Download - Rui Machado Portfolio
Rui Pedro Machado
Rua dos Chãos n23 5º 4710-230 Braga (Portugal)
Portuguese 17/02/1987
Computer Skills:Very Good command of modeling tools as AutoCad™, Maxon Cinema 4d™, and basic knowledge of 3d Studio Max™;
Very Good command of rendering tools as Maxon Cinema 4d™, Artlantis studio™, and basic knowledge of 3d Studio Max™;
Good command of photo editing tool as PhotoShop™, InDesign™;
Good command of Microsoft Office™ tools (Word™, PowerPoint™);
Basic knowledge of several tools as Adobe Premiere™, Microsoft Excel™;
Advanced skills of internet and data-base searching.
Education:09/2005 - 07/2008 Bachelor’s Degree in ArchitectureFaculdade de Ciências e Tecnologia da Universidade de Coimbra (Portugal).
09/2008 - 07/2009 Master Degree in ArchitectureCVUT – Czech Technical UniversityPrague (Czech Republic).
09/2009 - CurrentMaster Degree in ArchitectureFaculdade de Ciências e Tecnologia da Universidade de Coimbra (Portugal).
Fisrt Certificate in English with final classifi-cation of B.
Volunteer at Habitat for Humanity, coordi-nating two volunteers teams in two house reconstructions.
Work Experience:05/2008 - 08/2008 ArchitectDwelling renovation project
06/2011 - 09/2011Team leader in two reconstructions, for Habitat for Humanity, as a volunteer
Other Languages:English - Independent userSpanish - Independent userCzech - Beginner user
Working Skills:Developer of architectural/construction drawings and plans;Conceptual designs for architectural com-petitions;Good design skills acquired through several work and training;Deep house-constructing knowledge;
Other Competences:Good experience in project developments and management;Entrepreneurship;Leadership ability;No restraints in availability to work;Fast Learner;
This is the fourth year’s final pro-ject. The goal was to create an Hotel with a restaurant and a spa, in the middle of Coimbra.The all concept is based on a steel grid structure that sepa-rates facilities and enlightens the building. The Hotel is divided in 3 build-ings. Between them is the main entrance and the Foyer.
The horizontal one countain the Restaurant (ground floor), the Spa (1st and 2nd floor) and the technical areas.The front building contain the liv-ing room, bar, the hotel services, technical areas and double rooms.The back tower locates the basement, conference room and the other rooms on the top floors.The buildings have the fire es-cape, service elevator and covered terraces in all floors.
Hotel & Spa ****Hotel & Spa ****
This Masterplan intends to reha-bilitate a fundamental part of Coimbra and integrate the line for the new surface metro. It de-velops the interaction between a cultural center, the metro sta-tion and the new urban park. For the new site, there’s a completely new grid that organizes the habitacional and comercial area (NW). The West side hosts the park with new paths, a dynamic mixed platform confronts the side walk of the road on the right and a huge auditorium headed by a stage in the back of the Cul-tural Center. The Metro station plays an important role on this equation because this is a main entrance to the city so it is very important to stimulate people to take the public transportation.
Masterplan
Solum
Masterplan
Solum
A urban football stadium, 10.000 people capacity, was the goal for this project in Prague. The interest point of this project is that the field is located under-ground. With this move it is very easy to assure the way in and out to every sit from all around the stadium.This project made a good im-pression in the studio because of this dynamic and its low cost. It hosts vip places and every func-tionality a stadium should host.
Zizkov StadiumZizkov Stadium
As an architecture student hav-ing a possibility to really work by your own, is the oportunity you only can dream about. A total renovation project was needed for a duplex penthouse right in centre of Braga. This 60’s build-ing’s top floor is the only dwelling that holds, and a full renovation was certainly required. This open space project fullfilled the owners expectations as the top floor dificulties to host three suite was acomplished.
Dwelling
Renovation
Project
Dwelling
Renovation
Project