recife, 08 de fevereiro de 2012recife, 08 de fevereiro de 2012. suitable harbor infrastructure...

22
Recife, 08 de fevereiro de 2012

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Recife, 08 de fevereiro de 2012

Page 2: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

� Suitable harbor infrastructure

� Structured industrial zone

� Second fuel market in NE Region

� Partnership with the state of Pernambuco to provide external infrastructure

Main reasons:

The Choice of The Choice of PernambucoPernambuco

Page 3: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

SUAPE Port accesses North America, SUAPE Port accesses North America,

Europe and Africa easilyEurope and Africa easily

Page 4: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

It is located in the center of the growing Northeast region

SUAPE PortSUAPE Port

7 Metropolis

7 international airports

8 international ports

1 river port

30 million of people

90% of GDP of northeast

4 Metropolis

4 international airports

5 international ports

12 million of people

More than 35% of GDP ofnortheast

Page 5: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Infrastructure available Infrastructure available (railroads / expressways)(railroads / expressways)

Refinery

NEWExpressway

NEWExpressway

PetrochemicalPlants

Railroads

Shipyards

Page 6: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

PORTO DE GALINHAS

RNEST

LocationLocation

Page 7: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

TheThe ProjectProject

• Total investment: R$ 26 billion (including external

infrastructure);

• Land Area: 630 ha (6.3 km²);

• Beggining of Operation: jun/2013;

• Financing: BNDES (R$ 10 billion);

• Project Advance: 52% (jan/2012);

• Budget Execution: R$ 11.9 billion (jan/2012).

Page 8: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

7%

41%

6%

19%

14%

12%

2010

38% 33% 31%21%

16%

19%22% 25%

36%37%

6% 5% 5% 4%4%

34%32% 28%

15%17%

4%

11% 12%

3% 7% 7% 12% 13%

50’s 60’s 70’s 80’s 90’s

LPG

Fuel Oil

Diesel

Jet Fuel

Gasoline

NaphtaPetroc.

Brasil 1950 - 2010

DemandDemand ProfileProfileDomesticDomestic MarketMarket ProfileProfile EvolutionEvolution

Page 9: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Capacity: 230.000 bpd (36.600 m ³/d) of crude 16 API

Production:

LPG 1.600 m3/dNafta for petrochemical 3.000 m 3/dDiesel (10ppm S) 26.000 m 3/d (70%)Coker Gasoil (Bunker) 2.000 ton/dCoke 6.200 ton/dSulphuric Acid 770 ton/d

Target Market: Brazil North and Northeast Regions

RefineryRefinery ProfileProfile

Page 10: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Refining Scheme

LN

ATMHN

CRUDE ATMATM

H2

DieselHDTDiesel

LKN

HKNLKGO

COKE

HKGO

DCK

HDT HDT NaphtaNaphta PTCH N

DIESEL

KERO

AtR

ATR

Fuel Oil/ Gasoil

LPG

H2

TheThe RNESTRNEST

Page 11: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Major InnovationsMajor Innovations

� Raw Material – crude 16 API;

� Coking of atmospheric residue;

� Focus on diesel production;

� Simple and efficient Refining Scheme;

� Focus on environmental issues:• Water consumption optimized

• Liquid and gaseous effluents treated

• Elimination of odors from hydrocarbons

Page 12: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Design SolutionsDesign Solutions

� Emissions of SOx and NOx – SNOX Units;

� Disposal of wastewater - Submarine Pipeline;

� Reduction of water consumption – Waste Treatment

with water reuse;

� Capture of rain water in two lakes;

� Reduction of HC vapor emanations: floating roof

tanks covered, oil and water separator covered;

filters in fixed roof tanks

Page 13: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

MainMain TechnologiesTechnologies

Haldor TopsoeHydrogen Generation

Haldor TopsoeSNOX

Worley ParsonsTreatment of Gases

UOPHDT nafta

Haldor TopsoeHDT diesel

PetrobrasDelayed Coking

PetrobrasAtmospheric Distillation

TechnologyUnit

Page 14: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Utilities Number Capacity

Oil boilers 2 400 t/h

Coke boiler 1 700 t/h

Turbogenerators 3 50 MW

RefineryRefinery ProfileProfile

Page 15: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Ag

o/2

01

4

En

do

fa

ssis

ted

op

era

tio

n

Jun

/20

13

-F

irst

Tra

in

Be

gg

inin

go

f o

pe

rati

on

Jan

/20

14

–S

eco

nd

Tra

in

Be

gg

inin

go

f o

pe

rati

on

Se

p/2

00

5

Ap

pro

va

lo

fD

SP

Ph

ase

I

(20

0 k

bo

p–

62

% o

fd

iese

l)

De

c/2

00

6

Ap

pro

va

lo

fD

SP

Ph

ase

II

(20

0 k

bo

p-

62

% o

fd

iese

l)

Au

g/2

00

7

Be

gin

nin

go

fE

art

hw

ork

No

v/2

00

9

Ap

pro

va

lo

fD

SP

Fa

se I

II

(23

0 k

bo

p–

70

% o

fd

iese

l)

PhasePhase IVIV

ExecutionExecution

PhasePhase IIIIII

BasicBasic

ProjectProject

PhasePhase IIII

Conceptual Conceptual

ProjectProject

ActualActual

FebFeb/12/12

PhasePhase II

OpportunityOpportunity

IdentificationIdentification

PhasePhase VV

ClosingClosing

Jun

/20

11

Piu

bli

cati

on

of

Bu

sin

ess

Pla

n2

01

1/2

01

5

TimelineTimeline

Page 16: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Abreu e Lima Abreu e Lima RefineryRefineryJan/2012

Page 17: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

PierPier for for SuezmaxSuezmax TankersTankersJan/2011

Page 18: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

PortPort ExpansionExpansionJan/2011

Page 19: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

PortPort ExpansionExpansionFeb/2011

Page 20: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

� Investments of PETROBRAS in Pernambuco- Refinaria Abreu e Lima: ~ US$ 14 billions

- Ships and Platforms: ~ US$ 4 billions

- Petroquímica Suape: ~ US$ 2.5 billions

EconomicEconomic ImpactsImpacts

Page 21: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

- Manpower Development

- Industrial Assembly Professionals: 6.430 trained un til 2011. Around 5 thousands are being trained in 2012 .

- Construction Professionals : 7.210 trained until 20 11.

- Agreement with STQE (Employment, Qualification andEntrepreneurship Secretariat)

• 200 professional instructors in 2012

• 4.000 professionals until 2013

EconomicEconomic ImpactsImpacts

Page 22: Recife, 08 de fevereiro de 2012Recife, 08 de fevereiro de 2012. Suitable harbor infrastructure Structured industrial zone Second fuel market in NE Region ... Jun/2013 -FirstTrain Begginingof

Site:

www.petrobras.com.br/abreuelima

E-mail:

[email protected]

Thank you!