  • UNIVERSIDADE DO EXTREMO SUL CATARINENSE UNESC

    CURSO DE ENGENHARIA CIVIL

    DEIVID HENRIQUE LOCKS

    TARCISIO ZUCHINALLI

    TRABALHO DE CONCRETO ARMADO I

    CRICIMA

    2014

  • DEIVID HENRIQUE LOCKS

    TARCISIO ZUCHINALLI

    TRABALHO DE CONCRETO ARMADO I

    Trabalho apresentado como requisito

    parcial para aprovao na disciplina de

    Concreto Armado I, da Universidade do

    Extremo Sul Catarinense, solicitado pelo

    professor Alexandre Vargas.

    CRICIMA

    2014

  • SUMRIO

    1. PLANTA DE FORMA ............................................................................................................... 1

    1.1. Planta de forma do trreo.......................................................................................... 1

    1.2. Planta de forma da cobertura ................................................................................... 2

    1.3. Plantas das demais formas ....................................................................................... 3

    2. CARGA NA LAJE ..................................................................................................................... 4

    3. ESQUEMA ESTRUTURAL DAS VIGAS DO TRREO .................................................................. 5

    3.1. V401 .............................................................................................................................. 5

    3.2. V402 .............................................................................................................................. 6

    3.3. V403 .............................................................................................................................. 7

    3.4. V404 .............................................................................................................................. 8

    3.5. V405 .............................................................................................................................. 9

    3.6. V406 ............................................................................................................................ 10

    3.7. V407 ............................................................................................................................ 11

    3.8. V408 ............................................................................................................................ 12

    3.9. V409 ............................................................................................................................ 13

    3.10. V410 ........................................................................................................................ 14

    3.11. V411 ........................................................................................................................ 15

    3.12. V412 ........................................................................................................................ 16

    3.13. V413 ........................................................................................................................ 17

    3.14. V414 ........................................................................................................................ 18

    3.15. V415 ........................................................................................................................ 19

    3.16. V416 ........................................................................................................................ 20

    3.17. V417 ........................................................................................................................ 21

    3.18. V418 ........................................................................................................................ 22

    3.19. V419 ........................................................................................................................ 23

    3.20. V420 ........................................................................................................................ 24

    3.21. V421 ........................................................................................................................ 25

    3.22. V422 ........................................................................................................................ 26

    3.23. V423 ........................................................................................................................ 27

    3.24. V424 ........................................................................................................................ 28

    4. ESQUEMA ESTRUTURAL DAS VIGAS DE COBERTURA .......................................................... 29

  • 4.1. V501 ............................................................................................................................ 29

    4.2. V502 ............................................................................................................................ 30

    4.3. V503 ............................................................................................................................ 31

    4.4. V504 ............................................................................................................................ 32

    4.5. V505 ............................................................................................................................ 33

    4.6. V506 ............................................................................................................................ 34

    4.7. V507 ............................................................................................................................ 35

    4.8. V508 ............................................................................................................................ 36

    4.9. V509 ............................................................................................................................ 37

    4.10. V510 ........................................................................................................................ 38

    4.11. V511 ........................................................................................................................ 39

    4.12. V512 ........................................................................................................................ 40

    4.13. V513 ........................................................................................................................ 41

    4.14. V514 ........................................................................................................................ 42

    4.15. V515 ........................................................................................................................ 43

    4.16. V516 ........................................................................................................................ 44

    4.17. V517 ........................................................................................................................ 45

    4.18. V518 ........................................................................................................................ 46

    4.19. V518 B ..................................................................................................................... 47

    4.20. V519 ........................................................................................................................ 48

    4.21. V520 ........................................................................................................................ 49

    4.22. V521 ........................................................................................................................ 50

    4.23. V522 ........................................................................................................................ 51

    4.24. V523 ........................................................................................................................ 52

    4.25. V524 ........................................................................................................................ 53

    4.26. V525 ........................................................................................................................ 54

    4.27. V526 ........................................................................................................................ 55

    4.28. V527 ........................................................................................................................ 56

    4.29. V528 ........................................................................................................................ 57

    5. ESQUEMA ESTRUTURALDAS VIGAS DO CINTAMENTO ....................................................... 58

    5.1. V301 ............................................................................................................................ 58

    5.2. V302 ............................................................................................................................ 59

    5.3. V303 ............................................................................................................................ 60

    5.4. V304 ............................................................................................................................ 61

  • 6. ESQUEMA ESTRUTURALDAS VIGAS DO FUNDO DO RESERVATRIO .................................. 62

    6.1. V401 ............................................................................................................................ 62

    6.2. V402 ............................................................................................................................ 63

    6.3. V403 ............................................................................................................................ 64

    6.4. V404 ............................................................................................................................ 65

    7. ESQUEMA ESTRUTURALDAS VIGAS DO TETO DO RESERVATRIO ..................................... 66

    7.1. V501 ............................................................................................................................ 66

    7.2. V502 ............................................................................................................................ 67

    7.3. V503 ............................................................................................................................ 68

    7.4. V504 ............................................................................................................................ 69

    6. DIMENCIONAMENTO DA AREA DE AO .............................................................................. 70

    7. DESLACAMENTO (ymax.) DAS VIGAS .................................................................................. 73

    8. CARGA NOS PILARES ........................................................................................................... 78

  • 1

    1. PLANTA DE FORMA

    1.1. Planta de forma do trreo

  • 2

    1.2. Planta de forma da cobertura

  • 3

    1.3. Plantas das demais formas

  • 4

    2. CARGA NA LAJE

    PP Laje pr-moldada = 200,00 Kgf/m

    Enchimento = 100,00 Kgf/m

    Revestimento = 20,00 Kgf/m

    Sobre-Carga = 200,00 Kgf/m

    _________________________________________

    Carga total da laje : 520,00 Kgf/m

  • 5

    3. ESQUEMA ESTRUTURAL DAS VIGAS DO TRREO

    3.1. V401

    Seo da viga = 15x55cm

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 1,39490 tf/m 1,39490 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,20625 tf/m 0,20625 tf/m 0,20625 tf/m 0,20625 tf/m PP

    0,65475 tf/m 2,04965 tf/m 2,04965 tf/m 0,65475 tf/m

  • 6

    3.2. V402

    Seo da viga = 12x55cm

    2,23754 tf

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,53235 tf/m Parede

    PP 0,16500 tf/m PP

    0,69735 tf/m

  • 7

    3.3. V403

    Seo da viga = 12x55cm

    2,23754 tf

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,53235 tf/m Parede

    PP 0,16500 tf/m PP

    0,69735 Tf/m

  • 8

    3.4. V404

    Seo da viga = 12x55cm

    1,93759 tf 1,68917 tf 1,93759 tf

    Laje 0,00000 Tf/m 1,39490 tf/m 1,39490 tf/m 1,39490 tf/m 1,39490 tf/m 0,00000 tf/m Laje

    Laje 0,35100 Tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m PP

    0,96450 tf/m 2,35940 tf/m 2,35940 tf/m 2,35940 tf/m 2,35940 tf/m 0,96450 tf/m

  • 9

    3.5. V405

    Seo da viga = 12x55cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    0,61350 tf/m

  • 10

    3.6. V406

    Seo da viga = 12x55cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    0,61350 tf/m

  • 11

    3.7. V407

    Seo da viga = 12x55cm

    Laje 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m Laje

    Laje 1,39490 tf/m 0,00000 tf/m 0,15600 tf/m 1,39490 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,00000 tf/m 0,44850 tf/m Parede

    PP 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m PP

    2,35940 tf/m 0,96450 tf/m 0,67200 tf/m 2,35940 tf/m

  • 12

    3.8. V408

    Seo da viga = 12x55cm

    Laje 0,15600 tf/m Laje

    Laje 0,89050 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    1,66000 tf/m

  • 13

    3.9. V409

    Seo da viga = 12x30cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,49725 tf/m Parede

    PP 0,09000 tf/m PP

    0,58725 tf/m

  • 14

    3.10. V410

    Seo da viga = 15x55cm

    Laje 0,00000 tf/m 0,89050 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,20625 tf/m 0,20625 tf/m PP

    0,65475 tf/m 1,54525 tf/m

  • 15

    3.11. V411

    Seo da viga = 15x55cm

    Laje 0,00000 tf/m Laje

    Laje 1,39490 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,20625 tf/m PP

    2,04965 tf/m

  • 16

    3.12. V412

    Seo da viga = 15x55cm

    Laje 0,00000 tf/m Laje

    Laje 1,39490 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,20625 tf/m PP

    2,04965 tf/m

  • 17

    3.13. V413

    Seo da viga = 20x55cm

    1,14073 tf

    Laje 0,00000 tf/m Laje

    Laje 1,48980 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,27500 tf/m PP

    2,21330 tf/m

  • 18

    3.14. V414

    Seo da viga = 12x55cm

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,47580 tf/m 1,21680 tf/m Laje

    Parede 0,53235 tf/m 0,53235 tf/m Parede

    PP 0,16500 tf/m 0,16500 tf/m PP

    1,17315 tf/m 1,91415 tf/m

  • 19

    3.15. V415

    Seo da viga = 20x55cm

    5,63654 tf

    0,54908 tf 3,02142 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,47580 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    0,72350 tf/m 1,19930 tf/m

  • 20

    3.16. V416

    Seo da viga = 20x55cm

    7,67755 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 1,21680 tf/m 1,43000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    1,94030 tf/m 2,04965 tf/m

  • 21

    3.17. V417

    Seo da viga = 20x55cm

    5,63654 tf 0,53312 tf 15,53873 tf

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,51350 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m PP

    0,72350 tf/m 1,23700 tf/m 0,27500 tf/m

  • 22

    3.18. V418

    Seo da viga = 15x55cm

    0,58138 tf

    Laje 0,00000 tf/m 0,51350 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,20625 tf/m 0,20625 tf/m PP

    0,65475 tf/m 1,16825 tf/m

  • 23

    3.19. V419

    Seo da viga = 20x55cm

    12,11184 tf

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,27500 tf/m PP

    0,72350 tf/m

  • 24

    3.20. V420

    Seo da viga = 20x55cm e 15x55cm

    5,63654 tf 15,46382 tf

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,20625 tf/m 0,20625 tf/m PP

    0,72350 tf/m 0,65475 tf/m 0,20625 tf/m

  • 25

    3.21. V421

    Seo da viga = 20x55cm

    7,67755 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 1,21680 tf/m 1,43000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    1,94030 tf/m 2,04965 tf/m

  • 26

    3.22. V422

    Seo da viga = 20x55cm

    5,63654 tf

    0,54908 tf 2,99143 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,47580 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    0,72350 tf/m 1,19930 tf/m

  • 27

    3.23. V423

    Seo da viga = 12x55cm

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,47580 tf/m 1,21680 tf/m Laje

    Parede 0,53235 tf/m 0,53235 tf/m Parede

    PP 0,16500 tf/m 0,16500 tf/m PP

    1,17315 tf/m 1,91415 tf/m

  • 28

    3.24. V424

    Seo da viga = 20x55cm

    1,14073 tf

    Laje 0,00000 tf/m Laje

    Laje 1,48980 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,27500 tf/m PP

    2,21330 tf/m

  • 29

    4. ESQUEMA ESTRUTURAL DAS VIGAS DE COBERTURA

    4.1. V501

    Seo da viga = 15x55cm

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 1,39490 tf/m 1,39490 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,20625 tf/m 0,20625 tf/m 0,20625 tf/m 0,20625 tf/m PP

    0,65475 tf/m 2,04965 tf/m 2,04965 tf/m 0,65475 tf/m

  • 30

    4.2. V502

    Seo da viga = 12x55cm

    1,40704 tf 2,58078 tf 1,40704 tf

    Laje 0,00000 tf/m 1,39490 tf/m 1,39490 tf/m 1,39490 tf/m 1,39490 tf/m 0,00000 tf/m Laje

    Laje 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m Laje

    Parede 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Parede

    PP 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m PP

    0,51600 tf/m 1,91090 tf/m 1,91090 tf/m 1,91090 tf/m 1,91090 tf/m 0,51600 tf/m

  • 31

    4.3. V503

    Seo da viga = 12x55cm

    1,92370 tf

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    0,61350 tf/m

  • 32

    4.4. V504

    Seo da viga = 12x55cm

    1,71984 tf

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    0,61350 tf/m

  • 33

    4.5. V505

    Seo da viga = 12x55cm

    Laje 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m 0,35100 tf/m Laje

    Laje 1,39100 tf/m 0,00000 tf/m 0,15990 tf/m 1,39100 tf/m Laje

    Parede 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Parede

    PP 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m 0,16500 tf/m PP

    1,90700 tf/m 0,51600 tf/m 0,67590 tf/m 1,90700 tf/m

  • 34

    4.6. V506

    Seo da viga = 12x55cm

    Laje 0,15600 tf/m Laje

    Laje 0,89050 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    1,66000 tf/m

  • 35

    4.7. V507

    Seo da viga = 12x30cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,09000 tf/m PP

    0,09000 tf/m

  • 36

    4.8. V508

    Seo da viga = 15x55cm

    8 CARGA de 0,09975 tf

    Laje 0,00000 tf/m 0,88920 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,20625 tf/m 0,20625 tf/m PP

    0,65475 tf/m 1,54395 tf/m

  • 37

    4.9. V509

    Seo da viga = 12x50cm

    8 CARGA de 0,09975 tf

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 38

    4.10. V510

    Seo da viga = 12x55cm

    Laje 1,39100 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    2,00450 tf/m

  • 39

    4.11. V511

    Seo da viga = 12x55cm

    Laje 1,39100 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,44850 tf/m Parede

    PP 0,16500 tf/m PP

    2,00450 tf/m

  • 40

    4.12. V512

    Seo da viga = 20x55cm

    1,14073 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,74100 tf/m 1,43000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    1,46450 tf/m 2,15350 tf/m

  • 41

    4.13. V513

    Seo da viga = 20x55cm

    5,51237 tf 0,50190 tf 1,75765 tf

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,74100 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m PP

    0,72350 tf/m 0,72350 tf/m 0,72350 tf/m 1,01600 tf/m

  • 42

    4.14. V514

    Seo da viga = 20x55cm

    7,67755 tf

    Laje 1,43000 tf/m 1,43000 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,00000 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    1,70500 tf/m 1,70500 tf/m

  • 43

    4.15. V515

    Seo da viga = 20x55cm

    6,33887 tf 0,08910 tf 12,96578 tf

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m 0,51350 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m PP

    0,72350 tf/m 0,27500 tf/m 0,78850 tf/m 0,27500 tf/m

  • 44

    4.16. V516

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 45

    4.17. V517

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 46

    4.18. V518

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 47

    4.19. V518 B

    Seo da viga = 15x55cm

    0,08910 tf

    Laje 0,00000 tf/m 0,51220 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,20625 tf/m 0,20625 tf/m PP

    0,65475 tf/m 1,16695 tf/m

  • 48

    4.20. V519

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 49

    4.21. V520

    Seo da viga = 20x55cm

    12,11184 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,00000 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    0,27500 tf/m 0,27500 tf/m

  • 50

    4.22. V521

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 51

    4.23. V522

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 52

    4.24. V523

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 53

    4.25. V524

    Seo da viga = 12x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,15000 tf/m PP

    0,15000 tf/m

  • 54

    4.26. V525

    Seo da viga = 20x55 e 15x55cm

    6,33887 tf 12,89813 tf

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,20625 tf/m 0,20625 tf/m 0,20625 tf/m PP

    0,72350 tf/m 0,65475 tf/m 0,65475 tf/m 0,20625 tf/m

  • 55

    4.27. V526

    Seo da viga = 20x55cm

    7,67755 tf

    Laje 1,43000 tf/m 1,43000 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,00000 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    1,70500 tf/m 1,70500 tf/m

  • 56

    4.28. V527

    Seo da viga = 20x55cm

    5,51237 tf 0,40395 tf 1,73440 tf

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,74100 tf/m Laje

    Laje 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m 0,00000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m 0,44850 tf/m 0,00000 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m 0,27500 tf/m PP

    0,72350 tf/m 0,72350 tf/m 0,72350 tf/m 1,01600 tf/m

  • 57

    4.29. V528

    Seo da viga = 20x55cm

    1,14073 tf

    Laje 0,00000 tf/m 0,00000 tf/m Laje

    Laje 0,74100 tf/m 1,43000 tf/m Laje

    Parede 0,44850 tf/m 0,44850 tf/m Parede

    PP 0,27500 tf/m 0,27500 tf/m PP

    1,46450 tf/m 2,15350 tf/m

  • 58

    5. ESQUEMA ESTRUTURALDAS VIGAS DO CINTAMENTO

    5.1. V301

    Seo da viga = 12x40cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,39975 tf/m Parede

    PP 0,12000 tf/m PP

    0,51975 tf/m

  • 59

    5.2. V302

    Seo da viga = 12x40cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,39975 tf/m Parede

    PP 0,12000 tf/m PP

    0,51975 tf/m

  • 60

    5.3. V303

    Seo da viga = 12x40cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,39975 tf/m Parede

    PP 0,12000 tf/m PP

    0,51975 tf/m

  • 61

    5.4. V304

    Seo da viga = 12x40cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,39975 tf/m Parede

    PP 0,12000 tf/m PP

    0,51975 tf/m

  • 62

    6. ESQUEMA ESTRUTURALDAS VIGAS DO FUNDO DO

    RESERVATRIO

    6.1. V401

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,50568 tf/m Laje

    Parede 0,28275 tf/m Parede

    PP 0,18750 tf/m PP

    0,97593 tf/m

  • 63

    6.2. V402

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,50568 tf/m Laje

    Parede 0,28275 tf/m Parede

    PP 0,18750 tf/m PP

    0,97593 tf/m

  • 64

    6.3. V403

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,47290 tf/m Laje

    Parede 0,28275 tf/m Parede

    PP 0,18750 tf/m PP

    0,94315 tf/m

  • 65

    6.4. V404

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,47290 tf/m Laje

    Parede 0,28275 tf/m Parede

    PP 0,18750 tf/m PP

    0,94315 tf/m

  • 66

    7. ESQUEMA ESTRUTURALDAS VIGAS DO TETO DO RESERVATRIO

    7.1. V501

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,32000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,18750 tf/m PP

    0,50750 tf/m

  • 67

    7.2. V502

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,32000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,18750 tf/m PP

    0,50750 tf/m

  • 68

    7.3. V503

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,18750 tf/m PP

    0,18750 tf/m

  • 69

    7.4. V504

    Seo da viga = 15x50cm

    Laje 0,00000 tf/m Laje

    Laje 0,00000 tf/m Laje

    Parede 0,00000 tf/m Parede

    PP 0,18750 tf/m PP

    0,18750 tf/m

  • 70

    6. DIMENCIONAMENTO DA AREA DE AO

    Viga Momento

    Fletor Mk

    (tf.m) bw (m)

    h (m) x (cm) x/d Dominio As (cm) As' (cm)

    TETO DO RESERVATRIO

    V501 M1k 0,89209 0,15 0,5 1,5450 0,0343 2 0,6472 -

    V502 M1k 0,89209 0,15 0,5 1,5450 0,0343 2 0,6472 -

    V503 M1k 0,28547 0,15 0,5 0,4897 0,0109 2 0,2052 -

    V504 M1k 0,28547 0,15 0,5 0,4897 0,0109 2 0,2052 -

    FUNDO DO RESERVATRIO

    V401 M1k 1,71550 0,15 0,5 3,0108 0,0669 2 1,2613 -

    V402 M1k 1,71550 0,15 0,5 3,0108 0,0669 2 1,2613 -

    V403 M1k 1,43596 0,15 0,5 2,5086 0,0557 2 1,0509 -

    V404 M1k 1,43596 0,15 0,5 2,5086 0,0557 2 1,0509 -

    CINTAMENTO

    V301 M1k 0,92830 0,12 0,4 2,6272 0,0751 2 0,8805 -

    V302 M1k 0,92830 0,12 0,4 2,6272 0,0751 2 0,8805 -

    V303 M1k 0,80499 0,12 0,4 2,2686 0,0648 2 0,7603 -

    V304 M1k 0,80499 0,12 0,4 2,2686 0,0648 2 0,7603 -

    COBERTURA

    V501

    M1k 0,99371 0,15 0,55 1,5467 0,0309 2 0,6480 -

    X1k 3,62908 0,15 0,55 5,8529 0,1171 2 2,4519 -

    M2k 3,10750 0,15 0,55 4,9750 0,0995 2 2,0842 -

    X2k 5,93570 0,15 0,55 9,9104 0,1982 2 4,1518 -

    M3k 3,10750 0,15 0,55 4,9750 0,0995 2 2,0842 -

    X3k 3,62908 0,15 0,55 5,8529 0,1171 2 2,4519 -

    M4k 0,99371 0,15 0,55 1,5467 0,0309 2 0,6480 -

    V502

    M1k 2,91369 0,12 0,55 5,8750 0,1175 2 1,9690 -

    X1k 6,76393 0,12 0,55 14,7341 0,2947 3 4,9380 -

    M2k 4,80387 0,12 0,55 10,0369 0,2007 2 3,3638 -

    X2k 6,70643 0,12 0,55 14,5898 0,2918 3 4,8897 -

    M3K 2,84744 0,12 0,55 5,7346 0,1147 2 1,9219 -

    V503 X1K 1,88125 0,12 0,55 3,7260 0,0745 2 1,2487 -

    V504 M1K 1,70594 0,12 0,55 3,3689 0,0674 2 1,1291 -

    V505

    M1K 4,72502 0,12 0,55 9,8567 0,1971 2 3,3034 -

    X1K 5,68326 0,12 0,55 12,0901 0,2418 2 4,0519 -

    X2K 1,84688 0,12 0,55 3,6558 0,0731 2 1,2252 -

    X3K 5,18507 0,12 0,55 10,9169 0,2183 2 3,6587 -

    M2K 4,90219 0,12 0,55 10,2624 0,2052 2 3,4394 -

    V506 M1k 2,79480 0,12 0,55 5,6234 0,1125 2 1,8846 -

    V507 M1k 0,04410 0,12 0,3 0,1699 0,0068 2 0,0570 -

  • 71

    Viga Momento

    Fletor Mk (tf.m)

    bw (m)

    h (m) x (cm) x/d Dominio As (cm) As' (cm)

    V508 X1k 2,07279 0,15 0,55 3,2721 0,0654 2 1,3708 -

    M1K 1,99161 0,15 0,55 3,1405 0,0628 2 1,3157 -

    V509 M1K 1,26754 0,12 0,5 2,7747 0,0617 2 0,9299 -

    V510 M1K 7,57952 0,12 0,55 16,8308 0,3366 3 5,6407 -

    V511 M1K 7,57952 0,12 0,55 16,8308 0,3366 3 5,6407 -

    V512

    M1K 1,17525 0,2 0,55 1,3700 0,0274 2 0,7652 -

    X1K 1,32147 0,2 0,55 1,5426 0,0309 2 0,8617 -

    M2K 0,18033 0,2 0,55 0,2083 0,0042 2 0,1163 -

    X2K 1,83768 0,2 0,55 2,1559 0,0431 2 1,2042 -

    V513

    X1K 6,18682 0,2 0,55 7,5944 0,1519 2 4,2420 -

    M1K 3,09659 0,2 0,55 3,6784 0,0736 2 2,0547 -

    X2K 3,51640 0,2 0,55 4,1950 0,0839 2 2,3432 -

    V514 M1K 0,58058 0,2 0,55 0,6730 0,0135 2 0,3759 -

    X1K 9,47683 0,2 0,55 12,0969 0,2419 2 6,7570 -

    V515

    X1K 7,41047 0,2 0,55 9,2246 0,1845 2 5,1526 -

    M1K 13,86087 0,2 0,55 18,8119 0,3762 3 10,5078 -

    X2K 20,96316 0,2 0,55 32,7496 0,6550 4 17,5475 3,7574

    V516 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V517 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V518 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V518B M1K 1,50001 0,15 0,55 2,3501 0,0470 2 0,9845 -

    V519 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V520 X1K 13,48940 0,2 0,55 18,2034 0,3641 3 10,1679 -

    V521 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V522 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V523 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V524 M1K 0,03317 0,12 0,5 0,0709 0,0016 2 0,0237 -

    V525 X1K 8,12756 0,2 0,55 10,2035 0,2041 2 5,6994 -

    X2K 21,56273 0,15 0,55 no passa, deve rever a seo da viga

    V526 M1K 0,58058 0,2 0,55 0,6730 0,0135 2 0,3759 -

    X1K 9,47683 0,2 0,55 12,0969 0,2419 2 6,7570 -

    V527

    X1K 6,18682 0,2 0,55 7,5944 0,1519 2 4,2420 -

    M1K 3,13318 0,2 0,55 3,7233 0,0745 2 2,0797 -

    X2K 3,56662 0,2 0,55 4,2571 0,0851 2 2,3779 -

  • 72

    Viga Momento

    Fletor Mk

    (tf.m) bw (m)

    h (m) x (cm) x/d Dominio As (cm) As' (cm)

    V528

    M1K 0,95714 0,2 0,55 1,1134 0,0223 2 0,6219 -

    X1K 1,85966 0,2 0,55 2,1822 0,0436 2 1,2189 -

    M2K 1,01735 0,2 0,55 1,1842 0,0237 2 0,6614 -

    X2K 0,81749 0,2 0,55 0,9497 0,0190 2 0,5305 -

    TRREO

    V401

    M1K 0,99371 0,15 0,55 1,5467 0,0309 2 0,6480 -

    X1K 3,62908 0,15 0,55 5,8529 0,1171 2 2,4519 -

    M2K 3,01075 0,15 0,55 4,8137 0,0963 2 2,0166 -

    X2K 5,93570 0,15 0,55 9,9104 0,1982 2 4,1518 -

    M3K 3,01075 0,15 0,55 4,8137 0,0963 2 2,0166 -

    X3K 3,62908 0,15 0,55 5,8529 0,1171 2 2,4519 -

    M4K 0,99371 0,15 0,55 1,5467 0,0309 2 0,6480 -

    V402 X1K 1,54804 0,12 0,55 3,0490 0,0610 2 1,0219 -

    V403 X1K 1,54804 0,12 0,55 3,0490 0,0610 2 1,0219 -

    V404

    M1K 4,69397 0,12 0,55 9,7859 0,1957 2 3,2797 -

    X1K 8,00271 0,12 0,55 17,9575 0,3592 3 6,0183 -

    M2K 4,13595 0,12 0,55 8,5295 0,1706 2 2,8586 -

    X2K 7,93030 0,12 0,55 17,7627 0,3553 3 5,9531 -

    M3K 4,60850 0,12 0,55 9,5915 0,1918 2 3,2145 -

    V405 M1K 0,24571 0,12 0,55 0,4739 0,0095 2 0,1588 -

    V406 M1K 0,24571 0,12 0,55 0,4739 0,0095 2 0,1588 -

    V407

    M1K 5,82361 0,12 0,55 12,4256 0,2485 2 4,1644 -

    X1K 7,08703 0,12 0,55 15,5535 0,3111 3 5,2126 -

    X2K 2,39134 0,12 0,55 4,7777 0,0956 2 1,6012 -

    X3K 6,32518 0,12 0,55 13,6434 0,2729 3 4,5725 -

    M2K 6,10214 0,12 0,55 13,0982 0,2620 3 4,3898 -

    V408 M1K 2,79480 0,12 0,55 5,6234 0,1125 2 1,8846 -

    V409 M1K 0,28778 0,12 0,3 1,1263 0,0451 2 0,3775 -

    V410 X1K 1,83135 0,15 0,55 2,8817 0,0576 2 1,2072 -

    M1K 1,80790 0,15 0,55 2,8439 0,0569 2 1,1914 -

    V411 M1K 7,75024 0,15 0,55 13,3371 0,2667 3 5,5873 -

    V412 M1K 7,75024 0,15 0,55 13,3371 0,2667 3 5,5873 -

    V413 M1K 0,97575 0,2 0,55 1,1353 0,0227 2 0,6341 -

    X1K 1,86083 0,2 0,55 2,1836 0,0437 2 1,2197 -

    V414 M1K 1,30778 0,12 0,55 2,5656 0,0513 2 0,8599 -

    V415

    X1K 6,44527 0,2 0,55 7,9347 0,1587 2 4,4321 -

    M1K 5,27006 0,2 0,55 6,4042 0,1281 2 3,5772 -

    X1K 7,01709 0,2 0,55 8,6951 0,1739 2 4,8569 -

  • 73

    Viga Momento

    Fletor Mk (tf.m)

    bw (m)

    h (m) x (cm) x/d Dominio As (cm) As' (cm)

    V416 M1K 0,96744 0,2 0,55 1,1255 0,0225 2 0,6287 -

    X1K 9,68535 0,2 0,55 12,3959 0,2479 2 6,9240 -

    V417

    X1K 7,02516 0,2 0,55 8,7059 0,1741 2 4,8629 -

    M1K 14,54086 0,2 0,55 19,9482 0,3990 3 11,1425 -

    X2K 25,05420 0,2 0,55 45,3100 0,9062 4 17,5475 1,7339

    V418 M1K 1,93748 0,15 0,55 3,0530 0,0611 2 1,2790 -

    V419 X1K 13,76074 0,2 0,55 18,6470 0,3729 3 10,4157 -

    V420 X1K 7,41501 0,2 0,55 9,2307 0,1846 2 5,1560 -

    X2K 25,79606 0,15 0,55 no passa, deve rever a seo da viga

    V421 M1K 0,96744 0,2 0,55 1,1255 0,0225 2 0,6287 -

    X1K 9,68535 0,2 0,55 12,3959 0,2479 2 6,9240 -

    V422

    X1K 6,44527 0,2 0,55 7,9347 0,1587 2 4,4321 -

    M1K 5,24738 0,2 0,55 6,3751 0,1275 2 3,5609 -

    X1K 6,96701 0,2 0,55 8,6281 0,1726 2 4,8194 -

    V423 M1K 1,30778 0,12 0,55 2,5656 0,0513 2 0,8599 -

    V424 M1K 1,77729 0,2 0,55 2,0839 0,0417 2 1,1640 -

    X1K 1,20904 0,2 0,55 1,4099 0,0282 2 0,7875 -

  • 74

    7. DESLACAMENTO (ymax.) DAS VIGAS

    Viga Momento Fletor bw (m)

    h (m)

    Vo terico

    l (m) E (Mpa)

    Flecha de clculo

    ymx(mm)

    FlechaAdm. NBR 6118

    (mm)

    Resultado (status)

    deslocamento

    + () ; - ()

    TETO DO RESERVATRIO

    V501 TRECHO 1 0,15 0,5 3,75 28000 0,0229 15 ok -

    V502 TRECHO 1 0,15 0,5 3,75 2800 0,0229 15 ok -

    V503 TRECHO 1 0,15 0,5 3,49 2800 0,0828 13,96 ok -

    V504 TRECHO 1 0,15 0,5 3,49 2800 0,0828 13,96 ok -

    FUNDO DO RESERVATRIO

    V401 TRECHO 1 0,15 0,5 3,75 2800 0,5744 15 ok -

    V402 TRECHO 1 0,15 0,5 3,75 2800 0,5744 15 ok -

    V403 TRECHO 1 0,15 0,5 3,49 2800 0,4164 13,96 ok -

    V404 TRECHO 1 0,15 0,5 3,49 2800 0,4164 13,96 ok -

    CINTAMENTO

    V301 TRECHO 1 0,12 0,4 3,78 2800 0,7710 15,12 ok -

    V302 TRECHO 1 0,12 0,4 3,78 2800 0,7710 15,12 ok -

    V303 TRECHO 1 0,12 0,4 3,52 2800 0,5798 14,08 ok -

    V304 TRECHO 1 0,12 0,4 3,52 2800 0,5798 14,08 ok -

    COBERTURA

    V501

    TRECHO 6 0,15 0,55 5,5 2800 0,0001 22 ok -

    TRECHO 8 0,15 0,55 5,5 2800 0,0000 22 ok -

    TRECHO 10 0,15 0,55 5,5 2800 0,0000 22 ok -

    TRECHO 12 0,15 0,55 5,5 2800 0,0001 22 ok -

    V502 TRECHO 1 0,12 0,55 5,5 2800 1,2530 22 ok -

    TRECHO 2 0,12 0,55 5,73 2800 1,9570 22,92 ok -

    TRECHO 3 0,12 0,55 5,47 2800 1,2050 21,88 ok -

    V503 TRECHO 1 0,12 0,55 0,86 2800 0,2715 6,88 ok -

    TRECHO 2 0,12 0,55 1,79 2800 0,0645 7,16 ok +

    V504 TRECHO 1 0,12 0,55 0,86 2800 0,2715 6,88 ok -

    TRECHO 2 0,12 0,55 1,79 2800 0,0645 7,16 ok +

    V505

    TRECHO 1 0,12 0,55 5,53 2800 2,6030 22,12 ok -

    TRECHO2 0,12 0,55 1,97 2800 0,1942 7,88 ok +

    TRECHO 3 0,12 0,55 3,68 2800 0,3627 14,72 ok +

    TRECHO 4 0,12 0,55 5,52 2800 2,7750 22,08 ok -

    V506 TRECHO 1 0,12 0,55 3,67 2800 0,8417 14,68 ok -

    V507 TRECHO 1 0,12 0,3 1,98 2800 0,0238 7,92 ok -

  • 75

    Viga Momento

    Fletor bw (m)

    h (m)

    Vo terico

    l (m)

    E (Mpa)

    Flecha de clculo

    ymx(mm)

    FlechaAdm. NBR 6118

    (mm) Resultado(status)

    deslocamento

    + () ; - ()

    V508

    TRECHO 1 0,15 0,55 1,95 2800

    0,0599 7,8 ok +

    TRECHO 2 0,15 0,55 3,73 2800

    0,4141 14,92 ok -

    V509 TRECHO 1 0,12 0,5 5,7 2800

    1,1860 22,8 ok -

    V510 TRECHO 1 0,12 0,55 5,5 2800

    5,1268 22 ok -

    V511 TRECHO 1 0,12 0,55 5,5 2800

    5,1268 22 ok -

    V512

    TRECHO 1 0,2 0,55 1,94 2800

    0,0727 7,76 ok -

    TRECHO 2 0,2 0,55 2,55 2800

    0,0183 10,2 ok +

    TRECHO 3 0,2 0,55 0,88 2800

    0,1238 7,04 ok -

    V513

    TRECHO 1 0,2 0,55 1,05 2800

    1,4320 4,2 ok -

    TRECHO 2 0,2 0,55 4 2800

    0,3106 16 ok +

    TRECHO 3 0,2 0,55 1,59 2800

    1,7450 12,72 ok -

    V514

    TRECHO 1 0,2 0,55 4,26 2800

    0,9417 17,04 ok +

    TRECHO 2 0,2 0,55 1,1 2800

    1,5770 8,8 ok -

    V515

    TRECHO 1 0,2 0,55 1,1 2800

    3,5130 8,8 ok -

    TRECHO 2 0,2 0,55 4,01 2800

    3,4000 16,04 ok +

    TRECHO 3 0,2 0,55 1,59 2800

    8,5480 12,72 ok -

    V516 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V517 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V518 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V518B TRECHO 1 0,15 0,55 3,55 2800

    0,4088 14,2 ok -

    V519 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V520

    TRECHO 1 0,2 0,55 4,28 2800

    1,8370 17,12 ok +

    TRECHO 2 0,2 0,55 1,1 2800

    3,2240 8,8 ok -

    V521 TRECHO18 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V522 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V523 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V524 TRECHO 1 0,12 0,5 1,33 2800

    0,0017 5,32 ok -

    V525

    TRECHO 1 0,2 0,55 1,2 2800

    5,2380 9,6 ok -

    TRECHO 2 0,15 0,55 3,85 2800

    4,3410 15,4 ok +

    TRECHO 3 0,15 0,55 1,65 2800

    0,1199 13,2 ok -

    V526

    TRECHO 1 0,2 0,55 4,26 2800

    0,9417 17,04 ok +

    TRECHO 2 0,2 0,55 1,1 2800

    1,5770 8,8 ok -

  • 76

    Viga Momento

    Fletor bw (m)

    h (m)

    Vo terico

    l (m)

    E (Mpa)

    Flecha de clculo

    ymx(mm)

    FlechaAdm. NBR 6118

    (mm)

    Resultado (status)

    deslocamento

    + () ; - ()

    V527

    TRECHO 1 0,2 0,55 1,05 2800 1,4370 8,4 ok -

    TRECHO 2 0,2 0,55 4 2800 0,9311 16 ok +

    TRECHO 3 0,2 0,55 1,59 2800 1,7600 12,72 ok -

    V528

    TRECHO 1 0,2 0,55 2,64 2800 0,0631 10,56 ok -

    TRECHO 2 0,2 0,55 2,94 2800 0,0828 11,76 ok -

    TRECHO 3 0,2 0,55 0,49 2800 0,0275 3,92 ok +

    TRREO

    V401

    TRECHO 1 0,15 0,55 5,5 2800 0,2246 22 ok -

    TRECHO 2 0,15 0,55 5,5 2800 1,0680 22 ok -

    TRECHO 3 0,15 0,55 5,5 2800 1,0680 22 ok -

    TRECHO 4 0,15 0,55 5,5 2800 0,2246 22 ok -

    V402 TRECHO 1 0,12 0,55 0,63 2800 0,0422 5,04 ok -

    V403 TRECHO 1 0,12 0,55 0,63 2800 0,0422 5,04 ok -

    V404

    TRECHO 1 0,12 0,55 5,5 2800 0,0476 22 ok -

    TRECHO 2 0,12 0,55 5,73 2800 0,0312 22,92 ok -

    TRECHO 3 0,12 0,55 5,47 2800 0,0461 21,88 ok -

    V405 TRECHO 1 0,12 0,55 1,79 2800 0,0176 7,16 ok -

    V406 TRECHO 1 0,12 0,55 1,79 2800 0,0176 7,16 ok -

    V407

    TRECHO 1 0,12 0,55 5,53 2800 3,1980 22,12 ok -

    TRECHO 2 0,12 0,55 1,97 2800 0,2253 7,88 ok +

    TRECHO 3 0,12 0,55 3,68 2800 0,4864 14,72 ok +

    TRECHO 4 0,12 0,55 5,52 2800 3,4700 22,08 ok -

    V408 TRECHO 1 0,12 0,55 3,67 2800 0,8417 14,68 ok -

    V409 TRECHO 1 0,12 0,3 1,98 2800 0,1555 7,92 ok -

    V410 TRECHO 1 0,15 0,55 2 2800 0,0554 8 ok +

    TRECHO 2 0,15 0,55 3,7 2800 0,3711 14,8 ok -

    V411 TRECHO 1 0,15 0,55 5,5 2800 4,1939 22 ok -

    V412 TRECHO 1 0,15 0,55 5,5 2800 0,0594 22 ok -

    V413 TRECHO 1 0,2 0,55 2,54 2800 0,0594 10,16 ok -

    TRECHO 2 0,2 0,55 0,88 2800 0,0609 7,04 ok -

    V414 TRECHO 1 0,12 0,55 2,41 2800 1,8390 9,64 ok -

  • 77

    Viga Momento

    Fletor bw (m)

    h (m)

    Vo terico

    l (m)

    E (Mpa)

    Flecha de clculo

    ymx(mm)

    FlechaAdm. NBR 6118

    (mm)

    Resultado (status)

    deslocamento

    + () ; - ()

    V415

    TRECHO 1 0,2 0,55 1,07 2800

    1,8390 4,28 ok -

    TRECHO 2 0,2 0,55 4 2800

    1,3960 16 ok +

    TRECHO 3 0,2 0,55 1,64 2800

    1,5750 13,12 ok -

    V416

    TRECHO 1 0,2 0,55 4,26 2800

    0,0439 17,04 ok +

    TRECHO 2 0,2 0,55 1,1 2800

    1,4870 8,8 ok -

    V417

    TRECHO 1 0,2 0,55 1,16 2800

    3,7560 9,28 ok -

    TRECHO 2 0,2 0,55 3,97 2800

    3,5520 15,88 ok +

    TRECHO 3 0,2 0,55 1,59 2800

    9,6260 12,72 ok -

    V418 TRECHO 1 0,15 0,55 3,55 2800

    4,0440 14,2 ok -

    V419

    TRECHO 1 0,2 0,55 4,26 2800

    3,0883 17,04 ok +

    TRECHO 2 0,2 0,55 1,1 2800

    1,6460 8,8 ok -

    V420

    TRECHO 1 0,2 0,55 1,22 2800

    5,6460 9,76 ok -

    TRECHO 2 0,15 0,55 3,85 2800

    4,9140 15,4 ok +

    TRECHO 3 0,15 0,55 1,65 2800

    0,1403 13,2 ok -

    V421

    TRECHO 1 0,2 0,55 4,26 2800

    0,0439 17,04 ok +

    TRECHO 2 0,2 0,55 1,1 2800

    1,4870 8,8 * -

    V422

    TRECHO 1 0,2 0,55 1,07 2800

    1,8350 8,56 ok -

    TRECHO 2 0,2 0,55 4 2800

    1,3760 16 ok +

    TRECHO 3 0,2 0,55 1,67 2800

    3,2210 13,36 ok -

    V423 TRECHO 1 0,12 0,55 2,41 2800

    0,1805 9,64 ok -

    V424

    TRECHO 1 0,2 0,55 2,91 2800

    1,8090 11,64 ok -

    TRECHO 2 0,2 0,55 0,65 2800

    0,7089 5,2 ok +

  • 78

    8. CARGA NOS PILARES

  • 79