TJDFTSOLUES EM FUNDAES - MAIO 2009200 80 50 40 17.5 480 8 70 40 3 2

PLANILHA PARA CLCULO E ORAMENTO DE PROJETOS EM TUBULESMelhor visualizado em 1024 x 768 pixels

Licenciado para: TRIBUNAL DE JUSTIA DO DISTRITO FEDERAL E TERRITRIOS

5

TJDFT3

O 2009 CLIQUE ABAIXO PARA COMEAR

E PROJETOS EM TUBULESAutor: Eng. Civil Guilherme Magalhes Almeida

do em 1024 x 768 pixels

Matr. 315255

TJDFT - SERCIV

Tel: (61)3103-7759 FEDERAL E TERRITRIOS

ESTE MDULO DO SOFTWARE AINDA EST EM FASE DE DESENVOLVIMENTO. AGUARDE O LANAMENTO DA NOVA VERSO!!!

1

1

DATA

CONTADOR

O QUE VOC DESEJA FAZER?QUERO CALCULAR UM TUBULO DE BASE OVAL (FALSA ELIPSE) QUERO CALCULAR UM TUBULO DE BASE CIRCULAR QUERO ORAR UM TUBULO OVAL (FALSA ELIPSE) J CALCULADO QUERO ORAR UM TUBULO CIRULAR J CALCULADO

TUBULO DE BASE CIRCULAR fck (kg/cm2) Taxa do terrento sigma s (kg/cm2) Carga Q (Tf) Perfurao do fuste Pf (m) Limite para altura da base - h lim (cm) NMERO DE REPETIESRECALCULAR OS PARMETROS ABAIXO

ENTRADA 200.00 3.00 500.00 12.00 200.00 1.00

TAXA DO TERRENO NECESSRIA PARA H=200 CM (kg/cm2) CARGA MXIMA PARA H=200 CM (Tf)

6.03 194.24 60.35 16.98 0.71 24.91 22.61 31.11 235.00 16.98 4.34 21.34 12.66 64.71 108.00% 500.00 194.24

ngulo da base alfa (graus) rea da base (m2) rea do fuste (m2) Volume da base (m3) Volume alargamento base (m3) Volume total (m3) Valor do fuste para h lim = 200 cm rea da base com fuste alterado (m2) rea do fuste com a alterao (m2) Volume da base com fuste alterado (m3) Vol. alargamento da base com fuste alterado (m3) Volume total com fuste alterado (m3)Percentual de aumento do volume total com alterao do fuste

CARGA ATUANTE CARGA MAXIMA

TAXA CALCULADA TAXA ORIGINAL

6.03 3.00

D (cm) 460.67 ADOTAR d (cm) 91.59 ADOTAR h (cm) 320.42 ADOTAR ATENO! h = 325 > h lim = 200 valor do fuste recalculado = 235 cmRecalcula fuste quando h > h lim

RESULTADOS 465.00 95.00 325.00

fuste alter vinc teste

TRUE

Alternar fuste

TRUE

CP 100 CP 135 CP 150 CP 200 CP 250 CP 300 CP 400 CP 500

4

1 2 3 4 5 6 7 8

COTAO DOS INSUMOS MO DE OBRAArmador Carpinteiro Pedreiro Servente Poceiro

UNIDADEh h h h h

PREO3.31 3.31 3.31 2.13 3.31

Nivel de Perdas Perdas =

MATERIAISConcreto C-15 usinado - p/ tubules Concreto estrutural C15 usinado - p/ blocos Armadura CA-50 diam. 12,5 mm Arame Recozido, 18 BWG Cimento comum Brita 1 Areia lavada Tbua 1''x12'' , pinus ou similar Sarrafo 1''x4'' , pinus ou similar Pontalete 3''x3'' , pinus ou similar Prego 18x30 Desmoldante para formas

UNIDADEM3 M3 KG KG KG M3 M3 METRO METRO METRO KG LITRO

PREO275.32 275.32 4.16 11.75 0.39 66.27 83.73 7.21 2.58 9.19 6.85 6.99

TAXA DE LEIS SOCIAIS (%)

APLICAR TAXA DE LEIS SOCIAIS

COMPOSIES Nvel de perdasPerfurao do fuste (CIRULARES) Servente Pocerio ml h h

mn5.4285 5.4285

med6.0317 6.0317

Perfurao do fuste (OVAIS) Servente Pocerio

ml h h

mn3.0535 3.0535

med3.3928 3.3928

Alargamento da base Servente Pocerio Lanamento de concreto C-15 - p/ tubules Concreto C-15 usinado Pedreiro Servente

m3 h h

mn10.0000 12.0000

med12.0000 14.0000

m3 m3 h h

mn1.0300 3.0000 3.0000

med1.0500 4.0500 4.0500

Colocao de ferragem de topo - CA-50 12mm Armadura CA-50 diam. 12,5mm Arame recozido, 18 BWG

kg kg kg

mn1.0800 0.0200

med1.1500 0.0200

Armador Servente

h h

0.0700 0.0700

0.0900 0.0900

Escavao manual Servente

m3 h

mn1.6000

med2.1700

Lastro de concreto magro Cimento comum Areia mdia - lavada e peneirada pedra 1 Pedreiro Servente

m3 kg m3 m3 m3 h

mn209.0000 0.6631 0.8342 3.0000 4.0000

med220.0000 0.6980 0.8780 4.0500 5.4000

Corte e preparo de cabea de tubulo Pedreiro Servente

Unidade h h

mn0.2400 2.4000

med0.2500 2.5000

Confeco, colocao e remoo da frma Tbua 1''x12'' , pinus ou similar Sarrafo 1''x4'' , pinus ou similar Pontalete 3''x3'' , pinus ou similar Prego 18x30 Desmoldante para formas Carpinteiro Servente

m2 m m m kg l h h

mn1.0000 3.5000 0.9000 0.1500 0.1500 1.3500 1.3500

med1.0500 3.9000 0.9800 0.1600 0.1700 1.5000 1.5000

Dobramento e colocao da armadura Armadura CA-50 diam, 12,5 mm Arame recozido , 18 BWG Armador Servente Lanamento e adensamento de concreto estrutural para blocos Servente Pedreiro Concreto usinado para blocos

kg kg kg h h

mn1.0800 0.0200 0.0700 0.0700

med1.1500 0.0200 0.0900 0.0900

m3 h h m3

mn3.0000 3.0000 1.0000

med4.0500 4.0500 1.0500

Reaterro Servente

m3 h

mn1.5000

med2.0300

Bota fora Servente

m3 h

mn1.6000

med2.1700

VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DA LISTA?

VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DO PROJETO?

min med mx 2

1.00 2.00 3.00

XA DE LEIS SOCIAIS (%)APLICAR TAXA DE LEIS SOCIAIS

124.00 TRUE

el de perdasmx7.2380 7.2380

adotada6.0317 6.0317

preo 4.77 7.41 Total: 28.78 44.72 73.50

mx4.0714 4.0714

adotada3.3928 3.3928

preo 4.77 7.41 Total: 16.19 25.16 41.34

mx14.0000 16.0000

adotada12.0000 14.0000

preo 4.77 7.41 Total: 57.25 103.80 161.06

mx1.0700 4.8600 4.8600

adotada1.0500 4.0500 4.0500

preo 275.32 7.41 4.77 Total: 289.09 30.03 19.32 338.44

mx1.2500 0.0200

adotada1.1500 0.0200

preo 4.16 11.75 4.78 0.24

0.1100 0.1100

0.0900 0.0900

7.41 4.77 Total:

0.67 0.43 6.12

mx2.6000

adotada2.1700

preo 4.77 Total: 10.35 10.35

mx242.0000 0.7678 0.9658 4.8600 6.4800

adotada220.0000 0.6980 0.8780 4.0500 4.0500

preo 0.39 83.73 66.27 7.41 4.77 Total: 85.80 58.44 58.19 30.03 19.32 251.78

mx0.2600 2.6000

adotada0.2500 2.5000

preo 7.41 7.41 Total: 1.85 18.54 20.39

mx1.1000 4.1000 1.0800 0.1700 0.2000 1.5500 1.5500

adotada1.0500 3.9000 0.9800 0.1600 0.1700 1.5000 1.5000 7.21 2.58 9.19 6.85 6.99 7.41 4.77 Total: 7.57 10.06 9.01 1.10 1.19 11.12 7.16 47.20

mx1.2500 0.0200 0.1100 0.1100

adotada1.1500 0.0200 0.0900 0.0900

preo 4.16 11.75 7.41 4.77 Total: 4.78 0.24 0.67 0.43 6.12

mx4.8600 4.8600 1.1000

adotada4.0500 4.0500 1.0500

preo 4.77 7.41 275.32 Total: 19.32 30.03 289.09 338.44

mx2.4300

adotada2.0300

preo 4.77 Total: 9.69 9.69

mx2.6000

adotada2.1700

preo 4.77 Total: 10.35 10.35

TUBULO OVAL - ENTRADA DE DADOSENTRADA

NMERO DE REPETIES

1.00 80.00 21.00 205.00 20.00

DADOS DO FUSTEDIMETRO DO FUSTE d (cm) PERFURAO DO FUSTE Pf (m)

DADOS DA BASEALTURA DA BASE h (cm) ALTURA DO RODAP dh (cm) DIAMETRO DA BASE D

DADOS DO BLOCOCOMPRIMENTO DO BLOCO X (cm) LARGURA DO BLOCO Y (cm) ALTURA DO BLOCO HB (cm) BITOLA UTILIZADA NO BLOCO (mm)CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3) 100.00 100.00 95.00 12.50 80.00 60.00 50.00 50.00 60.00 60.00 50.00 50.00 60.00 12.50 8 200.00

Distncia a1 (cm) Distncia a2 (cm) Distncia a3 (cm) Distncia a4 (cm) Distncia b1(cm) Distncia b2 (cm) Distncia b3 (cm) Distncia b4 (cm)

ARMADURA LONGITUDINALBITOLA UTILIZADA (mm) QUANTIDADE DE FERROS COMPRIMENTO DO FERRO (cm) 8 FERROS DIMETRO DE 12,5 mm - 200

ARMADURA TRANVERSAL (ESTRIBOS)BITOLA UTILIZADA (mm) ESPAAMENTO (cm) COBRIMENTO (cm) COMPRIMENTO DO ESTRIBO (cm) QUANTIDADE DE ESTRIBOS (un) - 1 TUBULO 10 FERROS DIMETRO DE 5 C/ 20 - 2605.00 20.00 2.00 260.00 10.00

DADOS COMPLEMENTARESNGULO DA INCLINAO DO TALUDE BETA (GRAUS) ALTURA DO CONCRETO MACRO C (cm)ENTRADA NO BLOCO D (cm) Distncia A (ARREDONDADA) ngulo Beta adotado (graus)DESCONTA VOLUME DA ENTRADA

60.00 60.00

60.00 5.00 5.00 57.73DIST. A ORIG.

Material + mo de obra

PREO (R$)

DescrioPerfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Lanamento e adenamento de Concreto magro e= 5cm Corte e preparo da cabea do tubulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura no bloco Lanamento e adenamento de concreto estrutural p/ blocos Reaterro Bota fora TUBULO

Unidademl m3 m3 kg kg m3 m3 Unid. m2 kg m3 m3 m3

Quantidade21.00 -0.72 9.83 15.98 4.16 6.88 0.17 1.00 3.80 76.00

Unitrio73.50 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12

BLOCO

0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra:

MATERIALPREO (R$)

DescrioConcreto Armadura longitudinal Armadura tranversal Concreto magro Concreto estrutural Forma ArmaduraTub.

Unidadem3 kg kg m3 m3 m2 kg

Quantidade9.83 15.98 4.16 0.17 0.95 3.80 76.00

Unitrio

289.09 5.02 5.02 202.43 289.09 28.92 5.02 Total material Total mo de obra:

Bloco

VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DA LISTA?

VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DO PROJETO?

PREO (R$)

Total1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 R$ 6,149.69

ARMADURA Vol. Base = 0,31 m3 CA-50 DIAM. 12,5 CA-60 DIAM. 5 8 BARRAS C = 200 10 BARRAS C = 260

CA-50 DIAM. 12,5

PREO (R$)

Total2,843.16 80.22 20.86 35.40 274.63 109.91 381.44 R$ 3,745.61 R$ 2,404.08

R$ 6,149.69

DADOS

TIPO 1

TIPO 2

TUB

TUBULO

UL

E

IR C S

C

UL

E AR

S

BLOCO

X (cm) Y (cm) HB (cm) ARMADURA Fuste d (cm) Pf (m) h (cm) dh (cm) D (cm)ARM. LONG. ARM.TRANV.

100.00 100.00 95.00 CA-50 DIAM. 12,5 80.00 21.00 205.00 20.00

-

REPETIES MATERIAL + MO DE OBRA Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora MATERIAL Concreto Armadura longitudinal UNIDADE m unid. m3 kg kg m3 m2 m3 m2 kg m3 m3 m3 UNIDADE m3 kg

CA-50 DIAM. 12,5 8 BARRAS C = 200 CA-60 DIAM. 5 10 BARRAS C = 260 1.00 TOTAL UNITRIO 21.00 21.00 -0.72 -0.72 9.83 9.83 15.98 15.98 4.16 4.16 6.88 6.88 0.17 1.00 3.80 76.00 0.95 5.76 10.96 9.83 15.98 0.17 1.00 3.80 76.00 0.95 5.76 10.96 9.83 15.98

TOTAL

TUB.

BLOCO

TUBULO

TUB.

Armadura tranversal Concreto magro Concreto estrutural Forma Armadura

kg m3 m3 m2 kg

4.16 0.17 0.95 3.80 76.00 73.50 1,543.49 3,745.61

4.16 0.17 0.95 3.80 76.00

PREO UNITRIO DA PERFURAO (R$) - POR METRO PREO TOTAL DA PERFURAO (R$) PREO UNITRIO DO MATERIAL (R$) PREO TOTAL DO MATERIAL (R$) PREO UNITRIO DA MO DE OBRA (R$) PREO TOTAL DA MO DE OBRA (R$) PREO UNITRIO (MO+MAT) (R$) PREO TOTAL(MO+MAT) (R$)

BLOCO

UNITRIO 3,745.61 2,404.08

2,404.08 6,149.69 6,149.69 TIPO 1 TIPO 2

SOMA QUANTITATIVOS T1 A T10GERAL - BLOCOS RETANGULARES

PREO (R$) UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg m3 m3 m3 1.00 3.80 76.00 0.95 5.76 10.96 UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12 338.44 9.69 10.35 TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47

QUADRO ORIGINAL DAS QUANTIDADES

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural p/ blocos Reaterro Bota fora

BLOCO

TUBULO

BLOC

Total material + mo de obra Total material Total mo de obra

6,149.69 3,745.61 2,404.08

TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg m3 m3 m3 1.00 3.80 76.00

PREO (R$) UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12

PRIMEIRA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 6,149.69 3,745.61 2,404.08

BLOCO

TUBULO

0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES

TUBULO

Perfurao do fuste Alargamento da base Lanamento de concreto

UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83

PREO (R$) UNITRIO VAR 161.06 338.44

SEGUNDA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53

TUBULO

Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

kg kg m3 m2 unid. m2 kg m3 m3 m3

15.98 4.16 6.88 0.17 1.00 3.80 76.00

6.12 6.12 10.35 251.78 20.39 47.20 6.12

97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 6,149.69 3,745.61 2,404.08

BLOCO

0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura

UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg 1.00 3.80 76.00

PREO (R$) UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12

TERCEIRA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79

BLOCO

TUBULO

BLOCO Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m3 m3 m3

0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra

321.52 55.74 113.47 6,149.69 3,745.61 2,404.08

TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

UNIDADE QUANT. m 21.00 m3 -0.72 m3 9.83 kg 15.98 kg 4.16 m3 6.88 m2 0.17 unid. m2 kg m3 m3 m3 1.00 3.80 76.00

PREO (R$) UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12

QUARTA DEZENA COPIADA TOTAL 1,543.49 -116.03 3,328.53 97.74 25.41 71.23 44.03 20.39 179.37 464.79 321.52 55.74 113.47 6,149.69 3,745.61 2,404.08

BLOCO

TUBULO

0.95 338.44 5.76 9.69 10.96 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES CIRCULARESGERAL - BLOCOS RETANGULARES

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

UNIDADE QUANT. m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3

PREO (R$) UNITRIO TOTAL

DEZENA 5 AINDA NO UTILIZADA

BLOCO

TUBULO

Total material + mo de obra Total material Total mo de obra

TUBULES OVAISGERAL - BLOCOS RETANGULARES

UNIDADE QUANT. m m3 m3 kg kg m3 84.00 -2.88 39.34 63.93 16.62 27.52

PREO (R$) UNITRIO TOTAL VAR 161.06 338.44 6.12 6.12 10.35 6,173.97 -464.13 13,314.12 390.97 101.65 284.93

RESULTADO FINAL - SOMA DAS 5 DEZENASRestaurarRestaurar Restaurar Restaurar Restaurar Adequar alterao do unitrio do fuste

Perfurao do fuste Alargamento da base TUBULO Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual

Restaurar

BLOCO

Restaurar

Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m2 unid. m2 kg m3 m3 m3

0.70 4.00 15.20 304.00 3.80 23.02

251.78 20.39 47.20 6.12 338.44 9.69

176.11 81.56 717.46 1,859.17 1,286.06 222.97 453.89 24,598.75 14,982.44 9,616.30

Restaurar

RestaurarRestaurar

BLOCO

RestaurarRestaurar Restaurar Restaurar Restaurar todas as quantidades e preos originais do BD

43.84 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES OVAISQUANTITATIVOS GERAL

BLOCO

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma

UNIDADE QUANT. m 160.00 m3 79.37 m3 205.03 kg 599.34 kg 245.87 m3 249.68 m2 5.46 unid. m2 20.00 110.40

PREO (R$) UNITRIO TOTAL VAR 10,471.00 91.39 7,253.96 159.37 32,676.60 2.15 1,290.95 2.15 529.60 6.32 1,577.74 132.92 726.36 8.75 24.54 174.99 2,709.11

TUBULO

BLOCO

Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

kg m3 m3 m3

2,649.60

2.15

5,707.13 5,869.63 1,247.86 1,539.42 R$ 71,774.35 R$ 39,324.06 R$ 32,450.29 10.00 12.00 6.00 CUSTO FINAL R$ 93,731.56 R$ 51,354.08 R$ 42,377.48 30.59% R$ 21,957.21

33.12 177.22 211.10 5.91 243.62 6.32 Total material + mo de obra Total material Total mo de obra LUCRO (%) ADMNISTRAO (%) CUSTOS FINANCEIROS (%) Total material + mo de obra total material Total mo de obra BDI MDIO DIFERENA BRUTA

TIPO 3

TIPO 4

TIPO 5

-

-

-

-

UNITRIO

TOTAL

UNITRIO

TOTAL

UNITRIO

TOTAL

UNITRIO

UNITRIO

UNITRIO

UNITRIO

UNITRIO

TIPO 2

TIPO 3

TIPO 4

TIPO 5

UANTIDADES

alterao do unitrio do fuste

s e preos originais do BD

TIPO 6

TIPO 7

TIPO 8

TIPO 9

-

-

-

TOTAL

UNITRIO

TOTAL

UNITRIO

TOTAL

UNITRIO

TOTAL

UNITRIO

UNITRIO

UNITRIO

TIPO 6

TIPO 7

TIPO 8

TIPO 9

TIPO 10

-

-

UNITRIO

TOTAL

UNITRIO

UNITRIO

UNITRIO

TIPO 9

TIPO 10

RESUMO DOS FERROS TABELA ORIGINAL

AO BLOCO CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0 ARM. LONGIT. CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0ARM. TRANSV.

TIPO 1

TIPO 2

TIPO 3

TIPO 4

76.00

15.98

CA-50 6.3 8.0 10.0 12.5 16.0 CA-60 3.4 5.0 6.0

4.16

TIPO 5

TIPO 6

TIPO 7

TIPO 8

TIPO 9

TIPO 10

AO BLOCO SOMA 1 CA-50 0.00 8.0 0.00 10.0 76.00 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. LONGIT. 0.00 CA-50 0.00 8.0 0.00 10.0 15.98 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. TRANSV. 0.00 CA-50 0.00 6.3 0.00 8.0 0.00 10.0 0.00 12.5 0.00 16.0 0.00 CA-60 0.00 3.4 4.16 5.0 0.00 6.0

3.40 0.00

RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00 RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA QUARTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 0.00 0.00 0.00 91.98 0.00 RESULTADO DAS ARMADURAS DA QUINTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00

3.40 0.00

5.00 4.16

20.00 0.00

3.40 0.00

5.00 4.16

20.00 0.00

3.40 0.00

5.00 4.16

20.00 0.00

3.40 0.00

5.00 4.16

20.00 0.00

3.40

5.00

20.00

3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 25.00CA-50+10 % CA-60+10 %

0.00 16.62 0.00 0.00 0.00 0.00 367.93 0.00 0.00 0.00 405.00 19.00

RESULTADO FINAL AO

kg

kg

CA - 50

CA - 60

DADES 25.00 0.00

25.00 0.00

25.00 0.00

25.00 0.00

25.00 0.00

25.00

ENTRADA DE DADOS DE TUBULES OVAIS DE DIVISA - CLCULODADOSfck (kgf/cm2) Taxa do terreno sigma s (kg/cm2) Carga Q1 (tf) - TUBULO OVAL DE DIVISA gama f (NB51/78 =1,4) gama c (NB51/78 =1,6) Lado do pilar paralelo viga alavanca b0 (cm) Brao de alavanca y (dist. eixo-eixo entre pilares) [cm] Valor de n (a = nb) a < 2,5b Perfurao do fuste Pf (m) Carga Q2 (tf) - TUBULO CIRCULAR Valor limite para altura da base - h lim (cm) Nmero de conjuntos (1 conjunto = 1 apoio)RECALCULAR OS PARMETROS ABAIXO

ENTRADA 200.00 3.00 50.00 1.40 1.60 40.00 500.00 2.00 21.00 10.00 200.00 1.00

REPRODUZIR COM CARGA MXIMA

NMERO DE TUBULES NECESSRIOS PARA 1 CONJUNTO COM h lim = 200 cm TAXA DO TERRENO NECESSRIA PARA USAR S 1 TUBULO COM h lim 200 cm (kg/cm2) CARGA MXIMA PARA H=200 CM (Tf) TUBULO COM H < 200 cm OK!

Dimetro do fuste d (cm) rea para b (cm2) Dimetro do setor circular b (cm) R1 (ton) - reao no tubulo rea para clculo x (cm2) X (cm)

29.87 16,666.67 96.62 53.19 17,730.50 98.77 121.24 200.00 2.07 1.06 30.00 3.19 1.60 8.40 1.77 0.28 1.85 1.50 7.44

adotar adotar

adotarh h lim Alternar fuste

1.60 8.40 1.77 0.28 1.85 1.50 7.44

CALCULO TUBUL. NECESS. CARGA ATUANTE CARGA MAXIMA CARGA AT/CARGA MAX SEGURANA TAXA CALCULADA TAXA ORIGINAL PRODUTO fuste alterado vinculo do fuste

1.00 50.00 94.07 0.53 88.14% 1.59 3.00 1.00

TRUE

338.44

0

TUBULO OVAL - ENTRADA DE DADDOSENTRADA

NMERO DE CONJUNTOS (APOIOS) NMERO DE TUBULES NECESSRIOS P/ 1 CONJ. NMERO TOTAL DE TUBULES

1.00 1.00 1.00 60.00 21.00 100.00 20.00 175.00 90.00 85.00 80.00 80.00 75.00 10.00 80.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 12.50 6.00 200.00

DADOS DO FUSTEDIMETRO DO FUSTE d (cm) PERFURAO DO FUSTE Pf (m)

DADOS DA BASEALTURA DA BASE h (cm) ALTURA DO RODAP dh (cm) COMPRIMENTO DA BASE OVAL a (x + b) - (cm) BASE RETA x - (cm) DIMETRO b (cm)

DADOS DO BLOCOCOMPRIMENTO DO BLOCO X (cm) LARGURA DO BLOCO Y (cm) ALTURA DO BLOCO HB (cm) BITOLA UTILIZADA NO BLOCO (mm) CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3) Distncia a1 (cm) Distncia a2 (cm) Distncia a3 (cm) Distncia a4 (cm) Distncia b1(cm) Distncia b2 (cm) Distncia b3 (cm) Distncia b4 (cm)

ARMADURA LONGITUDINALBITOLA UTILIZADA (mm) QUANTIDADE DE FERROS COMPRIMENTO DO FERRO (cm) 6 FERROS DIMETRO DE 12,5 mm - 200

ARMADURA TRANVERSAL (ESTRIBOS)BITOLA UTILIZADA (mm) ESPAAMENTO (cm) COBRIMENTO (cm) COMPRIMENTO DO ESTRIBO (cm) - 1 TUBULO QUANTIDADE DE ESTRIBOS (un) - 1 TUBULO 10 FERROS DIMETRO DE 6,3 C/ 20 - 1976.30 20.00 2.00 197.00 10.00

DADOS COMPLEMENTARES

NGULO DA INCLINAO DO TALUDE BETA (GRAUS) ALTURA DO CONCRETO MACRO C (cm) DESCONTA VOLUME DA ENTRADA ENTRADA NO BLOCO D (cm)Distncia A (ARREDONDADA) ngulo Beta adotado (graus) 50.00 60.00

60.00 5.00 5.00 46.19DIST. A ORIG.

Material + mo de obraPREO (R$)

DescrioPerfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Lanamento e adenamento de Concreto magro e= 5cm Corte e preparo da cabea do tubulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura no bloco Lanamento e adenamento de concreto estrutural p/ blocos Reaterro Bota foraTUBULO

Unidademl m3 m3 kg kg m3 m3 Unid. m2 kg m3 m3 m3

Quantidade21.00 0.92 6.85 12.00 5.00 4.30 0.15 1.00 2.40 38.40

Unitrio41.34 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12

BLOCO

0.47 338.44 3.67 9.69 7.48 10.35 Total material + mo de obra:

MATERIALPREO (R$)

DescrioConcreto Armadura longitudinal Armadura tranversal Concreto magroBloco Tub.

Unidadem3 kg kg m3 m3 m2 kg

Quantidade6.85 12.00 5.00 0.15 0.47 2.40 38.40

Unitrio289.09 5.02 5.02 202.43 289.09 28.92 5.02 Total material

Concreto estrutural Forma Armadura

Total mo de obra:

VOC TEM CERTEZA QUE DESEJA APAGAR TODOS

OS QUANTITATIVOS DA LISTA?

VOC TEM CERTEZA QUE DESEJA APAGAR TODOS OS QUANTITATIVOS DO PROJETO?

PREO (R$)

Total868.21 147.73 2,319.89 73.39 30.58 44.51 37.23 20.39 113.28 234.84 157.67 35.55 77.47 R$ 4,160.74

ARMADURA Vol. Base = 1,2 m3 CA-50 DIAM. 12,5 CA-60 DIAM. 6,3 6 BARRAS C = 200 10 BARRAS C = 197

CA-50 DIAM. 10

PREO (R$)

Total1,981.60 60.23 25.10 29.93 134.67 69.42 192.73 R$ 2,493.67 R$ 1,667.07

R$ 4,160.74

DADOS BLOCO X (cm) Y (cm) HB (cm) ARMADURA Fuste d (cm) Pf (m) h (cm) dh (cm) a (cm) x (cm) b (cm)

TIPO 1

TIPO 2

100.00 100.00

-

100.00 100.00

MATERIAL + MO DE OBRA Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro

UNIDADE m unid. m3 kg kg m3 m2 m3 m2 kg m3 m3

TUBULO

TUBULO

U B U T

L

S E

O

IS A V

95.00 95.00 CA-50 DIAM. 10 CA-50 DIAM. 10 80.00 80.00 21.00 21.00 205.00 205.00 20.00 20.00 335.00 350.00 150.00 135.00 185.00 215.00 ARM. LONG. CA-50 DIAM. 12,5 8 BARRAS C = 200 CA-50 DIAM. 12,5 ARM.TRANV. CA-60 DIAM. 6,3 10 BARRAS C = 260 CA-60 DIAM. 6,3 NUM. CONJUNTOS 1.00 1.00 NUM. TUB. 1 CONJ. 1.00 1.00 TOTAL TUBULES 1.00 1.00 TOTAL UNITRIO TOTAL 21.00 21.00 21.00 7.37 7.37 8.77 17.93 17.93 19.33 16.00 16.00 16.00 7.00 7.00 7.00 6.88 6.88 6.88 0.17 1.00 3.80 76.00 0.92 5.76 0.17 1.00 3.80 76.00 0.92 5.76 0.17 1.00 3.80 76.00 0.92 5.76

BLOCO

BLOCO Bota fora MATERIAL Concreto Armadura longitudinal Armadura tranversal Concreto magro Concreto estrutural Forma Armadura TUB.

m3 UNIDADE m3 kg kg m3 m3 m2 kg

19.05 17.93 16.00 7.00 0.17 0.92 3.80 76.00 73.50 1,543.49 6,091.43

19.05 17.93 16.00 7.00 0.17 0.92 3.80 76.00

20.45 19.33 16.00 7.00 0.17 0.92 3.80 76.00 73.50 1,543.49 6,496.15

PREO UNITRIO DA PERFURAO (R$) - POR METRO PREO TOTAL DA PERFURAO (R$) PREO UNITRIO DO MATERIAL (R$) PREO TOTAL DO MATERIAL (R$) PREO UNITRIO DA MO DE OBRA (R$) PREO TOTAL DA MO DE OBRA (R$) PREO UNITRIO (MO+MAT) (R$) PREO TOTAL(MO+MAT) (R$) PREO MDIO MATERIAL - 1 TUBULO PREO MDIO MO DE OBRA - 1 TUBULO PREO MDIO MATERIAL + MO DE OBRA - 1 TUBULO

BLOCO

1 CONJUNTO 6,091.43 4,191.94

4,191.94 10,283.37 10,283.37 TIPO 1 6,091.43 4,191.94 10,283.37 PREO (R$)

4,501.01 10,997.15 TIPO 2 6,496.15 4,501.01 10,997.15 QUADRO ORIGINAL DAS QUANTIDADES

SOMA QUANTITATIVOS T1 A T10GERAL - BLOCOS RETANGULARES UNIDADE QUANT.

BLOCO

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo

m m3 m3 kg kg m3 m2 unid.

105.00 24.75 72.58 76.00 33.00 31.63 0.85 5.00

UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39

TOTAL 6,993.95 3,986.87 24,565.12 464.79 201.82 327.44 213.29 101.95

TUBULO

BLOCO

Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m2 kg m3 m3 m3

17.52 338.16

47.20 6.12

826.97 2,068.09 1,392.04 257.17 804.03 42,203.52 25,094.54 17,108.98

4.11 338.44 26.55 9.69 77.66 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3

105.00 24.75 72.58 76.00 33.00 31.63 0.85 5.00 17.52 338.16

PREO (R$) UNITRIO TOTAL VAR 6,993.95 161.06 3,986.87 338.44 24,565.12 6.12 464.79 6.12 201.82 10.35 327.44 251.78 213.29 20.39 47.20 6.12 101.95 826.97 2,068.09 1,392.04 257.17 804.03 42,203.52 25,094.54 17,108.98

PRIMEIRA DEZENA COPIADA

BLOCO

TUBULO

4.11 338.44 26.55 9.69 77.66 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.

PREO (R$) UNITRIO TOTAL

DEZENA 2 AINDA NO UTILIZADA

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3 Total material + mo de obra Total material Total mo de obra

BLOCO

TUBULO

TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.

PREO (R$) UNITRIO TOTAL

DEZENA 3 AINDA NO UTILIZADA

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual

m m3 m3 kg kg m3

BLOCO

TUBULO

Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m2 unid. m2 kg m3 m3 m3 Total material + mo de obra Total material Total mo de obra

BLOCO

TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.

PREO (R$) UNITRIO TOTAL

DEZENA 4 AINDA NO UTILIZADA

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3

BLOCO

TUBULO

BLOC

Total material + mo de obra Total material Total mo de obra

TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.

PREO (R$) UNITRIO TOTAL

DEZENA 5 AINDA NO UTILIZADA

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3 Total material + mo de obra Total material Total mo de obra

BLOCO

TUBULO

TUBULES OVAISGERAL - BLOCOS RETANGULARES UNIDADE QUANT.

PREO (R$) UNITRIO TOTAL ^VAR 6,993.95

RESULTADO FINAL - SOMA DAS 5 DEZENASRestaurar Adequar alterao do unitrio do fuste

Perfurao do fuste TUBULO

m

105.00

Adequar alterao do unitrio do fuste

Alargamento da base TUBULO Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

m3 m3 kg kg m3 m2 unid. m2 kg m3 m3 m3

24.75 72.58 76.00 33.00 31.63 0.85 5.00 17.52 338.16 4.11 26.55

161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12 338.44 9.69

3,986.87 24,565.12 464.79 201.82 327.44 213.29 101.95 826.97 2,068.09 1,392.04 257.17 804.03 R$ 42,203.52 R$ 25,094.54 R$ 17,108.98

Restaurar Restaurar

RestaurarRestaurar

RestaurarRestaurar

RestaurarRestaurar Restaurar Restaurar

BLOCO

RestaurarRestaurar Restaurar todas as quantidades e preos originais do BD

77.66 10.35 Total material + mo de obra Total material Total mo de obra

TUBULES OVAISQUANTITATIVOS GERAL

TUBULO

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal

UNIDADE QUANT. m 8.00 m3 21.71 m3 28.64 kg 15.00

PREO (R$) UNITRIO VAR 91.39 159.37 2.15

TOTAL 577.21 1,984.37 4,564.41 32.31

TUBULO

Armadura tranversal Escavao manual Concreto magro Corte e preparo da cabea do tutulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura Lanamento e adensamento de concreto estrutural Reaterro Bota fora

kg m3 m2 unid. m2 kg m3 m3 m3

18.00 11.48 0.21 1.00 6.00 150.00

2.15 6.32 132.92 11.09 24.54 2.15

38.77 72.57 27.89 11.09 147.23 323.09 324.62 55.56 194.15 R$ 8,353.28 R$ 4,418.61 R$ 3,934.67 10.00 12.00 6.00 R$ 10,908.72 R$ 5,770.35 R$ 5,138.37 30.59% R$ 2,555.44

BLOCO

1.83 177.22 9.40 5.91 30.72 6.32 Total material + mo de obra Total material Total mo de obra LUCRO (%) ADMNISTRAO (%) CUSTOS FINANCEIROS (%) CUSTO FINAL Total material + mo de obra Total material Total mo de obra BDI MDIO DIFERENA BRUTA

TIPO 3

TIPO 4

TIPO 5

-

100.00 100.00

8 BARRAS C = 200 10 BARRAS C = 260

90.00 90.00 85.00 CA-50 DIAM. 10 70.00 21.00 70.00 20.00 140.00 60.00 80.00 CA-50 DIAM. 12,5 CA-60 DIAM. 6,3 1.00 1.00 1.00 TOTAL 21.00 0.53 8.61 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64

7 BARRAS C = 200 10 BARRAS C = 228

90.00 90.00 85.00 CA-50 DIAM. 10 70.00 21.00 100.00 20.00 170.00 90.00 80.00 CA-50 DIAM. 12,5 CA-60 DIAM. 6,3 1.00 1.00 1.00 TOTAL 21.00 0.82 8.90 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64

7 BARRAS C = 200 10 BARRAS C = 228

95.00 CA-50 DIAM. 10 80.00 21.00 205.00 20.00 330.00 145.00 185.00 8 BARRAS C = 200 CA-50 DIAM. 12,5 10 BARRAS C = 260 CA-60 DIAM. 6,3 1.00 1.00 1.00 UNITRIO TOTAL 21.00 21.00 8.77 7.27 19.33 17.83 16.00 16.00 7.00 7.00 6.88 6.88 0.17 1.00 3.80 76.00 0.92 5.76 0.17 1.00 3.80 76.00 0.92 5.76

UNITRIO 21.00 7.27 17.83 16.00 7.00 6.88 0.17 1.00 3.80 76.00 0.92 5.76

UNITRIO 21.00 0.53 8.61 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64

UNITRIO 21.00 0.82 8.90 14.00 6.00 5.49 0.16 1.00 3.06 55.08 0.67 4.64

20.45 19.33 16.00 7.00 0.17 0.92 3.80 76.00

18.95 17.83 16.00 7.00 0.17 0.92 3.80 76.00 73.50 1,543.49 6,062.52

18.95 17.83 16.00 7.00 0.17 0.92 3.80 76.00

9.46 8.61 14.00 6.00 0.16 0.67 3.06 55.08 56.27 1,181.74 3,181.09

9.46 8.61 14.00 6.00 0.16 0.67 3.06 55.08

9.75 8.90 14.00 6.00 0.16 0.67 3.06 55.08 56.27 1,181.74 3,263.35

9.75 8.90 14.00 6.00 0.16 0.67 3.06 55.08

1 CONJUNTO 6,496.15 4,501.01

1 CONJUNTO 6,062.52 4,169.86

1 CONJUNTO 3,181.09 2,091.68

1 CONJUNTO 3,263.35 2,154.49

4,169.86 10,997.15 10,232.38 TIPO 2 6,062.52 4,169.86 10,232.38 TIPO 3 10,232.38

2,091.68 5,272.77 5,272.77 TIPO 4 3,181.09 2,091.68 5,272.77

2,154.49 5,417.84 5,417.84 TIPO 5 3,263.35 2,154.49 5,417.84

UANTIDADES

alterao do unitrio do fuste

alterao do unitrio do fuste

s e preos originais do BD

1

TIPO 6

TIPO 7

TIPO 8

TIPO 9

-

-

-

TOTAL

UNITRIO

TOTAL

UNITRIO

TOTAL

UNITRIO

TOTAL

1 CONJUNTO

1 CONJUNTO

1 CONJUNTO

TIPO 6

TIPO 7

TIPO 8

TIPO 9

TIPO 10

-

-

UNITRIO

TOTAL

UNITRIO 0.00

1 CONJUNTO

1 CONJUNTO

TIPO 9

TIPO 10

RESUMO DOS FERROS TABELA ORIGINAL

AO BLOCO CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0 ARM. LONGIT. CA-50 8.0 10.0 12.5 16.0 20.0 25.0 CA-60 5.0 6.0ARM. TRANSV.

TIPO 1

TIPO 2

TIPO 3

TIPO 4

76.00

76.00

76.00

55.08

16.00

16.00

16.00

14.00

CA-50 6.3 8.0 10.0 12.5 16.0 CA-60 3.4 5.0 6.0

7.00

7.00

7.00

6.00

TIPO 5

TIPO 6

TIPO 7

TIPO 8

TIPO 9

TIPO 10

55.08

14.00

6.00

AO BLOCO SOMA 1 CA-50 0.00 8.0 338.16 10.0 0.00 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. LONGIT. 0.00 CA-50 0.00 8.0 0.00 10.0 76.00 12.5 0.00 16.0 0.00 20.0 0.00 25.0 0.00 CA-60 0.00 5.0 0.00 6.0 0.00 ARM. TRANSV. 0.00 CA-50 33.00 6.3 0.00 8.0 0.00 10.0 0.00 12.5 0.00 16.0 0.00 CA-60 0.00 3.4 0.00 5.0 0.00 6.0

3.40 0.00

RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 0.00 0.00 33.00 0.00 338.16 76.00 0.00 0.00 RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00 0.00 33.00 0.00 338.16 76.00 0.00 RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00

3.40 0.00

5.00 0.00

20.00 0.00

3.40

5.00

20.00

3.40

5.00

RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00

20.00

3.40

5.00

RESULTADO DAS ARMADURAS DA QUARTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00

20.00

3.40

5.00

RESULTADO DAS ARMADURAS DA QUINTA DEZENA 6.00 6.30 8.00 10.00 12.50 16.00

20.00

3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00 25.00CA-50+10 % CA-60+10 %

0.00 0.00 0.00 33.00 0.00 338.16 76.00 0.00 0.00 0.00 492.00 0.00

RESULTADO FINAL AO

kg kg kg

CA - 50

CA - 60

DADES 25.00 0.00

25.00 0.00

25.00

25.00

25.00

25.00

PLANILHA DE CUSTO

Perfurao do fuste Alargamento da base Lanamento de concreto Armadura longitudinal Armadura tranversal Escavao manual Lanamento e adenamento de concreto magro Corte e preparo da cabea do tubulo Confeco, colocao e remoo de forma Dobramento e colocao de armadura no bloco Lanamento e adenamento de concreto estrutural Reaterro Bota fora

UNIDADE m m3 m3 kg kg m3 m2 unidade m2 kg m3 m3 m3

QUANTIDADE 189.00 21.87 111.92 139.93 49.62 59.15 1.55 9.00 32.72 642.16

UNITRIO VAR 161.06 338.44 6.12 6.12 10.35 251.78 20.39 47.20 6.12

TOTAL 13,167.92 3,522.74 37,879.25 855.77 303.47 612.37 389.40 183.51 1,544.43 3,927.26

BLOCO