970 BDI 0,39240Mão-de-Obra 0,37680 Material 0,86960SubMO 0,83650

15.03.060 FACE EXTERNA DE CALHAS/CONDUTORES COM TINTA SINTETICA (ESMALTE) M 7,42

1.01.40 0,20000PINTOR H 0,942004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.02 0,10000TINTA ESMALTE L 0,996009,963.80.12 0,20000LIXA PARA FERRO UN 0,286001,433.80.28 0,06000ZARCAO L 0,9654016,09

LS 2,08132 BDI 1,38799Mão-de-Obra 1,70600 Material 2,24740SubMO 3,78732

15.03.061 FACE INTERNA DE CALHAS COM TINTA BETUMINOSA M 4,29

1.01.40 0,10000PINTOR H 0,471004,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,822.40.56 0,25000TINTA BETUMINOSA L 1,597506,39

LS 1,04066 BDI 0,80297Mão-de-Obra 0,85300 Material 1,59750SubMO 1,89366

15.03.062 FACE APARENTE DE RUFOS/RINCOES COM TINTA BETUMINOSA M 4,29

1.01.40 0,10000PINTOR H 0,471004,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,822.40.56 0,25000TINTA BETUMINOSA L 1,597506,39

LS 1,04066 BDI 0,80297Mão-de-Obra 0,85300 Material 1,59750SubMO 1,89366

15.03.063 FACE EXTERNA DE CALHAS/CONDUTORES COM TINTA A OLEO M 7,32

1.01.40 0,20000PINTOR H 0,942004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.12 0,20000LIXA PARA FERRO UN 0,286001,433.80.28 0,06000ZARCAO L 0,9654016,093.80.34 0,10000TINTA A OLEO L 0,913009,13

LS 2,08132 BDI 1,36890Mão-de-Obra 1,70600 Material 2,16440SubMO 3,78732

15.03.070 SINALIZACAO. LETRAS,NUMEROS E SIMBOLOS UN 219,34

3.87.01 1,00000SINALIZACAO-LETRAS/NUMEROS/SIMBOLOS (APLICADO) UN 178,33000178,33

LS 0,00000 BDI 41,01590Mão-de-Obra 0,00000 Material 178,33000SubMO 0,00000

15.03.071 SINALIZACAO:PICTOGRAMAS UN 246,68

3.87.02 1,00000SINALIZACAO-PICTOGRAMAS (APLICADO) UN 200,56000200,56

LS 0,00000 BDI 46,12880Mão-de-Obra 0,00000 Material 200,56000SubMO 0,00000

15.03.099 PINTURAS EM ESQUADRIAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

15.04.001 CAIACAO M2 4,99

1.01.40 0,35000PINTOR H 1,648504,713.80.03 0,50000CAL PARA PINTURA KG 0,350000,703.81.03 0,00750FIXADOR DE CAL L 0,052056,94

LS 2,01117 BDI 0,93420Mão-de-Obra 1,64850 Material 0,40205SubMO 3,65967

15.04.005 LATEX M2 13,97

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.13 0,25000TINTA LATEX ECONOMICA L 1,080004,323.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 4,44995 BDI 2,61382Mão-de-Obra 3,64750 Material 3,26700SubMO 8,09745

15.04.006 TINTA ACRILICA M2 14,63

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.42 0,25000TINTA LATEX STANDARD L 1,612506,453.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

09/02/2011 11:38:40 Página: 277 de 0

Page 278: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 4,44995 BDI 2,73630Mão-de-Obra 3,64750 Material 3,79950SubMO 8,09745

15.04.007 MASSA NIVELADORA PARA EXTERIOR E INTERIOR UN 14,59

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.80.09 0,25000SELADOR P/PINTURA LATEX L 2,490009,963.80.14 0,30000MASSA NIVELADORA EXTERIOR/INTERIOR L 1,152003,843.80.40 0,20000LIXA D"AGUA UN 0,130000,65

LS 4,44995 BDI 2,72997Mão-de-Obra 3,64750 Material 3,77200SubMO 8,09745

15.04.008 LATEX EM ELEMENTO VAZADO M2 13,97

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,40000AJUDANTE DE PINTOR H 1,528003,823.75.13 0,25000TINTA LATEX ECONOMICA L 1,080004,323.80.09 0,20000SELADOR P/PINTURA LATEX L 1,992009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 4,44995 BDI 2,61382Mão-de-Obra 3,64750 Material 3,26700SubMO 8,09745

15.04.009 TRATAMENTO DE CONCRETO COM ESTUQUE E LIXAMENTO M2 19,97

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 0,50000SERVENTE H 1,905003,812.05.08 0,15000CIMENTO KG 0,055500,372.05.09 0,15000CIMENTO BRANCO KG 0,157501,052.80.05 0,10000COLA PVA KG 0,611006,113.80.05 0,04000DISCO DE DESBASTE 7" UN 0,356008,903.80.11 0,17000LIXA CARBETO DE SILICIO 7" UN 0,506602,98

LS 7,99710 BDI 3,73490Mão-de-Obra 6,55500 Material 1,68660SubMO 14,55210

15.04.010 VERNIZ ACRILICO M2 13,00

1.01.40 0,40000PINTOR H 1,884004,713.80.54 0,15000VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 1,6320010,883.80.55 0,25000VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 4,7600019,04

LS 2,29848 BDI 2,43213Mão-de-Obra 1,88400 Material 6,39200SubMO 4,18248

15.04.011 TINTA MINERAL IMPERMEAVEL SEM NATA SELADORA M2 7,53

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.75.15 0,40000TINTA MINERAL IMPERMEAVEL KG 1,092002,73

LS 2,76452 BDI 1,40818Mão-de-Obra 2,26600 Material 1,09200SubMO 5,03052

15.04.012 TINTA MINERAL IMPERMEAVEL C/ NATA SELADORA S/ BLOCO DE CONCRETO M2 14,33

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,822.05.99 0,20000ADESIVO P/ ARGAMASSA E CHAPISCO BIANCO/SIKAFIX L 1,092005,463.75.15 0,40000TINTA MINERAL IMPERMEAVEL KG 1,092002,73

LS 5,20330 BDI 2,68003Mão-de-Obra 4,26500 Material 2,18400SubMO 9,46830

15.04.013 HIDROFUGO A BASE DE SILICONE M2 16,62

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.80.22 0,50000SILICONE - HIDRAFUGANTE L 7,9650015,93

LS 3,05183 BDI 3,10922Mão-de-Obra 2,50150 Material 7,96500SubMO 5,55333

15.04.015 ESMALTE EM SUPERFICIE REBOCADA SEM MASSA CORRIDA M2 12,85

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,823.75.02 0,25000TINTA ESMALTE L 2,490009,963.80.40 0,30000LIXA D"AGUA UN 0,195000,653.80.61 0,20000LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE L 2,2160011,08

LS 3,05183 BDI 2,40450Mão-de-Obra 2,50150 Material 4,90100SubMO 5,55333

15.04.020 LIQUIDO IMUNIZANTE EM MADEIRA APARENTE M2 6,96

1.01.40 0,30000PINTOR H 1,413004,712.40.47 0,20000IMUNIZANTE PARA MADEIRA - CUPINICIDA L 2,5240012,62

LS 1,72386 BDI 1,30200Mão-de-Obra 1,41300 Material 2,52400SubMO 3,13686

15.04.070 SINALIZACAO: LOGOTIPO RESERVATORIO SUPERIOR UN 2.103,66

3.87.03 1,00000SINALIZACAO-BANDEIRA RESERVATORIO SUPERIOR (APLIC) UN 1.710,300001.710,30

LS 0,00000 BDI 393,36900Mão-de-Obra 0,00000 Material 1.710,30000SubMO 0,00000

15.04.071 RS-16 VAGA COM SIMBOLO INTERNACIONAL DE ACESSO UN 204,12

1.01.40 6,00000PINTOR H 28,260004,711.01.41 6,00000AJUDANTE DE PINTOR H 22,920003,822.80.81 2,00000FITA CREPE 25MM X 50M UN 9,220004,613.75.17 7,15000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 43,114506,03

09/02/2011 11:38:40 Página: 278 de 0

Page 279: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 62,43960 BDI 38,16944Mão-de-Obra 51,18000 Material 52,33450SubMO 113,61960

15.04.073 PINTURA PARA TELHAS DE ALUMINIO COM TINTA ESMALTE AUTOMOTIVA M2 12,16

1.01.40 0,30000PINTOR H 1,413004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.75.50 0,06300FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 1,2102319,213.80.35 0,13000ESMALTE AUTOMOTIVO (TIPO DUCO) L 2,7859021,433.80.60 0,03300TINNER L 0,214506,50

LS 3,12198 BDI 2,27507Mão-de-Obra 2,55900 Material 4,21063SubMO 5,68098

15.04.078 SINALIZAÇÃO VISUAL DE DEGRAUS-PINTURA ACRÍLICA P/PISOS CJ 7,87

1.01.40 0,33000PINTOR H 1,554304,711.01.41 0,33000AJUDANTE DE PINTOR H 1,260603,822.80.81 0,03000FITA CREPE 25MM X 50M UN 0,138304,613.75.17 0,00300TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,018096,03

LS 3,43418 BDI 1,47326Mão-de-Obra 2,81490 Material 0,15639SubMO 6,24908

15.04.079 PINTURA ACRILICA PARA PISOS M2 12,33

1.01.40 0,45000PINTOR H 2,119504,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,823.75.17 0,25000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,507506,03

LS 4,68297 BDI 2,30666Mão-de-Obra 3,83850 Material 1,50750SubMO 8,52147

15.04.080 PINTURA DE QUADRAS ESP-LINHAS DEMARCATORIAS (600M2) UN 727,00

1.01.40 22,80000PINTOR H 107,388004,711.01.41 22,80000AJUDANTE DE PINTOR H 87,096003,822.80.81 22,00000FITA CREPE 25MM X 50M UN 101,420004,613.75.17 9,60000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 57,888006,03

LS 237,27048 BDI 135,94437Mão-de-Obra 194,48400 Material 159,30800SubMO 431,75448

15.04.081 PINTURA DE LINHAS DEMARCATORIAS DE QUADRA DE ESPORTES M 1,21

1.01.40 0,03400PINTOR H 0,160144,711.01.41 0,03400AJUDANTE DE PINTOR H 0,129883,822.80.81 0,04400FITA CREPE 25MM X 50M UN 0,202844,613.75.17 0,02300TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,138696,03

LS 0,35382 BDI 0,22664Mão-de-Obra 0,29002 Material 0,34153SubMO 0,64384

15.04.099 PINTURAS EM PAREDES EXTERNAS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

15.50.001 RASPAGEM DE CAIACAO OU TINTA MINERAL IMPERMEAVEL M2 1,04

1.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,82

LS 0,46604 BDI 0,19505Mão-de-Obra 0,38200 Material 0,00000SubMO 0,84804

15.50.002 REMOCAO DE OLEO,ESMALTE,LATEX/ACRILICO EM PAREDES COM LIXAMENTO M2 1,96

1.01.41 0,15000AJUDANTE DE PINTOR H 0,573003,823.80.40 0,50000LIXA D"AGUA UN 0,325000,65

LS 0,69906 BDI 0,36732Mão-de-Obra 0,57300 Material 0,32500SubMO 1,27206

15.50.003 REMOCAO DE OLEO,ESMALTE OU VERNIZ EM ESQ DE MADEIRA C/LIXAMENTO M2 2,81

1.01.41 0,25000AJUDANTE DE PINTOR H 0,955003,823.80.39 0,50000LIXA PARA MADEIRA UN 0,165000,33

LS 1,16510 BDI 0,52557Mão-de-Obra 0,95500 Material 0,16500SubMO 2,12010

15.50.004REMOCAO DE OLEO,ESMALTE,ALUMIN OU GRAFITE EM ESQ DE FERROC/LIXAMENTO

M2 3,48

1.01.41 0,25000AJUDANTE DE PINTOR H 0,955003,823.80.12 0,50000LIXA PARA FERRO UN 0,715001,43

LS 1,16510 BDI 0,65207Mão-de-Obra 0,95500 Material 0,71500SubMO 2,12010

15.50.010 REMOCAO OLEO,ESMALTE/VERNIZ EM RODAPES,BAGUETES E MOLD C/LIXAMENTO M 0,56

1.01.41 0,05000AJUDANTE DE PINTOR H 0,191003,823.80.39 0,10000LIXA PARA MADEIRA UN 0,033000,33

LS 0,23302 BDI 0,10512Mão-de-Obra 0,19100 Material 0,03300SubMO 0,42402

15.50.011REMOCAO DE OLEO,ESMALTE,LATEX/ACRILICO EM PAREDES COM PRODUTOQUIMICO

M2 3,77

1.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.29 0,10000REMOVEDOR DE TINTA L 1,3750013,75

LS 0,93208 BDI 0,70635Mão-de-Obra 0,76400 Material 1,37500SubMO 1,69608

15.50.012 REMOCAO DE OLEO ESMALTE OU VERNIZ EM ESQ. DE MADEIRA C/PROD QUIMICO M2 3,77

1.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.29 0,10000REMOVEDOR DE TINTA L 1,3750013,75

09/02/2011 11:38:40 Página: 279 de 0

Page 280: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,93208 BDI 0,70635Mão-de-Obra 0,76400 Material 1,37500SubMO 1,69608

15.50.013REMOCAO DE OLEO,ESMALTE,ALUMIN OU GRAFITE EM ESQ DE FERRO C/PRODQUIM

M2 3,77

1.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.29 0,10000REMOVEDOR DE TINTA L 1,3750013,75

LS 0,93208 BDI 0,70635Mão-de-Obra 0,76400 Material 1,37500SubMO 1,69608

15.50.014 REMOCAO OLEO,ESMALTE/VERNIZ EM RODAPES,BAGUETES E MOLD C/PROD QUIM M 0,75

1.01.41 0,04000AJUDANTE DE PINTOR H 0,152803,823.80.29 0,02000REMOVEDOR DE TINTA L 0,2750013,75

LS 0,18642 BDI 0,14127Mão-de-Obra 0,15280 Material 0,27500SubMO 0,33922

15.50.030 REMOCAO DE PINTURA EM ESTRUTURA METALICA COM LIXAMENTO M2 13,06

1.01.41 1,00000AJUDANTE DE PINTOR H 3,820003,823.80.12 1,50000LIXA PARA FERRO UN 2,145001,43

LS 4,66040 BDI 2,44384Mão-de-Obra 3,82000 Material 2,14500SubMO 8,48040

15.50.099 REMOCOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

15.80.008 OLEO DE LINHACA EM MADEIRAMENTO APARENTE DE TELHADO M2 5,20

1.01.40 0,18000PINTOR H 0,847804,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.80.18 0,10000OLEO DE LINHACA L 0,651006,51

LS 1,96640 BDI 0,97272Mão-de-Obra 1,61180 Material 0,65100SubMO 3,57820

15.80.010 PINTURA EM AZULEJO M2 15,97

1.01.40 0,18000PINTOR H 0,847804,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.26 0,20000TINTA PARA AJULEJO SAYERLACK OU SIMILAR L 9,4060047,03

LS 1,96640 BDI 2,98637Mão-de-Obra 1,61180 Material 9,40600SubMO 3,57820

15.80.012 TINTA EPOXI ANTIPICHACAO (SPEEL FLEX) 2 DEMAOS M2 10,92

1.01.40 0,18000PINTOR H 0,847804,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,823.75.18 0,25600TINTA EPOXI ANTI PICHACAO MONOCOMP (SPELL FLEX) L 5,3043220,72

LS 1,96640 BDI 2,04298Mão-de-Obra 1,61180 Material 5,30432SubMO 3,57820

15.80.015 LATEX EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA M2 7,93

1.01.40 0,27500PINTOR H 1,295254,711.01.41 0,27500AJUDANTE DE PINTOR H 1,050503,823.75.13 0,20000TINTA LATEX ECONOMICA L 0,864004,323.80.17 0,08000MASSA NIVELADORA INTERIOR L 0,182402,283.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 2,86182 BDI 1,48326Mão-de-Obra 2,34575 Material 1,24140SubMO 5,20757

15.80.016 ESMALTE EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA M2 9,95

1.01.40 0,27500PINTOR H 1,295254,711.01.41 0,27500AJUDANTE DE PINTOR H 1,050503,823.75.02 0,20000TINTA ESMALTE L 1,992009,963.80.16 0,08000MASSA PARA MADEIRA L 0,697608,723.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 2,86182 BDI 1,86120Mão-de-Obra 2,34575 Material 2,88460SubMO 5,20757

15.80.017 OLEO EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA M2 9,74

1.01.40 0,27500PINTOR H 1,295254,711.01.41 0,27500AJUDANTE DE PINTOR H 1,050503,823.80.16 0,08000MASSA PARA MADEIRA L 0,697608,723.80.34 0,20000TINTA A OLEO L 1,826009,133.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 2,86182 BDI 1,82302Mão-de-Obra 2,34575 Material 2,71860SubMO 5,20757

15.80.018 ACRILICA EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA M2 8,45

1.01.40 0,27500PINTOR H 1,295254,711.01.41 0,27500AJUDANTE DE PINTOR H 1,050503,823.75.42 0,20000TINTA LATEX STANDARD L 1,290006,453.80.17 0,08000MASSA NIVELADORA INTERIOR L 0,182402,283.80.40 0,30000LIXA D"AGUA UN 0,195000,65

LS 2,86182 BDI 1,58124Mão-de-Obra 2,34575 Material 1,66740SubMO 5,20757

15.80.019ESMALTE EM ESQUADRIAS DE MADEIRA INCLUSIVE PREPARO E RETOQUES DEMASSA

M2 9,83

1.01.40 0,27500PINTOR H 1,295254,711.01.41 0,27500AJUDANTE DE PINTOR H 1,050503,82

09/02/2011 11:38:40 Página: 280 de 0

Page 281: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.75.02 0,20000TINTA ESMALTE L 1,992009,963.80.16 0,08000MASSA PARA MADEIRA L 0,697608,723.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,33

LS 2,86182 BDI 1,83912Mão-de-Obra 2,34575 Material 2,78860SubMO 5,20757

15.80.020 OLEO EM ESQUADRIAS DE MADEIRA INCLUSIVE PREPARO E RETOQUES DE MASSA M2 9,63

1.01.40 0,27500PINTOR H 1,295254,711.01.41 0,27500AJUDANTE DE PINTOR H 1,050503,823.80.16 0,08000MASSA PARA MADEIRA L 0,697608,723.80.34 0,20000TINTA A OLEO L 1,826009,133.80.39 0,30000LIXA PARA MADEIRA UN 0,099000,33

LS 2,86182 BDI 1,80094Mão-de-Obra 2,34575 Material 2,62260SubMO 5,20757

15.80.021 OLEO EM ESQUADRIAS DE FERRO INCLUSIVE PREPARO E RETOQUES DE ZARCAO M2 14,84

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,823.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,05000ZARCAO L 0,8045016,093.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 5,20330 BDI 2,77640Mão-de-Obra 4,26500 Material 2,60300SubMO 9,46830

15.80.022ESMALTE EM ESQUADRIAS DE FERRO INCLUSIVE PREPARO E RETOQUES DEZARCAO

M2 15,00

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,823.75.02 0,15000TINTA ESMALTE L 1,494009,963.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,05000ZARCAO L 0,8045016,09

LS 5,20330 BDI 2,80503Mão-de-Obra 4,26500 Material 2,72750SubMO 9,46830

15.80.023 OLEO EM RODAPES/BAGUETES/MOLD. MAD. INCL. PREPARO E RETOQUE DE MASSA M 1,48

1.01.40 0,03840PINTOR H 0,180864,711.01.41 0,04700AJUDANTE DE PINTOR H 0,179543,823.80.16 0,00400MASSA PARA MADEIRA L 0,034888,723.80.34 0,04000TINTA A OLEO L 0,365209,133.80.39 0,02270LIXA PARA MADEIRA UN 0,007490,33

LS 0,43969 BDI 0,27776Mão-de-Obra 0,36040 Material 0,40757SubMO 0,80010

15.80.024ALUMINIO EM ESQUADRIAS DE FERRO INCLUSIVE PREPARO E RETOQUE DEZARCAO

M2 15,71

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,823.75.07 0,15000TINTA ESMALTE SINTETICO - ALUMINIO L 2,0775013,853.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,05000ZARCAO L 0,8045016,09

LS 5,20330 BDI 2,93924Mão-de-Obra 4,26500 Material 3,31100SubMO 9,46830

15.80.025 REMOVEDOR DE PICHACAO (SPEEL CLEAN) - POS PINTURA ANTIPICHACAO M2 4,51

1.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.62 0,04940REMOVEDOR DE PICHACOES (SPEEL CLEAN) L 1,1273122,82

LS 1,39812 BDI 0,84443Mão-de-Obra 1,14600 Material 1,12731SubMO 2,54412

15.80.027 GRAFITE EM ESQUADRIAS DE FERRO INCL. PREPARO E RETOQUE DE ZARCAO M2 15,54

1.01.40 0,50000PINTOR H 2,355004,711.01.41 0,50000AJUDANTE DE PINTOR H 1,910003,822.80.56 0,15000GRAFITE L 1,9380012,923.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,05000ZARCAO L 0,8045016,09

LS 5,20330 BDI 2,90715Mão-de-Obra 4,26500 Material 3,17150SubMO 9,46830

15.80.029 VERNIZ ANTIPICHACAO (SPEEL FLEX) 2 DEMAOS M2 12,71

1.01.40 0,30000PINTOR H 1,413004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.24 0,25600VERNIZ ANTIPICHACAO (SPEEL FLEX) L 4,6592018,20

LS 3,12198 BDI 2,37824Mão-de-Obra 2,55900 Material 4,65920SubMO 5,68098

15.80.030 VERNIZ EM ESQUADRIAS DE MADEIRA INCL. PREPARO E RETOQUE DE MASSA M2 11,88

1.01.40 0,30000PINTOR H 1,413004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,823.80.16 0,20000MASSA PARA MADEIRA L 1,744008,723.80.39 0,20000LIXA PARA MADEIRA UN 0,066000,333.80.50 0,20000VERNIZ SINTETICO BRILHANTE L 2,1740010,87

LS 3,12198 BDI 2,22295Mão-de-Obra 2,55900 Material 3,98400SubMO 5,68098

15.80.032VERNIZ EM RODAPES/BAGUETES/MOLD. MAD. INCL. PREPARO E RETOQUE DEMASSA

M 1,57

09/02/2011 11:38:40 Página: 281 de 0

Page 282: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.40 0,03840PINTOR H 0,180864,711.01.41 0,04700AJUDANTE DE PINTOR H 0,179543,823.80.16 0,00400MASSA PARA MADEIRA L 0,034888,723.80.39 0,02270LIXA PARA MADEIRA UN 0,007490,333.80.50 0,04000VERNIZ SINTETICO BRILHANTE L 0,4348010,87

LS 0,43969 BDI 0,29377Mão-de-Obra 0,36040 Material 0,47717SubMO 0,80010

15.80.035 PINTURA EM LOUSA INCL. PREPARO E RETOQUE DE MASSA M2 8,41

1.01.40 0,19200PINTOR H 0,904324,711.01.41 0,23500AJUDANTE DE PINTOR H 0,897703,823.75.30 0,20000TINTA ESMALTE SINTETICO VERDE ESCOLAR L 2,5920012,963.80.16 0,02000MASSA PARA MADEIRA L 0,174408,723.80.40 0,11350LIXA D"AGUA UN 0,073780,65

LS 2,19846 BDI 1,57335Mão-de-Obra 1,80202 Material 2,84018SubMO 4,00048

15.80.040 PINTURA DE QUADRAS ESPORTIVAS - LINHAS DEMARCATORIAS UN 333,35

1.01.40 12,00000PINTOR H 56,520004,711.01.41 12,00000AJUDANTE DE PINTOR H 45,840003,823.75.17 7,26020TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 43,779016,03

LS 124,87920 BDI 62,33419Mão-de-Obra 102,36000 Material 43,77901SubMO 227,23920

15.80.042 PINTURA DE LINHAS DEMARCATORIAS DE QUADRA DE ESPORTES M 0,97

1.01.40 0,03400PINTOR H 0,160144,711.01.41 0,03400AJUDANTE DE PINTOR H 0,129883,823.75.17 0,02500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,150756,03

LS 0,35382 BDI 0,18276Mão-de-Obra 0,29002 Material 0,15075SubMO 0,64384

15.80.050 OLEO EM FORRO DE MADEIRA INCLUSIVE PREPARO E RETOQUE DE MASSA M2 9,88

1.01.40 0,28800PINTOR H 1,356484,711.01.41 0,35250AJUDANTE DE PINTOR H 1,346553,823.80.16 0,02000MASSA PARA MADEIRA L 0,174408,723.80.34 0,20000TINTA A OLEO L 1,826009,133.80.39 0,11350LIXA PARA MADEIRA UN 0,037460,33

LS 3,29770 BDI 1,84887Mão-de-Obra 2,70303 Material 2,03786SubMO 6,00073

15.80.051 ESMALTE EM FORRO DE MADEIRA INCLUSIVE PREPARO E RETOQUE DE MASSA M2 10,09

1.01.40 0,28800PINTOR H 1,356484,711.01.41 0,35250AJUDANTE DE PINTOR H 1,346553,823.75.02 0,20000TINTA ESMALTE L 1,992009,963.80.16 0,02000MASSA PARA MADEIRA L 0,174408,723.80.39 0,11350LIXA PARA MADEIRA UN 0,037460,33

LS 3,29770 BDI 1,88705Mão-de-Obra 2,70303 Material 2,20386SubMO 6,00073

15.80.060 ESMALTE EM ESTRUTURA METALICA INCLUSIVE PREPARO E RETOQUE DE ZARCAO M2 9,17

1.01.40 0,25540PINTOR H 1,202934,711.01.41 0,31260AJUDANTE DE PINTOR H 1,194133,823.75.02 0,15000TINTA ESMALTE L 1,494009,963.80.12 0,11350LIXA PARA FERRO UN 0,162311,433.80.28 0,03000ZARCAO L 0,4827016,09

LS 2,92442 BDI 1,71591Mão-de-Obra 2,39707 Material 2,13901SubMO 5,32149

15.80.061 OLEO EM ESTRUTURA METALICA INCLUSIVE PREPARO E RETOQUE DE ZARCAO M2 9,02

1.01.40 0,25540PINTOR H 1,202934,711.01.41 0,31260AJUDANTE DE PINTOR H 1,194133,823.80.12 0,11350LIXA PARA FERRO UN 0,162311,433.80.28 0,03000ZARCAO L 0,4827016,093.80.34 0,15000TINTA A OLEO L 1,369509,13

LS 2,92442 BDI 1,68728Mão-de-Obra 2,39707 Material 2,01451SubMO 5,32149

15.80.062 GRAFITE EM ESTRUTURA METALICA INCLUSIVE PREPARO E RETOQUE DE ZARCAO M2 9,72

1.01.40 0,25540PINTOR H 1,202934,711.01.41 0,31260AJUDANTE DE PINTOR H 1,194133,822.80.56 0,15000GRAFITE L 1,9380012,923.80.12 0,11350LIXA PARA FERRO UN 0,162311,433.80.28 0,03000ZARCAO L 0,4827016,09

LS 2,92442 BDI 1,81803Mão-de-Obra 2,39707 Material 2,58301SubMO 5,32149

15.80.070 GALVANIZACAO A FRIO - PINTURA P/ ESTRUTURAS - CONSERVACAO M2 26,11

1.01.40 0,20000PINTOR H 0,942004,711.01.41 0,15000AJUDANTE DE PINTOR H 0,573003,823.75.91 0,11000GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 17,44160158,563.80.12 0,30000LIXA PARA FERRO UN 0,429001,43

LS 1,84830 BDI 4,88380Mão-de-Obra 1,51500 Material 17,87060SubMO 3,36330

15.80.071 GALVANIZACAO A FRIO - PINTURA P/ ESQUADRIAS - CONSERVACAO M2 39,33

1.01.40 0,41000PINTOR H 1,931104,71

09/02/2011 11:38:40 Página: 282 de 0

Page 283: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.41 0,41000AJUDANTE DE PINTOR H 1,566203,823.75.91 0,15000GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 23,78400158,563.80.12 0,30000LIXA PARA FERRO UN 0,429001,43

LS 4,26671 BDI 7,35471Mão-de-Obra 3,49730 Material 24,21300SubMO 7,76401

15.80.072 PRIMER P/ GALVANIZADOS (GALVIT/SIMILAR) - ESTRUTURAS - CONSERVACAO M2 5,66

1.01.40 0,18000PINTOR H 0,847804,711.01.41 0,13000AJUDANTE DE PINTOR H 0,496603,823.80.66 0,11000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,6214014,74

LS 1,64017 BDI 1,05937Mão-de-Obra 1,34440 Material 1,62140SubMO 2,98457

15.80.073 PRIMER P/ GALVANIZADOS (GALVIT/SIMILAR) - ESQUADRIAS - CONSERVACAO M2 11,57

1.01.40 0,38000PINTOR H 1,789804,711.01.41 0,38000AJUDANTE DE PINTOR H 1,451603,823.80.66 0,15000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 2,2110014,74

LS 3,95451 BDI 2,16359Mão-de-Obra 3,24140 Material 2,21100SubMO 7,19591

15.80.075 FUNDO ANTI-OXIDANTE EM ESTRUTURAS - CONSERVACAO M2 6,84

1.01.40 0,20000PINTOR H 0,942004,711.01.41 0,15000AJUDANTE DE PINTOR H 0,573003,823.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,11000ZARCAO L 1,7699016,09

LS 1,84830 BDI 1,27931Mão-de-Obra 1,51500 Material 2,19890SubMO 3,36330

15.80.076 FUNDO ANTI-OXIDANTE EM ESQUADRIAS - CONSERVACAO M2 13,04

1.01.40 0,41000PINTOR H 1,931104,711.01.41 0,41000AJUDANTE DE PINTOR H 1,566203,823.80.12 0,30000LIXA PARA FERRO UN 0,429001,433.80.28 0,15000ZARCAO L 2,4135016,09

LS 4,26671 BDI 2,43950Mão-de-Obra 3,49730 Material 2,84250SubMO 7,76401

15.80.099 SERVICOS DE PINTURA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.01.005 FD-04 FECHAMENTO DE DIVISAS/PLACAS DE CONCRETO M 233,70

1.01.11 1,53000CARPINTEIRO H 6,961504,551.01.12 1,53000AJUDANTE DE CARPINTEIRO H 6,058803,961.01.21 0,58000FERREIRO H 2,766604,771.01.22 0,58000AJUDANTE DE FERREIRO H 2,215603,821.01.39 1,72000PEDREIRO H 7,998004,651.01.46 6,43000SERVENTE H 24,498303,812.05.03 0,14500AREIA M3 11,4840079,202.05.08 61,25000CIMENTO KG 22,662500,372.05.17 0,14200PEDRA BRITADA 1 M3 8,7940661,932.05.18 0,07300PEDRA BRITADA 2 M3 4,4595761,092.10.17 0,48000SARRAFO PINHO APARELHADO 10X2,5 CM M 2,188804,562.10.21 0,24000TABUAS PINHO DE 1"X12" DE 3A. M2 4,1232017,182.10.32 0,38000CHAPA COMPENSADA RESINADA E=12MM M2 4,5980012,102.15.38 6,70000ACO CA-60-B $MD BITOLAS KG 17,755002,652.67.60 0,28000PREGO KG 1,279604,572.70.10 0,12000ARAME RECOZIDO N.18 KG 0,555604,63

LS 61,60854 BDI 43,70176Mão-de-Obra 50,49880 Material 77,90033SubMO 112,10734

16.01.008FD-07 FECHAM DIVISA/BL CONCRETO/REV CHAP GROSSO FACE EXTH=185CM/SAPAT

M 307,58

1.01.11 1,05000CARPINTEIRO H 4,777504,551.01.12 1,05000AJUDANTE DE CARPINTEIRO H 4,158003,961.01.21 0,43100FERREIRO H 2,055874,771.01.22 0,43100AJUDANTE DE FERREIRO H 1,646423,821.01.39 4,34000PEDREIRO H 20,181004,651.01.46 6,55600SERVENTE H 24,978363,812.05.03 0,10500AREIA M3 8,3160079,202.05.05 8,96000CAL HIDRATADA KG 3,046400,342.05.08 29,46400CIMENTO KG 10,901680,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05700PEDRA BRITADA 2 M3 3,4821361,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,06100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,46289253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.15.25 3,52000ACO CA-50-A $MD BITOLAS KG 9,504002,702.15.38 1,44000ACO CA-60-B $MD BITOLAS KG 3,816002,652.25.77 23,40000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 44,928001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,08000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,834401,43

09/02/2011 11:38:40 Página: 283 de 0

Page 284: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.40.10 0,20400EMULSAO ADESIVA PVA KG 2,1562810,572.67.60 0,04000PREGO KG 0,182804,572.70.10 0,08600ARAME RECOZIDO N.18 KG 0,398184,63

LS 70,51252 BDI 57,51622Mão-de-Obra 57,79715 Material 121,76083SubMO 128,30967

16.01.009FD-08 FECHAM DIVISA/BL CONCRETO/REV CHAP GROSSO FACE EXTH=185CM/BROCA

M 346,82

1.01.11 1,27000CARPINTEIRO H 5,778504,551.01.12 1,27000AJUDANTE DE CARPINTEIRO H 5,029203,961.01.21 0,64600FERREIRO H 3,081424,771.01.22 0,64600AJUDANTE DE FERREIRO H 2,467723,821.01.39 4,37000PEDREIRO H 20,320504,651.01.46 7,32000SERVENTE H 27,889203,812.05.03 0,12200AREIA M3 9,6624079,202.05.05 8,96000CAL HIDRATADA KG 3,046400,342.05.08 39,95400CIMENTO KG 14,782980,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05800PEDRA BRITADA 2 M3 3,5432261,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,04100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 10,39309253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,24000TABUAS PINHO DE 1"X12" DE 3A. M2 4,1232017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.15.25 9,20000ACO CA-50-A $MD BITOLAS KG 24,840002,702.15.38 1,27000ACO CA-60-B $MD BITOLAS KG 3,365502,652.25.77 23,40000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 44,928001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 3,48000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 4,976401,432.40.10 0,17400EMULSAO ADESIVA PVA KG 1,8391810,572.67.60 0,08000PREGO KG 0,365604,572.70.10 0,13000ARAME RECOZIDO N.18 KG 0,601904,63

LS 78,77118 BDI 64,85275Mão-de-Obra 64,56654 Material 138,63074SubMO 143,33772

16.01.010 FD-10 FECHAMENTO PARA DEVISAS/MOUROES M 33,99

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 1,00000SERVENTE H 3,810003,812.70.32 0,48950ARAME GALVANIZADO No. 10 KG 3,039806,212.75.20 0,50000FD-10MOURAO CONCRETO 10X10X220CM UN 10,9750021,95

LS 7,48470 BDI 6,35593Mão-de-Obra 6,13500 Material 14,01480SubMO 13,61970

16.01.011 FD-11 FECHAMENTO DE DIVISAS - MOUROES C/ PLACAS PRE MOLDADAS M 122,61

1.01.39 0,73000PEDREIRO H 3,394504,651.01.46 1,71000SERVENTE H 6,515103,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 13,87000CIMENTO KG 5,131900,372.05.18 0,03300PEDRA BRITADA 2 M3 2,0159761,092.75.16 1,67000PLACA PREMOLDADA 160X60X3CM UN 46,5596027,882.75.21 0,56000MOURAO P/PLACA PREMOLD. C/DIMENS MIN 10X10X240CM UN 22,3160039,85

LS 12,08971 BDI 22,92778Mão-de-Obra 9,90960 Material 77,68667SubMO 21,99931

16.01.012 FD-12 FECHAMENTO DE DIVISAS - MOUROES C/ ARAMES E HIBISCOS M 90,71

1.01.26 0,36000JARDINEIRO H 1,774804,931.01.39 0,50000PEDREIRO H 2,325004,651.01.46 1,36000SERVENTE H 5,181603,812.70.32 0,48950ARAME GALVANIZADO No. 10 KG 3,039806,212.75.20 0,50000FD-10MOURAO CONCRETO 10X10X220CM UN 10,9750021,953.85.02 0,29600ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,506161,713.85.03 0,29600CALCARIO DOLOMITICO KG 0,118400,403.85.11 0,12800TERRA VEGETAL M3 11,5443290,193.85.12 0,29600FOSFATO DE ROCHAS KG 0,405521,373.85.13 20,00000ADUBO ORGANICO CURTIDO L 4,200000,213.86.48 4,00000ARBUSTO H=0.50/0.70M-HIBISCO UN 22,360005,59

LS 11,32331 BDI 16,96340Mão-de-Obra 9,28140 Material 53,14920SubMO 20,60471

16.01.013 FD-13 FECHAMENTO DIV/BL CONCR/SEM REVESTIMENTO (H=185CM/SAPATA) M 295,56

1.01.11 1,05000CARPINTEIRO H 4,777504,551.01.12 1,05000AJUDANTE DE CARPINTEIRO H 4,158003,961.01.21 0,43100FERREIRO H 2,055874,771.01.22 0,43100AJUDANTE DE FERREIRO H 1,646423,821.01.39 3,89000PEDREIRO H 18,088504,651.01.46 6,10600SERVENTE H 23,263863,812.05.03 0,10000AREIA M3 7,9200079,202.05.05 8,96000CAL HIDRATADA KG 3,046400,342.05.08 26,96200CIMENTO KG 9,975940,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05700PEDRA BRITADA 2 M3 3,4821361,092.05.22 0,01000PEDRISCO M3 0,6610066,10

09/02/2011 11:38:40 Página: 284 de 0

Page 285: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.36 0,06100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,46289253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,14000TABUAS PINHO DE 1"X12" DE 3A. M2 2,4052017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.15.25 3,52000ACO CA-50-A $MD BITOLAS KG 9,504002,702.15.38 1,44000ACO CA-60-B $MD BITOLAS KG 3,816002,652.25.77 23,40000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 44,928001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,08000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,834401,432.40.10 0,20400EMULSAO ADESIVA PVA KG 2,1562810,572.67.60 0,04000PREGO KG 0,182804,572.70.10 0,08600ARAME RECOZIDO N.18 KG 0,398184,63

LS 65,86798 BDI 55,26836Mão-de-Obra 53,99015 Material 120,43909SubMO 119,85813

16.01.014FD-14 FECHAMENTO DE DIVISA/BLOCO DE CONCRETO/ S/REVEST.H=185CM/BROCA

M 334,71

1.01.11 1,27000CARPINTEIRO H 5,778504,551.01.12 1,27000AJUDANTE DE CARPINTEIRO H 5,029203,961.01.21 0,64600FERREIRO H 3,081424,771.01.22 0,64600AJUDANTE DE FERREIRO H 2,467723,821.01.39 3,92000PEDREIRO H 18,228004,651.01.46 6,87000SERVENTE H 26,174703,812.05.03 0,11700AREIA M3 9,2664079,202.05.05 8,96000CAL HIDRATADA KG 3,046400,342.05.08 37,45200CIMENTO KG 13,857240,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05800PEDRA BRITADA 2 M3 3,5432261,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,04100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 10,39309253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,24000TABUAS PINHO DE 1"X12" DE 3A. M2 4,1232017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.15.25 9,20000ACO CA-50-A $MD BITOLAS KG 24,840002,702.15.38 1,27000ACO CA-60-B $MD BITOLAS KG 3,365502,652.25.77 23,40000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 44,928001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 3,43000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 4,904901,432.40.10 0,17400EMULSAO ADESIVA PVA KG 1,8391810,572.67.60 0,08000PREGO KG 0,365604,572.70.10 0,13000ARAME RECOZIDO N.18 KG 0,601904,63

LS 74,12664 BDI 62,58845Mão-de-Obra 60,75954 Material 137,23750SubMO 134,88618

16.01.015FD-15 FECHAMENTO DE DIVISA/BL CONCRETO/REVEST CHAP FINOH=235CM/SAPATA

M 448,14

1.01.11 1,86600CARPINTEIRO H 8,490304,551.01.12 1,86600AJUDANTE DE CARPINTEIRO H 7,389363,961.01.21 0,83100FERREIRO H 3,963874,771.01.22 0,83100AJUDANTE DE FERREIRO H 3,174423,821.01.39 5,14400PEDREIRO H 23,919604,651.01.46 8,86300SERVENTE H 33,768033,812.05.03 0,14500AREIA M3 11,4840079,202.05.05 11,44400CAL HIDRATADA KG 3,890960,342.05.08 41,08400CIMENTO KG 15,201080,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,06700PEDRA BRITADA 2 M3 4,0930361,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,09300CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 23,57457253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,45400TABUAS PINHO DE 1"X12" DE 3A. M2 7,7997217,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 1,88400PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 9,853325,232.15.25 6,90000ACO CA-50-A $MD BITOLAS KG 18,630002,702.15.38 2,70000ACO CA-60-B $MD BITOLAS KG 7,155002,652.25.77 28,60000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 54,912001,922.25.96 5,20000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 13,052002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,17000PREGO KG 0,776904,572.70.10 0,17000ARAME RECOZIDO N.18 KG 0,787104,63

LS 98,46081 BDI 83,79883Mão-de-Obra 80,70558 Material 185,17633SubMO 179,16639

16.01.016FD-16 FECHAMENTO DIVISA/BL CONCRETO/REVEST CHAPISCO FINOH=235CM/BROCA

M 471,76

1.01.11 2,08600CARPINTEIRO H 9,491304,551.01.12 2,08600AJUDANTE DE CARPINTEIRO H 8,260563,961.01.21 1,02000FERREIRO H 4,865404,771.01.22 1,02000AJUDANTE DE FERREIRO H 3,896403,821.01.39 5,08600PEDREIRO H 23,649904,65

09/02/2011 11:38:40 Página: 285 de 0

Page 286: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 8,86100SERVENTE H 33,760413,812.05.03 0,15700AREIA M3 12,4344079,202.05.05 11,44400CAL HIDRATADA KG 3,890960,342.05.08 49,67100CIMENTO KG 18,378270,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,06300CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,96987253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,55400TABUAS PINHO DE 1"X12" DE 3A. M2 9,5177217,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 1,88400PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 9,853325,232.15.25 12,39000ACO CA-50-A $MD BITOLAS KG 33,453002,702.15.38 2,16000ACO CA-60-B $MD BITOLAS KG 5,724002,652.25.77 28,60000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 54,912001,922.25.96 5,20000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 13,052002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,20600PREGO KG 0,941424,572.70.10 0,20400ARAME RECOZIDO N.18 KG 0,944524,63

LS 102,38724 BDI 88,21542Mão-de-Obra 83,92397 Material 197,23408SubMO 186,31121

16.01.021 FD-21 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO / SAPATA (H=185CM) M 512,29

1.01.11 1,34900CARPINTEIRO H 6,137954,551.01.12 1,34900AJUDANTE DE CARPINTEIRO H 5,342043,961.01.21 0,40700FERREIRO H 1,941394,771.01.22 0,40700AJUDANTE DE FERREIRO H 1,554743,821.01.39 2,97900PEDREIRO H 13,852354,651.01.44 0,25000SERRALHEIRO H 2,020008,081.01.45 0,25000AJUDANTE SERRALHEIRO H 1,085004,341.01.46 5,95700SERVENTE H 22,696173,812.05.03 0,06300AREIA M3 4,9896079,202.05.05 3,65200CAL HIDRATADA KG 1,241680,342.05.08 19,45800CIMENTO KG 7,199460,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05700PEDRA BRITADA 2 M3 3,4821361,092.05.22 0,00500PEDRISCO M3 0,3305066,102.05.36 0,07100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 17,99779253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,25500TABUAS PINHO DE 1"X12" DE 3A. M2 4,3809017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 0,69000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 3,608705,232.15.25 2,92100ACO CA-50-A $MD BITOLAS KG 7,886702,702.15.38 1,76000ACO CA-60-B $MD BITOLAS KG 4,664002,652.25.77 7,80000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 14,976001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,08600PREGO KG 0,393024,572.70.10 0,08200ARAME RECOZIDO N.18 KG 0,379664,633.13.44 0,60700GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST UN 154,48150254,503.13.45 0,66700MONTANTE P/GRADIL METALGRADE H=1322MM PINT.ELETRO UN 49,3780174,03

LS 66,64816 BDI 95,79479Mão-de-Obra 54,62964 Material 295,22130SubMO 121,27780

16.01.022 FD-22 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO/SAPATA (H=235CM) M 572,38

1.01.11 1,34900CARPINTEIRO H 6,137954,551.01.12 1,34900AJUDANTE DE CARPINTEIRO H 5,342043,961.01.21 0,40700FERREIRO H 1,941394,771.01.22 0,40700AJUDANTE DE FERREIRO H 1,554743,821.01.39 2,97900PEDREIRO H 13,852354,651.01.44 0,35000SERRALHEIRO H 2,828008,081.01.45 0,35000AJUDANTE SERRALHEIRO H 1,519004,341.01.46 5,95700SERVENTE H 22,696173,812.05.03 0,06300AREIA M3 4,9896079,202.05.05 3,65200CAL HIDRATADA KG 1,241680,342.05.08 19,45800CIMENTO KG 7,199460,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05700PEDRA BRITADA 2 M3 3,4821361,092.05.22 0,00500PEDRISCO M3 0,3305066,102.05.36 0,07100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 17,99779253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,25500TABUAS PINHO DE 1"X12" DE 3A. M2 4,3809017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 0,69000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 3,608705,232.15.25 2,92100ACO CA-50-A $MD BITOLAS KG 7,886702,702.15.38 1,76000ACO CA-60-B $MD BITOLAS KG 4,664002,652.25.77 7,80000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 14,976001,92

09/02/2011 11:38:40 Página: 286 de 0

Page 287: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,08600PREGO KG 0,393024,572.70.10 0,08200ARAME RECOZIDO N.18 KG 0,379664,633.13.42 0,60700GRADIL METALGRADE H=1718MM C=1650MM PINT. UN 189,11085311,553.13.43 0,66700MONTANTE P/GRADIL METALGRADE H=1718MM PINT.ELETRO UN 60,8437491,22

LS 68,16340 BDI 107,03083Mão-de-Obra 55,87164 Material 341,31638SubMO 124,03504

16.01.023 FE-01 FECHAMENTO PARA SETORIZACAO (ALAMBRADO) M2 282,45

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,50000AJUDANTE DE CARPINTEIRO H 1,980003,961.01.39 0,08000PEDREIRO H 0,372004,651.01.46 1,43000SERVENTE H 5,448303,812.05.35 0,01400CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 3,40354243,112.10.09 0,75600PONTALETE PINHO DE 3"X3" M 2,857683,782.10.21 0,02500TABUAS PINHO DE 1"X12" DE 3A. M2 0,4295017,182.10.32 0,08300CHAPA COMPENSADA RESINADA E=12MM M2 1,0043012,102.67.60 0,05000PREGO KG 0,228504,573.15.96 1,00000FE-01 GRADIL TIPO ALAMBRADO COMPLETO-GALVANIZADO M2 198,40000198,403.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,56

LS 12,29187 BDI 52,81767Mão-de-Obra 10,07530 Material 207,27488SubMO 22,36717

16.01.024 FE-02 FECHAMENTO PARA SETORIZACAO (GRADIL ELETROFUNDIDO) M2 234,92

1.01.11 0,62000CARPINTEIRO H 2,821004,551.01.12 0,62000AJUDANTE DE CARPINTEIRO H 2,455203,961.01.39 0,08000PEDREIRO H 0,372004,651.01.44 0,25000SERRALHEIRO H 2,020008,081.01.45 0,25000AJUDANTE SERRALHEIRO H 1,085004,341.01.46 1,43000SERVENTE H 5,448303,812.05.35 0,01400CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 3,40354243,112.10.09 0,93600PONTALETE PINHO DE 3"X3" M 3,538083,782.10.21 0,03100TABUAS PINHO DE 1"X12" DE 3A. M2 0,5325817,182.10.32 0,10300CHAPA COMPENSADA RESINADA E=12MM M2 1,2463012,102.67.60 0,06200PREGO KG 0,283344,573.13.44 0,45800GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST UN 116,56100254,503.13.45 0,45800MONTANTE P/GRADIL METALGRADE H=1322MM PINT.ELETRO UN 33,9057474,03

LS 17,32583 BDI 43,92952Mão-de-Obra 14,20150 Material 159,47058SubMO 31,52733

16.01.028 FD-23 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO / BROCA (H=185CM) M 551,24

1.01.11 1,56900CARPINTEIRO H 7,138954,551.01.12 1,56900AJUDANTE DE CARPINTEIRO H 6,213243,961.01.21 0,63000FERREIRO H 3,005104,771.01.22 0,63000AJUDANTE DE FERREIRO H 2,406603,821.01.39 3,03800PEDREIRO H 14,126704,651.01.44 0,25000SERRALHEIRO H 2,020008,081.01.45 0,25000AJUDANTE SERRALHEIRO H 1,085004,341.01.46 6,39300SERVENTE H 24,357333,812.05.03 0,08400AREIA M3 6,6528079,202.05.05 3,65200CAL HIDRATADA KG 1,241680,342.05.08 31,41800CIMENTO KG 11,624660,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,06200PEDRA BRITADA 2 M3 3,7875861,092.05.22 0,00500PEDRISCO M3 0,3305066,102.05.36 0,05100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,92799253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,35500TABUAS PINHO DE 1"X12" DE 3A. M2 6,0989017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 0,69000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 3,608705,232.15.25 8,90000ACO CA-50-A $MD BITOLAS KG 24,030002,702.15.38 1,67000ACO CA-60-B $MD BITOLAS KG 4,425502,652.25.77 7,80000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 14,976001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,06000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,805801,432.40.10 0,20400EMULSAO ADESIVA PVA KG 2,1562810,572.67.60 0,12600PREGO KG 0,575824,572.70.10 0,12600ARAME RECOZIDO N.18 KG 0,583384,633.13.44 0,60700GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST UN 154,48150254,503.13.45 0,66700MONTANTE P/GRADIL METALGRADE H=1322MM PINT.ELETRO UN 49,3780174,03

LS 73,63056 BDI 103,07920Mão-de-Obra 60,35292 Material 314,18697SubMO 133,98348

16.01.029 FD-24 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO / BROCA (H=235CM) M 611,33

1.01.11 1,56900CARPINTEIRO H 7,138954,551.01.12 1,56900AJUDANTE DE CARPINTEIRO H 6,213243,961.01.21 0,63000FERREIRO H 3,005104,771.01.22 0,63000AJUDANTE DE FERREIRO H 2,406603,821.01.39 3,03800PEDREIRO H 14,126704,65

09/02/2011 11:38:40 Página: 287 de 0

Page 288: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.44 0,35000SERRALHEIRO H 2,828008,081.01.45 0,35000AJUDANTE SERRALHEIRO H 1,519004,341.01.46 6,39300SERVENTE H 24,357333,812.05.03 0,08400AREIA M3 6,6528079,202.05.05 3,65200CAL HIDRATADA KG 1,241680,342.05.08 31,41800CIMENTO KG 11,624660,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,06200PEDRA BRITADA 2 M3 3,7875861,092.05.22 0,00500PEDRISCO M3 0,3305066,102.05.36 0,05100CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,92799253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,35500TABUAS PINHO DE 1"X12" DE 3A. M2 6,0989017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 0,69000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 3,608705,232.15.25 8,90000ACO CA-50-A $MD BITOLAS KG 24,030002,702.15.38 1,67000ACO CA-60-B $MD BITOLAS KG 4,425502,652.25.77 7,80000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 14,976001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,06000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,805801,432.40.10 0,20400EMULSAO ADESIVA PVA KG 2,1562810,572.67.60 0,12600PREGO KG 0,575824,572.70.10 0,12600ARAME RECOZIDO N.18 KG 0,583384,633.13.42 0,60700GRADIL METALGRADE H=1718MM C=1650MM PINT. UN 189,11085311,553.13.43 0,66700MONTANTE P/GRADIL METALGRADE H=1718MM PINT.ELETRO UN 60,8437491,22

LS 75,14580 BDI 114,31524Mão-de-Obra 61,59492 Material 360,28205SubMO 136,74072

16.01.030 FD-25 FECHAMENTO DIVISA C/ GRADIL ELETROF / SAPATA (199X132.20CM) M 475,52

1.01.11 1,55800CARPINTEIRO H 7,088904,551.01.12 1,55800AJUDANTE DE CARPINTEIRO H 6,169683,961.01.21 0,83200FERREIRO H 3,968644,771.01.22 0,83220AJUDANTE DE FERREIRO H 3,179003,821.01.39 4,34200PEDREIRO H 20,190304,651.01.44 0,25000SERRALHEIRO H 2,020008,081.01.45 0,25000AJUDANTE SERRALHEIRO H 1,085004,341.01.46 7,68000SERVENTE H 29,260803,812.05.03 0,10200AREIA M3 8,0784079,202.05.05 8,62200CAL HIDRATADA KG 2,931480,342.05.08 27,95000CIMENTO KG 10,341500,372.05.17 0,00500PEDRA BRITADA 1 M3 0,3096561,932.05.18 0,06700PEDRA BRITADA 2 M3 4,0930361,092.05.22 0,00700PEDRISCO M3 0,4627066,102.05.36 0,09500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 24,08155253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,46300TABUAS PINHO DE 1"X12" DE 3A. M2 7,9543417,182.10.33 0,08100CHAPA COMPENSADA PLASTIFICADA E=10MM M2 1,4831118,312.10.38 2,04600PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 10,700585,232.15.25 7,14000ACO CA-50-A $MD BITOLAS KG 19,278002,702.15.38 2,43000ACO CA-60-B $MD BITOLAS KG 6,439502,652.25.77 21,50000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 41,280001,922.25.96 4,00000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 10,040002,512.40.09 4,38000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,263401,432.40.10 0,21900EMULSAO ADESIVA PVA KG 2,3148310,572.67.60 0,17600PREGO KG 0,804324,572.70.10 0,16600ARAME RECOZIDO N.18 KG 0,768584,633.13.44 0,26000GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST UN 66,17000254,50

LS 89,01404 BDI 88,91969Mão-de-Obra 72,96232 Material 224,63097SubMO 161,97636

16.01.031 FD-26 FECHAMENTO DIVISA C/ GRADIL ELETROF / BROCA (199X132.20CM) M 517,10

1.01.11 1,77800CARPINTEIRO H 8,089904,551.01.12 1,77800AJUDANTE DE CARPINTEIRO H 7,040883,961.01.21 1,35500FERREIRO H 6,463354,771.01.22 1,35500AJUDANTE DE FERREIRO H 5,176103,821.01.39 4,30700PEDREIRO H 20,027554,651.01.44 0,35000SERRALHEIRO H 2,828008,081.01.45 0,35000AJUDANTE SERRALHEIRO H 1,519004,341.01.46 7,83000SERVENTE H 29,832303,812.05.03 0,11600AREIA M3 9,1872079,202.05.05 8,62200CAL HIDRATADA KG 2,931480,342.05.08 37,69000CIMENTO KG 13,945300,372.05.17 0,00500PEDRA BRITADA 1 M3 0,3096561,932.05.18 0,05800PEDRA BRITADA 2 M3 3,5432261,092.05.22 0,00700PEDRISCO M3 0,4627066,102.05.36 0,06500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 16,47685253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,56300TABUAS PINHO DE 1"X12" DE 3A. M2 9,6723417,182.10.33 0,08100CHAPA COMPENSADA PLASTIFICADA E=10MM M2 1,4831118,312.10.38 2,04600PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 10,700585,23

09/02/2011 11:38:40 Página: 288 de 0

Page 289: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.15.25 13,28000ACO CA-50-A $MD BITOLAS KG 35,856002,702.15.38 2,30000ACO CA-60-B $MD BITOLAS KG 6,095002,652.25.77 21,50000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 41,280001,922.25.96 4,00000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 10,040002,512.40.09 4,38000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,263401,432.40.10 0,21900EMULSAO ADESIVA PVA KG 2,3148310,572.67.60 0,21600PREGO KG 0,987124,572.70.10 0,27100ARAME RECOZIDO N.18 KG 1,254734,633.13.44 0,26000GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST UN 66,17000254,50

LS 98,79204 BDI 96,69536Mão-de-Obra 80,97708 Material 240,64551SubMO 179,76912

16.01.032 FD-27 FECHAMENTO DIVISA C/ GRADIL ELETROF / SAPATA (59X211.40CM) M 519,11

1.01.11 1,98200CARPINTEIRO H 9,018104,551.01.12 1,98200AJUDANTE DE CARPINTEIRO H 7,848723,961.01.21 0,95000FERREIRO H 4,531504,771.01.22 0,95000AJUDANTE DE FERREIRO H 3,629003,821.01.39 5,28400PEDREIRO H 24,570604,651.01.44 0,25000SERRALHEIRO H 2,020008,081.01.45 0,25000AJUDANTE SERRALHEIRO H 1,085004,341.01.46 8,47700SERVENTE H 32,297373,812.05.03 0,12000AREIA M3 9,5040079,202.05.05 10,16400CAL HIDRATADA KG 3,455760,342.05.08 32,83800CIMENTO KG 12,150060,372.05.17 0,00800PEDRA BRITADA 1 M3 0,4954461,932.05.18 0,06700PEDRA BRITADA 2 M3 4,0930361,092.05.22 0,00800PEDRISCO M3 0,5288066,102.05.36 0,10000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 25,34900253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,53500TABUAS PINHO DE 1"X12" DE 3A. M2 9,1913017,182.10.33 0,13000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,3803018,312.10.38 2,40000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 12,552005,232.15.25 8,30000ACO CA-50-A $MD BITOLAS KG 22,410002,702.15.38 2,60000ACO CA-60-B $MD BITOLAS KG 6,890002,652.25.77 25,20000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 48,384001,922.25.96 4,80000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 12,048002,512.40.09 4,50000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,435001,432.40.10 0,22500EMULSAO ADESIVA PVA KG 2,3782510,572.67.60 0,20000PREGO KG 0,914004,572.70.10 0,19000ARAME RECOZIDO N.18 KG 0,879704,633.13.46 0,17000GRADIL METALGRADE H=2114MM C=1650MM PINT.ELETROST. UN 52,46710308,63

LS 103,70035 BDI 97,06975Mão-de-Obra 85,00029 Material 233,34174SubMO 188,70064

16.01.033 FD-28 FECHAMENTO DIVISA C/ GRADIL ELETROF / BROCA (59X211.40CM) M 558,81

1.01.11 2,20200CARPINTEIRO H 10,019104,551.01.12 2,20200AJUDANTE DE CARPINTEIRO H 8,719923,961.01.21 1,16000FERREIRO H 5,533204,771.01.22 1,16000AJUDANTE DE FERREIRO H 4,431203,821.01.39 5,30000PEDREIRO H 24,645004,651.01.44 0,35000SERRALHEIRO H 2,828008,081.01.45 0,35000AJUDANTE SERRALHEIRO H 1,519004,341.01.46 8,89400SERVENTE H 33,886143,812.05.03 0,14000AREIA M3 11,0880079,202.05.05 10,16400CAL HIDRATADA KG 3,455760,342.05.08 45,06000CIMENTO KG 16,672200,372.05.17 0,00800PEDRA BRITADA 1 M3 0,4954461,932.05.18 0,06500PEDRA BRITADA 2 M3 3,9708561,092.05.22 0,00800PEDRISCO M3 0,5288066,102.05.36 0,07000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 17,74430253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,63500TABUAS PINHO DE 1"X12" DE 3A. M2 10,9093017,182.10.33 0,13000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,3803018,312.10.38 2,40000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 12,552005,232.15.25 14,48000ACO CA-50-A $MD BITOLAS KG 39,096002,702.15.38 2,48000ACO CA-60-B $MD BITOLAS KG 6,572002,652.25.77 25,20000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 48,384001,922.25.96 4,80000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 12,048002,512.40.09 4,50000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,435001,432.40.10 0,22500EMULSAO ADESIVA PVA KG 2,3782510,572.67.60 0,24000PREGO KG 1,096804,572.70.10 0,23000ARAME RECOZIDO N.18 KG 1,064904,633.13.46 0,17000GRADIL METALGRADE H=2114MM C=1650MM PINT.ELETROST. UN 52,46710308,63

LS 111,72950 BDI 104,49408Mão-de-Obra 91,58156 Material 251,01100SubMO 203,31106

16.01.034 PT-50 PORTÃO DE TELA PARA SETORIZAÇÃO UN 1.026,68

1.01.11 2,72000CARPINTEIRO H 12,376004,551.01.12 2,72000AJUDANTE DE CARPINTEIRO H 10,771203,961.01.39 0,42000PEDREIRO H 1,953004,65

09/02/2011 11:38:40 Página: 289 de 0

Page 290: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,821.01.46 5,02000SERVENTE H 19,126203,812.05.35 0,07100CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 17,26081243,112.10.09 4,08000PONTALETE PINHO DE 3"X3" M 15,422403,782.10.21 0,13600TABUAS PINHO DE 1"X12" DE 3A. M2 2,3364817,182.10.32 0,44900CHAPA COMPENSADA RESINADA E=12MM M2 5,4329012,102.67.60 0,27200PREGO KG 1,243044,573.13.69 1,00000PT-50 PORTÃO DE TELA P/SETORIZAÇÃO (1,00X2,00)M-GALVANIZADO UN 684,60000684,603.75.07 0,15000TINTA ESMALTE SINTETICO - ALUMINIO L 2,0775013,853.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.66 0,10000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,4740014,74

LS 57,18677 BDI 191,98125Mão-de-Obra 46,87440 Material 730,63993SubMO 104,06117

16.01.045 PORTÃO EM GRADIL ELETROFUNDIDO M2 339,34

1.01.39 0,18010PEDREIRO H 0,837474,651.01.40 0,48970PINTOR H 2,306494,711.01.41 0,48930AJUDANTE DE PINTOR H 1,869133,821.01.46 0,18010SERVENTE H 0,686183,813.13.80 0,18020PT30/PT34-PORTAO GRADIL ELETROFUNDIDO (300X185CM) UN 257,686001.430,003.16.16 0,18020PORTA CADEADO 89 MM - ACO ZINCADO UN 0,746034,143.17.19 0,18020CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 2,6327214,613.75.02 0,11530TINTA ESMALTE L 1,148399,963.80.66 0,06940FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,0229614,74

LS 6,95310 BDI 63,45434Mão-de-Obra 5,69926 Material 263,23609SubMO 12,65236

16.01.046 PORTÃO EM CHAPA DE AÇO M2 523,29

1.01.39 0,18010PEDREIRO H 0,837474,651.01.40 0,48970PINTOR H 2,306494,711.01.41 0,48970AJUDANTE DE PINTOR H 1,870653,821.01.46 0,18010SERVENTE H 0,686183,813.13.71 0,14180PT-41 PORTAO EM CHAPA DE ACO (300X235CM)-GALVANIZADO UN 405,821672.861,933.16.16 0,14180PORTA CADEADO 89 MM - ACO ZINCADO UN 0,587054,143.17.19 0,14180CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 2,0717014,613.75.02 0,22840TINTA ESMALTE L 2,274869,963.80.66 0,13760FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 2,0282214,74

LS 6,95496 BDI 97,85103Mão-de-Obra 5,70079 Material 412,78351SubMO 12,65575

16.01.047 PM-01 PORTAO DE MADEIRA - 3,60 M UN 5.515,76

1.01.11 11,54000CARPINTEIRO H 52,507004,551.01.12 11,54000AJUDANTE DE CARPINTEIRO H 45,698403,961.01.21 1,41000FERREIRO H 6,725704,771.01.22 1,41000AJUDANTE DE FERREIRO H 5,386203,821.01.39 13,34000PEDREIRO H 62,031004,651.01.40 5,51000PINTOR H 25,952104,711.01.41 4,90000AJUDANTE DE PINTOR H 18,718003,821.01.46 19,59000SERVENTE H 74,637903,812.05.03 0,38500AREIA M3 30,4920079,202.05.05 8,13000CAL HIDRATADA KG 2,764200,342.05.08 164,68000CIMENTO KG 60,931600,372.05.17 0,08000PEDRA BRITADA 1 M3 4,9544061,932.05.18 0,23900PEDRA BRITADA 2 M3 14,6005161,092.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,76000TABUAS PINHO DE 1"X12" DE 3A. M2 13,0568017,182.10.32 1,83000CHAPA COMPENSADA RESINADA E=12MM M2 22,1430012,102.15.25 16,18000ACO CA-50-A $MD BITOLAS KG 43,686002,702.25.05 42,00000BLOCO CONCRETO DE 19X39X19CM UN 104,160002,482.40.56 2,00000TINTA BETUMINOSA L 12,780006,392.40.69 0,56000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,405602,512.67.60 1,19000PREGO KG 5,438304,573.01.91 1,00000PORTAO PEROBA COMPLETO (PM-01) CJ 3.449,890003.449,893.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.16.91 2,00000FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD UN 7,620003,813.80.34 4,90000TINTA A OLEO L 44,737009,133.80.39 3,67000LIXA PARA MADEIRA UN 1,211100,33

LS 355,82069 BDI 1.031,40268Mão-de-Obra 291,65630 Material 3.836,88251SubMO 647,47699

16.01.048 PM-11 PORTAO DE MADEIRA-1,20 M UN 2.895,19

1.01.11 11,54000CARPINTEIRO H 52,507004,551.01.12 11,54000AJUDANTE DE CARPINTEIRO H 45,698403,961.01.21 1,41000FERREIRO H 6,725704,771.01.22 1,41000AJUDANTE DE FERREIRO H 5,386203,821.01.39 12,34000PEDREIRO H 57,381004,651.01.40 1,84000PINTOR H 8,666404,711.01.41 1,63000AJUDANTE DE PINTOR H 6,226603,821.01.46 18,59000SERVENTE H 70,827903,81

09/02/2011 11:38:40 Página: 290 de 0

Page 291: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,38500AREIA M3 30,4920079,202.05.05 8,13000CAL HIDRATADA KG 2,764200,342.05.08 164,68000CIMENTO KG 60,931600,372.05.17 0,08000PEDRA BRITADA 1 M3 4,9544061,932.05.18 0,23900PEDRA BRITADA 2 M3 14,6005161,092.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,76000TABUAS PINHO DE 1"X12" DE 3A. M2 13,0568017,182.10.32 1,83000CHAPA COMPENSADA RESINADA E=12MM M2 22,1430012,102.15.25 16,18000ACO CA-50-A $MD BITOLAS KG 43,686002,702.25.05 42,00000BLOCO CONCRETO DE 19X39X19CM UN 104,160002,482.40.56 2,00000TINTA BETUMINOSA L 12,780006,392.40.69 0,56000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,405602,512.67.60 1,19000PREGO KG 5,438304,573.01.90 1,00000PORTAO COMPLETO COM FERRAGEM (PM-11) UN 1.438,710001.438,713.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.16.91 1,00000FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD UN 3,810003,813.80.34 1,63000TINTA A OLEO L 14,881909,133.80.39 1,22000LIXA PARA MADEIRA UN 0,402600,33

LS 309,17142 BDI 541,37849Mão-de-Obra 253,41920 Material 1.791,22891SubMO 562,59062

16.01.049 PM-12 PORTAO DE MADEIRA-1,80 M UN 3.321,99

1.01.11 11,54000CARPINTEIRO H 52,507004,551.01.12 11,54000AJUDANTE DE CARPINTEIRO H 45,698403,961.01.21 1,41000FERREIRO H 6,725704,771.01.22 1,41000AJUDANTE DE FERREIRO H 5,386203,821.01.39 12,34000PEDREIRO H 57,381004,651.01.40 2,75000PINTOR H 12,952504,711.01.41 2,45000AJUDANTE DE PINTOR H 9,359003,821.01.46 18,59000SERVENTE H 70,827903,812.05.03 0,38500AREIA M3 30,4920079,202.05.05 8,13000CAL HIDRATADA KG 2,764200,342.05.08 164,68000CIMENTO KG 60,931600,372.05.17 0,08000PEDRA BRITADA 1 M3 4,9544061,932.05.18 0,23900PEDRA BRITADA 2 M3 14,6005161,092.10.17 0,80000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,648004,562.10.21 0,76000TABUAS PINHO DE 1"X12" DE 3A. M2 13,0568017,182.10.32 1,83000CHAPA COMPENSADA RESINADA E=12MM M2 22,1430012,102.15.25 16,18000ACO CA-50-A $MD BITOLAS KG 43,686002,702.25.05 42,00000BLOCO CONCRETO DE 19X39X19CM UN 104,160002,482.40.56 2,00000TINTA BETUMINOSA L 12,780006,392.40.69 0,56000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,405602,512.67.60 1,19000PREGO KG 5,438304,573.01.92 1,00000PM-12 PORTAO MADEIRA 1,8M 1 FOLHA UN 1.759,560001.759,563.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.16.21 1,00000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 11,2000011,203.16.91 1,00000FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD UN 3,810003,813.80.34 2,45000TINTA A OLEO L 22,368509,133.80.39 1,84000LIXA PARA MADEIRA UN 0,607200,33

LS 318,22199 BDI 621,18534Mão-de-Obra 260,83770 Material 2.121,74611SubMO 579,05969

16.01.058 GRADIL METALGRADE PINT ELETROSTATICA 62X132MM BARRA 25X2MM M2 210,68

1.01.39 0,93000PEDREIRO H 4,324504,651.01.44 0,25000SERRALHEIRO H 2,020008,081.01.45 0,25000AJUDANTE SERRALHEIRO H 1,085004,341.01.46 0,93000SERVENTE H 3,543303,813.10.91 0,35200MONTANTE P/GRADIL ORSOMETAL H=1722MM PINT.ELETROST UN 38,29056108,783.13.46 0,35200GRADIL METALGRADE H=2114MM C=1650MM PINT.ELETROST. UN 108,63776308,63

LS 13,38682 BDI 39,39623Mão-de-Obra 10,97280 Material 146,92832SubMO 24,35962

16.01.060 FD-29 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / SAPATA (239X199CM) M 472,05

1.01.11 1,93700CARPINTEIRO H 8,813354,551.01.12 1,93700AJUDANTE DE CARPINTEIRO H 7,670523,961.01.21 0,85300FERREIRO H 4,068814,771.01.22 0,85300AJUDANTE DE FERREIRO H 3,258463,821.01.39 6,27100PEDREIRO H 29,160154,651.01.46 8,09300SERVENTE H 30,834333,812.05.03 0,10000AREIA M3 7,9200079,202.05.05 7,13000CAL HIDRATADA KG 2,424200,342.05.08 29,60200CIMENTO KG 10,952740,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,06700PEDRA BRITADA 2 M3 4,0930361,092.05.22 0,00700PEDRISCO M3 0,4627066,102.05.36 0,09500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 24,08155253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,48100TABUAS PINHO DE 1"X12" DE 3A. M2 8,2635817,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,31

09/02/2011 11:38:40 Página: 291 de 0

Page 292: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.38 2,04600PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 10,700585,232.15.25 7,40000ACO CA-50-A $MD BITOLAS KG 19,980002,702.15.38 2,40000ACO CA-60-B $MD BITOLAS KG 6,360002,652.25.77 15,60000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 29,952001,922.25.96 5,20000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 13,052002,512.30.22 5,90000ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM UN 44,486007,542.40.09 4,70000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,721001,432.40.10 0,24000EMULSAO ADESIVA PVA KG 2,5368010,572.67.60 0,18000PREGO KG 0,822604,572.70.10 0,17000ARAME RECOZIDO N.18 KG 0,787104,63

LS 102,24286 BDI 88,27037Mão-de-Obra 83,80562 Material 197,73575SubMO 186,04848

16.01.061 FD-30 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / BROCA (239X199CM) M 485,89

1.01.11 2,15700CARPINTEIRO H 9,814354,551.01.12 2,15700AJUDANTE DE CARPINTEIRO H 8,541723,961.01.21 1,07000FERREIRO H 5,103904,771.01.22 1,07000AJUDANTE DE FERREIRO H 4,087403,821.01.39 6,21300PEDREIRO H 28,890454,651.01.46 8,09800SERVENTE H 30,853383,812.05.03 0,08500AREIA M3 6,7320079,202.05.05 7,13000CAL HIDRATADA KG 2,424200,342.05.08 38,19200CIMENTO KG 14,131040,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,092.05.22 0,00700PEDRISCO M3 0,4627066,102.05.36 0,06500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 16,47685253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,58100TABUAS PINHO DE 1"X12" DE 3A. M2 9,9815817,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 2,04600PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 10,700585,232.15.25 12,90000ACO CA-50-A $MD BITOLAS KG 34,830002,702.15.38 2,24000ACO CA-60-B $MD BITOLAS KG 5,936002,652.25.77 15,60000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 29,952001,922.25.96 2,20000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 5,522002,512.30.22 5,90000ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM UN 44,486007,542.40.09 4,70000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,721001,432.40.10 0,24000EMULSAO ADESIVA PVA KG 2,5368010,572.67.60 0,22000PREGO KG 1,005404,572.70.10 0,22000ARAME RECOZIDO N.18 KG 1,018604,63

LS 106,49526 BDI 90,85898Mão-de-Obra 87,29120 Material 201,25257SubMO 193,78646

16.01.062 FD-31 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / SAPATA (39X199CM) M 458,51

1.01.11 1,93700CARPINTEIRO H 8,813354,551.01.12 1,93700AJUDANTE DE CARPINTEIRO H 7,670523,961.01.21 0,87000FERREIRO H 4,149904,771.01.22 0,87000AJUDANTE DE FERREIRO H 3,323403,821.01.39 5,84400PEDREIRO H 27,174604,651.01.46 8,78800SERVENTE H 33,482283,812.05.03 0,12600AREIA M3 9,9792079,202.05.05 10,51000CAL HIDRATADA KG 3,573400,342.05.08 34,64300CIMENTO KG 12,817910,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,06700PEDRA BRITADA 2 M3 4,0930361,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,09500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 24,08155253,492.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,48100TABUAS PINHO DE 1"X12" DE 3A. M2 8,2635817,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 2,04600PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 10,700585,232.15.25 7,56000ACO CA-50-A $MD BITOLAS KG 20,412002,702.15.38 2,43000ACO CA-60-B $MD BITOLAS KG 6,439502,652.25.77 26,00000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 49,920001,922.25.96 5,00000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 12,550002,512.30.22 0,90000ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM UN 6,786007,542.40.09 4,60000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,578001,432.40.10 0,23000EMULSAO ADESIVA PVA KG 2,4311010,572.67.60 0,15600PREGO KG 0,712924,572.70.10 0,17200ARAME RECOZIDO N.18 KG 0,796364,63

LS 103,22914 BDI 85,73921Mão-de-Obra 84,61405 Material 184,93600SubMO 187,84319

16.01.063 FD-32 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / BROCA (39X199CM) M 474,71

1.01.11 2,15700CARPINTEIRO H 9,814354,551.01.12 2,15700AJUDANTE DE CARPINTEIRO H 8,541723,961.01.21 1,08500FERREIRO H 5,175454,771.01.22 1,08500AJUDANTE DE FERREIRO H 4,144703,821.01.39 5,76000PEDREIRO H 26,784004,651.01.46 8,63200SERVENTE H 32,887923,81

09/02/2011 11:38:40 Página: 292 de 0

Page 293: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,07000AREIA M3 5,5440079,202.05.05 10,51000CAL HIDRATADA KG 3,573400,342.05.08 41,92800CIMENTO KG 15,513360,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.05.18 0,05200PEDRA BRITADA 2 M3 3,1766861,092.05.22 0,01000PEDRISCO M3 0,6610066,102.05.36 0,06500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 16,47685253,492.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,58100TABUAS PINHO DE 1"X12" DE 3A. M2 9,9815817,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,312.10.38 2,04600PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 10,700585,232.15.25 13,05000ACO CA-50-A $MD BITOLAS KG 35,235002,702.15.38 2,24000ACO CA-60-B $MD BITOLAS KG 5,936002,652.25.77 26,00000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 49,920001,922.25.96 5,00000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 12,550002,512.30.22 0,90000ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM UN 6,786007,542.40.09 4,60000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,578001,432.40.10 0,23000EMULSAO ADESIVA PVA KG 2,4311010,572.67.60 0,21600PREGO KG 0,987124,572.70.10 0,21700ARAME RECOZIDO N.18 KG 1,004714,63

LS 106,56473 BDI 88,76715Mão-de-Obra 87,34814 Material 192,03125SubMO 193,91287

16.01.064 PT-29 PORTAO DE TELA PARA QUADRA M2 478,55

1.01.40 0,90000PINTOR H 4,239004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,821.01.44 1,08000SERRALHEIRO H 8,726408,081.01.45 1,08000AJUDANTE SERRALHEIRO H 4,687204,343.13.91 0,41000PT-29 PORTAO DE TELA PARA QUADRA-GALVANIZADO UN 335,40460818,063.16.21 0,41000CADEADO LATAO CIL. TRAVA DUPLA 30 MM UN 4,5920011,203.75.07 0,25000TINTA ESMALTE SINTETICO - ALUMINIO L 3,4625013,853.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.12 0,50000LIXA PARA FERRO UN 0,715001,433.80.66 0,15000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 2,2110014,74

LS 22,93429 BDI 89,48595Mão-de-Obra 18,79860 Material 347,33646SubMO 41,73289

16.01.065 VERGA/CINTA EM BLOCO DE CONCRETO CANALETA 14X19X39CM M 31,39

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,09000AREIA M3 7,1280079,202.05.08 4,36500CIMENTO KG 1,615050,372.05.18 0,01300PEDRA BRITADA 2 M3 0,7941761,092.15.25 0,50000ACO CA-50-A $MD BITOLAS KG 1,350002,702.25.96 2,50000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,275002,51

LS 4,59330 BDI 5,86972Mão-de-Obra 3,76500 Material 17,16222SubMO 8,35830

16.01.066 VERGA/CINTA EM BLOCO DE CONCRETO CANALETA 19X19X39CM M 28,02

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,01400AREIA M3 1,1088079,202.05.08 6,62900CIMENTO KG 2,452730,372.05.18 0,01900PEDRA BRITADA 2 M3 1,1607161,092.15.25 0,50000ACO CA-50-A $MD BITOLAS KG 1,350002,702.25.97 2,50000BLOCO DE CONCRETO CANALETA 19X19X39CM UN 8,350003,34

LS 4,59330 BDI 5,23952Mão-de-Obra 3,76500 Material 14,42224SubMO 8,35830

16.01.080 PT-30 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (300X185CM) UN 2.974,10

1.01.11 5,54000CARPINTEIRO H 25,207004,551.01.12 5,54000AJUDANTE DE CARPINTEIRO H 21,938403,961.01.21 4,05000FERREIRO H 19,318504,771.01.22 4,05000AJUDANTE DE FERREIRO H 15,471003,821.01.39 9,55000PEDREIRO H 44,407504,651.01.40 2,29500PINTOR H 10,809454,711.01.41 2,29500AJUDANTE DE PINTOR H 8,766903,821.01.46 22,81000SERVENTE H 86,906103,812.05.03 0,01470AREIA M3 1,1642479,202.05.08 4,90000CIMENTO KG 1,813000,372.05.18 0,01960PEDRA BRITADA 2 M3 1,1973661,092.05.36 0,66600CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 168,82434253,492.10.09 10,32000PONTALETE PINHO DE 3"X3" M 39,009603,782.10.17 10,08000SARRAFO PINHO APARELHADO 10X2,5 CM M 45,964804,562.10.21 2,52000TABUAS PINHO DE 1"X12" DE 3A. M2 43,2936017,182.10.32 1,13520CHAPA COMPENSADA RESINADA E=12MM M2 13,7359212,102.15.25 34,55000ACO CA-50-A $MD BITOLAS KG 93,285002,702.15.38 5,63000ACO CA-60-B $MD BITOLAS KG 14,919502,652.40.56 0,93000TINTA BETUMINOSA L 5,942706,392.40.69 0,50000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,255002,512.67.60 1,00800PREGO KG 4,606564,57

09/02/2011 11:38:40 Página: 293 de 0

Page 294: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.70.10 0,80000ARAME RECOZIDO N.18 KG 3,704004,633.13.80 1,00000PT30/PT34-PORTAO GRADIL ELETROFUNDIDO (300X185CM) UN 1.430,000001.430,003.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,64000TINTA ESMALTE L 6,374409,963.75.91 0,01000GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,58560158,563.80.66 0,38500FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 5,6749014,74

LS 284,04632 BDI 556,13349Mão-de-Obra 232,82485 Material 1.901,10052SubMO 516,87117

16.01.081 PT-31 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (300X235CM) UN 3.361,19

1.01.11 5,64000CARPINTEIRO H 25,662004,551.01.12 5,64000AJUDANTE DE CARPINTEIRO H 22,334403,961.01.21 4,05000FERREIRO H 19,318504,771.01.22 4,05000AJUDANTE DE FERREIRO H 15,471003,821.01.39 9,92000PEDREIRO H 46,128004,651.01.40 2,55000PINTOR H 12,010504,711.01.41 2,55000AJUDANTE DE PINTOR H 9,741003,821.01.46 23,80000SERVENTE H 90,678003,812.05.03 0,01470AREIA M3 1,1642479,202.05.08 4,90000CIMENTO KG 1,813000,372.05.18 0,01960PEDRA BRITADA 2 M3 1,1973661,092.05.36 0,70600CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 178,96394253,492.10.09 10,42000PONTALETE PINHO DE 3"X3" M 39,387603,782.10.17 10,18000SARRAFO PINHO APARELHADO 10X2,5 CM M 46,420804,562.10.21 2,82000TABUAS PINHO DE 1"X12" DE 3A. M2 48,4476017,182.10.32 1,13620CHAPA COMPENSADA RESINADA E=12MM M2 13,7480212,102.15.25 37,07000ACO CA-50-A $MD BITOLAS KG 100,089002,702.15.38 6,16000ACO CA-60-B $MD BITOLAS KG 16,324002,652.40.56 0,93000TINTA BETUMINOSA L 5,942706,392.40.69 0,50000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,255002,512.67.60 1,00800PREGO KG 4,606564,572.70.10 0,80000ARAME RECOZIDO N.18 KG 3,704004,633.13.81 1,00000PT31/PT35-PORTAO GRADIL ELETROFUNDIDO (300X235CM) UN 1.700,000001.700,003.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,69930TINTA ESMALTE L 6,965039,963.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,563.80.66 0,42150FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 6,2129114,74

LS 294,43895 BDI 628,51567Mão-de-Obra 241,34340 Material 2.196,89448SubMO 535,78235

16.01.082 PT-32 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (180X185CM) UN 3.573,89

1.01.11 5,54000CARPINTEIRO H 25,207004,551.01.12 5,54000AJUDANTE DE CARPINTEIRO H 21,938403,961.01.21 4,05000FERREIRO H 19,318504,771.01.22 4,05000AJUDANTE DE FERREIRO H 15,471003,821.01.39 8,55000PEDREIRO H 39,757504,651.01.40 1,57190PINTOR H 7,403654,711.01.41 1,57190AJUDANTE DE PINTOR H 6,004663,821.01.46 21,81000SERVENTE H 83,096103,812.05.03 0,01470AREIA M3 1,1642479,202.05.08 4,90000CIMENTO KG 1,813000,372.05.18 0,01960PEDRA BRITADA 2 M3 1,1973661,092.05.36 0,66600CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 168,82434253,492.10.09 10,32000PONTALETE PINHO DE 3"X3" M 39,009603,782.10.17 10,08000SARRAFO PINHO APARELHADO 10X2,5 CM M 45,964804,562.10.21 2,52000TABUAS PINHO DE 1"X12" DE 3A. M2 43,2936017,182.10.32 1,13520CHAPA COMPENSADA RESINADA E=12MM M2 13,7359212,102.15.25 34,55000ACO CA-50-A $MD BITOLAS KG 93,285002,702.15.38 5,63000ACO CA-60-B $MD BITOLAS KG 14,919502,652.40.56 0,93000TINTA BETUMINOSA L 5,942706,392.40.69 0,50000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,255002,512.67.60 1,00800PREGO KG 4,606564,572.70.10 0,80000ARAME RECOZIDO N.18 KG 3,704004,633.13.82 1,00000PT32/PT36-PORTAO GRADIL ELETROFUNDIDO (180X185CM) UN 1.954,540001.954,543.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,43840TINTA ESMALTE L 4,366469,963.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.66 0,26370FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 3,8869414,74

LS 266,20011 BDI 668,28968Mão-de-Obra 218,19681 Material 2.421,21039SubMO 484,39691

16.01.083 PT-33 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (180X235CM) UN 2.484,54

1.01.11 5,64000CARPINTEIRO H 25,662004,551.01.12 5,64000AJUDANTE DE CARPINTEIRO H 22,334403,961.01.21 4,05000FERREIRO H 19,318504,771.01.22 4,05000AJUDANTE DE FERREIRO H 15,471003,821.01.39 8,92000PEDREIRO H 41,478004,65

09/02/2011 11:38:40 Página: 294 de 0

Page 295: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.40 1,57300PINTOR H 7,408834,711.01.41 1,57300AJUDANTE DE PINTOR H 6,008863,821.01.46 22,80000SERVENTE H 86,868003,812.05.03 0,01470AREIA M3 1,1642479,202.05.08 4,90000CIMENTO KG 1,813000,372.05.18 0,01960PEDRA BRITADA 2 M3 1,1973661,092.05.36 0,70600CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 178,96394253,492.10.09 10,42000PONTALETE PINHO DE 3"X3" M 39,387603,782.10.17 10,18000SARRAFO PINHO APARELHADO 10X2,5 CM M 46,420804,562.10.21 2,82000TABUAS PINHO DE 1"X12" DE 3A. M2 48,4476017,182.10.32 1,13620CHAPA COMPENSADA RESINADA E=12MM M2 13,7480212,102.15.25 37,07000ACO CA-50-A $MD BITOLAS KG 100,089002,702.15.38 6,16000ACO CA-60-B $MD BITOLAS KG 16,324002,652.40.56 0,93000TINTA BETUMINOSA L 5,942706,392.40.69 0,50000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,255002,512.67.60 1,00800PREGO KG 4,606564,572.70.10 0,80000ARAME RECOZIDO N.18 KG 3,704004,633.13.83 1,00000PT33/PT37-PORTAO GRADIL ELETROFUNDIDO (180X235CM) UN 1.030,000001.030,003.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,44100TINTA ESMALTE L 4,392369,963.75.91 0,00800GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,26848158,563.80.66 0,27000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 3,9798014,74

LS 273,95050 BDI 464,58955Mão-de-Obra 224,54959 Material 1.521,45446SubMO 498,50009

16.01.084 PT-34 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (300X185CM) UN 2.551,85

1.01.11 3,87800CARPINTEIRO H 17,644904,551.01.12 3,87800AJUDANTE DE CARPINTEIRO H 15,356883,961.01.39 6,68500PEDREIRO H 31,085254,651.01.40 3,37090PINTOR H 15,876944,711.01.41 3,37090AJUDANTE DE PINTOR H 12,876843,821.01.46 15,96700SERVENTE H 60,834273,812.05.36 0,11260CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,54297253,492.10.09 0,85700PONTALETE PINHO DE 3"X3" M 3,239463,782.10.17 1,47420SARRAFO PINHO APARELHADO 10X2,5 CM M 6,722354,562.10.21 1,49140TABUAS PINHO DE 1"X12" DE 3A. M2 25,6222517,182.10.32 0,60000CHAPA COMPENSADA RESINADA E=12MM M2 7,2600012,102.40.69 0,25000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,627502,512.67.60 0,57400PREGO KG 2,623184,572.70.10 0,17500ARAME RECOZIDO N.18 KG 0,810254,633.11.88 5,00000TUBO DE ACO 100X100X3 MM M 190,0500038,013.13.80 1,00000PT30/PT34-PORTAO GRADIL ELETROFUNDIDO (300X185CM) UN 1.430,000001.430,003.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,94000TINTA ESMALTE L 9,362409,963.75.91 0,01000GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,58560158,563.80.66 0,56500FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 8,3281014,74

LS 187,48359 BDI 477,17703Mão-de-Obra 153,67508 Material 1.733,52407SubMO 341,15867

16.01.085 PT-35 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (300X235CM) UN 2.966,01

1.01.11 3,87800CARPINTEIRO H 17,644904,551.01.12 3,87800AJUDANTE DE CARPINTEIRO H 15,356883,961.01.39 6,88500PEDREIRO H 32,015254,651.01.40 4,26700PINTOR H 20,097574,711.01.41 4,26700AJUDANTE DE PINTOR H 16,299943,821.01.46 16,51800SERVENTE H 62,933583,812.05.36 0,11260CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,54297253,492.10.09 0,85700PONTALETE PINHO DE 3"X3" M 3,239463,782.10.17 1,47420SARRAFO PINHO APARELHADO 10X2,5 CM M 6,722354,562.10.21 1,49140TABUAS PINHO DE 1"X12" DE 3A. M2 25,6222517,182.10.32 0,60000CHAPA COMPENSADA RESINADA E=12MM M2 7,2600012,102.40.69 0,25000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,627502,512.67.60 0,57400PREGO KG 2,623184,572.70.10 0,17500ARAME RECOZIDO N.18 KG 0,810254,633.11.88 6,00000TUBO DE ACO 100X100X3 MM M 228,0600038,013.13.81 1,00000PT31/PT35-PORTAO GRADIL ELETROFUNDIDO (300X235CM) UN 1.700,000001.700,003.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 1,18900TINTA ESMALTE L 11,842449,963.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,563.80.66 0,71500FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 10,5391014,74

LS 200,50471 BDI 554,62086Mão-de-Obra 164,34812 Material 2.046,54223SubMO 364,85283

16.01.086 PT-36 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (180X185CM) UN 3.137,41

1.01.11 3,87800CARPINTEIRO H 17,644904,551.01.12 3,87800AJUDANTE DE CARPINTEIRO H 15,356883,961.01.39 5,97000PEDREIRO H 27,760504,65

09/02/2011 11:38:40 Página: 295 de 0

Page 296: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.40 2,30000PINTOR H 10,833004,711.01.41 2,30000AJUDANTE DE PINTOR H 8,786003,821.01.46 14,25600SERVENTE H 54,315363,812.05.36 0,11260CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,54297253,492.10.09 0,85700PONTALETE PINHO DE 3"X3" M 3,239463,782.10.17 1,47420SARRAFO PINHO APARELHADO 10X2,5 CM M 6,722354,562.10.21 1,49140TABUAS PINHO DE 1"X12" DE 3A. M2 25,6222517,182.10.32 0,60000CHAPA COMPENSADA RESINADA E=12MM M2 7,2600012,102.40.69 0,25000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,627502,512.67.60 0,57400PREGO KG 2,623184,572.70.10 0,17500ARAME RECOZIDO N.18 KG 0,810254,633.11.88 5,00000TUBO DE ACO 100X100X3 MM M 190,0500038,013.13.82 1,00000PT32/PT36-PORTAO GRADIL ELETROFUNDIDO (180X185CM) UN 1.954,540001.954,543.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,64000TINTA ESMALTE L 6,374409,963.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.66 0,38000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 5,6012014,74

LS 164,32990 BDI 586,67054Mão-de-Obra 134,69664 Material 2.251,71493SubMO 299,02654

16.01.087 PT-37 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (180X235CM) UN 2.074,49

1.01.11 3,87800CARPINTEIRO H 17,644904,551.01.12 3,87800AJUDANTE DE CARPINTEIRO H 15,356883,961.01.39 6,21000PEDREIRO H 28,876504,651.01.40 2,91000PINTOR H 13,706104,711.01.41 2,91000AJUDANTE DE PINTOR H 11,116203,821.01.46 14,83000SERVENTE H 56,502303,812.05.36 0,11260CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,54297253,492.10.09 0,85700PONTALETE PINHO DE 3"X3" M 3,239463,782.10.17 1,47420SARRAFO PINHO APARELHADO 10X2,5 CM M 6,722354,562.10.21 1,49140TABUAS PINHO DE 1"X12" DE 3A. M2 25,6222517,182.10.32 0,60000CHAPA COMPENSADA RESINADA E=12MM M2 7,2600012,102.40.69 0,25000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,627502,512.67.60 0,57400PREGO KG 2,623184,572.70.10 0,17500ARAME RECOZIDO N.18 KG 0,810254,633.11.88 6,00000TUBO DE ACO 100X100X3 MM M 228,0600038,013.13.83 1,00000PT33/PT37-PORTAO GRADIL ELETROFUNDIDO (180X235CM) UN 1.030,000001.030,003.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,81000TINTA ESMALTE L 8,067609,963.75.91 0,00800GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,26848158,563.80.66 0,48000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 7,0752014,74

LS 174,70751 BDI 387,91332Mão-de-Obra 143,20288 Material 1.368,66925SubMO 317,91039

16.01.088 PT-41 PORTAO EM CHAPA DE ACO (300X235CM) UN 4.887,39

1.01.11 5,64000CARPINTEIRO H 25,662004,551.01.12 5,64000AJUDANTE DE CARPINTEIRO H 22,334403,961.01.21 4,05000FERREIRO H 19,318504,771.01.22 4,05000AJUDANTE DE FERREIRO H 15,471003,821.01.39 9,92000PEDREIRO H 46,128004,651.01.40 5,81000PINTOR H 27,365104,711.01.41 5,81000AJUDANTE DE PINTOR H 22,194203,821.01.46 23,80000SERVENTE H 90,678003,812.05.03 0,01470AREIA M3 1,1642479,202.05.08 4,90000CIMENTO KG 1,813000,372.05.18 0,01960PEDRA BRITADA 2 M3 1,1973661,092.05.36 0,70600CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 178,96394253,492.10.09 10,42000PONTALETE PINHO DE 3"X3" M 39,387603,782.10.17 10,18000SARRAFO PINHO APARELHADO 10X2,5 CM M 46,420804,562.10.21 2,82000TABUAS PINHO DE 1"X12" DE 3A. M2 48,4476017,182.10.32 1,13620CHAPA COMPENSADA RESINADA E=12MM M2 13,7480212,102.15.25 37,07000ACO CA-50-A $MD BITOLAS KG 100,089002,702.15.38 6,16000ACO CA-60-B $MD BITOLAS KG 16,324002,652.40.56 0,93000TINTA BETUMINOSA L 5,942706,392.40.69 0,50000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,255002,512.67.60 1,00800PREGO KG 4,606564,572.70.10 0,80000ARAME RECOZIDO N.18 KG 3,704004,633.13.71 1,00000PT-41 PORTAO EM CHAPA DE ACO (300X235CM)-GALVANIZADO UN 2.861,930002.861,933.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 1,61000TINTA ESMALTE L 16,035609,963.75.91 0,01200GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,90272158,563.80.66 0,97000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 14,2978014,74

LS 328,36446 BDI 913,90399Mão-de-Obra 269,15120 Material 3.375,97994SubMO 597,51566

16.01.089 PT-42 PORTAO EM CHAPA DE ACO (180X235CM) UN 3.436,05

1.01.11 5,64000CARPINTEIRO H 25,662004,55

09/02/2011 11:38:40 Página: 296 de 0

Page 297: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.12 5,64000AJUDANTE DE CARPINTEIRO H 22,334403,961.01.21 4,05000FERREIRO H 19,318504,771.01.22 4,05000AJUDANTE DE FERREIRO H 15,471003,821.01.39 8,92000PEDREIRO H 41,478004,651.01.40 2,91000PINTOR H 13,706104,711.01.41 2,91000AJUDANTE DE PINTOR H 11,116203,821.01.46 22,80000SERVENTE H 86,868003,812.05.03 0,01470AREIA M3 1,1642479,202.05.08 4,90000CIMENTO KG 1,813000,372.05.18 0,01960PEDRA BRITADA 2 M3 1,1973661,092.05.36 0,70600CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 178,96394253,492.10.09 10,42000PONTALETE PINHO DE 3"X3" M 39,387603,782.10.17 10,18000SARRAFO PINHO APARELHADO 10X2,5 CM M 46,420804,562.10.21 2,82000TABUAS PINHO DE 1"X12" DE 3A. M2 48,4476017,182.10.32 1,13620CHAPA COMPENSADA RESINADA E=12MM M2 13,7480212,102.15.25 37,07000ACO CA-50-A $MD BITOLAS KG 100,089002,702.15.38 6,16000ACO CA-60-B $MD BITOLAS KG 16,324002,652.40.56 0,93000TINTA BETUMINOSA L 5,942706,392.40.69 0,50000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,255002,512.67.60 1,00800PREGO KG 4,606564,572.70.10 0,80000ARAME RECOZIDO N.18 KG 3,704004,633.13.72 1,00000PT-42 PORTAO EM CHAPA DE ACO (180X235CM)-GALVANIZADO UN 1.771,500001.771,503.16.16 1,00000PORTA CADEADO 89 MM - ACO ZINCADO UN 4,140004,143.17.19 1,00000CADEADO LATAO CIL. TRAVA DUPLA 35 MM UN 14,6100014,613.75.02 0,81000TINTA ESMALTE L 8,067609,963.75.91 0,00800GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 1,26848158,563.80.66 0,48000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 7,0752014,74

LS 287,86412 BDI 642,51499Mão-de-Obra 235,95420 Material 2.269,72510SubMO 523,81832

16.01.099 SERVICOS PARA FECHAMENTOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.02.007 PISO DE CONCRETO CAMURCADO - FUNDACAO DIRETA FCK-25 MPA M2 93,25

1.01.21 0,30000FERREIRO H 1,431004,771.01.22 0,30000AJUDANTE DE FERREIRO H 1,146003,821.01.39 0,61000PEDREIRO H 2,836504,651.01.46 0,61000SERVENTE H 2,324103,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,89000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,584201,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,08000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,7376021,722.40.93 0,26700BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,034710,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,01070FITA CREPE 25MM X 50M UN 0,049334,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,948.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 9,66541 BDI 17,43879Mão-de-Obra 7,92247 Material 58,23295SubMO 17,58788

16.02.008 PISO DE CONCRETO LISO-FUNDACAO DIRETA FCK-25 MPA M2 98,28

1.01.21 0,30000FERREIRO H 1,431004,771.01.22 0,30000AJUDANTE DE FERREIRO H 1,146003,821.01.39 0,83000PEDREIRO H 3,859504,651.01.46 0,83000SERVENTE H 3,162303,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,89000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 1,584201,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.91 0,08000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 1,7376021,722.40.93 0,26700BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,034710,132.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,443.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,948.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 11,93608 BDI 18,37778Mão-de-Obra 9,78367 Material 58,18363SubMO 21,71975

16.02.009 PLACA DE CONCRETO MOLDADA NO LOCAL - 90X90 CM M2 46,88

09/02/2011 11:38:40 Página: 297 de 0

Page 298: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 0,65000PEDREIRO H 3,022504,651.01.46 1,67000SERVENTE H 6,362703,812.05.03 0,03000AREIA M3 2,3760079,202.05.08 14,42000CIMENTO KG 5,335400,372.05.18 0,03500PEDRA BRITADA 2 M3 2,1381561,092.10.01 0,50000CAIBRO PEROBA DE 5X6CM M 2,135004,272.15.38 2,00000ACO CA-60-B $MD BITOLAS KG 5,300002,65

LS 11,44994 BDI 8,76753Mão-de-Obra 9,38520 Material 17,28455SubMO 20,83514

16.02.012 PAVIMENTACAO ARTICULADA SOBRE BASE AREIA GROSSA E=5A6CM M2 73,29

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,08000SERVENTE H 4,114803,811.01.55 0,02130OPERADOR H 0,148046,952.05.03 0,05500AREIA M3 4,3560079,202.05.18 0,06000PEDRA BRITADA 2 M3 3,6654061,093.65.40 1,05000PISO PRE MOLDADO ARTICULADO E=5A6CM M2 33,4635031,878.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,83

LS 9,73906 BDI 13,70491Mão-de-Obra 7,98284 Material 41,86468SubMO 17,72189

16.02.015 PAVIMENTACAO ASFALTICA M2 24,92

1.01.46 0,30000SERVENTE H 1,143003,812.05.17 0,01300PEDRA BRITADA 1 M3 0,8050961,932.05.19 0,09300PEDRA BRITADA 3 M3 5,4618958,732.05.22 0,00700PEDRISCO M3 0,4627066,102.40.52 6,75000ASFALTO 80/100 KG 9,315001,388.03.12 0,00500CAMINHAO ESPARGIDOR 6000KG-BAR/MANG H 0,3375067,508.03.14 0,00100CARRETA PRANCHA H 0,0977797,778.03.26 0,01000ROLO COMPRESSOR 10/12 T H 1,24420124,42

LS 1,39446 BDI 4,66017Mão-de-Obra 1,14300 Material 17,72415SubMO 2,53746

16.02.018 BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL DIRECIONAL M2 178,02

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.55.40 1,00000PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG M2 130,92000130,92

LS 5,62542 BDI 33,28925Mão-de-Obra 4,61100 Material 134,49946SubMO 10,23642

16.02.020 BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL ALERTA M2 178,02

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.55.40 1,00000PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG M2 130,92000130,92

LS 5,62542 BDI 33,28925Mão-de-Obra 4,61100 Material 134,49946SubMO 10,23642

16.02.022 PAVIMENTACAO COM PEDRISCO COM ESPESS DE 5 CM M2 6,95

1.01.46 0,20000SERVENTE H 0,762003,812.05.22 0,06000PEDRISCO M3 3,9660066,10

LS 0,92964 BDI 1,30126Mão-de-Obra 0,76200 Material 3,96600SubMO 1,69164

16.02.023PAVIMENTACAO DE PEDRA MOSAICO PORTUGUES 2 COR/SOBRE BASE AREIAGROSSA

M2 110,32

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 2,20000SERVENTE H 8,382003,812.05.03 0,07000AREIA M3 5,5440079,202.05.08 3,50000CIMENTO KG 1,295000,373.50.55 1,00000PEDRA EM MOSAICO PORTUGUES 2 CORES M2 43,6000043,60

LS 21,57204 BDI 20,62940Mão-de-Obra 17,68200 Material 50,43900SubMO 39,25404

16.02.025 GUIAS PRE-MOLDADAS TIPO PMSP M 58,32

1.01.11 0,11000CARPINTEIRO H 0,500504,551.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,67000SERVENTE H 6,362703,812.05.03 0,00600AREIA M3 0,4752079,202.05.08 2,00000CIMENTO KG 0,740000,372.05.18 0,03300PEDRA BRITADA 2 M3 2,0159761,092.10.21 0,01000TABUAS PINHO DE 1"X12" DE 3A. M2 0,1718017,183.65.14 1,00000GUIA PRE-MOLDADA CONCR TIPO "PMSP" M 20,5200020,52

LS 12,91150 BDI 10,90607Mão-de-Obra 10,58320 Material 23,92297SubMO 23,49470

16.02.026 SARJETAS MOLDADAS NO LOCAL TIPO PMSP M 48,61

1.01.11 0,28000CARPINTEIRO H 1,274004,551.01.39 0,60000PEDREIRO H 2,790004,65

09/02/2011 11:38:40 Página: 298 de 0

Page 299: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 1,44000SERVENTE H 5,486403,812.05.03 0,04500AREIA M3 3,5640079,202.05.08 21,00000CIMENTO KG 7,770000,372.05.18 0,10600PEDRA BRITADA 2 M3 6,4755461,092.10.21 0,03000TABUAS PINHO DE 1"X12" DE 3A. M2 0,5154017,18

LS 11,65149 BDI 9,09117Mão-de-Obra 9,55040 Material 18,32494SubMO 21,20189

16.02.027 GA-01 GUIA LEVE OU SEPARADOR DE PISOS M 18,55

1.01.39 0,07200PEDREIRO H 0,334804,651.01.46 0,22980SERVENTE H 0,875543,812.05.18 0,00080PEDRA BRITADA 2 M3 0,0488761,093.65.15 1,00000GUIA LEVE PRE-MOLDADA P/ JARDIM 7,5X23X100CM UN 12,3500012,35

LS 1,47661 BDI 3,46974Mão-de-Obra 1,21034 Material 12,39887SubMO 2,68695

16.02.028 GA-02 GUIA E SARJETA M 58,82

1.01.11 0,39000CARPINTEIRO H 1,774504,551.01.39 0,60000PEDREIRO H 2,790004,651.01.46 1,20000SERVENTE H 4,572003,812.05.18 0,03000PEDRA BRITADA 2 M3 1,8327061,092.05.35 0,03000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 7,29330243,112.10.21 0,04000TABUAS PINHO DE 1"X12" DE 3A. M2 0,6872017,183.65.16 1,33330GUIA ECONOMICA PRE-MOLDADA 7,5X23X75CM UN 17,7328913,30

LS 11,14653 BDI 11,00070Mão-de-Obra 9,13650 Material 27,54609SubMO 20,28303

16.02.029 GA-03 GUIA E SARJETA TIPO PMSP M 84,67

1.01.11 0,39000CARPINTEIRO H 1,774504,551.01.39 0,80000PEDREIRO H 3,720004,651.01.46 1,60000SERVENTE H 6,096003,812.05.18 0,08000PEDRA BRITADA 2 M3 4,8872061,092.05.35 0,07000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 17,01770243,112.10.21 0,04000TABUAS PINHO DE 1"X12" DE 3A. M2 0,6872017,183.65.14 1,00000GUIA PRE-MOLDADA CONCR TIPO "PMSP" M 20,5200020,52

LS 14,14041 BDI 15,83389Mão-de-Obra 11,59050 Material 43,11210SubMO 25,73091

16.02.031 DEGRAU DE CONCRETO CAMURCADO M 45,59

1.01.21 0,09610FERREIRO H 0,458404,771.01.22 0,09610AJUDANTE DE FERREIRO H 0,367103,821.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,812.05.36 0,02960CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 7,50330253,492.15.42 0,44000TELA TELCON Q138 (PAINEL) M2 4,4132010,032.40.35 0,41000LONA DE PLASTICO PRETO E=0,20MM M2 0,373100,912.66.78 1,20000FERRO CANTONEIRA 1X1X1/8' KG 3,192002,662.80.17 0,09250ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 0,594786,432.80.20 0,01780FIBRA DE POLIPROPILENO MONOFILAMENTO KG 0,3816321,44

LS 11,32831 BDI 8,52652Mão-de-Obra 9,28550 Material 16,45801SubMO 20,61381

16.02.033 PEDRA MIRACEMA M2 52,85

1.01.39 0,92000PEDREIRO H 4,278004,651.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 10,63000CIMENTO KG 3,933100,373.50.45 1,05000PEDRA MIRACEMA 23X11,5CM M2 18,1230017,26

LS 10,09977 BDI 9,88282Mão-de-Obra 8,27850 Material 24,59050SubMO 18,37827

16.02.036 PAVIMENTACAO MOSAICO COM BLOCOS DE CONCRETO NATURAL M2 54,85

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,90000SERVENTE H 3,429003,812.05.03 0,07000AREIA M3 5,5440079,203.65.43 1,05000PISO MOSAICO COM BLOCOS DE CONCRETO NATURAL E=5CM M2 23,1840022,08

LS 8,72178 BDI 10,25772Mão-de-Obra 7,14900 Material 28,72800SubMO 15,87078

16.02.045 CERAMICA EXTRUDADA 24X11 OU 11X11 OU 18X18CM - DETALHES E REQUADROS M2 84,36

1.01.28 0,60000LADRILHISTA H 3,030005,051.01.46 0,40000SERVENTE H 1,524003,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,353.45.43 1,05000CERAMICA ESTRUDADA 24X11 OU 11X11 OU 18X18CM M2 56,7315054,03

LS 5,55588 BDI 15,77602Mão-de-Obra 4,55400 Material 58,48150SubMO 10,10988

16.02.048 SEIXO ROLADO - DETALHES E REQUADROS M2 55,90

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 10,63000CIMENTO KG 3,933100,372.05.28 1,00000SEIXO ROLADO MARROM (SACO 30KG) UN 14,6200014,62

09/02/2011 11:38:40 Página: 299 de 0

Page 300: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 13,39011 BDI 10,45422Mão-de-Obra 10,97550 Material 21,08750SubMO 24,36561

16.02.050 PASTILHA NATURAL 2,5X2,5CM - DETALHES E REQUADROS M2 190,08

1.01.38 1,70000PASTILHEIRO H 9,197005,411.01.39 0,60000PEDREIRO H 2,790004,651.01.46 1,80000SERVENTE H 6,858003,812.05.03 0,02100AREIA M3 1,6632079,202.05.05 4,64000CAL HIDRATADA KG 1,577600,342.05.07 1,34000CAULIM KG 2,050201,532.05.08 2,22000CIMENTO KG 0,821400,372.05.09 2,50000CIMENTO BRANCO KG 2,625001,053.20.22 1,05000PASTILHA NATURAL 2,5X2,5CM M2 103,9710099,02

LS 22,99090 BDI 35,54519Mão-de-Obra 18,84500 Material 112,70840SubMO 41,83590

16.02.051 PASTILHA NATURAL 5,0X5,0CM - DETALHES E REQUADROS M2 176,21

1.01.38 1,70000PASTILHEIRO H 9,197005,411.01.39 0,60000PEDREIRO H 2,790004,651.01.46 1,80000SERVENTE H 6,858003,812.05.03 0,02100AREIA M3 1,6632079,202.05.05 4,64000CAL HIDRATADA KG 1,577600,342.05.07 1,34000CAULIM KG 2,050201,532.05.08 2,22000CIMENTO KG 0,821400,372.05.09 2,50000CIMENTO BRANCO KG 2,625001,053.20.23 1,05000PASTILHA NATURAL 5,0X5,0CM M2 92,6940088,28

LS 22,99090 BDI 32,95148Mão-de-Obra 18,84500 Material 101,43140SubMO 41,83590

16.02.056 LADRILHO HIDRAULICO 20X20CM LISO 1 COR M2 58,80

1.01.28 0,70000LADRILHISTA H 3,535005,051.01.46 0,70000SERVENTE H 2,667003,812.05.81 5,00000ARGAMASSA PRE-FABR TIPO CIMENTCOLA KG 1,750000,353.65.19 1,05000LADRILHO HIDRAULICO 20X20CM 1 COR M2 32,2875030,75

LS 7,56644 BDI 10,99537Mão-de-Obra 6,20200 Material 34,03750SubMO 13,76844

16.02.061 LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DE ALERTA M2 94,97

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.65.25 1,00000LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL ALERTA M2 63,4000063,40

LS 5,62542 BDI 17,75965Mão-de-Obra 4,61100 Material 66,97946SubMO 10,23642

16.02.062 LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DIRECIONAL M2 94,97

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,60000SERVENTE H 2,286003,812.05.03 0,00630AREIA M3 0,4989679,202.05.08 7,50000CIMENTO KG 2,775000,372.80.05 0,05000COLA PVA KG 0,305506,113.65.27 1,00000LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL DIREC. M2 63,4000063,40

LS 5,62542 BDI 17,75965Mão-de-Obra 4,61100 Material 66,97946SubMO 10,23642

16.02.070 LASTRO DE CONCRETO - 5CM M2 22,61

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,03000AREIA M3 2,3760079,202.05.08 10,00000CIMENTO KG 3,700000,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,09

LS 5,42046 BDI 4,22810Mão-de-Obra 4,44300 Material 8,51960SubMO 9,86346

16.02.071 LASTRO DE PEDRA BRITADA - 5CM M2 5,69

1.01.46 0,15000SERVENTE H 0,571503,812.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,09

LS 0,69723 BDI 1,06460Mão-de-Obra 0,57150 Material 3,35995SubMO 1,26873

16.02.080 PEDRA ARDOSIA 40X40CM E=7A10MM M2 45,19

1.01.39 0,92000PEDREIRO H 4,278004,651.01.46 1,05000SERVENTE H 4,000503,812.05.03 0,03200AREIA M3 2,5344079,202.05.08 10,63000CIMENTO KG 3,933100,373.50.02 1,05000PEDRA ARDOSIA 40X40CM E=7A10MM M2 11,8965011,33

LS 10,09977 BDI 8,45072Mão-de-Obra 8,27850 Material 18,36400SubMO 18,37827

16.02.090 CIMENTADO DESEMPENADO COM JUNTA SECA E=3,5CM INCL ARG REG M2 36,04

1.01.39 1,17000PEDREIRO H 5,440504,651.01.46 0,93000SERVENTE H 3,543303,812.05.03 0,03680AREIA M3 2,9145679,20

09/02/2011 11:38:40 Página: 300 de 0

Page 301: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.08 15,61000CIMENTO KG 5,775700,372.10.60 0,30000RIPA DE PEROBA 1X5CM M 0,669002,23

LS 10,96024 BDI 6,73976Mão-de-Obra 8,98380 Material 9,35926SubMO 19,94404

16.02.091 CIMENTADO DESEMPENADO ALISADO C/ CORANTE E=3,5CM INCL ARG REG M2 38,59

1.01.39 1,17000PEDREIRO H 5,440504,651.01.46 0,93000SERVENTE H 3,543303,812.05.03 0,03680AREIA M3 2,9145679,202.05.08 15,61000CIMENTO KG 5,775700,372.10.60 0,30000RIPA DE PEROBA 1X5CM M 0,669002,233.80.38 0,10000PIGMENTO EM PO PARA ARGAMASSA KG 2,0770020,77

LS 10,96024 BDI 7,21747Mão-de-Obra 8,98380 Material 11,43626SubMO 19,94404

16.02.099 REVESTIMENTOS P/ PISOS EXTERNOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.03.001 CORTE DE MATO E GRAMA - ROÇAGEM MECANIZADA M2 0,66

1.01.01 0,02500AJUDANTE H 0,097503,901.01.26 0,02500JARDINEIRO H 0,123254,938.01.75 0,02500ROÇADEIRA MECANICA H 0,054252,17

LS 0,26932 BDI 0,12519Mão-de-Obra 0,22075 Material 0,05425SubMO 0,49007

16.03.003 GRAMA BATATAIS EM PLACAS M2 9,02

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,25000SERVENTE H 0,952503,813.85.02 0,10000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,171001,713.85.03 0,15000CALCARIO DOLOMITICO KG 0,060000,403.85.07 1,00000FORRACAO GRAMA TIPO BATATAIS EM PLACAS M2 2,930002,933.85.12 0,10000FOSFATO DE ROCHAS KG 0,137001,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,21

LS 1,64322 BDI 1,68777Mão-de-Obra 1,34690 Material 4,34800SubMO 2,99012

16.03.005 GRAMA SAO CARLOS EM PLACAS M2 11,49

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,25000SERVENTE H 0,952503,813.85.02 0,10000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,171001,713.85.03 0,15000CALCARIO DOLOMITICO KG 0,060000,403.85.12 0,10000FOSFATO DE ROCHAS KG 0,137001,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.10 1,00000FORRACAO GRAMA TIPO SAO CARLOS EM PLACAS M2 4,940004,94

LS 1,64322 BDI 2,15007Mão-de-Obra 1,34690 Material 6,35800SubMO 2,99012

16.03.007 GRAMA PRETA EM MUDAS M2 40,11

1.01.26 0,16000JARDINEIRO H 0,788804,931.01.46 0,08000SERVENTE H 0,304803,813.85.02 0,10000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,171001,713.85.03 0,15000CALCARIO DOLOMITICO KG 0,060000,403.85.12 0,10000FOSFATO DE ROCHAS KG 0,137001,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.11 1,00000FORRACAO GRAMA TIPO PRETA M2 28,7700028,77

LS 1,33419 BDI 7,50163Mão-de-Obra 1,09360 Material 30,18800SubMO 2,42779

16.03.008 FORRACAO - ONZE HORAS M2 31,21

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.85.50 1,00000FORRACAO - ONZE HORAS M2 19,0100019,01

LS 0,85302 BDI 5,83607Mão-de-Obra 0,69920 Material 23,82200SubMO 1,55222

16.03.009 FORRACAO - SALVIA M2 13,70

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.85.42 1,00000FORRACAO - SALVIA M2 4,780004,78

LS 0,85302 BDI 2,56317Mão-de-Obra 0,69920 Material 9,59200SubMO 1,55222

16.03.010 FORRACAO - MARANTA M2 24,64

09/02/2011 11:38:40 Página: 301 de 0

Page 302: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.85.46 1,00000FORRACAO - MARANTA M2 13,6700013,67

LS 0,85302 BDI 4,60787Mão-de-Obra 0,69920 Material 18,48200SubMO 1,55222

16.03.014 AP-02 PROTETOR PARA ARVORES UN 53,65

1.01.21 0,80000FERREIRO H 3,816004,771.01.22 0,80000AJUDANTE DE FERREIRO H 3,056003,822.15.10 8,00000ACO CA-25 $MD BITOLAS KG 21,840002,732.70.29 1,00000ARAME GALVANIZADO N.12 KG 6,530006,53

LS 8,38384 BDI 10,03394Mão-de-Obra 6,87200 Material 28,37000SubMO 15,25584

16.03.016 ARVORE ORNAMENTAL H=1,50 A 2,00 M - JACARANDA MIMOSO UN 79,80

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.85.31 1,00000ARVORE ORNAM H=1,50/2,00M - JACARANDA MIMOSO UN 20,1400020,14

LS 6,85948 BDI 14,92328Mão-de-Obra 5,62253 Material 52,40179SubMO 12,48201

16.03.017 ARVORE ORNAMENTAL H=1,50 A 2,00 M - FEDEGOSO UN 80,13

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.85.32 1,00000ARVORE ORNAMENTAL H=1,50 A 2,00 M - FEDEGOSO UN 20,4100020,41

LS 6,85948 BDI 14,98538Mão-de-Obra 5,62253 Material 52,67179SubMO 12,48201

16.03.018 ARVORE ORNAMENTAL H=1,50 A 2,00 M - BRASSAIA UN 77,66

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.85.33 1,00000ARVORE ORNAMENTAL H=1,50 A 2,00 M - BRASSAIA UN 18,4000018,40

LS 6,85948 BDI 14,52308Mão-de-Obra 5,62253 Material 50,66179SubMO 12,48201

16.03.019 ARVORE ORNAMENTAL H=1,50 A 2,00 - MAGNOLIA AMARELA UN 79,81

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.85.34 1,00000ARVORE ORNAM H=1,50/2,00M - MAGNOLIA AMARELA UN 20,1500020,15

LS 6,85948 BDI 14,92558Mão-de-Obra 5,62253 Material 52,41179SubMO 12,48201

16.03.020 ARVORE ORNAMENTAL H=1.50 A 2.00M - CIPRESTE ITALIANO UN 187,55

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.12 1,00000ARVORE ORNAM. H=1.50/2.00M - CIPRESTE ITALIANO UN 107,74000107,74

LS 6,85948 BDI 35,07128Mão-de-Obra 5,62253 Material 140,00179SubMO 12,48201

09/02/2011 11:38:40 Página: 302 de 0

Page 303: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.03.021 ARVORE ORNAMENTAL H=1.50 A 2.00M - FLAMBOYANT UN 77,35

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20430TERRA VEGETAL M3 18,4258290,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.13 1,00000ARVORE ORNAM. H=1.50/2.00M-FLAMBOYANT UN 18,1900018,19

LS 6,85948 BDI 14,46440Mão-de-Obra 5,62253 Material 50,40670SubMO 12,48201

16.03.022 ARVORE ORNAMENTAL H=1.50 A 2.00M - GREVILHA UN 78,45

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.14 1,00000ARVORE ORNAM. H=1.50/2.00M-GREVILHA UN 19,0400019,04

LS 6,85948 BDI 14,67028Mão-de-Obra 5,62253 Material 51,30179SubMO 12,48201

16.03.023 ARVORE ORNAMENTAL H=1.50 A 2.00M - IPE AMARELO UN 93,47

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.15 1,00000ARVORE ORNAM. H=1.50/2.00M-IPE AMARELO/ROXO UN 31,2500031,25

LS 6,85948 BDI 17,47858Mão-de-Obra 5,62253 Material 63,51179SubMO 12,48201

16.03.024 ARVORE ORNAMENTAL H=1.50 A 2.00M - IPE ROXO UN 93,47

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.15 1,00000ARVORE ORNAM. H=1.50/2.00M-IPE AMARELO/ROXO UN 31,2500031,25

LS 6,85948 BDI 17,47858Mão-de-Obra 5,62253 Material 63,51179SubMO 12,48201

16.03.025 ARVORE ORNAMENTAL H=1.5 A 2.00M - JATOBA UN 82,05

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.17 1,00000ARVORE ORNAM. H=1.50/2.00M - JATOBA UN 21,9700021,97

LS 6,85948 BDI 15,34418Mão-de-Obra 5,62253 Material 54,23179SubMO 12,48201

16.03.026 ARVORE ORNAMENTAL H=1.5 A 2.00M - PAINEIRA ROSA UN 81,86

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.18 1,00000ARVORE ORNAM. H=1.50/2.00M-PAINEIRA ROSA UN 21,8100021,81

LS 6,85948 BDI 15,30738Mão-de-Obra 5,62253 Material 54,07179SubMO 12,48201

16.03.027 ARVORE ORNAMENTAL H=1.50 A 2.00M - PAU BRASIL UN 84,72

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,20

09/02/2011 11:38:40 Página: 303 de 0

Page 304: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.19 1,00000ARVORE ORNAM. H=1.50/2.00M - PAU BRASIL UN 24,1400024,14

LS 6,85948 BDI 15,84328Mão-de-Obra 5,62253 Material 56,40179SubMO 12,48201

16.03.028 ARVORE ORNAMENTAL H=1.50 A 2.00M - PAU FERRO UN 88,09

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,77600SERVENTE H 6,766563,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.20 1,00000ARVORE ORNAM. H=1.50/2.00M - PAU FERRO UN 21,8200021,82

LS 9,64097 BDI 16,47379Mão-de-Obra 7,90243 Material 54,08179SubMO 17,54340

16.03.029 ARVORE ORNAMENTAL H=1.50 A 2.00M - PLATANO UN 77,24

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.21 1,00000ARVORE ORNAM. H=1.50/2.00M-PLATANO UN 18,0600018,06

LS 6,85948 BDI 14,44488Mão-de-Obra 5,62253 Material 50,32179SubMO 12,48201

16.03.030 ARVORE ORNAMENTAL H=1.50 A 2.00M - SIBIPIRUNA UN 80,49

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.22 1,00000ARVORE ORNAM. H=1.50/2.00M-SIBIPIRUNA UN 20,7000020,70

LS 6,85948 BDI 15,05208Mão-de-Obra 5,62253 Material 52,96179SubMO 12,48201

16.03.031 ARVORE ORNAMENTAL H=1,50 A 2.00M - TIPUANA UN 79,59

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.23 1,00000ARVORE ORNAM. H=1.50/2.00M-TIPUANA UN 19,9700019,97

LS 6,85948 BDI 14,88418Mão-de-Obra 5,62253 Material 52,23179SubMO 12,48201

16.03.032 ARVORE ORNAMENTAL H=1.50 A 2.00M - ALECRIM DE CAMPINAS UN 80,43

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.24 1,00000ARVORE ORNAM. H=1.50/2.00M - ALECRIM CAMPINAS UN 20,6500020,65

LS 6,85948 BDI 15,04058Mão-de-Obra 5,62253 Material 52,91179SubMO 12,48201

16.03.033 ARVORE ORNAMENTAL H=1.50 A 2.00M - CASSIA ALELUIA UN 81,63

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,21

09/02/2011 11:38:40 Página: 304 de 0

Page 305: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.86.25 1,00000ARVORE ORNAM. H=1.50/2.00M-CASSIA ALFLUIA UN 21,6300021,63

LS 6,85948 BDI 15,26598Mão-de-Obra 5,62253 Material 53,89179SubMO 12,48201

16.03.034 ARVORE ORNAMENTAL H=1.50 A 2.00M - CHAPEU DE SOL UN 78,47

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.26 1,00000ARVORE ORNAM. H=1.50/2.00M-CHAPEU DE SOL UN 19,0600019,06

LS 6,85948 BDI 14,67488Mão-de-Obra 5,62253 Material 51,32179SubMO 12,48201

16.03.035 ARVORE ORNAMENTAL H=1.50 A 2.00M - FIGUEIRA PANDURATA UN 83,10

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.27 1,00000ARVORE ORNAM. H=1.50/2.00M-FIGUEIRA PANDURATA UN 22,8200022,82

LS 6,85948 BDI 15,53968Mão-de-Obra 5,62253 Material 55,08179SubMO 12,48201

16.03.036 ARVORE ORNAMENTAL H=1.50 A 2.00M - PATA DE VACA UN 80,02

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.28 1,00000ARVORE ORNAM. H=1.50/2.00M-PATA DE VACA UN 20,3200020,32

LS 6,85948 BDI 14,96468Mão-de-Obra 5,62253 Material 52,58179SubMO 12,48201

16.03.037 ARVORE ORNAMENTAL H=1.50 A 2.00M - QUARESMEIRA UN 80,40

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.29 1,00000ARVORE ORNAM. H=1.50/2.00M-QUARESMEIRA UN 20,9500020,95

LS 6,85948 BDI 15,03598Mão-de-Obra 5,62253 Material 52,89179SubMO 12,48201

16.03.038 ARVORE ORNAMENTAL H=1.50 A 2.00M - MANACA DA SERRA UN 78,57

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.30 1,00000ARVORE ORNAM. H=1.50/2.00M-MANACA DA SERRA UN 19,4600019,46

LS 6,85948 BDI 14,69328Mão-de-Obra 5,62253 Material 51,40179SubMO 12,48201

16.03.039 ARVORE ORNAMENTAL H=1.50 A 2.00M - RESEDA EXTREMOSA UN 76,44

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.31 1,00000ARVORE ORNAM. H=1.50/2.00M-RESEDA EXTREMOSA UN 17,4100017,41

LS 6,85948 BDI 14,29538Mão-de-Obra 5,62253 Material 49,67179SubMO 12,48201

16.03.040 ARVORE ORNAMENTAL H=1.50 A 2.00M - ALAMO UN 80,15

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,81

09/02/2011 11:38:40 Página: 305 de 0

Page 306: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.74 1,00000ARVORE ORNAM. H=1.50/2.00M - ALAMO UN 20,4200020,42

LS 6,85948 BDI 14,98768Mão-de-Obra 5,62253 Material 52,68179SubMO 12,48201

16.03.041 ARVORE ORNAMENTAL H=1.50 A 2.00M - CHORAO UN 77,35

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.65 1,00000ARVORE ORNAM H=1.50/2.00M - CHORAO UN 18,1500018,15

LS 6,85948 BDI 14,46558Mão-de-Obra 5,62253 Material 50,41179SubMO 12,48201

16.03.045 ARVORE FRUTIFERA H=0.50 A 1.00M - ABACATE UN 67,71

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.32 1,00000ARVORE FRUTIF. H=50/1.00M - ABACATE UN 10,6300010,63

LS 6,85948 BDI 12,66238Mão-de-Obra 5,62253 Material 42,57179SubMO 12,48201

16.03.046 ARVORE FRUTIFERA H=0.50 A 1.00M - MANGUEIRA UN 69,68

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.33 1,00000ARVORE FRUTIF. H=0.50/1.00M - MANGUEIRA UN 11,9100011,91

LS 6,85948 BDI 13,03038Mão-de-Obra 5,62253 Material 44,17179SubMO 12,48201

16.03.047 ARVORE FRUTIFERA H=0.50 A 1.00M - JAMBOLAO UN 67,06

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.34 1,00000ARVORE FRUTIF. H=0.50/1.00-JAMBOLAO UN 9,780009,78

LS 6,85948 BDI 12,54048Mão-de-Obra 5,62253 Material 42,04179SubMO 12,48201

16.03.048 ARVORE FRUTIFERA H=0.50 A 1.00M - AMOREIRA UN 67,26

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.35 1,00000ARVORE FRUTIF. H=0.50/1.00M-AMOREIRA UN 9,940009,94

LS 6,85948 BDI 12,57728Mão-de-Obra 5,62253 Material 42,20179SubMO 12,48201

16.03.049 ARVORE FRUTIFERA H=0.50 A 1.00M - AMEIXA AMARELA (NESPERA) UN 68,72

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,21

09/02/2011 11:38:40 Página: 306 de 0

Page 307: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.86.36 1,00000ARVORE FRUTIF. H=0.50/1.00M-AMEIXA AMARELA UN 11,1300011,13

LS 6,85948 BDI 12,85098Mão-de-Obra 5,62253 Material 43,39179SubMO 12,48201

16.03.050 ARVORE FRUTIFERA H=0.50 A 1.00M - BANANEIRA UN 72,57

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.37 1,00000ARVORE FRUTIF. H=0.50/1.00M-BANANEIRA UN 14,2600014,26

LS 6,85948 BDI 13,57088Mão-de-Obra 5,62253 Material 46,52179SubMO 12,48201

16.03.051 ARVORE FRUTIFERA H=0.50 A 1.00M - ACEROLA (CEREJA DAS ANTILHAS) UN 67,54

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.38 1,00000ARVORE FRUTIF. H=0.50/1.00M-ACEROLA UN 10,1700010,17

LS 6,85948 BDI 12,63018Mão-de-Obra 5,62253 Material 42,43179SubMO 12,48201

16.03.052 ARVORE FRUTIFERA H=0.50 A 1.00M - CARAMBOLA UN 66,25

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.76 1,00000ARVORE FRUTIF. H=0.50/1.00M - CARAMBOLA UN 9,120009,12

LS 6,85948 BDI 12,38868Mão-de-Obra 5,62253 Material 41,38179SubMO 12,48201

16.03.053 ARVORE FRUTIFERA H=0.50 A 1.00M - LIMOEIRO UN 68,67

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.40 1,00000ARVORE FRUTIF. H=0.50/1.00M-LIMOEIRO UN 11,0900011,09

LS 6,85948 BDI 12,84178Mão-de-Obra 5,62253 Material 43,35179SubMO 12,48201

16.03.054 ARVORE FRUTIFERA H=0.50 A 1.00M - PITANGUEIRA UN 66,49

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.41 1,00000ARVORE FRUTIF. H=0.50/1.00M-PITANGUEIRA UN 9,320009,32

LS 6,85948 BDI 12,43468Mão-de-Obra 5,62253 Material 41,58179SubMO 12,48201

16.03.055 ARVORE FRUTIFERA H=0.50 A 1.00M - UVAIA UN 68,24

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.42 1,00000ARVORE FRUTIF. H=0.50/1.00M-UVATA UN 10,7400010,74

LS 6,85948 BDI 12,76128Mão-de-Obra 5,62253 Material 43,00179SubMO 12,48201

16.03.056 ARVORE FRUTIFERA H=0,50 A 1,00 M - ROMA UN 69,53

09/02/2011 11:38:40 Página: 307 de 0

Page 308: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.85.35 1,00000ARVORE ORNAMENTAL H=0,50 A 1,00 M - ROMA UN 11,7900011,79

LS 6,85948 BDI 13,00278Mão-de-Obra 5,62253 Material 44,05179SubMO 12,48201

16.03.057 ARBUSTO H=0,50 A 0,70 M - GREVILHA ANA UN 20,71

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.38 1,00000ARBUSTO H= 0,50 A 0,70 M - GREVILHA ANA UN 10,9000010,90

LS 0,95965 BDI 3,87317Mão-de-Obra 0,78660 Material 15,09360SubMO 1,74625

16.03.058 ARBUSTO H=0,50 A 0,70 M - SHEFLERA UN 24,02

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.39 1,00000ARBUSTO H=0,50 A 0,70 M - SHEFLERA UN 13,5900013,59

LS 0,95965 BDI 4,49187Mão-de-Obra 0,78660 Material 17,78360SubMO 1,74625

16.03.059 ARBUSTO H=0,50 A 0,70 M - CROTON UN 28,51

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.40 1,00000ARBUSTO H=0,50 A 0,70 M - CROTON UN 17,2400017,24

LS 0,95965 BDI 5,33137Mão-de-Obra 0,78660 Material 21,43360SubMO 1,74625

16.03.060 PALMACEAS H=1.50 A 2.00M - ARECA BAMBU UN 72,58

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.43 1,00000PALMACEA H=0.50/1.00M-ARECA BAMBU UN 14,2700014,27

LS 6,85948 BDI 13,57318Mão-de-Obra 5,62253 Material 46,53179SubMO 12,48201

16.03.061 PALMACEAS H=1.50 A 2.00M - FALSA LATANIA UN 85,55

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.86.44 1,00000PALMACEA H=0.50/1.00M-FALSA LATANIA UN 24,8100024,81

LS 6,85948 BDI 15,99738Mão-de-Obra 5,62253 Material 57,07179SubMO 12,48201

16.03.062 PALMACEAS H=1.50 A 2.00M - SEAFORTIA UN 85,92

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,21

09/02/2011 11:38:40 Página: 308 de 0

Page 309: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.86.75 1,00000PALMACEA H=1.50/2.00M - SEAFORTIA UN 25,1100025,11

LS 6,85948 BDI 16,06638Mão-de-Obra 5,62253 Material 57,37179SubMO 12,48201

16.03.063 PALMACEA H=1,50 A 2,00 M - JERIVA UN 100,90

1.01.26 0,23040JARDINEIRO H 1,135874,931.01.46 1,17760SERVENTE H 4,486663,812.05.03 0,00640AREIA M3 0,5068879,203.85.02 0,80000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 1,368001,713.85.03 0,80000CALCARIO DOLOMITICO KG 0,320000,403.85.11 0,20480TERRA VEGETAL M3 18,4709190,193.85.12 0,80000FOSFATO DE ROCHAS KG 1,096001,373.85.13 50,00000ADUBO ORGANICO CURTIDO L 10,500000,213.85.36 1,00000PALMACEAS H=1,50 A 2,00 M - JERIVA UN 37,2900037,29

LS 6,85948 BDI 18,86778Mão-de-Obra 5,62253 Material 69,55179SubMO 12,48201

16.03.064 ARBUSTO H=0,50 A 0,70 M - LIGUSTRINHO UN 17,77

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.41 1,00000ARBUSTO H=0,50 A 0,70 M - LIGUSTRINHO UN 8,510008,51

LS 0,95965 BDI 3,32347Mão-de-Obra 0,78660 Material 12,70360SubMO 1,74625

16.03.065 ARBUSTO H=0.50 A 0.70M - ACALIFA UN 14,21

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.45 1,00000ARBUSTO H=0.50/0.70M-ACALIFA UN 5,620005,62

LS 0,95965 BDI 2,65877Mão-de-Obra 0,78660 Material 9,81360SubMO 1,74625

16.03.066 ARBUSTO H=0.50 A 0.70M - AZALEA UN 21,53

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.46 1,00000ARBUSTO H=0.50/0.70M-AZALEIA UN 11,6000011,60

LS 0,95965 BDI 4,02736Mão-de-Obra 0,78660 Material 15,76400SubMO 1,74625

16.03.067 ARBUSTO H=0.50 A 0.70M - BELA EMILIA UN 12,79

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.47 1,00000ARBUSTO H=0.50/0.70M-BELA EMILIA UN 4,460004,46

LS 0,95965 BDI 2,39197Mão-de-Obra 0,78660 Material 8,65360SubMO 1,74625

16.03.068 ARBUSTO H=0.50 A 0.70M - HIBISCO UN 14,18

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.48 1,00000ARBUSTO H=0.50/0.70M-HIBISCO UN 5,590005,59

LS 0,95965 BDI 2,65187Mão-de-Obra 0,78660 Material 9,78360SubMO 1,74625

16.03.069 ARBUSTO H=0.50 A 0.70M - JASMIM MANGA (FRANGIPANI) UN 21,79

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,37

09/02/2011 11:38:40 Página: 309 de 0

Page 310: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.49 1,00000ARBUSTO H=0.50/0.70M-JASMIM MANGA UN 11,7800011,78

LS 0,95965 BDI 4,07557Mão-de-Obra 0,78660 Material 15,97360SubMO 1,74625

16.03.070 ARBUSTO H=0.50 A 0.70M - MURTA DE CHEIRO (FALSA MURTA) UN 19,86

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.50 1,00000ARBUSTO H=0.50/0.70M-MURTA DE CHEIRO UN 10,2100010,21

LS 0,95965 BDI 3,71447Mão-de-Obra 0,78660 Material 14,40360SubMO 1,74625

16.03.071 ARBUSTO H=0.50 A 0.70 M - SUINA UN 20,19

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.51 1,00000ARBUSTO H=0.50/0.70M-SUINA UN 10,4800010,48

LS 0,95965 BDI 3,77657Mão-de-Obra 0,78660 Material 14,67360SubMO 1,74625

16.03.072 ARBUSTO H=0.50 A 0.70 M - MALVAVISCO UN 14,04

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.64 1,00000ARBUSTO H=0.50/0.70M-MALVAVISCO UN 5,480005,48

LS 0,95965 BDI 2,62657Mão-de-Obra 0,78660 Material 9,67360SubMO 1,74625

16.03.073 ARBUSTO H=0.50 A 0.70M - BICO DE PAPAGAIO UN 16,76

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.66 1,00000ARBUSTO H=0.50/0.70M-BICO DE PAPAGAIO UN 7,690007,69

LS 0,95965 BDI 3,13487Mão-de-Obra 0,78660 Material 11,88360SubMO 1,74625

16.03.074 ARBUSTO H=0.50 A 0.70M - PIRACANTA UN 21,48

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.67 1,00000ARBUSTO H=0.50/0.70M-PIRACANTA UN 11,5300011,53

LS 0,95965 BDI 4,01807Mão-de-Obra 0,78660 Material 15,72360SubMO 1,74625

16.03.075 TREPADEIRA H=0.50 A 0.70 M - COSTELA DE ADAO UN 20,20

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.52 1,00000TREPADEIRA H=0.50/0.70M-COSTELA DE ADAO UN 10,4900010,49

LS 0,95965 BDI 3,77887Mão-de-Obra 0,78660 Material 14,68360SubMO 1,74625

16.03.076 TREPADEIRA H=0.50 A 0.70 M - GUAIMBE UN 22,36

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,19

09/02/2011 11:38:40 Página: 310 de 0

Page 311: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.53 1,00000TREPADEIRA H=0.50/0.70M - GUAIMBE UN 12,2400012,24

LS 0,95965 BDI 4,18137Mão-de-Obra 0,78660 Material 16,43360SubMO 1,74625

16.03.077 TREPADEIRA H=0.50 A 0.70 M - PRIMAVERA UN 23,94

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.54 1,00000TREPADEIRA H=0.50/0.70M-PRIMAVERA UN 13,5300013,53

LS 0,95965 BDI 4,47807Mão-de-Obra 0,78660 Material 17,72360SubMO 1,74625

16.03.078 TREPADEIRA H=0,10 A 0,15M - UNHA DE GATO UN 3,93

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,813.85.11 0,00780TERRA VEGETAL M3 0,7034890,193.85.13 1,00000ADUBO ORGANICO CURTIDO L 0,210000,213.86.55 1,00000TREPADEIRA H=0,10/0,15M - UNHA DE GATO UN 0,730000,73

LS 0,85302 BDI 0,73501Mão-de-Obra 0,69920 Material 1,64348SubMO 1,55222

16.03.079 TREPADEIRA H=0.50 A 0.70M-ALAMANDA UN 14,66

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.73 1,00000TREPADEIRA H=0.50/0.70M-ALAMANDA UN 5,980005,98

LS 0,95965 BDI 2,74157Mão-de-Obra 0,78660 Material 10,17360SubMO 1,74625

16.03.080 ARBUSTO H=0,50 A 0,70 M - CALIANDRA UN 15,11

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.37 1,00000ARBUSTO H=0,50 A 0,70 M - CALIANDRA UN 6,350006,35

LS 0,95965 BDI 2,82667Mão-de-Obra 0,78660 Material 10,54360SubMO 1,74625

16.03.081 FOLHAGEM H=0,50 A 0,70 - HELICONIA UN 21,40

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.43 1,00000FOLHAGEM H=0,50 A 0,70 M - HECICONIA UN 11,4600011,46

LS 0,95965 BDI 4,00197Mão-de-Obra 0,78660 Material 15,65360SubMO 1,74625

16.03.082 TREPADEIRA - JIBOIA UN 8,40

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.85.48 1,00000TREPADEIRA - JIBOIA UN 0,890000,89

LS 0,95965 BDI 1,57087Mão-de-Obra 0,78660 Material 5,08360SubMO 1,74625

16.03.083 BAMBU H=1,00 A 2,00 M - BAMBUZINHO UN 26,53

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,21

09/02/2011 11:38:40 Página: 311 de 0

Page 312: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.85.47 1,00000BAMBU - H=1,00 A 2,00 M - BAMBUZINHO UN 15,6300015,63

LS 0,95965 BDI 4,96107Mão-de-Obra 0,78660 Material 19,82360SubMO 1,74625

16.03.084 FOLHAGEM-H=0.50 A 0.70M BANANEIRA ZEBRINA UN 26,53

1.01.26 0,09000JARDINEIRO H 0,443704,931.01.46 0,09000SERVENTE H 0,342903,813.85.02 0,07400ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,126541,713.85.03 0,07400CALCARIO DOLOMITICO KG 0,029600,403.85.11 0,03200TERRA VEGETAL M3 2,8860890,193.85.12 0,07400FOSFATO DE ROCHAS KG 0,101381,373.85.13 5,00000ADUBO ORGANICO CURTIDO L 1,050000,213.86.68 1,00000FOLHAGEM-BANANEIRA ZEBRINA UN 15,6300015,63

LS 0,95965 BDI 4,96107Mão-de-Obra 0,78660 Material 19,82360SubMO 1,74625

16.03.085 FORRACAO - CURCULIGO M2 20,52

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.80 1,00000FORRACAO - CURCULIGO M2 10,3200010,32

LS 0,85302 BDI 3,83737Mão-de-Obra 0,69920 Material 15,13200SubMO 1,55222

16.03.086 FORRACAO - HERA INGLESA UN 3,90

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,813.85.11 0,00780TERRA VEGETAL M3 0,7034890,193.85.13 1,00000ADUBO ORGANICO CURTIDO L 0,210000,213.86.57 1,00000FORRACAO - HERA INGLESA UN 0,710000,71

LS 0,85302 BDI 0,73041Mão-de-Obra 0,69920 Material 1,62348SubMO 1,55222

16.03.087 FORRACAO - LANTANA M2 15,34

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.82 1,00000FORRACAO - LANTANA M2 6,110006,11

LS 0,85302 BDI 2,86907Mão-de-Obra 0,69920 Material 10,92200SubMO 1,55222

16.03.088 FORRACAO - LIRIO AMARELO M2 37,52

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.83 1,00000FORRACAO - LIRIO AMARELO M2 24,1400024,14

LS 0,85302 BDI 7,01597Mão-de-Obra 0,69920 Material 28,95200SubMO 1,55222

16.03.089 FORRACAO - MARIA SEM VERGONHA M2 25,38

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.84 1,00000FORRACAO - MARIA SEM VERGONHA M2 14,2700014,27

LS 0,85302 BDI 4,74587Mão-de-Obra 0,69920 Material 19,08200SubMO 1,55222

16.03.090 FORRACAO - SANCHEZIA (DIGITAL) M2 13,30

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.85 1,00000FORRACAO - SANGHEZIA M2 4,450004,45

LS 0,85302 BDI 2,48727Mão-de-Obra 0,69920 Material 9,26200SubMO 1,55222

09/02/2011 11:38:40 Página: 312 de 0

Page 313: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.03.091 FORRACAO - PILEA M2 22,61

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.86 1,00000FORRACAO - PILEA M2 12,0200012,02

LS 0,85302 BDI 4,22837Mão-de-Obra 0,69920 Material 16,83200SubMO 1,55222

16.03.092 FORRACAO - CLOROFITO M2 23,53

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.87 1,00000FORRACAO - CLOROFITO M2 12,7700012,77

LS 0,85302 BDI 4,40087Mão-de-Obra 0,69920 Material 17,58200SubMO 1,55222

16.03.093 FORRACAO - VEDELIA M2 34,35

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.88 1,00000FORRACAO - VEDELIA M2 21,5700021,57

LS 0,85302 BDI 6,42487Mão-de-Obra 0,69920 Material 26,38200SubMO 1,55222

16.03.095 FORRACAO - ZEBRINA PENDULA M2 29,89

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.86.89 1,00000FORRACAO - ZEBRINA PENDULA M2 17,9400017,94

LS 0,85302 BDI 5,58997Mão-de-Obra 0,69920 Material 22,75200SubMO 1,55222

16.03.096 FORRACAO - AGAPANTO M2 25,82

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.85.44 1,00000FORRACAO - AGAPANTO M2 14,6300014,63

LS 0,85302 BDI 4,82867Mão-de-Obra 0,69920 Material 19,44200SubMO 1,55222

16.03.097 FORRACAO - SETCREASEA M2 28,56

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.85.45 1,00000FORRACAO - SETCREASEA M2 16,8600016,86

LS 0,85302 BDI 5,34157Mão-de-Obra 0,69920 Material 21,67200SubMO 1,55222

16.03.098 FORRACAO - COLEO M2 21,88

1.01.26 0,08000JARDINEIRO H 0,394404,931.01.46 0,08000SERVENTE H 0,304803,812.05.03 0,01000AREIA M3 0,7920079,203.85.02 0,25000ADUBO QUIMICO NPK,FORM.BASE (10-10-10) KG 0,427501,713.85.03 0,25000CALCARIO DOLOMITICO KG 0,100000,403.85.12 0,25000FOSFATO DE ROCHAS KG 0,342501,373.85.13 15,00000ADUBO ORGANICO CURTIDO L 3,150000,213.85.49 1,00000FORRACAO - COLEO M2 11,4300011,43

09/02/2011 11:38:40 Página: 313 de 0

Page 314: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,85302 BDI 4,09267Mão-de-Obra 0,69920 Material 16,24200SubMO 1,55222

16.03.099 SERVICOS DE GRAMADOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.04.001 QE-02 POSTE PARA REDE DE VOLEIBOL PR 836,46

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 2,00000SERVENTE H 7,620003,812.05.36 0,12300CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 31,17927253,493.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.17 1,00000QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR PR 490,02000490,023.67.20 1,00000REDE DE VOLEI C/ 4 FAIXAS UN 92,6300092,636.25.01 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM M 1,040001,306.25.08 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM M 16,5680020,71

LS 14,96940 BDI 156,41303Mão-de-Obra 12,27000 Material 652,81727SubMO 27,23940

16.04.002 QE-03 TRAVE DE FUTEBOL DE SALAO (FUNDACAO DIRETA) UN 911,46

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 2,00000SERVENTE H 7,620003,812.05.36 0,12300CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 31,17927253,493.67.12 1,00000REDE PARA TRAVE DE GOL UN 36,8100036,813.67.15 2,00000TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL UN 21,3800010,693.67.18 1,00000QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE UN 606,81000606,816.25.01 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM M 1,040001,306.25.08 0,80000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM M 16,5680020,71

LS 14,96940 BDI 170,43613Mão-de-Obra 12,27000 Material 713,78727SubMO 27,23940

16.04.004 QE-25 TABELA DE BASQUETE UN 3.875,31

1.01.11 16,68000CARPINTEIRO H 75,894004,551.01.12 16,68000AJUDANTE DE CARPINTEIRO H 66,052803,961.01.21 9,10000FERREIRO H 43,407004,771.01.22 9,10000AJUDANTE DE FERREIRO H 34,762003,821.01.39 10,21000PEDREIRO H 47,476504,651.01.40 2,06000PINTOR H 9,702604,711.01.41 2,06000AJUDANTE DE PINTOR H 7,869203,821.01.46 30,54000SERVENTE H 116,357403,812.05.03 0,38000AREIA M3 30,0960079,202.05.08 171,70000CIMENTO KG 63,529000,372.05.18 0,50000PEDRA BRITADA 2 M3 30,5450061,092.05.35 1,10000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 267,42100243,112.10.09 20,25000PONTALETE PINHO DE 3"X3" M 76,545003,782.10.14 4,32000SARRAFO PINHO APARELHADO 5X2,5 CM M 9,028802,092.10.21 1,76000TABUAS PINHO DE 1"X12" DE 3A. M2 30,2368017,182.15.25 127,65000ACO CA-50-A $MD BITOLAS KG 344,655002,702.50.17 53,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 528,410009,972.50.20 53,00000MONTAGEM DE ESTRUTURA METALICA KG 115,010002,172.67.60 1,79000PREGO KG 8,180304,572.70.10 1,82000ARAME RECOZIDO N.18 KG 8,426604,633.67.09 1,00000TABELA DE BASQUETE COM ARO E CESTO UN 631,75000631,753.75.02 0,43000TINTA ESMALTE L 4,282809,963.75.50 0,43000FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 8,2603019,213.75.91 0,02000GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 3,17120158,563.76.50 55,00000GALVANIZACAO A FOGO KG 97,350001,773.80.39 2,70000LIXA PARA MADEIRA UN 0,891000,333.80.60 0,23000TINNER L 1,495006,50

LS 489,85623 BDI 724,65215Mão-de-Obra 401,52150 Material 2.259,28380SubMO 891,37773

16.04.006 QE-11 DEGRAU ARQUIBANCADA M 88,34

1.01.39 1,92000PEDREIRO H 8,928004,651.01.46 2,30000SERVENTE H 8,763003,812.05.03 0,04300AREIA M3 3,4056079,202.05.05 5,14000CAL HIDRATADA KG 1,747600,342.05.08 10,30000CIMENTO KG 3,811000,372.05.18 0,03300PEDRA BRITADA 2 M3 2,0159761,092.25.04 5,20000BLOCO CONCRETO DE 14X39X19CM UN 9,984001,922.25.15 51,00000TIJOLO COMUM MACICO UN 11,220000,223.60.31 0,50000JUNTA PLASTICA DILATACAO P/ PISO 19X3MM M 0,370000,74

LS 21,58302 BDI 16,52048Mão-de-Obra 17,69100 Material 32,55417SubMO 39,27402

16.04.007QE-12 QUADRA DE ESPORTES/PISO DE CONCRETO ARMADO/FUNDACAO DIRET-600M2

UN 46.721,83

1.01.21 22,50000FERREIRO H 107,325004,771.01.22 22,50000AJUDANTE DE FERREIRO H 85,950003,821.01.39 120,00000PEDREIRO H 558,000004,651.01.40 22,50000PINTOR H 105,975004,711.01.41 22,50000AJUDANTE DE PINTOR H 85,950003,82

09/02/2011 11:38:40 Página: 314 de 0

Page 315: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 120,00000SERVENTE H 457,200003,811.01.55 16,00000OPERADOR H 111,200006,952.05.23 48,00000BRITA GRADUADA M3 3.266,8800068,062.05.36 48,00000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12.167,52000253,492.15.07 167,00000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 297,260001,782.15.08 540,00000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 1.377,000002,552.15.42 708,00000TELA TELCON Q138 (PAINEL) M2 7.101,2400010,032.40.35 660,00000LONA DE PLASTICO PRETO E=0,20MM M2 600,600000,912.40.56 35,70000TINTA BETUMINOSA L 228,123006,392.40.91 45,00000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 977,4000021,722.40.93 55,00000BAGUETE PLASTICO TIPO TARUCEL D=6MM M 7,150000,132.70.10 17,00000ARAME RECOZIDO N.18 KG 78,710004,632.80.17 150,00000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 964,500006,432.80.20 28,80000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 617,4720021,442.80.81 19,00000FITA CREPE 25MM X 50M UN 87,590004,613.55.90 600,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 6.564,0000010,943.75.17 9,38000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 56,561406,038.01.16 12,80000ROLO COMPACTADOR LISO 1000KG H 228,2240017,838.01.20 3,20000PLACA VIBRATORIA - 90KG H 9,248002,89

LS 1.844,15200 BDI 8.736,60299Mão-de-Obra 1.511,60000 Material 34.629,47840SubMO 3.355,75200

16.04.011 QE-16 ARQUIBANCADA DE CONCRETO (CIMENTADO DESEMPENADO) M 150,37

1.01.11 1,78000CARPINTEIRO H 8,099004,551.01.12 1,78000AJUDANTE DE CARPINTEIRO H 7,048803,961.01.21 0,25000FERREIRO H 1,192504,771.01.22 0,25000AJUDANTE DE FERREIRO H 0,955003,821.01.39 0,94000PEDREIRO H 4,371004,651.01.46 1,56300SERVENTE H 5,955033,812.05.03 0,02120AREIA M3 1,6790479,202.05.05 1,81000CAL HIDRATADA KG 0,615400,342.05.08 2,65000CIMENTO KG 0,980500,372.05.18 0,03300PEDRA BRITADA 2 M3 2,0159761,092.05.30 0,03250CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 7,67813236,252.10.09 2,68000PONTALETE PINHO DE 3"X3" M 10,130403,782.10.21 0,90000TABUAS PINHO DE 1"X12" DE 3A. M2 15,4620017,182.10.32 0,29000CHAPA COMPENSADA RESINADA E=12MM M2 3,5090012,102.15.25 2,90000ACO CA-50-A $MD BITOLAS KG 7,830002,702.25.04 5,20000BLOCO CONCRETO DE 14X39X19CM UN 9,984001,922.67.60 0,18000PREGO KG 0,822604,572.70.10 0,05000ARAME RECOZIDO N.18 KG 0,231504,63

LS 33,69802 BDI 28,11931Mão-de-Obra 27,62133 Material 60,93854SubMO 61,31935

16.04.012 QE-16 ARQUIBANCADA DE CONCRETO (TIJOLO LAMINADO EM ESPELHO) M 155,58

1.01.11 2,18000CARPINTEIRO H 9,919004,551.01.12 2,18000AJUDANTE DE CARPINTEIRO H 8,632803,961.01.21 0,25000FERREIRO H 1,192504,771.01.22 0,25000AJUDANTE DE FERREIRO H 0,955003,821.01.39 1,12000PEDREIRO H 5,208004,651.01.46 1,49300SERVENTE H 5,688333,812.05.03 0,02170AREIA M3 1,7186479,202.05.05 0,82000CAL HIDRATADA KG 0,278800,342.05.08 2,96500CIMENTO KG 1,097050,372.05.18 0,03300PEDRA BRITADA 2 M3 2,0159761,092.05.30 0,03250CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 7,67813236,252.10.09 3,28000PONTALETE PINHO DE 3"X3" M 12,398403,782.10.21 0,11000TABUAS PINHO DE 1"X12" DE 3A. M2 1,8898017,182.10.32 0,36000CHAPA COMPENSADA RESINADA E=12MM M2 4,3560012,102.15.25 2,90000ACO CA-50-A $MD BITOLAS KG 7,830002,702.25.04 5,20000BLOCO CONCRETO DE 14X39X19CM UN 9,984001,922.25.36 8,75000TIJOLO LAMINADO FURADO UN 5,862500,672.67.60 0,22000PREGO KG 1,005404,572.70.10 0,05000ARAME RECOZIDO N.18 KG 0,231504,63

LS 38,54667 BDI 29,09235Mão-de-Obra 31,59563 Material 56,34619SubMO 70,14230

16.04.014 QE-19 ARQUIBANCADA DE CONCRETO (PLAQUETA DE LAMINADO) M 155,51

1.01.11 1,78000CARPINTEIRO H 8,099004,551.01.12 1,78000AJUDANTE DE CARPINTEIRO H 7,048803,961.01.21 0,25000FERREIRO H 1,192504,771.01.22 0,25000AJUDANTE DE FERREIRO H 0,955003,821.01.28 0,70000LADRILHISTA H 3,535005,051.01.39 0,87000PEDREIRO H 4,045504,651.01.46 1,70300SERVENTE H 6,488433,812.05.03 0,02530AREIA M3 2,0037679,202.05.05 2,22000CAL HIDRATADA KG 0,754800,342.05.08 2,69500CIMENTO KG 0,997150,372.05.18 0,03300PEDRA BRITADA 2 M3 2,0159761,092.05.30 0,03250CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 7,67813236,25

09/02/2011 11:38:40 Página: 315 de 0

Page 316: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.10.09 2,68000PONTALETE PINHO DE 3"X3" M 10,130403,782.10.21 0,09000TABUAS PINHO DE 1"X12" DE 3A. M2 1,5462017,182.10.32 0,29000CHAPA COMPENSADA RESINADA E=12MM M2 3,5090012,102.15.25 2,90000ACO CA-50-A $MD BITOLAS KG 7,830002,702.25.04 5,20000BLOCO CONCRETO DE 14X39X19CM UN 9,984001,922.67.60 0,18000PREGO KG 0,822604,572.70.10 0,05000ARAME RECOZIDO N.18 KG 0,231504,633.35.62 0,37000PLAQUETA LAMINADA PARA REVESTIMENTO M2 9,3055025,15

LS 38,26436 BDI 29,08065Mão-de-Obra 31,36423 Material 56,80901SubMO 69,62859

16.04.016 QUADRA DE ESPORTES-PISO DE CONCRETO ARMADO-FUND. DIRETA M2 76,59

1.01.21 0,03750FERREIRO H 0,178884,771.01.22 0,03750AJUDANTE DE FERREIRO H 0,143253,821.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03750PINTOR H 0,176634,711.01.41 0,03750AJUDANTE DE PINTOR H 0,143253,821.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.23 0,08000BRITA GRADUADA M3 5,4448068,062.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.15.07 0,27800BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 0,494841,782.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,18000TELA TELCON Q138 (PAINEL) M2 11,8354010,032.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,912.40.56 0,06000TINTA BETUMINOSA L 0,383406,392.40.91 0,02800SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 0,6081621,722.40.93 0,09200BAGUETE PLASTICO TIPO TARUCEL D=6MM M 0,011960,132.70.10 0,02850ARAME RECOZIDO N.18 KG 0,131964,632.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,442.80.81 0,02830FITA CREPE 25MM X 50M UN 0,130464,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01560TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,094076,038.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,838.01.20 0,00530PLACA VIBRATORIA - 90KG H 0,015322,89

LS 3,07302 BDI 14,32299Mão-de-Obra 2,51887 Material 56,68196SubMO 5,59189

16.04.017 QE-37 TABELA DE BASQUETE (FUNDACAO DIRETA) UN 5.596,12

1.01.11 4,46000CARPINTEIRO H 20,293004,551.01.12 5,97000AJUDANTE DE CARPINTEIRO H 23,641203,961.01.21 10,40000FERREIRO H 49,608004,771.01.22 10,40000AJUDANTE DE FERREIRO H 39,728003,821.01.39 9,11000PEDREIRO H 42,361504,651.01.46 35,02000SERVENTE H 133,426203,812.05.03 0,36300AREIA M3 28,7496079,202.05.08 173,40000CIMENTO KG 64,158000,372.05.18 0,49000PEDRA BRITADA 2 M3 29,9341061,092.05.36 6,95000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 1.761,75550253,492.10.14 4,32000SARRAFO PINHO APARELHADO 5X2,5 CM M 9,028802,092.10.21 1,55000TABUAS PINHO DE 1"X12" DE 3A. M2 26,6290017,182.12.29 3,90000FORMA DE TUBO DE PAPELAO DIAM.30 CM M 276,8220070,982.15.25 117,00000ACO CA-50-A $MD BITOLAS KG 315,900002,702.15.38 3,00000ACO CA-60-B $MD BITOLAS KG 7,950002,652.50.17 50,00000ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL KG 498,500009,972.50.20 50,00000MONTAGEM DE ESTRUTURA METALICA KG 108,500002,172.67.60 0,47000PREGO KG 2,147904,572.70.10 2,10000ARAME RECOZIDO N.18 KG 9,723004,633.67.09 1,00000TABELA DE BASQUETE COM ARO E CESTO UN 631,75000631,753.76.50 52,00000GALVANIZACAO A FOGO KG 92,040001,77

LS 377,05064 BDI 1.046,43018Mão-de-Obra 309,05790 Material 3.863,58790SubMO 686,10854

16.04.019 FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - FUNDO - BROCA M 629,45

1.01.11 0,83000CARPINTEIRO H 3,776504,551.01.12 0,83000AJUDANTE DE CARPINTEIRO H 3,286803,961.01.21 0,63000FERREIRO H 3,005104,771.01.22 0,63000AJUDANTE DE FERREIRO H 2,406603,821.01.39 3,38400PEDREIRO H 15,735604,651.01.40 1,37500PINTOR H 6,476254,711.01.41 1,37500AJUDANTE DE PINTOR H 5,252503,821.01.44 1,50000SERRALHEIRO H 12,120008,081.01.45 1,50000AJUDANTE SERRALHEIRO H 6,510004,341.01.46 7,46000SERVENTE H 28,422603,812.05.03 0,09900AREIA M3 7,8408079,202.05.05 12,80000CAL HIDRATADA KG 4,352000,342.05.08 35,61000CIMENTO KG 13,175700,372.05.18 0,04600PEDRA BRITADA 2 M3 2,8101461,092.05.22 0,00600PEDRISCO M3 0,3966066,10

09/02/2011 11:38:40 Página: 316 de 0

Page 317: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.36 0,11800CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 29,91182253,492.10.09 0,91000PONTALETE PINHO DE 3"X3" M 3,439803,782.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,64000TABUAS PINHO DE 1"X12" DE 3A. M2 10,9952017,182.15.25 7,64000ACO CA-50-A $MD BITOLAS KG 20,628002,702.15.38 2,03000ACO CA-60-B $MD BITOLAS KG 5,379502,652.25.77 13,00000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 24,960001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,08000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,834401,432.40.10 0,20000EMULSAO ADESIVA PVA KG 2,1140010,572.67.60 0,14000PREGO KG 0,639804,572.70.10 0,12000ARAME RECOZIDO N.18 KG 0,555604,632.70.31 0,70000ARAME GALVANIZADO No. 16 KG 5,250007,502.75.09 4,00000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 96,9200024,233.75.07 0,14170TINTA ESMALTE SINTETICO - ALUMINIO L 1,9625513,853.75.13 0,49000TINTA LATEX ECONOMICA L 2,116804,323.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.09 0,39000SELADOR P/PINTURA LATEX L 3,884409,963.80.12 0,28170LIXA PARA FERRO UN 0,402831,433.80.40 0,58000LIXA D"AGUA UN 0,377000,653.80.66 0,08540FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2588014,746.05.15 2,64000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 23,680808,976.05.16 2,46000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 40,5900016,50

LS 106,13018 BDI 117,70205Mão-de-Obra 86,99195 Material 318,62589SubMO 193,12213

16.04.020 FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - FUNDO - SAPATA M 566,09

1.01.11 0,61300CARPINTEIRO H 2,789154,551.01.12 0,61300AJUDANTE DE CARPINTEIRO H 2,427483,961.01.21 0,39100FERREIRO H 1,865074,771.01.22 0,39100AJUDANTE DE FERREIRO H 1,493623,821.01.39 3,35000PEDREIRO H 15,577504,651.01.40 1,37500PINTOR H 6,476254,711.01.41 1,37500AJUDANTE DE PINTOR H 5,252503,821.01.44 1,50000SERRALHEIRO H 12,120008,081.01.45 1,50000AJUDANTE SERRALHEIRO H 6,510004,341.01.46 6,87000SERVENTE H 26,174703,812.05.03 0,10100AREIA M3 7,9992079,202.05.05 12,80000CAL HIDRATADA KG 4,352000,342.05.08 25,43000CIMENTO KG 9,409100,372.05.18 0,02000PEDRA BRITADA 2 M3 1,2218061,092.05.22 0,00600PEDRISCO M3 0,3966066,102.05.36 0,07200CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 18,25128253,492.10.09 0,91000PONTALETE PINHO DE 3"X3" M 3,439803,782.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,25000TABUAS PINHO DE 1"X12" DE 3A. M2 4,2950017,182.15.25 2,46000ACO CA-50-A $MD BITOLAS KG 6,642002,702.15.38 2,04000ACO CA-60-B $MD BITOLAS KG 5,406002,652.25.77 13,00000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 24,960001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,10000PREGO KG 0,457004,572.70.10 0,07800ARAME RECOZIDO N.18 KG 0,361144,632.70.31 0,70000ARAME GALVANIZADO No. 16 KG 5,250007,502.75.09 4,00000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 96,9200024,233.75.07 0,14170TINTA ESMALTE SINTETICO - ALUMINIO L 1,9625513,853.75.13 0,49000TINTA LATEX ECONOMICA L 2,116804,323.75.91 0,00600GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,95136158,563.80.09 0,39000SELADOR P/PINTURA LATEX L 3,884409,963.80.12 0,28170LIXA PARA FERRO UN 0,402831,433.80.40 0,58000LIXA D"AGUA UN 0,377000,653.80.66 0,08540FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2588014,746.05.15 2,64000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 23,680808,976.05.16 2,46000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 40,5900016,50

LS 98,43725 BDI 105,85445Mão-de-Obra 80,68627 Material 281,11323SubMO 179,12352

16.04.031 FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - LATERAIS - BROCA M 432,93

1.01.11 0,60000CARPINTEIRO H 2,730004,551.01.12 0,60000AJUDANTE DE CARPINTEIRO H 2,376003,961.01.21 0,51200FERREIRO H 2,442244,771.01.22 0,51200AJUDANTE DE FERREIRO H 1,955843,821.01.39 1,89300PEDREIRO H 8,802454,651.01.40 0,83200PINTOR H 3,918724,711.01.41 0,83200AJUDANTE DE PINTOR H 3,178243,821.01.44 1,00000SERRALHEIRO H 8,080008,081.01.45 1,00000AJUDANTE SERRALHEIRO H 4,340004,341.01.46 5,28000SERVENTE H 20,116803,81

09/02/2011 11:38:40 Página: 317 de 0

Page 318: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.03 0,07400AREIA M3 5,8608079,202.05.05 5,75000CAL HIDRATADA KG 1,955000,342.05.08 25,28000CIMENTO KG 9,353600,372.05.18 0,03900PEDRA BRITADA 2 M3 2,3825161,092.05.22 0,00600PEDRISCO M3 0,3966066,102.05.36 0,11400CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 28,89786253,492.10.09 0,36000PONTALETE PINHO DE 3"X3" M 1,360803,782.10.14 0,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,672002,092.10.21 0,58000TABUAS PINHO DE 1"X12" DE 3A. M2 9,9644017,182.15.25 6,66000ACO CA-50-A $MD BITOLAS KG 17,982002,702.15.38 1,87000ACO CA-60-B $MD BITOLAS KG 4,955502,652.25.77 5,20000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 9,984001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,08000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 5,834401,432.40.10 0,21000EMULSAO ADESIVA PVA KG 2,2197010,572.67.60 0,10400PREGO KG 0,475284,572.70.10 0,10300ARAME RECOZIDO N.18 KG 0,476894,632.70.31 0,70000ARAME GALVANIZADO No. 16 KG 5,250007,502.75.09 2,40000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 58,1520024,233.75.07 0,14010TINTA ESMALTE SINTETICO - ALUMINIO L 1,9403913,853.75.13 0,19000TINTA LATEX ECONOMICA L 0,820804,323.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.09 0,15000SELADOR P/PINTURA LATEX L 1,494009,963.80.12 0,27890LIXA PARA FERRO UN 0,398831,433.80.40 0,22000LIXA D"AGUA UN 0,143000,653.80.66 0,08430FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2425814,746.05.15 2,64000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 23,680808,976.05.16 1,16000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 19,1400016,50

LS 70,68715 BDI 80,95540Mão-de-Obra 57,94029 Material 223,35253SubMO 128,62744

16.04.034 FQ-02 ALAMBRADO SOBRE DIVISA M2 78,93

1.01.40 0,13810PINTOR H 0,650454,711.01.41 0,13810AJUDANTE DE PINTOR H 0,527543,821.01.44 0,46880SERRALHEIRO H 3,787908,081.01.45 0,46880AJUDANTE SERRALHEIRO H 2,034594,342.70.31 0,21880ARAME GALVANIZADO No. 16 KG 1,641007,502.75.09 1,00000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 24,2300024,233.75.07 0,03910TINTA ESMALTE SINTETICO - ALUMINIO L 0,5415413,853.75.91 0,00400GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,63424158,563.80.12 0,07720LIXA PARA FERRO UN 0,110401,433.80.66 0,02330FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 0,3434414,746.05.15 1,31300TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 11,777618,976.05.16 0,56700TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 9,3555016,50

LS 8,54060 BDI 14,76021Mão-de-Obra 7,00049 Material 48,63372SubMO 15,54109

16.04.035 FQ-04 ALAMBRADO COM PERFIL E TELA SOLDADA - GALVANIZADOS M2 142,60

1.01.39 0,12380PEDREIRO H 0,575674,651.01.40 0,13810PINTOR H 0,650454,711.01.41 0,13810AJUDANTE DE PINTOR H 0,527543,821.01.44 1,50000SERRALHEIRO H 12,120008,081.01.45 1,50000AJUDANTE SERRALHEIRO H 6,510004,341.01.46 0,50000SERVENTE H 1,905003,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 1,36000CIMENTO KG 0,503200,372.05.22 0,00130PEDRISCO M3 0,0859366,102.66.82 1,18000PERFIL "U" ENRIJECIDO 60X45X20MM CH.14 GALV. M 44,2382037,492.67.37 1,60000PARAFUSO FRANCES 5/16"X3/4" C/PORCAS E ARRUELAS GA CJ 0,448000,282.75.04 1,10000TELA ALAMBRADO SOLDADA GALV.FIO 3,0MM MALHA 5X15CM M2 14,1240012,843.10.55 0,11890FIXACAO (FERRO TRABALHADO) KG 4,9557541,683.75.07 0,03910TINTA ESMALTE SINTETICO - ALUMINIO L 0,5415413,853.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.12 0,07720LIXA PARA FERRO UN 0,110401,433.80.66 0,02330FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 0,3434414,74

LS 27,19217 BDI 26,66640Mão-de-Obra 22,28866 Material 66,46006SubMO 49,48083

16.04.036 FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - LATERAIS - SAPATA M 385,67

1.01.11 0,38000CARPINTEIRO H 1,729004,551.01.12 0,38000AJUDANTE DE CARPINTEIRO H 1,504803,961.01.21 0,27400FERREIRO H 1,306984,771.01.22 0,27400AJUDANTE DE FERREIRO H 1,046683,821.01.39 1,92000PEDREIRO H 8,928004,651.01.40 0,83200PINTOR H 3,918724,711.01.41 0,83200AJUDANTE DE PINTOR H 3,178243,821.01.44 1,00000SERRALHEIRO H 8,080008,081.01.45 1,00000AJUDANTE SERRALHEIRO H 4,340004,341.01.46 4,99000SERVENTE H 19,011903,812.05.03 0,20900AREIA M3 16,5528079,20

09/02/2011 11:38:40 Página: 318 de 0

Page 319: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.05 5,75000CAL HIDRATADA KG 1,955000,342.05.08 17,73000CIMENTO KG 6,560100,372.05.18 0,02000PEDRA BRITADA 2 M3 1,2218061,092.05.22 0,00600PEDRISCO M3 0,3966066,102.05.36 0,06500CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 16,47685253,492.10.09 0,36000PONTALETE PINHO DE 3"X3" M 1,360803,782.10.14 0,40000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,836002,092.10.21 0,16000TABUAS PINHO DE 1"X12" DE 3A. M2 2,7488017,182.15.25 1,40000ACO CA-50-A $MD BITOLAS KG 3,780002,702.15.38 1,75000ACO CA-60-B $MD BITOLAS KG 4,637502,652.25.77 5,20000BLOCO CONCRETO 14X19X39CM - 20KGF/CM2 UN 9,984001,922.25.96 2,60000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 6,526002,512.40.09 4,68000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 6,692401,432.40.10 0,23400EMULSAO ADESIVA PVA KG 2,4733810,572.67.60 0,06400PREGO KG 0,292484,572.70.10 0,05400ARAME RECOZIDO N.18 KG 0,250024,632.70.31 0,70000ARAME GALVANIZADO No. 16 KG 5,250007,502.75.09 2,40000TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2" M2 58,1520024,233.75.07 0,14010TINTA ESMALTE SINTETICO - ALUMINIO L 1,9403913,853.75.13 0,19000TINTA LATEX ECONOMICA L 0,820804,323.75.91 0,00500GALVANIZACAO A FRIO (TINTA RICA EM ZINCO) L 0,79280158,563.80.09 0,15000SELADOR P/PINTURA LATEX L 1,494009,963.80.12 0,27890LIXA PARA FERRO UN 0,398831,433.80.40 0,22000LIXA D"AGUA UN 0,143000,653.80.66 0,08430FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,2425814,746.05.15 2,64000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM) M 23,680808,976.05.16 1,16000TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM) M 19,1400016,50

LS 64,71407 BDI 72,11837Mão-de-Obra 53,04432 Material 195,79972SubMO 117,75839

16.04.043 QE-23 ESPACO MULTIESPORTIVO/PISO DE CONCR. ARMADO/FUND. DIRET - 160 M2 UN 12.620,48

1.01.21 6,00000FERREIRO H 28,620004,771.01.22 6,00000AJUDANTE DE FERREIRO H 22,920003,821.01.39 32,00000PEDREIRO H 148,800004,651.01.40 6,00000PINTOR H 28,260004,711.01.41 6,00000AJUDANTE DE PINTOR H 22,920003,821.01.46 32,00000SERVENTE H 121,920003,811.01.55 4,26660OPERADOR H 29,652876,952.05.23 12,80000BRITA GRADUADA M3 871,1680068,062.05.36 12,80000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 3.244,67200253,492.15.07 34,00000BARRA DE TRANSF AÇO LISO D=12,5MM (C=35CM) UN 60,520001,782.15.08 144,00000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 367,200002,552.15.42 189,00000TELA TELCON Q138 (PAINEL) M2 1.895,6700010,032.40.35 176,00000LONA DE PLASTICO PRETO E=0,20MM M2 160,160000,912.40.56 9,52000TINTA BETUMINOSA L 60,832806,392.40.91 18,60000SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30 UN 403,9920021,722.40.93 11,00000BAGUETE PLASTICO TIPO TARUCEL D=6MM M 1,430000,132.70.10 4,60000ARAME RECOZIDO N.18 KG 21,298004,632.80.17 40,00000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 257,200006,432.80.20 7,70000FIBRA DE POLIPROPILENO MONOFILAMENTO KG 165,0880021,442.80.81 6,00000FITA CREPE 25MM X 50M UN 27,660004,613.55.90 160,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 1.750,4000010,943.75.17 2,50000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 15,075006,038.01.16 3,41330ROLO COMPACTADOR LISO 1000KG H 60,8591417,838.01.20 0,85330PLACA VIBRATORIA - 90KG H 2,466042,89

LS 491,77330 BDI 2.359,92814Mão-de-Obra 403,09287 Material 9.365,69098SubMO 894,86617

16.04.099 SERVICOS DE QUADRAS DE ESPORTES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.05.004 CA-05 CANALETA P/ AGUAS PLUVIAIS (L=60CM) M 29,62

1.01.39 0,42000PEDREIRO H 1,953004,651.01.46 0,84000SERVENTE H 3,200403,812.05.30 0,05300CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 12,52125236,252.10.32 0,01000CHAPA COMPENSADA RESINADA E=12MM M2 0,1210012,10

LS 6,28715 BDI 5,53904Mão-de-Obra 5,15340 Material 12,64225SubMO 11,44055

16.05.005 CA-06 CANALETA P/ AGUAS PLUVIAIS (L=90CM) M 43,02

1.01.39 0,53000PEDREIRO H 2,464504,651.01.46 1,24000SERVENTE H 4,724403,812.05.30 0,08000CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 18,90000236,252.10.32 0,01000CHAPA COMPENSADA RESINADA E=12MM M2 0,1210012,10

LS 8,77046 BDI 8,04548Mão-de-Obra 7,18890 Material 19,02100SubMO 15,95936

16.05.012 CA-11 CAIXA DE AREIA COM GRELHA UN 289,47

1.01.11 0,74000CARPINTEIRO H 3,367004,551.01.12 0,74000AJUDANTE DE CARPINTEIRO H 2,930403,96

09/02/2011 11:38:40 Página: 319 de 0

Page 320: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.21 0,07000FERREIRO H 0,333904,771.01.22 0,07000AJUDANTE DE FERREIRO H 0,267403,821.01.39 3,03000PEDREIRO H 14,089504,651.01.46 7,92000SERVENTE H 30,175203,812.05.03 0,08500AREIA M3 6,7320079,202.05.05 6,24000CAL HIDRATADA KG 2,121600,342.05.08 22,94000CIMENTO KG 8,487800,372.05.18 0,03400PEDRA BRITADA 2 M3 2,0770661,092.10.09 1,11000PONTALETE PINHO DE 3"X3" M 4,195803,782.10.21 0,04000TABUAS PINHO DE 1"X12" DE 3A. M2 0,6872017,182.10.32 0,12000CHAPA COMPENSADA RESINADA E=12MM M2 1,4520012,102.15.25 0,81000ACO CA-50-A $MD BITOLAS KG 2,187002,702.25.15 77,00000TIJOLO COMUM MACICO UN 16,940000,222.40.69 0,36000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,903602,512.67.60 0,07000PREGO KG 0,319904,572.70.10 0,01000ARAME RECOZIDO N.18 KG 0,046304,636.76.08 1,00000CA-11 GRELHA DE FERRO 20 X 20 CM UN 75,6100075,61

LS 62,41935 BDI 54,12889Mão-de-Obra 51,16340 Material 121,76026SubMO 113,58275

16.05.030 CA-20 CANALETA DE AGUAS PLUVIAIS EM CONCRETO (15CM) M 87,50

1.01.11 1,45200CARPINTEIRO H 6,606604,551.01.12 1,45200AJUDANTE DE CARPINTEIRO H 5,749923,961.01.39 0,31200PEDREIRO H 1,450804,651.01.46 1,59550SERVENTE H 6,078863,812.05.30 0,05200CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 12,28500236,252.10.14 2,64000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,517602,092.10.32 0,66000CHAPA COMPENSADA RESINADA E=12MM M2 7,9860012,102.67.60 0,26400PREGO KG 1,206484,57

LS 24,26113 BDI 16,36275Mão-de-Obra 19,88618 Material 26,99508SubMO 44,14731

16.05.031 CA-21 CANALETA DE AGUAS PLUVIAIS EM CONCRETO (20CM) M 89,43

1.01.11 1,45200CARPINTEIRO H 6,606604,551.01.12 1,45200AJUDANTE DE CARPINTEIRO H 5,749923,961.01.39 0,33000PEDREIRO H 1,534504,651.01.46 1,67500SERVENTE H 6,381753,812.05.30 0,05500CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 12,99375236,252.10.14 2,64000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,517602,092.10.32 0,66000CHAPA COMPENSADA RESINADA E=12MM M2 7,9860012,102.67.60 0,26400PREGO KG 1,206484,57

LS 24,73278 BDI 16,72316Mão-de-Obra 20,27277 Material 27,70383SubMO 45,00555

16.05.032 CA-22 CANALETA DE AGUAS PLUVIAIS EM CONCRETO (30CM) M 93,34

1.01.11 1,45200CARPINTEIRO H 6,606604,551.01.12 1,45200AJUDANTE DE CARPINTEIRO H 5,749923,961.01.39 0,36600PEDREIRO H 1,701904,651.01.46 1,83950SERVENTE H 7,008503,812.05.30 0,06100CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA M3 14,41125236,252.10.14 2,64000SARRAFO PINHO APARELHADO 5X2,5 CM M 5,517602,092.10.32 0,66000CHAPA COMPENSADA RESINADA E=12MM M2 7,9860012,102.67.60 0,26400PREGO KG 1,206484,57

LS 25,70164 BDI 17,45467Mão-de-Obra 21,06692 Material 29,12133SubMO 46,76855

16.05.036 CANALETA DE CONCRETO 1/2 CANA DN 30CM P/ AGUAS PLUVIAIS M 39,22

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00050AREIA M3 0,0396079,202.05.08 0,22600CIMENTO KG 0,083620,372.05.17 0,03580PEDRA BRITADA 1 M3 2,2170961,936.80.41 1,00000CANALETA CONCRETO 30X100CM (DXC) UN 19,0300019,03

LS 5,78280 BDI 7,33542Mão-de-Obra 4,74000 Material 21,37031SubMO 10,52280

16.05.037 CANALETA DE CONCRETO 1/2 CANA DN 40CM P/ AGUAS PLUVIAIS M 50,83

1.01.39 0,23330PEDREIRO H 1,084854,651.01.46 1,31000SERVENTE H 4,991103,812.05.03 0,00110AREIA M3 0,0871279,202.05.08 0,45500CIMENTO KG 0,168350,372.05.17 0,05030PEDRA BRITADA 1 M3 3,1150861,936.80.40 1,00000CANALETA CONCRETO DIAM 40 CM UN 24,4700024,47

LS 7,41265 BDI 9,50570Mão-de-Obra 6,07595 Material 27,84055SubMO 13,48860

16.05.038 CANALETA DE CONCRETO 1/2 CANA DN 50CM P/ AGUAS PLUVIAIS M 63,48

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 1,76000SERVENTE H 6,705603,812.05.03 0,00160AREIA M3 0,1267279,202.05.08 0,68000CIMENTO KG 0,251600,372.05.17 0,06680PEDRA BRITADA 1 M3 4,1369261,936.80.90 1,00000CANALETA DE CONCRETO 1/2 CANA DN 50CM M 29,6300029,63

09/02/2011 11:38:40 Página: 320 de 0

Page 321: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 9,59908 BDI 11,87086Mão-de-Obra 7,86810 Material 34,14524SubMO 17,46718

16.05.039 CANALETA DE CONCRETO 1/2 CANA DN 60CM P/ AGUAS PLUVIAIS M 87,31

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 2,23000SERVENTE H 8,496303,812.05.03 0,00210AREIA M3 0,1663279,202.05.08 0,90500CIMENTO KG 0,334850,372.05.17 0,08560PEDRA BRITADA 1 M3 5,3012161,936.80.91 1,00000CANALETA DE CONCRETO 1/2 CANA DN 60CM M 43,2300043,23

LS 12,06739 BDI 16,32795Mão-de-Obra 9,89130 Material 49,03238SubMO 21,95869

16.05.040 TC-03 TAMPA DE CONCRETO P/ CANALETA AP (20CM) M 62,30

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,813.65.50 1,70000TC-03 PLACA DE CONCRETO PRE-MOLDADO 59,5X19,5X5CM UN 43,8430025,79

LS 3,74235 BDI 11,65016Mão-de-Obra 3,06750 Material 43,84300SubMO 6,80985

16.05.041 TC-04 TAMPA DE CONCRETO P/ CANALETA AP (25CM) M 73,48

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,813.65.51 1,70000TC-04 PLACA DE CONCRETO PRE-MOLDADO 59,5X24,5X5CM UN 52,9380031,14

LS 3,74235 BDI 13,74201Mão-de-Obra 3,06750 Material 52,93800SubMO 6,80985

16.05.042 TC-05 TAMPA DE CONCRETO P/ CANALETA AP (35CM) M 84,38

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,813.65.52 1,70000TC-05 PLACA DE CONCRETO PRE-MOLDADO 59,5X34,5X5CM UN 61,7950036,35

LS 3,74235 BDI 15,77912Mão-de-Obra 3,06750 Material 61,79500SubMO 6,80985

16.05.043 TC-06 TAMPA EM GRELHA DE FERRO GALVANIZADO P/ CANALETA (20CM) M 308,73

1.01.39 0,66700PEDREIRO H 3,101554,651.01.46 0,66700SERVENTE H 2,541273,812.66.65 2,20000CANTONEIRA DE 1'X1'X1/8' M 6,974003,176.75.68 1,00000TC-06 GRELHA FERRO GALV (PERFIL 3/4"X1/4") L=20CM M 231,50000231,50

LS 6,88424 BDI 57,73024Mão-de-Obra 5,64282 Material 238,47400SubMO 12,52706

16.05.044 TC-07 TAMPA EM GRELHA DE FERRO GALVANIZADO P/ CANALETA (25CM) M 341,32

1.01.39 0,66700PEDREIRO H 3,101554,651.01.46 0,66700SERVENTE H 2,541273,812.66.65 2,20000CANTONEIRA DE 1'X1'X1/8' M 6,974003,176.75.69 1,00000TC-07 GRELHA FERRO GALV (PERFIL 3/4"X1/4") L=25CM M 258,00000258,00

LS 6,88424 BDI 63,82524Mão-de-Obra 5,64282 Material 264,97400SubMO 12,52706

16.05.045 TC-08 TAMPA EM GRELHA DE FERRO GALVANIZADO P/ CANALETA (35CM) M 388,69

1.01.39 0,66700PEDREIRO H 3,101554,651.01.46 0,66700SERVENTE H 2,541273,812.66.65 2,20000CANTONEIRA DE 1'X1'X1/8' M 6,974003,176.75.70 1,00000TC-08 GRELHA FERRO GALV (PERFIL 3/4"X1/4") L=35CM M 296,51000296,51

LS 6,88424 BDI 72,68254Mão-de-Obra 5,64282 Material 303,48400SubMO 12,52706

16.05.046 TC-09 TAMPA DE CONCRETO PRE-MOLDADA PERF. P/ CANALETA L=20CM M 61,02

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,813.65.53 1,70000TC-09 PLACA DE CONCR. PRE-MOLD PERF. 59,5X19,5X5CM UN 42,8060025,18

LS 3,74235 BDI 11,41165Mão-de-Obra 3,06750 Material 42,80600SubMO 6,80985

16.05.047 TC-10 TAMPA DE CONCRETO PRE-MOLDADA PERF. P/ CANALETA L=25CM M 67,59

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,813.65.54 1,70000TC-10 PLACA DE CONCR. PRE-MOLD PERF. 59,5X24,5X5CM UN 48,1440028,32

LS 3,74235 BDI 12,63939Mão-de-Obra 3,06750 Material 48,14400SubMO 6,80985

16.05.048 TC-11 TAMPA DE CONCRETO PRE-MOLDADA PERF. P/ CANALETA L=35CM M 87,85

1.01.39 0,25000PEDREIRO H 1,162504,651.01.46 0,50000SERVENTE H 1,905003,813.65.55 1,70000TC-11 PLACA DE CONCR. PRE-MOLD PERF. 59,5X34,5X5CM UN 64,6170038,01

LS 3,74235 BDI 16,42818Mão-de-Obra 3,06750 Material 64,61700SubMO 6,80985

16.05.099 SERVICOS DE DRENAGENS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.06.001 BC-22 BANCO DE CONCRETO M 173,37

1.01.11 1,38500CARPINTEIRO H 6,301754,551.01.12 1,38500AJUDANTE DE CARPINTEIRO H 5,484603,96

09/02/2011 11:38:40 Página: 321 de 0

Page 322: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.21 0,38000FERREIRO H 1,812604,771.01.22 0,38000AJUDANTE DE FERREIRO H 1,451603,821.01.39 1,29000PEDREIRO H 5,998504,651.01.40 0,64200PINTOR H 3,023824,711.01.41 0,60400AJUDANTE DE PINTOR H 2,307283,821.01.46 1,87000SERVENTE H 7,124703,812.05.03 0,02000AREIA M3 1,5840079,202.05.05 0,07000CAL HIDRATADA KG 0,023800,342.05.08 13,74000CIMENTO KG 5,083800,372.05.18 0,01600PEDRA BRITADA 2 M3 0,9774461,092.05.35 0,07300CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 17,74703243,112.10.21 0,08400TABUAS PINHO DE 1"X12" DE 3A. M2 1,4431217,182.10.32 0,20000CHAPA COMPENSADA RESINADA E=12MM M2 2,4200012,102.15.38 3,78000ACO CA-60-B $MD BITOLAS KG 10,017002,652.25.15 14,00000TIJOLO COMUM MACICO UN 3,080000,223.75.42 0,14700TINTA LATEX STANDARD L 0,948156,453.80.40 0,18000LIXA D"AGUA UN 0,117000,653.80.54 0,11400VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 1,2403210,883.80.55 0,19000VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 3,6176019,046.25.07 1,12000TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 75MM M 18,2784016,32

LS 40,87592 BDI 32,42044Mão-de-Obra 33,50485 Material 66,57766SubMO 74,38077

16.06.010 PG-01 TANQUE DE AREIA/PLAY-GROUND-AREIA M3 142,15

1.01.46 4,30000SERVENTE H 16,383003,812.05.03 1,00000AREIA M3 79,2000079,20

LS 19,98726 BDI 26,58116Mão-de-Obra 16,38300 Material 79,20000SubMO 36,37026

16.06.011 PG-02 TANQUE DE AREIA/PLAY-GROUND-CASCALHO M3 151,73

1.01.46 5,30000SERVENTE H 20,193003,812.05.03 0,25000AREIA M3 19,8000079,202.05.19 1,00000PEDRA BRITADA 3 M3 58,7300058,73

LS 24,63546 BDI 28,37245Mão-de-Obra 20,19300 Material 78,53000SubMO 44,82846

16.06.012 PG-02 TANQUE DE AREIA/PLAY-GROUND-MURETA M 135,39

1.01.39 3,20000PEDREIRO H 14,880004,651.01.46 5,16000SERVENTE H 19,659603,812.05.03 0,06900AREIA M3 5,4648079,202.05.05 5,98000CAL HIDRATADA KG 2,033200,342.05.08 17,42000CIMENTO KG 6,445400,372.25.15 84,00000TIJOLO COMUM MACICO UN 18,480000,222.40.69 0,39000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,978902,51

LS 42,13831 BDI 25,31845Mão-de-Obra 34,53960 Material 33,40230SubMO 76,67791

16.06.015 FL-01 FLOREIRA - CONCRETO M 207,68

1.01.11 4,00000CARPINTEIRO H 18,200004,551.01.12 4,00000AJUDANTE DE CARPINTEIRO H 15,840003,961.01.21 0,67000FERREIRO H 3,195904,771.01.22 0,67000AJUDANTE DE FERREIRO H 2,559403,821.01.39 0,61000PEDREIRO H 2,836504,651.01.46 1,29000SERVENTE H 4,914903,812.05.03 0,04000AREIA M3 3,1680079,202.05.08 19,44000CIMENTO KG 7,192800,372.05.18 0,04800PEDRA BRITADA 2 M3 2,9323261,092.10.21 0,20000TABUAS PINHO DE 1"X12" DE 3A. M2 3,4360017,182.10.32 0,66000CHAPA COMPENSADA RESINADA E=12MM M2 7,9860012,102.15.25 7,80000ACO CA-50-A $MD BITOLAS KG 21,060002,702.25.05 0,60000BLOCO CONCRETO DE 19X39X19CM UN 1,488002,482.40.56 0,55000TINTA BETUMINOSA L 3,514506,392.45.02 0,01600ARGILA EXPANDIDA M3 3,49888218,683.85.11 0,10000TERRA VEGETAL M3 9,0190090,19

LS 58,00697 BDI 38,83531Mão-de-Obra 47,54670 Material 63,29550SubMO 105,55367

16.06.022 MB-03 MASTRO PARA BANDEIRAS CJ 6.375,79

1.01.11 1,94000CARPINTEIRO H 8,827004,551.01.12 1,94000AJUDANTE DE CARPINTEIRO H 7,682403,961.01.39 9,78000PEDREIRO H 45,477004,651.01.46 36,51000SERVENTE H 139,103103,812.05.35 1,34700CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 327,46917243,112.10.21 0,16000TABUAS PINHO DE 1"X12" DE 3A. M2 2,7488017,182.10.32 0,52800CHAPA COMPENSADA RESINADA E=12MM M2 6,3888012,103.67.02 3,00000MASTRO P/BANDEIRA DE ACO 10M - COMPLETO (MB-03) UN 4.400,550001.466,85

LS 245,32919 BDI 1.192,22236Mão-de-Obra 201,08950 Material 4.737,15677SubMO 446,41869

16.06.023 AL-01 ABRIGO PARA LIXO UN 2.650,42

1.01.11 6,05200CARPINTEIRO H 27,536604,551.01.12 6,05200AJUDANTE DE CARPINTEIRO H 23,965923,961.01.18 1,40000ENCANADOR H 7,028005,02

09/02/2011 11:38:40 Página: 322 de 0

Page 323: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,091.01.21 1,03000FERREIRO H 4,913104,771.01.22 1,03000AJUDANTE DE FERREIRO H 3,934603,821.01.39 26,52150PEDREIRO H 123,324984,651.01.40 4,90000PINTOR H 23,079004,711.01.46 43,12100SERVENTE H 164,291013,812.05.03 0,49000AREIA M3 38,8080079,202.05.05 83,61500CAL HIDRATADA KG 28,429100,342.05.08 91,50000CIMENTO KG 33,855000,372.05.35 0,43000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 104,53730243,112.10.21 0,30600TABUAS PINHO DE 1"X12" DE 3A. M2 5,2570817,182.10.32 0,99450CHAPA COMPENSADA RESINADA E=12MM M2 12,0334512,102.15.25 2,25250ACO CA-50-A $MD BITOLAS KG 6,081752,702.15.38 9,20550ACO CA-60-B $MD BITOLAS KG 24,394582,652.25.02 78,00000BLOCO CONCRETO DE 9X39X19CM UN 116,220001,492.67.60 0,60350PREGO KG 2,758004,572.70.10 0,34000ARAME RECOZIDO N.18 KG 1,574204,633.11.38 1,00000AL-01 PORTAO C/ CHAPA PERFURADA GALV 1.20 X 2.40 UN 674,07000674,073.20.01 7,78800AZULEJO LISO BRANCO BRILHANTE M2 177,1770022,753.75.02 0,75000TINTA ESMALTE L 7,470009,963.75.42 1,75000TINTA LATEX STANDARD L 11,287506,453.75.50 0,60000FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS L 11,5260019,213.80.10 1,40000FUNDO PREPARADOR DE PAREDE L 15,5120011,083.80.40 2,10000LIXA D"AGUA UN 1,365000,656.25.31 1,50000TUBO PVC P/ESGOTO 50MM M 6,465004,316.75.01 1,00000CX SIFONADA PVC 150X150X50MM - C/GRELHA ALUMINIO UN 23,9600023,96

LS 468,23503 BDI 495,60749Mão-de-Obra 383,79921 Material 1.302,78095SubMO 852,03424

16.06.035 PI-01 BASE P/PORTICO DE IDENTIFICACAO UN 145,30

1.01.21 0,81000FERREIRO H 3,863704,771.01.22 0,81000AJUDANTE DE FERREIRO H 3,094203,821.01.39 0,98000PEDREIRO H 4,557004,651.01.46 3,65000SERVENTE H 13,906503,812.05.03 0,09800AREIA M3 7,7616079,202.05.08 53,79000CIMENTO KG 19,902300,372.05.17 0,13000PEDRA BRITADA 1 M3 8,0509061,932.15.25 9,35000ACO CA-50-A $MD BITOLAS KG 25,245002,702.70.10 0,16000ARAME RECOZIDO N.18 KG 0,740804,63

LS 31,01411 BDI 27,17131Mão-de-Obra 25,42140 Material 61,70060SubMO 56,43551

16.06.050 CANTEIRO DE OBRAS - LARG 2,20M M2 217,75

1.01.11 1,68200CARPINTEIRO H 7,653104,551.01.12 1,65200AJUDANTE DE CARPINTEIRO H 6,541923,961.01.39 0,98150PEDREIRO H 4,563984,651.01.40 1,06200PINTOR H 5,002024,711.01.41 0,94400AJUDANTE DE PINTOR H 3,606083,821.01.46 3,21360SERVENTE H 12,243823,812.05.03 0,05890AREIA M3 4,6648879,202.05.08 20,74000CIMENTO KG 7,673800,372.05.18 0,18960PEDRA BRITADA 2 M3 11,5826661,092.10.01 2,57250CAIBRO PEROBA DE 5X6CM M 10,984584,272.10.05 0,00300MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 4,187071.395,692.10.32 0,42900CHAPA COMPENSADA RESINADA E=12MM M2 5,1909012,102.10.60 1,81200RIPA DE PEROBA 1X5CM M 4,040762,232.56.61 0,64400TELHA TECNOLOGIA CRFS ONDULADA 6MM M2 8,4428413,112.66.07 0,80000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,392000,492.67.60 0,04950PREGO KG 0,226224,573.75.13 0,59000TINTA LATEX ECONOMICA L 2,548804,323.80.09 0,47200SELADOR P/PINTURA LATEX L 4,701129,963.80.39 0,70800LIXA PARA MADEIRA UN 0,233640,336.96.02 0,10000MODULO DE VERBA MV 24,23500242,35

LS 48,32531 BDI 40,71931Mão-de-Obra 39,61091 Material 89,10426SubMO 87,93622

16.06.051 CANTEIRO DE OBRAS - LARG 3.30M M2 259,90

1.01.11 1,36000CARPINTEIRO H 6,188004,551.01.12 1,34000AJUDANTE DE CARPINTEIRO H 5,306403,961.01.39 0,87000PEDREIRO H 4,045504,651.01.40 0,82800PINTOR H 3,899884,711.01.41 0,73600AJUDANTE DE PINTOR H 2,811523,821.01.46 2,77000SERVENTE H 10,553703,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 18,41000CIMENTO KG 6,811700,372.05.18 0,89000PEDRA BRITADA 2 M3 54,3701061,092.10.01 2,15000CAIBRO PEROBA DE 5X6CM M 9,180504,272.10.05 0,00270MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 3,768361.395,692.10.32 0,33330CHAPA COMPENSADA RESINADA E=12MM M2 4,0329312,102.10.60 1,61000RIPA DE PEROBA 1X5CM M 3,590302,23

09/02/2011 11:38:40 Página: 323 de 0

Page 324: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.56.61 0,58200TELHA TECNOLOGIA CRFS ONDULADA 6MM M2 7,6300213,112.66.07 0,70000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,343000,492.67.60 0,04000PREGO KG 0,182804,573.75.13 0,46000TINTA LATEX ECONOMICA L 1,987204,323.80.09 0,36800SELADOR P/PINTURA LATEX L 3,665289,963.80.39 0,55200LIXA PARA MADEIRA UN 0,182160,336.96.02 0,16000MODULO DE VERBA MV 38,77600242,35

LS 40,02210 BDI 48,60071Mão-de-Obra 32,80500 Material 138,48035SubMO 72,82710

16.06.061 TAPUME MOVEL - H=1,10M M 32,14

1.01.11 0,20880CARPINTEIRO H 0,950044,551.01.12 0,20880AJUDANTE DE CARPINTEIRO H 0,826853,961.01.40 0,13200PINTOR H 0,621724,711.01.41 0,19600AJUDANTE DE PINTOR H 0,748723,822.10.31 1,10000CHAPA COMPENSADA RESINADA E=10MM M2 10,439009,492.10.38 1,50000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 7,845005,232.67.60 0,01710PREGO KG 0,078154,573.75.13 0,18250TINTA LATEX ECONOMICA L 0,788404,32

LS 3,83974 BDI 6,01165Mão-de-Obra 3,14733 Material 19,15055SubMO 6,98707

16.06.062 TAPUME FIXO M2 28,99

1.01.11 0,15660CARPINTEIRO H 0,712534,551.01.12 0,15650AJUDANTE DE CARPINTEIRO H 0,619743,961.01.40 0,12120PINTOR H 0,570854,711.01.41 0,17820AJUDANTE DE PINTOR H 0,680723,822.10.31 1,05000CHAPA COMPENSADA RESINADA E=10MM M2 9,964509,492.10.38 1,36000PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO M 7,112805,232.67.60 0,00800PREGO KG 0,036564,573.75.13 0,16700TINTA LATEX ECONOMICA L 0,721444,32

LS 3,15229 BDI 5,42143Mão-de-Obra 2,58385 Material 17,83530SubMO 5,73614

16.06.065 ANDAIME - FACHADA - ALUGUEL MENSAL M2 6,66

2.12.10 1,00000ANDAIME-FACHADA-ALUGUEL MENSAL M2 5,420005,42

LS 0,00000 BDI 1,24660Mão-de-Obra 0,00000 Material 5,42000SubMO 0,00000

16.06.066 ANDAIME - TORRE - ALUGUEL MENSAL M 16,33

2.12.21 1,00000ANDAIME TIPO TORRE - ALUGUEL MENSAL M 13,2800013,28

LS 0,00000 BDI 3,05440Mão-de-Obra 0,00000 Material 13,28000SubMO 0,00000

16.06.076 FORNECIMENTO E INSTALAÇAO DE PLACAS DE OBRA M2 174,85

1.01.11 0,98000CARPINTEIRO H 4,459004,551.01.12 0,98000AJUDANTE DE CARPINTEIRO H 3,880803,962.10.05 0,03400MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 47,453461.395,692.67.60 0,26000PREGO KG 1,188204,573.87.30 1,00000FORNECIMENTO DE PLACA DE OBRA M2 75,0000075,00

LS 10,17456 BDI 32,69588Mão-de-Obra 8,33980 Material 123,64166SubMO 18,51436

16.06.077 MANUTENÇÃO MENSAL DE PLACAS DE OBRA M2 7,48

1.01.11 0,32200CARPINTEIRO H 1,465104,551.01.12 0,32200AJUDANTE DE CARPINTEIRO H 1,275123,96

LS 3,34307 BDI 1,39916Mão-de-Obra 2,74022 Material 0,00000SubMO 6,08329

16.06.080 TRANSPORTE COM CAMINHAO ATE 6T KM 9,02

2.03.52 1,00000TRANSPORTE COM CAMINHAO ATE 6T KM 7,340007,34

LS 0,00000 BDI 1,68820Mão-de-Obra 0,00000 Material 7,34000SubMO 0,00000

16.06.081 TRANSPORTE COM UTILITARIO ATE 3 T KM 2,04

2.03.53 1,00000TRANSPORTE COM PICK-UP ATE 3T KM 1,660001,66

LS 0,00000 BDI 0,38180Mão-de-Obra 0,00000 Material 1,66000SubMO 0,00000

16.06.082 TRANSPORTE C/ VEICULO COMERCIAL LEVE ATE 1,2 T C/ MOTORISTA KM 2,70

1.01.52 0,08140MOTORISTA H 0,445265,472.03.55 0,06150VEICULO COMERCIAL LEVE ATE 1,2TON INCLUSO IMPOSTOS H 0,7952012,938.81.16 0,16600GASOLINA L 0,413342,49

LS 0,54322 BDI 0,50531Mão-de-Obra 0,44526 Material 1,20853SubMO 0,98847

16.06.086 INSTALAÇÃO DE QUADRO BRANCO (QB-01) UN 11,41

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.46 0,50000SERVENTE H 1,905003,81

LS 5,09960 BDI 2,13431Mão-de-Obra 4,18000 Material 0,00000SubMO 9,27960

16.06.087 INSTALACAO DE FAIXAS DE PROTECAO (FP-03/FP-04) POR REGUA UN 4,56

1.01.11 0,20000CARPINTEIRO H 0,910004,551.01.46 0,20000SERVENTE H 0,762003,81

LS 2,03984 BDI 0,85372Mão-de-Obra 1,67200 Material 0,00000SubMO 3,71184

09/02/2011 11:38:40 Página: 324 de 0

Page 325: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.06.088 INSTALACAO DE FAIXAS DE EXPOSICAO (FP-05) POR REGUA UN 2,28

1.01.11 0,10000CARPINTEIRO H 0,455004,551.01.46 0,10000SERVENTE H 0,381003,81

LS 1,01992 BDI 0,42686Mão-de-Obra 0,83600 Material 0,00000SubMO 1,85592

16.06.089 RS-10 REGUA DE SINALIZACAO - PORTA DA PLATAFORMA UN 25,18

1.01.48 0,15000MARCENEIRO H 1,062007,082.67.39 6,00000PARAFUSO AUTOATARRACHANTE 9,5X2,9MM UN 0,120000,023.87.07 1,00000RS-10 REGUA DE SINALIZACAO - PLATAFORMA UN 18,0000018,00

LS 1,29564 BDI 4,70986Mão-de-Obra 1,06200 Material 18,12000SubMO 2,35764

16.06.090 INSTALACAO DE LOUSA (LG-07) UN 22,82

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.46 1,00000SERVENTE H 3,810003,81

LS 10,19920 BDI 4,26862Mão-de-Obra 8,36000 Material 0,00000SubMO 18,55920

16.06.091 INSTALACAO DE MURAL (MR-02) UN 5,70

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.46 0,25000SERVENTE H 0,952503,81

LS 2,54980 BDI 1,06715Mão-de-Obra 2,09000 Material 0,00000SubMO 4,63980

16.06.092 INSTALACAO DE FOGAO INDUSTRIAL UN 12,43

1.01.18 0,50000ENCANADOR H 2,510005,021.01.19 0,50000AJUDANTE DE ENCANADOR H 2,045004,09

LS 5,55710 BDI 2,32578Mão-de-Obra 4,55500 Material 0,00000SubMO 10,11210

16.06.093 INSTALACAO DE SUPORTE TV/VIDEO UN 5,70

1.01.11 0,25000CARPINTEIRO H 1,137504,551.01.46 0,25000SERVENTE H 0,952503,81

LS 2,54980 BDI 1,06715Mão-de-Obra 2,09000 Material 0,00000SubMO 4,63980

16.06.094 INSTALACAO DE PORTICO DE INDENTIFICACAO UN 5,20

1.01.46 0,50000SERVENTE H 1,905003,81

LS 2,32410 BDI 0,97269Mão-de-Obra 1,90500 Material 0,00000SubMO 4,22910

16.06.095 COLOCACAO DE REGUAS DE SINALIZACAO UN 3,10

1.01.11 0,25000CARPINTEIRO H 1,137504,55

LS 1,38775 BDI 0,58081Mão-de-Obra 1,13750 Material 0,00000SubMO 2,52525

16.06.096 RS-02 REGUA DE SINALIZACAO DE AMBIENTES UN 25,18

1.01.48 0,15000MARCENEIRO H 1,062007,082.67.39 6,00000PARAFUSO AUTOATARRACHANTE 9,5X2,9MM UN 0,120000,023.87.04 1,00000RS-02 REGUA DE SINALIZACAO - AMBIENTES UN 18,0000018,00

LS 1,29564 BDI 4,70986Mão-de-Obra 1,06200 Material 18,12000SubMO 2,35764

16.06.097 RS-05 REGUA DE SINALIZACAO DE SANITARIOS UN 25,18

1.01.48 0,15000MARCENEIRO H 1,062007,082.67.39 6,00000PARAFUSO AUTOATARRACHANTE 9,5X2,9MM UN 0,120000,023.87.05 1,00000RS-05 REGUA DE SINALIZACAO - SANITARIO UN 18,0000018,00

LS 1,29564 BDI 4,70986Mão-de-Obra 1,06200 Material 18,12000SubMO 2,35764

16.06.098 RS-13 REGUA DE SINALIZACAO DE ELEVADOR UN 25,18

1.01.48 0,15000MARCENEIRO H 1,062007,082.67.39 6,00000PARAFUSO AUTOATARRACHANTE 9,5X2,9MM UN 0,120000,023.87.06 1,00000RS-13 REGUA DE SINALIZACAO - ELEVADOR UN 18,0000018,00

LS 1,29564 BDI 4,70986Mão-de-Obra 1,06200 Material 18,12000SubMO 2,35764

16.06.099 SERVICOS DE COMPLEMENTOS EXTERNOS MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.07.001 TR-01 TRONCOS ESCADA UN 650,52

1.01.18 4,90000ENCANADOR H 24,598005,021.01.19 4,90000AJUDANTE DE ENCANADOR H 20,041004,091.01.40 1,05000PINTOR H 4,945504,711.01.41 1,05000AJUDANTE DE PINTOR H 4,011003,821.01.46 2,06400SERVENTE H 7,863843,812.11.05 8,60000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 199,5200023,202.67.84 14,00000ARRUELA 45MM UN 12,600000,903.75.02 0,70000TINTA ESMALTE L 6,972009,963.80.66 0,42000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 6,1908014,746.05.03 10,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 167,1600015,92

LS 74,98040 BDI 121,64298Mão-de-Obra 61,45934 Material 392,44280SubMO 136,43973

16.07.002 TR-02 TRONCOS ESCADA INCLINADA UN 705,33

09/02/2011 11:38:40 Página: 325 de 0

Page 326: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.18 5,60000ENCANADOR H 28,112005,021.01.19 5,60000AJUDANTE DE ENCANADOR H 22,904004,091.01.40 1,20000PINTOR H 5,652004,711.01.41 1,20000AJUDANTE DE PINTOR H 4,584003,821.01.46 2,06400SERVENTE H 7,863843,812.11.05 8,60000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 199,5200023,202.67.84 16,00000ARRUELA 45MM UN 14,400000,903.75.02 0,80000TINTA ESMALTE L 7,968009,963.80.66 0,48000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 7,0752014,746.05.03 12,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 191,0400015,92

LS 84,32133 BDI 131,89128Mão-de-Obra 69,11584 Material 420,00320SubMO 153,43717

16.07.003 TR-03 TRONCOS ESCADA DUPLA UN 1.112,80

1.01.18 9,10000ENCANADOR H 45,682005,021.01.19 9,10000AJUDANTE DE ENCANADOR H 37,219004,091.01.40 1,95000PINTOR H 9,184504,711.01.41 1,95000AJUDANTE DE PINTOR H 7,449003,821.01.46 3,09600SERVENTE H 11,795763,812.11.05 12,90000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 299,2800023,202.67.84 26,00000ARRUELA 45MM UN 23,400000,903.75.02 1,30000TINTA ESMALTE L 12,948009,963.80.66 0,78000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 11,4972014,746.05.03 19,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 310,4400015,92

LS 135,82292 BDI 208,08523Mão-de-Obra 111,33026 Material 657,56520SubMO 247,15318

16.07.004 TR-04 TRONCOS ESCADA INCLINADA DUPLA UN 1.222,41

1.01.18 10,50000ENCANADOR H 52,710005,021.01.19 10,50000AJUDANTE DE ENCANADOR H 42,945004,091.01.40 2,25000PINTOR H 10,597504,711.01.41 2,25000AJUDANTE DE PINTOR H 8,595003,821.01.46 3,09600SERVENTE H 11,795763,812.11.05 12,90000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 299,2800023,202.67.84 30,00000ARRUELA 45MM UN 27,000000,903.75.02 1,50000TINTA ESMALTE L 14,940009,963.80.66 0,90000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 13,2660014,746.05.03 22,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 358,2000015,92

LS 154,50478 BDI 228,58183Mão-de-Obra 126,64326 Material 712,68600SubMO 281,14804

16.07.005 TR-05 TRONCOS BARRAS UN 178,93

1.01.18 0,70000ENCANADOR H 3,514005,021.01.19 0,70000AJUDANTE DE ENCANADOR H 2,863004,091.01.40 0,15000PINTOR H 0,706504,711.01.41 0,15000AJUDANTE DE PINTOR H 0,573003,821.01.46 0,96000SERVENTE H 3,657603,812.11.05 4,00000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 92,8000023,202.67.84 2,00000ARRUELA 45MM UN 1,800000,903.75.02 0,10000TINTA ESMALTE L 0,996009,963.80.66 0,06000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 0,8844014,746.05.03 1,50000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 23,8800015,92

LS 13,80320 BDI 33,45987Mão-de-Obra 11,31410 Material 120,36040SubMO 25,11730

16.07.006 TR-06 TRONCOS BARRA UN 295,80

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,091.01.40 0,30000PINTOR H 1,413004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,821.01.46 1,44000SERVENTE H 5,486403,812.11.05 6,00000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 139,2000023,202.67.84 4,00000ARRUELA 45MM UN 3,600000,903.75.02 0,20000TINTA ESMALTE L 1,992009,963.80.66 0,12000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 1,7688014,746.05.03 3,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 47,7600015,92

LS 25,37527 BDI 55,31396Mão-de-Obra 20,79940 Material 194,32080SubMO 46,17467

16.07.008 TR-08 TRONCOS BARRAS PARALELAS UN 403,40

1.01.18 1,40000ENCANADOR H 7,028005,021.01.19 1,40000AJUDANTE DE ENCANADOR H 5,726004,091.01.40 0,60000PINTOR H 2,826004,711.01.41 0,60000AJUDANTE DE PINTOR H 2,292003,821.01.46 1,72800SERVENTE H 6,583683,812.11.05 7,20000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 167,0400023,202.67.84 4,00000ARRUELA 45MM UN 3,600000,903.75.02 0,40000TINTA ESMALTE L 3,984009,963.80.66 0,24000FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO L 3,5376014,746.05.03 6,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 95,5200015,92

LS 29,83593 BDI 75,43384Mão-de-Obra 24,45568 Material 273,68160SubMO 54,29161

09/02/2011 11:38:40 Página: 326 de 0

Page 327: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.07.009 TR-09 TRONCOS BARRA DE EQUILIBRIO UN 600,64

1.01.18 2,10000ENCANADOR H 10,542005,021.01.19 2,10000AJUDANTE DE ENCANADOR H 8,589004,091.01.46 2,45200SERVENTE H 9,342123,812.11.05 15,80000TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM M 366,5600023,202.67.84 12,00000ARRUELA 45MM UN 10,800000,906.05.03 3,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1") M 47,7600015,92

LS 34,73721 BDI 112,31598Mão-de-Obra 28,47312 Material 425,12000SubMO 63,21033

16.07.015 AM-01 AMARELINHA UN 111,02

1.01.40 4,05000PINTOR H 19,075504,711.01.41 4,05000AJUDANTE DE PINTOR H 15,471003,823.75.17 2,25000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 13,567506,03

LS 42,14673 BDI 20,75997Mão-de-Obra 34,54650 Material 13,56750SubMO 76,69323

16.07.016 BC-16 BANCO RETO-CONCRETO (PASTILHA) UN 351,97

1.01.11 2,56000CARPINTEIRO H 11,648004,551.01.12 2,56000AJUDANTE DE CARPINTEIRO H 10,137603,961.01.21 0,70000FERREIRO H 3,339004,771.01.22 0,70000AJUDANTE DE FERREIRO H 2,674003,821.01.38 0,61200PASTILHEIRO H 3,310925,411.01.39 2,68800PEDREIRO H 12,499204,651.01.40 0,37800PINTOR H 1,780384,711.01.41 0,37800AJUDANTE DE PINTOR H 1,443963,821.01.46 6,05800SERVENTE H 23,080983,812.05.03 0,14390AREIA M3 11,3968879,202.05.05 4,85760CAL HIDRATADA KG 1,651580,342.05.07 0,48240CAULIM KG 0,738071,532.05.08 56,88880CIMENTO KG 21,048860,372.05.09 0,90000CIMENTO BRANCO KG 0,945001,052.05.18 0,09600PEDRA BRITADA 2 M3 5,8646461,092.05.22 0,01680PEDRISCO M3 1,1104866,102.10.09 3,84000PONTALETE PINHO DE 3"X3" M 14,515203,782.10.21 0,12800TABUAS PINHO DE 1"X12" DE 3A. M2 2,1990417,182.10.32 0,42240CHAPA COMPENSADA RESINADA E=12MM M2 5,1110412,102.15.25 8,05000ACO CA-50-A $MD BITOLAS KG 21,735002,702.25.12 6,24000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 12,417601,992.40.56 0,48000TINTA BETUMINOSA L 3,067206,392.40.69 0,14400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,361442,512.67.60 0,25600PREGO KG 1,169924,572.70.10 0,14000ARAME RECOZIDO N.18 KG 0,648204,633.20.25 0,37800PASTILHA ESMALTADA 4,0X 4,0 CM M2 25,7002267,993.75.17 0,21000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,266306,03

LS 85,29513 BDI 65,81584Mão-de-Obra 69,91404 Material 130,94667SubMO 155,20917

16.07.017 BC-17 BANCO RETO-CONCRETO (CERAMICAS) UN 333,90

1.01.11 2,56000CARPINTEIRO H 11,648004,551.01.12 2,56000AJUDANTE DE CARPINTEIRO H 10,137603,961.01.21 0,70000FERREIRO H 3,339004,771.01.22 0,70000AJUDANTE DE FERREIRO H 2,674003,821.01.28 0,54000LADRILHISTA H 2,727005,051.01.39 2,47200PEDREIRO H 11,494804,651.01.40 0,37800PINTOR H 1,780384,711.01.41 0,37800AJUDANTE DE PINTOR H 1,443963,821.01.46 5,78800SERVENTE H 22,052283,812.05.03 0,14780AREIA M3 11,7057679,202.05.05 3,18720CAL HIDRATADA KG 1,083650,342.05.08 59,91640CIMENTO KG 22,169070,372.05.18 0,09600PEDRA BRITADA 2 M3 5,8646461,092.05.22 0,01680PEDRISCO M3 1,1104866,102.10.09 3,84000PONTALETE PINHO DE 3"X3" M 14,515203,782.10.21 0,12800TABUAS PINHO DE 1"X12" DE 3A. M2 2,1990417,182.10.32 0,42240CHAPA COMPENSADA RESINADA E=12MM M2 5,1110412,102.15.25 8,05000ACO CA-50-A $MD BITOLAS KG 21,735002,702.25.12 6,24000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 12,417601,992.40.56 0,48000TINTA BETUMINOSA L 3,067206,392.40.69 0,14400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,361442,512.67.60 0,25600PREGO KG 1,169924,572.70.10 0,14000ARAME RECOZIDO N.18 KG 0,648204,633.45.36 0,37800CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL M2 17,6450446,683.75.17 0,21000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,266306,03

LS 82,10236 BDI 62,43786Mão-de-Obra 67,29702 Material 122,06958SubMO 149,39938

16.07.018 BC-18 BANCO RETO-CONCRETO (CACOS CERAMICOS) UN 313,95

1.01.11 2,56000CARPINTEIRO H 11,648004,551.01.12 2,56000AJUDANTE DE CARPINTEIRO H 10,137603,961.01.21 0,70000FERREIRO H 3,339004,77

09/02/2011 11:38:40 Página: 327 de 0

Page 328: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.22 0,70000AJUDANTE DE FERREIRO H 2,674003,821.01.28 0,54000LADRILHISTA H 2,727005,051.01.39 2,47200PEDREIRO H 11,494804,651.01.40 0,37800PINTOR H 1,780384,711.01.41 0,37800AJUDANTE DE PINTOR H 1,443963,821.01.46 5,79000SERVENTE H 22,059903,812.05.03 0,15630AREIA M3 12,3789679,202.05.05 3,18720CAL HIDRATADA KG 1,083650,342.05.08 60,13960CIMENTO KG 22,251650,372.05.18 0,09600PEDRA BRITADA 2 M3 5,8646461,092.05.22 0,01680PEDRISCO M3 1,1104866,102.10.09 3,84000PONTALETE PINHO DE 3"X3" M 14,515203,782.10.21 0,12800TABUAS PINHO DE 1"X12" DE 3A. M2 2,1990417,182.10.32 0,42240CHAPA COMPENSADA RESINADA E=12MM M2 5,1110412,102.15.25 8,05000ACO CA-50-A $MD BITOLAS KG 21,735002,702.25.12 6,24000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 12,417601,992.40.56 0,48000TINTA BETUMINOSA L 3,067206,392.40.69 0,14400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,361442,512.67.60 0,25600PREGO KG 1,169924,572.70.10 0,14000ARAME RECOZIDO N.18 KG 0,648204,633.45.01 0,36000CACO CERAMICO COLORIDO M2 0,655201,823.75.17 0,21000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,266306,03

LS 82,11166 BDI 58,70792Mão-de-Obra 67,30464 Material 105,83552SubMO 149,41630

16.07.019 BC-19 BANCO CURVO CONCRETO (PASTILHA) UN 395,23

1.01.11 2,98000CARPINTEIRO H 13,559004,551.01.12 2,98000AJUDANTE DE CARPINTEIRO H 11,800803,961.01.21 0,80000FERREIRO H 3,816004,771.01.22 0,80000AJUDANTE DE FERREIRO H 3,056003,821.01.38 0,78200PASTILHEIRO H 4,230625,411.01.39 2,80800PEDREIRO H 13,057204,651.01.40 0,46800PINTOR H 2,204284,711.01.41 0,46800AJUDANTE DE PINTOR H 1,787763,821.01.46 6,39800SERVENTE H 24,376383,812.05.03 0,15200AREIA M3 12,0384079,202.05.05 5,32160CAL HIDRATADA KG 1,809340,342.05.07 0,61640CAULIM KG 0,943091,532.05.08 60,40760CIMENTO KG 22,350810,372.05.09 1,15000CIMENTO BRANCO KG 1,207501,052.05.18 0,10400PEDRA BRITADA 2 M3 6,3533661,092.05.22 0,01680PEDRISCO M3 1,1104866,102.10.09 4,47000PONTALETE PINHO DE 3"X3" M 16,896603,782.10.21 0,14900TABUAS PINHO DE 1"X12" DE 3A. M2 2,5598217,182.10.32 0,49170CHAPA COMPENSADA RESINADA E=12MM M2 5,9495712,102.15.25 9,20000ACO CA-50-A $MD BITOLAS KG 24,840002,702.25.12 6,24000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 12,417601,992.40.56 0,48000TINTA BETUMINOSA L 3,067206,392.40.69 0,14400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,361442,512.67.60 0,29800PREGO KG 1,361864,572.70.10 0,16000ARAME RECOZIDO N.18 KG 0,740804,633.20.25 0,48300PASTILHA ESMALTADA 4,0X 4,0 CM M2 32,8391767,993.75.17 0,26000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,567806,03

LS 95,02341 BDI 73,90505Mão-de-Obra 77,88804 Material 148,41485SubMO 172,91145

16.07.020 BC-20 BANCO CURVO CONCRETO (CERAMICA) UN 372,15

1.01.11 2,98000CARPINTEIRO H 13,559004,551.01.12 2,98000AJUDANTE DE CARPINTEIRO H 11,800803,961.01.21 0,80000FERREIRO H 3,816004,771.01.22 0,80000AJUDANTE DE FERREIRO H 3,056003,821.01.28 0,69000LADRILHISTA H 3,484505,051.01.39 2,53200PEDREIRO H 11,773804,651.01.40 0,46800PINTOR H 2,204284,711.01.41 0,46800AJUDANTE DE PINTOR H 1,787763,821.01.46 6,05300SERVENTE H 23,061933,812.05.03 0,15700AREIA M3 12,4344079,202.05.05 3,18720CAL HIDRATADA KG 1,083650,342.05.08 64,27620CIMENTO KG 23,782190,372.05.18 0,10400PEDRA BRITADA 2 M3 6,3533661,092.05.22 0,01680PEDRISCO M3 1,1104866,102.10.09 4,47000PONTALETE PINHO DE 3"X3" M 16,896603,782.10.21 0,14900TABUAS PINHO DE 1"X12" DE 3A. M2 2,5598217,182.10.32 0,49170CHAPA COMPENSADA RESINADA E=12MM M2 5,9495712,102.15.25 9,20000ACO CA-50-A $MD BITOLAS KG 24,840002,702.25.12 6,24000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 12,417601,992.40.56 0,48000TINTA BETUMINOSA L 3,067206,392.40.69 0,14400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,361442,512.67.60 0,29800PREGO KG 1,361864,57

09/02/2011 11:38:40 Página: 328 de 0

Page 329: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.70.10 0,16000ARAME RECOZIDO N.18 KG 0,740804,633.45.36 0,48300CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL M2 22,5464446,683.75.17 0,26000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,567806,03

LS 90,94377 BDI 69,58904Mão-de-Obra 74,54407 Material 137,07321SubMO 165,48784

16.07.021 BC-21 BANCO CURVO CONCRETO (CACOS CERAMICOS) UN 347,14

1.01.11 2,98000CARPINTEIRO H 13,559004,551.01.12 2,98000AJUDANTE DE CARPINTEIRO H 11,800803,961.01.21 0,80000FERREIRO H 3,816004,771.01.22 0,80000AJUDANTE DE FERREIRO H 3,056003,821.01.28 0,69000LADRILHISTA H 3,484505,051.01.39 2,53200PEDREIRO H 11,773804,651.01.40 0,46800PINTOR H 2,204284,711.01.41 0,46800AJUDANTE DE PINTOR H 1,787763,821.01.46 6,06000SERVENTE H 23,088603,812.05.03 0,17230AREIA M3 13,6461679,202.05.05 3,18720CAL HIDRATADA KG 1,083650,342.05.08 64,56640CIMENTO KG 23,889570,372.05.18 0,10400PEDRA BRITADA 2 M3 6,3533661,092.05.22 0,01680PEDRISCO M3 1,1104866,102.10.09 4,47000PONTALETE PINHO DE 3"X3" M 16,896603,782.10.21 0,14900TABUAS PINHO DE 1"X12" DE 3A. M2 2,5598217,182.10.32 0,49170CHAPA COMPENSADA RESINADA E=12MM M2 5,9495712,102.15.25 9,20000ACO CA-50-A $MD BITOLAS KG 24,840002,702.25.12 6,24000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 12,417601,992.40.56 0,48000TINTA BETUMINOSA L 3,067206,392.40.69 0,14400IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,361442,512.67.60 0,29800PREGO KG 1,361864,572.70.10 0,16000ARAME RECOZIDO N.18 KG 0,740804,633.45.01 0,46000CACO CERAMICO COLORIDO M2 0,837201,823.75.17 0,26000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,567806,03

LS 90,97630 BDI 64,91293Mão-de-Obra 74,57074 Material 116,68311SubMO 165,54704

16.07.031 CR-01 CARACOL UN 448,24

1.01.28 7,00000LADRILHISTA H 35,350005,051.01.40 5,75000PINTOR H 27,082504,711.01.41 5,75000AJUDANTE DE PINTOR H 21,965003,821.01.46 3,57000SERVENTE H 13,601703,812.05.03 0,10880AREIA M3 8,6169679,202.05.08 36,14200CIMENTO KG 13,372540,372.25.37 143,00000TIJOLO REQUEIMADO 10X21CM UN 98,670000,693.60.65 12,50000JUNTAS PLASTICAS COLORIDAS M 8,875000,713.75.17 2,87500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 17,336256,03

LS 119,55902 BDI 83,81866Mão-de-Obra 97,99920 Material 146,87075SubMO 217,55822

16.07.033 FL-03 FLOREIRA / BANCO CIRCULAR GRANILITE DIAM=160CM UN 991,70

1.01.24 1,20000GRANITEIRO H 6,756005,631.01.39 14,50740PEDREIRO H 67,459414,651.01.46 25,03680SERVENTE H 95,390213,812.05.03 0,33380AREIA M3 26,4369679,202.05.05 18,81470CAL HIDRATADA KG 6,397000,342.05.08 117,39490CIMENTO KG 43,436110,372.05.09 27,99000CIMENTO BRANCO KG 29,389501,052.05.18 0,12000PEDRA BRITADA 2 M3 7,3308061,092.25.25 43,55000BLOCO CERAMICO FURADO VEDACAO - 19X19X39 CM UN 85,793501,972.25.27 20,41000BLOCO CERAMICO FURADO VEDACAO - 11.5X19X39 CM UN 25,308401,242.40.56 6,79000TINTA BETUMINOSA L 43,388106,392.40.69 2,77140IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 6,956212,512.41.60 3,11000FORNECIMENTO E APLICACAO DE RESINA ACRILICA M2 31,3488010,083.30.15 3,11000FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 108,4768034,883.60.12 3,11000JUNTA PLASTICA "I" 27MM PARA PISOS M 3,047800,983.60.65 2,40000JUNTAS PLASTICAS COLORIDAS M 1,704000,713.80.38 0,51630PIGMENTO EM PO PARA ARGAMASSA KG 10,7235520,77

LS 206,91885 BDI 185,44026Mão-de-Obra 169,60562 Material 429,73754SubMO 376,52447

16.07.034 FL-04 FLOREIRA / CIRCULAR GRANILITE DIAM=180CM UN 1.599,95

1.01.39 18,18840PEDREIRO H 84,576064,651.01.46 42,79080SERVENTE H 163,032953,812.05.03 0,54250AREIA M3 42,9660079,202.05.05 52,53980CAL HIDRATADA KG 17,863530,342.05.08 143,89860CIMENTO KG 53,242480,372.05.09 64,80000CIMENTO BRANCO KG 68,040001,052.05.18 0,29000PEDRA BRITADA 2 M3 17,7161061,092.25.15 218,40000TIJOLO COMUM MACICO UN 48,048000,222.25.21 47,06000BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM UN 70,119401,492.40.56 10,88000TINTA BETUMINOSA L 69,523206,392.40.69 3,17580IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 7,971262,51

09/02/2011 11:38:40 Página: 329 de 0

Page 330: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.41.60 7,20000FORNECIMENTO E APLICACAO DE RESINA ACRILICA M2 72,5760010,083.30.15 7,20000FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 251,1360034,883.60.12 7,20000JUNTA PLASTICA "I" 27MM PARA PISOS M 7,056000,983.80.38 1,19520PIGMENTO EM PO PARA ARGAMASSA KG 24,8243020,77

LS 302,08299 BDI 299,17808Mão-de-Obra 247,60901 Material 751,08228SubMO 549,69200

16.07.035 FL-05 FLOREIRA CIRCULAR DIAM=110CM UN 627,62

1.01.39 11,62980PEDREIRO H 54,078574,651.01.40 1,50300PINTOR H 7,079134,711.01.41 1,50300AJUDANTE DE PINTOR H 5,741463,821.01.46 22,25910SERVENTE H 84,807173,812.05.03 0,29090AREIA M3 23,0392879,202.05.05 30,85780CAL HIDRATADA KG 10,491650,342.05.08 76,89880CIMENTO KG 28,452560,372.05.18 0,07000PEDRA BRITADA 2 M3 4,2763061,092.25.15 165,90000TIJOLO COMUM MACICO UN 36,498000,222.25.21 25,48000BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM UN 37,965201,492.40.56 3,73000TINTA BETUMINOSA L 23,834706,392.40.69 1,54740IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 3,883972,513.75.17 0,83500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 5,035056,03

LS 185,08172 BDI 117,36090Mão-de-Obra 151,70633 Material 173,47671SubMO 336,78806

16.07.036 FL-06 FLOREIRA RETANGULAR 150X220CM UN 903,21

1.01.39 14,96570PEDREIRO H 69,590514,651.01.40 1,66950PINTOR H 7,863354,711.01.41 1,66950AJUDANTE DE PINTOR H 6,377493,821.01.46 32,32460SERVENTE H 123,156733,812.05.03 0,32120AREIA M3 25,4390479,202.05.05 16,55630CAL HIDRATADA KG 5,629140,342.05.08 114,28600CIMENTO KG 42,285820,372.05.17 0,01560PEDRA BRITADA 1 M3 0,9661161,932.05.92 0,11000SEIXO ROLADO M3 29,27100266,102.25.25 40,30000BLOCO CERAMICO FURADO VEDACAO - 19X19X39 CM UN 79,391001,972.25.27 40,30000BLOCO CERAMICO FURADO VEDACAO - 11.5X19X39 CM UN 49,972001,242.40.56 4,84000TINTA BETUMINOSA L 30,927606,392.40.69 2,12520IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 5,334252,513.75.17 0,92750TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 5,592836,03

LS 252,52544 BDI 168,89413Mão-de-Obra 206,98807 Material 274,80879SubMO 459,51351

16.07.041 LG-06 LOUSA EXTERNA UN 3.544,61

1.01.39 79,32040PEDREIRO H 368,839864,651.01.40 12,67650PINTOR H 59,706324,711.01.41 12,67650AJUDANTE DE PINTOR H 48,424233,821.01.46 110,03640SERVENTE H 419,238683,812.05.03 1,70210AREIA M3 134,8063279,202.05.05 307,15020CAL HIDRATADA KG 104,431070,342.05.08 262,18400CIMENTO KG 97,008080,372.05.18 0,20800PEDRA BRITADA 2 M3 12,7067261,092.25.15 694,40000TIJOLO COMUM MACICO UN 152,768000,222.25.16 458,50000TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM UN 243,005000,533.75.17 1,78750TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 10,778636,033.75.30 6,30600TINTA ESMALTE SINTETICO VERDE ESCOLAR L 81,7257612,963.80.16 6,30600MASSA PARA MADEIRA L 54,988328,72

LS 1.093,37509 BDI 662,81448Mão-de-Obra 896,20909 Material 892,21789SubMO 1.989,58418

16.07.051 MC-01 MESA XADREZ/DAMAS UN 488,47

1.01.11 2,86800CARPINTEIRO H 13,049404,551.01.12 2,86800AJUDANTE DE CARPINTEIRO H 11,357283,961.01.21 2,68000FERREIRO H 12,783604,771.01.22 2,68000AJUDANTE DE FERREIRO H 10,237603,821.01.38 0,44200PASTILHEIRO H 2,391225,411.01.39 1,34600PEDREIRO H 6,258904,651.01.40 0,71000PINTOR H 3,344104,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,821.01.46 3,39200SERVENTE H 12,923523,812.05.03 0,05950AREIA M3 4,7124079,202.05.05 1,20640CAL HIDRATADA KG 0,410180,342.05.07 0,34840CAULIM KG 0,533051,532.05.08 29,07470CIMENTO KG 10,757640,372.05.09 0,74750CIMENTO BRANCO KG 0,784881,052.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.09 3,44000PONTALETE PINHO DE 3"X3" M 13,003203,782.10.14 0,72000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,504802,092.10.21 0,33000TABUAS PINHO DE 1"X12" DE 3A. M2 5,6694017,182.10.31 0,07920CHAPA COMPENSADA RESINADA E=10MM M2 0,751619,492.10.32 0,29700CHAPA COMPENSADA RESINADA E=12MM M2 3,5937012,102.15.25 8,28000ACO CA-50-A $MD BITOLAS KG 22,356002,70

09/02/2011 11:38:40 Página: 330 de 0

Page 331: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.60 0,30000PREGO KG 1,371004,572.70.10 0,14400ARAME RECOZIDO N.18 KG 0,666724,632.80.05 0,06500COLA PVA KG 0,397156,113.12.15 0,80000GRADIL DE FERRO (TIPO PMSP) KG 9,2560011,573.20.25 0,27300PASTILHA ESMALTADA 4,0X 4,0 CM M2 18,5612767,993.75.02 0,12500TINTA ESMALTE L 1,245009,963.80.05 0,02600DISCO DE DESBASTE 7" UN 0,231408,903.80.11 0,11050LIXA CARBETO DE SILICIO 7" UN 0,329292,983.80.12 0,25000LIXA PARA FERRO UN 0,357501,433.80.28 0,07500ZARCAO L 1,2067516,093.80.54 0,09750VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 1,0608010,883.80.55 0,16250VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 3,0940019,046.05.10 1,40000TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM M 126,4620090,33

LS 90,35884 BDI 91,34166Mão-de-Obra 74,06462 Material 232,71421SubMO 164,42346

16.07.052 MC-02 MESA CIRCULOS UN 504,66

1.01.11 2,86800CARPINTEIRO H 13,049404,551.01.12 2,86800AJUDANTE DE CARPINTEIRO H 11,357283,961.01.21 2,68000FERREIRO H 12,783604,771.01.22 2,68000AJUDANTE DE FERREIRO H 10,237603,821.01.24 1,05000GRANITEIRO H 5,911505,631.01.39 0,54000PEDREIRO H 2,511004,651.01.40 0,45000PINTOR H 2,119504,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,821.01.46 3,04900SERVENTE H 11,616693,812.05.03 0,05400AREIA M3 4,2768079,202.05.08 28,40000CIMENTO KG 10,508000,372.05.09 8,10000CIMENTO BRANCO KG 8,505001,052.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.09 3,44000PONTALETE PINHO DE 3"X3" M 13,003203,782.10.14 0,72000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,504802,092.10.21 0,33000TABUAS PINHO DE 1"X12" DE 3A. M2 5,6694017,182.10.31 0,07920CHAPA COMPENSADA RESINADA E=10MM M2 0,751619,492.10.32 0,29700CHAPA COMPENSADA RESINADA E=12MM M2 3,5937012,102.15.25 8,28000ACO CA-50-A $MD BITOLAS KG 22,356002,702.67.60 0,30000PREGO KG 1,371004,572.70.10 0,14400ARAME RECOZIDO N.18 KG 0,666724,633.12.15 0,80000GRADIL DE FERRO (TIPO PMSP) KG 9,2560011,573.30.15 0,90000FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 31,3920034,883.60.12 0,90000JUNTA PLASTICA "I" 27MM PARA PISOS M 0,882000,983.60.65 2,10000JUNTAS PLASTICAS COLORIDAS M 1,491000,713.75.02 0,12500TINTA ESMALTE L 1,245009,963.80.12 0,25000LIXA PARA FERRO UN 0,357501,433.80.28 0,07500ZARCAO L 1,2067516,093.80.38 0,14940PIGMENTO EM PO PARA ARGAMASSA KG 3,1030420,776.05.10 1,40000TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM M 126,4620090,33

LS 86,99280 BDI 94,36862Mão-de-Obra 71,30557 Material 252,00000SubMO 158,29837

16.07.053 MC-03 MESA ONDAS UN 484,39

1.01.11 2,86800CARPINTEIRO H 13,049404,551.01.12 2,86800AJUDANTE DE CARPINTEIRO H 11,357283,961.01.21 2,68000FERREIRO H 12,783604,771.01.22 2,68000AJUDANTE DE FERREIRO H 10,237603,821.01.24 1,05000GRANITEIRO H 5,911505,631.01.39 0,54000PEDREIRO H 2,511004,651.01.40 0,45000PINTOR H 2,119504,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,821.01.46 3,04900SERVENTE H 11,616693,812.05.03 0,05400AREIA M3 4,2768079,202.05.08 28,40000CIMENTO KG 10,508000,372.05.09 8,10000CIMENTO BRANCO KG 8,505001,052.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.09 3,44000PONTALETE PINHO DE 3"X3" M 13,003203,782.10.14 0,72000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,504802,092.10.21 0,33000TABUAS PINHO DE 1"X12" DE 3A. M2 5,6694017,182.10.31 0,07920CHAPA COMPENSADA RESINADA E=10MM M2 0,751619,492.10.32 0,29700CHAPA COMPENSADA RESINADA E=12MM M2 3,5937012,102.15.25 8,28000ACO CA-50-A $MD BITOLAS KG 22,356002,702.67.60 0,30000PREGO KG 1,371004,572.70.10 0,14400ARAME RECOZIDO N.18 KG 0,666724,633.12.15 0,80000GRADIL DE FERRO (TIPO PMSP) KG 9,2560011,573.30.15 0,42750FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM M2 14,9112034,883.60.12 0,90000JUNTA PLASTICA "I" 27MM PARA PISOS M 0,882000,983.60.65 2,10000JUNTAS PLASTICAS COLORIDAS M 1,491000,713.75.02 0,12500TINTA ESMALTE L 1,245009,963.80.12 0,25000LIXA PARA FERRO UN 0,357501,433.80.28 0,07500ZARCAO L 1,2067516,09

09/02/2011 11:38:40 Página: 331 de 0

Page 332: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.80.38 0,14940PIGMENTO EM PO PARA ARGAMASSA KG 3,1030420,776.05.10 1,40000TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM M 126,4620090,33

LS 86,99280 BDI 90,57804Mão-de-Obra 71,30557 Material 235,51920SubMO 158,29837

16.07.054 MC-04 MESA JOGO DA VELHA UN 490,21

1.01.11 2,86800CARPINTEIRO H 13,049404,551.01.12 2,86800AJUDANTE DE CARPINTEIRO H 11,357283,961.01.21 2,68000FERREIRO H 12,783604,771.01.22 2,68000AJUDANTE DE FERREIRO H 10,237603,821.01.39 3,69000PEDREIRO H 17,158504,651.01.40 0,81000PINTOR H 3,815104,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,821.01.46 3,04900SERVENTE H 11,616693,812.05.03 0,05400AREIA M3 4,2768079,202.05.08 28,53500CIMENTO KG 10,557950,372.05.09 0,13500CIMENTO BRANCO KG 0,141751,052.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.09 3,44000PONTALETE PINHO DE 3"X3" M 13,003203,782.10.14 0,72000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,504802,092.10.21 0,33000TABUAS PINHO DE 1"X12" DE 3A. M2 5,6694017,182.10.31 0,07920CHAPA COMPENSADA RESINADA E=10MM M2 0,751619,492.10.32 0,29700CHAPA COMPENSADA RESINADA E=12MM M2 3,5937012,102.15.25 8,28000ACO CA-50-A $MD BITOLAS KG 22,356002,702.67.60 0,30000PREGO KG 1,371004,572.70.10 0,14400ARAME RECOZIDO N.18 KG 0,666724,632.80.05 0,09000COLA PVA KG 0,549906,113.12.15 0,80000GRADIL DE FERRO (TIPO PMSP) KG 9,2560011,573.60.65 4,50000JUNTAS PLASTICAS COLORIDAS M 3,195000,713.75.02 0,12500TINTA ESMALTE L 1,245009,963.80.05 0,03600DISCO DE DESBASTE 7" UN 0,320408,903.80.11 0,15300LIXA CARBETO DE SILICIO 7" UN 0,455942,983.80.12 0,25000LIXA PARA FERRO UN 0,357501,433.80.28 0,07500ZARCAO L 1,2067516,093.80.54 0,13500VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 1,4688010,883.80.55 0,22500VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 4,2840019,046.05.10 1,40000TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM M 126,4620090,33

LS 99,71935 BDI 91,66632Mão-de-Obra 81,73717 Material 217,09270SubMO 181,45652

16.07.055 MC-05 MESA CERAMICA UN 458,69

1.01.11 2,86800CARPINTEIRO H 13,049404,551.01.12 2,86800AJUDANTE DE CARPINTEIRO H 11,357283,961.01.21 2,68000FERREIRO H 12,783604,771.01.22 2,68000AJUDANTE DE FERREIRO H 10,237603,821.01.28 0,13500LADRILHISTA H 0,681755,051.01.39 0,99000PEDREIRO H 4,603504,651.01.40 0,63000PINTOR H 2,967304,711.01.41 0,45000AJUDANTE DE PINTOR H 1,719003,821.01.46 2,91400SERVENTE H 11,102343,812.05.03 0,05400AREIA M3 4,2768079,202.05.08 28,46750CIMENTO KG 10,532980,372.05.09 0,06750CIMENTO BRANCO KG 0,070881,052.05.10 2,25000CIMENTO COLANTE KG 0,765000,342.05.18 0,07200PEDRA BRITADA 2 M3 4,3984861,092.10.09 3,44000PONTALETE PINHO DE 3"X3" M 13,003203,782.10.14 0,72000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,504802,092.10.21 0,33000TABUAS PINHO DE 1"X12" DE 3A. M2 5,6694017,182.10.31 0,07920CHAPA COMPENSADA RESINADA E=10MM M2 0,751619,492.10.32 0,29700CHAPA COMPENSADA RESINADA E=12MM M2 3,5937012,102.15.25 8,28000ACO CA-50-A $MD BITOLAS KG 22,356002,702.67.60 0,30000PREGO KG 1,371004,572.70.10 0,14400ARAME RECOZIDO N.18 KG 0,666724,632.80.05 0,04500COLA PVA KG 0,274956,113.12.15 0,80000GRADIL DE FERRO (TIPO PMSP) KG 9,2560011,573.45.51 0,47250CERAMICA ESMALTADA LISA 20 X 30 CM M2 9,8232820,793.75.02 0,12500TINTA ESMALTE L 1,245009,963.80.05 0,01800DISCO DE DESBASTE 7" UN 0,160208,903.80.11 0,07650LIXA CARBETO DE SILICIO 7" UN 0,227972,983.80.12 0,25000LIXA PARA FERRO UN 0,357501,433.80.28 0,07500ZARCAO L 1,2067516,093.80.54 0,06750VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 0,7344010,883.80.55 0,11250VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 2,1420019,046.05.10 1,40000TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM M 126,4620090,33

LS 83,57216 BDI 85,77264Mão-de-Obra 68,50177 Material 220,85060SubMO 152,07393

16.07.061 MG-01 MURETA C/ GUARDA CORPO METALICO (BLOCOS DE CONCRETO APARENTE) M 505,91

1.01.11 0,57140CARPINTEIRO H 2,599874,551.01.12 0,57140AJUDANTE DE CARPINTEIRO H 2,262743,96

09/02/2011 11:38:40 Página: 332 de 0

Page 333: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.21 0,16430FERREIRO H 0,783714,771.01.22 0,16430AJUDANTE DE FERREIRO H 0,627633,821.01.39 3,60140PEDREIRO H 16,746514,651.01.40 0,77820PINTOR H 3,665324,711.01.41 0,64250AJUDANTE DE PINTOR H 2,454353,821.01.44 3,07140SERRALHEIRO H 24,816918,081.01.45 3,07140AJUDANTE SERRALHEIRO H 13,329884,341.01.46 10,17410SERVENTE H 38,763323,812.05.03 0,11280AREIA M3 8,9337679,202.05.05 10,33320CAL HIDRATADA KG 3,513290,342.05.08 30,23490CIMENTO KG 11,186910,372.05.09 0,02090CIMENTO BRANCO KG 0,021951,052.05.18 0,07210PEDRA BRITADA 2 M3 4,4045961,092.10.09 0,85710PONTALETE PINHO DE 3"X3" M 3,239843,782.10.21 0,02860TABUAS PINHO DE 1"X12" DE 3A. M2 0,4913517,182.10.32 0,09430CHAPA COMPENSADA RESINADA E=12MM M2 1,1410312,102.15.25 1,88930ACO CA-50-A $MD BITOLAS KG 5,101112,702.25.04 6,68570BLOCO CONCRETO DE 14X39X19CM UN 12,836541,922.25.15 22,00000TIJOLO COMUM MACICO UN 4,840000,222.40.56 0,60000TINTA BETUMINOSA L 3,834006,392.40.69 0,55160IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,384522,512.67.60 0,05710PREGO KG 0,260954,572.70.10 0,03290ARAME RECOZIDO N.18 KG 0,152334,632.80.05 0,01390COLA PVA KG 0,084936,113.12.15 0,28570GRADIL DE FERRO (TIPO PMSP) KG 3,3055511,573.75.02 0,06000TINTA ESMALTE L 0,597609,963.75.17 0,31250TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,884386,033.80.05 0,00560DISCO DE DESBASTE 7" UN 0,049848,903.80.11 0,02370LIXA CARBETO DE SILICIO 7" UN 0,070632,983.80.12 0,20000LIXA PARA FERRO UN 0,286001,433.80.28 0,04000ZARCAO L 0,6436016,093.80.54 0,02090VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 0,2273910,883.80.55 0,03480VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 0,6625919,046.05.08 1,99640TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 106,7275453,46

LS 129,38130 BDI 94,60216Mão-de-Obra 106,05024 Material 175,88220SubMO 235,43154

16.07.062 MG-02 MURETA C/ GUARDA CORPO METALICO (BLOCOS CERAMICOS) M 511,87

1.01.11 0,57140CARPINTEIRO H 2,599874,551.01.12 0,57140AJUDANTE DE CARPINTEIRO H 2,262743,961.01.21 0,16430FERREIRO H 0,783714,771.01.22 0,16430AJUDANTE DE FERREIRO H 0,627633,821.01.39 3,65340PEDREIRO H 16,988314,651.01.40 1,01220PINTOR H 4,767464,711.01.41 0,85050AJUDANTE DE PINTOR H 3,248913,821.01.44 3,07140SERRALHEIRO H 24,816918,081.01.45 3,07140AJUDANTE SERRALHEIRO H 13,329884,341.01.46 10,28850SERVENTE H 39,199193,812.05.03 0,11600AREIA M3 9,1872079,202.05.05 10,33320CAL HIDRATADA KG 3,513290,342.05.08 31,49850CIMENTO KG 11,654450,372.05.09 0,02090CIMENTO BRANCO KG 0,021951,052.05.18 0,07210PEDRA BRITADA 2 M3 4,4045961,092.10.09 0,85710PONTALETE PINHO DE 3"X3" M 3,239843,782.10.21 0,02860TABUAS PINHO DE 1"X12" DE 3A. M2 0,4913517,182.10.32 0,09430CHAPA COMPENSADA RESINADA E=12MM M2 1,1410312,102.15.25 1,88930ACO CA-50-A $MD BITOLAS KG 5,101112,702.25.15 22,00000TIJOLO COMUM MACICO UN 4,840000,222.25.29 16,64000TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM UN 9,318400,562.40.56 0,60000TINTA BETUMINOSA L 3,834006,392.40.69 0,55160IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,384522,512.67.60 0,05710PREGO KG 0,260954,572.70.10 0,03290ARAME RECOZIDO N.18 KG 0,152334,632.80.05 0,01390COLA PVA KG 0,084936,113.12.15 0,28570GRADIL DE FERRO (TIPO PMSP) KG 3,3055511,573.75.02 0,06000TINTA ESMALTE L 0,597609,963.75.17 0,31250TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 1,884386,033.75.42 0,13000TINTA LATEX STANDARD L 0,838506,453.80.05 0,00560DISCO DE DESBASTE 7" UN 0,049848,903.80.09 0,10400SELADOR P/PINTURA LATEX L 1,035849,963.80.11 0,02370LIXA CARBETO DE SILICIO 7" UN 0,070632,983.80.12 0,20000LIXA PARA FERRO UN 0,286001,433.80.28 0,04000ZARCAO L 0,6436016,093.80.39 0,15600LIXA PARA MADEIRA UN 0,051480,333.80.54 0,02090VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 0,2273910,883.80.55 0,03480VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 0,6625919,046.05.08 1,99640TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3") M 106,7275453,46

LS 132,52202 BDI 95,71622Mão-de-Obra 108,62461 Material 175,01085SubMO 241,14663

09/02/2011 11:38:40 Página: 333 de 0

Page 334: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.07.081 RV-01 ROSA DOS VENTOS R=180CM UN 125,59

1.01.40 4,58000PINTOR H 21,571804,711.01.41 4,58000AJUDANTE DE PINTOR H 17,495603,823.75.17 2,55000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 15,376506,03

LS 47,66223 BDI 23,48441Mão-de-Obra 39,06740 Material 15,37650SubMO 86,72963

16.07.082 RV-02 ROSA DOS VENTOS R=175CM UN 93,24

1.01.40 3,58000PINTOR H 16,861804,711.01.41 3,58000AJUDANTE DE PINTOR H 13,675603,823.75.17 1,33000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 8,019906,03

LS 37,25563 BDI 17,43697Mão-de-Obra 30,53740 Material 8,01990SubMO 67,79303

16.07.091 SD-01 SOBE/DESCE H=30CM UN 98,42

1.01.11 0,34400CARPINTEIRO H 1,565204,551.01.12 0,32400AJUDANTE DE CARPINTEIRO H 1,283043,961.01.21 0,40000FERREIRO H 1,908004,771.01.22 0,40000AJUDANTE DE FERREIRO H 1,528003,821.01.39 0,36000PEDREIRO H 1,674004,651.01.40 0,11700PINTOR H 0,551074,711.01.41 0,11700AJUDANTE DE PINTOR H 0,446943,821.01.46 1,38400SERVENTE H 5,273043,812.05.03 0,03600AREIA M3 2,8512079,202.05.08 17,20000CIMENTO KG 6,364000,372.05.18 0,04800PEDRA BRITADA 2 M3 2,9323261,092.10.14 0,48000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,003202,092.10.21 0,16800TABUAS PINHO DE 1"X12" DE 3A. M2 2,8862417,182.12.28 0,40000FORMA DE TUBO DE PAPELAO DIAM.20 CM M 18,9720047,432.15.25 4,60000ACO CA-50-A $MD BITOLAS KG 12,420002,702.67.60 0,05200PREGO KG 0,237644,572.70.10 0,08000ARAME RECOZIDO N.18 KG 0,370404,633.75.17 0,06500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,391956,03

LS 17,35973 BDI 18,40413Mão-de-Obra 14,22929 Material 48,42895SubMO 31,58902

16.07.092 SD-02 SOBE/DESCE H=40CM UN 117,05

1.01.11 0,36400CARPINTEIRO H 1,656204,551.01.12 0,33900AJUDANTE DE CARPINTEIRO H 1,342443,961.01.21 0,50000FERREIRO H 2,385004,771.01.22 0,50000AJUDANTE DE FERREIRO H 1,910003,821.01.39 0,42000PEDREIRO H 1,953004,651.01.40 0,14400PINTOR H 0,678244,711.01.41 0,14400AJUDANTE DE PINTOR H 0,550083,821.01.46 1,54400SERVENTE H 5,882643,812.05.03 0,04200AREIA M3 3,3264079,202.05.08 20,50000CIMENTO KG 7,585000,372.05.18 0,05600PEDRA BRITADA 2 M3 3,4210461,092.10.14 0,48000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,003202,092.10.21 0,18000TABUAS PINHO DE 1"X12" DE 3A. M2 3,0924017,182.12.28 0,50000FORMA DE TUBO DE PAPELAO DIAM.20 CM M 23,7150047,432.15.25 5,75000ACO CA-50-A $MD BITOLAS KG 15,525002,702.67.60 0,05300PREGO KG 0,242214,572.70.10 0,10000ARAME RECOZIDO N.18 KG 0,463004,633.75.17 0,08000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,482406,03

LS 19,95627 BDI 21,88899Mão-de-Obra 16,35760 Material 58,85565SubMO 36,31387

16.07.093 SD-03 SOBE/DESCE H=50CM UN 135,69

1.01.11 0,38400CARPINTEIRO H 1,747204,551.01.12 0,35400AJUDANTE DE CARPINTEIRO H 1,401843,961.01.21 0,60000FERREIRO H 2,862004,771.01.22 0,60000AJUDANTE DE FERREIRO H 2,292003,821.01.39 0,48000PEDREIRO H 2,232004,651.01.40 0,17100PINTOR H 0,805414,711.01.41 0,17100AJUDANTE DE PINTOR H 0,653223,821.01.46 1,70400SERVENTE H 6,492243,812.05.03 0,04800AREIA M3 3,8016079,202.05.08 23,80000CIMENTO KG 8,806000,372.05.18 0,06400PEDRA BRITADA 2 M3 3,9097661,092.10.14 0,48000SARRAFO PINHO APARELHADO 5X2,5 CM M 1,003202,092.10.21 0,19200TABUAS PINHO DE 1"X12" DE 3A. M2 3,2985617,182.12.28 0,60000FORMA DE TUBO DE PAPELAO DIAM.20 CM M 28,4580047,432.15.25 6,90000ACO CA-50-A $MD BITOLAS KG 18,630002,702.67.60 0,05400PREGO KG 0,246784,572.70.10 0,12000ARAME RECOZIDO N.18 KG 0,555604,633.75.17 0,09500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,572856,03

LS 22,55281 BDI 25,37385Mão-de-Obra 18,48591 Material 69,28235SubMO 41,03872

16.07.094 TB-01 TEATRO DE BONECOS - MURO UN 2.122,63

09/02/2011 11:38:40 Página: 334 de 0

Page 335: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 40,89280PEDREIRO H 190,151524,651.01.40 12,52800PINTOR H 59,006884,711.01.41 12,52800AJUDANTE DE PINTOR H 47,856963,821.01.46 57,30820SERVENTE H 218,344243,812.05.03 0,83210AREIA M3 65,9023279,202.05.05 121,26890CAL HIDRATADA KG 41,231430,342.05.08 212,10410CIMENTO KG 78,478520,372.05.18 0,14500PEDRA BRITADA 2 M3 8,8580561,092.15.25 2,50000ACO CA-50-A $MD BITOLAS KG 6,750002,702.25.15 378,00000TIJOLO COMUM MACICO UN 83,160000,222.25.21 125,71000BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM UN 187,307901,492.25.96 12,50000BLOCO DE CONCRETO CANALETA 14X19X39CM UN 31,375002,512.40.56 4,95000TINTA BETUMINOSA L 31,630506,392.40.69 1,97460IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 4,956252,513.75.17 6,96000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 41,968806,03

LS 628,73871 BDI 396,91493Mão-de-Obra 515,35960 Material 581,61876SubMO 1.144,09832

16.07.095 TB-02 TEATRO DE BONECOS - PISO UN 104,60

1.01.40 3,81600PINTOR H 17,973364,711.01.41 3,81600AJUDANTE DE PINTOR H 14,577123,823.75.17 2,12000TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 12,783606,03

LS 39,71159 BDI 19,56050Mão-de-Obra 32,55048 Material 12,78360SubMO 72,26207

16.08.034 FS-05 FOSSA SEPTICA ANEIS CONCR. DN=1,4M H=1,5M UN 2.765,06

1.01.11 1,46000CARPINTEIRO H 6,643004,551.01.12 1,46000AJUDANTE DE CARPINTEIRO H 5,781603,961.01.18 3,40000ENCANADOR H 17,068005,021.01.19 3,40000AJUDANTE DE ENCANADOR H 13,906004,091.01.21 5,70000FERREIRO H 27,189004,771.01.22 5,70000AJUDANTE DE FERREIRO H 21,774003,821.01.39 18,39000PEDREIRO H 85,513504,651.01.42 10,20000POCEIRO H 45,900004,501.01.46 57,50000SERVENTE H 219,075003,812.05.03 0,02000AREIA M3 1,5840079,202.05.17 0,38000PEDRA BRITADA 1 M3 23,5334061,932.05.35 0,70000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 170,17700243,112.05.96 21,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 33,600001,602.10.17 3,00000SARRAFO PINHO APARELHADO 10X2,5 CM M 13,680004,562.10.21 0,70000TABUAS PINHO DE 1"X12" DE 3A. M2 12,0260017,182.15.25 62,10000ACO CA-50-A $MD BITOLAS KG 167,670002,702.15.38 0,90000ACO CA-60-B $MD BITOLAS KG 2,385002,652.67.23 2,00000PARAFUSO 3/16' 2,5CM UN 0,180000,092.67.60 0,27000PREGO KG 1,233904,572.67.78 0,00200BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,001480,742.70.10 1,14000ARAME RECOZIDO N.18 KG 5,278204,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 1,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 4,000004,006.02.36 1,00000FS-05 FOSSA EM ANEIS CONCR. DN=1,4M H=1,5M COMPLET UN 651,51000651,516.25.34 2,00000TUBO PVC P/ESGOTO 150MM M 28,2000014,106.26.74 4,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM UN 15,280003,826.26.77 1,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 3,480003,486.26.85 2,50000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 67,4250026,976.70.21 10,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 21,200002,12

LS 540,27712 BDI 517,04488Mão-de-Obra 442,85010 Material 1.264,89398SubMO 983,12722

16.08.050 FA-01 FILTRO ANAEROBICO DN=1,40M H=2,00M UN 3.349,39

1.01.11 1,82000CARPINTEIRO H 8,281004,551.01.12 1,82000AJUDANTE DE CARPINTEIRO H 7,207203,961.01.18 4,65000ENCANADOR H 23,343005,021.01.19 4,65000AJUDANTE DE ENCANADOR H 19,018504,091.01.21 7,05000FERREIRO H 33,628504,771.01.22 7,05000AJUDANTE DE FERREIRO H 26,931003,821.01.39 18,39000PEDREIRO H 85,513504,651.01.42 13,57000POCEIRO H 61,065004,501.01.46 60,79000SERVENTE H 231,609903,812.05.03 0,02000AREIA M3 1,5840079,202.05.17 0,38000PEDRA BRITADA 1 M3 23,5334061,932.05.20 1,15000PEDRA BRITADA 4 M3 72,2430062,822.05.35 0,87000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 211,50570243,112.05.96 26,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 41,600001,602.10.17 3,30000SARRAFO PINHO APARELHADO 10X2,5 CM M 15,048004,562.10.21 0,82500TABUAS PINHO DE 1"X12" DE 3A. M2 14,1735017,182.15.25 76,00000ACO CA-50-A $MD BITOLAS KG 205,200002,702.15.38 2,00000ACO CA-60-B $MD BITOLAS KG 5,300002,652.67.23 6,00000PARAFUSO 3/16' 2,5CM UN 0,540000,092.67.60 0,33000PREGO KG 1,508104,572.67.78 0,06000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,044400,74

09/02/2011 11:38:40 Página: 335 de 0

Page 336: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.70.10 1,56000ARAME RECOZIDO N.18 KG 7,222804,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 1,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 4,000004,006.02.30 1,00000FA-01 FILTRO ANEIS CONCRETO DN=1,4M H=2,0M COMPLET UN 799,26000799,266.26.77 4,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 13,920003,486.26.85 3,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 80,9100026,976.26.86 1,50000TUBO PVC RIGIDO ESGOTO DIAM 250 MM (10") M 48,7950032,536.70.21 15,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 31,800002,12

LS 605,84907 BDI 626,30945Mão-de-Obra 496,59760 Material 1.620,63790SubMO 1.102,44667

16.08.051 FA-02 FILTRO ANAEROBICO DN=2,00M H=2,00M UN 5.771,76

1.01.11 2,35000CARPINTEIRO H 10,692504,551.01.12 2,35000AJUDANTE DE CARPINTEIRO H 9,306003,961.01.18 4,65000ENCANADOR H 23,343005,021.01.19 4,65000AJUDANTE DE ENCANADOR H 19,018504,091.01.21 12,80000FERREIRO H 61,056004,771.01.22 12,80000AJUDANTE DE FERREIRO H 48,896003,821.01.39 26,50000PEDREIRO H 123,225004,651.01.42 23,49000POCEIRO H 105,705004,501.01.46 107,01000SERVENTE H 407,708103,812.05.03 0,02800AREIA M3 2,2176079,202.05.17 0,58000PEDRA BRITADA 1 M3 35,9194061,932.05.20 2,36000PEDRA BRITADA 4 M3 148,2552062,822.05.35 1,43000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 347,64730243,112.05.96 37,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 59,200001,602.10.17 4,30000SARRAFO PINHO APARELHADO 10X2,5 CM M 19,608004,562.10.21 1,07000TABUAS PINHO DE 1"X12" DE 3A. M2 18,3826017,182.15.25 125,00000ACO CA-50-A $MD BITOLAS KG 337,500002,702.15.38 3,00000ACO CA-60-B $MD BITOLAS KG 7,950002,652.67.23 6,00000PARAFUSO 3/16' 2,5CM UN 0,540000,092.67.60 0,45000PREGO KG 2,056504,572.67.78 0,06000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,044400,742.70.10 2,66000ARAME RECOZIDO N.18 KG 12,315804,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 1,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 4,000004,006.02.31 1,00000FA-02 FILTRO ANEIS CONCRETO DN=2,0M H=2,0M COMPLET UN 1.652,990001.652,996.26.77 4,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 13,920003,486.26.85 3,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 80,9100026,976.26.86 2,10000TUBO PVC RIGIDO ESGOTO DIAM 250 MM (10") M 68,3130032,536.70.21 20,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 42,400002,12

LS 986,91912 BDI 1.079,27248Mão-de-Obra 808,95010 Material 2.896,61980SubMO 1.795,86922

16.08.060 CD-01 CAIXA DE DISTRIBUICAO /2 CAMARAS UN 341,11

1.01.11 0,96000CARPINTEIRO H 4,368004,551.01.12 0,96000AJUDANTE DE CARPINTEIRO H 3,801603,961.01.21 0,07300FERREIRO H 0,348214,771.01.22 0,07300AJUDANTE DE FERREIRO H 0,278863,821.01.39 4,98000PEDREIRO H 23,157004,651.01.46 10,18000SERVENTE H 38,785803,812.05.03 0,13600AREIA M3 10,7712079,202.05.05 15,30000CAL HIDRATADA KG 5,202000,342.05.08 28,28000CIMENTO KG 10,463600,372.05.35 0,07300CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 17,74703243,112.10.21 0,37000TABUAS PINHO DE 1"X12" DE 3A. M2 6,3566017,182.15.25 6,46000ACO CA-50-A $MD BITOLAS KG 17,442002,702.15.38 0,84000ACO CA-60-B $MD BITOLAS KG 2,226002,652.25.15 216,00000TIJOLO COMUM MACICO UN 47,520000,222.40.69 0,48000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,204802,512.67.60 0,14800PREGO KG 0,676364,572.70.10 0,14600ARAME RECOZIDO N.18 KG 0,675984,63

LS 86,30215 BDI 63,78525Mão-de-Obra 70,73947 Material 120,28557SubMO 157,04162

16.08.061 CD-02 CAIXA DE DISTRIBUICAO /3 CAMARAS UN 464,54

1.01.11 1,36000CARPINTEIRO H 6,188004,551.01.12 1,36000AJUDANTE DE CARPINTEIRO H 5,385603,961.01.21 1,02400FERREIRO H 4,884484,771.01.22 1,02400AJUDANTE DE FERREIRO H 3,911683,821.01.39 6,11100PEDREIRO H 28,416154,651.01.46 12,58000SERVENTE H 47,929803,812.05.03 0,18000AREIA M3 14,2560079,202.05.05 17,64000CAL HIDRATADA KG 5,997600,342.05.08 43,26000CIMENTO KG 16,006200,372.05.35 0,10240CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 24,89446243,112.10.21 0,52300TABUAS PINHO DE 1"X12" DE 3A. M2 8,9851417,182.15.25 9,01000ACO CA-50-A $MD BITOLAS KG 24,327002,702.15.38 1,23000ACO CA-60-B $MD BITOLAS KG 3,259502,652.25.15 280,00000TIJOLO COMUM MACICO UN 61,600000,22

09/02/2011 11:38:40 Página: 336 de 0

Page 337: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.40.69 0,69000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 1,731902,512.67.60 0,21000PREGO KG 0,959704,572.70.10 0,20500ARAME RECOZIDO N.18 KG 0,949154,63

LS 117,99317 BDI 86,86537Mão-de-Obra 96,71571 Material 162,96665SubMO 214,70888

16.08.062 CD-03 CAIXA DE DISTRIBUICAO /4 CAMARAS UN 584,58

1.01.11 1,75000CARPINTEIRO H 7,962504,551.01.12 1,75000AJUDANTE DE CARPINTEIRO H 6,930003,961.01.21 1,32300FERREIRO H 6,310714,771.01.22 1,32300AJUDANTE DE FERREIRO H 5,053863,821.01.39 7,95300PEDREIRO H 36,981454,651.01.46 15,86400SERVENTE H 60,441843,812.05.03 0,22000AREIA M3 17,4240079,202.05.05 24,03600CAL HIDRATADA KG 8,172240,342.05.08 47,43600CIMENTO KG 17,551320,372.05.35 0,13230CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 32,16345243,112.10.21 0,67000TABUAS PINHO DE 1"X12" DE 3A. M2 11,5106017,182.15.25 11,52000ACO CA-50-A $MD BITOLAS KG 31,104002,702.15.38 1,71000ACO CA-60-B $MD BITOLAS KG 4,531502,652.25.15 336,00000TIJOLO COMUM MACICO UN 73,920000,222.40.69 0,80500IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 2,020552,512.67.60 0,27000PREGO KG 1,233904,572.70.10 0,23040ARAME RECOZIDO N.18 KG 1,066754,63

LS 150,89004 BDI 109,31180Mão-de-Obra 123,68036 Material 200,69832SubMO 274,57040

16.08.065 FS-06-01 FOSSA SEPTICA L=3,00M VOL. UTIL = 7,56M3 UN 10.654,34

1.01.11 12,74000CARPINTEIRO H 57,967004,551.01.12 12,74000AJUDANTE DE CARPINTEIRO H 50,450403,961.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,091.01.21 28,60000FERREIRO H 136,422004,771.01.22 28,60000AJUDANTE DE FERREIRO H 109,252003,821.01.39 57,00000PEDREIRO H 265,050004,651.01.46 457,00000SERVENTE H 1.741,170003,812.05.03 2,93000AREIA M3 232,0560079,202.05.05 218,00000CAL HIDRATADA KG 74,120000,342.05.08 870,00000CIMENTO KG 321,900000,372.05.18 0,44000PEDRA BRITADA 2 M3 26,8796061,092.05.22 0,62000PEDRISCO M3 40,9820066,102.05.35 1,48000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 359,80280243,112.10.14 23,16000SARRAFO PINHO APARELHADO 5X2,5 CM M 48,404402,092.10.21 5,79000TABUAS PINHO DE 1"X12" DE 3A. M2 99,4722017,182.15.25 287,00000ACO CA-50-A $MD BITOLAS KG 774,900002,702.15.38 6,00000ACO CA-60-B $MD BITOLAS KG 15,900002,652.25.76 382,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 1.165,100003,052.25.80 25,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 49,250001,972.67.47 4,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 2,000000,502.67.60 2,32000PREGO KG 10,602404,572.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.70.10 5,14000ARAME RECOZIDO N.18 KG 23,798204,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,456.25.33 4,00000TUBO PVC P/ESGOTO 100MM M 24,000006,006.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 2,70000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 72,8190026,97

LS 2.896,25121 BDI 1.992,27578Mão-de-Obra 2.373,97640 Material 3.391,84100SubMO 5.270,22761

16.08.066 FS-06-02 FOSSA SEPTICA L=3,80M VOL. UTIL = 9,58M3 UN 12.084,99

1.01.11 15,00000CARPINTEIRO H 68,250004,551.01.12 15,00000AJUDANTE DE CARPINTEIRO H 59,400003,961.01.18 1,50000ENCANADOR H 7,530005,021.01.19 1,50000AJUDANTE DE ENCANADOR H 6,135004,091.01.21 33,70000FERREIRO H 160,749004,771.01.22 33,70000AJUDANTE DE FERREIRO H 128,734003,821.01.39 65,00000PEDREIRO H 302,250004,651.01.46 512,00000SERVENTE H 1.950,720003,812.05.03 3,21000AREIA M3 254,2320079,202.05.05 247,00000CAL HIDRATADA KG 83,980000,342.05.08 945,00000CIMENTO KG 349,650000,372.05.18 0,48000PEDRA BRITADA 2 M3 29,3232061,092.05.22 0,68000PEDRISCO M3 44,9480066,102.05.35 1,75000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 425,44250243,112.10.14 27,38000SARRAFO PINHO APARELHADO 5X2,5 CM M 57,224202,092.10.21 6,85000TABUAS PINHO DE 1"X12" DE 3A. M2 117,6830017,182.15.25 330,00000ACO CA-50-A $MD BITOLAS KG 891,000002,702.15.38 7,00000ACO CA-60-B $MD BITOLAS KG 18,550002,652.25.76 444,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 1.354,200003,052.25.80 25,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 49,250001,97

09/02/2011 11:38:40 Página: 337 de 0

Page 338: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.67.47 4,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 2,000000,502.67.60 2,74000PREGO KG 12,521804,572.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.70.10 6,60000ARAME RECOZIDO N.18 KG 30,558004,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,456.25.33 4,00000TUBO PVC P/ESGOTO 100MM M 24,000006,006.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 2,70000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 72,8190026,97

LS 3.274,19696 BDI 2.259,79624Mão-de-Obra 2.683,76800 Material 3.867,23610SubMO 5.957,96496

16.08.067 FS-06-03 FOSSA SEPTICA L=5,40M VOL. UTIL = 13,61M3 UN 15.538,08

1.01.11 20,24000CARPINTEIRO H 92,092004,551.01.12 20,24000AJUDANTE DE CARPINTEIRO H 80,150403,961.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,091.01.21 43,00000FERREIRO H 205,110004,771.01.22 43,00000AJUDANTE DE FERREIRO H 164,260003,821.01.39 85,25000PEDREIRO H 396,412504,651.01.46 646,50000SERVENTE H 2.463,165003,812.05.03 4,20000AREIA M3 332,6400079,202.05.05 324,50000CAL HIDRATADA KG 110,330000,342.05.08 1.231,00000CIMENTO KG 455,470000,372.05.18 0,63000PEDRA BRITADA 2 M3 38,4867061,092.05.22 0,85000PEDRISCO M3 56,1850066,102.05.35 2,29000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 556,72190243,112.10.14 36,80000SARRAFO PINHO APARELHADO 5X2,5 CM M 76,912002,092.10.21 9,20000TABUAS PINHO DE 1"X12" DE 3A. M2 158,0560017,182.15.25 422,00000ACO CA-50-A $MD BITOLAS KG 1.139,400002,702.15.38 9,00000ACO CA-60-B $MD BITOLAS KG 23,850002,652.25.76 570,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 1.738,500003,052.25.80 38,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 74,860001,972.67.47 4,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 2,000000,502.67.60 3,68000PREGO KG 16,817604,572.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.70.10 8,44000ARAME RECOZIDO N.18 KG 39,077204,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,456.25.33 4,00000TUBO PVC P/ESGOTO 100MM M 24,000006,006.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 5,50000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 148,3350026,97

LS 4.171,68008 BDI 2.905,49473Mão-de-Obra 3.419,40990 Material 5.041,49580SubMO 7.591,08998

16.08.068 FS-07-01 FOSSA SEPTICA L=4,80M VOL. UTIL = 20,74M3 UN 15.782,66

1.01.11 22,50000CARPINTEIRO H 102,375004,551.01.12 22,50000AJUDANTE DE CARPINTEIRO H 89,100003,961.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,091.01.21 26,10000FERREIRO H 124,497004,771.01.22 26,10000AJUDANTE DE FERREIRO H 99,702003,821.01.39 85,34000PEDREIRO H 396,831004,651.01.46 700,10000SERVENTE H 2.667,381003,812.05.03 3,95700AREIA M3 313,3944079,202.05.05 288,29000CAL HIDRATADA KG 98,018600,342.05.08 1.168,48000CIMENTO KG 432,337600,372.05.18 0,86400PEDRA BRITADA 2 M3 52,7817661,092.05.22 0,75300PEDRISCO M3 49,7733066,102.05.35 3,24000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 787,67640243,112.10.14 40,92000SARRAFO PINHO APARELHADO 5X2,5 CM M 85,522802,092.10.21 10,23000TABUAS PINHO DE 1"X12" DE 3A. M2 175,7514017,182.15.25 357,00000ACO CA-50-A $MD BITOLAS KG 963,900002,702.15.38 11,00000ACO CA-60-B $MD BITOLAS KG 29,150002,652.25.76 574,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 1.750,700003,052.25.80 38,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 74,860001,972.67.47 4,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 2,000000,502.67.60 4,09000PREGO KG 18,691304,572.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.70.10 1,92000ARAME RECOZIDO N.18 KG 8,889604,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,456.25.33 4,00000TUBO PVC P/ESGOTO 100MM M 24,000006,006.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 5,50000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 148,3350026,97

LS 4.267,68932 BDI 2.951,22933Mão-de-Obra 3.498,10600 Material 5.065,63656SubMO 7.765,79532

16.08.069 FS-07-02 FOSSA SEPTICA L=5,80M VOL. UTIL = 25,06M3 UN 17.955,01

1.01.11 26,20000CARPINTEIRO H 119,210004,551.01.12 26,20000AJUDANTE DE CARPINTEIRO H 103,752003,961.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,09

09/02/2011 11:38:40 Página: 338 de 0

Page 339: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.21 29,60000FERREIRO H 141,192004,771.01.22 29,60000AJUDANTE DE FERREIRO H 113,072003,821.01.39 97,40000PEDREIRO H 452,910004,651.01.46 799,10000SERVENTE H 3.044,571003,812.05.03 4,51600AREIA M3 357,6672079,202.05.05 326,48000CAL HIDRATADA KG 111,003200,342.05.08 1.336,96000CIMENTO KG 494,675200,372.05.18 1,00800PEDRA BRITADA 2 M3 61,5787261,092.05.22 0,86000PEDRISCO M3 56,8460066,102.05.35 3,75000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 911,66250243,112.10.14 47,64000SARRAFO PINHO APARELHADO 5X2,5 CM M 99,567602,092.10.21 11,91000TABUAS PINHO DE 1"X12" DE 3A. M2 204,6138017,182.15.25 405,00000ACO CA-50-A $MD BITOLAS KG 1.093,500002,702.15.38 12,00000ACO CA-60-B $MD BITOLAS KG 31,800002,652.25.76 649,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 1.979,450003,052.25.80 38,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 74,860001,972.67.47 4,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 2,000000,502.67.60 4,76400PREGO KG 21,771484,572.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.70.10 2,18000ARAME RECOZIDO N.18 KG 10,093404,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,456.25.33 4,00000TUBO PVC P/ESGOTO 100MM M 24,000006,006.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 5,50000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 148,3350026,97

LS 4.871,37094 BDI 3.357,44258Mão-de-Obra 3.992,92700 Material 5.733,27850SubMO 8.864,29794

16.08.070 FS-07-03 FOSSA SEPTICA L=6,40M VOL. UTIL = 29,38M3 UN 19.771,45

1.01.11 29,81000CARPINTEIRO H 135,635504,551.01.12 29,81000AJUDANTE DE CARPINTEIRO H 118,047603,961.01.18 2,00000ENCANADOR H 10,040005,021.01.19 2,00000AJUDANTE DE ENCANADOR H 8,180004,091.01.21 32,80000FERREIRO H 156,456004,771.01.22 32,80000AJUDANTE DE FERREIRO H 125,296003,821.01.39 106,07000PEDREIRO H 493,225504,651.01.46 887,35000SERVENTE H 3.380,803503,812.05.03 4,93460AREIA M3 390,8203279,202.05.05 353,05000CAL HIDRATADA KG 120,037000,342.05.08 1.468,58000CIMENTO KG 543,374600,372.05.18 1,09400PEDRA BRITADA 2 M3 66,8324661,092.05.22 0,95200PEDRISCO M3 62,9272066,102.05.35 4,13000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 1.004,04430243,112.10.14 54,20000SARRAFO PINHO APARELHADO 5X2,5 CM M 113,278002,092.10.21 13,55000TABUAS PINHO DE 1"X12" DE 3A. M2 232,7890017,182.15.25 447,00000ACO CA-50-A $MD BITOLAS KG 1.206,900002,702.15.38 14,00000ACO CA-60-B $MD BITOLAS KG 37,100002,652.25.76 699,00000BLOCO CONCR ESTRUTURAL 19X19X39CM UN 2.131,950003,052.25.80 38,00000BLOCO CONCRETO (9/14/19)X19X39 $MD UN 74,860001,972.67.47 4,00000PARAFUSO INOX AUTO-ATARR SEXT M6X50 UN 2,000000,502.67.60 5,42000PREGO KG 24,769404,572.67.77 0,04000BUCHA TIPO S-8 (CENTO) UN 0,4444011,112.70.10 2,38000ARAME RECOZIDO N.18 KG 11,019404,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,456.25.33 4,00000TUBO PVC P/ESGOTO 100MM M 24,000006,006.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 5,50000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 148,3350026,97

LS 5.401,77460 BDI 3.697,10045Mão-de-Obra 4.427,68410 Material 6.244,89108SubMO 9.829,45870

16.08.071 FS-08-01 FOSSA SEPTICA ANEIS CONCRETO DN=2,4M H=2,0M UN 6.737,29

1.01.11 3,22000CARPINTEIRO H 14,651004,551.01.12 3,22000AJUDANTE DE CARPINTEIRO H 12,751203,961.01.18 4,00000ENCANADOR H 20,080005,021.01.19 4,00000AJUDANTE DE ENCANADOR H 16,360004,091.01.21 18,55000FERREIRO H 88,483504,771.01.22 18,55000AJUDANTE DE FERREIRO H 70,861003,821.01.39 18,64000PEDREIRO H 86,676004,651.01.42 30,50000POCEIRO H 137,250004,501.01.46 101,27000SERVENTE H 385,838703,812.05.03 0,02000AREIA M3 1,5840079,202.05.17 0,76000PEDRA BRITADA 1 M3 47,0668061,932.05.35 2,27000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 551,85970243,112.05.96 51,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 81,600001,602.10.17 5,90000SARRAFO PINHO APARELHADO 10X2,5 CM M 26,904004,562.10.21 1,47000TABUAS PINHO DE 1"X12" DE 3A. M2 25,2546017,182.15.25 205,00000ACO CA-50-A $MD BITOLAS KG 553,500002,702.67.23 4,00000PARAFUSO 3/16' 2,5CM UN 0,360000,092.67.60 0,60000PREGO KG 2,742004,572.67.78 0,04000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,029600,74

09/02/2011 11:38:40 Página: 339 de 0

Page 340: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.70.10 4,10000ARAME RECOZIDO N.18 KG 18,983004,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 2,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 8,000004,006.02.40 1,00000FS-08-01 FOSSA SEPTICA ANEIS CONCR. DN=2,4M H=2,0M UN 2.022,250002.022,256.25.34 2,00000TUBO PVC P/ESGOTO 150MM M 28,2000014,106.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 6,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 161,8200026,976.70.21 23,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 48,760002,12

LS 1.016,20071 BDI 1.259,81944Mão-de-Obra 832,95140 Material 3.628,32370SubMO 1.849,15211

16.08.072 FS-08-02 FOSSA SEPTICA ANEIS CONCRETO DN=2,4M H=2,5M UN 7.966,44

1.01.11 3,76000CARPINTEIRO H 17,108004,551.01.12 3,76000AJUDANTE DE CARPINTEIRO H 14,889603,961.01.18 4,10000ENCANADOR H 20,582005,021.01.19 4,10000AJUDANTE DE ENCANADOR H 16,769004,091.01.21 21,63000FERREIRO H 103,175104,771.01.22 21,63000AJUDANTE DE FERREIRO H 82,626603,821.01.39 22,22000PEDREIRO H 103,323004,651.01.42 38,05000POCEIRO H 171,225004,501.01.46 120,75000SERVENTE H 460,057503,812.05.03 0,02500AREIA M3 1,9800079,202.05.17 0,76000PEDRA BRITADA 1 M3 47,0668061,932.05.35 2,65000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 644,24150243,112.05.96 66,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 105,600001,602.10.17 6,85000SARRAFO PINHO APARELHADO 10X2,5 CM M 31,236004,562.10.21 1,71000TABUAS PINHO DE 1"X12" DE 3A. M2 29,3778017,182.15.25 239,00000ACO CA-50-A $MD BITOLAS KG 645,300002,702.67.23 4,00000PARAFUSO 3/16' 2,5CM UN 0,360000,092.67.60 0,68000PREGO KG 3,107604,572.67.78 0,04000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,029600,742.70.10 4,80000ARAME RECOZIDO N.18 KG 22,224004,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 2,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 8,000004,006.02.41 1,00000FS-08-02 FOSSA SEPTICA ANEIS CONCR. DN=2,4M H=2,5M UN 2.401,830002.401,836.25.34 2,50000TUBO PVC P/ESGOTO 150MM M 35,2500014,106.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 7,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 188,7900026,976.70.21 31,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 65,720002,12

LS 1.207,50208 BDI 1.489,65967Mão-de-Obra 989,75580 Material 4.279,52330SubMO 2.197,25788

16.08.073 FS-08-03 FOSSA SEPTICA ANEIS CONCRETO DN=2,4M H=3,0M UN 9.052,77

1.01.11 4,29000CARPINTEIRO H 19,519504,551.01.12 4,29000AJUDANTE DE CARPINTEIRO H 16,988403,961.01.18 4,20000ENCANADOR H 21,084005,021.01.19 4,20000AJUDANTE DE ENCANADOR H 17,178004,091.01.21 27,42000FERREIRO H 130,793404,771.01.22 27,42000AJUDANTE DE FERREIRO H 104,744403,821.01.39 23,14000PEDREIRO H 107,601004,651.01.42 43,75000POCEIRO H 196,875004,501.01.46 125,73000SERVENTE H 479,031303,812.05.03 0,03000AREIA M3 2,3760079,202.05.17 0,76000PEDRA BRITADA 1 M3 47,0668061,932.05.35 3,03000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 736,62330243,112.05.96 83,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 132,800001,602.10.17 7,80000SARRAFO PINHO APARELHADO 10X2,5 CM M 35,568004,562.10.21 1,95000TABUAS PINHO DE 1"X12" DE 3A. M2 33,5010017,182.15.25 273,00000ACO CA-50-A $MD BITOLAS KG 737,100002,702.67.23 4,00000PARAFUSO 3/16' 2,5CM UN 0,360000,092.67.60 0,78000PREGO KG 3,564604,572.67.78 0,04000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,029600,742.70.10 5,46000ARAME RECOZIDO N.18 KG 25,279804,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 2,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 8,000004,006.02.42 1,00000FS-08-03 FOSSA SEPTICA ANEIS CONCR. DN=2,4M H=3,0M UN 2.781,410002.781,416.25.34 3,00000TUBO PVC P/ESGOTO 150MM M 42,3000014,106.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 8,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 215,7600026,976.70.21 38,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 80,560002,12

LS 1.334,45430 BDI 1.692,79503Mão-de-Obra 1.093,81500 Material 4.931,70910SubMO 2.428,26930

16.08.074 FS-09-01 FOSSA SEPTICA ANEIS CONCRETO DN=3,0M H=2,5M UN 11.027,84

1.01.11 5,12000CARPINTEIRO H 23,296004,551.01.12 5,12000AJUDANTE DE CARPINTEIRO H 20,275203,961.01.18 4,10000ENCANADOR H 20,582005,021.01.19 4,10000AJUDANTE DE ENCANADOR H 16,769004,091.01.21 35,01000FERREIRO H 166,997704,771.01.22 35,01000AJUDANTE DE FERREIRO H 133,738203,82

09/02/2011 11:38:40 Página: 340 de 0

Page 341: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.39 24,69000PEDREIRO H 114,808504,651.01.42 52,21000POCEIRO H 234,945004,501.01.46 134,19000SERVENTE H 511,263903,812.05.03 0,02500AREIA M3 1,9800079,202.05.17 1,08000PEDRA BRITADA 1 M3 66,8844061,932.05.35 4,30000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 1.045,37300243,112.05.96 83,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 132,800001,602.10.17 9,30000SARRAFO PINHO APARELHADO 10X2,5 CM M 42,408004,562.10.21 2,33000TABUAS PINHO DE 1"X12" DE 3A. M2 40,0294017,182.15.25 387,00000ACO CA-50-A $MD BITOLAS KG 1.044,900002,702.67.23 4,00000PARAFUSO 3/16' 2,5CM UN 0,360000,092.67.60 0,93000PREGO KG 4,250104,572.67.78 0,04000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,029600,742.70.10 7,74000ARAME RECOZIDO N.18 KG 35,836204,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 2,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 8,000004,006.02.50 1,00000FS-09-01 FOSSA SEPTICA ANEIS CONCR. DN=3,0M H=2,5M UN 3.430,130003.430,136.25.34 2,50000TUBO PVC P/ESGOTO 150MM M 35,2500014,106.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 7,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 188,7900026,976.70.21 38,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 80,560002,12

LS 1.516,06411 BDI 2.062,11797Mão-de-Obra 1.242,67550 Material 6.206,99070SubMO 2.758,73961

16.08.075 FS-09-02 FOSSA SEPTICA ANEIS CONCRETO DN=3,0M H=3,0M UN 12.876,50

1.01.11 6,41000CARPINTEIRO H 29,165504,551.01.12 6,41000AJUDANTE DE CARPINTEIRO H 25,383603,961.01.18 4,20000ENCANADOR H 21,084005,021.01.19 4,20000AJUDANTE DE ENCANADOR H 17,178004,091.01.21 43,79000FERREIRO H 208,878304,771.01.22 43,79000AJUDANTE DE FERREIRO H 167,277803,821.01.39 26,09000PEDREIRO H 121,318504,651.01.42 59,85000POCEIRO H 269,325004,501.01.46 141,83000SERVENTE H 540,372303,812.05.03 0,03000AREIA M3 2,3760079,202.05.17 1,08000PEDRA BRITADA 1 M3 66,8844061,932.05.35 5,38000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 1.307,93180243,112.05.96 103,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 164,800001,602.10.17 11,64000SARRAFO PINHO APARELHADO 10X2,5 CM M 53,078404,562.10.21 2,91000TABUAS PINHO DE 1"X12" DE 3A. M2 49,9938017,182.15.25 484,00000ACO CA-50-A $MD BITOLAS KG 1.306,800002,702.67.23 4,00000PARAFUSO 3/16' 2,5CM UN 0,360000,092.67.60 1,16000PREGO KG 5,301204,572.67.78 0,04000BUCHA PLASTICA TIPO S-6 (CENTO) UN 0,029600,742.70.10 9,68000ARAME RECOZIDO N.18 KG 44,818404,633.87.15 1,00000PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM UN 42,4500042,454.85.71 2,00000BRACADEIRA PARA TUBO 200MM ACO GALV. UN 8,000004,006.02.51 1,00000FS-09-02 FOSSA SEPTICA ANEIS CONCR. DN=3,0M H=3,0M UN 3.941,140003.941,146.25.34 3,00000TUBO PVC P/ESGOTO 150MM M 42,3000014,106.26.77 2,00000ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM UN 6,960003,486.26.85 8,00000TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8") M 215,7600026,976.70.21 48,00000MANGUEIRA PLASTICA FLEXIVEL 3/4' M 101,760002,12

LS 1.707,97926 BDI 2.407,80235Mão-de-Obra 1.399,98300 Material 7.360,74360SubMO 3.107,96226

16.08.099 SERVICOS EM TRATAMENTO DE ESGOTO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.09.003 SM-03 SUMIDOURO - TAMPA DE CONCRETO DN=2,40M UN 505,60

1.01.39 0,80000PEDREIRO H 3,720004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,00800AREIA M3 0,6336079,202.05.96 16,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 25,600001,606.02.60 1,00000TAMPA CONCRETO PRE-MOLD C/ SOBRE TAMPA DN=2,40M UN 369,80000369,80

LS 8,25696 BDI 94,54347Mão-de-Obra 6,76800 Material 396,03360SubMO 15,02496

16.09.004 SM-04 SUMIDOURO - TAMPA DE CONCRETO DN=3,00M UN 802,85

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,01200AREIA M3 0,9504079,202.05.96 20,00000ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO KG 32,000001,606.02.61 1,00000TAMPA CONCRETO PRE-MOLD C/ SOBRE TAMPA DN=3,00M UN 601,00000601,00

LS 10,32120 BDI 150,12827Mão-de-Obra 8,46000 Material 633,95040SubMO 18,78120

16.09.007 SM-03 SUMIDOURO - POCO M 1.411,89

1.01.39 2,32000PEDREIRO H 10,788004,651.01.42 15,22000POCEIRO H 68,490004,501.01.46 17,54000SERVENTE H 66,827403,81

09/02/2011 11:38:40 Página: 341 de 0

Page 342: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.19 0,90400PEDRA BRITADA 3 M3 53,0919258,736.02.65 1,00000ANEIS PRE-MOLD CONCRETO DN=2,40M M 759,16000759,166.25.34 0,80000TUBO PVC P/ESGOTO 150MM M 11,2800014,10

LS 178,24859 BDI 264,01376Mão-de-Obra 146,10540 Material 823,53192SubMO 324,35399

16.09.008 SM-04 SUMIDOURO - POCO M 1.933,70

1.01.39 3,62000PEDREIRO H 16,833004,651.01.42 20,88000POCEIRO H 93,960004,501.01.46 24,50000SERVENTE H 93,345003,812.05.19 1,41000PEDRA BRITADA 3 M3 82,8093058,736.02.66 1,00000ANEIS PRE-MOLD CONCRETO DN=3,00M M 1.022,020001.022,026.25.34 1,00000TUBO PVC P/ESGOTO 150MM M 14,1000014,10

LS 249,04836 BDI 361,58660Mão-de-Obra 204,13800 Material 1.118,92930SubMO 453,18636

16.09.099 SERVICOS DE POCO ABSORVENTE MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.10.010 REVESTIMENTO DE POCOS COM ALVENARIA 1 TIJOLO SEM ARGAMASSA M2 58,50

1.01.42 1,06000POCEIRO H 4,770004,501.01.46 1,06000SERVENTE H 4,038603,812.25.15 127,32000TIJOLO COMUM MACICO UN 28,010400,22

LS 10,74649 BDI 10,94006Mão-de-Obra 8,80860 Material 28,01040SubMO 19,55509

16.10.011 REVESTIMENTO DE POCOS COM ALVENARIA 1 TIJOLO COM ARGAMASSA M2 93,13

1.01.42 1,70000POCEIRO H 7,650004,501.01.46 2,76000SERVENTE H 10,515603,812.05.03 0,09800AREIA M3 7,7616079,202.05.05 15,36000CAL HIDRATADA KG 5,222400,342.25.15 101,86000TIJOLO COMUM MACICO UN 22,409200,22

LS 22,16203 BDI 17,41579Mão-de-Obra 18,16560 Material 35,39320SubMO 40,32763

16.10.020 PA-01/01 POCO DE AGUA POTAVEL - SERVICOS - ATE 5 M DE PROFUNDIDADE M 303,32

1.01.11 1,32000CARPINTEIRO H 6,006004,551.01.21 0,61000FERREIRO H 2,909704,771.01.22 0,61000AJUDANTE DE FERREIRO H 2,330203,821.01.39 1,99000PEDREIRO H 9,253504,651.01.42 5,60000POCEIRO H 25,200004,501.01.46 8,87000SERVENTE H 33,794703,812.05.03 0,06200AREIA M3 4,9104079,202.05.05 3,01000CAL HIDRATADA KG 1,023400,342.05.08 21,27000CIMENTO KG 7,869900,372.05.17 0,12200PEDRA BRITADA 1 M3 7,5554661,932.05.18 0,05900PEDRA BRITADA 2 M3 3,6043161,092.10.21 0,07000TABUAS PINHO DE 1"X12" DE 3A. M2 1,2026017,182.10.32 0,22000CHAPA COMPENSADA RESINADA E=12MM M2 2,6620012,102.10.60 0,76000RIPA DE PEROBA 1X5CM M 1,694802,232.15.25 1,21000ACO CA-50-A $MD BITOLAS KG 3,267002,702.15.38 0,97000ACO CA-60-B $MD BITOLAS KG 2,570502,652.25.15 150,87000TIJOLO COMUM MACICO UN 33,191400,222.40.69 0,23000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,577302,51

LS 96,98280 BDI 56,71937Mão-de-Obra 79,49410 Material 70,12907SubMO 176,47690

16.10.021 PA-01/02 POCO DE AGUA POTAVEL - DE 5 A 10 M DE PROFUNDIDADE M 303,09

1.01.39 0,77000PEDREIRO H 3,580504,651.01.42 10,80000POCEIRO H 48,600004,501.01.46 11,61000SERVENTE H 44,234103,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,80000CAL HIDRATADA KG 0,272000,342.05.08 0,41000CIMENTO KG 0,151700,372.25.15 143,45000TIJOLO COMUM MACICO UN 31,559000,22

LS 117,62581 BDI 56,67640Mão-de-Obra 96,41460 Material 32,37870SubMO 214,04041

16.10.022 PA-01/03 POCO DE AGUA POTAVEL - DE 10 A 15 M DE PROFUNDIDADE M 385,01

1.01.39 0,77000PEDREIRO H 3,580504,651.01.42 14,41000POCEIRO H 64,845004,501.01.46 15,22000SERVENTE H 57,988203,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,80000CAL HIDRATADA KG 0,272000,342.05.08 0,41000CIMENTO KG 0,151700,372.25.15 143,45000TIJOLO COMUM MACICO UN 31,559000,22

LS 154,22471 BDI 71,99394Mão-de-Obra 126,41370 Material 32,37870SubMO 280,63841

16.10.023 PA-01/04 POCO DE AGUA POTAVEL - DE 15 A 20 M DE PROFUNDIDADE M 466,69

1.01.39 0,77000PEDREIRO H 3,580504,651.01.42 18,01000POCEIRO H 81,045004,50

09/02/2011 11:38:40 Página: 342 de 0

Page 343: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 18,82000SERVENTE H 71,704203,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,80000CAL HIDRATADA KG 0,272000,342.05.08 0,41000CIMENTO KG 0,151700,372.25.15 143,45000TIJOLO COMUM MACICO UN 31,559000,22

LS 190,72223 BDI 87,26905Mão-de-Obra 156,32970 Material 32,37870SubMO 347,05193

16.10.024 PA-01/05 POCO DE AGUA POTAVEL - DE 20 A 25 M DE PROFUNDIDADE M 568,81

1.01.39 0,77000PEDREIRO H 3,580504,651.01.42 22,51000POCEIRO H 101,295004,501.01.46 23,32000SERVENTE H 88,849203,812.05.03 0,00500AREIA M3 0,3960079,202.05.05 0,80000CAL HIDRATADA KG 0,272000,342.05.08 0,41000CIMENTO KG 0,151700,372.25.15 143,45000TIJOLO COMUM MACICO UN 31,559000,22

LS 236,34413 BDI 106,36293Mão-de-Obra 193,72470 Material 32,37870SubMO 430,06883

16.10.030 POCO SEMI-ARTESIANO PERF. SOLO ATE 60M - VAZAO 5 M3 UN 7.380,00

2.04.80 1,00000M.O./EQUIP. PERF. POCO SEMI-ARTESIANO ATE 60M UN 6.000,000006.000,00

LS 0,00000 BDI 1.380,00000Mão-de-Obra 0,00000 Material 6.000,00000SubMO 0,00000

16.10.099 SERVICOS DE POCO DE AGUA POTAVEL MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.11.005 LIMPEZA DA OBRA M2 7,28

1.01.46 0,70000SERVENTE H 2,667003,81

LS 3,25374 BDI 1,36177Mão-de-Obra 2,66700 Material 0,00000SubMO 5,92074

16.11.012 LIMPEZA DE APARELHOS SANITARIOS UN 8,32

1.01.46 0,80000SERVENTE H 3,048003,81

LS 3,71856 BDI 1,55631Mão-de-Obra 3,04800 Material 0,00000SubMO 6,76656

16.11.013 LIMPEZA DE REVESTIMENTOS HIDRAULICOS M2 6,24

1.01.46 0,60000SERVENTE H 2,286003,81

LS 2,78892 BDI 1,16723Mão-de-Obra 2,28600 Material 0,00000SubMO 5,07492

16.11.014 LIMPEZA DE VIDROS M2 7,80

1.01.46 0,75000SERVENTE H 2,857503,81

LS 3,48615 BDI 1,45904Mão-de-Obra 2,85750 Material 0,00000SubMO 6,34365

16.11.020 LIMPEZA DE FACHADA POR HIDROJATEAMENTO M2 4,64

1.01.46 0,10000SERVENTE H 0,381003,811.01.55 0,10000OPERADOR H 0,695006,959.00.09 0,10000MAQUINA LAVA-JATO(AGUA FRIA, PRES 1700PSI) H 0,191001,919.10.08 1,00000SOLUCAO LIMPADORA DILUIDA EM AGUA L 1,200001,20

LS 1,31272 BDI 0,86934Mão-de-Obra 1,07600 Material 1,39100SubMO 2,38872

16.11.099 SERVICOS DE LIMPEZA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.13.001 ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M M3 23,92

1.01.46 2,30000SERVENTE H 8,763003,81

LS 10,69086 BDI 4,47439Mão-de-Obra 8,76300 Material 0,00000SubMO 19,45386

16.13.002 ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M M3 31,21

1.01.46 3,00000SERVENTE H 11,430003,81

LS 13,94460 BDI 5,83616Mão-de-Obra 11,43000 Material 0,00000SubMO 25,37460

16.13.007 ESCORAMENTO PONTALETADO M2 33,54

1.01.11 0,30000CARPINTEIRO H 1,365004,551.01.12 0,30000AJUDANTE DE CARPINTEIRO H 1,188003,962.10.05 0,01500MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 20,935351.395,692.10.52 0,02500ESTRONCAS DE EUCALIPTO - DIAM DE 15CM M 0,208508,342.67.60 0,10000PREGO KG 0,457004,57

LS 3,11466 BDI 6,27176Mão-de-Obra 2,55300 Material 21,60085SubMO 5,66766

16.13.010 APILOAMENTO PARA SIMPLES REGULARIZACAO M2 4,16

1.01.46 0,40000SERVENTE H 1,524003,81

LS 1,85928 BDI 0,77815Mão-de-Obra 1,52400 Material 0,00000SubMO 3,38328

16.13.015 REATERRO INTERNO APILOADO M3 36,41

1.01.46 3,50000SERVENTE H 13,335003,81

09/02/2011 11:38:40 Página: 343 de 0

Page 344: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 16,26870 BDI 6,80885Mão-de-Obra 13,33500 Material 0,00000SubMO 29,60370

16.13.025 LASTRO DE CONCRETO - 5CM M2 22,61

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,80000SERVENTE H 3,048003,812.05.03 0,03000AREIA M3 2,3760079,202.05.08 10,00000CIMENTO KG 3,700000,372.05.18 0,04000PEDRA BRITADA 2 M3 2,4436061,09

LS 5,42046 BDI 4,22810Mão-de-Obra 4,44300 Material 8,51960SubMO 9,86346

16.13.026 LASTRO DE PEDRA BRITADA - 5CM M2 5,69

1.01.46 0,15000SERVENTE H 0,571503,812.05.18 0,05500PEDRA BRITADA 2 M3 3,3599561,09

LS 0,69723 BDI 1,06460Mão-de-Obra 0,57150 Material 3,35995SubMO 1,26873

16.13.030 ESCORAMENTO DE VALAS CONTINUO ATé 2,00M M2 47,95

1.01.11 0,67100CARPINTEIRO H 3,053054,551.01.46 1,34200SERVENTE H 5,113023,812.10.27 0,10530VIGAS PEROBA DE 6X16 CM M 1,3689013,002.10.52 0,07020ESTRONCAS DE EUCALIPTO - DIAM DE 15CM M 0,585478,342.10.54 0,23160PRANCHAS PEROBA DE 3 CM M2 15,7094367,832.67.60 0,70000PREGO KG 3,199004,57

LS 9,96261 BDI 8,96804Mão-de-Obra 8,16607 Material 20,86280SubMO 18,12868

16.13.031 ESCORAMENTO DE VALAS CONTINUO ATé 4,00M M2 45,89

1.01.11 0,51300CARPINTEIRO H 2,334154,551.01.46 1,02600SERVENTE H 3,909063,812.10.27 1,34620VIGAS PEROBA DE 6X16 CM M 17,5006013,002.10.66 0,10260VIGA DE PEROBA 8X18CM M 1,8621918,152.10.88 0,06840ESTRONCA DE EUCALIPTO DN 20CM M 0,8898813,012.67.60 0,70000PREGO KG 3,199004,57

LS 7,61672 BDI 8,58167Mão-de-Obra 6,24321 Material 23,45167SubMO 13,85993

16.13.035 ESCORAMENTO DE VALAS DESCONTINUO ATé 2,00M M2 33,07

1.01.11 0,53700CARPINTEIRO H 2,443354,551.01.46 1,07400SERVENTE H 4,091943,812.10.27 0,10530VIGAS PEROBA DE 6X16 CM M 1,3689013,002.10.52 0,07020ESTRONCAS DE EUCALIPTO - DIAM DE 15CM M 0,585478,342.10.54 0,11600PRANCHAS PEROBA DE 3 CM M2 7,8682867,832.67.60 0,56000PREGO KG 2,559204,57

LS 7,97305 BDI 6,18474Mão-de-Obra 6,53529 Material 12,38185SubMO 14,50834

16.13.036 ESCORAMENTO DE VALAS DESCONTINUO ATé 4,00M M2 31,25

1.01.11 0,42000CARPINTEIRO H 1,911004,551.01.46 0,83000SERVENTE H 3,162303,812.10.27 0,68000VIGAS PEROBA DE 6X16 CM M 8,8400013,002.10.66 0,10260VIGA DE PEROBA 8X18CM M 1,8621918,152.10.88 0,06840ESTRONCA DE EUCALIPTO DN 20CM M 0,8898813,012.67.60 0,56000PREGO KG 2,559204,57

LS 6,18943 BDI 5,84522Mão-de-Obra 5,07330 Material 14,15127SubMO 11,26273

16.13.099 SERVICOS EM TERRA - MUROS DE ARRIMO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.14.004 FORNEC INST E PROTENSAO DE TIRANTES P/25T SOLO INCL MOB,TRANSP,INSTAL M 215,25

2.15.54 1,00000FORN INST E PROTENSAO TIRANTES 25T SOLO C/TX INST M 175,00000175,00

LS 0,00000 BDI 40,25000Mão-de-Obra 0,00000 Material 175,00000SubMO 0,00000

16.14.006 FORMAS DE MADEIRA MACICA M2 55,84

1.01.11 1,30000CARPINTEIRO H 5,915004,551.01.12 1,30000AJUDANTE DE CARPINTEIRO H 5,148003,962.10.09 3,00000PONTALETE PINHO DE 3"X3" M 11,340003,782.10.21 0,50000TABUAS PINHO DE 1"X12" DE 3A. M2 8,5900017,182.67.60 0,20000PREGO KG 0,914004,57

LS 13,49686 BDI 10,44289Mão-de-Obra 11,06300 Material 20,84400SubMO 24,55986

16.14.009 FORMAS PLANAS PLASTIFICADAS PARA CONCRETO APARENTE M2 71,76

1.01.11 2,00000CARPINTEIRO H 9,100004,551.01.12 2,00000AJUDANTE DE CARPINTEIRO H 7,920003,962.10.09 3,00000PONTALETE PINHO DE 3"X3" M 11,340003,782.10.21 0,10000TABUAS PINHO DE 1"X12" DE 3A. M2 1,7180017,182.10.34 0,33000CHAPA COMPENSADA PLASTIFICADA E=12MM M2 6,5868019,962.67.60 0,20000PREGO KG 0,914004,57

LS 20,76440 BDI 13,41894Mão-de-Obra 17,02000 Material 20,55880SubMO 37,78440

09/02/2011 11:38:40 Página: 344 de 0

Page 345: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.14.011 ACO CA 50 (A OU B) FYK = 500 M PA KG 6,27

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.25 1,15000ACO CA-50-A $MD BITOLAS KG 3,105002,702.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,17405Mão-de-Obra 0,85900 Material 3,19760SubMO 1,90698

16.14.012 ACO CA 60 (A OU B) FYK = 600 M PA KG 6,20

1.01.21 0,10000FERREIRO H 0,477004,771.01.22 0,10000AJUDANTE DE FERREIRO H 0,382003,822.15.38 1,15000ACO CA-60-B $MD BITOLAS KG 3,047502,652.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,63

LS 1,04798 BDI 1,16083Mão-de-Obra 0,85900 Material 3,14010SubMO 1,90698

16.14.013 TELA ARMADURA (MALHA ACO CA 60 FYK = 600 M PA) KG 6,49

1.01.21 0,03000FERREIRO H 0,143104,771.01.22 0,03000AJUDANTE DE FERREIRO H 0,114603,822.15.60 1,10000TELA ARMADURA (MALHA AÇO CA-60) KG 4,708004,28

LS 0,31439 BDI 1,21442Mão-de-Obra 0,25770 Material 4,70800SubMO 0,57209

16.14.034 CONCRETO DOSADO E LANCADO FCK= 20 M PA M3 443,61

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.35 1,02000CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA M3 247,97220243,11

LS 61,92720 BDI 82,95166Mão-de-Obra 50,76000 Material 247,97220SubMO 112,68720

16.14.038 CONCRETO DOSADO E LANCADO FCK=25 MPA M3 456,63

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.36 1,02000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 258,55980253,49

LS 61,92720 BDI 85,38681Mão-de-Obra 50,76000 Material 258,55980SubMO 112,68720

16.14.039 CONCRETO DOSADO E LANCADO FCK=30MPA M3 471,92

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 6,00000SERVENTE H 22,860003,812.05.38 1,02000CONCRETO DOSADO (CONDICAO A) FCK=30MPA M3 270,99360265,68

LS 61,92720 BDI 88,24658Mão-de-Obra 50,76000 Material 270,99360SubMO 112,68720

16.14.044 CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA M3 420,35

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.53 1,02000CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA M3 285,40620279,81

LS 30,96360 BDI 78,60245Mão-de-Obra 25,38000 Material 285,40620SubMO 56,34360

16.14.048 CONCRETO DOSADO BOMBEADO E LANCADO FCK=25 MPA M3 439,43

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.37 1,02000CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA M3 300,92040295,02

LS 30,96360 BDI 82,17072Mão-de-Obra 25,38000 Material 300,92040SubMO 56,34360

16.14.049 CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA M3 453,08

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.05.39 1,02000CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA M3 312,01800305,90

LS 30,96360 BDI 84,72317Mão-de-Obra 25,38000 Material 312,01800SubMO 56,34360

16.14.055 CONCRETO GROUT M3 472,70

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 16,00000SERVENTE H 60,960003,812.05.03 0,72000AREIA M3 57,0240079,202.05.05 20,00000CAL HIDRATADA KG 6,800000,342.05.08 283,00000CIMENTO KG 104,710000,372.05.22 0,28000PEDRISCO M3 18,5080066,10

LS 108,40920 BDI 88,39158Mão-de-Obra 88,86000 Material 187,04200SubMO 197,26920

16.14.099 SERVICOS EM CONCRETO ARMADO - MUROS DE ARRIMO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.15.009 ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 14X19X39CM M2 72,83

1.01.39 1,90000PEDREIRO H 8,835004,651.01.46 1,10000SERVENTE H 4,191003,812.05.03 0,02300AREIA M3 1,8216079,202.05.05 4,14000CAL HIDRATADA KG 1,407600,342.05.08 3,24000CIMENTO KG 1,198800,37

09/02/2011 11:38:40 Página: 345 de 0

Page 346: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.25.12 13,00000BLOCO DE CONCRETO APARENTE ESPESS 15 CM UN 25,870001,99

LS 15,89172 BDI 13,61962Mão-de-Obra 13,02600 Material 30,29800SubMO 28,91772

16.15.010 ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 19X19X39CM M2 81,73

1.01.39 2,00000PEDREIRO H 9,300004,651.01.46 1,15000SERVENTE H 4,381503,812.05.03 0,01500AREIA M3 1,1880079,202.05.05 2,76000CAL HIDRATADA KG 0,938400,342.05.08 2,16000CIMENTO KG 0,799200,372.25.13 13,00000BLOCO DE CONCRETO APARENTE ESPESS 20 CM UN 33,150002,55

LS 16,69143 BDI 15,28316Mão-de-Obra 13,68150 Material 36,07560SubMO 30,37293

16.15.029 IMPERMEAB COM ARGAM CIM/AREIA 1:3 COM HIDROFOGO M2 32,37

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,20000SERVENTE H 4,572003,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 9,28000CIMENTO KG 3,433600,372.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 11,25084 BDI 6,05421Mão-de-Obra 9,22200 Material 5,84980SubMO 20,47284

16.15.030 IMPERM COM TINTA BETUMINOSA / COM REG. EM ARGAMASSA CIM AREIA 1:3 M2 41,27

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,30000SERVENTE H 4,953003,812.05.03 0,02100AREIA M3 1,6632079,202.05.08 9,28000CIMENTO KG 3,433600,372.40.56 1,00000TINTA BETUMINOSA L 6,390006,392.40.69 0,30000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,753002,51

LS 11,71566 BDI 7,71845Mão-de-Obra 9,60300 Material 12,23980SubMO 21,31866

16.15.031 IMPERMEABILIZACAO POR CRISTALIZACAO - MUROS DE ARRIMO M2 8,49

1.01.39 0,10000PEDREIRO H 0,465004,652.40.09 3,00000CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO KG 4,290001,432.40.10 0,15000EMULSAO ADESIVA PVA KG 1,5855010,57

LS 0,56730 BDI 1,58879Mão-de-Obra 0,46500 Material 5,87550SubMO 1,03230

16.15.034 MANTA GEOTEXTIL DE 300GR/M2 M2 12,34

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.40.49 1,00000BIDIM OP-30 (300 GR/M2) M2 4,400004,40

LS 3,09636 BDI 2,30790Mão-de-Obra 2,53800 Material 4,40000SubMO 5,63436

16.15.040 DRENAGEM COM PEDRA BRITADA M3 108,66

1.01.46 2,50000SERVENTE H 9,525003,812.05.18 1,10000PEDRA BRITADA 2 M3 67,1990061,09

LS 11,62050 BDI 20,31924Mão-de-Obra 9,52500 Material 67,19900SubMO 21,14550

16.15.041 DRENAGEM COM AREIA GROSSA M3 127,96

1.01.46 2,00000SERVENTE H 7,620003,812.05.03 1,10000AREIA M3 87,1200079,20

LS 9,29640 BDI 23,92837Mão-de-Obra 7,62000 Material 87,12000SubMO 16,91640

16.15.049 MURO EM GABIAO COM TELA GALVANIZADA 8/10CM - FIO DIAM 2,7MM M3 282,39

1.01.01 3,00000AJUDANTE H 11,700003,901.01.92 3,00000ARTIFICE H 14,490004,832.70.12 1,00000GABIAO MALHA 8/10 FIO 2,7MM INC ARAME ZINC P/ AMAR M3 99,5000099,502.80.29 1,15000PEDRA RACHAO D=10A15CM M3 71,9440062,56

LS 31,95180 BDI 52,80473Mão-de-Obra 26,19000 Material 171,44400SubMO 58,14180

16.15.099 OUTROS SERVICOS - MUROS DE ARRIMO MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.18.001 SERVICOS - CIVIL MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.18.029 PROJETO ARQUITETONICO COMPLETO (ARQ/EST/HID/ELE/INC) M2 58,21

2.04.88 1,00000PROJETO ARQUITETONICO COMPLETO (ARQ/EST/HID/ELE/INC) M2 47,3300047,33

LS 0,00000 BDI 10,88590Mão-de-Obra 0,00000 Material 47,33000SubMO 0,00000

16.18.030 PROJETO DE ARQUITETURA COMPLETO M2 28,90

2.04.89 1,00000PROJETO DE ARQUITETURA COMPLETO M2 23,5000023,50

LS 0,00000 BDI 5,40500Mão-de-Obra 0,00000 Material 23,50000SubMO 0,00000

16.18.040 PROJETO EXECUTIVO DE ARQUITETURA M2 11,04

09/02/2011 11:38:40 Página: 346 de 0

Page 347: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.04.90 1,00000FORNECIMENTO DE PROJ. EXEC. DE ARQUITETURA M2 8,980008,98

LS 0,00000 BDI 2,06540Mão-de-Obra 0,00000 Material 8,98000SubMO 0,00000

16.18.041 PROJETO EXECUTIVO DE ESTRUTURA M2 12,61

2.04.91 1,00000FORNECIMENTO DE PROJ. EXEC. DE ESTRUTURA M2 10,2600010,26

LS 0,00000 BDI 2,35980Mão-de-Obra 0,00000 Material 10,26000SubMO 0,00000

16.18.050 PROJETO EXECUTIVO DE ARQUITETURA - PRANCHA TECNICA (ELEV/PLAT) UN 1.416,93

2.04.83 1,00000FORNECIMENTO DE PROJ EXEC ARQ - PRANCHA TECNICA UN 1.151,980001.151,98

LS 0,00000 BDI 264,95540Mão-de-Obra 0,00000 Material 1.151,98000SubMO 0,00000

16.18.051 PROJETO EXECUTIVO DE ESTRUTURA - PRANCHA TECNICA (ELEV/PLAT) UN 1.133,54

2.04.84 1,00000FORNECIMENTO DE PROJ EXEC EST - PRANCHA TECNICA UN 921,58000921,58

LS 0,00000 BDI 211,96340Mão-de-Obra 0,00000 Material 921,58000SubMO 0,00000

16.18.061 LEVANTAMENTO PLANIALTIMETRICO M2 0,12

2.04.81 1,00000LEVANTAMENTO PLANIALTIMETRICO M2 0,100000,10

LS 0,00000 BDI 0,02300Mão-de-Obra 0,00000 Material 0,10000SubMO 0,00000

16.18.062 LEVANTAMENTO CADASTRAL M2 0,17

2.04.82 1,00000LEVANTAMENTO CADASTRAL M2 0,140000,14

LS 0,00000 BDI 0,03220Mão-de-Obra 0,00000 Material 0,14000SubMO 0,00000

16.19.001 SERVICOS - HIDRAULICA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.19.040 PROJETO EXECUTIVO DE HIDRAULICA M2 4,32

2.04.92 1,00000FORNECIMENTO DE PROJ. EXEC. DE HIDRAULICA M2 3,520003,52

LS 0,00000 BDI 0,80960Mão-de-Obra 0,00000 Material 3,52000SubMO 0,00000

16.19.041 PROJETO EXECUTIVO DE INCENDIO M2 0,75

2.04.93 1,00000FORNECIMENTO DE PROJ. EXEC. DE INCENDIO M2 0,610000,61

LS 0,00000 BDI 0,14030Mão-de-Obra 0,00000 Material 0,61000SubMO 0,00000

16.19.050 PROJETO EXECUTIVO DE HIDRAULICA - PRANCHA TECNICA (ELEV/PLAT) UN 651,78

2.04.85 1,00000FORNECIMENTO DE PROJ EXEC HID - PRANCHA TECNICA UN 529,91000529,91

LS 0,00000 BDI 121,87930Mão-de-Obra 0,00000 Material 529,91000SubMO 0,00000

16.20.001 SERVICOS - ELETRICA MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.20.020 PLATAFORMA 2 PARADAS PORTAS UNILATERAIS UN 32.533,50

6.65.20 1,00000PLATAFORMA 2 PARADAS HID PORTAS UNIL FORN/INST UN 26.450,0000026.450,00

LS 0,00000 BDI 6.083,50000Mão-de-Obra 0,00000 Material 26.450,00000SubMO 0,00000

16.20.022 ELEVADOR 2 PARADAS MAQ CONJUGADA PORTA UNILARERAL (ACESSIB) UN 63.345,00

6.65.22 1,00000FORN INST DE ELEVADOR 2 PARADAS C/ PORTA UNILAT UN 51.500,0000051.500,00

LS 0,00000 BDI 11.845,00000Mão-de-Obra 0,00000 Material 51.500,00000SubMO 0,00000

16.20.023 ELEVADOR 3 PARADAS MAQ CONJUGADA PORTA UNILATERAL (ACESSIB) UN 66.912,00

6.65.23 1,00000FORN INST DE ELEVADOR 3 PARADAS C/ PORTA UNILAT UN 54.400,0000054.400,00

LS 0,00000 BDI 12.512,00000Mão-de-Obra 0,00000 Material 54.400,00000SubMO 0,00000

16.20.024 ELEVADOR 4 PARADAS MAQUINA CONJUGADA COM PORTAS UNILATERAIS UN 118.080,00

6.65.24 1,00000FORN INST DE ELEVADOR 4 PARADAS C/ PORTAS UNILAT UN 96.000,0000096.000,00

LS 0,00000 BDI 22.080,00000Mão-de-Obra 0,00000 Material 96.000,00000SubMO 0,00000

16.20.025 ELEVADOR 5 PARADAS MAQUINA CONJUGADA COM PORTAS BILATERAIS UN 124.230,00

6.65.25 1,00000FORN INST DE ELEVADOR 5 PARADAS C/ PORTAS BILATER UN 101.000,00000101.000,00

LS 0,00000 BDI 23.230,00000Mão-de-Obra 0,00000 Material101.000,00000

SubMO 0,00000

16.20.026 ELEVADOR 5 PARADAS MAQUINA CONJUGADA COM PORTAS UNILATERAIS UN 120.540,00

6.65.26 1,00000FORN INST ELEVADOR 5 PARADAS C/ PORTAS UNILATERAIS UN 98.000,0000098.000,00

LS 0,00000 BDI 22.540,00000Mão-de-Obra 0,00000 Material 98.000,00000SubMO 0,00000

16.20.029 ELEVADOR 4 PARADAS MAQUINA CONJUGADA COM PORTAS BILATERAIS UN 120.540,00

6.65.34 1,00000FORN INST ELEVADOR 4 PARADAS C/ PORTAS BILATERAIS UN 98.000,0000098.000,00

LS 0,00000 BDI 22.540,00000Mão-de-Obra 0,00000 Material 98.000,00000SubMO 0,00000

16.20.033 ELEVADOR 3 PARADAS MAQUINA CONJUGADA COM PORTAS BILATERAIS UN 118.080,00

6.65.33 1,00000FORN INST ELEVADOR 3 PARADAS C/ PORTAS BILATERAIS UN 96.000,0000096.000,00

LS 0,00000 BDI 22.080,00000Mão-de-Obra 0,00000 Material 96.000,00000SubMO 0,00000

09/02/2011 11:38:40 Página: 347 de 0

Page 348: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.20.040 PROJETO EXECUTIVO DE ELETRICA M2 4,89

2.04.94 1,00000FORNECIMENTO DE PROJ. EXEC. DE ELETRICA M2 3,980003,98

LS 0,00000 BDI 0,91540Mão-de-Obra 0,00000 Material 3,98000SubMO 0,00000

16.20.041 MANUTENCAO INTEGRAL P/ PLATAFORMA NOVA 2 PARADAS - MENSAL UN 545,32

6.65.11 1,00000MANUT INTEGRAL P/ PLAT NOVA 2 PARADAS - MENSAL UN 443,35000443,35

LS 0,00000 BDI 101,97050Mão-de-Obra 0,00000 Material 443,35000SubMO 0,00000

16.20.042 MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 2 PARADAS - MENSAL UN 713,31

6.65.12 1,00000MANUT INTEGRAL P/ ELEV NOVO 2 PARADAS - MENSAL UN 579,93000579,93

LS 0,00000 BDI 133,38390Mão-de-Obra 0,00000 Material 579,93000SubMO 0,00000

16.20.043 MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 3 PARADAS - MENSAL UN 788,08

6.65.13 1,00000MANUT INTEGRAL P/ ELEV NOVO 3 PARADAS - MENSAL UN 640,72000640,72

LS 0,00000 BDI 147,36560Mão-de-Obra 0,00000 Material 640,72000SubMO 0,00000

16.20.044 MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 4 PARADAS - MENSAL UN 857,87

6.65.14 1,00000MANUT INTEGRAL P/ ELEVADOR NOVO 4 PARADAS - MENSAL UN 697,46000697,46

LS 0,00000 BDI 160,41580Mão-de-Obra 0,00000 Material 697,46000SubMO 0,00000

16.20.045 MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 5 PARADAS - MENSAL UN 936,01

6.65.15 1,00000MANUT INTEGRAL P/ ELEVADOR NOVO 5 PARADAS - MENSAL UN 760,99000760,99

LS 0,00000 BDI 175,02770Mão-de-Obra 0,00000 Material 760,99000SubMO 0,00000

16.20.050 PROJETO EXECUTIVO DE ELETRICA - PRANCHA TECNICA (ELEV/PLAT) UN 940,85

2.04.86 1,00000FORNECIMENTO DE PROJ EXEC ELE - PRANCHA TECNICA UN 764,92000764,92

LS 0,00000 BDI 175,93160Mão-de-Obra 0,00000 Material 764,92000SubMO 0,00000

16.30.012 CANTEIRO DE OBRAS - LARG 2,20M M2 217,75

1.01.11 1,68200CARPINTEIRO H 7,653104,551.01.12 1,65200AJUDANTE DE CARPINTEIRO H 6,541923,961.01.39 0,98150PEDREIRO H 4,563984,651.01.40 1,06200PINTOR H 5,002024,711.01.41 0,94400AJUDANTE DE PINTOR H 3,606083,821.01.46 3,21360SERVENTE H 12,243823,812.05.03 0,05890AREIA M3 4,6648879,202.05.08 20,74000CIMENTO KG 7,673800,372.05.18 0,18960PEDRA BRITADA 2 M3 11,5826661,092.10.01 2,57250CAIBRO PEROBA DE 5X6CM M 10,984584,272.10.05 0,00300MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 4,187071.395,692.10.32 0,42900CHAPA COMPENSADA RESINADA E=12MM M2 5,1909012,102.10.60 1,81200RIPA DE PEROBA 1X5CM M 4,040762,232.56.61 0,64400TELHA TECNOLOGIA CRFS ONDULADA 6MM M2 8,4428413,112.66.07 0,80000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,392000,492.67.60 0,04950PREGO KG 0,226224,573.75.13 0,59000TINTA LATEX ECONOMICA L 2,548804,323.80.09 0,47200SELADOR P/PINTURA LATEX L 4,701129,963.80.39 0,70800LIXA PARA MADEIRA UN 0,233640,336.96.02 0,10000MODULO DE VERBA MV 24,23500242,35

LS 48,32531 BDI 40,71931Mão-de-Obra 39,61091 Material 89,10426SubMO 87,93622

16.30.013 CANTEIRO DE OBRAS - LARG 3,30M M2 259,42

1.01.11 1,36000CARPINTEIRO H 6,188004,551.01.12 1,34000AJUDANTE DE CARPINTEIRO H 5,306403,961.01.39 0,87000PEDREIRO H 4,045504,651.01.40 0,82800PINTOR H 3,899884,711.01.41 0,73600AJUDANTE DE PINTOR H 2,811523,821.01.46 2,77000SERVENTE H 10,553703,812.05.03 0,05000AREIA M3 3,9600079,202.05.08 18,41000CIMENTO KG 6,811700,372.05.18 0,89000PEDRA BRITADA 2 M3 54,3701061,092.10.01 2,15000CAIBRO PEROBA DE 5X6CM M 9,180504,272.10.05 0,00270MADEIRA SERRADA PESADA EXTERNA (G1-C5) M3 3,768361.395,692.10.32 0,33330CHAPA COMPENSADA RESINADA E=12MM M2 4,0329312,102.10.60 1,61000RIPA DE PEROBA 1X5CM M 3,590302,232.56.61 0,55200TELHA TECNOLOGIA CRFS ONDULADA 6MM M2 7,2367213,112.66.07 0,70000PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA UN 0,343000,492.67.60 0,04000PREGO KG 0,182804,573.75.13 0,46000TINTA LATEX ECONOMICA L 1,987204,323.80.09 0,36800SELADOR P/PINTURA LATEX L 3,665289,963.80.39 0,55200LIXA PARA MADEIRA UN 0,182160,336.96.02 0,16000MODULO DE VERBA MV 38,77600242,35

LS 40,02210 BDI 48,51026Mão-de-Obra 32,80500 Material 138,08705SubMO 72,82710

16.30.014 TAPUME MOVEL VERTICAL M 41,84

1.01.11 0,32290CARPINTEIRO H 1,469204,55

09/02/2011 11:38:40 Página: 348 de 0

Page 349: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.12 0,32290AJUDANTE DE CARPINTEIRO H 1,278683,961.01.21 0,03330FERREIRO H 0,158844,771.01.22 0,03330AJUDANTE DE FERREIRO H 0,127213,821.01.39 0,04000PEDREIRO H 0,186004,651.01.40 0,66150PINTOR H 3,115674,711.01.41 0,58800AJUDANTE DE PINTOR H 2,246163,821.01.46 0,10670SERVENTE H 0,406533,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 2,20000CIMENTO KG 0,814000,372.05.18 0,00530PEDRA BRITADA 2 M3 0,3237861,092.10.14 0,16670SARRAFO PINHO APARELHADO 5X2,5 CM M 0,348402,092.10.21 0,33330TABUAS PINHO DE 1"X12" DE 3A. M2 5,7260917,182.10.32 0,08830CHAPA COMPENSADA RESINADA E=12MM M2 1,0684312,102.10.60 0,89710RIPA DE PEROBA 1X5CM M 2,000532,232.15.25 0,38330ACO CA-50-A $MD BITOLAS KG 1,034912,702.67.60 0,01760PREGO KG 0,080434,572.70.10 0,00670ARAME RECOZIDO N.18 KG 0,031024,633.75.13 0,36750TINTA LATEX ECONOMICA L 1,587604,323.80.09 0,05880SELADOR P/PINTURA LATEX L 0,585659,963.80.39 0,44100LIXA PARA MADEIRA UN 0,145530,33

LS 10,96570 BDI 7,82395Mão-de-Obra 8,98828 Material 14,06318SubMO 19,95398

16.30.015 TAPUME MOVEL HORIZONTAL M 23,77

1.01.11 0,20880CARPINTEIRO H 0,950044,551.01.12 0,20880AJUDANTE DE CARPINTEIRO H 0,826853,961.01.21 0,03330FERREIRO H 0,158844,771.01.22 0,03330AJUDANTE DE FERREIRO H 0,127213,821.01.39 0,04000PEDREIRO H 0,186004,651.01.40 0,32850PINTOR H 1,547244,711.01.41 0,29200AJUDANTE DE PINTOR H 1,115443,821.01.46 0,10670SERVENTE H 0,406533,812.05.03 0,00400AREIA M3 0,3168079,202.05.08 2,20000CIMENTO KG 0,814000,372.05.18 0,00530PEDRA BRITADA 2 M3 0,3237861,092.10.14 0,16670SARRAFO PINHO APARELHADO 5X2,5 CM M 0,348402,092.10.21 0,04170TABUAS PINHO DE 1"X12" DE 3A. M2 0,7164117,182.10.32 0,04480CHAPA COMPENSADA RESINADA E=12MM M2 0,5420812,102.10.60 0,45050RIPA DE PEROBA 1X5CM M 1,004622,232.15.25 0,38330ACO CA-50-A $MD BITOLAS KG 1,034912,702.67.60 0,01710PREGO KG 0,078154,572.70.10 0,00670ARAME RECOZIDO N.18 KG 0,031024,633.75.13 0,18250TINTA LATEX ECONOMICA L 0,788404,323.80.09 0,14600SELADOR P/PINTURA LATEX L 1,454169,963.80.39 0,21900LIXA PARA MADEIRA UN 0,072270,33

LS 6,48813 BDI 4,44619Mão-de-Obra 5,31814 Material 7,52499SubMO 11,80626

16.30.016 ANDAIME - FACHADA - ALUGUEL MENSAL M2 6,66

2.12.10 1,00000ANDAIME-FACHADA-ALUGUEL MENSAL M2 5,420005,42

LS 0,00000 BDI 1,24660Mão-de-Obra 0,00000 Material 5,42000SubMO 0,00000

16.30.017 ANDAIME - TORRE - ALUGUEL MENSAL M 16,33

2.12.21 1,00000ANDAIME TIPO TORRE - ALUGUEL MENSAL M 13,2800013,28

LS 0,00000 BDI 3,05440Mão-de-Obra 0,00000 Material 13,28000SubMO 0,00000

16.31.019 REFORCO FUNDACOES ESTACAS RAIZ 50T M 258,73

1.01.21 0,30000FERREIRO H 1,431004,771.01.46 0,30000SERVENTE H 1,143003,812.02.73 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=200MM ATE 50 TF M 158,48000158,482.05.03 0,06500AREIA M3 5,1480079,202.05.08 40,00000CIMENTO KG 14,800000,372.15.20 10,20000ACO CA-50 DE 5/8" - 15,9MM KG 26,214002,57

LS 3,14028 BDI 48,38194Mão-de-Obra 2,57400 Material 204,64200SubMO 5,71428

16.31.021 REFORCO FUNDACOES ESTACA RAIZ 20T M 224,46

1.01.21 0,26000FERREIRO H 1,240204,771.01.46 0,26000SERVENTE H 0,990603,812.02.71 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=150MM ATE 25 TF M 140,34000140,342.05.03 0,04500AREIA M3 3,5640079,202.05.08 27,00000CIMENTO KG 9,990000,372.15.20 9,20000ACO CA-50 DE 5/8" - 15,9MM KG 23,644002,57

LS 2,72158 BDI 41,97279Mão-de-Obra 2,23080 Material 177,53800SubMO 4,95238

16.31.023 REFORCO FUNDACOES ESTACA RAIZ 30T M 236,21

1.01.21 0,26000FERREIRO H 1,240204,771.01.46 0,26000SERVENTE H 0,990603,812.02.72 1,00000MAO DE OBRA EQUIP P/ ESTACA RAIZ D=160MM ATE 30 TF M 147,94000147,942.05.03 0,05100AREIA M3 4,0392079,20

09/02/2011 11:38:40 Página: 349 de 0

Page 350: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.08 31,00000CIMENTO KG 11,470000,372.15.20 9,20000ACO CA-50 DE 5/8" - 15,9MM KG 23,644002,57

LS 2,72158 BDI 44,17048Mão-de-Obra 2,23080 Material 187,09320SubMO 4,95238

16.31.024 ESTACA REACAO PARA 20T CRAVADA ALEM 5,00M DE PROFUNDIDADE M 199,62

2.02.10 1,00000ESTACA REACAO P/ 20T CRAVADA ALEM 5.00M PROF M 162,30000162,30

LS 0,00000 BDI 37,32900Mão-de-Obra 0,00000 Material 162,30000SubMO 0,00000

16.31.025 ESTACA REACAO P/20T CRAVADA ATE 5,00 M DE PROFUNDIDADE UN 1.312,37

2.02.11 1,00000ESTACA REACAO P/ 20T CRAVADA ATE 5.00M PROF UN 1.066,970001.066,97

LS 0,00000 BDI 245,40310Mão-de-Obra 0,00000 Material 1.066,97000SubMO 0,00000

16.31.026 ESTACA REACAO PARA 30T CRAVADA ALEM 5,00M DE PROFUNDIDADE M 202,08

2.02.12 1,00000ESTACA REACAO P/30T CRAVADA ALEM 5.00M PROF M 164,30000164,30

LS 0,00000 BDI 37,78900Mão-de-Obra 0,00000 Material 164,30000SubMO 0,00000

16.31.027 ESTACA REACAO P/30T CRAVADA ATE 5,00M DE PROFUNDIDADE UN 1.649,39

2.02.13 1,00000ESTACA REACAO P/30T CRAVADA ATE 5.00M PROF UN 1.340,970001.340,97

LS 0,00000 BDI 308,42310Mão-de-Obra 0,00000 Material 1.340,97000SubMO 0,00000

16.32.034 JATEAMENTO ABRASIVO COM ÓXIDO DE ALUMÍNIO M2 27,04

1.01.46 0,48000SERVENTE H 1,828803,811.01.55 0,19200OPERADOR H 1,334406,958.01.97 0,19200EQUIPAMENTO JATO DE AREIA COMPLETO C/COMPRESSOR H 4,2067221,918.81.14 3,00000OLEO DIESEL L 6,000002,009.10.21 4,00000OXIDO DE ALUMINIO KG 4,760001,19

LS 3,85910 BDI 5,05748Mão-de-Obra 3,16320 Material 14,96672SubMO 7,02230

16.35.001 DEFINICAO E DEMARCACAO DA AREA DE REPARO, COM DISCO DE CORTE M 2,93

1.01.39 0,10000PEDREIRO H 0,465004,651.01.46 0,10000SERVENTE H 0,381003,818.80.70 0,02000DISCO DE CORTE DIAMANTADO UN 0,4606023,039.00.01 0,10000SERRA CIRCULAR MANUAL H 0,048000,48

LS 1,03212 BDI 0,54895Mão-de-Obra 0,84600 Material 0,50860SubMO 1,87812

16.35.002 ESCARIFICACAO MANUAL (CORTE DE CONCRETO) ATE 3CM DE PROFUNDIDADE M2 104,03

1.01.46 10,00000SERVENTE H 38,100003,81

LS 46,48200 BDI 19,45386Mão-de-Obra 38,10000 Material 0,00000SubMO 84,58200

16.35.003 ESCARIFICACAO COM DISCO DE DESBASTE ATE 0,5CM DE PROFUNDIDADE M2 14,75

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,813.80.05 0,26000DISCO DE DESBASTE 7" UN 2,314008,909.00.02 0,50000LIXADEIRA ELETRICA H 0,295000,59

LS 5,16060 BDI 2,75991Mão-de-Obra 4,23000 Material 2,60900SubMO 9,39060

16.35.004 ESCARIFICACAO MECANICA,CORTE DE CONCRETO ATE 3,0CM PROFUNDIDADE M2 70,06

1.01.39 3,60000PEDREIRO H 16,740004,651.01.46 1,80000SERVENTE H 6,858003,819.00.03 3,60000REBARBADOR ELETRICO E PONTEIROS H 4,572001,27

LS 28,78956 BDI 13,10070Mão-de-Obra 23,59800 Material 4,57200SubMO 52,38756

16.35.005 DEMOLICAO C/MARTELETES PNEUMATICOS ATE 5,0CM DE PROFUNDIDADE M2 139,88

1.01.39 5,00000PEDREIRO H 23,250004,651.01.46 1,50000SERVENTE H 5,715003,818.81.14 5,00000OLEO DIESEL L 10,000002,009.00.04 2,50000COMPRESSOR (250 PCM) 2 MARTEL TEX20 FILTROS LINHA H 39,4250015,77

LS 35,33730 BDI 26,15728Mão-de-Obra 28,96500 Material 49,42500SubMO 64,30230

16.35.006ESCARIFICACAO MECANICA,CORTE CONCRETO C/REBARBADORES ELETR ATE5,0CM

M2 116,76

1.01.39 6,00000PEDREIRO H 27,900004,651.01.46 3,00000SERVENTE H 11,430003,819.00.03 6,00000REBARBADOR ELETRICO E PONTEIROS H 7,620001,27

LS 47,98260 BDI 21,83450Mão-de-Obra 39,33000 Material 7,62000SubMO 87,31260

16.35.007 LIXAMENTO ELETRICO DE ARMADURA C/ESCOVA CIRCULAR M 3,04

1.01.46 0,25000SERVENTE H 0,952503,819.00.02 0,25000LIXADEIRA ELETRICA H 0,147500,599.10.02 0,05000ESCOVAS CIRCULAR COM CERDAS DE ACO UN 0,210004,20

LS 1,16205 BDI 0,56857Mão-de-Obra 0,95250 Material 0,35750SubMO 2,11455

16.35.008 ESCOVAMENTO MANUAL M2 4,23

1.01.46 0,33000SERVENTE H 1,257303,819.10.03 0,25000ESCOVAS RETANGULAR COM CERDAS DE ACO UN 0,650002,60

09/02/2011 11:38:40 Página: 350 de 0

Page 351: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 1,53391 BDI 0,79148Mão-de-Obra 1,25730 Material 0,65000SubMO 2,79121

16.35.009 PISTOLA DE AGULHA M2 55,09

1.01.39 4,00000PEDREIRO H 18,600004,659.00.05 4,00000PISTOLA ELETROMECANICA H 3,400000,859.10.04 0,00100JOGO DE AGULHAS PARA PISTOLA ELETROMECANICA UN 0,10350103,50

LS 22,69200 BDI 10,30297Mão-de-Obra 18,60000 Material 3,50350SubMO 41,29200

16.35.011 QUEIMA CONTROLADA M2 18,78

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 0,50000SERVENTE H 1,905003,819.10.06 0,20000GAS KG 0,722003,61

LS 7,99710 BDI 3,51304Mão-de-Obra 6,55500 Material 0,72200SubMO 14,55210

16.35.012 APLICACAO DE SOLVENTE EM SUBSTRATO IMPREGNADOS M2 9,21

1.01.46 0,33000SERVENTE H 1,257303,819.10.07 0,50000REMOVEDOR DE GRAXAS BASE SOLVENTE NAO CORROSIVO L 4,700009,40

LS 1,53391 BDI 1,72298Mão-de-Obra 1,25730 Material 4,70000SubMO 2,79121

16.35.013 FREZAMENTO MECANICO COM MAQUINA DE DESBASTE M2 18,90

1.01.39 0,75000PEDREIRO H 3,487504,651.01.46 0,50000SERVENTE H 1,905003,819.00.08 0,75000FREZADORA E ESCARIFICADORA MECANICA (MOD F-30) H 3,397504,53

LS 6,57885 BDI 3,53484Mão-de-Obra 5,39250 Material 3,39750SubMO 11,97135

16.35.014 LIMPEZA DO SUBSTRATO COM APLICACAO DE JATO DE AGUA FRIA M2 5,93

1.01.39 0,22000PEDREIRO H 1,023004,651.01.46 0,11000SERVENTE H 0,419103,819.00.09 0,22000MAQUINA LAVA-JATO(AGUA FRIA, PRES 1700PSI) H 0,420201,919.10.08 1,00000SOLUCAO LIMPADORA DILUIDA EM AGUA L 1,200001,20

LS 1,75936 BDI 1,10898Mão-de-Obra 1,44210 Material 1,62020SubMO 3,20146

16.35.015 LIMPEZA DO SUBSTRATO COM APLICACAO DE JATO DE AGUA QUENTE M2 8,43

1.01.39 0,26000PEDREIRO H 1,209004,651.01.46 0,13000SERVENTE H 0,495303,819.00.10 0,26000MAQUINA LAVA-JATO (AGUA QUENTE/FRIA PRES 1700PSI) H 0,845003,259.10.08 1,00000SOLUCAO LIMPADORA DILUIDA EM AGUA L 1,200001,209.10.09 0,13000QUEROSENE L 1,028307,91

LS 2,07925 BDI 1,57708Mão-de-Obra 1,70430 Material 3,07330SubMO 3,78355

16.35.016 LIMPEZA DO SUBSTRATO, LAVAGEM COM SOLUCOES ACIDAS, PISOS E PAREDES M2 5,08

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,10000SERVENTE H 0,381003,819.10.10 1,00000SOLUCAO ACIDA DILUIDA EM AGUA - MURIATICO L 1,220001,22

LS 1,59942 BDI 0,95000Mão-de-Obra 1,31100 Material 1,22000SubMO 2,91042

16.35.017 LIMPEZA DO SUBSTRATO,LAVAGEM COM SOLUCOES ALCALINAS,PISOS E PAREDES M2 3,82

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,10000SERVENTE H 0,381003,819.10.11 2,00000SOLUCAO ALCALINA Ca(OH)2 + H20 (EM MASSA 1:5) L 0,200000,10

LS 1,59942 BDI 0,71540Mão-de-Obra 1,31100 Material 0,20000SubMO 2,91042

16.35.018 LIMPEZA PARA REMOCAO DE OLEOS E GRAXAS IMPREGNADOS SUPERFICIALMENTE M2 8,38

1.01.46 0,25000SERVENTE H 0,952503,819.10.07 0,50000REMOVEDOR DE GRAXAS BASE SOLVENTE NAO CORROSIVO L 4,700009,40

LS 1,16205 BDI 1,56735Mão-de-Obra 0,95250 Material 4,70000SubMO 2,11455

16.35.019 LIMPEZA DO SUBSTRATO, COM JATO DE AR COMPRIMIDO M2 4,34

1.01.55 0,10000OPERADOR H 0,695006,958.81.14 0,43000OLEO DIESEL L 0,860002,009.00.11 0,10000COMPRESSOR DE 125/250PCM,MANGUEIRA E FILTRO LINHA H 1,1280011,28

LS 0,84790 BDI 0,81211Mão-de-Obra 0,69500 Material 1,98800SubMO 1,54290

16.35.020 LIMPEZA DO SUBSTRATO COM UTILIZACAO DE SOLVENTE VOLATEIS M2 9,30

1.01.46 0,25000SERVENTE H 0,952503,819.10.12 0,50000ACETONA L 5,2600010,529.10.13 0,01000ESTOPA KG 0,052305,239.10.14 0,01000ALGODAO KG 0,1396013,96

LS 1,16205 BDI 1,74028Mão-de-Obra 0,95250 Material 5,45190SubMO 2,11455

16.35.021 PREPARACAO DO SUBSTRATOS POR SATURACAO COM AGUA M2 3,34

1.01.46 0,20000SERVENTE H 0,762003,819.10.15 1,00000SACOS DE ANINHAGEM UN 1,030001,03

LS 0,92964 BDI 0,62598Mão-de-Obra 0,76200 Material 1,03000SubMO 1,69164

09/02/2011 11:38:40 Página: 351 de 0

Page 352: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.35.022 PREPARACAO DO SUBSTRATO POR APICOAMENTO MANUAL DA SUPERFICIE M2 26,00

1.01.46 2,50000SERVENTE H 9,525003,81

LS 11,62050 BDI 4,86347Mão-de-Obra 9,52500 Material 0,00000SubMO 21,14550

16.36.001 REPAROS SUP LOC,ARGAM CIM C/POLIMEROS (1,0<ESP<3.0CM)-TIPO E M2 88,87

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 1,50000SERVENTE H 5,715003,819.10.16 52,00000FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E KG 28,600000,55

LS 23,99130 BDI 16,61895Mão-de-Obra 19,66500 Material 28,60000SubMO 43,65630

16.36.002 REPAROS SUP LOC,ARGAM CIM C/POLIMEROS (1,0<ESP<3.0CM)-TIPO M M2 107,42

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 1,50000SERVENTE H 5,715003,819.10.70 52,00000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M KG 43,680000,84

LS 23,99130 BDI 20,08735Mão-de-Obra 19,66500 Material 43,68000SubMO 43,65630

16.36.003 REPAROS SUP LOC,ARGAM CIM C/POLIMEROS (1,0<ESP<3,0CM)-TIPO F M2 120,21

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 1,50000SERVENTE H 5,715003,819.10.71 52,00000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F KG 54,080001,04

LS 23,99130 BDI 22,47935Mão-de-Obra 19,66500 Material 54,08000SubMO 43,65630

16.36.005 REPAROS SUPERF LOCALIZ, ARGAM POLIMERICA BASE EPOXI (0,5<ESP<1,5CM) M2 474,73

1.01.39 3,50000PEDREIRO H 16,275004,651.01.46 2,00000SERVENTE H 7,620003,819.10.17 34,50000ARGAMASSA POLIMERICA BASE EPOXI KG 330,165009,579.10.18 0,18000SOLVENTE PARA MATERIAIS BASE EPOXI L 2,7504015,28

LS 29,15190 BDI 88,77133Mão-de-Obra 23,89500 Material 332,91540SubMO 53,04690

16.36.006 REPAROS SUPERF LOCALIZ,ARGAM POLIMERICA BASE POLIESTER (0,5<ESP<1,5CM) M2 260,78

1.01.39 3,50000PEDREIRO H 16,275004,651.01.46 2,00000SERVENTE H 7,620003,819.10.19 28,80000PREPARO E FORNECIMENTO DE ARGAMASSA BASE POLIESTER KG 158,976005,52

LS 29,15190 BDI 48,76527Mão-de-Obra 23,89500 Material 158,97600SubMO 53,04690

16.37.001 REPAROS SUPERF ARGAM BASE CIMENTO C/POLIMEROS (1,0<ESP<5,0CM)-TIPO E M2 102,82

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 1,30000SERVENTE H 4,953003,819.10.16 83,20000FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E KG 45,760000,55

LS 20,79246 BDI 19,22696Mão-de-Obra 17,04300 Material 45,76000SubMO 37,83546

16.37.002 REPAROS SUPERF ARGAM BASE CIMENTO C/POLIMEROS (1,0<ESP<5,0CM)-TIPO M M2 132,49

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 1,30000SERVENTE H 4,953003,819.10.70 83,20000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M KG 69,888000,84

LS 20,79246 BDI 24,77640Mão-de-Obra 17,04300 Material 69,88800SubMO 37,83546

16.37.003 REPAROS SUPERF ARGAM BASE CIMENTO C/POLIMEROS (1,0<ESP<5,0CM)-TIPO F M2 152,96

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 1,30000SERVENTE H 4,953003,819.10.71 83,20000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F KG 86,528001,04

LS 20,79246 BDI 28,60360Mão-de-Obra 17,04300 Material 86,52800SubMO 37,83546

16.37.005 REPAROS SUPERF COM ARGAMASSA PROJETADA (1,0<ESP<7,0CM)-TIPO E M2 152,64

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 1,30000SERVENTE H 4,953003,811.01.55 0,08000OPERADOR H 0,556006,959.00.12 0,00110BICO PROJETOR COMPLETO UN 0,47922435,659.00.13 0,02790MANGOTE DE 1 1/2" M 2,1452376,899.00.14 0,08000MAQUINA DE JATO VIA SECA H 0,9072011,349.00.15 0,00330DISCO DE FERRO UN 0,46774141,749.00.16 0,00330DISCO DE BORRACHA SUPERIOR UN 0,47428143,729.00.17 0,00330DISCO DE BORRACHA INFERIOR UN 0,47428143,729.10.16 145,60000FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E KG 80,080000,55

LS 21,47078 BDI 28,54248Mão-de-Obra 17,59900 Material 85,02794SubMO 39,06978

16.37.006 REPAROS SUPERF COM ARGAMASSA PROJETADA (1,0<ESP<7,0CM)-TIPO M M2 204,57

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 1,30000SERVENTE H 4,953003,811.01.55 0,08000OPERADOR H 0,556006,959.00.12 0,00110BICO PROJETOR COMPLETO UN 0,47922435,659.00.13 0,02790MANGOTE DE 1 1/2" M 2,1452376,899.00.14 0,08000MAQUINA DE JATO VIA SECA H 0,9072011,349.00.15 0,00330DISCO DE FERRO UN 0,46774141,749.00.16 0,00330DISCO DE BORRACHA SUPERIOR UN 0,47428143,72

09/02/2011 11:38:40 Página: 352 de 0

Page 353: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

9.00.17 0,00330DISCO DE BORRACHA INFERIOR UN 0,47428143,729.10.70 145,60000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M KG 122,304000,84

LS 21,47078 BDI 38,25400Mão-de-Obra 17,59900 Material 127,25194SubMO 39,06978

16.37.007 REPAROS SUPERF COM ARGAMASSA PROJETADA (1,0<ESP<7,0CM)-TIPO F M2 240,39

1.01.39 2,60000PEDREIRO H 12,090004,651.01.46 1,30000SERVENTE H 4,953003,811.01.55 0,08000OPERADOR H 0,556006,959.00.12 0,00110BICO PROJETOR COMPLETO UN 0,47922435,659.00.13 0,02790MANGOTE DE 1 1/2" M 2,1452376,899.00.14 0,08000MAQUINA DE JATO VIA SECA H 0,9072011,349.00.15 0,00330DISCO DE FERRO UN 0,46774141,749.00.16 0,00330DISCO DE BORRACHA SUPERIOR UN 0,47428143,729.00.17 0,00330DISCO DE BORRACHA INFERIOR UN 0,47428143,729.10.71 145,60000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F KG 151,424001,04

LS 21,47078 BDI 44,95160Mão-de-Obra 17,59900 Material 156,37194SubMO 39,06978

16.37.009 REPAROS SUPERF ESTUCAM CORRETIVO,C/ARGAM POLIMERICA ESP<5MM-TIPO E M2 18,58

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,819.10.16 10,40000FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E KG 5,720000,55

LS 5,16060 BDI 3,47544Mão-de-Obra 4,23000 Material 5,72000SubMO 9,39060

16.37.010 REPAROS SUPERF ESTUCAM CORRETIVO,C/ARGAM POLIMERICA ESP<5MM-TIPO M M2 22,29

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,819.10.70 10,40000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M KG 8,736000,84

LS 5,16060 BDI 4,16912Mão-de-Obra 4,23000 Material 8,73600SubMO 9,39060

16.37.011 REPAROS SUPERF ESTUCAM CORRETIVO,C/ARGAM POLIMERICA ESP<5MM-TIPO F M2 24,85

1.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,819.10.71 10,40000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F KG 10,816001,04

LS 5,16060 BDI 4,64752Mão-de-Obra 4,23000 Material 10,81600SubMO 9,39060

16.38.001 REPAROS DE JUNTAS C/ARGAM BASE CIMENTO C/POLIMEROS-TIPO E M2 106,77

1.01.39 4,00000PEDREIRO H 18,600004,651.01.46 2,00000SERVENTE H 7,620003,819.10.16 52,00000FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E KG 28,600000,55

LS 31,98840 BDI 19,96593Mão-de-Obra 26,22000 Material 28,60000SubMO 58,20840

16.38.002 REPAROS DE JUNTAS C/ARGAM BASE CIMENTO C/POLIMEROS-TIPO M M2 125,32

1.01.39 4,00000PEDREIRO H 18,600004,651.01.46 2,00000SERVENTE H 7,620003,819.10.70 52,00000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M KG 43,680000,84

LS 31,98840 BDI 23,43433Mão-de-Obra 26,22000 Material 43,68000SubMO 58,20840

16.38.003 REPAROS DE JUNTAS C/ARGAM BASE CIMENTO C/ POLIMEROS-TIPO F M2 138,11

1.01.39 4,00000PEDREIRO H 18,600004,651.01.46 2,00000SERVENTE H 7,620003,819.10.71 52,00000FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F KG 54,080001,04

LS 31,98840 BDI 25,82633Mão-de-Obra 26,22000 Material 54,08000SubMO 58,20840

16.38.005 REPAROS EM JUNTAS, C/ARGAM BASE EPOXI P/ESP ATE 1,5CM M2 492,63

1.01.39 4,50000PEDREIRO H 20,925004,651.01.46 2,50000SERVENTE H 9,525003,819.10.17 34,50000ARGAMASSA POLIMERICA BASE EPOXI KG 330,165009,579.10.18 0,18000SOLVENTE PARA MATERIAIS BASE EPOXI L 2,7504015,28

LS 37,14900 BDI 92,11831Mão-de-Obra 30,45000 Material 332,91540SubMO 67,59900

16.38.006 JUNTAS C/ELASTOMEROS POLISSULFETOS OU BOR SILICONE SEC TRANSV 2X2CM D3 113,09

1.01.39 0,33000PEDREIRO H 1,534504,651.01.46 0,10000SERVENTE H 0,381003,819.10.22 2,50000MANGUEIRA CRISTAL DIAM 3/4" ESP=2MM M 5,275002,119.10.23 1,00000SELANTE PARA ENCHIMENTO DE JUNTAS L 82,4200082,42

LS 2,33691 BDI 21,14790Mão-de-Obra 1,91550 Material 87,69500SubMO 4,25241

16.39.001 REPAROS PROFUNDOS COM GRAUTE BASE CIMENTO (3,0<ESP<5,0CM) M3 2.437,19

1.01.39 18,00000PEDREIRO H 83,700004,651.01.46 18,00000SERVENTE H 68,580003,812.05.70 1.980,00000GRAUTH KG 1.643,400000,83

LS 185,78160 BDI 455,73617Mão-de-Obra 152,28000 Material 1.643,40000SubMO 338,06160

16.39.002 REPAROS PROFUNDOS, MICROCONCRETO COM POLIMEROS (5,0<ESP<30,0CM) M3 2.570,89

1.01.39 21,50000PEDREIRO H 99,975004,651.01.46 21,50000SERVENTE H 81,915003,81

09/02/2011 11:38:40 Página: 353 de 0

Page 354: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.05.22 0,65000PEDRISCO M3 42,9650066,102.05.70 1.980,00000GRAUTH KG 1.643,400000,83

LS 221,90580 BDI 480,73698Mão-de-Obra 181,89000 Material 1.686,36500SubMO 403,79580

16.39.003 REPAROS PROF EXEC C/ARGAM SECA DRY PACK ISENTA RETR(3,0<ESP<10,0CM) M3 2.798,02

1.01.39 52,00000PEDREIRO H 241,800004,651.01.46 26,00000SERVENTE H 99,060003,812.05.17 0,55000PEDRA BRITADA 1 M3 34,0615061,939.10.73 2.215,00000ARGAMASSA SECA TIPO DRY PACK KG 1.484,050000,67

LS 415,84920 BDI 523,20876Mão-de-Obra 340,86000 Material 1.518,11150SubMO 756,70920

16.39.004 FORMAS PARA REPAROS PROFUNDOS (ESP>3,0CM) M2 164,21

1.01.11 6,00000CARPINTEIRO H 27,300004,551.01.12 6,00000AJUDANTE DE CARPINTEIRO H 23,760003,962.10.09 3,00000PONTALETE PINHO DE 3"X3" M 11,340003,782.10.16 3,50000SARRAFO DE PINHO DE 1X4" DE 3A CONSTR M 4,760001,362.10.32 0,25000CHAPA COMPENSADA RESINADA E=12MM M2 3,0250012,102.65.69 0,20000PREGO 18X27 KG 1,028005,14

LS 62,29320 BDI 30,70643Mão-de-Obra 51,06000 Material 20,15300SubMO 113,35320

16.39.005 APLICACAO DE MEMBRANA DE CURA QUIMICA EM REPAROS ESTRUTURAIS M2 4,92

1.01.46 0,40000SERVENTE H 1,524003,812.40.45 0,20000CURING L 0,624003,12

LS 1,85928 BDI 0,92167Mão-de-Obra 1,52400 Material 0,62400SubMO 3,38328

16.40.001 PROTECAO DE ARMADURAS COM TINTA DE ALTO TEOR DE ZINCO M 3,25

1.01.46 0,25000SERVENTE H 0,952503,813.80.46 0,01600PRIMER ANTIOXIDANTE RICO EM ZINCO KG 0,5195232,479.10.65 0,00400SOLVENTE KG 0,012323,08

LS 1,16205 BDI 0,60867Mão-de-Obra 0,95250 Material 0,53184SubMO 2,11455

16.40.002 ARGAMASSA OU CONCRETO DE REPARO COM INIBIDORES DE CORROSAO M3 702,36

1.01.39 15,00000PEDREIRO H 69,750004,651.01.46 15,00000SERVENTE H 57,150003,812.05.03 0,62000AREIA M3 49,1040079,202.05.08 450,00000CIMENTO KG 166,500000,372.05.17 0,79000PEDRA BRITADA 1 M3 48,9247061,939.10.24 7,00000INIBIDOR DE CORROSAO (NITRO DE SODIO OU CALCIO) KG 24,780003,54

LS 154,81800 BDI 131,33614Mão-de-Obra 126,90000 Material 289,30870SubMO 281,71800

16.41.001 EMENDA POR TRASPASSE, PARA RECONSTITUICAO DA SECAO DA ARMADURA KG 7,17

1.01.21 0,16000FERREIRO H 0,763204,771.01.22 0,16000AJUDANTE DE FERREIRO H 0,611203,822.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,639.10.72 1,05000ACO CA 50 (1/2") KG 2,688002,56

LS 1,67677 BDI 1,34131Mão-de-Obra 1,37440 Material 2,78060SubMO 3,05117

16.41.002 EMENDAS POR SOLDA DE TOPO, P/RECONSTITUICAO DA SECAO DA ARMADURA UN 7,96

1.01.44 0,20000SERRALHEIRO H 1,616008,081.01.45 0,20000AJUDANTE SERRALHEIRO H 0,868004,349.10.25 0,05000ELETRODO E7018 OU E6013 (AWS) KG 0,6590013,189.10.26 0,50000PONTAS DE FERRO AUXILIARES KG 0,300000,60

LS 3,03048 BDI 1,48890Mão-de-Obra 2,48400 Material 0,95900SubMO 5,51448

16.42.001 REPARO ESTRUTURAL POR INJECAO RESINA BASE EPOXI EM FISSURAS 0,3A9,0MM M 255,85

1.01.39 1,50000PEDREIRO H 6,975004,651.01.46 1,60000SERVENTE H 6,096003,819.00.18 1,00000CENTRAL INJECAO RESINA C/TANQUE REG PRES E COMPRES H 3,500003,509.10.18 0,12000SOLVENTE PARA MATERIAIS BASE EPOXI L 1,8336015,289.10.28 1,00000TUBOS PLASTICOS PARA INJECAO DE GRAUTE M 2,040002,049.10.29 0,20000PASTA TIXOTROPICA BASE POLIESTER SELANTE KG 7,1240035,629.10.30 2,10000PASTA DE ALTA PERFORMANCE P/INJECAO BASE IPOXI KG 164,4930078,33

LS 15,94662 BDI 47,84189Mão-de-Obra 13,07100 Material 178,99060SubMO 29,01762

16.42.002 REPARO ESTRUTURAL C/APLICACAO DE GRAUTE BASE EPOXI TRINCAS DE 10A40MM M 87,09

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,812.10.14 0,25000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,522502,092.10.32 0,10000CHAPA COMPENSADA RESINADA E=12MM M2 1,2100012,102.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,639.10.18 0,12000SOLVENTE PARA MATERIAIS BASE EPOXI L 1,8336015,289.10.27 3,50000ARGAMASSA GRAUTE,BASE EPOXI KG 52,7100015,06

LS 7,93610 BDI 16,28625Mão-de-Obra 6,50500 Material 56,36870SubMO 14,44110

16.42.003 REPARO ESTR VIGAS LAJES PILARES C/APLIC GRAUTE BASE EPOXI VAOS 35A70MM M 120,43

09/02/2011 11:38:40 Página: 354 de 0

Page 355: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.39 0,50000PEDREIRO H 2,325004,651.01.46 0,50000SERVENTE H 1,905003,812.10.14 0,25000SARRAFO PINHO APARELHADO 5X2,5 CM M 0,522502,092.10.32 0,10000CHAPA COMPENSADA RESINADA E=12MM M2 1,2100012,102.70.10 0,02000ARAME RECOZIDO N.18 KG 0,092604,639.10.18 0,12000SOLVENTE PARA MATERIAIS BASE EPOXI L 1,8336015,289.10.27 5,30000ARGAMASSA GRAUTE,BASE EPOXI KG 79,8180015,06

LS 7,93610 BDI 22,52109Mão-de-Obra 6,50500 Material 83,47670SubMO 14,44110

16.42.004 TRATAMENTO DE MICRO FISSURAS POR SILICATACAO OU FLUORSILICATACAO M2 7,34

1.01.39 0,27000PEDREIRO H 1,255504,651.01.46 0,27000SERVENTE H 1,028703,819.10.32 0,25000PRODUTO A BASE DE SILICATO DE SODIO KG 0,900003,60

LS 2,78672 BDI 1,37331Mão-de-Obra 2,28420 Material 0,90000SubMO 5,07092

16.43.001 FUROS EM CONCRETO COM D=1" E PROFUNDIDADE 5CM UN 6,16

1.01.46 0,38000SERVENTE H 1,447803,819.00.19 0,33000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,257400,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.33 0,03000BROCA COM PONTA DE VIDIA (D=1"X160MM) UN 1,5285050,95

LS 1,76632 BDI 1,15345Mão-de-Obra 1,44780 Material 1,80090SubMO 3,21412

16.43.002 FUROS EM CONCRETO COM D=1" E PROFUNDIDADE 15CM UN 16,41

1.01.46 0,96000SERVENTE H 3,657603,819.00.19 0,90000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,702000,789.00.20 0,06000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,018000,309.10.34 0,06000BROCA COM PONTA DE VIDIA (D=1"X330MM) UN 4,5060075,10

LS 4,46227 BDI 3,06955Mão-de-Obra 3,65760 Material 5,22600SubMO 8,11987

16.43.003 FUROS EM CONCRETO COM D=1" E PROFUNDIDADE 30CM UN 13,49

1.01.46 0,30000SERVENTE H 1,143003,819.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.00.22 0,25000EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80) H 2,5825010,339.10.35 0,02000BROCA EXTRATORA C/PONTA DE DIAMANTE (D=1"X400MM UN 5,84000292,00

LS 1,39446 BDI 2,52424Mão-de-Obra 1,14300 Material 8,43750SubMO 2,53746

16.43.004 FUROS EM CONCRETO COM D=3/4" E PROFUNDIDADE 5CM UN 5,21

1.01.46 0,35000SERVENTE H 1,333503,819.00.19 0,30000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,234000,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.36 0,03000BROCA COM PONTA DE VIDIA (D=3/4"X160MM) UN 1,0326034,42

LS 1,62687 BDI 0,97565Mão-de-Obra 1,33350 Material 1,28160SubMO 2,96037

16.43.005 FUROS EM CONCRETO COM D=3/4" E PROFUNDIDADE 15CM UN 14,90

1.01.46 0,90000SERVENTE H 3,429003,819.00.19 0,85000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,663000,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.37 0,06000BROCA COM PONTA DE VIDIA (D=3/4"X330MM) UN 3,8280063,80

LS 4,18338 BDI 2,78723Mão-de-Obra 3,42900 Material 4,50600SubMO 7,61238

16.43.006 FUROS EM CONCRETO COM D=3/4" E PROFUNDIDADE 30CM UN 12,53

1.01.46 0,27000SERVENTE H 1,028703,819.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.00.22 0,22000EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80) H 2,2726010,339.10.38 0,02000BROCA EXTRATORA C/PONTA DE DIAMANTE (D=3/4"X400MM) UN 5,62000281,00

LS 1,25501 BDI 2,34400Mão-de-Obra 1,02870 Material 7,90760SubMO 2,28371

16.43.007 FUROS EM CONCRETO COM D=1/2" E PROFUNDIDADE 5CM UN 3,45

1.01.46 0,27000SERVENTE H 1,028703,819.00.19 0,22000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,171600,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.39 0,03000BROCA COM PONTA DE VIDIA (D=1/2"X160MM) UN 0,3420011,40

LS 1,25501 BDI 0,64683Mão-de-Obra 1,02870 Material 0,52860SubMO 2,28371

16.43.008 FUROS EM CONCRETO COM D=1/2" E PROFUNDIDADE 15CM UN 11,09

1.01.46 0,81000SERVENTE H 3,086103,819.00.19 0,76000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,592800,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.40 0,06000BROCA COM PONTA DE VIDEA (D=1/2"X330MM) UN 1,5648026,08

LS 3,76504 BDI 2,07546Mão-de-Obra 3,08610 Material 2,17260SubMO 6,85114

16.43.009 FUROS EM CONCRETO COM D=1/2" E PROFUNDIDADE 30CM UN 11,40

1.01.46 0,25000SERVENTE H 0,952503,819.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.00.22 0,20000EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80) H 2,0660010,33

09/02/2011 11:38:40 Página: 355 de 0

Page 356: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

9.10.41 0,02000BROCA EXTRATORA C/PONTA DE DIAMANTE (D=1/2"X400MM) UN 5,08000254,00

LS 1,16205 BDI 2,13338Mão-de-Obra 0,95250 Material 7,16100SubMO 2,11455

16.43.010 FUROS EM CONCRETO COM D=3/8" E PROFUNDIDADE 5CM UN 3,04

1.01.46 0,24000SERVENTE H 0,914403,819.00.19 0,19000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,148200,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.42 0,03000BROCA COM PONTA DE VIDIA (D=3/8"X160MM) UN 0,286509,55

LS 1,11557 BDI 0,57032Mão-de-Obra 0,91440 Material 0,44970SubMO 2,02997

16.43.011 FUROS EM CONCRETO COM D=3/8" E PROFUNDIDADE 15CM UN 9,51

1.01.46 0,72000SERVENTE H 2,743203,819.00.19 0,67000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,522600,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.43 0,06000BROCA COM PONTA DE VIDIA (D=3/8"X330MM) UN 1,1052018,42

LS 3,34670 BDI 1,77852Mão-de-Obra 2,74320 Material 1,64280SubMO 6,08990

16.43.012 FUROS EM CONCRETO COM D=3/8" E PROFUNDIDADE 30CM UN 9,24

1.01.46 0,20000SERVENTE H 0,762003,819.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.00.22 0,15000EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80) H 1,5495010,339.10.44 0,02000BROCA EXTRATORA C/PONTA DE DIAMANTE (D=3/8"X400MM) UN 4,26000213,00

LS 0,92964 BDI 1,72871Mão-de-Obra 0,76200 Material 5,82450SubMO 1,69164

16.44.001 FORNECIMENTO E COLOCACAO DE CHUMBADORES QUIMICOS D=3/4" UN 47,65

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,819.00.19 0,20000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,156000,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.37 0,10000BROCA COM PONTA DE VIDIA (D=3/4"X330MM) UN 6,3800063,809.10.47 1,00000CHUMBADOR QUIMICO D=3/4" UN 18,5200018,529.10.66 1,00000PARAFUSO PRISIONEIRO COMPR=220MM UN 9,920009,92

LS 2,06424 BDI 8,91187Mão-de-Obra 1,69200 Material 34,99100SubMO 3,75624

16.44.002 FORNECIMENTO E COLOCACAO DE CHUMBADORES QUIMICOS D=1/2" UN 20,02

1.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,15000SERVENTE H 0,571503,819.00.19 0,15000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,117000,789.00.20 0,05000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,015000,309.10.40 0,10000BROCA COM PONTA DE VIDEA (D=1/2"X330MM) UN 2,6080026,089.10.45 1,00000PARAFUSO PRISIONEIRO COMPR=160MM UN 3,690003,699.10.48 1,00000CHUMBADOR QUIMICO D=1/2" UN 7,030007,03

LS 1,54818 BDI 3,74375Mão-de-Obra 1,26900 Material 13,46000SubMO 2,81718

16.44.003 FORNECIMENTO E COLOCACAO DE CHUMBADORES QUIMICOS D=3/8" UN 14,30

1.01.39 0,10000PEDREIRO H 0,465004,651.01.46 0,10000SERVENTE H 0,381003,819.00.19 0,10000FURADEIRA ELETRICA MOD PROFISSIONAL H 0,078000,789.00.20 0,03000COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE H 0,009000,309.10.43 0,10000BROCA COM PONTA DE VIDIA (D=3/8"X330MM) UN 1,8420018,429.10.46 1,00000PARAFUSO PRISIONEIRO COMPR=130MM UN 1,760001,769.10.49 1,00000CHUMBADOR QUIMICO D=3/8" UN 6,060006,06

LS 1,03212 BDI 2,67424Mão-de-Obra 0,84600 Material 9,74900SubMO 1,87812

16.45.001 FORNECIMENTO E COLOCACAO DE CHUMBADORES EXPANSIVEIS D=3/4" UN 13,80

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,819.10.50 1,00000CHUMBADOR EXPANSIVEL D=3/4" UN 7,470007,47

LS 2,06424 BDI 2,58204Mão-de-Obra 1,69200 Material 7,47000SubMO 3,75624

16.45.002 FORNECIMENTO E COLOCACAO DE CHUMBADORES EXPANSIVEIS D=1/2" UN 6,70

1.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,15000SERVENTE H 0,571503,819.10.51 1,00000CHUMBADOR EXPANSIVEL D=1/2" UN 2,630002,63

LS 1,54818 BDI 1,25285Mão-de-Obra 1,26900 Material 2,63000SubMO 2,81718

16.45.003 FORNECIMENTO E COLOCACAO DE CHUMBADORES ESPANSIVEIS D=3/8" UN 3,67

1.01.39 0,10000PEDREIRO H 0,465004,651.01.46 0,10000SERVENTE H 0,381003,819.10.52 1,00000CHUMBADOR EXPANSIVEL D=3/8" UN 1,110001,11

LS 1,03212 BDI 0,68727Mão-de-Obra 0,84600 Material 1,11000SubMO 1,87812

16.45.010 PINOS WALSIWA PARA FIXACAO DE ARMADURAS UN 8,74

1.01.55 0,40000OPERADOR H 2,780006,954.94.89 1,10000PINOS DE ACO 30X30 UN 0,330000,308.65.95 1,10000FINCA PINOS LONGO UN 0,506000,46

09/02/2011 11:38:40 Página: 356 de 0

Page 357: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

8.65.96 0,16000PISTOLA PARA FIXACAO DE PINOS H 0,104000,65

LS 3,39160 BDI 1,63567Mão-de-Obra 2,78000 Material 0,94000SubMO 6,17160

16.46.001 ANCORAGEM DE BARRAS DE ACO, COM RESINA BASE DE POLIESTER D3 30,10

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,813.75.21 1,80000RESINA DE POLIESTER KG 20,7180011,51

LS 2,06424 BDI 5,62908Mão-de-Obra 1,69200 Material 20,71800SubMO 3,75624

16.46.002 ANCORAGEM DE BARRAS DE ACO COM RESINA BASE EPOXI D3 69,55

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,819.10.68 1,80000ADESIVO BASE EPOXI KG 52,7940029,33

LS 2,06424 BDI 13,00656Mão-de-Obra 1,69200 Material 52,79400SubMO 3,75624

16.47.001 PREPARACAO DE PONTE DE ADERENCIA COM ADESIVO ACRILICO M2 8,72

1.01.39 0,20000PEDREIRO H 0,930004,651.01.46 0,20000SERVENTE H 0,762003,812.05.08 1,20000CIMENTO KG 0,444000,379.10.67 0,36000ADESIVO BASE ACRILICA KG 2,894408,04

LS 2,06424 BDI 1,63177Mão-de-Obra 1,69200 Material 3,33840SubMO 3,75624

16.47.002 PREPARACAO DE PONTE DE ADERENCIA COM ADESIVO BASE EPOXI M2 50,60

1.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,819.10.18 0,12000SOLVENTE PARA MATERIAIS BASE EPOXI L 1,8336015,289.10.68 0,70000ADESIVO BASE EPOXI KG 20,5310029,33

LS 10,32120 BDI 9,46353Mão-de-Obra 8,46000 Material 22,36460SubMO 18,78120

16.48.001 LIXAMENTO MANUAL M2 6,08

1.01.46 0,50000SERVENTE H 1,905003,813.80.12 0,50000LIXA PARA FERRO UN 0,715001,43

LS 2,32410 BDI 1,13714Mão-de-Obra 1,90500 Material 0,71500SubMO 4,22910

16.48.002 LIXAMENTO GROSSO OU FINO COM LIXADEIRA ELETRICA M2 9,23

1.01.39 0,40000PEDREIRO H 1,860004,651.01.46 0,20000SERVENTE H 0,762003,819.00.02 0,60000LIXADEIRA ELETRICA H 0,354000,599.10.53 0,25000DISCO DE LIXA GROSSO (24 OU 36) UN 1,122504,499.10.54 0,05000DISCO DE BORRACHA KG 0,210004,20

LS 3,19884 BDI 1,72669Mão-de-Obra 2,62200 Material 1,68650SubMO 5,82084

16.48.003 APLICACAO MANUAL DE ESTUQUE E PREPARO DE PASTA M2 9,62

1.01.39 0,30000PEDREIRO H 1,395004,651.01.46 0,30000SERVENTE H 1,143003,812.05.08 0,60000CIMENTO KG 0,222000,372.05.09 0,30000CIMENTO BRANCO KG 0,315001,059.10.20 0,30000ALVAIADE KG 0,450001,509.10.67 0,15000ADESIVO BASE ACRILICA KG 1,206008,04

LS 3,09636 BDI 1,80029Mão-de-Obra 2,53800 Material 2,19300SubMO 5,63436

16.48.004 POLIMENTO DO ESTUQUE, LIXAMENTO MANUAL M2 3,48

1.01.46 0,25000SERVENTE H 0,952503,813.80.12 0,50000LIXA PARA FERRO UN 0,715001,43

LS 1,16205 BDI 0,65080Mão-de-Obra 0,95250 Material 0,71500SubMO 2,11455

16.48.005 APLICACAO PINTURA HIDROFUGANTE UMA DEMAO,SILICONE BASE AGUA M2 26,01

1.01.40 0,20000PINTOR H 0,942004,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,829.10.55 0,50000SILICONE BASE AGUA L 18,2100036,42

LS 1,61528 BDI 4,86433Mão-de-Obra 1,32400 Material 18,21000SubMO 2,93928

16.48.006APLICACAO PINTURA HIDROFUGANTE EM DUAS DEMAOS,SILICONE BASESOLVENTE

M2 18,35

1.01.40 0,36000PINTOR H 1,695604,711.01.41 0,18000AJUDANTE DE PINTOR H 0,687603,829.10.56 0,60000SILICONE BASE SOLVENTE L 9,6300016,05

LS 2,90750 BDI 3,43176Mão-de-Obra 2,38320 Material 9,63000SubMO 5,29070

16.48.007APLICACAO PINTURA HIDROFUGANTE DUAS DEMAOS,SILOXANO OLIGOM BASESOLVEN

M2 15,37

1.01.40 0,36000PINTOR H 1,695604,711.01.41 0,18000AJUDANTE DE PINTOR H 0,687603,829.10.57 0,60000SILOXANO OLIGOMERICO L 7,2120012,02

LS 2,90750 BDI 2,87562Mão-de-Obra 2,38320 Material 7,21200SubMO 5,29070

09/02/2011 11:38:40 Página: 357 de 0

Page 358: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.48.008APLICACAO PINTURA HIDROFUGANTE DUAS DEMAOS,SILOXANO POLIM BASESOLVENT

M2 15,95

1.01.40 0,36000PINTOR H 1,695604,711.01.41 0,18000AJUDANTE DE PINTOR H 0,687603,829.10.58 0,60000SILOXANO POLIMERICO L 7,6800012,80

LS 2,90750 BDI 2,98326Mão-de-Obra 2,38320 Material 7,68000SubMO 5,29070

16.48.009 APLICACAO PINTURA IMPERM DUAS DEMAOS VERNIZ EPOXI BICOMPONENTE M2 16,57

1.01.40 0,44000PINTOR H 2,072404,711.01.41 0,22000AJUDANTE DE PINTOR H 0,840403,823.80.42 0,34000EPOXI PINTURA (COMP MF) KG 7,0108020,62

LS 3,55362 BDI 3,09976Mão-de-Obra 2,91280 Material 7,01080SubMO 6,46642

16.48.010APLICACAO PINTURA IMPERM DUAS DEMAOS VERNIZ POLIUR ALIFBICOMPONENTES

M2 30,35

1.01.40 0,66000PINTOR H 3,108604,711.01.41 0,22000AJUDANTE DE PINTOR H 0,840403,829.10.59 0,36000VERNIZ POLIURETANO ALIFATICO (BICOMPONENTES) L 15,6888043,589.10.61 0,04000SOLVENTE PARA VERNIZ POLIURETANO L 0,219605,49

LS 4,81778 BDI 5,67529Mão-de-Obra 3,94900 Material 15,90840SubMO 8,76678

16.48.011APLICACAO PINTURA IMPERM DUAS DEMAOS VERNIZ POLIUR ALIFMONOCOMPONENTE

M2 19,90

1.01.40 0,44000PINTOR H 2,072404,711.01.41 0,22000AJUDANTE DE PINTOR H 0,840403,829.10.60 0,25000VERNIZ POLIURETANO ALIFATICO (MONOCOMPONENTES) KG 9,7200038,88

LS 3,55362 BDI 3,72288Mão-de-Obra 2,91280 Material 9,72000SubMO 6,46642

16.48.012 APLICACAO PINTURA INPERM DUAS DEMAOS VERNIZ ACRILICO BASE SOLVENTE M2 21,21

1.01.40 0,54000PINTOR H 2,543404,711.01.41 0,27000AJUDANTE DE PINTOR H 1,031403,823.75.80 0,20000PRIMER ACRILICO BASE AGUA L 2,4800012,403.80.55 0,35000VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 6,6640019,049.10.61 0,03000SOLVENTE PARA VERNIZ POLIURETANO L 0,164705,49

LS 4,36126 BDI 3,96629Mão-de-Obra 3,57480 Material 9,30870SubMO 7,93606

16.48.013 ALICACAO PINTURA IMPERM PRIMER DUAS DEMAOS VERNIZ ACRILICO BASE AGUA M2 17,49

1.01.40 0,54000PINTOR H 2,543404,711.01.41 0,27000AJUDANTE DE PINTOR H 1,031403,823.75.80 0,20000PRIMER ACRILICO BASE AGUA L 2,4800012,403.80.54 0,35000VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR) L 3,8080010,88

LS 4,36126 BDI 3,27153Mão-de-Obra 3,57480 Material 6,28800SubMO 7,93606

16.48.014APLICACAO PINTURA IMPERM DUAS DEMAOS,BORRACHA CLORADA BASESOLVENTE

M2 29,97

1.01.40 0,66000PINTOR H 3,108604,711.01.41 0,22000AJUDANTE DE PINTOR H 0,840403,829.10.62 0,36000PINTURA BORRACHA CLORADA L 14,9328041,489.10.63 0,03000SOLVENTE PARA BORRACHA CLORADA L 0,6669022,23

LS 4,81778 BDI 5,60429Mão-de-Obra 3,94900 Material 15,59970SubMO 8,76678

16.48.015 APLICACAO PINTURA IMPERM DUAS DEMAOS SITEMA DUPLO EPOXI POLIURETANO M2 41,72

1.01.40 0,90000PINTOR H 4,239004,711.01.41 0,30000AJUDANTE DE PINTOR H 1,146003,829.10.59 0,36000VERNIZ POLIURETANO ALIFATICO (BICOMPONENTES) L 15,6888043,589.10.61 0,03000SOLVENTE PARA VERNIZ POLIURETANO L 0,164705,499.10.64 0,25000VERNIZ EPOXI (BICOMPONENTES) KG 6,1175024,47

LS 6,56970 BDI 7,80291Mão-de-Obra 5,38500 Material 21,97100SubMO 11,95470

16.48.016 APLICACAO PINTURA IMPERM DUAS DEMAOS SISTEMA DUPLO SILANO SILOXANO M2 25,43

1.01.40 0,54000PINTOR H 2,543404,711.01.41 0,27000AJUDANTE DE PINTOR H 1,031403,823.80.55 0,36000VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO L 6,8544019,049.10.61 0,03000SOLVENTE PARA VERNIZ POLIURETANO L 0,164705,499.10.69 0,30000PRIMER SILANO SILOXANO L 5,7240019,08

LS 4,36126 BDI 4,75621Mão-de-Obra 3,57480 Material 12,74310SubMO 7,93606

16.48.031 PREPARACAO SUPERF C/ JATEAMENTO ABRAS PAD SA 2X1/2" APLIC FUNDO PRIMER M2 41,06

1.01.40 0,40000PINTOR H 1,884004,711.01.41 0,20000AJUDANTE DE PINTOR H 0,764003,821.01.46 0,48000SERVENTE H 1,828803,811.01.55 0,19200OPERADOR H 1,334406,953.76.35 0,12860TINTA FUNDO PRIMER EPOXI L 5,0655539,393.76.37 0,02570DILUENTE P/ FUNDO PRIMER EPOXI L 0,4556617,738.01.97 0,19200EQUIPAMENTO JATO DE AREIA COMPLETO C/COMPRESSOR H 4,2067221,918.81.14 3,00000OLEO DIESEL L 6,000002,00

09/02/2011 11:38:40 Página: 358 de 0

Page 359: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

9.10.21 4,00000OXIDO DE ALUMINIO KG 4,760001,19

LS 7,08966 BDI 7,67942Mão-de-Obra 5,81120 Material 20,48794SubMO 12,90086

16.48.035 PINTURA INTUMESCENTE P/ REVESTIMENTO CONTRA FOGO EM ESTR METALICA M2 65,19

3.76.40 1,00000PINTURA INTUMESCENTE FORNECIDA E APLICADA M2 53,0000053,00

LS 0,00000 BDI 12,19000Mão-de-Obra 0,00000 Material 53,00000SubMO 0,00000

16.48.040 ARGAMASSA PROJETADA P/ REVESTIMENTO CONTRA FOGO EM ESTR METALICA M2 38,13

3.76.45 1,00000ARGAMASSA PROJETADA FORNECIDA E APLICADA M2 31,0000031,00

LS 0,00000 BDI 7,13000Mão-de-Obra 0,00000 Material 31,00000SubMO 0,00000

16.49.001 APARELHO DE APOIO DE NEOPRENE FRETADO D3 126,43

1.01.39 0,90000PEDREIRO H 4,185004,651.01.46 0,90000SERVENTE H 3,429003,812.12.19 1,00000APARELHO DE APOIO DE NEOPRENE FRETADO D3 85,8900085,89

LS 9,28908 BDI 23,64241Mão-de-Obra 7,61400 Material 85,89000SubMO 16,90308

16.50.001 DE TUBO DE F.G. P/ SUST DE TELA ALAMBR INCL BASE FIXACAO UN 13,52

1.01.46 1,30000SERVENTE H 4,953003,81

LS 6,04266 BDI 2,52900Mão-de-Obra 4,95300 Material 0,00000SubMO 10,99566

16.50.002 DE TELA DE ARAME GALVANIZADO M2 1,15

1.01.39 0,05000PEDREIRO H 0,232504,651.01.46 0,05000SERVENTE H 0,190503,81

LS 0,51606 BDI 0,21598Mão-de-Obra 0,42300 Material 0,00000SubMO 0,93906

16.50.010 DEMOLICAO DE PISO DE CONCRETO SIMPLES CAPEADO M3 135,24

1.01.46 13,00000SERVENTE H 49,530003,81

LS 60,42660 BDI 25,29002Mão-de-Obra 49,53000 Material 0,00000SubMO 109,95660

16.50.015 DEMOLICAO DE PISO DE CONCRETO COM RETRO ESCAVADEIRA M3 51,16

1.01.46 1,80000SERVENTE H 6,858003,818.01.08 0,45000RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP H 26,3700058,60

LS 8,36676 BDI 9,56680Mão-de-Obra 6,85800 Material 26,37000SubMO 15,22476

16.50.099 DEMOLICOES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.80.003 FC-05 MURO DE FECHO DE TIJOLOS DE BARRO MACICO S/REVEST-FUND DIRETA M 272,26

1.01.11 1,48000CARPINTEIRO H 6,734004,551.01.12 1,48000AJUDANTE DE CARPINTEIRO H 5,860803,961.01.21 0,23000FERREIRO H 1,097104,771.01.22 0,23000AJUDANTE DE FERREIRO H 0,878603,821.01.39 5,48000PEDREIRO H 25,482004,651.01.46 6,45000SERVENTE H 24,574503,812.05.03 0,11900AREIA M3 9,4248079,202.05.05 8,01000CAL HIDRATADA KG 2,723400,342.05.08 32,20000CIMENTO KG 11,914000,372.05.18 0,11300PEDRA BRITADA 2 M3 6,9031761,092.10.17 0,80000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,648004,562.10.21 0,20000TABUAS PINHO DE 1"X12" DE 3A. M2 3,4360017,182.10.32 0,17000CHAPA COMPENSADA RESINADA E=12MM M2 2,0570012,102.15.25 3,00000ACO CA-50-A $MD BITOLAS KG 8,100002,702.25.15 122,00000TIJOLO COMUM MACICO UN 26,840000,222.40.56 0,26000TINTA BETUMINOSA L 1,661406,392.40.69 0,14000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,351402,512.67.60 0,18000PREGO KG 0,822604,57

LS 78,84494 BDI 50,91135Mão-de-Obra 64,62700 Material 77,88177SubMO 143,47194

16.80.004 FC-05 MURO DE FECHO DE TIJOLOS DE BARRO MACICO S/REVEST-FUND BROCA M 326,85

1.01.11 1,48000CARPINTEIRO H 6,734004,551.01.12 1,48000AJUDANTE DE CARPINTEIRO H 5,860803,961.01.21 0,31000FERREIRO H 1,478704,771.01.22 0,31000AJUDANTE DE FERREIRO H 1,184203,821.01.39 6,06000PEDREIRO H 28,179004,651.01.46 8,65000SERVENTE H 32,956503,812.05.03 0,13800AREIA M3 10,9296079,202.05.05 8,43000CAL HIDRATADA KG 2,866200,342.05.08 49,62000CIMENTO KG 18,359400,372.05.18 0,11300PEDRA BRITADA 2 M3 6,9031761,092.10.17 0,80000SARRAFO PINHO APARELHADO 10X2,5 CM M 3,648004,562.10.21 0,20000TABUAS PINHO DE 1"X12" DE 3A. M2 3,4360017,182.10.32 0,17000CHAPA COMPENSADA RESINADA E=12MM M2 2,0570012,102.15.10 1,00000ACO CA-25 $MD BITOLAS KG 2,730002,732.15.25 4,00000ACO CA-50-A $MD BITOLAS KG 10,800002,70

09/02/2011 11:38:40 Página: 359 de 0

Page 360: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

2.15.38 1,00000ACO CA-60-B $MD BITOLAS KG 2,650002,652.25.15 128,00000TIJOLO COMUM MACICO UN 28,160000,222.40.56 0,36000TINTA BETUMINOSA L 2,300406,392.40.69 0,19000IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO KG 0,476902,512.67.60 0,18000PREGO KG 0,822604,57

LS 93,19970 BDI 61,11840Mão-de-Obra 76,39320 Material 96,13927SubMO 169,59290

16.80.006 FERRO TRABALHADO (GRADIL) KG 14,23

3.12.15 1,00000GRADIL DE FERRO (TIPO PMSP) KG 11,5700011,57

LS 0,00000 BDI 2,66110Mão-de-Obra 0,00000 Material 11,57000SubMO 0,00000

16.80.007 PINGADEIRA PARA MUROS DE ALVENARIA M 49,90

1.01.11 0,83000CARPINTEIRO H 3,776504,551.01.12 0,83000AJUDANTE DE CARPINTEIRO H 3,286803,961.01.39 1,00000PEDREIRO H 4,650004,651.01.46 1,00000SERVENTE H 3,810003,812.05.03 0,00690AREIA M3 0,5464879,202.05.08 4,25000CIMENTO KG 1,572500,372.05.17 0,00900PEDRA BRITADA 1 M3 0,5573761,932.10.21 0,04000TABUAS PINHO DE 1"X12" DE 3A. M2 0,6872017,182.10.33 0,15000CHAPA COMPENSADA PLASTIFICADA E=10MM M2 2,7465018,31

LS 18,93843 BDI 9,33151Mão-de-Obra 15,52330 Material 6,11005SubMO 34,46173

16.80.008 QUADRA DE ESPORTES - PISO DE CONCRETO NAO ARMADO M2 49,30

1.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03750PINTOR H 0,176634,711.01.41 0,03750AJUDANTE DE PINTOR H 0,143253,821.01.46 0,20000SERVENTE H 0,762003,812.05.18 0,05000PEDRA BRITADA 2 M3 3,0545061,092.05.36 0,07000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 17,74430253,492.10.18 0,85000SARRAFO PINHO 7,5X2,5 CM M 3,289503,872.40.56 0,06000TINTA BETUMINOSA L 0,383406,392.80.81 0,02500FITA CREPE 25MM X 50M UN 0,115254,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,090456,03

LS 2,45449 BDI 9,21927Mão-de-Obra 2,01188 Material 35,61740SubMO 4,46636

16.80.009 QUADRA DE ESPORTES - PISO DE CONCRETO ARMADO M2 59,24

1.01.21 0,03750FERREIRO H 0,178884,771.01.22 0,03750AJUDANTE DE FERREIRO H 0,143253,821.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,03750PINTOR H 0,176634,711.01.41 0,03750AJUDANTE DE PINTOR H 0,143253,821.01.46 0,20000SERVENTE H 0,762003,812.05.18 0,05000PEDRA BRITADA 2 M3 3,0545061,092.05.36 0,07000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 17,74430253,492.10.18 0,85000SARRAFO PINHO 7,5X2,5 CM M 3,289503,872.15.25 0,10000ACO CA-50-A $MD BITOLAS KG 0,270002,702.15.44 1,10400TELA TELCON Q-92 M2 6,966246,312.40.56 0,06000TINTA BETUMINOSA L 0,383406,392.70.10 0,02800ARAME RECOZIDO N.18 KG 0,129644,632.80.81 0,02500FITA CREPE 25MM X 50M UN 0,115254,613.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,943.75.17 0,01500TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS) L 0,090456,03

LS 2,84748 BDI 11,07790Mão-de-Obra 2,33400 Material 42,98328SubMO 5,18148

16.80.010 TELA DE ARAME GALVANIZADO N.12 MALHA 2" M2 38,24

1.01.39 0,75000PEDREIRO H 3,487504,651.01.46 0,75000SERVENTE H 2,857503,812.70.31 0,20000ARAME GALVANIZADO No. 16 KG 1,500007,502.75.08 1,05000TELA ARAME GALV MALHA QUADRANGULAR 2" FIO 12 M2 15,5085014,77

LS 7,74090 BDI 7,15171Mão-de-Obra 6,34500 Material 17,00850SubMO 14,08590

16.80.011 TUBO DE F.G. 1 1/4" P/ SUSTENT TELA DE ALAMBRADO EXCL BASE-TRAVAMENTO M 26,80

1.01.39 0,20000PEDREIRO H 0,930004,651.01.40 0,10000PINTOR H 0,471004,711.01.41 0,10000AJUDANTE DE PINTOR H 0,382003,821.01.46 0,20000SERVENTE H 0,762003,813.75.07 0,02800TINTA ESMALTE SINTETICO - ALUMINIO L 0,3878013,853.80.12 0,05500LIXA PARA FERRO UN 0,078651,433.80.28 0,01700ZARCAO L 0,2735316,094.21.73 1,00000ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4") M 15,4000015,40

LS 3,10490 BDI 5,01167Mão-de-Obra 2,54500 Material 16,13998SubMO 5,64990

16.80.012 TUBO DE F.G. 2" P/ SUSTENT TELA DE ALAMBRADO EXCL BASE-MONTANTE M 50,51

1.01.39 0,20000PEDREIRO H 0,930004,65

09/02/2011 11:38:40 Página: 360 de 0

Page 361: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.40 0,16000PINTOR H 0,753604,711.01.41 0,16000AJUDANTE DE PINTOR H 0,611203,821.01.46 0,20000SERVENTE H 0,762003,813.75.07 0,04500TINTA ESMALTE SINTETICO - ALUMINIO L 0,6232513,853.80.12 0,09000LIXA PARA FERRO UN 0,128701,433.80.28 0,02700ZARCAO L 0,4344316,096.05.06 1,00000TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2") M 33,1000033,10

LS 3,72930 BDI 9,44667Mão-de-Obra 3,05680 Material 34,28638SubMO 6,78610

16.80.013 PISO DE CONCRETO DESEMPENADO C/ REQUADRO 1.80CM E=6CM M2 32,62

1.01.39 0,46000PEDREIRO H 2,139004,651.01.46 0,46000SERVENTE H 1,752603,812.05.36 0,06000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 15,20940253,492.10.60 1,20000RIPA DE PEROBA 1X5CM M 2,676002,23

LS 4,74775 BDI 6,10069Mão-de-Obra 3,89160 Material 17,88540SubMO 8,63935

16.80.014 LASTRO DE BRITA GRADUADA COMPACTAÇÃO MECÂNICA E=8CM M2 9,43

1.01.46 0,21800SERVENTE H 0,830583,812.05.23 0,08000BRITA GRADUADA M3 5,4448068,068.01.16 0,02130ROLO COMPACTADOR LISO 1000KG H 0,3797817,83

LS 1,01331 BDI 1,76375Mão-de-Obra 0,83058 Material 5,82458SubMO 1,84389

16.80.015 ISOLAMENTO COM LONA PRETA M2 1,54

1.01.46 0,03000SERVENTE H 0,114303,812.40.35 1,10000LONA DE PLASTICO PRETO E=0,20MM M2 1,001000,91

LS 0,13945 BDI 0,28859Mão-de-Obra 0,11430 Material 1,00100SubMO 0,25375

16.80.016 TELA Q-92 PARA PISO DE CONCRETO M2 8,85

1.01.21 0,03000FERREIRO H 0,143104,771.01.22 0,03000AJUDANTE DE FERREIRO H 0,114603,822.15.44 1,05000TELA TELCON Q-92 M2 6,625506,31

LS 0,31439 BDI 1,65545Mão-de-Obra 0,25770 Material 6,62550SubMO 0,57209

16.80.017 TELA Q-138 E ESPAÇADOR TRELIÇADO P/PISO DE CONCRETO M2 16,71

1.01.21 0,04000FERREIRO H 0,190804,771.01.22 0,04000AJUDANTE DE FERREIRO H 0,152803,822.15.08 0,90000ESPAÇADOR TRELIÇADO DE AÇO H=5CM M 2,295002,552.15.42 1,05000TELA TELCON Q138 (PAINEL) M2 10,5315010,03

LS 0,41919 BDI 3,12554Mão-de-Obra 0,34360 Material 12,82650SubMO 0,76279

16.80.018 PISO DE CONCRETO FCK=25MPA E=5CM M2 19,05

1.01.39 0,15000PEDREIRO H 0,697504,651.01.46 0,15000SERVENTE H 0,571503,812.05.36 0,05000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 12,67450253,49

LS 1,54818 BDI 3,56309Mão-de-Obra 1,26900 Material 12,67450SubMO 2,81718

16.80.019 PISO DE CONCRETO FCK=25MPA E=8CM DESEMPENAMENTO MECÂNICO M2 45,03

1.01.39 0,18000PEDREIRO H 0,837004,651.01.46 0,18000SERVENTE H 0,685803,811.01.55 0,02660OPERADOR H 0,184876,952.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,433.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,94

LS 2,08336 BDI 8,42208Mão-de-Obra 1,70767 Material 32,82670SubMO 3,79103

16.80.020 TRELICA METALICA PARA TABELA DE BASQUETES UN 2.853,57

1.01.39 3,00000PEDREIRO H 13,950004,651.01.46 3,00000SERVENTE H 11,430003,812.67.18 1,00000ESTRUT MET TRELICA P/TABELA BASQUETE DES QE-04 UN 2.263,640002.263,64

LS 30,96360 BDI 533,59623Mão-de-Obra 25,38000 Material 2.263,64000SubMO 56,34360

16.80.021 TABELA DE MADEIRA PARA BASQUETE UN 413,12

1.01.11 1,00000CARPINTEIRO H 4,550004,551.01.12 1,00000AJUDANTE DE CARPINTEIRO H 3,960003,963.67.14 1,00000TABELA BASQUETE COMPLETA (QE-05) UN 316,98000316,98

LS 10,38220 BDI 77,25061Mão-de-Obra 8,51000 Material 316,98000SubMO 18,89220

16.80.022 CESTO PARA TABELA DE BASQUETE UN 121,29

1.01.11 0,50000CARPINTEIRO H 2,275004,551.01.12 0,50000AJUDANTE DE CARPINTEIRO H 1,980003,963.67.10 1,00000ARO DUPLO DE ACO BASQUETE UN 86,2900086,293.67.11 1,00000CESTO NYLON BASQUETE UN 2,880002,88

LS 5,19110 BDI 22,68170Mão-de-Obra 4,25500 Material 89,17000SubMO 9,44610

16.80.023 PISO DE CONCRETO COM FIBRA FCK=25MPA E=8CM DESEMPENAMENTO MECÂNICO M2 46,76

1.01.39 0,20000PEDREIRO H 0,930004,65

09/02/2011 11:38:40 Página: 361 de 0

Page 362: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

1.01.46 0,20000SERVENTE H 0,762003,811.01.55 0,02660OPERADOR H 0,184876,952.05.36 0,08000CONCRETO DOSADO (CONDICAO A) FCK 25 MPA M3 20,27920253,492.80.17 0,25000ENDURECEDOR SUPERFICIAL PARA CONCRETO KG 1,607506,432.80.20 0,04800FIBRA DE POLIPROPILENO MONOFILAMENTO KG 1,0291221,443.55.90 1,00000MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER M2 10,9400010,94

LS 2,28978 BDI 8,74517Mão-de-Obra 1,87687 Material 33,85582SubMO 4,16665

16.80.070 SUMIDOURO - COROAMENTO, INCLUSIVE ESCAVACAO M 966,67

1.01.39 16,80000PEDREIRO H 78,120004,651.01.42 7,51000POCEIRO H 33,795004,501.01.46 28,65000SERVENTE H 109,156503,812.05.03 0,46900AREIA M3 37,1448079,202.05.05 79,73000CAL HIDRATADA KG 27,108200,342.05.08 41,30000CIMENTO KG 15,281000,372.25.15 980,00000TIJOLO COMUM MACICO UN 215,600000,22

LS 269,70723 BDI 180,75993Mão-de-Obra 221,07150 Material 295,13400SubMO 490,77873

16.80.071 SUMIDOURO - ESCAVACAO M 204,90

1.01.42 9,03000POCEIRO H 40,635004,501.01.46 9,03000SERVENTE H 34,404303,81

LS 91,54795 BDI 38,31507Mão-de-Obra 75,03930 Material 0,00000SubMO 166,58725

16.80.072 SUMIDOURO - BRITA M3 98,24

1.01.46 2,50000SERVENTE H 9,525003,812.05.19 1,00000PEDRA BRITADA 3 M3 58,7300058,73

LS 11,62050 BDI 18,37137Mão-de-Obra 9,52500 Material 58,73000SubMO 21,14550

16.80.086 LIMPEZA DE APARELHOS SANITARIOS UN 8,32

1.01.46 0,80000SERVENTE H 3,048003,81

LS 3,71856 BDI 1,55631Mão-de-Obra 3,04800 Material 0,00000SubMO 6,76656

16.80.087 LIMPEZA DE REVESTIMENTOS HIDRAULICOS M2 6,24

1.01.46 0,60000SERVENTE H 2,286003,81

LS 2,78892 BDI 1,16723Mão-de-Obra 2,28600 Material 0,00000SubMO 5,07492

16.80.088 LIMPEZA DE VIDROS M2 7,80

1.01.46 0,75000SERVENTE H 2,857503,81

LS 3,48615 BDI 1,45904Mão-de-Obra 2,85750 Material 0,00000SubMO 6,34365

16.80.089 LIMPEZA DE CAIXA D'AGUA ATE 1000 LITROS UN 31,21

1.01.46 3,00000SERVENTE H 11,430003,81

LS 13,94460 BDI 5,83616Mão-de-Obra 11,43000 Material 0,00000SubMO 25,37460

16.80.090 LIMPEZA DE CAIXAS D'AGUA ATE 10.000 LITROS UN 83,22

1.01.46 8,00000SERVENTE H 30,480003,81

LS 37,18560 BDI 15,56309Mão-de-Obra 30,48000 Material 0,00000SubMO 67,66560

16.80.091 LIMPEZA DE CAIXAS D'AGUA ACIMA DE 10.000 LITROS UN 187,26

1.01.46 18,00000SERVENTE H 68,580003,81

LS 83,66760 BDI 35,01695Mão-de-Obra 68,58000 Material 0,00000SubMO 152,24760

16.80.092 LIMPEZA DE CAIXILHOS METALICOS M2 15,60

1.01.46 1,50000SERVENTE H 5,715003,81

LS 6,97230 BDI 2,91808Mão-de-Obra 5,71500 Material 0,00000SubMO 12,68730

16.80.093 LIMPEZA DE CAIXA DE INSPECAO UN 3,12

1.01.46 0,30000SERVENTE H 1,143003,81

LS 1,39446 BDI 0,58362Mão-de-Obra 1,14300 Material 0,00000SubMO 2,53746

16.80.094 LIMPEZA DE FOSSA SEPTICA M3 70,23

2.04.50 1,00000LIMPEZA FOSSA SEPTICA M3 57,1000057,10

LS 0,00000 BDI 13,13300Mão-de-Obra 0,00000 Material 57,10000SubMO 0,00000

16.80.095 LIMPEZA DE SUMIDOURO POR VIAGEM DE 7 M3 VG 485,11

2.04.51 1,00000LIMPEZA SUMIDOURO-VIAGEM 7M3 VG 394,40000394,40

LS 0,00000 BDI 90,71200Mão-de-Obra 0,00000 Material 394,40000SubMO 0,00000

16.80.098 RETIRADA DE ENTULHO M3 33,81

1.01.46 1,20000SERVENTE H 4,572003,818.03.10 0,28000CAMINHAO BASCULANTE 6M3 H 17,3432061,94

LS 5,57784 BDI 6,32340Mão-de-Obra 4,57200 Material 17,34320SubMO 10,14984

16.80.099 SERVICOS DE SERVICOS COMPLEMENTARES MV 298,09

6.96.02 1,00000MODULO DE VERBA MV 242,35000242,35

09/02/2011 11:38:40 Página: 362 de 0

Page 363: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,00000 BDI 55,74050Mão-de-Obra 0,00000 Material 242,35000SubMO 0,00000

16.85.001 TRANSP ATE 50 KM E INST DO EQUIP DE PERFURACAO UN 5.220,73

2.04.29 1,00000TRANSP ATE 50KM E INST EQUIP PERF UN 4.244,500004.244,50

LS 0,00000 BDI 976,23500Mão-de-Obra 0,00000 Material 4.244,50000SubMO 0,00000

16.85.002 TRANSP ADICIONAL POR KM DO SERVICO 168501 KM 6,07

2.04.27 1,00000TRANSP ADICIONAL P/KM (SERV 168501) KM 4,940004,94

LS 0,00000 BDI 1,13620Mão-de-Obra 0,00000 Material 4,94000SubMO 0,00000

16.85.005 PERFURACAO EM ALUVIAO DE 18"-450 MM M 556,48

2.04.16 1,00000PERFURACAO EM ALUVIAO 18'-450MM M 452,43000452,43

LS 0,00000 BDI 104,05890Mão-de-Obra 0,00000 Material 452,43000SubMO 0,00000

16.85.006 PERFURACAO EM ALUVIAO DE 16"-400 MM M 481,05

2.04.15 1,00000PERFURACAO EM ALUVIAO 16'-400MM M 391,10000391,10

LS 0,00000 BDI 89,95300Mão-de-Obra 0,00000 Material 391,10000SubMO 0,00000

16.85.007 PERFURACAO EM ALUVIAO DE 14"-350 MM M 411,55

2.04.14 1,00000PERFURACAO EM ALUVIAO 14'-350MM M 334,60000334,60

LS 0,00000 BDI 76,95800Mão-de-Obra 0,00000 Material 334,60000SubMO 0,00000

16.85.008 PERFURACAO EM ALUVIAO DE 12"-300 MM M 385,05

2.04.18 1,00000PERFURACAO EM ALUVIAO 12'-300MM M 313,05000313,05

LS 0,00000 BDI 72,00150Mão-de-Obra 0,00000 Material 313,05000SubMO 0,00000

16.85.009 PERFURACAO EM ALUVIAO DE 10"-250 MM M 250,62

2.04.17 1,00000PERFURACAO EM ALUVIAO 10'-250MM M 203,76000203,76

LS 0,00000 BDI 46,86480Mão-de-Obra 0,00000 Material 203,76000SubMO 0,00000

16.85.011 PERFURACAO EM ROCHA ALTERADA D= 12'-300 MM M 377,70

2.04.21 1,00000PERFURACAO EM ROCHA ALTERADA 12' M 307,08000307,08

LS 0,00000 BDI 70,62840Mão-de-Obra 0,00000 Material 307,08000SubMO 0,00000

16.85.012 PERFURACAO EM ROCHA ALTERADA D= 10'-250 MM M 264,57

2.04.20 1,00000PERFURACAO EM ROCHA ALTERADA 10' M 215,10000215,10

LS 0,00000 BDI 49,47300Mão-de-Obra 0,00000 Material 215,10000SubMO 0,00000

16.85.013 PERFURACAO EM ROCHA ALTERADA D= 8'-200 MM M 191,40

2.04.19 1,00000PERFURACAO EM ROCHA ALTERADA 8' M 155,61000155,61

LS 0,00000 BDI 35,79030Mão-de-Obra 0,00000 Material 155,61000SubMO 0,00000

16.85.014 PERFURACAO EM ROCHA ALTERADA DN 350MM (14") M 336,40

2.04.55 1,00000PERFURACAO EM ROCHA ALTERADA 14" M 273,50000273,50

LS 0,00000 BDI 62,90500Mão-de-Obra 0,00000 Material 273,50000SubMO 0,00000

16.85.015 PERFURACAO EM ROCHA SA D= 10"-250 MM M 439,82

2.04.24 1,00000PERFURACAO EM ROCHA SA 10' M 357,58000357,58

LS 0,00000 BDI 82,24340Mão-de-Obra 0,00000 Material 357,58000SubMO 0,00000

16.85.016 PERFURACAO EM ROCHA SA D= 8"-200 MM M 281,19

2.04.23 1,00000PERFURACAO EM ROCHA SA 8' M 228,61000228,61

LS 0,00000 BDI 52,58030Mão-de-Obra 0,00000 Material 228,61000SubMO 0,00000

16.85.017 PERFURACAO EM ROCHA SA D= 6"-150 MM M 188,87

2.04.22 1,00000PERFURACAO EM ROCHA SA 6' M 153,56000153,56

LS 0,00000 BDI 35,31880Mão-de-Obra 0,00000 Material 153,56000SubMO 0,00000

16.85.021 TUBO DE REVEST DE BOCA DE CHAPA DE ACO D= 16"X3/16" M 911,22

2.04.32 1,00000TUBO DE ACO 16'X3/16' FORN E APLIC M 740,83000740,83

LS 0,00000 BDI 170,39090Mão-de-Obra 0,00000 Material 740,83000SubMO 0,00000

16.85.022 TUBO DE REVEST DE BOCA DE CHAPA DE ACO D= 14"X3/16" M 757,06

2.04.31 1,00000TUBO DE ACO 14'X3/16' FORN E APLIC M 615,50000615,50

LS 0,00000 BDI 141,56500Mão-de-Obra 0,00000 Material 615,50000SubMO 0,00000

16.85.023 TUBO DE REVEST DE BOCA DE CHAPA DE ACO D= 12"X3/16" M 517,21

2.04.30 1,00000TUBO DE ACO 12'X3/16' FORN E APLIC M 420,50000420,50

LS 0,00000 BDI 96,71500Mão-de-Obra 0,00000 Material 420,50000SubMO 0,00000

16.85.025 REVEST INTERNO DIM 2440 PRETO D= 8"-200 MM M 500,69

2.04.34 1,00000TUBO DIN-2440 PRETO 8' FORN E APLIC M 407,07000407,07

LS 0,00000 BDI 93,62610Mão-de-Obra 0,00000 Material 407,07000SubMO 0,00000

09/02/2011 11:38:40 Página: 363 de 0

Page 364: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

16.85.026 REVEST INTERNO DIM 2440 PRETO D= 6"-150 MM M 296,82

2.04.33 1,00000TUBO DIN-2440 PRETO 6' FORN E APLIC M 241,32000241,32

LS 0,00000 BDI 55,50360Mão-de-Obra 0,00000 Material 241,32000SubMO 0,00000

16.85.028 FILTRO TIPO NOLD GALV D= 8"-200 MM M 875,87

2.04.12 1,00000FILTRO 'NOLD' GALV 8' FORN E APLIC M 712,09000712,09

LS 0,00000 BDI 163,78070Mão-de-Obra 0,00000 Material 712,09000SubMO 0,00000

16.85.029 FILTRO TIPO NOLD GALV D= 6"-150 MM M 541,54

2.04.11 1,00000FILTRO 'NOLD' GALV 6' FORN E APLIC M 440,28000440,28

LS 0,00000 BDI 101,26440Mão-de-Obra 0,00000 Material 440,28000SubMO 0,00000

16.85.031 PRE-FILTRO DE PEDREGULHO LAVADO E SELECIONADO M3 378,43

2.04.25 1,00000PREFILTRO DE PEDREGULHO FORN E APLIC M3 307,67000307,67

LS 0,00000 BDI 70,76410Mão-de-Obra 0,00000 Material 307,67000SubMO 0,00000

16.85.033 CIMENTACAO ENTRE PERFURACAO DE MAIOR "D" E O REVEST DE BOCA M3 1.269,51

2.04.06 1,00000CIMENTADO ENTRE PERFURACAO E TUBO M3 1.032,130001.032,13

LS 0,00000 BDI 237,38990Mão-de-Obra 0,00000 Material 1.032,13000SubMO 0,00000

16.85.035 LIMPEZA E DESENV DO POCO C/ COMPRESSOR DE AR E/OU PISTAO VALV H 326,54

2.04.13 1,00000LIMPEZA E DESENV POCO C/AR OU PISTAO H 265,48000265,48

LS 0,00000 BDI 61,06040Mão-de-Obra 0,00000 Material 265,48000SubMO 0,00000

16.85.037 ENSAIO DE VAZAO COM BOMBA SUBMERSA H 122,85

2.04.08 1,00000ENSAIO DE VAZAO C/BOMBA SUBMERSA H 99,8800099,88

LS 0,00000 BDI 22,97240Mão-de-Obra 0,00000 Material 99,88000SubMO 0,00000

16.85.038 ENSAIO DE VAZAO COM COMPRESSOR DE AR H 202,66

2.04.10 1,00000ENSAIO DE VAZAO C/COMPRESSOR DE AR H 164,77000164,77

LS 0,00000 BDI 37,89710Mão-de-Obra 0,00000 Material 164,77000SubMO 0,00000

16.85.039 ENSAIO DE VAZAO COM BOMBA DE PISTAO H 307,50

2.04.09 1,00000ENSAIO DE VAZAO C/BOMBA DE PISTAO H 250,00000250,00

LS 0,00000 BDI 57,50000Mão-de-Obra 0,00000 Material 250,00000SubMO 0,00000

16.85.041 TRANSP ATE 50 KM E INST EQUIP DE BOMBEAMENTO UN 1.897,61

2.04.28 1,00000TRANSP ATE 50KM E INST EQUIP BOMBEAM UN 1.542,780001.542,78

LS 0,00000 BDI 354,83940Mão-de-Obra 0,00000 Material 1.542,78000SubMO 0,00000

16.85.042 TRANSP ADICIONAL POR KM DO SERVICO 168541 KM 5,35

2.04.26 1,00000TRANSP ADICIONAL P/KM (SERV 168541) KM 4,350004,35

LS 0,00000 BDI 1,00050Mão-de-Obra 0,00000 Material 4,35000SubMO 0,00000

16.85.044 ANALISE FISICO-QUIMICA DA AGUA UN 98,80

2.04.04 1,00000ANALISE FISICO-QUIMICA DA AGUA UN 80,3300080,33

LS 0,00000 BDI 18,47590Mão-de-Obra 0,00000 Material 80,33000SubMO 0,00000

16.85.045 ANALISE BACTERIOLOGICA UN 64,57

2.04.03 1,00000ANALISE BACTERIOLOGICA UN 52,5000052,50

LS 0,00000 BDI 12,07500Mão-de-Obra 0,00000 Material 52,50000SubMO 0,00000

16.85.046 DESINFECCAO UN 437,67

2.04.05 1,00000DESINFECCAO UN 355,83000355,83

LS 0,00000 BDI 81,84090Mão-de-Obra 0,00000 Material 355,83000SubMO 0,00000

16.85.048 LAJE DE PROTECAO DE 2,00X2,00 M UN 207,59

1.01.39 2,40000PEDREIRO H 11,160004,651.01.46 6,40000SERVENTE H 24,384003,812.05.03 0,23000AREIA M3 18,2160079,202.05.08 137,20000CIMENTO KG 50,764000,372.05.18 0,34200PEDRA BRITADA 2 M3 20,8927861,09

LS 43,36368 BDI 38,81951Mão-de-Obra 35,54400 Material 89,87278SubMO 78,90768

16.85.049 ABRIGO DE POCO EM ALVENARIA DE 1,00X1,00X0,60 M C/ TAMPA METALICA UN 597,59

1.01.39 10,78000PEDREIRO H 50,127004,651.01.40 5,03000PINTOR H 23,691304,711.01.41 1,20000AJUDANTE DE PINTOR H 4,584003,821.01.46 12,73000SERVENTE H 48,501303,812.05.03 0,12800AREIA M3 10,1376079,202.05.05 24,99000CAL HIDRATADA KG 8,496600,342.05.08 23,67000CIMENTO KG 8,757900,372.25.15 142,80000TIJOLO COMUM MACICO UN 31,416000,223.13.90 1,73000PF-07TAMPA INSPECAO UN 121,9823070,513.80.03 2,04000CAL PARA PINTURA KG 1,428000,70

09/02/2011 11:38:40 Página: 364 de 0

Page 365: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

3.80.12 2,00000LIXA PARA FERRO UN 2,860001,433.80.18 0,04000OLEO DE LINHACA L 0,260406,513.80.28 0,60000ZARCAO L 9,6540016,093.80.34 1,00000TINTA A OLEO L 9,130009,13

LS 154,82239 BDI 111,74522Mão-de-Obra 126,90360 Material 204,12280SubMO 281,72599

16.85.050 DOCUMENTACAO TECNICA FINAL UN 562,20

2.04.07 1,00000DOCUMENTACAO TECNICA FINAL UN 457,08000457,08

LS 0,00000 BDI 105,12840Mão-de-Obra 0,00000 Material 457,08000SubMO 0,00000

16.85.051 REVEST. INT. TUBO LISO DE PVC GEOMECANICO D=6" M 179,97

2.04.60 1,00000TUBO LISO DE PVC GEOMECANICO D=6" FORN APL M 146,32000146,32

LS 0,00000 BDI 33,65360Mão-de-Obra 0,00000 Material 146,32000SubMO 0,00000

16.85.052 REVEST. INT. TUBO LISO DE PVC GEOMECANICO D=8" M 371,10

2.04.61 1,00000TUBO LISO DE PVC GEOMECANICO D=8" FORN APL M 301,71000301,71

LS 0,00000 BDI 69,39330Mão-de-Obra 0,00000 Material 301,71000SubMO 0,00000

16.85.053 REVEST. INT. TUBO LISO DE PVC REFORCADO GEOMECANICO D=6" M 258,27

2.04.70 1,00000TUBO LISO DE PVC REFORCADO GEOMECANICO 6" FORN APL M 209,98000209,98

LS 0,00000 BDI 48,29540Mão-de-Obra 0,00000 Material 209,98000SubMO 0,00000

16.85.054 REVEST. INT. TUBO LISO DE PVC REFORCADO GEOMECANICO D=8" M 448,65

2.04.71 1,00000TUBO LISO DE PVC REFORCADO GEOMECANICO 8" FORN APL M 364,76000364,76

LS 0,00000 BDI 83,89480Mão-de-Obra 0,00000 Material 364,76000SubMO 0,00000

16.85.056 FILTRO TIPO STANDARD PVC AB 75MM D=6" M 255,53

2.04.62 1,00000TUBO PVC FILTRO STANDARD D=6" AB 75MM FORN APL M 207,75000207,75

LS 0,00000 BDI 47,78250Mão-de-Obra 0,00000 Material 207,75000SubMO 0,00000

16.85.057 FILTRO TIPO STANDARD PVC AB 75MM D=8" M 485,97

2.04.63 1,00000TUBO PVC FILTRO STANDARD D=8" AB 75MM FORN APL M 395,10000395,10

LS 0,00000 BDI 90,87300Mão-de-Obra 0,00000 Material 395,10000SubMO 0,00000

16.85.058 FILTRO TIPO STANDARD PVC REFORCADO AB 75MM D=6" M 335,27

2.04.68 1,00000TUBO PVC REFOR FILTRO STANDARD D=6" AB 75MM FO APL M 272,58000272,58

LS 0,00000 BDI 62,69340Mão-de-Obra 0,00000 Material 272,58000SubMO 0,00000

16.85.059 FILTRO TIPO STANDARD PVC REFORCADO AB 75MM D=8" M 515,38

2.04.69 1,00000TUBO PVC REFOR FILTRO STANDARD D=8' AB 75MM FO APL M 419,01000419,01

LS 0,00000 BDI 96,37230Mão-de-Obra 0,00000 Material 419,01000SubMO 0,00000

16.85.060 CJ MOTOR BOMBA SUBMERSO 1HP EXTR 700 A 2000 L/H A M 120 A 80MCA UN 2.599,37

1.01.18 5,90000ENCANADOR H 29,618005,021.01.19 11,80000AJUDANTE DE ENCANADOR H 48,262004,096.65.60 1,00000CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 1 HP-120 MCA UN 1.940,420001.940,42

LS 95,01360 BDI 486,06213Mão-de-Obra 77,88000 Material 1.940,42000SubMO 172,89360

16.85.061 CJ MOTOR BOMBA SUBMERSO 1,5HP EXTR 1700 A 2600 L/H A M 140 A 80 MCA UN 2.799,76

1.01.18 5,90000ENCANADOR H 29,618005,021.01.19 11,80000AJUDANTE DE ENCANADOR H 48,262004,096.65.61 1,00000CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 1,5HP-140MCA UN 2.103,340002.103,34

LS 95,01360 BDI 523,53373Mão-de-Obra 77,88000 Material 2.103,34000SubMO 172,89360

16.85.062 CJ MOTOR BOMBA SUBMERSO 2HP EXTR 2200 A 4000 L/H A M 160 A 100MCA UN 3.133,71

1.01.18 5,90000ENCANADOR H 29,618005,021.01.19 11,80000AJUDANTE DE ENCANADOR H 48,262004,096.65.62 1,00000CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 2HP-160MCA UN 2.374,840002.374,84

LS 95,01360 BDI 585,97873Mão-de-Obra 77,88000 Material 2.374,84000SubMO 172,89360

16.85.063 CJ MOTOR BOMBA SUBMERSO 3HP EXTR 2600 A 4900 L/H A M 160 A 100MCA UN 3.518,11

1.01.18 5,90000ENCANADOR H 29,618005,021.01.19 11,80000AJUDANTE DE ENCANADOR H 48,262004,096.65.63 1,00000CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 3HP-160MCA UN 2.687,360002.687,36

LS 95,01360 BDI 657,85833Mão-de-Obra 77,88000 Material 2.687,36000SubMO 172,89360

16.85.064 CJ MOTOR BOMBA SUBMERSO 5HP EXTR 3000 A 5700 L/H A M 180 A 100MCA UN 4.098,62

1.01.18 5,90000ENCANADOR H 29,618005,021.01.19 11,80000AJUDANTE DE ENCANADOR H 48,262004,096.65.64 1,00000CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 5HP-180MCA UN 3.159,320003.159,32

LS 95,01360 BDI 766,40913Mão-de-Obra 77,88000 Material 3.159,32000SubMO 172,89360

16.85.065 TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=10"X1/4" M 737,66

2.04.64 1,00000TUBO DE ACO 10"X1/4" FORN APL M 599,73000599,73

09/02/2011 11:38:40 Página: 365 de 0

Page 366: Tab_jan_2011 - Composições Fde

RELATÓRIO ANALÍTICO DE SERVIÇOS

Referência Custo Unit.CoeficienteDescrição UN Custo Total

A tabela oficial é a que se encontra disponivel no site: www.fde.sp.gov.br

Tab. Ref. janeiro/2011

LS: 122%

BDI: 23%

LS 0,00000 BDI 137,93790Mão-de-Obra 0,00000 Material 599,73000SubMO 0,00000

16.85.066 TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=12"X1/4" M 855,39

2.04.65 1,00000TUBO DE ACO 12"X1/4" FORN APL M 695,44000695,44

LS 0,00000 BDI 159,95120Mão-de-Obra 0,00000 Material 695,44000SubMO 0,00000

16.85.067 TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=14"X1/4" M 992,29

2.04.66 1,00000TUBO DE ACO 14"X1/4" FORN APL M 806,74000806,74

LS 0,00000 BDI 185,55020Mão-de-Obra 0,00000 Material 806,74000SubMO 0,00000

16.85.068 TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=16"X1/4" M 1.135,37

2.04.67 1,00000TUBO DE ACO 16"X1/4" FORN APL M 923,07000923,07

LS 0,00000 BDI 212,30610Mão-de-Obra 0,00000 Material 923,07000SubMO 0,00000

16.85.070 QUADRO DE COMANDO CJ MOTOR BOMBA P/ MOTOR DE 1HP 220V BIFAS UN 957,98

1.01.15 4,90000ELETRICISTA H 26,509005,414.16.04 1,00000QUADRO P/BOMBA 1HP (168570) UN 720,00000720,00

LS 32,34098 BDI 179,13550Mão-de-Obra 26,50900 Material 720,00000SubMO 58,84998

16.85.071 QUADRO COMANDO CJ MOTOR BOMBA SUB P/MOTOR 1,5 A 2HP 220V BIFASICO UN 957,98

1.01.15 4,90000ELETRICISTA H 26,509005,414.16.02 1,00000QUADRO P/BOMBA 1,5HP (168571) UN 720,00000720,00

LS 32,34098 BDI 179,13550Mão-de-Obra 26,50900 Material 720,00000SubMO 58,84998

16.85.072 QUADRO DE COMAN CJ MOTOR BOMBA SUB P/ MOTOR DE 3A5HP 220V TRIFASICO UN 957,98

1.01.15 4,90000ELETRICISTA H 26,509005,414.16.03 1,00000QUADRO P/BOMBA 3 A 5HP (168572) UN 720,00000720,00

LS 32,34098 BDI 179,13550Mão-de-Obra 26,50900 Material 720,00000SubMO 58,84998

16.85.080 CABO DE COBRE ATE 600V - 3X14AWG M 3,98

1.01.15 0,04000ELETRICISTA H 0,216405,414.31.25 1,00000CABO COBRE SUBMERSIVEL 3X14AWG-600V M 2,760002,76

LS 0,26401 BDI 0,74529Mão-de-Obra 0,21640 Material 2,76000SubMO 0,48041

16.85.081 CABO DE COBRE ATE 600V - 3X12AWG M 5,68

1.01.15 0,04000ELETRICISTA H 0,216405,414.31.24 1,00000CABO COBRE SUBMERSIVEL 3X12AWG-600V M 4,140004,14

LS 0,26401 BDI 1,06269Mão-de-Obra 0,21640 Material 4,14000SubMO 0,48041

16.85.082 CABO DE COBRE ATE 600V - 3X10AWG M 7,74

1.01.15 0,04000ELETRICISTA H 0,216405,414.31.23 1,00000CABO COBRE SUBMERSIVEL 3X10AWG-600V M 5,820005,82

LS 0,26401 BDI 1,44909Mão-de-Obra 0,21640 Material 5,82000SubMO 0,48041

16.85.083 CABO DE COBRE ATE 600V - 3X8AWG M 13,00

1.01.15 0,04000ELETRICISTA H 0,216405,414.31.22 1,00000CABO COBRE SUBMERSIVEL 3X8AWG-600V M 10,0900010,09

LS 0,26401 BDI 2,43119Mão-de-Obra 0,21640 Material 10,09000SubMO 0,48041

16.85.084 CABO DE COBRE ATE 600V - 3X6AWG M 19,10

1.01.15 0,04000ELETRICISTA H 0,216405,414.31.21 1,00000CABO COBRE SUBMERSIVEL 3X6AWG-600V M 15,0500015,05

LS 0,26401 BDI 3,57199Mão-de-Obra 0,21640 Material 15,05000SubMO 0,48041

16.85.085 CABO DE COBRE ATE 600V - 3X4AWG M 29,10

1.01.15 0,04000ELETRICISTA H 0,216405,414.31.20 1,00000CABO COBRE SUBMERSIVEL 3X4AWG-600V M 23,1800023,18

LS 0,26401 BDI 5,44189Mão-de-Obra 0,21640 Material 23,18000SubMO 0,48041

16.85.090 ELETRODO DE NIVEL CONTRA TRABALHO A SECO UN 41,09

1.01.15 0,70000ELETRICISTA H 3,787005,414.96.80 1,00000ELETRODO DE NIVEL CONTRA TRAB A SECO UN 25,0000025,00

LS 4,62014 BDI 7,68364Mão-de-Obra 3,78700 Material 25,00000SubMO 8,40714

09/02/2011 11:38:40 Página: 366 de 0