Roberto Ferreira Peres Rua Salvador de Mesquita 340, ap. 301 Recreio dos Bandeirantes – Rio de Janeiro – RJ Phone: +55 (21) 3411-5929, Mobile: +55 (21) 99699-9535 e-mail: [email protected] SUMMARY Strong knowledge in industrial and civil construction with over 7 years working in Central America and South America - Nicaragua, Dominican Republic, Venezuela, Argentina and Ecuador. Working in pipelines, storage terminal, gas compression plants, geothermal project and buildings. Excellent perform in commercial and cost area. EDUCATION BACKGROUND International Executive MBA in Project Management, FGV, Jul. 2012. Bachelor in Civil Engineering, PUC-RJ, Jul. 2008. English, Spanish and Portuguese – fluent. PROFESSIONAL BACKGROUND Odebrecht Construction Inc. – Ecuador Jul 2013 – Nov 2015 Pascuales – Cuenca Multipurpose Pipeline May 2015 – Nov 2015 Commercial Manager, Jr. Management contracts. Create new prices for the contract increasing the profit in 100K. Reduce 2% of the construction cost with different cost control method. Responsible for Monthly Certification Report. Construction Manager, Jr. – Civil – Cuenca Fuel Storage Terminal Coordinate the construction of a fuel storage terminal with 959.000 m³ of earthworks, 14.000 m³ of concrete, installation of 170 tons of structural steel, 1.000 m² of buildings and 14.500 m² of road with asphalt. Lead a team of 350 professionals – civil area. Responsible for managing the costs and measurement of all the activities developed. La Esperanza Aqueduct Project – Eloy Alfaro Pacific Refinery Jul 2013 – May 2015 Construction Manager, Jr. – Area – Aqueduct Coordinate the construction of a aqueduct with 93 km and 48-inch pipe - API 5L. Lead a team of 750 professionals divided at all phases of the project. Lead of the mechanized welding team, getting results with low repair rates. Construction of 3 storage areas and storage for 8.000 pipes. Responsible for managing the costs and measurement of all the activities developed.

Upload: roberto-ferreira-peres

Post on 13-Apr-2017

50 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Roberto Ferreira Peres (in)

Roberto Ferreira Peres

Rua Salvador de Mesquita 340, ap. 301

Recreio dos Bandeirantes – Rio de Janeiro – RJ

Phone: +55 (21) 3411-5929, Mobile: +55 (21) 99699-9535

e-mail: [email protected]

SUMMARY Strong knowledge in industrial and civil construction with over 7 years working in Central America and South America - Nicaragua, Dominican Republic, Venezuela, Argentina and Ecuador.

Working in pipelines, storage terminal, gas compression plants, geothermal project and buildings.

Excellent perform in commercial and cost area.

EDUCATION BACKGROUND International Executive MBA in Project Management, FGV, Jul. 2012. Bachelor in Civil Engineering, PUC-RJ, Jul. 2008. English, Spanish and Portuguese – fluent.

PROFESSIONAL BACKGROUND Odebrecht Construction Inc. – Ecuador Jul 2013 – Nov 2015

Pascuales – Cuenca Multipurpose Pipeline May 2015 – Nov 2015 Commercial Manager, Jr.

• Management contracts. • Create new prices for the contract increasing the profit in 100K. • Reduce 2% of the construction cost with different cost control method. • Responsible for Monthly Certification Report.

Construction Manager, Jr. – Civil – Cuenca Fuel Storage Terminal

• Coordinate the construction of a fuel storage terminal with 959.000 m³ of earthworks,

14.000 m³ of concrete, installation of 170 tons of structural steel, 1.000 m² of buildings and 14.500 m² of road with asphalt.

• Lead a team of 350 professionals – civil area. • Responsible for managing the costs and measurement of all the activities developed.

La Esperanza Aqueduct Project – Eloy Alfaro Pacific Refinery Jul 2013 – May 2015 Construction Manager, Jr. – Area – Aqueduct

• Coordinate the construction of a aqueduct with 93 km and 48-inch pipe - API 5L. Lead a

team of 750 professionals divided at all phases of the project. • Lead of the mechanized welding team, getting results with low repair rates. • Construction of 3 storage areas and storage for 8.000 pipes. • Responsible for managing the costs and measurement of all the activities developed.

Page 2: Roberto Ferreira Peres (in)

Lead Estimator

• Participate in the study and preparation of the technical-commercial proposal of the

project, sizing equipment and work teams, direct and indirect costs, the project planning and contract administration.

• Study of productivity plans and performance teams. • Support contract manager in decision-making related to spreadsheets closures for the

customer and preparation of Action Programmes. Odebrecht Construction Inc. – Argentina Oct 2011 – Jul 2013 San Jeronimo Gas Compression Plant Feb 2013 – Jul 2013 Construction Manager, Jr.

• Responsible for the commissioning of all equipment installed. • Install all of the cathodic protection system, shelters, gas separators and turbocharger.

Pascuales – Cuenca Multipurpose Pipeline Nov 2012 – Feb 2013 Lead Estimator

• Participate in the study and preparation of the technical-commercial proposal of the

project. • Technical, economic and commercial design for the construction of the oil pipeline of

210 km with 8 and 10-inch pipe in API 5L, 5 pumping and 2 product terminal stations. • Study of productivity plans and performance teams. • Support the contract manager in decision-making related to spreadsheets closures for

the customer and preparation of Action Programmes.

General Conesa Gas Compression Plant Jul 2012 – Nov 2012 Construction Manager, Jr. – Pipeline

• Coordinate piping team responsible for the installation of 6 km of pipe, 2 gas separator

units, perform hydrostatic testing of the installed pipe, tie-in connection between the existing pipeline and compression plant, commissioning and final delivery of work.

Buchanan Gas Compression Plant Mar 2012 – Jul 2012 Construction Manager, Jr.

• Responsible for building the Buchanan Gas Compression Plant - Punta Lara, leading the

entire installation process of the gas separator and 32-inch pipe, tie-in with pressurized system, earthworks of the industrial area and construction the foundations of the entire connection system.

North Zone Water Treatment System Oct 2011 – Mar 2012 Construction Coordinator

• Responsible for the construction of Toma R6 Water, conduit installation of water and the

pier access. • Manage the manufacturing process of the Cantitravel System and pipe for foundation

piles.

Queiroz Galvão Construction Inc. – International May 2008 – Oct 2011 Queiroz Galvão Headquarters, Dominican Republic and Venezuela Mar 2011 – Oct 2011 Lead Estimator

Page 3: Roberto Ferreira Peres (in)

• Technical-commercial proposal development for the Hydroelectric Project Uribante Caparo and Valley Irrigation Project Quíbor.

• Consolidate the proposal for the implementation of residential projects, scale direct and indirect costs for construction of 200 homes units.

San Jacinto Tizate Geothermal Project – 72 MW, Nicaragua Aug 2008 – Mar 2011 Construction Coordinator – Civil

• Responsible for the civil construction team, lead 150 professionals in the execution of

123.000 m³ of earthworks, 18.000 m³ of concrete, installation of 640 tons of structural steel and 3 km of 36-inch pipeline. Mount the power house, install the turbo-generator, 2 steam separators, pipe shop, and all infrastructure associated with the camps.

Tumarin Hydroelectric Project 220 MW, Nicaragua Apr 2009 – Jul 2009 Lead Estimator

• Provide support the study of technical and economic feasibility for the construction of

Tumarin Hydroelectric Project.

Queiroz Galvão Headquarter, Brazil May 2008 – Aug 2008 Intern

• Technical Dept of Engineering and Commercial – assist in the preparation of

management reports, financial management and monitoring of all active international projects. Review contracts and measurement methodologies for each project.

Andrade Gutierrez Construction Inc. Apr 2007 – May 2008 Worked on Various Projects, Rio de Janeiro Intern

• Responsible for the construction of the Initial Deposit Steam Generators Project

drainage and participation in the implementation of the project superstructure. • Participate in the executive supervision of the project. • Participate in the preparation of management reports and technical/economic feasibility

studies projects for bidding. Brascan Construction Inc. Dec 2006 – Apr 2007 Santa Monica Jardins Project, Rio de Janeiro Intern

• Participate in the construction of 30 single-family 500 m² residential units, covering all

stages of the project. • Supervise foundation, masonry, electrical, hydraulic installation, finishings and owner

acceptance. Gafisa Construction S.A Aug 2004 – Jan 2006 Blue One Residence Service Project, Rio de Janeiro Intern

• Construction of 2 buildings with 160 residential units, covering all stages of the project. • Construction of foundation bases, masonry, electrical and hydraulic installations,

finishing and delivery to the owner.