20150514 hospital

35
ENERGIA E SUSTENTABILIDADE AMBIENTAL Gilberto M Jannuzzi UNICAMP 24º. Congresso FEHOSP 12-15 Maio 2015, Royal Palm Plaza Campinas SP

Upload: gilberto-de-martino-jannuzzi

Post on 21-Jul-2015

222 views

Category:

Education


2 download

TRANSCRIPT

Page 1: 20150514 hospital

ENERGIA E SUSTENTABILIDADE AMBIENTAL Gilberto M Jannuzzi UNICAMP

24º. Congresso FEHOSP 12-15 Maio 2015, Royal Palm Plaza Campinas SP

Page 2: 20150514 hospital

Tópicos • Contexto energético atual • Energia e Sustentabilidade • Um exemplo de eficiência energética no HC da UNICAMP

Page 3: 20150514 hospital
Page 4: 20150514 hospital
Page 5: 20150514 hospital
Page 6: 20150514 hospital
Page 7: 20150514 hospital

Pontos de atenção • Aumento da demanda de eletricidade (residencial e

comercial) e gasolina nos últimos 2 anos. Redução de tarifas e preços congelados da gasolina. •  2013 PIB cresceu 2,3%, elet 4,5% •  2014 PIB ˜0% elet 2,2% (recessão industrial)

• Eletricidade: problemas na gestão de leilões, conclusão de obras, coordenação de obras de expansão

• Desequilíbrio financeiro das empresas de eletricidade

Page 8: 20150514 hospital

Respostas oficiais • Diversificação de fontes de suprimento

•  Leilões específicos: eólico, solar

• Desde 2003 praticamente todas novas usinas hidroelétricas sem reservatório

• Dependência cada vez maior de termoeletricidade •  Fatores de capacidade:

•  Hidroelétricas 2012 (57%) 2013 (49%) •  Termoelétricas 2012 (geral 37%, GN 42%) 2013 (65% , 73%)

Page 9: 20150514 hospital

ENERGIA ARMAZENADA EM RESERVATÓRIOS: 2000 a 2014

Fonte: Operador Nacional do Sistema Elétrico – ONS (2014)

9

0  

25,000  

50,000  

75,000  

100,000  

125,000  

150,000  

175,000  

200,000  

225,000  

1999   2000   2001   2002   2003   2004   2005   2006   2007   2008   2009   2010   2011   2012   2013   2014   2015  

Energia  Hídrica  méd

ia  Arm

azen

ada  [M

W/ano

]  

ANO  

SIN  

SE/CO  

S  

N  

NE  

8%  

69%  

18%   5%   S  

SE/CO  

NE  

N  

Page 10: 20150514 hospital

10 Evolution of the energy stored in water resevoirs 2013-2022 (PNE

2030)

Fonte: Plano Nacional de Energia – PNE 2030

Analisando a previsão de capacidade de armazenamento dos reservatórios ao final do ano de 2022, percebe-se que, em termos percentuais, a elevação de 2% é bem inferior ao aumento da capacidade instalada de usinas hidrelétricas, de 40%.

Page 11: 20150514 hospital

ENERGIA E SUSTENTABILIDADE

Page 12: 20150514 hospital

Quais soluções ?

• Eficiência Energética

• Fontes Renováveis

Page 13: 20150514 hospital

Soluções P

IR: in

tegran

do as op

ções de recu

rsos Sus

tent

abili

dad

e Asp

ecto

s in

stitu

cion

ais

Des

envo

lvim

ent

o

GLD,%E'iciência%e%conservação%

Recursos%de%demanda%

Substituição%de%energéticos,%geração%

distribuída,%Mudança%padrões%de%consumo%

Materiais%Armazenamento%de%energia%

Tecnologias%de%interface%

Família%"smart"(redes,%medição,%

equipamentos)%geração%

distribuída,%

Combustíves%Eletricidade%

Calor%Recursos%de%Oferta%E'iciência%

energética%

Page 14: 20150514 hospital

EXEMPLO DE PROJETO DE EFICIENCIA ENERGÉTICA Hospital das Clínicas da UNICAMP (realizado entre 2004-2005)

Page 15: 20150514 hospital

Projeto  de  Eficiência  Energé2ca    Hospital  de  Clínicas  da  UNICAMP  

•  Parceria  UNICAMP/ELEKTRO;  •  Recursos  da  Lei  10848/04  e  9.991/00  •  Investimento  ELEKTRO  com  50%  assumido  por  ela;  

•  Os  demais  50%  são  retornáveis  com  os  recurso  da  UNICAMP  relativos  a  economia  na  conta  de  energia  elétrica;  

Page 16: 20150514 hospital

Viabilidade  do  Projeto  

•  Diagnóstico  dos  equipamentos  instalados  que  podem  gerar  economia  de  energia  elétrica;  

•  Estimativa  da  economia  gerada  com  a  substituição;  

•  Estudo  BeneRício  x  Custo;  importante  o  cálculo  do  pay  back  simples;  

•  Cronograma  Prévio.    

Page 17: 20150514 hospital

Projeto  HC  

•  1ª  ETAPA:    ~  2500  luminárias  ~  7800  lâmpadas  

•  2ª  ETAPA    ~  4400  luminárias  ~  12200  lâmpadas  -­‐  Sistema  de  ar  condicionado  (chillers)  

Page 18: 20150514 hospital

Dados  do  sistema  anKgo      

SISTEMA ANTIGO

Tipo de Luminária/lâmpada 2x20W 2x32W 4x32W 2x40W 4x40W 1X110W TOTAL

Quantidade de luminárias 2 172 337 861 1091 42 2505

Quantidade de lâmpadas 4 344 1348 1722 4364 42 7824

Quantidade de reatores 2 172 674 861 2182 42 3933

6 tipos de luminárias, 4 tipos de lâmpadas e 4 tipos de reatores.

SISTEMA ANTIGO

Tipo de Luminária/lâmpada 2x20W 1x32W 2x32W 4x32W 1x40W 2x40W 4x40W 1X110W TOTAL

Quantidade de luminárias 152 15 842 770 172 1302 1087 15 4355

Quantidade de lâmpadas 304 15 1684 3080 172 2604 4348 15 12222

Quantidade de reatores 152 15 842 1540 172 1302 2174 15 6212

8 tipos de luminárias, 4 tipos de lâmpadas e 4 tipos de reatores.

Etapa 1

Etapa 2

Page 19: 20150514 hospital

Sistema antigo de iluminação

Sistema novo de iluminação

Page 20: 20150514 hospital

ESPECIFICAÇÃO  •  Luminárias:  

 Aproveitamento  dos  vãos  do  teto;  •  Lâmpadas;    

 Fluorescente  Tubular  Trifósforo;      Potência:  32W;  Fluxo  Luminoso:  2700  lm;  Temperatura  de  cor:  4000  ºK;      Índice  de  Reprodução  de  Cores  :  IRC  >  80%  

•  Reatores:      Fator  de  Potência:  maior  que  0,98    THD:  menor  que  10%  

 

Page 21: 20150514 hospital

MEDIÇÕES  DE  ENERGIA  •  Os  quadros  elétricos  medidos,  na  etapa  1,  representam  o  consumo  de  29,5%  do  consumo  total  do  sistema  antigo.    

•  Apesar  do  cuidado  de  se  medir  antes  e  após  a  instalação  do  sistema  novo  no  mesmo  dia  da  semana,medições  de  24  horas,  os  gráRicos  mostraram  que  houve  mudanças  nos  hábitos  de  consumo  com  o  sistema  novo  comprovados  pelos  gráRicos  a  seguir.  

•  As  medições  da  etapa  2  foram  para  um  número  menor  de  quadros  e  durante  1  semana.  

 

Page 22: 20150514 hospital

Comparação  dos  resultados  de  consumo  de  energia  (kWh)  

Econo-

ENERGIA ENERGIA mia HORA DATA HORA (kWh) HORA DATA HORA (kWh) (%)

1, FL-24fs SUPERINTENDÊNCIA 17/09 SAB 0:00 19/09 0:00 114,09 26/11 SAB 0:00 28/11 0:00 99,12 13,12 2, FL-22 IMUNOLOGIA 19/09 SEG 19:20 20/09 19:20 227,60 05/12 SEG 0:00 06/12 0:00 101,02 55,62 3, FL-21 ANATOMIA 20/09 TER 22:15 21/09 22:15 185,32 29/11 TER 5:05 30/11 5:05 58,27 68,56 4, LA-24 ORTOPEDIA 2 22/09 QUI 22:50 23/09 22:50 40,02 01/12 QUI 5:50 02/12 5:50 39,77 0,62 5, LA-26 ORTOPEDIA 1 26/09 SEG 0:00 27/09 0:00 106,15 05/12 SEG 0:00 06/12 0:00 59,05 44,37 6, LA-27 OFTALMOLOGIA 27/09 TER 5:35 28/09 5:35 110,21 29/11 TER 5:30 30/11 5:30 63,58 42,31 7, LA-23a AMBULATÓRIO CIRÚRGICO 05/10 QUA 7:15 06/10 7:15 119,93 30/11 QUA 5:20 01/12 5:20 94,68 21,05 8, FL-24 SUPERINTENDÊNCIA 03/10 SEG 0:00 04/10 0:00 108,93 28/11 SEG 0:00 2911 0:00 73,14 32,86 9, LA-25b OTORRINOLARINGOLOGIA 04/10 TER 6:50 05/10 6:50 75,59 06/12 TER 6:20 07/12 6:20 26,44 65,02

10, LC-23fs LABORATÓRIO DOCÊNCIA 08/10 SAB 0:00 10/10 0:00 206,66 26/11 SAB 0:00 28/11 0:00 53,43 74,15 11, LC-23 LABORATÓRIO DOCÊNCIA 10/10 SEG 0:00 11/10 0:00 122, 28/11 SEG 0:00 2911 0:00 79,76 34,62 12, LE-28 CENTRAL DE MATERIAIS 19/10 QUA 0:00 20/10 0:00 157,27 30/11 QUA 5:40 01/12 5:40 97,58 37,95 13, LE-26 CENTRO CIRÚRG. ROTINA 20/10 QUI 0:40 21/10 0:40 106,92 01/12 QUI 5:40 02/12 5:40 78,24 26,82

45,02 45,02 45,02

50.420,70 27.722,40

QDL LOCAL ANTES

INSTALAÇÃO RETIRADA RETIRADA DATA

APÓS DATA

CONSUMO MENSAL (kWh) TOTAL ÁREAS CONSUMO ANUAL (MWh) TOTAL ÁREAS

REGISTRO DE CONSUMO DE ENERGIA NO HOSPITAL DE CLÍNICAS - UNICAMP (CAMPINAS)

N °

1.680,69 924,08

INSTALAÇÃO

613,45 337,29

CONSUMO DIÁRIO (kWh) TOTAL ÁREAS

Page 23: 20150514 hospital

MEDIÇÕES  DE  ILUMINÂNCIA  –  Etapa  1    

a iluminância, medida em lux, teve um aumento médio de 20 a 35%.

Page 24: 20150514 hospital

MEDIÇÕES  DE  ILUMINÂNCIA  –  Etapa  2  

A iluminância, medida em lux, teve um aumento médio de 98%.

4° Andar Sala Lux antigo Lux Novo Diferença %

E4P4: Posto 265 718 171% E4P4: Posto 265 718 171% C4P3 258 712 176% C4P3: Posto – Sala cirurgia pediátrica 408 609 49% C4-169 C4P2 398 713 79% C4-155 249 368 48% E2P4: Posto 530 672 27% EECT: diretoria e secretaria de enfermagem 208 423 103% E4-171 / E4-171ª 270 765 183% E4P1 380 633 67% C4-184 528 594 13% E4-135 375 775 107% Corredor 169 198 17% E4-140 508 834 64% C4-140 297 577 94% C4-168 237 565 138% Corredor 128 330 158% Média Lux 322 600 98%

Page 25: 20150514 hospital

Distorção  Harmônica  Total  (THD)    

UNICAMP - REGISTROS DO H.C. - SUPERINTENDÊNCIA - FL 24 (03/10/2005)

0

3

6

9

12

15

18

21

24

27

30

33

00:00:00

00:30:00

01:00:00

01:30:00

02:00:00

02:30:00

03:00:00

03:30:00

04:00:00

04:30:00

05:00:00

05:30:00

06:00:00

06:30:00

07:00:00

07:30:00

08:00:00

08:30:00

09:00:00

09:30:00

10:00:00

10:30:00

11:00:00

11:30:00

12:00:00

12:30:00

13:00:00

13:30:00

14:00:00

14:30:00

15:00:00

15:30:00

16:00:00

16:30:00

17:00:00

17:30:00

18:00:00

18:30:00

19:00:00

19:30:00

20:00:00

20:30:00

21:00:00

21:30:00

22:00:00

22:30:00

23:00:00

23:30:00

00:00:00

Intervalos de integração

THD

de

potê

ncia

até

21a

ord

em (%

)

UNICAMP - REGISTROS DO H.C. - SUPERINTENDÊNCIA - FL 24 (28/11/2005)

0

2

4

6

8

10

12

14

16

18

20

22

24

26

00:00:00

00:30:00

01:00:00

01:30:00

02:00:00

02:30:00

03:00:00

03:30:00

04:00:00

04:30:00

05:00:00

05:30:00

06:00:00

06:30:00

07:00:00

07:30:00

08:00:00

08:30:00

09:00:00

09:30:00

10:00:00

10:30:00

11:00:00

11:30:00

12:00:00

12:30:00

13:00:00

13:30:00

14:00:00

14:30:00

15:00:00

15:30:00

16:00:00

16:30:00

17:00:00

17:30:00

18:00:00

18:30:00

19:00:00

19:30:00

20:00:00

20:30:00

21:00:00

21:30:00

22:00:00

22:30:00

23:00:00

23:30:00

00:00:00

Intervalos de integração

THD

de

potê

ncia

até

21

ord

em (%

)

Gráfico 3 – Superintendência Gráfico 4– Superintendência Sistema antigo (antes) - THD (%) Sistema novo (após) - THD (%)

a distorção de harmônica total variou de 24% a 30% e no sistema novo de 14% a 24%.

Page 26: 20150514 hospital

Fator  de  Potência    

UNICAMP - REGISTROS DO H.C. - LABORATÓRIO DOCÊNCIA - LC 23 (10/10/2005)

0.4

0.45

0.5

0.55

00:00:00

00:30:00

01:00:00

01:30:00

02:00:00

02:30:00

03:00:00

03:30:00

04:00:00

04:30:00

05:00:00

05:30:00

06:00:00

06:30:00

07:00:00

07:30:00

08:00:00

08:30:00

09:00:00

09:30:00

10:00:00

10:30:00

11:00:00

11:30:00

12:00:00

12:30:00

13:00:00

13:30:00

14:00:00

14:30:00

15:00:00

15:30:00

16:00:00

16:30:00

17:00:00

17:30:00

18:00:00

18:30:00

19:00:00

19:30:00

20:00:00

20:30:00

21:00:00

21:30:00

22:00:00

22:30:00

23:00:00

23:30:00

00:00:00

Intervalos de integração

Fato

res

de p

otên

cia

Trifásico

UNICAMP - REGISTROS DO H.C. - LABORATÓRIO DOCÊNCIA - LC 23 (28/11/2005)

0.89

0.9

0.91

0.92

0.93

0.94

0.95

0.96

0.97

0.98

0.99

1

00:00:00

00:30:00

01:00:00

01:30:00

02:00:00

02:30:00

03:00:00

03:30:00

04:00:00

04:30:00

05:00:00

05:30:00

06:00:00

06:30:00

07:00:00

07:30:00

08:00:00

08:30:00

09:00:00

09:30:00

10:00:00

10:30:00

11:00:00

11:30:00

12:00:00

12:30:00

13:00:00

13:30:00

14:00:00

14:30:00

15:00:00

15:30:00

16:00:00

16:30:00

17:00:00

17:30:00

18:00:00

18:30:00

19:00:00

19:30:00

20:00:00

20:30:00

21:00:00

21:30:00

22:00:00

22:30:00

23:00:00

23:30:00

00:00:00

Intervalos de integração

Fato

r de

potê

ncia

trifá

sico

Gráfico 5 – Laboratório Docência Gráfico 6 – Laboratório Docência Sistema antigo - Fator de Potência Sistema novo - Fator de Potência

sistema antigo de iluminação de cerca de 0,5, considerado crítico pois se encontrava muito abaixo de 0,92 que é o valor normalizado no Brasil. Com o sistema novo de iluminação os valores de fator de potência variaram de 0,93 a 0,99.

Page 27: 20150514 hospital

Fator  de  Potência    

UNICAMP - REGISTROS DO H.C. - SUPERINTENDÊNCIA - FL 24 (03/10/2005)

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

00:00:00

00:30:00

01:00:00

01:30:00

02:00:00

02:30:00

03:00:00

03:30:00

04:00:00

04:30:00

05:00:00

05:30:00

06:00:00

06:30:00

07:00:00

07:30:00

08:00:00

08:30:00

09:00:00

09:30:00

10:00:00

10:30:00

11:00:00

11:30:00

12:00:00

12:30:00

13:00:00

13:30:00

14:00:00

14:30:00

15:00:00

15:30:00

16:00:00

16:30:00

17:00:00

17:30:00

18:00:00

18:30:00

19:00:00

19:30:00

20:00:00

20:30:00

21:00:00

21:30:00

22:00:00

22:30:00

23:00:00

23:30:00

00:00:00

Intervalos de integração

Fato

res

de p

otên

cia

Trifásico

UNICAMP - REGISTROS DO H.C. - SUPERINTENDÊNCIA - FL 24 (28/11/2005)

0.9

0.91

0.92

0.93

0.94

0.95

0.96

0.97

0.98

0.99

1

00:00:00

00:30:00

01:00:00

01:30:00

02:00:00

02:30:00

03:00:00

03:30:00

04:00:00

04:30:00

05:00:00

05:30:00

06:00:00

06:30:00

07:00:00

07:30:00

08:00:00

08:30:00

09:00:00

09:30:00

10:00:00

10:30:00

11:00:00

11:30:00

12:00:00

12:30:00

13:00:00

13:30:00

14:00:00

14:30:00

15:00:00

15:30:00

16:00:00

16:30:00

17:00:00

17:30:00

18:00:00

18:30:00

19:00:00

19:30:00

20:00:00

20:30:00

21:00:00

21:30:00

22:00:00

22:30:00

23:00:00

23:30:00

00:00:00

Intervalos de integração

Fato

r de

pot

ênci

a tr

ifási

coGráfico 7 – Superintendência Gráfico 8 – Superintendência Sistema antigo - Fator de Potência Sistema novo - Fator de Potência

sistema antigo de iluminação de cerca de 0,5 A 0,7, sistema novo de iluminação os valores variaram de 0,94 a 0,99.

Page 28: 20150514 hospital

PESQUISA  DE  SATISFAÇÃO      

•  Para  veriRicar  a  satisfação  dos  usuários  do  sistema  novo  de  iluminação  foram  aplicados  questionários  antes  e  após  a  instalação  do  sistema  novo  de  iluminação.    

•  Foram  aplicados  (80  etapa  1;  55  etapa  2)  questionários  antes  e  após.    

•  As  perguntas  foram  elaboradas  no  sentido  de  veriRicar  o  perRil  de  usuário  e  as  características  do  uso  da  iluminação  no  do  local  e  também  para  se  fazer  avaliações  de  sua  satisfação  quanto  ao  sistema  instalado.  

Page 29: 20150514 hospital

Valores  realizados,  calculados  -­‐  I    

ITENS ANTES

APÓS ECONOMIA

Quantidade luminária(un) 2505 2505

Quantidade lâmpada(un) 7824 3975

Quantidade reator(un) 3933 2505

Potência Instalada (kW) 344,81 134,72 210,10

Consumo (MWh/ano) 2076,62 811,32 1265,30

Economia (%) 60,93%

Horas de funcionamento 18 18

Dias de funcionamento 30 30

Tarifa (R$/MWh) 175 175

Economia anual (R$) R$ 221.427,00

Page 30: 20150514 hospital

Valores  realizados,  calculados  -­‐  II    

ITENS ANTES

APÓS ECONOMIA

Quantidade luminária(un) 4355 4355

Quantidade lâmpada(un) 12222 6227 5995

Quantidade reator(un) 6212 4355 1857

Potência Instalada (kW) 495 212 283

Consumo (MWh/ano) 3252 1395 1857

Economia (%) 59%

Horas de funcionamento 18 18

Dias de funcionamento por ano 365 365

Tarifa (R$/MWh) 175 175

Economia anual (R$) 324.975,00

Page 31: 20150514 hospital

Resultados  finais,  medidos  -­‐  I  

ITENS ANTES APÓS ECONOMIA

Quantidade de luminárias 2505 2505

Quantidade lâmpada(un) 7824 3975 3849

Quantidade reator(un) 3933 2505 1428

Consumo (MWh/ano)

2076,62

1142,14 934,48

Economia (%) 45%

Tarifa (R$/MWh) 175

175

Economia anual (R$) R$ 163.533,69

Page 32: 20150514 hospital

RESULTADOS  ECONÔMICOS  

PREVISTO REALIZADO

Total de Investimentos R$ 1.600.000,00 R$ 1.670.000,00*

Doação R$ 800.000,00 R$ 880.000,00*

Amortização R$ 800.000,00 R$ 790.000,00*

Economia Mensal sem considerar os impostos

R$ 47.000,00*  

Tempo de retorno simples 39 meses** 18 meses**

* valores aproximados. ** para uma taxa de 18% a.a descontando os impostos.

Page 33: 20150514 hospital

CONCLUSÃO    

•  Foi  possível  reduzir  drasticamente  o  consumo  mensal  de  eletricidade  através  de  intervenções  no  sistema  de  iluminação  e  ar  condicionado.  

•  As  economias  de  energia  foram  suRicientes  para  pagar  os  investimentos  realizados.  

•  Operacionalmente  não  é  trivial  realizar  essas  intervenções  em  um  hospital  em  pleno  funcionamento.  

•  É  importante  monitorar  também  o  comportamento  dos  usuários.  Havia  uma  expectativa  teórica  de  redução  de  mais  de  60%  mas  as  medições  acusaram  uma  redução  de  45%  no  consumo  em  iluminação,  considerando  medidas  realizadas  durante  uma  semana  antes  e  uma  semana  depois  das  instalações.  

Page 34: 20150514 hospital

CONCLUSÃO    

•  O  retorno  do  projeto  foi  de  18  meses.  •  Outras  melhorias  importantes  provocadas  pelo  projeto  (qualidade  de  energia)  –   foram  o  fator  de  potência  nos  circuitos  medidos  e    –  o  nível  de  distorção  harmônica  total  (THD)  dos  alimentadores  dos  quadros  de  carga.  

–  O  nível  de  iluminância  teve  uma  melhora  média  de  20  a  35%,  apesar  da  economia  de  energia  realizada.  

•  A  pesquisa  de  satisfação  também  foi  uma  inovação  do  projeto.  O  resultado  mostrou  que  além  da  economia  de  energia,  o  sistema  novo  de  iluminação    satisfez  bastante  os  usuários.  

Page 35: 20150514 hospital

OBRIGADO [email protected]