apresentacao ep v.2_ingles

40
EP Engenharia Technologies and Equipments for the benefit of the Environment

Upload: fabio-riedel-almeida

Post on 15-Feb-2017

190 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Apresentacao ep v.2_ingles

EP Engenharia

Technologies and Equipments for the benefit of the Environment

Page 2: Apresentacao ep v.2_ingles

Grupo EP Engenharia do ProcessoSince 1974

Complete systems, including turn-key solutions.

Engineering, project, and construction (EPC) contracts, including turn-key solutions for water and wastewater treatment.

Assisted Operation

Laboratory for Chemical Analysis

Treatability Study and

Support for Research and Development

Components and equipments for water and

wastewater treatment systems

Chemical Products for:

Cooling Systems,

Steam Generation and

Water/wastewater Systems

Page 3: Apresentacao ep v.2_ingles

• Technology Research and Development for industrial and domestic water and wastewater.

• Develop basic and detailed engineering

• Manufacturing, inspection, execution and supervision of civil works and installation, commissioning, start-up and training.

• Operation and Control of water and wastewater Systems.

About EP Engenharia do ProcessoOur Business

Page 4: Apresentacao ep v.2_ingles

ISO 9001/2000 pela GLC

ISO 14.001

REBLAS

INEA – RJ

ISO 17025 pelo INMETRO

Supply Award – Volkswagen

CRCC (Petrobras)

Certifications

Page 5: Apresentacao ep v.2_ingles

• Guarulhos – SP

– Laboratories of chemical analysis and technological researches;

– Projects Structure;– Main Office.

• Nazaré Paulista – SP

– Steel shop – Maintenance Factory– Equipments Deposit– Chemical Products Factory

• Total Employees: 300

Infrastructure

Page 6: Apresentacao ep v.2_ingles

EP Analítica – Laboratory for Chemical Analysis

Page 7: Apresentacao ep v.2_ingles

Headquarters - Guarulhos

Page 8: Apresentacao ep v.2_ingles

Plant - Nazaré Paulista

Page 9: Apresentacao ep v.2_ingles

REFERENCES

Page 10: Apresentacao ep v.2_ingles

PETROBRÁS FAFEN (Petrochemical) – Camaçari, BA

Water Treatment System for industrial use and desmineralized water, with its orign from deep tubular well.

Processes and Technologies: clarification, microfiltration and desmineralization using reverse osmosis processes followed by mixed bed. Fully automatic system.

600 m³/h - industrial water280 m³/h - desmi water – RO + MB

Page 11: Apresentacao ep v.2_ingles

Water Treatment System for industrial use, with its orign from contamined water with domestic wastewater from Cunha channel.

Processes and Technologies : phisico-chemical process, followed by final polish with send filter and two steps of reverse osmosis, generationg desmineralized water for the production process. 100% automized unit with CLP.

Total flow rate - 120 m³/h – industrial wastewater + sewage

PROSINT (Petrochemical) – Rio de Janeiro, RJ

Page 12: Apresentacao ep v.2_ingles

Water Treatment and Demineralization Plant

Processes: Reverse Osmosis / Mix Bed

Conductivity must be less then 0,5 microS/cm

260 m³/h - Pre Tratament + RO + MB

PQU QUATTOR (Petrochemical) – Mauá, SP

Page 13: Apresentacao ep v.2_ingles

Water Treatment System and Demineralization Unit

Processes:WTP – Coagulation / Floculation / FiltrationDEMINERALIZATION – Ion Exchange followed by mix bed. Totally automatic plant controlled by CLP

COPEBRÁS (Petrochemical) – Catalão, GO

Flow rate: 600m³/h

Page 14: Apresentacao ep v.2_ingles

Supply of WTP - Turn key Project

Processes: RO permeate polish system using Mix Bed

Flow Rate: 300 m³/h

GEOPLAN (Environmental Technology) – RJ

Page 15: Apresentacao ep v.2_ingles

Supply of WWTP recycling 75% of industrial and domestic wastewater using the following technologies:

- Phisical-chemical clarification, DAF, biological treatment (activated sludge), tertiary tratament and demineralization by RO.

- System totally automatic system controlled by CLP

- EP is the responsible of the operation and analytical control of this unit since 2004.

Flow rate: 20m³/h

MAXION FUMAGALLI (Autoparts) – Limeira, SP

Page 16: Apresentacao ep v.2_ingles

Tertiary Treatment and Water Recycling

RO Unit

Flow rate: 20m³/h

MAXION FUMAGALLI (Autoparts) – Limeira, SP

Page 17: Apresentacao ep v.2_ingles

Processes:Anaerobic SystemAerobic SystemPhisical-chemicalPolishingMFRO

Turn Key Project

MASTERFOODS (Food) – Mogi Mirim, SP

Flow rate: 35m³/h

Page 18: Apresentacao ep v.2_ingles

Turn Key Project – WWTP

Processes: MBBR technology for high BOD removal from Guaraná concentrate

AMBEV (Beverage) – Maués, AM

Flow rate: 20m³/h

Page 19: Apresentacao ep v.2_ingles

WTP + Demineralization - Turn Key Project

Processes: RO System followed by mixed bed.

Flow rate: 60m³/h

OXITENO (Petrochemical) – Mauá, SP

Page 20: Apresentacao ep v.2_ingles

WWTP – BOT Project Processes: RO pre tratament using microfiltration

EP is responsible for the operation and chemical analisys control since 2009

Other Services: Recycling System Retrofit

VOLKSWAGEN (Automotive) – Taubaté, SP

Flow rate: 150m³/h

Page 21: Apresentacao ep v.2_ingles

WTP - Turn Key Project

Processe exclusively designed by EP laboratories for selenium removal

Services: Project, supply of Equipments, civil works, assembling, eletrical and automation works.

AMBEV (Beverage) – Dominican Republic

Flow rate: 180m³/h

Page 22: Apresentacao ep v.2_ingles

WWTP

Supply of biological system and outsourcing operation

Flow rate: 65m³/h

BUNGE ALIMENTOS (Food) – Bauru, SP

Page 23: Apresentacao ep v.2_ingles

WTP followed by microfiltration and RO system (BOO)

Services: Operation and chemical supply

Flow rate: 35m³/h

Carbon Filter

VOLKSWAGEN (Automotive) – São Bernardo do Campo, SP

RO System provides demineralizated water for painting processes and boilers.

Page 24: Apresentacao ep v.2_ingles

WWTP

EP is responsible for operation and chemical analysis control os this plant since 2001.

Flow rate: 20m³/h

VOLKSWAGEN - Trucks (Automotive) – Resende, RJ

Page 25: Apresentacao ep v.2_ingles

RECENT PROJECTS

Page 26: Apresentacao ep v.2_ingles

WTP – Turn key project

Supply of equipments and services that allows the water captation and treatment from Perequê river, for industrial use.

Technologies: Convention process followed by Send Filter

Flow rate: 150m³/h

PETROCOQUE (Petrochemical) – Cubatão, SP

Page 27: Apresentacao ep v.2_ingles

Service: WWTP and Recycling System for the new GM Factory

Technologies: biological system using "Wetland" technology followed by RO system for 75% recovery.

GENERAL MOTORS (Automotive) – Joinville, SC

Page 28: Apresentacao ep v.2_ingles

WWTP for the new Pepsico factory

Technologies: pre-treament with DAF, Activated Sludge, Recycling system (80%) using desinfecction , filtration, MF, softening and demineralization by RO processes.

PEPSICO (Food) – Feira de Santana, BA

Flow rate: 25m³/h

Page 29: Apresentacao ep v.2_ingles

Pre-treatment System retrofit to optimizate phisico-chemical and biological processes.

A new Equalization Tank and a water-oil separator system were bilt.

PEPSICO (Food) – Itu, SP

Page 30: Apresentacao ep v.2_ingles

Pre-treatment and WWTP retrofit with rotary screen instalation and two DAF systems.

EP is also responsible for the operation and chemical anaylis control of this plant.

Flow rate: 100m3/h

PEPSICO (Food) – Sete Lagoas, MG

Page 31: Apresentacao ep v.2_ingles

Technical Information:Capability: 100m³/hOrganic Load: 2500mg/L (BOD)Technologies: • Flotation (DAF)• Activated Sludge Outlet BOD < 20mg/L

PEPSICO (Food) – Sete Lagoas, MG

Page 32: Apresentacao ep v.2_ingles

Service: Project, construction and start-up of the WWTP

Technologies: Pre-tratament by phisical-chemical process, followed by Activated Sludge

Flow rate: 25m³/h

BOMBRIL (Hygiene) – Recife, PE

Page 33: Apresentacao ep v.2_ingles

Wastewater: contaminated with oil and grease

Flow rate: 35m³/h

Technologies: Conventional phisical-chemical Oil-Water sepatator

Lamellar Settler Automated System

LATAPACK-BALL (Packing) – Alagoinhas, BA

WWTP

Page 34: Apresentacao ep v.2_ingles

LATAPACK-BALL (Packing) – Alagoinhas, BA

Clarified water

Press filter

Page 35: Apresentacao ep v.2_ingles

MBR system RO system

WWTP using MBR technology for domestic and industrial wastewater treatment.

Recovery of 75% with two RO steps for industrial water

Flow rate: 5m³/h

IHARABRAS (Pesticides) – Sorocaba, SP

Page 36: Apresentacao ep v.2_ingles

MAXION (Autoparts) – Cruzeiro, SP

Supply of WWTP – Turn key project

Flow rate: 30m³/h

Page 37: Apresentacao ep v.2_ingles

WWTP extension

Processes: calamity tank for pH correction

Flow rate: 120m³/h

COCA COLA (Beverage) – Jundiaí, SP

Page 38: Apresentacao ep v.2_ingles

Mobile Units for Pilot Tests - CENPES - PETROBRÁS

Technologies:

• Conventional phisical-chemical treatment• Send Filtration - POLARTACK®• Activated Carbon• UF• RO• Advanced Oxidative Processes: Ozone Chlorine Dioxide UV Fentom

• Softning• Demineralization – Ion Exchange• Polishing – Mix Bed• Demineralization – EDR• Polisshing – EDI• CO2 removal by membranes - GTM• Decarbonator Tower

Page 39: Apresentacao ep v.2_ingles

PEPSICO (Food) – Guarulhos, SP

WWTP – Turn key project

Processes: Phisical-chemical process by flotation followed by bilological (MBBR)

Flow rate: 35m³/h

Page 40: Apresentacao ep v.2_ingles

[email protected]

Fone: 11 2463-7700